CN117532332B - A method for assembling small-gap bolts - Google Patents
A method for assembling small-gap boltsInfo
- Publication number
- CN117532332B CN117532332B CN202311707180.2A CN202311707180A CN117532332B CN 117532332 B CN117532332 B CN 117532332B CN 202311707180 A CN202311707180 A CN 202311707180A CN 117532332 B CN117532332 B CN 117532332B
- Authority
- CN
- China
- Prior art keywords
- bolt
- bolts
- disc
- formal
- sealing disc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P21/00—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with program control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING, OR HOLDING
- B25B27/00—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
- B25B27/14—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same
- B25B27/143—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for for assembling objects other than by press fit or detaching same for installing wire thread inserts or tubular threaded inserts
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Turbine Rotor Nozzle Sealing (AREA)
Abstract
A small-gap bolt assembling method includes presetting three process locating pins with different structures, uniformly distributing and correcting concentricity of bolt connecting holes of a sealing disc and a turbine disc by using the first process locating pin after a bolt head is preprocessed, uniformly distributing and correcting concentricity of a drum shaft, the sealing disc and the turbine disc connecting holes by using the second process locating pin, checking an assembled bolt hole system by using the third process locating pin, assembling a formal bolt at a process bolt removing position after checking, decomposing the process bolt, and replacing the formal bolt. According to the method, the small gap bolt of the certain type high-pressure turbine rotor balance assembly is assembled, the screw rod part is inspected after the disassembly, no deep spiral line is found, the surface quality is good, and the problems of the assembly quality and the efficiency of the small gap bolt are effectively solved.
Description
Technical Field
The invention relates to the field of mechanical assembly, in particular to a small-clearance bolt assembly method.
Background
The high-pressure turbine rotor assembly of the aeroengine is assembled by parts such as a turbine disc, a sealing disc, a drum shaft and the like and is connected through bolts and nuts. Typically, the clearance between the bolt shank and the diameter of the part connecting hole is about 0.5mm, but after a small clearance bolt is adopted, the radial theoretical clearance between the bolt shank and the part connecting hole is only 0.1mm. Since the assembly part bolts need to pass through 3 part connecting holes to connect all parts together, the theoretical clearance between the bolts and the part connecting holes is only 0.02mm due to the unavoidable difference of the position degrees of all the part connecting holes. The conventional visual assembly method cannot ensure that the bolts are completely aligned with the assembly holes, the interference of the bolts and the hole walls can cause the extrusion damage of the rod parts, a spiral line with obvious depth is generated, and the surface quality requirement cannot be ensured.
Disclosure of Invention
The invention aims to provide a small-gap bolt assembly method, which solves the problems that the conventional visual assembly method cannot ensure that a bolt is completely aligned with an assembly hole, the interference of the bolt and the hole wall can cause the extrusion damage of a rod part, a spiral line with obvious depth is generated, and the surface quality requirement cannot be ensured.
In order to achieve the above purpose, the present invention adopts the following technical scheme:
A method of assembling a small gap bolt, comprising:
three process positioning pins with different structures are preset;
After the bolt heads are pretreated, the concentricity of the bolt connecting holes of the sealing disc and the turbine disc is uniformly distributed and corrected by using a first process positioning pin;
uniformly distributing and correcting concentricity of the drum shaft, the sealing disc and the turbine disc connecting holes by using second process positioning pins;
Checking the assembled bolt hole system by using a third process positioning pin;
after checking, the formal bolts are installed at the positions of the process bolts, the process bolts are disassembled, and the formal bolts are replaced.
Further, three process positioning pins with different structures are preset:
Three positioning pins are adopted for positioning in the assembly process, numbering is carried out according to the first type, the second type and the third type, and the process bolts are adopted for correcting the supporting plate nuts of the partial holes.
Further, the bolt head is pretreated:
Before assembly, the bolt head is marked with a serial number by a marker pen, and the threaded part is coated with lubricating grease.
Further, the concentricity of the bolt connection holes of the sealing disc and the turbine disc is uniformly corrected by using the first process positioning pins:
The sealing disc is installed on the turbine disc assembly, 8 first process positioning pins are uniformly distributed, the positioning pins are screwed by a wrench, concentricity of the bolt connecting holes of the sealing disc and the turbine disc is uniformly distributed and corrected, then 8 process bolts are uniformly distributed, limiting force ensures that parts are axially tightly attached, and then the process bolts and the first positioning pins are decomposed.
Further, the concentricity of the drum shaft, the sealing disc and the turbine disc connecting holes is uniformly corrected by using second process positioning pins:
The drum assembly is installed at the spigot of the sealing disc, 8 second process locating pins are uniformly distributed, the rod parts of the locating pins are attached to the inner walls of the drum shaft and the bolt holes of the sealing disc, concentricity of the drum shaft, the sealing disc and the connecting holes of the turbine disc is uniformly corrected, 8 process bolts are symmetrically screwed on the uniformly distributed, and axial attachment of parts is ensured by limiting force.
Further, the assembled bolt hole system is inspected by using a third process locating pin:
And checking the assembled bolt hole system by using a third process locating pin, ensuring that the positions of the turbine disc, the sealing disc and the drum shaft assembly holes are accurate, and then decomposing the second locating pin and the third locating pin.
Further, after checking for errors, the formal bolts are installed at the positions of the bolts for the detaching process:
filling formal bolts except 8 process bolts, manually screwing the formal bolts to be self-locking, measuring the height from the bolt head to the shaft end surface of the drum barrel to meet the preset requirement, and ensuring no interference;
Further, the bolts are screwed to the condition that the bolt heads are attached to the shaft end faces of the drum, then the bolts are screwed out, whether spiral lines exist on the bolt rod portions or not is checked, and the bolts which do not meet the requirements are replaced and reassembled according to the steps.
Further, the preset requirement is 16mm.
Further, the process bolts are disassembled, and the formal bolts are replaced:
And decomposing 8 process bolts, replacing formal bolts, symmetrically and uniformly limiting the force of all bolts to 2/3 moment requirements, and symmetrically and uniformly limiting the force to the moment requirements.
Compared with the prior art, the invention has the following technical effects:
the invention can reduce the interference between the bolts and the connecting holes, avoid the damage of the bolts and improve the one-time assembly qualification rate of the assembly. Has stronger adaptability and field popularization value.
According to the method, the small gap bolt of the certain type high-pressure turbine rotor balance assembly is assembled, the screw rod part is inspected after the disassembly, no deep spiral line is found, the surface quality is good, and the problems of the assembly quality and the efficiency of the small gap bolt are effectively solved.
Drawings
Fig. 1 is a flow chart.
FIG. 2 is a schematic illustration of a first pin corrected high pressure turbine disc and turbine front seal disc hole location.
FIG. 3 is a schematic view of a second pin alignment drum shaft and seal disc hole location
FIG. 4 is a schematic view of a third pin check turbine rotor bore mounting location.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and fully with reference to the accompanying drawings, in which it is evident that the embodiments described are some, but not all embodiments of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In the description of the present invention, it will be understood that the terms "comprises" and "comprising," when used in this specification, specify the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof.
It is also to be understood that the terminology used in the description of the invention is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used in this specification and the appended claims, the singular forms "a," "an," and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise.
It should be further understood that the term "and/or" as used in the present specification and the appended claims refers to any and all possible combinations of one or more of the associated listed items and includes such combinations, e.g., a and/or B, may mean that there are three cases, a alone, a and B together, and B alone. In the present invention, the character "/" generally indicates that the front and rear related objects are an or relationship.
It should be understood that although the terms first, second, third, etc. may be used to describe the preset ranges, etc. in the embodiments of the present invention, these preset ranges should not be limited to these terms. These terms are only used to distinguish one preset range from another. For example, a first preset range may also be referred to as a second preset range, and similarly, a second preset range may also be referred to as a first preset range without departing from the scope of embodiments of the present invention.
The term "if" as used herein may be interpreted as "at" or "when" depending on the context "or" in response to a determination "or" in response to a detection. Similarly, the phrase "if determined" or "if detected (stated condition or event)" may be interpreted as "when determined" or "in response to determination" or "when detected (stated condition or event)" or "in response to detection (stated condition or event), depending on the context.
Various structural schematic diagrams according to the disclosed embodiments of the present invention are shown in the accompanying drawings. The figures are not drawn to scale, wherein certain details are exaggerated for clarity of presentation and may have been omitted. The shapes of the various regions, layers and their relative sizes, positional relationships shown in the drawings are merely exemplary, may in practice deviate due to manufacturing tolerances or technical limitations, and one skilled in the art may additionally design regions/layers having different shapes, sizes, relative positions as actually required.
The invention provides a method for assembling a small-clearance bolt, which comprises the following steps:
three process positioning pins with different structures are preset;
After the bolt heads are pretreated, the concentricity of the bolt connecting holes of the sealing disc and the turbine disc is uniformly distributed and corrected by using a first process positioning pin;
uniformly distributing and correcting concentricity of the drum shaft, the sealing disc and the turbine disc connecting holes by using second process positioning pins;
Checking the assembled bolt hole system by using a third process positioning pin;
after checking, the formal bolts are installed at the positions of the process bolts, the process bolts are disassembled, and the formal bolts are replaced.
The specific assembly process is as follows:
1) Before assembly, the bolt head is marked with a serial number by a marker pen, and the threaded part is coated with lubricating grease.
2) The sealing disc is installed on the turbine disc assembly, 8 first taper process locating pins are uniformly distributed and installed, the locating pins are screwed by a wrench, and concentricity of the sealing disc and the bolt connecting hole of the turbine disc is uniformly distributed and corrected, as shown in fig. 2. Then, 8 process bolts are uniformly distributed, the force limiting ensures that the parts are axially tightly attached, and then the process bolts and the first positioning pin are decomposed.
FIG. 2 is a schematic diagram of a first pin corrected high pressure turbine disc and turbine front seal disc hole location
3) The drum assembly is installed in the spigot of the sealing disc, 8 second process locating pins are uniformly distributed, the rod parts of the locating pins are attached to the inner walls of the drum shaft and the bolt holes of the sealing disc, and concentricity of the drum shaft, the sealing disc and the connecting holes of the turbine disc is uniformly corrected (as shown in figure 3). The 8 process bolts are symmetrically screwed up uniformly, and the limiting force ensures the axial adhesion of the parts.
4) The assembled bolt hole system was inspected using a third type of pin, as shown in fig. 4, to ensure that the turbine disk, seal disk, drum shaft assembly holes were accurate, and then the second and third types of locating pins were disassembled.
5) And (3) installing formal bolts (except 8 process bolt positions), manually screwing to be self-locking, measuring the height from the bolt head to the shaft end surface of the drum barrel to meet the requirement of 16mm, and ensuring no interference.
6) And (3) screwing the bolt until the bolt head is attached to the shaft end surface of the drum, screwing the bolt out, and checking whether the spiral trace exists on the bolt rod part. And replacing the bolts which do not meet the requirements and reassembling according to the steps.
7) Decomposing 8 process bolts, and replacing the formal bolts according to the steps 5) and 6).
8) And (3) symmetrically and uniformly limiting the force of all bolts to 2/3 of the moment requirement, and then symmetrically and uniformly limiting the force to the moment requirement.
The method comprises the steps of designing a special locating pin, making an assembly step and controlling the assembly moment. The interference of the bolts and the connecting holes can be reduced, the damage of the bolts is avoided, and the one-time assembly qualification rate of the assembly is improved. Has stronger adaptability and field popularization value.
According to the method, the small gap bolt of the certain type high-pressure turbine rotor balance assembly is assembled, the screw rod part is inspected after the disassembly, no deep spiral line is found, the surface quality is good, and the problems of the assembly quality and the efficiency of the small gap bolt are effectively solved.
Finally, it should be noted that the above embodiments are only for illustrating the technical solution of the present invention and not for limiting the same, and although the present invention has been described in detail with reference to the above embodiments, it should be understood by those skilled in the art that modifications and equivalents may be made to the specific embodiments of the present invention without departing from the spirit and scope of the present invention, and any modifications and equivalents are intended to be included in the scope of the claims of the present invention.
Claims (6)
1. A method of assembling a small gap bolt, comprising:
three process positioning pins with different structures are preset;
After the bolt heads are pretreated, the concentricity of the bolt connecting holes of the sealing disc and the turbine disc is uniformly distributed and corrected by using a first process positioning pin;
uniformly distributing and correcting concentricity of the drum shaft, the sealing disc and the turbine disc connecting holes by using second process positioning pins;
Checking the assembled bolt hole system by using a third process positioning pin;
after checking, installing a formal bolt at the position of the process bolt for removing the process bolt, decomposing the process bolt, and replacing the formal bolt;
Concentricity of bolt connection holes of the sealing disc and the turbine disc is uniformly corrected by using first process positioning pins:
Installing a sealing disc on a turbine disc assembly, uniformly arranging 8 first process positioning pins, tightening the positioning pins by using a wrench, uniformly arranging 8 process bolts, limiting force to ensure that parts are tightly attached axially, and decomposing the process bolts and the first positioning pins;
and (3) uniformly distributing and correcting concentricity of the drum shaft, the sealing disc and the turbine disc connecting holes by using second process positioning pins:
The drum assembly is installed at the spigot of the sealing disc, 8 second process locating pins are uniformly distributed, so that the rod parts of the locating pins are attached to the inner walls of the drum shaft and the bolt holes of the sealing disc, concentricity of the drum shaft, the sealing disc and the connecting holes of the turbine disc are uniformly distributed and corrected, 8 process bolts are uniformly distributed and symmetrically screwed, and axial attachment of parts is ensured by limiting force;
and checking the assembled bolt hole system by using a third process positioning pin:
checking the assembled bolt hole system by using a third process locating pin, ensuring that the positions of the turbine disc, the sealing disc and the drum shaft assembly holes are accurate, and then decomposing the second locating pin and the third locating pin;
after checking, the formal bolts are installed at the positions of the bolts for removing the process:
the formal bolts are installed except for 8 process bolts, the formal bolts are manually screwed to be self-locking, and the heights of the bolt heads to the shaft end surface of the drum barrel are measured to meet preset requirements, so that no interference is ensured.
2. The method for assembling a small gap bolt according to claim 1, wherein three kinds of process positioning pins having different structures are preset:
Three positioning pins are adopted for positioning in the assembly process, numbering is carried out according to the first type, the second type and the third type, and the process bolts are adopted for correcting the supporting plate nuts of the partial holes.
3. The method of assembling a small gap bolt according to claim 1, wherein the bolt head is pre-treated:
Before assembly, the bolt head is marked with a serial number by a marker pen, and the threaded part is coated with lubricating grease.
4. A method of assembling a small gap bolt according to claim 1, wherein the bolt is tightened until the bolt head engages the drum shaft end face, then the bolt is screwed out, the presence or absence of a spiral trace on the shank of the bolt is checked, and the unsatisfactory bolt is replaced and reassembled in accordance with the above steps.
5. The method for assembling a small gap bolt according to claim 1, wherein the preset requirement is 16mm.
6. The method of assembling a small gap bolt according to claim 1, wherein the process bolt is disassembled and the formal bolt is replaced:
And decomposing 8 process bolts, replacing formal bolts, symmetrically and uniformly limiting the force of all bolts to 2/3 moment requirements, and symmetrically and uniformly limiting the force to the moment requirements.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202311707180.2A CN117532332B (en) | 2023-12-12 | 2023-12-12 | A method for assembling small-gap bolts |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202311707180.2A CN117532332B (en) | 2023-12-12 | 2023-12-12 | A method for assembling small-gap bolts |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN117532332A CN117532332A (en) | 2024-02-09 |
| CN117532332B true CN117532332B (en) | 2026-02-10 |
Family
ID=89786120
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202311707180.2A Active CN117532332B (en) | 2023-12-12 | 2023-12-12 | A method for assembling small-gap bolts |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN117532332B (en) |
Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104019099A (en) * | 2014-05-26 | 2014-09-03 | 广西玉柴机器股份有限公司 | Integrated positioning pin hole structure |
| CN107883902A (en) * | 2017-10-25 | 2018-04-06 | 中国航发动力股份有限公司 | A turbine rotor assembly runout detection device |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US3680979A (en) * | 1970-10-07 | 1972-08-01 | Carrier Corp | Rotor structure for turbo machines |
| DE222679T1 (en) * | 1985-11-04 | 1987-10-15 | United Technologies Corp., Hartford, Conn. | SIDE PLATE FOR A TURBINE DISC. |
| US7371042B2 (en) * | 2004-12-21 | 2008-05-13 | General Electric Company | Method and apparatus for balancing gas turbine engines |
| CN109268473A (en) * | 2018-11-26 | 2019-01-25 | 中国航发南方工业有限公司 | The method for processing and assembling of dish axle connection structure and dish axle connection structure |
| CN110926773A (en) * | 2019-11-27 | 2020-03-27 | 中国航发沈阳黎明航空发动机有限责任公司 | Method for checking assembly flexibility of long bolts between high-pressure rotor disks |
| CN111485954B (en) * | 2020-04-16 | 2022-09-30 | 中国航发沈阳发动机研究所 | Rotor wheel disc assembling structure and assembling method thereof |
| CN111895951B (en) * | 2020-09-18 | 2022-09-30 | 中国航发贵州黎阳航空动力有限公司 | Method for detecting outer diameter of turbine rotor blade |
-
2023
- 2023-12-12 CN CN202311707180.2A patent/CN117532332B/en active Active
Patent Citations (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104019099A (en) * | 2014-05-26 | 2014-09-03 | 广西玉柴机器股份有限公司 | Integrated positioning pin hole structure |
| CN107883902A (en) * | 2017-10-25 | 2018-04-06 | 中国航发动力股份有限公司 | A turbine rotor assembly runout detection device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN117532332A (en) | 2024-02-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109356662B (en) | A kind of process method of aero-engine low-pressure turbine rotor assembly | |
| CN113199237B (en) | Method for assembling low-pressure turbine guider of aircraft engine and coaxiality auxiliary control device | |
| CN212713717U (en) | Self-centering plasma spraying supporting tool for sealing labyrinth plate type parts | |
| CN205013907U (en) | Female head of flared fitting and be used for aeroengine's coupling | |
| US20190390571A1 (en) | Annular casting and shrink-fitted part of an aircraft turbine engine | |
| CN117532332A (en) | A method of assembling small gap bolts | |
| CN222874312U (en) | Mechanical flange centering corrector | |
| CN219967187U (en) | Clamp for adjusting coaxiality of casing | |
| CN220523053U (en) | Pin bushing assembly structure | |
| CN210218355U (en) | Positioning pin for connecting shafting flange | |
| CN218093761U (en) | Anti-loosening structure for threaded connection | |
| CN212480416U (en) | Locking mechanism of cutting ferrule formula joint | |
| CN115705786A (en) | Blade baffle simulator | |
| CN216830670U (en) | Hydraulic dismounting type cylindrical surface interference connection structure | |
| CN119115522A (en) | A method for assembling a double-positioning rigid sealing pipeline | |
| CN223270846U (en) | Flange for sewage pipe | |
| CN219492810U (en) | Quick-mounting pin structure for aircraft spar connection | |
| CN108799084B (en) | Pump installation inspection method | |
| US20240141806A1 (en) | Method for removing or installing a diffuser segment of a turbine assembly | |
| CN111451989B (en) | A kind of double ball-cup joint oil pipe assembly detection method | |
| CN223756068U (en) | Alignment components and encoder alignment mounting device | |
| CN223813746U (en) | A casing connection device and casing | |
| CN204267160U (en) | The combined seal structure of radial diffuser, gas turbine | |
| WO2016076856A1 (en) | Threaded combustor housing with union nut | |
| CN224261179U (en) | Lengthened pipe joint |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||