- CN117506409A CN117506409A CN202311095941.3A CN202311095941A CN117506409A CN 117506409 A CN117506409 A CN 117506409A CN 202311095941 A CN202311095941 A CN 202311095941A CN 117506409 A CN117506409 A CN 117506409A
- Authority
- CN
- China
- Prior art keywords
- unloading
- auxiliary
- unloading trolley
- old
- track
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G35/00—Mechanical conveyors not otherwise provided for
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P21/00—Machines for assembling a multiplicity of different parts to compose units, with or without preceding or subsequent working of such parts, e.g. with program control
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)
Abstract
Description
技术领域Technical field
本发明属于卸料体系更换技术领域,更具体地,涉及一种筒仓顶部整体卸料体系更换系统及其施工方法。The invention belongs to the technical field of discharge system replacement, and more specifically, relates to an integral discharge system replacement system at the top of a silo and its construction method.
背景技术Background technique
皮带输送机卸料小车属于卸料装置的一种,具有在皮带输送机水平段任意点卸料、多点卸料、定点卸料、单双侧卸料的性能,往往与筒仓一起广泛应用于矿山、电力、冶金、煤炭、建材等行业,尤其适用于冶金行业原料场存储原料中,一方面方便整体布料,可以最大范围利用场地堆积物料或分配物料,从而节约土地;另一方筒仓具备物料“先进先出”以及真正实现“人料分离”的环保理念。但在长期使用的过程中,卸料体系中的小车、轨道、支架等结构不可避免的会发生设备磨损情况,需要进行整体停机换新,而停机换新对生产上料影响特别大,尤其是冶金行业,大幅缩短产能,故卸料小车停机换新施工工期要求特别苛刻。因此,提出一种能够快速高效的卸料体系更换方法对整个维护周期而言具有重要意义。The belt conveyor unloading trolley is a kind of unloading device. It has the performance of unloading at any point, multi-point unloading, fixed-point unloading, and single and double-side unloading in the horizontal section of the belt conveyor. It is often widely used together with silos. In mining, electric power, metallurgy, coal, building materials and other industries, it is especially suitable for storing raw materials in raw material yards in the metallurgical industry. On the one hand, it facilitates overall distribution and can maximize the use of the site to accumulate materials or distribute materials, thereby saving land; on the other hand, the silo has The environmental protection concept of "first in, first out" for materials and the true realization of "separation of people and materials". However, in the process of long-term use, the structures such as the trolley, track, and bracket in the unloading system will inevitably suffer from equipment wear, and the entire system needs to be shut down for replacement. Shutdown and replacement have a particularly great impact on production and loading, especially for In the metallurgical industry, production capacity has been greatly reduced, so the construction period for unloading trolleys to be shut down and replaced with new ones is particularly stringent. Therefore, proposing a fast and efficient method for replacing the unloading system is of great significance to the entire maintenance cycle.
为了解决上述技术问题,中国发明专利CN115724147A公开了一种环形给料机的安装方法,包括以下步骤:步骤一、安装内环卸料车轨道及内环犁料车轨道;步骤二、安装内环犁料车及驱动装置;步骤三、安装内环卸料车及驱动装置;步骤四、安装内环卸料装置;步骤五、安装内环犁料车密封装置;步骤六、内环卸料车密封装置;步骤七、安装外环设备;步骤八、安装电气系统设备及调试,优化了施工顺序、缩短了设备的安装时间,达到了节约工期的目的,提高了设备的安装效率和安装质量,保证设备平稳运行;此外,中国实用新型专利CN216286206U,公开了一种贮煤卸料小车控制装置,车载控制柜、车载摄像机、卸料小车电机、限位开关、天线箱、格雷母线、雷达料位计、地面控制柜、中控室以及地面摄像机。采用变频器控制方式,防止卸料小车发生位移现象,并采用格雷母线、雷达料位计、地址编码器等实时监测卸料小车的运行位置,确保卸料小车的精准定位,与此同时,各位置的摄像机将监测影像实时传输至中控制,使操作人员更直观的观察现场工作状态。一种贮煤卸料小车控制装置整体自动化、信息化水平以及安全性能更高,不但保障了安全生产,同时还提高了生产效率。In order to solve the above technical problems, Chinese invention patent CN115724147A discloses an installation method of an annular feeder, which includes the following steps: Step 1, install the inner ring unloading car track and the inner ring plow car track; Step 2, install the inner ring Plow truck and driving device; Step 3, install the inner ring unloading truck and driving device; Step 4, install the inner ring unloading device; Step 5, install the inner ring plow truck sealing device; Step 6, Inner ring unloading truck Sealing device; Step 7, install the outer ring equipment; Step 8, install the electrical system equipment and debug, optimize the construction sequence, shorten the installation time of the equipment, achieve the purpose of saving the construction period, and improve the installation efficiency and installation quality of the equipment. Ensure the smooth operation of the equipment; in addition, the Chinese utility model patent CN216286206U discloses a coal storage and unloading trolley control device, vehicle control cabinet, on-board camera, unloading trolley motor, limit switch, antenna box, Gray busbar, radar material level meter, ground control cabinet, central control room and ground cameras. The frequency converter control method is adopted to prevent the unloading trolley from shifting, and Gray busbar, radar level meter, address encoder, etc. are used to monitor the running position of the unloading trolley in real time to ensure the precise positioning of the unloading trolley. At the same time, each The camera at the location transmits the monitoring image to the central control in real time, allowing the operator to observe the on-site working status more intuitively. A coal storage and unloading trolley control device has higher overall automation, informatization level and safety performance, which not only ensures safe production, but also improves production efficiency.
但上述专利技术中存在如下改进之处:(1)筒仓顶部卸料小车所在的运行环境空间狭小,因此只有极少部分构件能通过房顶处原有吊装孔洞提前吊装至平台上,卸料小车主体结构庞大,拆解后给现场带来很大的拼装、倒运工作量,故采用常规方法拆解卸料小车再安装难以在工期上满足要求;(2)由于轨道安装的水平度及线性度极大程度上决定了卸料体系运行过程中的摩擦系数,因此应当采取措施提高轨道节段件连接的有效性;(3)提高钢轨线性度应当从安装轨道节段与安装完成轨道节段间姿态重合的角度出发,从而有效提高钢轨连接质量。However, there are the following improvements in the above-mentioned patented technology: (1) The operating environment space of the unloading trolley at the top of the silo is small, so only a few components can be hoisted to the platform in advance through the original hoisting holes on the roof, and the unloading The main structure of the trolley is huge. After disassembly, it will bring a lot of assembly and transport workload to the site. Therefore, it is difficult to meet the construction period requirements by disassembling and reinstalling the unloading trolley using conventional methods; (2) Due to the horizontality and linearity of the track installation The degree of friction greatly determines the friction coefficient during the operation of the unloading system, so measures should be taken to improve the effectiveness of rail segment connection; (3) Improving rail linearity should start from the installation of rail segments and the installation of completed rail segments. Starting from the angle of overlap between postures, it can effectively improve the rail connection quality.
发明内容Contents of the invention
针对现有技术的以上缺陷或改进需求,本发明提供一种筒仓顶部整体卸料体系更换系统及其施工方法,通过在厂房侧墙开设门洞,并在厂房外搭设型钢支架、辅助卸料小车支架和辅助轨道的方法,不仅能够实现厂房内卸料小车与厂房外辅助卸料体系更换系统搭建过程在空间和时间上实现分离,两者相互不会影响,而且可通过将新安装的卸料小车整体直接吊运至轨道上、并拉运至筒仓内,即可实现快速更换,有效避免了卸料小车的拆解,以及在筒仓内部受限空间内的倒运、组装,从而极大缩短了卸料小车主体的安装工期,提升了设备的安装质量和施工安全性。In view of the above defects or improvement needs of the existing technology, the present invention provides a silo top integral unloading system replacement system and its construction method by opening a door opening in the side wall of the factory building and setting up a steel bracket and an auxiliary unloading trolley outside the factory building. The method of brackets and auxiliary rails not only enables the separation of the replacement system construction process of the unloading trolley in the factory and the auxiliary unloading system outside the factory in space and time. The two will not affect each other, and the newly installed unloading system can be The entire trolley is hoisted directly to the track and pulled into the silo, allowing rapid replacement, effectively avoiding the disassembly of the unloading trolley, as well as the reverse transportation and assembly in the restricted space inside the silo, thereby greatly It shortens the installation period of the main body of the unloading trolley and improves the installation quality and construction safety of the equipment.
为了实现上述目的,按照本发明的第一方面,一种筒仓顶部整体卸料体系更换系统,包括:In order to achieve the above objects, according to the first aspect of the present invention, a silo top integral discharge system replacement system includes:
沿旧有卸料小车轨道方向并在靠近旧有皮带机尾部处的厂房侧墙开设的门洞、穿过所述门洞并安装布设于厂房之外且连接至旧有卸料小车轨道末端的辅助卸料体系组件、吊装工件至皮带机或轨道的吊装设备、待更换的新装卸料体系组件、卸料轨道辅助安装单元;A door opening is opened in the side wall of the factory building near the end of the old belt conveyor along the direction of the old unloading trolley track. Pass through the door opening and install an auxiliary unloading device located outside the factory building and connected to the end of the old unloading trolley track. Material system components, hoisting equipment for hoisting workpieces to belt conveyors or rails, new loading and unloading system components to be replaced, and unloading track auxiliary installation units;
所述辅助卸料体系组件,包括纵向横梁、固定设于所述纵向横梁上方的辅助卸料小车支架、安装于所述辅助卸料小车支架上方的辅助卸料小车轨道;The auxiliary unloading system component includes a longitudinal beam, an auxiliary unloading trolley bracket fixed above the longitudinal beam, and an auxiliary unloading trolley track installed above the auxiliary unloading trolley bracket;
所述新装卸料体系组件,包括新装卸料小车安装构件、新装卸料小车、新装卸料小车轨道;The new loading and unloading system components include new loading and unloading trolley installation components, new loading and unloading trolleys, and new loading and unloading trolley tracks;
通过在厂房侧墙开设门洞,并利用卸料轨道辅助安装单元将建设在厂房外的辅助卸料体系组件与厂房内的旧有卸料小车轨道连接,通过吊装设备将新装卸料体系组件吊装至厂房外的辅助卸料体系组件之上,通过旧有皮带机完成新装卸料小车安装构件向厂房内部的运输,并通过辅助卸料小车轨道完成旧有卸料小车的拆卸与新装卸料小车的安装操作。By opening a door opening in the side wall of the factory building, and using the auxiliary installation unit of the unloading track to connect the auxiliary unloading system components built outside the factory building with the old unloading trolley track in the factory building, the new loading and unloading system components are hoisted to the On the auxiliary unloading system components outside the factory, the old belt conveyor is used to complete the transportation of the new loading and unloading trolley installation components to the inside of the factory, and the disassembly of the old unloading trolley and the installation of the new loading and unloading trolley are completed through the auxiliary unloading trolley track. Installation operations.
优选的,所述的卸料轨道辅助安装单元,包括:Preferably, the unloading track auxiliary installation unit includes:
固定设置于所述新装卸料小车轨道末端并活动连接辅助卸料小车轨道一端的自由端定位单元、连接于辅助卸料小车轨道另一端用于调整辅助卸料小车轨道位姿的姿态调整单元。A free end positioning unit fixedly installed at the end of the new loading and unloading trolley track and movably connected to one end of the auxiliary unloading trolley track, and an attitude adjustment unit connected to the other end of the auxiliary unloading trolley track for adjusting the posture of the auxiliary unloading trolley track.
优选的,包括:Preferred include:
S100:在原有筒仓厂房外搭设辅助型钢支架;S100: Set up auxiliary steel supports outside the original silo factory building;
S200:拆除旧有尾轮,松弛旧有重锤放松旧有皮带,留设门洞;S200: Remove the old tail wheel, loosen the old weight and loosen the old belt, leaving a door opening;
S300:安装辅助卸料小车支架,并在辅助卸料小车支架上铺设辅助卸料小车轨道;S300: Install the auxiliary unloading trolley bracket and lay the auxiliary unloading trolley track on the auxiliary unloading trolley bracket;
S400:安装辅助皮带机导向辊并固定皮带;S400: Install the auxiliary belt conveyor guide roller and fix the belt;
S500:通过旧有皮带机输送新装卸料小车安装构件;S500: The new loading and unloading trolley installation components are transported through the old belt conveyor;
S600:拆除旧有卸料小车相关构件;S600: Remove the relevant components of the old unloading trolley;
S700:安装新装的卸料小车及其组件;S700: Install the newly installed unloading trolley and its components;
S800:安装新装卸料小车其他设备及皮带。S800: Install new loading and unloading trolley and other equipment and belts.
优选的,所述S100,包括如下步骤:Preferably, the S100 includes the following steps:
S101:根据新装卸料小车尺寸定制辅助型钢支架;S101: Customize the auxiliary steel bracket according to the size of the new loading and unloading trolley;
S102:将辅助型钢支架安装在室外地面上,支架基础应牢固可靠;S102: Install the auxiliary steel bracket on the outdoor ground, and the foundation of the bracket should be solid and reliable;
S103:控制辅助型钢支架搭设高度应与旧有卸料体系组件所在楼面平齐;S103: The erection height of the control auxiliary steel bracket should be flush with the floor where the components of the old unloading system are located;
S104:在辅助型钢支架顶部留设纵向横梁、走道板、防护栏杆,所述纵向横梁平行皮带机输送方向,纵向横梁间距与卸料小车支架间距同宽;所述走道板应能承受正常施工荷载;所述防护栏杆高度不低于1.2m。S104: Leave longitudinal beams, walkway plates, and protective railings on the top of the auxiliary steel bracket. The longitudinal beams are parallel to the conveying direction of the belt conveyor, and the distance between the longitudinal beams is the same as the distance between the unloading trolley brackets; the walkway plates should be able to withstand normal construction loads. ;The height of the protective railing shall not be less than 1.2m.
优选的,所述S200,包括如下步骤:Preferably, the S200 includes the following steps:
S201:在厂房侧墙留设门洞,拆除高度范围应能通过新装卸料小车;S201: Leave a door opening in the side wall of the factory building, and the demolition height range should be able to pass the new loading and unloading trolley;
S202:将旧有皮带机重锤提升至最高点,使旧有皮带松弛,将旧有皮带取下;S202: Lift the weight of the old belt conveyor to the highest point to loosen the old belt and remove the old belt;
S203:拆除旧有皮带机尾轮;S203: Remove the old belt conveyor tail wheel;
S204:将所述旧有皮带拉伸至所述辅助型钢支架上。S204: Stretch the old belt onto the auxiliary steel bracket.
优选的,所述S300,包括如下步骤:Preferably, the S300 includes the following steps:
S301:在辅助型钢支架纵向横梁上及筒仓旧有尾轮后楼板上搭设辅助卸料小车支架,在辅助卸料小车支架上铺设辅助卸料小车轨道;S301: Set up the auxiliary unloading trolley bracket on the longitudinal beam of the auxiliary steel bracket and the floor behind the old tail wheel of the silo, and lay the auxiliary unloading trolley track on the auxiliary unloading trolley bracket;
S302:在辅助卸料小车轨道铺设完成后轨道标高应与新更换的卸料小车运行轨道标高相同。S302: After the auxiliary unloading trolley track is laid, the track elevation should be the same as the newly replaced unloading trolley running track elevation.
优选的,所述S400,包括如下步骤:Preferably, the S400 includes the following steps:
S401:将卸下的旧有皮带拉伸至所述辅助型钢支架合适位置,在所述位置安装辅助皮带机导向辊;S401: Stretch the removed old belt to the appropriate position of the auxiliary steel bracket, and install the auxiliary belt conveyor guide roller at the position;
S402:所述旧有皮带能沿安装辅助导向皮带机辊正常运转、换向。S402: The old belt can run normally and change direction along the installed auxiliary guide belt conveyor roller.
优选的,所述S500,包括如下步骤:Preferably, the S500 includes the following steps:
S501:利用汽车吊将新装的卸料小车轨道、卸料小车支架吊运至旧有皮带机皮带上;S501: Use a truck crane to lift the newly installed unloading trolley track and unloading trolley bracket onto the old belt conveyor belt;
S502:启动旧有皮带机,将新装卸料小车安装构件输送至安装部位。S502: Start the old belt conveyor and transport the new loading and unloading trolley installation components to the installation location.
优选的,所述S600,包括如下步骤:Preferably, the S600 includes the following steps:
S601:将旧有卸料皮带、卸料小车主体、卸料小车轨道、卸料小车支架构件依次气割为合适大小拆除;S601: Dismantle the old unloading belt, unloading trolley body, unloading trolley track, and unloading trolley support components by gas cutting to appropriate sizes in sequence;
S602:将拆除的构件从旧有皮带机头轮处输送至地面。S602: Transport the dismantled components from the old belt conveyor head wheel to the ground.
优选的,所述S700,包括如下步骤:Preferably, the S700 includes the following steps:
S701:在旧有筒仓上部依次安装新装的卸料小车支架、卸料小车轨道构件;S701: Install the newly installed unloading trolley bracket and unloading trolley track components on the upper part of the old silo;
S702:利用汽车吊将新装的卸料小车整体吊运至辅助型钢支架上的辅助卸料小车轨道上;S702: Use a truck crane to lift the newly installed unloading trolley as a whole to the auxiliary unloading trolley track on the auxiliary steel bracket;
S703:在筒仓上新装卸料小车支架上固定卷扬机,将所述卷扬机与新装卸料小车支架通过钢丝绳进行绑扎连接,通过启动卷扬机,带动钢丝绳将辅助型钢支架上的新装卸料小车主体拉运至旧有筒仓上的新装卸料小车轨道上;S703: Fix the winch on the new loading and unloading trolley bracket on the silo, tie the winch and the new loading and unloading trolley bracket through the wire rope, and start the winch to drive the steel wire rope to pull the main body of the new loading and unloading trolley on the auxiliary steel bracket. to the new loading and unloading trolley track on the old silo;
S704:拆除筒仓上旧有尾轮处辅助型钢支架;S704: Remove the old auxiliary steel bracket at the tail wheel on the silo;
S705:在筒仓上旧有尾轮安装新装的尾轮及其他新装卸料小车构件。S705: Install the new tail wheel and other new loading and unloading trolley components on the old tail wheel on the silo.
总体而言,通过本发明所构思的以上技术方案与现有技术相比,能够取得下列有益效果:Generally speaking, compared with the prior art, the above technical solutions conceived by the present invention can achieve the following beneficial effects:
1.本发明的一种筒仓顶部整体卸料体系更换系统,通过在厂房侧墙开设门洞,并在厂房外搭设型钢支架、辅助卸料小车支架和辅助轨道的方法,不仅能够实现厂房内卸料小车与厂房外辅助卸料体系更换系统搭建过程在空间和时间上实现分离,两者相互不会影响,而且可通过将新安装的卸料小车整体直接吊运至轨道上、并拉运至筒仓内,即可实现快速更换,有效避免了卸料小车的拆解,以及在筒仓内部受限空间内的倒运、组装,从而极大缩短了卸料小车主体的安装工期,提升了设备的安装质量和施工安全性;1. A silo top integral unloading system replacement system of the present invention, by opening a door opening in the side wall of the factory building, and setting up a steel bracket, an auxiliary unloading trolley bracket and an auxiliary track outside the factory building, it can not only realize unloading inside the factory building The construction process of the replacement system of the material trolley and the auxiliary unloading system outside the factory is separated in space and time. The two will not affect each other, and the newly installed unloading trolley can be directly hoisted to the track as a whole and hauled to Quick replacement can be achieved in the silo, effectively avoiding the disassembly of the unloading trolley, as well as the transport and assembly in the restricted space inside the silo, thereby greatly shortening the installation period of the main body of the unloading trolley and improving the equipment The installation quality and construction safety;
2.本发明的一种筒仓顶部整体卸料体系更换系统,可通过调整旧有皮带机重锤延长旧有皮带至辅助卸料小车轨道之上,并利用吊装设备配合原有皮带机输送卸料小车辅助构件,避免了从结构吊装孔中上下料人工搬运至安装位置,节省了大量人工,提高了材料的倒运效率;2. A replacement system for the overall unloading system at the top of the silo of the present invention. The old belt can be extended by adjusting the weight of the old belt conveyor to the auxiliary unloading trolley track, and the hoisting equipment can be used to cooperate with the original belt conveyor to transport and unload. The auxiliary component of the material trolley avoids the manual loading and unloading of materials from the lifting holes of the structure to the installation location, saving a lot of labor and improving the efficiency of material transport;
3.本发明的一种筒仓顶部整体卸料体系更换系统,通过使新更换的卸料小车安装由皮带机尾轮处进入,原有的卸料小车拆除由头轮处运出,合理的规划了施工平面,卸料小车的更换和拆除可以同步进行,避免了工序上的交叉及冲突,提高了设备的安装效率;3. A replacement system for the overall unloading system at the top of the silo of the present invention. By installing the newly replaced unloading trolley and entering it from the tail wheel of the belt conveyor, the original unloading trolley is dismantled and transported out from the head wheel. Reasonable planning By clearing the construction plane, the replacement and dismantling of the unloading trolley can be carried out simultaneously, avoiding crossovers and conflicts in the process and improving the installation efficiency of the equipment;
4.本发明的一种筒仓顶部整体卸料体系更换系统,通过增设卸料轨道辅助安装单元5,并结合姿态传感器、丝杆传动机构实现轨道的水平位姿调整、齿轮机构实现轨道角度修正,从而有效提高了辅助卸料小车轨道201的安装质量。4. A replacement system for the overall unloading system at the top of the silo of the present invention, by adding an auxiliary installation unit 5 for the unloading track, and combining the attitude sensor and the screw transmission mechanism to realize the horizontal posture adjustment of the track, and the gear mechanism to realize the track angle correction. , thereby effectively improving the installation quality of the auxiliary unloading trolley track 201.
附图说明Description of drawings
图1为本发明实施例一种筒仓顶部整体卸料体系更换系统的更换前房内结构示意图;Figure 1 is a schematic diagram of the structure of the chamber before replacement of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图2为本发明实施例一种筒仓顶部整体卸料体系更换系统的第一更换施工阶段主视结构示意图;Figure 2 is a schematic view of the main structure of the first replacement construction stage of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图3为本发明实施例一种筒仓顶部整体卸料体系更换系统的第一更换施工阶段俯视结构示意图;Figure 3 is a schematic structural diagram of the first replacement construction stage of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图4为本发明实施例一种筒仓顶部整体卸料体系更换系统的第二更换施工阶段主视结构示意图;Figure 4 is a schematic view of the main structure of the second replacement construction stage of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图5为本发明实施例一种筒仓顶部整体卸料体系更换系统的第三更换施工阶段主视结构示意图;Figure 5 is a schematic view of the main structure of the third replacement construction stage of a silo top integral discharge system replacement system according to the embodiment of the present invention;
图6为本发明实施例一种筒仓顶部整体卸料体系更换系统的第四更换施工阶段主视结构示意图;Figure 6 is a schematic view of the main structure of the fourth replacement construction stage of a silo top integral discharge system replacement system according to the embodiment of the present invention;
图7为本发明实施例一种筒仓顶部整体卸料体系更换系统的辅助卸料体系组件截面结构示意图;Figure 7 is a schematic cross-sectional structural diagram of an auxiliary discharge system component of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图8为本发明实施例一种筒仓顶部整体卸料体系更换系统的卸料轨道辅助安装单元整体施工状态图;Figure 8 is an overall construction status diagram of the discharge track auxiliary installation unit of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图9为本发明实施例一种筒仓顶部整体卸料体系更换系统的自由端定位单元整体结构示意图;Figure 9 is a schematic diagram of the overall structure of the free end positioning unit of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图10为本发明实施例一种筒仓顶部整体卸料体系更换系统的第一滚动体仰视内部结构示意图;Figure 10 is a schematic diagram of the internal structure of the first rolling element viewed from above of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图11为本发明实施例一种筒仓顶部整体卸料体系更换系统的第一滚动体仰视结构示意图;Figure 11 is a schematic structural diagram of the first rolling element from above of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图12为本发明实施例一种筒仓顶部整体卸料体系更换系统的第一滚动体截面结构示意图;Figure 12 is a schematic cross-sectional structural diagram of the first rolling element of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图13为本发明实施例一种筒仓顶部整体卸料体系更换系统的第一滚动体俯视结构示意图;Figure 13 is a schematic structural diagram of the first rolling element from above of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图14为本发明实施例一种筒仓顶部整体卸料体系更换系统的姿态调整单元整体结构示意图;Figure 14 is a schematic diagram of the overall structure of the posture adjustment unit of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图15为本发明实施例一种筒仓顶部整体卸料体系更换系统的姿态调整单元内部结构示意图;Figure 15 is a schematic diagram of the internal structure of the attitude adjustment unit of a silo top integral discharge system replacement system according to an embodiment of the present invention;
图16为本发明实施例一种筒仓顶部整体卸料体系更换系统的施工方法流程图。Figure 16 is a flow chart of the construction method of a silo top integral discharge system replacement system according to an embodiment of the present invention.
在所有附图中,同样的附图标记表示相同的技术特征,具体为:1-旧有卸料体系组件、101-旧有皮带机头部、102-旧有卸料小车轨道、103-旧有卸料小车、104-旧有皮带机重锤、105-旧有皮带机尾部、2-辅助卸料体系组件、201-辅助卸料小车轨道、202-辅助卸料小车支架、203-纵向横梁、210-门洞、220-辅助型钢支架、3-吊装设备、4-新装卸料体系组件、401-新装卸料小车安装构件、402-新装卸料小车、403-新装卸料小车轨道、5-卸料轨道辅助安装单元、510-自由端定位单元、511-固定板、512-紧定螺钉孔、513-端部承载板、5131-半球形槽、5132-固定块、5133-定心球面板、514-第一滚动体、5141-球面滑槽、5142-防干涉孔、5143-第一轨道放置槽、5144-螺纹通孔、5145-螺栓杆、5146-夹紧调整旋钮、5147-夹紧板、520-姿态调整单元、521-支撑平台、522-高度调整机构、523-支撑板、524-水平调整单元、5241-主基体、5242-水平调整滑槽、5243-水平调整丝杆、5244-水平调整滑块、525-轨道转角修正单元、5251-限位球形壳体、5252-从动限位齿轮、5253-主动调整齿轮、5254-调整驱动电机、5255-齿条部、526-第二滚动体、5261-滚动主体、5262-第二轨道放置槽。In all drawings, the same reference numerals represent the same technical features, specifically: 1-old unloading system components, 101-old belt conveyor head, 102-old unloading trolley track, 103-old There are unloading trolleys, 104-old belt conveyor weight, 105-old belt conveyor tail, 2-auxiliary unloading system components, 201-auxiliary unloading trolley track, 202-auxiliary unloading trolley bracket, 203-longitudinal cross beam , 210-door opening, 220-auxiliary steel bracket, 3-hoisting equipment, 4-new loading and unloading system components, 401-new loading and unloading trolley installation components, 402-new loading and unloading trolley, 403-new loading and unloading trolley track, 5- Unloading track auxiliary installation unit, 510-free end positioning unit, 511-fixing plate, 512-set screw hole, 513-end bearing plate, 5131-hemispheric groove, 5132-fixing block, 5133-centering ball panel , 514-first rolling element, 5141-spherical chute, 5142-anti-interference hole, 5143-first track placement groove, 5144-threaded through hole, 5145-bolt rod, 5146-clamping adjustment knob, 5147-clamping Plate, 520-attitude adjustment unit, 521-support platform, 522-height adjustment mechanism, 523-support plate, 524-horizontal adjustment unit, 5241-main base, 5242-horizontal adjustment chute, 5243-horizontal adjustment screw, 5244 - Horizontal adjustment slider, 525-track angle correction unit, 5251-limit spherical housing, 5252-driven limit gear, 5253-active adjustment gear, 5254-adjustment drive motor, 5255-rack part, 526-No. Two rolling elements, 5261-rolling body, 5262-second track placement groove.
具体实施方式Detailed ways
在本申请的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In the description of this application, it needs to be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " The directions or positions indicated by "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" etc. The relationship is based on the orientation or positional relationship shown in the drawings, which is only for the convenience of describing the present invention and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore It should not be construed as a limitation of the present invention.
此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms “first” and “second” are used for descriptive purposes only and cannot be understood as indicating or implying relative importance or implicitly indicating the quantity of indicated technical features. Therefore, features defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present invention, "plurality" means two or more than two, unless otherwise explicitly and specifically limited.
在本申请中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In this application, unless otherwise clearly stated and limited, the terms "installation", "connection", "connection", "fixing" and other terms should be understood in a broad sense. For example, it can be a fixed connection or a detachable connection. , or integrally connected; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium; it can be an internal connection between two components. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。此外,下面所描述的本发明各个实施方式中所涉及到的技术特征只要彼此之间未构成冲突就可以相互组合。In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention and are not intended to limit the present invention. In addition, the technical features involved in the various embodiments of the present invention described below can be combined with each other as long as they do not conflict with each other.
如图1~15所示,在本发明实施例中,所述的一种筒仓顶部整体卸料体系更换系统,包括:As shown in Figures 1 to 15, in the embodiment of the present invention, the replacement system for the integral discharge system at the top of the silo includes:
沿旧有卸料小车轨道102方向并在靠近旧有皮带机尾部105处的厂房侧墙开设的门洞210、穿过所述门洞210并安装布设于厂房之外且连接至旧有卸料小车轨道102末端的辅助卸料体系组件2、吊装工件至皮带机或轨道的吊装设备3、待更换的新装卸料体系组件4、卸料轨道辅助安装单元5;A door opening 210 is opened along the direction of the old unloading trolley track 102 and near the rear end 105 of the old belt conveyor on the side wall of the factory building. Pass through the door opening 210 and install it outside the factory building and connect to the old unloading trolley track. 102 end auxiliary unloading system components 2, hoisting equipment for hoisting workpieces to belt conveyors or rails 3, new loading and unloading system components to be replaced 4, unloading track auxiliary installation unit 5;
所述辅助卸料体系组件2,包括纵向横梁203、固定设于所述纵向横梁203上方的辅助卸料小车支架202、安装于所述辅助卸料小车支架202上方的辅助卸料小车轨道201;The auxiliary unloading system component 2 includes a longitudinal beam 203, an auxiliary unloading trolley bracket 202 fixed above the longitudinal beam 203, and an auxiliary unloading trolley track 201 installed above the auxiliary unloading trolley bracket 202;
所述新装卸料体系组件4,包括新装卸料小车安装构件401、新装卸料小车402、新装卸料小车轨道403;The new loading and unloading system components 4 include new loading and unloading trolley installation components 401, new loading and unloading trolleys 402, and new loading and unloading trolley tracks 403;
通过在厂房侧墙开设门洞210,并利用卸料轨道辅助安装单元5将建设在厂房外的辅助卸料体系组件2与厂房内的旧有卸料小车轨道102连接,通过吊装设备3将新装卸料体系组件4吊装至厂房外的辅助卸料体系组件2之上,通过旧有皮带机完成新装卸料小车安装构件401向厂房内部的运输,并通过辅助卸料小车轨道201完成旧有卸料小车103的拆卸与新装卸料小车402的安装操作。By opening a door opening 210 in the side wall of the factory building, and using the unloading track auxiliary installation unit 5 to connect the auxiliary unloading system component 2 built outside the factory building with the old unloading trolley track 102 in the factory building, the new loading and unloading equipment is installed through the lifting equipment 3 The material system component 4 is hoisted to the auxiliary unloading system component 2 outside the factory. The new loading and unloading trolley installation component 401 is transported to the inside of the factory through the old belt conveyor, and the old unloading is completed through the auxiliary unloading trolley track 201. The disassembly of the trolley 103 and the installation operation of the new loading and unloading trolley 402.
在本发明实施例中,通过在厂房侧墙开设门洞,并在厂房外搭设型钢支架、辅助卸料小车支架和辅助轨道的方法,不仅能够实现厂房内卸料小车与厂房外辅助卸料体系更换系统搭建过程在空间和时间上实现分离,两者相互不会影响,而且可通过将新安装的卸料小车整体直接吊运至轨道上、并拉运至筒仓内,即可实现快速更换,有效避免了卸料小车的拆解,以及在筒仓内部受限空间内的倒运、组装,从而极大缩短了卸料小车主体的安装工期,提升了设备的安装质量和施工安全性;In the embodiment of the present invention, by opening a door opening in the side wall of the factory building and setting up a steel bracket, an auxiliary unloading trolley bracket and an auxiliary track outside the factory building, it is not only possible to replace the unloading trolley inside the factory building with the auxiliary unloading system outside the factory building The system construction process is separated in space and time, and the two will not affect each other. Moreover, the newly installed unloading trolley can be directly lifted onto the track and pulled into the silo for quick replacement. It effectively avoids the disassembly of the unloading trolley, as well as its transportation and assembly in the restricted space inside the silo, thus greatly shortening the installation period of the main body of the unloading trolley and improving the installation quality and construction safety of the equipment;
此外,可通过调整旧有皮带机重锤延长旧有皮带至辅助卸料小车轨道之上,并利用吊装设备配合原有皮带机输送卸料小车辅助构件,避免了从结构吊装孔中上下料人工搬运至安装位置,节省了大量人工,提高了材料的倒运效率;In addition, the old belt can be extended to the auxiliary unloading trolley track by adjusting the weight of the old belt conveyor, and the lifting equipment can be used to cooperate with the original belt conveyor to transport the auxiliary components of the unloading trolley, thus avoiding manual loading and unloading of materials from the lifting holes of the structure. Transporting to the installation location saves a lot of labor and improves the efficiency of material transport;
此外,新更换的卸料小车安装由皮带机尾轮处进入,原有的卸料小车拆除由头轮处运出,合理的规划了施工平面,卸料小车的更换和拆除可以同步进行,避免了工序上的交叉及冲突,提高了设备的安装效率。In addition, the newly replaced unloading trolley is installed through the tail wheel of the belt conveyor, and the original unloading trolley is removed from the head wheel. The construction plane is reasonably planned, and the replacement and removal of the unloading trolley can be carried out simultaneously to avoid Intersections and conflicts in processes improve the installation efficiency of equipment.
如图8~15所示,在本发明实施例中,所述的卸料轨道辅助安装单元5,包括:As shown in Figures 8 to 15, in the embodiment of the present invention, the unloading track auxiliary installation unit 5 includes:
固定设置于所述新装卸料小车轨道403末端并活动连接辅助卸料小车轨道201一端的自由端定位单元510、连接于辅助卸料小车轨道201另一端用于调整辅助卸料小车轨道201位姿的姿态调整单元520。The free end positioning unit 510 is fixedly installed at the end of the new loading and unloading trolley track 403 and is movably connected to one end of the auxiliary unloading trolley track 201, and is connected to the other end of the auxiliary unloading trolley track 201 for adjusting the posture of the auxiliary unloading trolley track 201. posture adjustment unit 520.
如图8~13所示,在本发明实施例中,所述的自由端定位单元510,包括:As shown in Figures 8 to 13, in the embodiment of the present invention, the free end positioning unit 510 includes:
设有紧定螺钉孔512的固定板511、通过紧定螺钉孔512将所述固定板511固定于旧有卸料小车轨道102末端的紧定螺钉、固定连接于所述固定板511右侧的端部承载板513、与所述端部承载板513上方万象转动连接的第一滚动体514;所述第一滚动体514为半球形;A fixed plate 511 provided with a set screw hole 512, a set screw that fixes the fixed plate 511 to the end of the old unloading trolley track 102 through the set screw hole 512, and a set screw fixedly connected to the right side of the fixed plate 511. The end bearing plate 513 and the first rolling element 514 are rotatably connected to everything above the end bearing plate 513; the first rolling element 514 is hemispherical;
所述端部承载板513,包括垂直方向固定设于端部承载板513中心处的固定块5132、设于固定块5132上方的定心球面板5133、开设于端部承载板513上表面的半球形槽5131;所述第一滚动体514与半球形槽5131万象转动连接;The end bearing plate 513 includes a fixed block 5132 fixed vertically at the center of the end bearing plate 513, a centering ball panel 5133 placed above the fixed block 5132, and a hemisphere opened on the upper surface of the end bearing plate 513. shaped groove 5131; the first rolling element 514 is rotationally connected to the hemispherical groove 5131;
所述第一滚动体514,包括开设于其下表面并有固定块5132穿过的防干涉孔5142、开设于防干涉孔5142内层用于与定心球面板5133滑动连接的球面滑槽5141;The first rolling element 514 includes an anti-interference hole 5142 opened on its lower surface through which the fixing block 5132 passes, and a spherical slide groove 5141 opened on the inner layer of the anti-interference hole 5142 for sliding connection with the centering spherical panel 5133. ;
所述第一滚动体514,还包括开设于其上表面用于定位辅助卸料小车轨道201前端的第一轨道放置槽5143、对称开设于第一轨道放置槽5143侧壁的螺纹通孔5144、与所述螺纹通孔5144转动连接的螺栓杆5145、分别固定连接于所述螺栓杆5145左右两端的夹紧调整旋钮5146和夹紧板5147。The first rolling element 514 also includes a first track placement slot 5143 opened on its upper surface for positioning the front end of the auxiliary unloading trolley track 201, a threaded through hole 5144 symmetrically opened on the side wall of the first track placement slot 5143, The bolt rod 5145 is rotatably connected to the threaded through hole 5144, and the clamping adjustment knob 5146 and the clamping plate 5147 are respectively fixedly connected to the left and right ends of the bolt rod 5145.
如图9、图14和图15所示,在本发明实施例中,所述的姿态调整单元520,包括:As shown in Figures 9, 14 and 15, in the embodiment of the present invention, the attitude adjustment unit 520 includes:
支撑平台521、设于支撑平台521上方的高度调整机构522、平行于支撑平台521上表面并固定设于高度调整机构522上方输出端的支撑板523、设于所述支撑板523上方用于输出水平直线运动的水平调整单元524、设于所述水平调整单元524输出端用于输出自转运动的轨道转角修正单元525、与轨道转角修正单元525输出端转动连接的第二滚动体526;Support platform 521, a height adjustment mechanism 522 provided above the support platform 521, a support plate 523 parallel to the upper surface of the support platform 521 and fixed to the output end above the height adjustment mechanism 522, provided above the support plate 523 for output level A horizontal adjustment unit 524 for linear motion, an orbit angle correction unit 525 provided at the output end of the horizontal adjustment unit 524 for outputting rotational motion, and a second rolling element 526 rotatably connected to the output end of the orbit angle correction unit 525;
所述第二滚动体526,包括外表面为半球形的滚动主体5261、设于所述滚动主体5261上表面用于定位辅助卸料小车轨道201后端的第二轨道放置槽5262;The second rolling element 526 includes a rolling body 5261 with a hemispherical outer surface, and a second track placement groove 5262 provided on the upper surface of the rolling body 5261 for positioning the rear end of the auxiliary unloading trolley track 201;
所述轨道转角修正单元525,包括固定设于水平调整单元524输出端的限位球形壳体5251、设于所述限位球形壳体5251内部并与第二滚动体526转动连接的半球空心槽、设于所述半球空心槽边缘处的主动调整齿轮5253与从动限位齿轮5252、用于驱动主动调整齿轮5253转动的调整驱动电机5254、设于所述滚动主体5261外壁并保持与主动调整齿轮5253和从动限位齿轮5252转动连接的齿条部5255。The track angle correction unit 525 includes a limiting spherical housing 5251 fixedly provided at the output end of the horizontal adjustment unit 524, a hemispherical hollow groove provided inside the limiting spherical housing 5251 and rotationally connected with the second rolling element 526, The active adjustment gear 5253 and the driven limiting gear 5252 are provided at the edge of the hemispherical hollow groove, and the adjustment drive motor 5254 for driving the active adjustment gear 5253 to rotate is provided on the outer wall of the rolling body 5261 and remains connected to the active adjustment gear. 5253 and the rack portion 5255 that is rotationally connected to the driven limiting gear 5252.
如图14和图15所示,在本发明实施例中,所述的水平调整单元524,包括:As shown in Figures 14 and 15, in the embodiment of the present invention, the horizontal adjustment unit 524 includes:
固定设置于支撑板523上方的主基体5241、开设于所述主基体5241上表面的水平调整滑槽5242、设置于滑动连接于所述水平调整滑槽5242内部的水平调整滑块5244、沿水平调整滑槽5242滑动方向与主基体5241转动连接并保持与所述-水平调整滑块5244内部的螺母块丝杆传动连接的水平调整丝杆5243、与所述水平调整丝杆5243的一端同轴固定连接的驱动电机。The main base 5241 is fixedly arranged above the support plate 523, the horizontal adjustment chute 5242 is opened on the upper surface of the main base 5241, the horizontal adjustment slide block 5244 is disposed in the horizontal adjustment chute 5242 and is slidably connected inside the horizontal adjustment chute 5242. The sliding direction of the adjustment chute 5242 is rotationally connected to the main base 5241 and maintains a horizontal adjustment screw 5243 that is drivingly connected to the nut block screw inside the horizontal adjustment slide 5244 and is coaxial with one end of the horizontal adjustment screw 5243 Fixed connection of drive motor.
如图15所示,在本发明实施例中,所述姿态调整单元520,还包括:As shown in Figure 15, in the embodiment of the present invention, the posture adjustment unit 520 also includes:
与所述滚动主体5261固定连接的姿态传感器。An attitude sensor fixedly connected to the rolling body 5261.
如图14所示,在本发明实施例中,所述的高度调整机构522为平行四边形机构或气缸。As shown in Figure 14, in the embodiment of the present invention, the height adjustment mechanism 522 is a parallelogram mechanism or a cylinder.
在本法发明实施例中,通过增设卸料轨道辅助安装单元5,并结合姿态传感器、丝杆传动机构实现轨道的水平位姿调整、齿轮机构实现轨道角度修正,从而有效提高了辅助卸料小车轨道201的安装质量。In the embodiment of the present invention, the auxiliary installation unit 5 of the unloading track is added, combined with the attitude sensor and the screw transmission mechanism to realize the horizontal posture adjustment of the track, and the gear mechanism to realize the track angle correction, thereby effectively improving the efficiency of the auxiliary unloading trolley. Rail 201 installation quality.
如图16所示,一种筒仓顶部整体卸料体系更换系统的施工方法,包括:As shown in Figure 16, a construction method for replacing the overall unloading system at the top of the silo includes:
S100:在原有筒仓厂房外搭设辅助型钢支架220;S100: Set up auxiliary steel bracket 220 outside the original silo factory building;
S200:拆除旧有尾轮,松弛旧有重锤放松旧有皮带,留设门洞;S200: Remove the old tail wheel, loosen the old weight and loosen the old belt, leaving a door opening;
S300:安装辅助卸料小车支架,并在辅助卸料小车支架上铺设辅助卸料小车轨道;S300: Install the auxiliary unloading trolley bracket and lay the auxiliary unloading trolley track on the auxiliary unloading trolley bracket;
S400:安装辅助皮带机导向辊并固定皮带;S400: Install the auxiliary belt conveyor guide roller and fix the belt;
S500:通过旧有皮带机输送新装卸料小车安装构件;S500: The new loading and unloading trolley installation components are transported through the old belt conveyor;
S600:拆除旧有卸料小车相关构件;S600: Remove the relevant components of the old unloading trolley;
S700:安装新装的卸料小车及其组件;S700: Install the newly installed unloading trolley and its components;
S800:安装新装卸料小车其他设备及皮带。S800: Install new loading and unloading trolley and other equipment and belts.
所述S100,包括如下步骤:The S100 includes the following steps:
S101:根据新装卸料小车402尺寸定制辅助型钢支架220;S101: Customize the auxiliary steel bracket 220 according to the size of the new loading and unloading trolley 402;
S102:将辅助型钢支架安装在室外地面上,支架基础应牢固可靠;S102: Install the auxiliary steel bracket on the outdoor ground, and the foundation of the bracket should be firm and reliable;
S103:控制辅助型钢支架搭设高度应与旧有卸料体系组件所在楼面平齐;S103: The erection height of the control auxiliary steel bracket should be flush with the floor where the components of the old unloading system are located;
S104:在辅助型钢支架顶部留设纵向横梁、走道板、防护栏杆,所述纵向横梁平行皮带机输送方向,纵向横梁间距与卸料小车支架间距同宽;所述走道板应能承受正常施工荷载;所述防护栏杆高度不低于1.2m。S104: Leave longitudinal beams, walkway plates, and protective railings on the top of the auxiliary steel bracket. The longitudinal beams are parallel to the conveying direction of the belt conveyor, and the distance between the longitudinal beams is the same as the distance between the unloading trolley brackets; the walkway plates should be able to withstand normal construction loads. ;The height of the protective railing shall not be less than 1.2m.
所述S200,包括如下步骤:The S200 includes the following steps:
S201:在厂房侧墙留设门洞,拆除高度范围应能通过新装卸料小车;S201: Leave a door opening in the side wall of the factory building, and the demolition height range should be able to pass the new loading and unloading trolley;
S202:将旧有皮带机重锤提升至最高点,使旧有皮带松弛,将旧有皮带取下;S202: Lift the weight of the old belt conveyor to the highest point to loosen the old belt and remove the old belt;
S203:拆除旧有皮带机尾轮;S203: Remove the old belt conveyor tail wheel;
S204:将所述旧有皮带拉伸至所述辅助型钢支架上。S204: Stretch the old belt onto the auxiliary steel bracket.
所述S300,包括如下步骤:The S300 includes the following steps:
S301:在辅助型钢支架纵向横梁上及筒仓旧有尾轮后楼板上搭设辅助卸料小车支架,在辅助卸料小车支架上铺设辅助卸料小车轨道;S301: Set up the auxiliary unloading trolley bracket on the longitudinal beam of the auxiliary steel bracket and the floor behind the old tail wheel of the silo, and lay the auxiliary unloading trolley track on the auxiliary unloading trolley bracket;
S302:在辅助卸料小车轨道铺设完成后轨道标高应与新更换的卸料小车运行轨道标高相同。S302: After the auxiliary unloading trolley track is laid, the track elevation should be the same as the newly replaced unloading trolley running track elevation.
所述S400,包括如下步骤:The S400 includes the following steps:
S401:将卸下的旧有皮带拉伸至所述辅助型钢支架合适位置,在所述位置安装辅助皮带机导向辊;S401: Stretch the removed old belt to the appropriate position of the auxiliary steel bracket, and install the auxiliary belt conveyor guide roller at the position;
S402:所述旧有皮带能沿安装辅助导向皮带机辊正常运转、换向。S402: The old belt can run normally and change direction along the installed auxiliary guide belt conveyor roller.
所述S500,包括如下步骤:The S500 includes the following steps:
S501:利用汽车吊将新装的卸料小车轨道、卸料小车支架等吊运至旧有皮带机皮带上;S501: Use a truck crane to lift the newly installed unloading trolley track, unloading trolley bracket, etc. to the old belt conveyor belt;
S502:启动旧有皮带机,将新装卸料小车安装构件输送至安装部位。S502: Start the old belt conveyor and transport the new loading and unloading trolley installation components to the installation location.
所述S600,包括如下步骤:The S600 includes the following steps:
S601:将旧有卸料皮带、卸料小车主体、卸料小车轨道、卸料小车支架等构件依次气割为合适大小拆除;S601: Gas-cut and dismantle the old unloading belt, unloading trolley body, unloading trolley track, unloading trolley bracket and other components to appropriate sizes in sequence;
S602:将拆除的构件从旧有皮带机头轮处输送至地面。S602: Transport the dismantled components from the old belt conveyor head wheel to the ground.
所述S700,包括如下步骤:The S700 includes the following steps:
S701:在旧有筒仓上部依次安装新装的卸料小车支架、卸料小车轨道等构件;S701: Install the newly installed unloading trolley bracket, unloading trolley track and other components on the upper part of the old silo;
S702:利用汽车吊将新装的卸料小车整体吊运至辅助型钢支架上的辅助卸料小车轨道上;S702: Use a truck crane to lift the newly installed unloading trolley as a whole to the auxiliary unloading trolley track on the auxiliary steel bracket;
S703:在筒仓上新装卸料小车支架上固定卷扬机,将所述卷扬机与新装卸料小车支架通过钢丝绳进行绑扎连接,通过启动卷扬机,带动钢丝绳将辅助型钢支架上的新装卸料小车主体拉运至旧有筒仓上的新装卸料小车轨道上;S703: Fix the winch on the new loading and unloading trolley bracket on the silo, tie the winch and the new loading and unloading trolley bracket through the wire rope, and start the winch to drive the steel wire rope to pull the main body of the new loading and unloading trolley on the auxiliary steel bracket. to the new loading and unloading trolley track on the old silo;
S704:拆除筒仓上旧有尾轮处辅助型钢支架;S704: Remove the old auxiliary steel bracket at the tail wheel on the silo;
S705:在筒仓上旧有尾轮安装新装的尾轮及其他新装卸料小车构件。S705: Install the new tail wheel and other new loading and unloading trolley components on the old tail wheel on the silo.
所述S800,包括如下步骤:The S800 includes the following steps:
S801:利用旧有筒仓上新装卸料小车支架上固定的卷扬机,带动新装皮带安装;S801: Use the winch fixed on the new loading and unloading trolley bracket on the old silo to drive the installation of the new belt;
S802:安装新装清扫器、监测元件等辅助设备;S802: Install new cleaners, monitoring components and other auxiliary equipment;
S803:拆除旧有筒仓上新装卸料小车支架上固定的卷扬机。S803: Remove the winch fixed on the new loading and unloading trolley bracket on the old silo.
以上仅为本申请的较佳实施例而已,并不用以限制本申请,凡在本申请的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本申请的保护范围之内。以上仅是本申请的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本申请技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本申请的保护范围。The above are only preferred embodiments of the present application and are not intended to limit the present application. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present application shall be included in the protection scope of the present application. Inside. The above are only the preferred embodiments of the present application. It should be pointed out that for those of ordinary skill in the art, several improvements and modifications can be made without departing from the technical principles of the present application. These improvements and modifications should also be made. regarded as the protection scope of this application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202311095941.3A CN117506409A (en) | 2023-08-29 | 2023-08-29 | A replacement system for the overall unloading system at the top of a silo and its construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202311095941.3A CN117506409A (en) | 2023-08-29 | 2023-08-29 | A replacement system for the overall unloading system at the top of a silo and its construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN117506409A true CN117506409A (en) | 2024-02-06 |
Family
ID=89755657
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202311095941.3A Pending CN117506409A (en) | 2023-08-29 | 2023-08-29 | A replacement system for the overall unloading system at the top of a silo and its construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN117506409A (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB8330681D0 (en) * | 1982-12-07 | 1983-12-29 | Vulcan Materials Co | Replacing conveyor belts |
| CN207497533U (en) * | 2017-10-26 | 2018-06-15 | 首钢京唐钢铁联合有限责任公司 | Carrier roller type conveyor |
| CN109896223A (en) * | 2017-12-07 | 2019-06-18 | 中冶宝钢技术服务有限公司 | Restricted clearance inner belt replacing options and its belt steering frame used |
| CN110589512A (en) * | 2019-08-29 | 2019-12-20 | 郑州市鑫宇机械制造有限公司 | A material distribution and transportation sports car system applied to the upper part of the silo |
| CN116177286A (en) * | 2023-02-06 | 2023-05-30 | 中国一冶集团有限公司 | A method for quickly replacing the belt of a belt conveyor |
-
2023
- 2023-08-29 CN CN202311095941.3A patent/CN117506409A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB8330681D0 (en) * | 1982-12-07 | 1983-12-29 | Vulcan Materials Co | Replacing conveyor belts |
| CN207497533U (en) * | 2017-10-26 | 2018-06-15 | 首钢京唐钢铁联合有限责任公司 | Carrier roller type conveyor |
| CN109896223A (en) * | 2017-12-07 | 2019-06-18 | 中冶宝钢技术服务有限公司 | Restricted clearance inner belt replacing options and its belt steering frame used |
| CN110589512A (en) * | 2019-08-29 | 2019-12-20 | 郑州市鑫宇机械制造有限公司 | A material distribution and transportation sports car system applied to the upper part of the silo |
| CN116177286A (en) * | 2023-02-06 | 2023-05-30 | 中国一冶集团有限公司 | A method for quickly replacing the belt of a belt conveyor |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US11607982B2 (en) | Transport vehicle and installation method for case of mobile power generation system | |
| CN106638687B (en) | A Prefabricated and Assembled Comprehensive Pipe Gallery Accurate and Rapid Assembly Technology | |
| CN101855160A (en) | Apparatus for lifting and moving window frame | |
| CN211397597U (en) | Template trolley and tunnel construction vehicle set | |
| CN102140829A (en) | Installation device and installation method of roof panel of grid structure factory building and panel conveying trolley | |
| CN117506409A (en) | A replacement system for the overall unloading system at the top of a silo and its construction method | |
| CN107720493A (en) | Architectural engineering cargo lift quick discharging method and car | |
| CN114703896A (en) | Self-compacting concrete pouring method for bottom plate of steel shell immersed tube tunnel | |
| CN112027926A (en) | Construction method of automatic hoisting tool system for mobile portable assembly type steel structure | |
| CN113428565A (en) | Concrete conveying belt device and control method thereof | |
| CN110127520B (en) | Method for installing small-lattice funnel and dust-settling pipe of large sintering machine | |
| CN207903766U (en) | The test specimen for testing loading system becomes rail conveying device | |
| CN101935721B (en) | Method for integrally dismounting and installing furnace top system of blast furnace | |
| CN113697687B (en) | Method for quickly hoisting underground multi-layer double-T-plate structure and positioning fixture thereof | |
| CN215101523U (en) | Auxiliary hoisting robot for cylindrical bin | |
| CN103482080A (en) | Gallery bridge type aviation container material continuous transfer loading and unloading equipment | |
| CN218622862U (en) | Roof structure capable of being rapidly disassembled | |
| CN102515030A (en) | Construction process for replacement for steam pocket in narrow condition | |
| CN223752298U (en) | Main equipment lifting system of gas power station | |
| CN221342611U (en) | Overhead transfer device for shield segment steel reinforcement cage | |
| CN111576892A (en) | Construction machine | |
| CN112605627A (en) | Ship integrated vibration isolation and impact resistance device cabin-entering conveying system | |
| CN213135590U (en) | Welding equipment | |
| CN222594487U (en) | Monorail erection device | |
| RU2713712C1 (en) | Replacement of lining of mills by means of manipulator fixed in trunnion bushing |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |