CN117328371A - A device and construction method for external construction of box girder chambers - Google Patents

A device and construction method for external construction of box girder chambers Download PDF

Info

Publication number
CN117328371A
CN117328371A CN202310846328.4A CN202310846328A CN117328371A CN 117328371 A CN117328371 A CN 117328371A CN 202310846328 A CN202310846328 A CN 202310846328A CN 117328371 A CN117328371 A CN 117328371A
Authority
CN
China
Prior art keywords
construction
support bracket
fixing
box
beam body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310846328.4A
Other languages
Chinese (zh)
Inventor
朱力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huashi Yancheng Intelligent Manufacturing Co ltd
Original Assignee
Huashi Yancheng Intelligent Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huashi Yancheng Intelligent Manufacturing Co ltd filed Critical Huashi Yancheng Intelligent Manufacturing Co ltd
Priority to CN202310846328.4A priority Critical patent/CN117328371A/en
Publication of CN117328371A publication Critical patent/CN117328371A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/10Cantilevered erection
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention relates to the technical field, in particular to a device and a construction method for outside construction of a box girder box, which solve the problems that most of existing tools for outside construction of the box girder in the prior art are relatively laggard, are constructed by hoisting people by a crane, have high potential safety hazard, cannot effectively guarantee construction quality and have lower working efficiency. A device and a construction method for the outside construction of a box girder box chamber comprise a support bracket and a girder body, wherein hanging pieces are arranged at four corners of the top of the support bracket, and a fixing piece is arranged at the top of the support bracket. The invention is realized by combining the support bracket, the suspension part, the fixing part and the suspension part, improves the working environment of operators, ensures the personal safety of constructors, ensures the construction quality when the construction device is used for the external trimming and decorating of the beam body and the installation work of the drain pipe, has reasonable structure, convenient operation, greatly improves the construction efficiency, effectively saves the construction cost and has better economic and social benefits.

Description

一种用于箱梁箱室外部施工的装置及施工方法A device and construction method for external construction of box girder chambers

技术领域Technical field

本发明涉及桥梁技术领域,尤其涉及一种用于箱梁箱室外部施工的装置及施工方法。The invention relates to the technical field of bridges, and in particular to a device and a construction method for external construction of box girder chambers.

背景技术Background technique

随着社会经济的大力发展,对交通设施建设的需求越来越大,桥梁在高速公路、铁路的建设中必不可少,比重较大,桥梁建设所需的工装也得到了大力发展;With the vigorous development of social economy, the demand for the construction of transportation facilities is increasing. Bridges are indispensable in the construction of highways and railways, accounting for a large proportion. The tooling required for bridge construction has also been vigorously developed;

而目前箱梁外部施工的工装,比较落后,多数采用吊车吊人施工,安全隐患大,施工质量不能得到有效保障,工作效率也较低,所以我们提出了可用于箱梁外部施工的工装,进行梁体外部整修、装饰及排水管安装工作的一种用于箱梁箱室外部施工的装置及施工方法,用以解决上述问题。At present, the tooling for the external construction of box girders is relatively backward. Most of them use cranes for construction, which poses great safety risks, the construction quality cannot be effectively guaranteed, and the work efficiency is also low. Therefore, we have proposed tooling that can be used for the external construction of box girders. A device and construction method for external construction of box girder chambers, which are used for external renovation, decoration and drainage pipe installation of beam bodies to solve the above problems.

发明内容Contents of the invention

本发明的目的是提供一种用于箱梁箱室外部施工的装置及施工方法,解决了现有技术中目前箱梁外部施工的工装,比较落后,多数采用吊车吊人施工,安全隐患大,施工质量不能得到有效保障,工作效率也较低的问题。The purpose of the present invention is to provide a device and a construction method for the external construction of box girder chambers, which solves the problem that the current tooling for the external construction of box girder in the prior art is relatively backward, and most of them use cranes for hoisting construction, which poses great safety risks. Construction quality cannot be effectively guaranteed and work efficiency is low.

为了实现上述目的,本发明采用了如下技术方案:In order to achieve the above objects, the present invention adopts the following technical solutions:

一种用于箱梁箱室外部施工的装置及施工方法,包括承托架和梁体,所述承托架的顶部四个拐角处均设置有悬挂件,所述承托架的顶部设置有固定件,固定件包含有两个对称设置且与梁体顶部可拆卸连接的固定支架,所述悬挂件包含有竖直设置且一端通过滑套贯穿承托架的滑动杆,所述滑动杆的两端均连接有限位板,所述滑动杆的顶端部设置有与限位板连接的吊环。A device and construction method for external construction of box girder chambers, including a supporting bracket and a beam body. Suspension parts are provided at the top four corners of the supporting bracket. The top of the supporting bracket is provided with a The fixing part includes two fixed brackets that are symmetrically arranged and detachably connected to the top of the beam body. The hanging part includes a sliding rod that is arranged vertically and has one end passing through the supporting bracket through a sliding sleeve. The sliding rod is Both ends are connected to limit plates, and the top end of the sliding rod is provided with a lifting ring connected to the limit plates.

优选的,所述承托架包含有两个对称设置的承托杆和若干个连接在两个承托杆之间的横梁。Preferably, the supporting bracket includes two symmetrically arranged supporting rods and several cross beams connected between the two supporting rods.

优选的,所述滑动杆、限位板和挂环均采用金属材质制成。Preferably, the sliding rod, limiting plate and hanging ring are all made of metal.

优选的,固定件包含有两个对称设置的固定杆,两个所述固定杆的底部均可拆卸连接有与梁体顶部固定连接的横板,两个所述固定杆之间对称且水平设置有两个吊装杆,所述吊装杆的两端分别与两个固定杆的底部连接,所述吊装杆的顶部连接有若干个连接环。Preferably, the fixing member includes two symmetrically arranged fixing rods. The bottoms of the two fixing rods are detachably connected with transverse plates fixedly connected to the top of the beam body. The two fixing rods are arranged symmetrically and horizontally. There are two lifting rods, the two ends of the lifting rod are respectively connected to the bottoms of the two fixed rods, and the top of the lifting rod is connected with several connecting rings.

优选的,所述固定杆的顶部中心处开设有固定槽,固定槽的内部竖直设置有一端通过螺套贯穿固定杆的固定螺杆,所述固定螺杆的一端与横板的顶部螺纹连接。Preferably, a fixing groove is provided at the center of the top of the fixing rod, and a fixing screw with one end passing through the fixing rod through a screw sleeve is vertically provided inside the fixing groove. One end of the fixing screw is threadedly connected to the top of the horizontal plate.

优选的,所述横板的顶部两侧均连接有对接块,所述对接块的一侧开设有对接槽,所述固定杆的底部两侧均连接有与对接槽相适配的插接块,所述固定杆的底部两侧均开设有与吊装杆相适配的插接槽,所述吊装杆的两端均连接有限位块。Preferably, docking blocks are connected to both sides of the top of the horizontal plate, a docking slot is provided on one side of the docking block, and plug blocks that match the docking slot are connected to both sides of the bottom of the fixed rod. , both sides of the bottom of the fixed rod are provided with plug-in slots that are adapted to the lifting rod, and both ends of the lifting rod are connected with limiting blocks.

一种利用权利要求1所述的箱梁箱室外部施工的施工方法,包括如下步骤:A construction method using the external construction of the box girder box chamber according to claim 1, including the following steps:

①将承托架设置在梁体底部,使用精轧螺纹钢将其固定,然后将固定支架吊装在垫梁上部,并用精轧螺纹钢临时固定;① Set the supporting bracket at the bottom of the beam body and fix it with fine-rolled rebar, then hoist the fixed bracket on the upper part of the pad beam and temporarily fix it with fine-rolled rebar;

②将顶固定支架吊装在行走梁上部,并用精轧螺纹钢固定,调整两道顶固定支架位置及间距,采用连接系对其进行连接;② Hoist the roof fixed bracket on the upper part of the walking beam and fix it with precision-rolled rebar. Adjust the position and spacing of the two roof fixed brackets and connect them with a connecting system;

③吊装精轧螺纹钢、倒链钢丝绳;③ Hoisting finely rolled rebar and reverse chain wire rope;

④通过悬挂件吊装承托架,然后用精轧螺纹钢将其锁定,连接倒链钢丝绳,然后吊装纵向分配梁;④ Lift the supporting bracket through the suspension parts, then lock it with fine-rolled rebar, connect the inverted steel wire rope, and then lift the longitudinal distribution beam;

⑤在纵向分配梁上铺设钢板,搭设脚手架;⑤Lay steel plates on the longitudinal distribution beams and set up scaffolding;

⑥此节段梁体室外部施工完成后,拆除固定支架的锚固件,利用倒链钢丝绳拽拉承托架,使整个装置同步向前移动至下段梁体施工位置后,再次将固定支架与梁体顶板锚固,进行下一节段梁体的室外部施。⑥After the external construction of the beam chamber of this section is completed, remove the anchors of the fixed bracket, use the inverted steel wire rope to pull the supporting bracket, and move the entire device forward synchronously to the construction position of the lower beam body, and then connect the fixed bracket and the beam again The top plate of the body is anchored, and the outdoor exterior construction of the next segment of the beam body is carried out.

本发明至少具备以下有益效果:The present invention at least has the following beneficial effects:

通过承托架、悬挂件、固定件、和悬挂件组合来实现,改善了操作人员的工作环境,确保了施工人员的人身安全,利用本施工装置在梁体外部整修、装饰及排水管安装工作时,施工质量得到了保障,此装置结构合理,操作方便,施工效率大大提高,施工成本有效节约,具有较好的经济效益及社会效益。It is realized through the combination of supporting brackets, suspension parts, fixing parts and suspension parts, which improves the working environment of the operators and ensures the personal safety of the construction workers. This construction device is used for renovation, decoration and drainage pipe installation work outside the beam body. At this time, the construction quality is guaranteed. The device has a reasonable structure, is easy to operate, greatly improves the construction efficiency, effectively saves construction costs, and has good economic and social benefits.

附图说明Description of drawings

为了更清楚地说明本发明实施例技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are some embodiments of the present invention, which are of great significance to this field. Ordinary technicians can also obtain other drawings based on these drawings without exerting creative work.

图1为本发明结构示意图;Figure 1 is a schematic structural diagram of the present invention;

图2为本发明横梁结构示意图;Figure 2 is a schematic diagram of the beam structure of the present invention;

图3为本发明固定杆结构示意图。Figure 3 is a schematic structural diagram of the fixed rod of the present invention.

图中:1、承托架;2、梁体;3、固定支架;4、悬挂件;5、限位板;6、滑动杆;7、吊环;8、横梁;9、对接块;10、横板;11、插接块;12、固定杆;13、插接槽;14、固定螺杆;15、连接环;16、限位块;17、吊装杆。In the picture: 1. Supporting bracket; 2. Beam body; 3. Fixed bracket; 4. Suspension parts; 5. Limiting plate; 6. Sliding rod; 7. Lifting ring; 8. Cross beam; 9. Butt block; 10. Horizontal plate; 11. Plug-in block; 12. Fixed rod; 13. Plug-in slot; 14. Fixed screw; 15. Connecting ring; 16. Limiting block; 17. Lifting rod.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the purpose, technical solutions and advantages of the present invention more clear, the present invention will be further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention and are not intended to limit the present invention.

实施例一Embodiment 1

参照图1-3,一种用于箱梁箱室外部施工的装置及施工方法,包括承托架1和梁体2,承托架1的顶部四个拐角处均设置有悬挂件4,承托架1的顶部设置有固定件,固定件包含有两个对称设置且与梁体2顶部可拆卸连接的固定支架3,悬挂件4包含有竖直设置且一端通过滑套贯穿承托架1的滑动杆6,滑动杆6的两端均连接有限位板5,滑动杆6的顶端部设置有与限位板5连接的吊环7。Referring to Figures 1-3, a device and construction method for external construction of a box girder chamber include a supporting bracket 1 and a beam body 2. Suspension pieces 4 are provided at the top four corners of the supporting bracket 1. The top of the bracket 1 is provided with a fixing piece. The fixing piece includes two symmetrically arranged fixing brackets 3 that are detachably connected to the top of the beam body 2. The hanging piece 4 includes a vertical piece with one end passing through the supporting bracket 1 through a sliding sleeve. The sliding rod 6 has both ends connected to the limiting plate 5. The top end of the sliding rod 6 is provided with a lifting ring 7 connected to the limiting plate 5.

根据上述实施例可知:通过承托架1、悬挂件4、固定件、和悬挂件4组合来实现,改善了操作人员的工作环境,确保了施工人员的人身安全,利用本施工装置在梁体外部整修、装饰及排水管安装工作时,施工质量得到了保障,此装置结构合理,操作方便,施工效率大大提高,施工成本有效节约,具有较好的经济效益及社会效益。According to the above embodiments, it can be seen that through the combination of the supporting bracket 1, the hanging piece 4, the fixing piece, and the hanging piece 4, the working environment of the operator is improved, and the personal safety of the construction personnel is ensured. The use of this construction device on the beam body During external renovation, decoration and drainage pipe installation work, the construction quality is guaranteed. This device has a reasonable structure and is easy to operate. The construction efficiency is greatly improved, the construction cost is effectively saved, and it has good economic and social benefits.

实施例二Embodiment 2

参照图1-3,承托架1包含有两个对称设置的承托杆和若干个连接在两个承托杆之间的横梁8,滑动杆6、限位板5和挂环7均采用金属材质制成,固定件包含有两个对称设置的固定杆12,两个固定杆12的底部均可拆卸连接有与梁体2顶部固定连接的横板10,两个固定杆12之间对称且水平设置有两个吊装杆17,吊装杆17的两端分别与两个固定杆12的底部连接,吊装杆17的顶部连接有若干个连接环15,固定杆12的顶部中心处开设有固定槽,固定槽的内部竖直设置有一端通过螺套贯穿固定杆12的固定螺杆14,固定螺杆14的一端与横板10的顶部螺纹连接,横板10的顶部两侧均连接有对接块9,对接块9的一侧开设有对接槽,固定杆12的底部两侧均连接有与对接槽相适配的插接块11,固定杆12的底部两侧均开设有与吊装杆17相适配的插接槽13,吊装杆17的两端均连接有限位块16。Referring to Figure 1-3, the supporting bracket 1 includes two symmetrically arranged supporting rods and several cross beams 8 connected between the two supporting rods. The sliding rod 6, the limiting plate 5 and the hanging ring 7 are all made of Made of metal material, the fixing piece includes two symmetrically arranged fixing rods 12. The bottoms of the two fixing rods 12 are detachably connected to a horizontal plate 10 fixedly connected to the top of the beam body 2. The two fixing rods 12 are symmetrical. And two lifting rods 17 are arranged horizontally. The two ends of the lifting rod 17 are respectively connected to the bottoms of the two fixed rods 12. The top of the lifting rod 17 is connected with several connecting rings 15. The top center of the fixed rod 12 is provided with a fixed The inside of the fixed groove is vertically provided with a fixing screw 14 with one end passing through the fixing rod 12 through a threaded sleeve. One end of the fixing screw 14 is threadedly connected to the top of the horizontal plate 10, and the top two sides of the horizontal plate 10 are connected with butt blocks 9 , one side of the docking block 9 is provided with a docking slot, and both sides of the bottom of the fixed rod 12 are connected with plug blocks 11 that are suitable for the docking slot. Both sides of the bottom of the fixed rod 12 are provided with plug blocks 11 that are suitable for the lifting rods 17 Equipped with a plug-in slot 13, both ends of the lifting rod 17 are connected to limit blocks 16.

实施例三Embodiment 3

箱梁箱室外部施工的施工方法,包括如下步骤:The construction method of external construction of box girder box chamber includes the following steps:

①将承托架1设置在梁体2底部,使用精轧螺纹钢将其固定,然后将固定支架3吊装在垫梁上部,并用精轧螺纹钢临时固定;① Set the supporting bracket 1 at the bottom of the beam body 2 and fix it with fine-rolled rebar, then hoist the fixed bracket 3 on the upper part of the pad beam and temporarily fix it with fine-rolled rebar;

②将顶固定支架3吊装在行走梁上部,并用精轧螺纹钢固定,调整两道顶固定支架3位置及间距,采用连接系对其进行连接;② Hoist the top fixed bracket 3 on the upper part of the walking beam and fix it with precision-rolled rebar. Adjust the position and spacing of the two top fixed brackets 3 and connect them using a connecting system;

③吊装精轧螺纹钢、倒链钢丝绳;③ Hoisting finely rolled rebar and reverse chain wire rope;

④通过悬挂件4吊装承托架1,然后用精轧螺纹钢将其锁定,连接倒链钢丝绳,然后吊装纵向分配梁;④ Lift the supporting bracket 1 through the suspension part 4, then lock it with precision-rolled rebar, connect the inverted steel wire rope, and then lift the longitudinal distribution beam;

⑤在纵向分配梁上铺设钢板,搭设脚手架;⑤Lay steel plates on the longitudinal distribution beams and set up scaffolding;

⑥此节段梁体2室外部施工完成后,拆除固定支架3的锚固件,利用倒链钢丝绳拽拉承托架1,使整个装置同步向前移动至下段梁体2施工位置后,再次将固定支架3与梁体2顶板锚固,进行下一节段梁体2的室外部施。⑥After the external construction of the beam body 2 in this section is completed, remove the anchors of the fixed bracket 3, use the inverted wire rope to pull the support bracket 1, so that the entire device can be moved forward synchronously to the construction position of the lower beam body 2, and then move it again. The fixed bracket 3 is anchored to the top plate of the beam body 2, and the next section of the beam body 2 is installed outdoors.

以上显示和描述了本发明的基本原理、主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是本发明的原理,在不脱离本发明精神和范围的前提下本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明的范围内。本发明要求的保护范围由所附的权利要求书及其等同物界定。The basic principles, main features and advantages of the present invention have been shown and described above. Those skilled in the industry should understand that the present invention is not limited to the above embodiments. What is described in the above embodiments and descriptions is only the principle of the present invention. The present invention may also have various modifications without departing from the spirit and scope of the present invention. changes and improvements that fall within the scope of the claimed invention. The scope of protection required for the present invention is defined by the appended claims and their equivalents.

Claims (7)

1. A device for outside construction of a beam box, comprising:
support bracket (1) and roof beam body (2), four corners in top of support bracket (1) all are provided with suspension member (4), the top of support bracket (1) is provided with the mounting, and the mounting is including two symmetry settings and with roof beam body (2) top can dismantle fixed bolster (3) of being connected, suspension member (4) are including vertical setting and one end run through slide bar (6) of support bracket (1) through the sliding sleeve, the both ends of slide bar (6) all are connected with limiting plate (5), the top portion of slide bar (6) is provided with rings (7) of being connected with limiting plate (5).
2. Device for external construction of a girder and a box according to claim 1, characterized in that the support bracket (1) comprises two symmetrically arranged support bars and several cross beams (8) connected between the two support bars.
3. The device for external construction of a box girder and box according to claim 2, wherein the sliding rod (6), the limiting plate (5) and the hanging ring (7) are all made of metal materials.
4. The device for outside construction of a box girder and a box according to claim 1, wherein the fixing piece comprises two symmetrically arranged fixing rods (12), the bottoms of the two fixing rods (12) are detachably connected with a transverse plate (10) fixedly connected with the top of the girder body (2), two lifting rods (17) are symmetrically and horizontally arranged between the two fixing rods (12), two ends of each lifting rod (17) are respectively connected with the bottoms of the two fixing rods (12), and the top of each lifting rod (17) is connected with a plurality of connecting rings (15).
5. The device for outside construction of a box girder and box according to claim 4, wherein a fixing groove is formed in the center of the top of the fixing rod (12), a fixing screw (14) with one end penetrating through the fixing rod (12) through a screw sleeve is vertically arranged in the fixing groove, and one end of the fixing screw (14) is in threaded connection with the top of the transverse plate (10).
6. The device for outside construction of a box girder and a box according to claim 5, characterized in that, the top both sides of the cross plate (10) are all connected with the butt joint piece (9), the butt joint groove has been seted up to one side of butt joint piece (9), the bottom both sides of dead lever (12) all are connected with grafting piece (11) with butt joint groove looks adaptation, grafting groove (13) with hoist and mount pole (17) looks adaptation have all been seted up to the bottom both sides of dead lever (12), the both ends of hoist and mount pole (17) all are connected with stopper (16).
7. A construction method for external construction of a box girder box chamber according to claim 1, comprising the steps of:
(1) the support bracket (1) is arranged at the bottom of the beam body (2), the support bracket is fixed by using finish rolling deformed steel bars, then the fixed bracket (3) is hoisted at the upper part of the bolster, and the support bracket is temporarily fixed by using the finish rolling deformed steel bars;
(2) the top fixing support (3) is hung on the upper part of the walking beam and fixed by finish rolling deformed steel bars, the positions and the intervals of the two top fixing supports (3) are adjusted, and the two top fixing supports are connected by adopting a connecting system;
(3) hoisting finish rolling deformed steel bar and chain-pouring steel wire rope;
(4) hoisting the support bracket (1) through the suspension piece (4), locking the support bracket by using finish rolling deformed steel bars, connecting a chain block steel wire rope, and hoisting the longitudinal distribution beam;
(5) paving steel plates on the longitudinal distribution beams, and erecting a scaffold;
(6) after the outdoor construction of the section beam body (2) is completed, the anchoring piece of the fixed support (3) is removed, the support bracket (1) is pulled by using the chain-pouring steel wire rope, the whole device synchronously moves forward to the construction position of the lower section beam body (2), the fixed support (3) is anchored with the top plate of the beam body (2) again, and the outdoor construction of the next section beam body (2) is carried out.
CN202310846328.4A 2023-07-11 2023-07-11 A device and construction method for external construction of box girder chambers Pending CN117328371A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310846328.4A CN117328371A (en) 2023-07-11 2023-07-11 A device and construction method for external construction of box girder chambers

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310846328.4A CN117328371A (en) 2023-07-11 2023-07-11 A device and construction method for external construction of box girder chambers

Publications (1)

Publication Number Publication Date
CN117328371A true CN117328371A (en) 2024-01-02

Family

ID=89289172

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310846328.4A Pending CN117328371A (en) 2023-07-11 2023-07-11 A device and construction method for external construction of box girder chambers

Country Status (1)

Country Link
CN (1) CN117328371A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105603882A (en) * 2016-02-29 2016-05-25 中交第一公路工程局有限公司 Continuous beam mid-span closure construction method achieving uninterrupted power of contact line and structure of method
CN106149568A (en) * 2016-08-24 2016-11-23 中国铁建大桥工程局集团有限公司 A kind of device for the outside construction of box beam chamber and construction method
JP2017020290A (en) * 2015-07-14 2017-01-26 オリエンタル白石株式会社 Disassembling method of bridge
CN107059656A (en) * 2017-01-04 2017-08-18 杭州江润科技有限公司 Active service bridge maintenance repairs the construction method of boat scaffold operating platform
CN211472207U (en) * 2020-01-03 2020-09-11 中建七局安装工程有限公司 Suspension beam system for hoisting prefabricated section box girder
CN114164772A (en) * 2021-12-07 2022-03-11 甘肃建投临夏建设管理有限公司 Rhombic hanging basket for viaduct cantilever pouring construction and mounting method
CN217556724U (en) * 2022-06-02 2022-10-11 重庆高速公路集团有限公司 Web steel reinforcement framework transfer, transportation and installation device of bridge hanging basket construction system
CN115162210A (en) * 2022-08-12 2022-10-11 无锡交通建设工程集团有限公司 Rhombic hanging basket structure and hanging basket synchronous walking method
CN115928611A (en) * 2022-12-13 2023-04-07 山西四建集团有限公司 A light-weight construction method for hanging baskets in cantilever beam pouring method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017020290A (en) * 2015-07-14 2017-01-26 オリエンタル白石株式会社 Disassembling method of bridge
CN105603882A (en) * 2016-02-29 2016-05-25 中交第一公路工程局有限公司 Continuous beam mid-span closure construction method achieving uninterrupted power of contact line and structure of method
CN106149568A (en) * 2016-08-24 2016-11-23 中国铁建大桥工程局集团有限公司 A kind of device for the outside construction of box beam chamber and construction method
CN107059656A (en) * 2017-01-04 2017-08-18 杭州江润科技有限公司 Active service bridge maintenance repairs the construction method of boat scaffold operating platform
CN211472207U (en) * 2020-01-03 2020-09-11 中建七局安装工程有限公司 Suspension beam system for hoisting prefabricated section box girder
CN114164772A (en) * 2021-12-07 2022-03-11 甘肃建投临夏建设管理有限公司 Rhombic hanging basket for viaduct cantilever pouring construction and mounting method
CN217556724U (en) * 2022-06-02 2022-10-11 重庆高速公路集团有限公司 Web steel reinforcement framework transfer, transportation and installation device of bridge hanging basket construction system
CN115162210A (en) * 2022-08-12 2022-10-11 无锡交通建设工程集团有限公司 Rhombic hanging basket structure and hanging basket synchronous walking method
CN115928611A (en) * 2022-12-13 2023-04-07 山西四建集团有限公司 A light-weight construction method for hanging baskets in cantilever beam pouring method

Similar Documents

Publication Publication Date Title
CN101672102A (en) Steel structural overhead ceiling construction platform
CN102877637A (en) Method for implementing operating platform in bottom wall construction of cantilever beam
CN106592962A (en) Large-height-difference long-span stiff-skeleton cladding concrete formwork construction method and apparatus
CN208122371U (en) On across the high-speed rail safe guarding shed fast dismounting device of operation line
CN107217836A (en) A kind of construction hanging basket suspension arrangement for steel construction shelter bridge
CN105088970A (en) Construction method of corrugated steel web PC box girder cable-stayed bridge
CN116853963B (en) A hoisting device and hoisting method for main beam of cable-stayed bridge
CN103758343A (en) Hanging type construction method and hanging device for reinforced concrete floor
CN206667042U (en) Bridge expanssion joint installation and adjustment instrument
EP1111135A3 (en) Method of building viaducts
CN209554635U (en) A kind of GRC plate hangs drawing support frame
CN108086168A (en) Ride cable-styled erection crane
CN203755678U (en) Upper suspension hoisting type hoisting device for reinforced concrete floor construction
CN202745353U (en) Tool-type overhanging scaffold
CN117328371A (en) A device and construction method for external construction of box girder chambers
CN205062677U (en) A rebar installation auxiliary device that is used for high mound of bridge to be under construction
CN209816682U (en) Bridge steel box girder aerial working operation platform
CN210798994U (en) Concrete structure wall body unilateral template structure
CN203755677U (en) Lower suspension hoisting type hoisting device for reinforced concrete floor construction
CN205711780U (en) Wave forms steel web SCC engineering method movable hanging basket
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN104652282B (en) Traversing carriage and using method thereof for the construction of the combination beam cable-stayed bridge edge of a wing
CN210888045U (en) an assembled mold
CN209653548U (en) A kind of horizontal protective device of modularization for construction
CN106149568A (en) A kind of device for the outside construction of box beam chamber and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination