Disclosure of Invention
Aiming at the defects in the prior art, the invention aims to provide a hanging type reticulated shell steel frame diamond section glass curtain wall structure so as to solve the problems.
The utility model provides a suspension type reticulated shell steel frame diamond tangent plane glass curtain wall structure, includes girder steel structure, hangs support, connecting steel spare, main joist, secondary joist, first glass curtain wall component and second glass curtain wall component down, girder steel structure installs on major structure, girder steel structure's lower part is connected in first glass curtain wall component through hanging the support down, the lower part of first glass curtain wall component is connected with second glass curtain wall component through connecting steel spare.
Preferably, the first glass curtain wall components are formed by splicing main keels and secondary keels.
Preferably, the lower main joist of the first glass curtain wall member is provided with a plurality of brackets mounted on the connecting steel member.
Preferably, the main joist of the second glass curtain wall member is connected with a plurality of suspension brackets, and the suspension brackets are connected to the main body structure.
Preferably, the steel beam structure comprises a rectangular steel beam and steel beam end connecting plates, wherein the two ends of the rectangular steel beam are connected with the steel beam end connecting plates, and the steel beam end connecting plates are connected with a plurality of stainless steel bolts.
Preferably, the lower hanging support comprises a first vertical beam and a second vertical beam, the first vertical beam is connected with the second vertical beam, the lower part of the second vertical beam is connected with the main joist, and a reinforcing rib plate is connected between the first vertical beam and the second vertical beam.
Preferably, the support comprises a backing plate, a support plate and connecting bolts, wherein the support plate is arranged on the backing plate, and a plurality of first connecting bolts are connected to the lower part of the backing plate.
Preferably, the suspension support comprises a main keel end steel plate, a steel rib plate and a steel plate frame, wherein the main keel end steel plate is connected to the steel plate frame through the steel rib plate, the steel plate frame comprises a first steel plate and a second steel plate, and the first steel plate and the second steel plate are fixed on a main structure through a second connecting bolt.
Preferably, a plurality of main keels are connected with an integrated main keel node, and a plurality of secondary keels are connected with an integrated secondary keel node.
Preferably, the main joist is welded with an integral main joist node, and the secondary joist is welded with an integral secondary joist node.
Compared with the prior art, the invention has the beneficial effects that: according to the invention, by changing the stress characteristics of the traditional structure, the upright post supporting steel frame is canceled, the traditional beam type stress is optimized, the supporting structure mainly transmits load in a bending mode, and the requirements of the building elevation on the appearance of concave-convex diamond shape are met; through deepening the design, optimizing glass and cut apart, splice angle, monolithic size, increasing fluorocarbon spraying aluminum plate ornamental strip according to the optimum angle of glass, appear diamond tangent plane form visual sense to possess sunshade, heat preservation function, noise reduction and light pollution reduce energy loss.
Detailed Description
It should be noted that, without conflict, the embodiments of the present invention and features of the embodiments may be combined with each other.
In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are merely for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "first," "second," and the like, are used for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defining "a first", "a second", etc. may explicitly or implicitly include one or more such feature. In the description of the present invention, unless otherwise indicated, the meaning of "a plurality" is two or more.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention can be understood by those of ordinary skill in the art in a specific case.
Embodiments of the invention are described in detail below with reference to the attached drawings, but the invention can be implemented in a number of different ways, which are defined and covered by the claims.
As shown in fig. 1 in combination with fig. 2 to 11, a diamond-cut glass curtain wall structure of a suspension type reticulated shell steel frame comprises a steel beam structure 1, a lower hanging support 2, a connecting steel piece 4, a first glass curtain wall member 5 and a second glass curtain wall member 6, wherein the steel beam structure 1 is installed on a main body structure 10, the lower part of the steel beam structure 1 is connected with the first glass curtain wall member 5 through the lower hanging support 2, and the lower part of the first glass curtain wall member 5 is connected with the second glass curtain wall member 6 through the connecting steel piece 4.
Further, the first glass curtain wall members 5 are formed by splicing main keels 8 and secondary keels 9.
Further, the lower main joist 8 of the first glass curtain wall member 5 is provided with a plurality of brackets 3, and the brackets 3 are mounted on the connecting steel member 4.
Further, the main joist 8 of the second glass curtain wall member 6 is connected with a plurality of suspension brackets 7, and the suspension brackets 7 are connected to the main structure 10.
Further, the steel beam structure 1 comprises a rectangular steel beam 101 and steel beam end connecting plates 102, wherein the two ends of the rectangular steel beam 101 are connected with the steel beam end connecting plates 102, and the steel beam end connecting plates 102 are connected with a plurality of stainless steel bolts 103.
Further, the lower hanging support 2 comprises a first vertical beam 201 and a second vertical beam 202, the first vertical beam 201 is connected to the second vertical beam 202, the lower portion of the second vertical beam 202 is connected with the main joist 8, and a reinforcing rib plate 204 is connected between the first vertical beam 201 and the second vertical beam 202.
Further, the support 3 includes a base plate 301, a support plate 302, and first connection bolts 303, the support plate 302 is mounted on the base plate 301, and a plurality of first connection bolts 303 are connected to the lower portion of the base plate 301.
Further, the suspension bracket 7 includes a main keel end steel plate 701, a steel rib plate 702, and a steel plate frame 703, wherein the main keel end steel plate 701 is connected to the steel plate frame 703 through the steel rib plate 702, the steel plate frame 703 includes a first steel plate 704 and a second steel plate 705, and the first steel plate 704 and the second steel plate 705 are fixed on the main body structure 10 through a second connecting bolt 706.
Further, a plurality of main joists 8 are connected to an integral main joist node 801, and a plurality of cross joists 9 are connected to an integral cross joist node 901.
Further, the main joist 8 is welded to the integral main joist node 801, and the cross joist 9 is welded to the integral cross joist node 901.
Compared with the prior art, the invention has the beneficial effects that: according to the invention, by changing the stress characteristics of the traditional structure, the upright post supporting steel frame is canceled, the traditional beam type stress is optimized, the supporting structure mainly transmits load in a bending mode, and the requirements of the building elevation on the appearance of concave-convex diamond shape are met; through deepening the design, optimizing glass and cut apart, splice angle, monolithic size, increasing fluorocarbon spraying aluminum plate ornamental strip according to the optimum angle of glass, appear diamond tangent plane form visual sense to possess sunshade, heat preservation function, noise reduction and light pollution reduce energy loss.
Working principle:
the installation of girder construction 1 installs girder construction 1 on major structure 10, and main joist frame and secondary joist frame are pieced together in advance on ground, assemble into first glass curtain wall component 5 and second glass curtain wall component 6 respectively through between main joist frame and the secondary joist frame, and the hoist and mount of first glass curtain wall component 5 are fixed under girder construction 1 through hanging support 2 down, hoist and mount of second glass curtain wall component 6 through support 3 and connecting steel 4 and the main joist 8 of first glass curtain wall component 5 lower part, then install glass curtain wall subassembly.
The construction process flow is as follows: the method comprises the steps of preparing work, embedding embedded parts, steel beam installation, positioning and paying off, support installation, main keel frame sectional ground splicing, secondary keel positioning and paying off, welding, rust removal, paint spraying, fireproof coating, supporting structure keel frame sectional hoisting, paint supplementing and glass curtain wall assembly installation.
A. Construction preparation work: and (3) deepening design, namely designing and calculating a curtain wall supporting structure model, determining keel and profile selection according to load, strength, rigidity and shearing resistance calculation results, and establishing a BIM model:
B. embedding the embedded part:
b1 process flow: checking an embedded part, positioning the embedded part, fixing the embedded part, positioning and checking, pouring concrete, removing a concrete form, cleaning the embedded part and checking the embedded part;
b2, post-embedded part treatment, namely only unqualified prefabricated embedded parts are treated:
C. and (3) steel beam installation:
the basic process flow comprises the following steps: positioning and paying off, wire snapping, punching, screw installation, anchor plate installation and welding of end parts of two sides of a steel beam;
D. positioning and paying off:
the basic process flow comprises the following steps: extracting space coordinate data of a lofting point position, checking an original control point, establishing a horizontal and vertical space control network, setting a station, and positioning the lofting point in situ:
E. and (2) support mounting:
the basic process flow comprises the following steps: preparing construction, measuring and placing a vertical and horizontal control line, searching and aligning a vertical line at a prefabricated embedded part, checking the horizontal height and the depth dimension, carrying out local spot welding, checking, carrying out full-welded fixation, cleaning a welding line, and carrying out corrosion prevention and rust prevention;
e1, aligning a vertical line at a locating and calibrating horizontal height and depth dimension:
e2, local spot welding and temporary fixing, wherein 3 points are arranged on a single welding surface;
e3, full-welding and fixing, and full-welding the qualified components;
e4, cleaning the welding seam, performing corrosion prevention and rust prevention, polishing the periphery of the welding seam to be smooth, performing acid washing passivation, and performing secondary corrosion prevention treatment because the original galvanized layer or other corrosion prevention layers are damaged by electric welding, brushing the zinc-rich primer for two times, wherein the thickness of the zinc-rich primer is not lower than 100 mu m, brushing the epoxy cloud iron intermediate paint for 2 times, wherein the thickness of the epoxy cloud iron intermediate paint is not lower than 80 mu m, and brushing the 2 layers of silver paint for performing comprehensive corrosion prevention treatment at the position of not lower than 80 mu m after the welding seam is qualified by inspection:
F. main joist frame segmentation ground concatenation:
the basic process flow comprises the following steps: construction preparation, main keel sample turning and blanking, ground welding operation table erection, cast steel piece three-dimensional control point extraction, cast steel piece positioning, cast steel piece temporary fixation on the ground operation table, cast steel piece positioning checking, main keel and cast steel piece bearing, repeated above procedures for temporarily fixing the cast steel piece at the other end on a ground operation frame, positioning checking, main keel and cast steel bar welding fixation, repeated above procedures for completing single hoisting unit net frame welding, weld joint cleaning, corrosion resistance and rust resistance:
f1, positioning and checking the cast steel part, carrying out ground positioning pre-assembly on the cast steel part according to the space relation between the main keel and the cast steel part, and carrying out welding fixation on the cast steel part and the main keel after confirming that errors are avoided.
And F2, dividing the 7-shaped main keel steel frame into three hoisting units at the corners, and assembling the hoisting units on the ground.
G. And (3) positioning, paying-off and welding the secondary joists:
the basic process flow comprises the following steps: rechecking a main keel parting line, popping up a secondary keel welding point center line, processing a secondary keel groove, spot welding a secondary keel, checking, full-welded fixation, welding line cleaning, corrosion prevention and rust prevention;
H. rust removal, paint spraying and fireproof coating:
the basic process flow comprises the following steps: integral surface purification treatment, shot blasting and sand blasting treatment, epoxy zinc-rich primer twice, epoxy iron-cloud intermediate paint twice, ultra-thin fireproof paint and fluorocarbon finish paint three times;
h1, epoxy zinc-rich primer is used twice, the minimum dry film thickness is 70 mu m, epoxy iron cloud intermediate paint is used twice, and the minimum dry film thickness is 110 mu m;
h2 and ultra-thin fireproof paint, wherein the fire resistance limit of the main joist is controlled according to 2.0H, the thickness is not less than 2.5mm, and the fire resistance limit of the secondary joist is controlled according to 1.0H, and the thickness is not less than 1.5mm;
h3 and fluorocarbon finish paint for three times, and the thickness is not less than 100 mu m
I. Support structure keel frame subsection hoisting
The basic process flow comprises the following steps: 50 tons of automobile cranes in place, hoisting preparation, test hoisting, layer height and beam positioning, hoisting in place, electric hoist auxiliary horizontal distance, positioning and checking, welding and unhooking;
J. and (3) paint repairing: only aiming at the part which is locally destroyed in the hoisting process, constructing according to the H2 and H3 processes;
K. and (3) mounting a glass curtain wall assembly:
the basic process flow comprises the following steps: aluminum alloy base installation, aluminum alloy auxiliary frame installation, glass plate installation, aluminum alloy support installation, aluminum alloy supporting strip installation, aluminum alloy pressing plate installation and fixation and weather-proof silicone sealant.
The foregoing description is only of the preferred embodiments of the present invention and is not intended to limit the scope of the invention, and all equivalent structures or equivalent processes using the descriptions and drawings of the present invention or directly or indirectly applied to other related technical fields are included in the scope of the invention.