CN117306394B - Flower box template for accurate construction and construction method thereof - Google Patents

Flower box template for accurate construction and construction method thereof Download PDF

Info

Publication number
CN117306394B
CN117306394B CN202311173742.XA CN202311173742A CN117306394B CN 117306394 B CN117306394 B CN 117306394B CN 202311173742 A CN202311173742 A CN 202311173742A CN 117306394 B CN117306394 B CN 117306394B
Authority
CN
China
Prior art keywords
template
flower box
mold
guardrail
guardrail template
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311173742.XA
Other languages
Chinese (zh)
Other versions
CN117306394A (en
Inventor
王文雷
许哲
王子龙
达欣
何新朋
刘威扬
杨高阳
陈立斌
严登鹏
王志敏
刘运喆
左怡林
张�杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Of Cccc Second Harbor Engineering Co ltd
CCCC Second Harbor Engineering Co
Original Assignee
First Construction Co Of Cccc Second Harbor Engineering Co ltd
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Of Cccc Second Harbor Engineering Co ltd, CCCC Second Harbor Engineering Co filed Critical First Construction Co Of Cccc Second Harbor Engineering Co ltd
Priority to CN202311173742.XA priority Critical patent/CN117306394B/en
Publication of CN117306394A publication Critical patent/CN117306394A/en
Application granted granted Critical
Publication of CN117306394B publication Critical patent/CN117306394B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/103Parapets, railings ; Guard barriers or road-bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

本发明提供一种精准施工的花箱模板及其施工方法,包括第一护栏模板和第二护栏模板,第一护栏模板和第二护栏模板的上侧通过支撑架连接,支撑架上穿设有第一吊杆,第一吊杆的底部通过驱动单元连接有花箱伸缩模,花箱伸缩模包括底模,底模两侧对称设有侧模,驱动单元用于驱动底模在第一吊杆的轴线方向移动,底模两侧分别设有第二吊杆,第二吊杆的上侧和支撑架固定,第二吊杆上套设有滑套和弹簧,滑套外侧设有耳板,耳板通过连接板和侧模铰接,弹簧用于为滑套提供稳定的支撑力。

The present invention provides a precisely constructed flower box template and a construction method thereof, comprising a first guardrail template and a second guardrail template, the upper sides of the first guardrail template and the second guardrail template are connected by a support frame, a first suspension rod is passed through the support frame, the bottom of the first suspension rod is connected to a flower box telescopic mold through a driving unit, the flower box telescopic mold comprises a bottom mold, side molds are symmetrically provided on both sides of the bottom mold, the driving unit is used to drive the bottom mold to move in the axial direction of the first suspension rod, second suspension rods are respectively provided on both sides of the bottom mold, the upper side of the second suspension rod is fixed to the support frame, a sliding sleeve and a spring are sleeved on the second suspension rod, an ear plate is provided on the outer side of the sliding sleeve, the ear plate is hinged to the side mold through a connecting plate, and the spring is used to provide a stable supporting force for the sliding sleeve.

Description

Flower box template for accurate construction and construction method thereof
Technical Field
The invention relates to the technical field of civil construction, in particular to a flower box template for precise construction and a construction method thereof.
Background
With the progress of society, there are increasing demands on construction technology. The three-dimensional pace of urban traffic is rapidly advanced, the concept of 'bridge aesthetics' proposed by LyonHart is introduced on the basis of meeting the use function of an urban bridge, the demands on cultural art, landscape modeling and the like of the urban bridge are more and more high, and a bridge edge guardrail with flower grooves is the product of the concept. For the construction with flower box guardrail, directly inlay the flower tank in bridge guardrail generally, in order to guarantee the affluence in space, the template is generally made right angle U type, receives its template of restriction of structural style to pull the mode of hard sled to demolish with giving birth to generally, along with the increase of turnover number of times, the template is liable to take place to warp, and the construction safety is poor, and the efficiency of construction is low.
The Chinese patent document CN 114351625A describes a reinforced concrete flower box guardrail and a construction method, and as the guardrail is adaptively arranged according to the bridge deck, the bridge decks at different positions on the bridge have different dimensional angles, and the method cannot adapt to the change of the bridge deck and has defects in use; chinese patent document CN 112663493A describes a concrete crash barrier structure of a flower box for a bridge, but it does not specifically describe how to ensure the construction accuracy of the flower box, and also has use defects.
Disclosure of Invention
The invention provides a flower box template for accurate construction and a construction method thereof, which solve the problems of low construction efficiency of flower boxes on guardrails, inconvenient assembly and disassembly of the flower box template and low overall construction precision.
In order to solve the technical problems, the invention adopts the following technical scheme: the utility model provides a flower box template of accurate construction, including first guardrail template and second guardrail template, the upside of first guardrail template and second guardrail template is passed through the support frame and is connected, wear to be equipped with first jib on the support frame, the bottom of first jib is connected with the flexible mould of flower box through drive unit, the flexible mould of flower box includes the die block, die block bilateral symmetry is equipped with the side mould, drive unit is used for driving the die block and removes at the axis direction of first jib, the die block both sides are equipped with the second jib respectively, the upside and the support frame of second jib are fixed, the cover is equipped with sliding sleeve and spring on the second jib, the sliding sleeve outside is equipped with the otic placode, the otic placode passes through connecting plate and side mould articulated, the spring is used for providing stable holding power for the sliding sleeve.
In the preferred scheme, the support frame includes crossbeam and vertical beam, and the vertical beam supports and leans on the outside of second guardrail template, and the vertical beam passes through screw and second guardrail template to be connected, and one side of crossbeam relative vertical beam is equipped with the round bar, and the round bar wears to establish on first guardrail template, and the round bar passes through the nut and is connected with first guardrail template.
In the preferred scheme, the upper portion of side form articulates through the axostylus axostyle has the clamp plate, and the bottom of clamp plate is equipped with the arch, and the arch is used for filling the breach between the side form of both sides and first guardrail template and the second guardrail template respectively, and the clamp plate passes through the latch hook and is connected with first guardrail template and second guardrail template respectively.
In the preferred scheme, the tops of first guardrail template and second guardrail template are parallel respectively and are equipped with the montant, and the top of clamp plate is articulated through the screw has the latch hook, latch hook detachable and montant joint.
In the preferred scheme, the bottom of first jib has set firmly the roof, and drive unit includes fixed cover and jacking cover, and the jacking cover sets firmly in the bottom of roof, and fixed cover passes through the base to be connected with the die block, and fixed cover internal rotation is equipped with the screw rod, and the screw rod bottom has set firmly the second helical gear, and the second helical gear meshing is connected with first helical gear, and first helical gear sets up on the motor, and motor and die block are connected, screw rod and jacking cover threaded connection.
In the preferred scheme, the downside of second helical gear is equipped with the bull stick, and the cover is equipped with the stop collar on the bull stick, is equipped with the bearing on the die block, and the bull stick wears to establish on the bearing, and the stop collar supports and leans on the bearing top.
In the preferred scheme, the fixed cover inboard is equipped with first step, and the jacking cover outside is equipped with the second step, first step and second step assorted.
In the preferred scheme, the both sides of sliding sleeve are equipped with the lock sleeve respectively, and lock sleeve and second jib threaded connection, spring both sides are supported respectively on lock sleeve and sliding sleeve.
In the preferred scheme, the die block both sides are equipped with first contact plate respectively, and the inboard of side form is equipped with the second contact plate, and the parallel is equipped with a plurality of first floor on the second contact plate, connects through the second floor between two first contact plates, runs through on the first contact plate and is equipped with waist circular slot, runs through on the second contact plate and is equipped with the through-hole, and the screw wears to establish in waist circular slot and through-hole, and the screw passes through the nut and connects die block and side form, and connecting plate and first floor hinge.
In a preferred scheme, the construction method of the flower box template comprises the following steps of:
s1, finishing processing of each part according to a design drawing, and performing calibration verification;
S2, installing the driving unit into a flower box expansion die, and debugging and running;
S3, adjusting the telescopic mould of the flower box to an open mould state through a driving unit;
s4, positioning the first guardrail template and the second guardrail template is completed, and the first guardrail template and the second guardrail template are fixed by using a support frame;
S5, integrally hoisting the flower box expansion die and the driving unit to the lower part of the support frame, and locking the first suspender and the second suspender respectively through nuts;
S6, adjusting the flexible mold of the flower box to a mold closing state through a driving unit, and adjusting the overall tightness through screws;
s7, opening and closing the first guardrail templates and the second guardrail templates on the two sides respectively through the pressing plates, so that integral transverse deviation correction is completed, and the position installation accuracy of the installation support frame and the flower box expansion die is ensured;
s8, opening the pressing plate, pouring, vibrating and constructing, and closing the pressing plate after the vibration is finished;
s9, removing the mold after pouring maintenance is completed, guaranteeing that each part is separated from the poured concrete surface, and integrally transporting to a next construction point;
s10, circularly operating S4-S9 until the construction is completed.
The beneficial effects of the invention are as follows: the support frame provides the installation basis for the flexible mould of flower case, the clamp plate can play simultaneously and detect the size width of pouring the guardrail between first guardrail template and the second guardrail template, and the effect of the accuracy of the position of pouring the guardrail relatively of flower case after pouring the completion, device overall structure is reliable, the template dismantles conveniently, the hard sled of drawing of giving birth to when having avoided adopting traditional mode to construct, lead to template life shorter at last, use cost is high situation, during the use, only need driving motor can accomplish holistic compound die or die sinking, the speed and the distance that the lock sleeve below the adjustment spring can change holistic side form withdrawal, the maintenance is convenient, can guarantee the high efficiency of construction, and has good economic benefits.
Drawings
The invention is further illustrated by the following examples in conjunction with the accompanying drawings:
FIG. 1 is a schematic cross-sectional view of a poured guardrail of the present invention;
FIG. 2 is a schematic front view of the mounting bracket of the present invention;
FIG. 3 is a schematic front view of the telescopic mold for installing flower boxes of the present invention in state one;
FIG. 4 is a schematic front view state II of the telescopic mould for installing the flower box;
FIG. 5 is a schematic view showing the internal structure of the driving unit of the present invention;
FIG. 6 is a schematic left-hand view of the invention in which the flower box expansion die is installed;
FIG. 7 is a schematic diagram of the mold closing of the flower box expansion mold of the present invention;
FIG. 8 is a schematic drawing of the invention in a flower box expansion die open mode;
FIG. 9 is a schematic view of the overall structure of the present invention in state one;
FIG. 10 is a schematic front view of FIG. 9;
FIG. 11 is a schematic top view of FIG. 9;
FIG. 12 is a schematic view of the overall structure of the present invention in state two;
FIG. 13 is a schematic view of the overall structure of the present invention, state three;
FIG. 14 is a schematic view of the explosive structure of FIG. 9 in state one;
FIG. 15 is a schematic view of the explosive structure of FIG. 9 in a second state;
FIG. 16 is a schematic view of the explosive structure of FIG. 9 in state three;
FIG. 17 is a schematic view of the explosive structure of FIG. 9 in state four;
FIG. 18 is a schematic view showing the overall structure of the roof mounting drive unit of the present invention;
FIG. 19 is a schematic view of the explosive structure of FIG. 18;
Fig. 20 is a schematic view of the top plate structure of the present invention.
In the figure: a first guardrail template 1; a second guardrail template 2; a support 3; a cross beam 301; a vertical beam 302; a round bar 303; a first boom 4; a nut 5; a flower box expansion die 6; a bottom die 601; a side form 602; a first contact plate 603; a second contact plate 604; waist-round groove 605; a through hole 606; a first rib 607; a second rib 608; a top plate 7; a drive unit 8; a fixing sleeve 801; jacking sleeve 802; a motor 803; a first helical gear 804; a second helical gear 805; a screw 806; a base 807; a rotating rod 808; stop collar 809; a bearing 810; a first step 811; a second step 812; a second boom 9; a lock sleeve 10; a sliding sleeve 11; a spring 12; a shaft lever 13; a platen 14; a protrusion 15; a screw 16; a latch hook 17; a vertical bar 18; an ear plate 19; and a connection plate 20.
Detailed Description
1-8, A flower box template of accurate construction, including first guardrail template 1 and second guardrail template 2, the upside of first guardrail template 1 and second guardrail template 2 passes through support frame 3 to be connected, wear to be equipped with first jib 4 on the support frame 3, the bottom of first jib 4 is connected with flower box flexible mould 6 through drive unit 8, flower box flexible mould 6 includes die block 601, die block 601 bilateral symmetry is equipped with side form 602, drive unit 8 is used for driving die block 601 and removes in the axis direction of first jib 4, die block 601 both sides are equipped with second jib 9 respectively, the upside and the support frame 3 of second jib 9 are fixed, the cover is equipped with sliding sleeve 11 and spring 12 on the second jib 9, the sliding sleeve 11 outside is equipped with otic placode 19, otic placode 19 is articulated through connecting plate 20 and side form 602, spring 12 is used for providing stable holding power for sliding sleeve 11. According to the structure, the first suspender 4 plays a role of bearing the integral weight of the flower box expansion die 6 and the driving unit 8, the stability of the state of the flower box expansion die 6 during die opening or die closing is guaranteed, meanwhile, the second suspender 9 is matched, the suspended weight is uniformly spread, the integral stress of the support frame 3 at different positions is guaranteed to be controllable, when die closing is needed, the bottom die 601 is moved downwards, at the moment, the side die 602 is moved downwards under the action of the sliding sleeve 11 through the lug plate 19 and the connecting plate 20 until the bottom die 601 and the side die 602 are closed, after the die closing is completed, the fixation between the bottom die 601 and the side die 602 is completed by using the screw 16, and the smoothness of the inner side wall after pouring is guaranteed; when the mould needs to be opened, the bottom mould 601 is moved upwards, the side mould 602 is moved upwards under the action of the elastic force of the spring 12 and finally separated from the surface of the poured concrete, so that the hard prying is avoided, the use of the flower box expansion mould 6 is convenient, and the installation and the disassembly are flexible.
In the preferred scheme, the support frame 3 includes crossbeam 301 and vertical beam 302, and vertical beam 302 supports the outside of leaning on second guardrail template 2, and vertical beam 302 passes through screw 16 and second guardrail template 2 to be connected, and the one side of crossbeam 301 relative vertical beam 302 is equipped with round bar 303, and round bar 303 wears to establish on first guardrail template 1, and round bar 303 passes through nut 5 and is connected with first guardrail template 1. Be provided with logical groove on crossbeam 301, first jib 4 can transversely remove to guarantee that the flexible mould 6 of flower box of its below hoist and mount is accurate in position, support frame 3 is fixed first guardrail template 1 and second guardrail template 2 from upper portion, the safety and the convenience of being convenient for construction, because the guardrail sets up in the both sides of decking, when the decking has higher height, the construction then has certain risk, consequently adopts support frame 3 to increase the factor of safety of construction to a certain extent.
In a preferred embodiment, as shown in fig. 9-20, a pressing plate 14 is hinged to the upper portion of the side mold 602 through a shaft rod 13, a protrusion 15 is provided at the bottom of the pressing plate 14, the protrusion 15 is used for filling up a gap between the side mold 602 on two sides and the first guardrail mold 1 and the second guardrail mold 2 respectively, and the pressing plate 14 is connected with the first guardrail mold 1 and the second guardrail mold 2 respectively through a latch hook 17. Because the size of guardrail has been prescribed in the design, consequently the precision transmission chain that the cooperation of corresponding clamp plate 14 first guardrail template 1 and second guardrail template 2 and flower box flexible mould 6 formed is accomplished, clamp plate 14 has compensatied because when long-term the use, can't alleviate first guardrail template 1 and second guardrail template 2 and flower box flexible mould 6 to have the defect of deformation better, consequently after flower box flexible mould 6 is initially fixed, can cooperate the position of adjustment first guardrail template 1, second guardrail template 2, support frame 3 and flower box flexible mould 6, thereby guarantee the dimensional accuracy of guardrail and the positional accuracy of flower box, guaranteed the uniformity of guardrail from the source, thereby after the construction is accomplished, along the bridge to guaranteeing the streamline of guardrail lateral wall unanimously, whole more pleasing to the eye.
In the preferred scheme, the tops of first guardrail template 1 and second guardrail template 2 are parallel respectively and are equipped with montant 18, and the top of clamp plate 14 is articulated through screw 16 to have latch hook 17, latch hook 17 detachable and montant 18 joint. From this structure, guaranteed the clamp plate 14 respectively with first guardrail template 1 with the fixed convenience of second guardrail template 2, because the position of latch hook 17 is fixed relatively, its rotatory radius is fixed, is provided with U type groove at the front end of latch hook 17, U type groove and montant 18 external diameter are the same, and whole locking is effectual, convenient operation.
In the preferred scheme, roof 7 has been set firmly to the bottom of first jib 4, drive unit 8 includes fixed cover 801 and jacking cover 802, jacking cover 802 sets firmly in the bottom of roof 7, fixed cover 801 passes through base 807 and die block 601 to be connected, fixed cover 801 internal rotation is equipped with screw rod 806, screw rod 806 bottom has set firmly second helical gear 805, second helical gear 805 meshing is connected with first helical gear 804, first helical gear 804 sets up on motor 803, motor 803 and die block 601 are connected, screw rod 806 and jacking cover 802 threaded connection. The motor 803 adopts servo motor, and motor 803 and base 807 are fixed on die block 601, and the structure is so that can be through motor 803, the position of the change jacking cover 802 that then can be convenient has also changed the position of roof 7 promptly, and whole transmission moment of torsion is stable, and the bearing capacity is strong, and the drive is convenient.
In the preferred scheme, the downside of second helical gear 805 is equipped with bull stick 808, and the cover is equipped with stop collar 809 on bull stick 808, is equipped with bearing 810 on the die block 601, and bull stick 808 wears to establish on bearing 810, and stop collar 809 supports and leans on the bearing 810 top. The bearing 810 is fixed on the bottom die 601, so that the rotating rod 808 ensures the rotation precision of the screw 806, the overall installation precision is high, the work is stable, and the problems of blocking and lost steps do not occur.
In a preferred embodiment, a first step 811 is provided on the inner side of the fixing sleeve 801, a second step 812 is provided on the outer side of the jacking sleeve 802, and the first step 811 is matched with the second step 812. From this structure to make holistic contact surface bigger, coaxial effect is better, and first step 811 and second step 812 are provided with a plurality ofly respectively, and the lateral wall of first step 811 and second step 812 adopts smooth design, avoids the friction hindrance when rotating.
In the preferred scheme, the two sides of the sliding sleeve 11 are respectively provided with a lock sleeve 10, the lock sleeve 10 is in threaded connection with the second suspender 9, and the two sides of the spring 12 respectively lean against the lock sleeve 10 and the sliding sleeve 11. From this structure to make can change the position of sliding sleeve 11 through lock sleeve 10, can also further change the compression length of spring 12 simultaneously, guarantee that holistic recovery deformation's speed and elastic force are more controllable, the scope of adjustment is bigger, when needs die sinking, upwards remove die block 601, for the stability of being convenient for remove better, will be located the lock sleeve 10 of spring both sides upwards adjust simultaneously, the distance that the lock sleeve 10 of spring 12 downside upwards moved simultaneously is slightly greater than the distance that lock sleeve 10 of spring 12 upside upwards moved, keep spring 12 in compression state, holistic dynamic response effect is better.
In the preferred scheme, the die block 601 both sides are equipped with first contact plate 603 respectively, the inboard of side form 602 is equipped with second contact plate 604, be equipped with a plurality of first floor 607 on the second contact plate 604 in parallel, connect through the second floor 608 between two first contact plates 603, it is equipped with waist circular slot 605 to run through on the first contact plate 603, it is equipped with through-hole 606 to run through on the second contact plate 604, screw 16 wears to establish in waist circular slot 605 and through-hole 606, screw 16 passes through nut 5 and connects die block 601 and side form 602, connecting plate 20 and first floor 607 are articulated. From this structure to make die block 601 and side form 602 stable in structure, the bearing capacity is strong, and the mutual contact locking effect is better, and the rotation scope of connecting plate 20 is bigger, and holistic motion state can be convenient is looked over by constructor, and the construction effect is better.
In a preferred scheme, the construction method of the flower box template comprises the following steps of:
s1, finishing processing of each part according to a design drawing, and performing calibration verification;
S2, installing the driving unit 8 into the flower box expansion die 6, and debugging and running;
S3, adjusting the flower box expansion die 6 to an open die state through the driving unit 8;
s4, positioning the first guardrail template 1 and the second guardrail template 2 is completed, and the first guardrail template 1 and the second guardrail template 2 are fixed by using a support frame 3;
s5, integrally hoisting the flower box expansion die 6 and the driving unit 8 to the lower part of the support frame 3, and locking the first suspender 4 and the second suspender 9 respectively through nuts 5;
s6, adjusting the flower box expansion die 6 to a die closing state through a driving unit 8, and adjusting the overall tightness through a screw 16;
S7, opening and closing the first guardrail templates 1 and the second guardrail templates 2 on the two sides respectively through the pressing plates 14, so that the integral transverse deviation correction is completed, and the position installation accuracy of the installation support frame 3 and the flower box expansion die 6 is ensured;
s8, opening the pressing plate 14, pouring, vibrating and constructing, and closing the pressing plate 14 after the vibrating is completed;
s9, removing the mold after pouring maintenance is completed, guaranteeing that each part is separated from the poured concrete surface, and integrally transporting to a next construction point;
s10, circularly operating S4-S9 until the construction is completed.
The above embodiments are only preferred embodiments of the present invention, and should not be construed as limiting the present invention, and the scope of the present invention should be defined by the claims, including the equivalents of the technical features in the claims. I.e., equivalent replacement modifications within the scope of this invention are also within the scope of the invention.

Claims (8)

1.一种精准施工的花箱模板,其特征是:包括第一护栏模板(1)和第二护栏模板(2),第一护栏模板(1)和第二护栏模板(2)的上侧通过支撑架(3)连接,支撑架(3)上穿设有第一吊杆(4),第一吊杆(4)的底部通过驱动单元(8)连接有花箱伸缩模(6),花箱伸缩模(6)包括底模(601),底模(601)两侧对称设有侧模(602),驱动单元(8)用于驱动底模(601)在第一吊杆(4)的轴线方向移动,底模(601)两侧分别设有第二吊杆(9),第二吊杆(9)的上侧和支撑架(3)固定,第二吊杆(9)上套设有滑套(11)和弹簧(12),滑套(11)外侧设有耳板(19),耳板(19)通过连接板(20)和侧模(602)铰接,弹簧(12)用于为滑套(11)提供稳定的支撑力;1. A precisely constructed flower box template, characterized in that: it comprises a first guardrail template (1) and a second guardrail template (2), the upper sides of the first guardrail template (1) and the second guardrail template (2) are connected via a support frame (3), a first suspension rod (4) is provided on the support frame (3), the bottom of the first suspension rod (4) is connected to a flower box telescopic mold (6) via a driving unit (8), the flower box telescopic mold (6) comprises a bottom mold (601), side molds (602) are symmetrically provided on both sides of the bottom mold (601), and the driving unit (8) is used to drive the bottom mold (601) to move the flower box telescopic mold (6 ... The unit (8) is used to drive the bottom mold (601) to move in the axial direction of the first suspension rod (4), and second suspension rods (9) are respectively provided on both sides of the bottom mold (601). The upper side of the second suspension rod (9) is fixed to the support frame (3), and a sliding sleeve (11) and a spring (12) are sleeved on the second suspension rod (9). An ear plate (19) is provided on the outer side of the sliding sleeve (11), and the ear plate (19) is hinged to the side mold (602) through a connecting plate (20). The spring (12) is used to provide a stable supporting force for the sliding sleeve (11); 第一吊杆(4)的底部固设有顶板(7),驱动单元(8)包括固定套(801)和顶升套(802),顶升套(802)固设在顶板(7)的底部,固定套(801)通过底座(807)和底模(601)连接,固定套(801)内转动设有螺杆(806),螺杆(806)底部固设有第二斜齿轮(805),第二斜齿轮(805)啮合连接有第一斜齿轮(804),第一斜齿轮(804)设置在电机(803)上,电机(803)和底模(601)连接,螺杆(806)和顶升套(802)螺纹连接;A top plate (7) is fixedly provided at the bottom of the first suspension rod (4); the driving unit (8) comprises a fixing sleeve (801) and a lifting sleeve (802); the lifting sleeve (802) is fixedly provided at the bottom of the top plate (7); the fixing sleeve (801) is connected to the bottom mold (601) via a base (807); a screw rod (806) is rotatably provided in the fixing sleeve (801); a second bevel gear (805) is fixedly provided at the bottom of the screw rod (806); the second bevel gear (805) is meshingly connected to the first bevel gear (804); the first bevel gear (804) is provided on a motor (803); the motor (803) is connected to the bottom mold (601); and the screw rod (806) and the lifting sleeve (802) are threadedly connected; 底模(601)两侧分别设有第一接触板(603),侧模(602)的内侧设有第二接触板(604),第二接触板(604)上平行设有多个第一肋板(607),两个第一接触板(603)之间通过第二肋板(608)连接,第一接触板(603)上贯穿设有腰圆槽(605),第二接触板(604)上贯穿设有通孔(606),螺钉(16)穿设在腰圆槽(605)和通孔(606)内,螺钉(16)通过螺母(5)将底模(601)和侧模(602)连接,连接板(20)和第一肋板(607)铰接。A first contact plate (603) is provided on both sides of the bottom mold (601), a second contact plate (604) is provided on the inner side of the side mold (602), a plurality of first ribs (607) are provided in parallel on the second contact plate (604), the two first contact plates (603) are connected via the second ribs (608), a waist-shaped groove (605) is provided through the first contact plate (603), a through hole (606) is provided through the second contact plate (604), a screw (16) is inserted into the waist-shaped groove (605) and the through hole (606), the screw (16) connects the bottom mold (601) and the side mold (602) via a nut (5), and the connecting plate (20) and the first ribs (607) are hinged. 2.根据权利要求1所述一种精准施工的花箱模板,其特征是:支撑架(3)包括横梁(301)和竖梁(302),竖梁(302)抵靠在第二护栏模板(2)的外侧,竖梁(302)通过螺钉(16)和第二护栏模板(2)连接,横梁(301)相对竖梁(302)的一侧设有圆杆(303),圆杆(303)穿设在第一护栏模板(1)上,圆杆(303)通过螺母(5)和第一护栏模板(1)连接。2. A precisely constructed flower box template according to claim 1, characterized in that: the support frame (3) includes a horizontal beam (301) and a vertical beam (302), the vertical beam (302) abuts against the outer side of the second guardrail template (2), the vertical beam (302) is connected to the second guardrail template (2) by screws (16), a round rod (303) is provided on the side of the horizontal beam (301) opposite to the vertical beam (302), the round rod (303) is passed through the first guardrail template (1), and the round rod (303) is connected to the first guardrail template (1) by a nut (5). 3.根据权利要求1所述一种精准施工的花箱模板,其特征是:侧模(602)的上部通过轴杆(13)铰接有压板(14),压板(14)的底部设有凸起(15),凸起(15)用于填补两侧的侧模(602)分别与第一护栏模板(1)及第二护栏模板(2)之间的缺口,压板(14)通过锁钩(17)分别与第一护栏模板(1)及第二护栏模板(2)连接。3. A precisely constructed flower box template according to claim 1, characterized in that: the upper part of the side template (602) is hinged with a pressure plate (14) through a shaft (13), and a protrusion (15) is provided at the bottom of the pressure plate (14), and the protrusion (15) is used to fill the gap between the side templates (602) on both sides and the first guardrail template (1) and the second guardrail template (2), respectively, and the pressure plate (14) is connected to the first guardrail template (1) and the second guardrail template (2) respectively through a locking hook (17). 4.根据权利要求3所述一种精准施工的花箱模板,其特征是:第一护栏模板(1)和第二护栏模板(2)的顶部分别平行设有竖杆(18),压板(14)的顶部通过螺钉(16)铰接有锁钩(17),锁钩(17)可拆卸的和竖杆(18)卡接。4. A precisely constructed flower box template according to claim 3, characterized in that: vertical rods (18) are respectively provided in parallel at the top of the first guardrail template (1) and the second guardrail template (2), and a locking hook (17) is hinged at the top of the pressure plate (14) by a screw (16), and the locking hook (17) is detachably connected to the vertical rod (18). 5.根据权利要求1所述一种精准施工的花箱模板,其特征是:第二斜齿轮(805)的下侧设有转杆(808),转杆(808)上套设有限位套(809),底模(601)上设有轴承(810),转杆(808)穿设在轴承(810)上,限位套(809)抵靠在轴承(810)顶部。5. A precisely constructed flower box template according to claim 1, characterized in that: a rotating rod (808) is provided on the lower side of the second bevel gear (805), a limiting sleeve (809) is sleeved on the rotating rod (808), a bearing (810) is provided on the bottom mold (601), the rotating rod (808) is passed through the bearing (810), and the limiting sleeve (809) abuts against the top of the bearing (810). 6.根据权利要求1所述一种精准施工的花箱模板,其特征是:固定套(801)内侧设有第一台阶(811),顶升套(802)外侧设有第二台阶(812),第一台阶(811)和第二台阶(812)相匹配。6. A precisely constructed flower box template according to claim 1, characterized in that: a first step (811) is provided on the inner side of the fixing sleeve (801), a second step (812) is provided on the outer side of the lifting sleeve (802), and the first step (811) and the second step (812) match each other. 7.根据权利要求1所述一种精准施工的花箱模板,其特征是:滑套(11)的两侧分别设有锁套(10),锁套(10)和第二吊杆(9)螺纹连接,弹簧(12)两侧分别抵靠在锁套(10)和滑套(11)上。7. A precisely constructed flower box template according to claim 1, characterized in that: locking sleeves (10) are respectively provided on both sides of the sliding sleeve (11), the locking sleeve (10) and the second suspension rod (9) are threadedly connected, and both sides of the spring (12) are respectively against the locking sleeve (10) and the sliding sleeve (11). 8.根据权利要求1~7任意一项所述一种精准施工的花箱模板的施工方法,其特征是:包括以下步骤:8. A method for constructing a precise flower box formwork according to any one of claims 1 to 7, characterized in that it comprises the following steps: S1、根据设计图纸完成各部件的加工,并进行校准核验;S1. Complete the processing of each component according to the design drawings and conduct calibration verification; S2、将驱动单元(8)安装到花箱伸缩模(6)内,并调试运行;S2, installing the drive unit (8) into the telescopic mold (6) of the flower box, and debugging and running it; S3、通过驱动单元(8)调整花箱伸缩模(6)至开模状态;S3, adjusting the flower box telescopic mold (6) to an open mold state through the driving unit (8); S4、完成第一护栏模板(1)和第二护栏模板(2)的定位,并用支撑架(3)将第一护栏模板(1)和第二护栏模板(2)进行固定;S4, completing the positioning of the first guardrail template (1) and the second guardrail template (2), and fixing the first guardrail template (1) and the second guardrail template (2) with a support frame (3); S5、将花箱伸缩模(6)和驱动单元(8)整体吊装至支撑架(3)的下部,通过螺母(5)分别对第一吊杆(4)和第二吊杆(9)完成锁止;S5, hoisting the flower box telescopic mold (6) and the driving unit (8) as a whole to the lower part of the support frame (3), and locking the first suspension rod (4) and the second suspension rod (9) respectively by nuts (5); S6、通过驱动单元(8)调整花箱伸缩模(6)至合模状态,并通过螺钉(16)调整整体的密封性;S6, adjusting the flower box telescopic mold (6) to a closed mold state through the driving unit (8), and adjusting the overall sealing performance through the screw (16); S7、通过压板(14)分别和两侧的第一护栏模板(1)与第二护栏模板(2)进行开合,从而完成整体的横向纠偏,保证安装支撑架(3)和花箱伸缩模(6)的位置安装准确;S7, the pressing plate (14) is used to open and close the first guardrail template (1) and the second guardrail template (2) on both sides, thereby completing the overall lateral deviation correction and ensuring that the installation support frame (3) and the flower box telescopic template (6) are accurately installed; S8、打开压板(14),进行浇筑振捣施工,待振捣完成后,关闭压板(14);S8, opening the pressing plate (14) to carry out pouring and vibrating construction, and closing the pressing plate (14) after the vibrating is completed; S9、待浇筑养护完成后进行拆模,保证各部件和已浇筑混凝土面脱离,整体运输至下一施工点;S9, after pouring and curing, the formwork is removed to ensure that all components are separated from the poured concrete surface and transported as a whole to the next construction site; S10、循环操作S4~ S9直至施工完成。S10. Repeat S4 to S9 until the construction is completed.
CN202311173742.XA 2023-09-12 2023-09-12 Flower box template for accurate construction and construction method thereof Active CN117306394B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311173742.XA CN117306394B (en) 2023-09-12 2023-09-12 Flower box template for accurate construction and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311173742.XA CN117306394B (en) 2023-09-12 2023-09-12 Flower box template for accurate construction and construction method thereof

Publications (2)

Publication Number Publication Date
CN117306394A CN117306394A (en) 2023-12-29
CN117306394B true CN117306394B (en) 2024-08-30

Family

ID=89245419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311173742.XA Active CN117306394B (en) 2023-09-12 2023-09-12 Flower box template for accurate construction and construction method thereof

Country Status (1)

Country Link
CN (1) CN117306394B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663493A (en) * 2020-12-30 2021-04-16 浙江中咨交通科技有限公司 Bridge area flower case concrete anticollision barrier structure
CN112832126A (en) * 2020-12-31 2021-05-25 浙江交工集团股份有限公司 Construction method of special-shaped cast-in-situ concrete planter anti-collision guardrail

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2663061B2 (en) * 1991-03-27 1997-10-15 ミサワセラミックス株式会社 How to make a flower box
JP2000160835A (en) * 1998-11-26 2000-06-13 Eiji Nakaoka Form fitting jig for forming support hole of guard rail fence or the like
KR20110081124A (en) * 2011-05-30 2011-07-13 배영진 Versatile flowerpots for bridge railings and guardrails
CN207891735U (en) * 2018-02-05 2018-09-21 安徽省公路桥梁工程有限公司 A kind of guardrail template
CN210797262U (en) * 2019-08-12 2020-06-19 中交二航局第四工程有限公司 A combined steel form applied to the concrete guardrail of the planter
CN210482079U (en) * 2019-08-20 2020-05-08 中铁四局集团第三建设有限公司 Cast-in-place reinforced concrete flower groove type anti-collision guardrail
CN212670292U (en) * 2020-04-19 2021-03-09 中交第二航务工程局有限公司 Device for fixing guardrail base template and controlling linear
CN214363134U (en) * 2020-12-31 2021-10-08 浙江交工集团股份有限公司 Construction structure of special-shaped cast-in-place concrete planter anti-collision guardrail
CN214939685U (en) * 2021-05-11 2021-11-30 中建八局第四建设有限公司 A device that can quickly disassemble the core mold of the bumper guardrail
CN215926718U (en) * 2021-08-17 2022-03-01 中国建筑第八工程局有限公司 Guardrail template structure of high-altitude clear water corridor
CN114351625B (en) * 2022-01-19 2023-03-28 杭州萧山交通建设管理有限公司 Reinforced concrete flower box guardrail and construction method
CN217026671U (en) * 2022-02-11 2022-07-22 中交第二航务工程局有限公司 Bridge railing steel bar formwork locating support
CN218779387U (en) * 2022-11-14 2023-03-31 新疆北新路桥集团股份有限公司 Guardrail manufacturing mold
CN115748449A (en) * 2022-12-16 2023-03-07 浙江交工集团股份有限公司 Construction method of shaped steel die special-shaped flower trough cast-in-place concrete anti-collision guardrail
CN218951999U (en) * 2023-01-10 2023-05-02 中铁十五局集团有限公司 Convenient-to-detach flower groove guardrail template

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112663493A (en) * 2020-12-30 2021-04-16 浙江中咨交通科技有限公司 Bridge area flower case concrete anticollision barrier structure
CN112832126A (en) * 2020-12-31 2021-05-25 浙江交工集团股份有限公司 Construction method of special-shaped cast-in-situ concrete planter anti-collision guardrail

Also Published As

Publication number Publication date
CN117306394A (en) 2023-12-29

Similar Documents

Publication Publication Date Title
CN103806644A (en) Hydraulic telescopic device for elevator shaft mold and operating method thereof
CN109968499A (en) A kind of T-type beam pours particular manufacturing craft and its application method
CN102022123B (en) Integral lining method for tunnel with altered diameter by model board trolley
CN112936505A (en) Manufacturing process of concrete prefabricated part
CN117306394B (en) Flower box template for accurate construction and construction method thereof
CN218815206U (en) A formwork for fair-faced concrete columns
CN117662182A (en) Device for rapid installation of steel corrugated plates in tube curtain tunnels and its construction method
CN106050271A (en) Ditch formwork device for tunnel and construction method of ditch formwork device
CN206845122U (en) A kind of rail mounted iron driller
CN211420901U (en) Hang basket side form subassembly convenient to drawing of patterns
CN217915902U (en) Building template mechanism
CN106089257A (en) A kind of tunnel ditch cable trough construction trolley
CN206035501U (en) Tunnel water ditch die carrier device
CN110984272A (en) A large-scale caisson compartment borrowing guide device
CN206942140U (en) A kind of shear wall formwork support meanss
CN214739901U (en) Stair template structure
CN206053965U (en) A kind of tunnel ditch cable trough construction trolley
CN116657605A (en) Positioning and guiding device for steel pipe piles on deep water platform
CN207159772U (en) A kind of highway bridge concrete steel form
CN222595521U (en) Reinforcing and connecting device for building structure
CN209384637U (en) An aluminum alloy formwork for variable section of wall columns
CN209384668U (en) A parapet forming device
CN215589468U (en) Template for assembly type building construction
CN114102849B (en) Machining die and manufacturing method for assembly type electric power box body foundation
CN218027810U (en) Road protection retaining wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant