CN117283857A - Demolding device for rubber conveyer belt production and manufacturing - Google Patents

Demolding device for rubber conveyer belt production and manufacturing Download PDF

Info

Publication number
CN117283857A
CN117283857A CN202311272794.2A CN202311272794A CN117283857A CN 117283857 A CN117283857 A CN 117283857A CN 202311272794 A CN202311272794 A CN 202311272794A CN 117283857 A CN117283857 A CN 117283857A
Authority
CN
China
Prior art keywords
cooling
shell
plates
conveyor belt
fixedly connected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311272794.2A
Other languages
Chinese (zh)
Other versions
CN117283857B (en
Inventor
李龙飞
张娜
甄森岗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tangshan Tianchi Industrial Co ltd
Original Assignee
Lixian Huadu Rubber Belt Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lixian Huadu Rubber Belt Co ltd filed Critical Lixian Huadu Rubber Belt Co ltd
Priority to CN202311272794.2A priority Critical patent/CN117283857B/en
Publication of CN117283857A publication Critical patent/CN117283857A/en
Application granted granted Critical
Publication of CN117283857B publication Critical patent/CN117283857B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C59/00—Surface shaping of articles, e.g. embossing; Apparatus therefor
    • B29C59/02—Surface shaping of articles, e.g. embossing; Apparatus therefor by mechanical means, e.g. pressing
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C33/00—Moulds or cores; Details thereof or accessories therefor
    • B29C33/44—Moulds or cores; Details thereof or accessories therefor with means for, or specially constructed to facilitate, the removal of articles, e.g. of undercut articles
    • B29C33/442—Moulds or cores; Details thereof or accessories therefor with means for, or specially constructed to facilitate, the removal of articles, e.g. of undercut articles with mechanical ejector or drive means therefor
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C35/00—Heating, cooling or curing, e.g. crosslinking or vulcanising; Apparatus therefor
    • B29C35/16—Cooling
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C59/00—Surface shaping of articles, e.g. embossing; Apparatus therefor
    • B29C59/002—Component parts, details or accessories; Auxiliary operations
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B29—WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29C—SHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C35/00—Heating, cooling or curing, e.g. crosslinking or vulcanising; Apparatus therefor
    • B29C35/16—Cooling
    • B29C2035/1616—Cooling using liquids

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Oral & Maxillofacial Surgery (AREA)
  • Thermal Sciences (AREA)
  • Moulds For Moulding Plastics Or The Like (AREA)

Abstract

本发明公开了一种橡胶输送带生产制作用的脱模装置,具体涉及橡胶输送带制作技术领域,包括安装壳体和收卷辊,所述安装壳体左右两端均设有连接板,所述安装壳体前部设有同步装置,两个所述成型装置相互远离的一端左右两侧均设有联动装置,多个所述联动装置远离安装壳体的一端均设有顶出装置。本发明所述的一种橡胶输送带生产制作用的脱模装置,利用设置的同步装置可带动上下两侧的成型装置向相反方向进行移动,可对未成型的输送带进行定型,同时设置的两个成型装置还可对输送带进行冷却的功能,同步装置工作的同时还会使上下两侧的联动装置进行工作,从而对成型后的输送带顶出,防止脱模时损坏输送带,方便对输送带进行收卷。

The invention discloses a demoulding device for the production of rubber conveyor belts, specifically related to the technical field of rubber conveyor belt production. It includes an installation shell and a winding roller. The left and right ends of the installation shell are provided with connecting plates. A synchronization device is provided at the front of the installation housing, linkage devices are provided on the left and right sides of the ends of the two forming devices that are far away from each other, and ejection devices are provided at the ends of the multiple linkage devices that are far away from the installation housing. The demoulding device used in the production of rubber conveyor belts according to the present invention can use the provided synchronization device to drive the molding devices on the upper and lower sides to move in opposite directions, and can shape the unformed conveyor belt. At the same time, the The two molding devices can also cool the conveyor belt. When the synchronization device works, it also causes the linkage devices on the upper and lower sides to work, thereby ejecting the formed conveyor belt to prevent damage to the conveyor belt during demoulding, which is convenient Rewind the conveyor belt.

Description

一种橡胶输送带生产制作用的脱模装置A demoulding device for the production of rubber conveyor belts

技术领域Technical field

本发明涉及橡胶输送带制作技术领域,特别涉及一种橡胶输送带生产制作用的脱模装置。The invention relates to the technical field of rubber conveyor belt production, and in particular to a demoulding device used in the production of rubber conveyor belts.

背景技术Background technique

输送带是带式输送机的主要部件,主要用于煤炭、矿山、冶金、化工、建筑和交通等部门的大规模连续化运输,运输的物料分为块状、粉状、糊状和成件物品等,输送带行业可以分为重型输送带及轻型输送带两大类,重型输送带以橡胶为主要原料,因此也称为橡胶输送带,其使用范围集中在重工业、基础设施建设领域。The conveyor belt is the main component of the belt conveyor. It is mainly used for large-scale continuous transportation in coal, mining, metallurgy, chemical industry, construction, transportation and other departments. The transported materials are divided into lumps, powders, pastes and pieces. Articles, etc., the conveyor belt industry can be divided into two categories: heavy-duty conveyor belts and light-duty conveyor belts. Heavy-duty conveyor belts use rubber as the main raw material, so they are also called rubber conveyor belts. Their scope of use is concentrated in heavy industry and infrastructure construction.

现有的橡胶输送带应用十分广泛,橡胶输送带有耐热带、耐磨带和耐寒带等特性,橡胶输送带制造过程中需要经过冷却降温的工序,现有的降温方式一般是将输送带置于阴凉处自然降温,降温冷却时间过长使得加工效率低,所以使冷却时间缩短,可使输送带冷却的效率提高。Existing rubber conveyor belts are widely used. Rubber conveyor belts have characteristics such as heat-resistant belts, wear-resistant belts, and cold-resistant belts. The manufacturing process of rubber conveyor belts requires a cooling process. The existing cooling method is generally to convert the conveyor belts into Place it in a cool place to cool down naturally. If the cooling time is too long, the processing efficiency will be low. Therefore, shortening the cooling time can improve the cooling efficiency of the conveyor belt.

中国专利文献CN217802800U公开了一种橡胶输送带制作用成型散热装置,包括散热架,所述散热架的内部固定安装有数量为三个且呈上下等距分布的横板,所述横板的内部固定安装有贯穿式风机,所述贯穿式风机的底部固定安装有风管,所述散热架的左右两侧内部均固定安装有导向板,所述散热架的内部固定安装有数量为三个且分别位于三个横板底部的撑板,所述撑板的顶部左右两侧均固定安装有撑座,左右两个所述撑座之间固定安装有数量为两个且呈前后分布的挡板,前后两个所述挡板之间固定安装有辊式输送机,前后两个所述挡板之间固定安装有位于辊式输送机底部的散热机构,设置的散热机构,用于对输送带散热降温,且辊式输送机之间的间隙处便于凉风穿过,散热机构的部件可将辊式输送机上传导的输送带上的热量吸收并通过水冷降温,配合贯穿式风机的散热效果,使得输送带冷却效率提高;Chinese patent document CN217802800U discloses a molded heat dissipation device for the production of rubber conveyor belts, which includes a heat dissipation frame. Three horizontal plates are fixedly installed inside the heat dissipation frame and are equidistantly distributed up and down. The interior of the horizontal plate A through-type fan is fixedly installed, and an air duct is fixedly installed at the bottom of the through-type fan. Guide plates are fixedly installed on the left and right sides of the heat dissipation rack. There are three fixed installations inside the heat dissipation rack. Support plates are respectively located at the bottom of the three horizontal plates. Support seats are fixedly installed on the left and right sides of the top of the support plates. Two baffles are fixedly installed between the left and right support seats and are distributed front and back. , a roller conveyor is fixedly installed between the two front and rear baffles, and a heat dissipation mechanism located at the bottom of the roller conveyor is fixedly installed between the two front and rear baffles. The heat dissipation mechanism is used to heat the conveyor belt. Heat dissipation and cooling, and the gap between the roller conveyors facilitates the passage of cool wind. The components of the heat dissipation mechanism can absorb the heat on the conveyor belt conducted on the roller conveyor and cool it through water cooling. In conjunction with the heat dissipation effect of the through-type fan, Improve the cooling efficiency of the conveyor belt;

该专利在实际使用时,虽然使输送带的冷却时间缩短,但是由于成型的过程中,输送带上会印有许多纹路,对输送带收卷时,可能会使传输带卡住,无法对传输带顶出脱模,还需工作人员手动进行脱模,费时费力。When this patent is actually used, although the cooling time of the conveyor belt is shortened, due to the molding process, many lines will be printed on the conveyor belt. When the conveyor belt is rolled up, the conveyor belt may get stuck and cannot be conveyed. Ejection from the mold requires workers to manually remove the mold, which is time-consuming and labor-intensive.

发明内容Contents of the invention

本发明的主要目的在于提供一种橡胶输送带生产制作用的脱模装置,可以有效解决无法对成型后的输送带顶出脱模的问题。The main purpose of the present invention is to provide a demoulding device for the production of rubber conveyor belts, which can effectively solve the problem of being unable to eject and demould the formed conveyor belt.

为实现上述目的,本发明采取的技术方案为:In order to achieve the above objects, the technical solutions adopted by the present invention are:

一种橡胶输送带生产制作用的脱模装置,包括安装壳体和收卷辊,所述安装壳体左右两端均设有连接板,所述连接板后端上部设有两个输送轮,所述安装壳体相互靠近的一端中部均设有固定块,所述收卷辊贯穿于右部的连接板,所述收卷辊前端设有电机,所述安装壳体前部设有同步装置,所述同步装置后端上下部均设有成型装置,两个所述成型装置相互远离的一端左右两侧均设有联动装置,多个所述联动装置分别与上下两侧的固定块活动连接,多个所述联动装置远离安装壳体的一端均设有顶出装置,两个所述顶出装置分别贯穿于上下两侧的成型装置。A demoulding device for the production of rubber conveyor belts, including an installation shell and a winding roller. The left and right ends of the installation shell are provided with connecting plates, and the upper part of the rear end of the connecting plate is provided with two conveying wheels. There are fixed blocks in the middle of the two ends of the installation housing that are close to each other. The winding roller runs through the connecting plate on the right. The front end of the winding roller is equipped with a motor. The front of the installation housing is equipped with a synchronization device. , the upper and lower parts of the rear end of the synchronization device are provided with forming devices, the ends of the two forming devices that are far away from each other are provided with linkage devices on the left and right sides, and a plurality of the linkage devices are movably connected to the fixed blocks on the upper and lower sides respectively. Each of the plurality of linkage devices is provided with an ejection device at one end away from the installation housing, and the two ejection devices respectively penetrate the molding devices on the upper and lower sides.

优选的,所述同步装置包括齿轮和液压缸,所述齿轮前端与安装壳体转动连接,所述齿轮外表面左右两侧均设有齿条,两个所述齿条前端均与安装壳体滑动连接,两个所述齿条后端远离齿轮的一侧均设有同步板,两个所述同步板前端均与安装壳体滑动连接,两个所述同步板相互靠近的一端左右部均设有L形板,多个所述L形板均与成型装置固定连接,所述液压缸输出端与下部的同步板固定连接,所述液压缸下端与安装壳体固定连接。Preferably, the synchronization device includes a gear and a hydraulic cylinder, the front end of the gear is rotatably connected to the installation housing, the left and right sides of the outer surface of the gear are provided with racks, and the front ends of the two racks are both connected to the installation housing. Sliding connection, the back ends of the two racks are equipped with synchronization plates on the side away from the gears, the front ends of the two synchronization plates are slidingly connected to the installation shell, and the left and right ends of the two synchronization plates that are close to each other are both An L-shaped plate is provided, a plurality of the L-shaped plates are fixedly connected to the forming device, the output end of the hydraulic cylinder is fixedly connected to the lower synchronization plate, and the lower end of the hydraulic cylinder is fixedly connected to the installation shell.

优选的,所述成型装置包括成型壳体和抽水泵,所述成型壳体前端分别与两个L形板固定连接,所述成型壳体内部设有冷却管,所述抽水泵入水端与冷却管的左端固定连接,所述抽水泵出水端设有冷却组件,所述成型壳体左右两端前部均设有T形块,两个所述T形块靠近联动装置的一端与联动装置固定连接。Preferably, the molding device includes a molding shell and a water pump. The front end of the molding shell is fixedly connected to two L-shaped plates respectively. A cooling pipe is provided inside the molding shell. The water inlet end of the water pump is connected to the cooling pipe. The left end of the pipe is fixedly connected, the water outlet end of the water pump is provided with a cooling assembly, the left and right ends of the molded housing are provided with T-shaped blocks, and one end of the two T-shaped blocks close to the linkage device is fixed to the linkage device connect.

优选的,所述冷却组件包括冷却壳体,所述冷却壳体内部设有冷凝管,所述冷却管右端与冷凝管相通,所述冷却壳体外表面上部入液管,所述冷却壳体外表面下部设有出液管,所述冷却壳体内部充满冷却液,所述冷却壳体外表面右部设有半导体制冷片,所述半导体制冷片右端与T形块固定连接。Preferably, the cooling assembly includes a cooling shell, a condensation pipe is provided inside the cooling shell, the right end of the cooling pipe is connected to the condensation pipe, a liquid inlet pipe is placed on the upper part of the outer surface of the cooling shell, and the outer surface of the cooling shell is A liquid outlet pipe is provided at the lower part, and the inside of the cooling housing is filled with cooling liquid. A semiconductor refrigeration piece is provided on the right side of the outer surface of the cooling case, and the right end of the semiconductor refrigeration piece is fixedly connected to the T-shaped block.

优选的,所述顶出装置包括顶出板,所述顶出板靠近成型壳体的一端设有多个顶出杆,多个所述顶出杆均贯穿于成型壳体,多个所述顶出杆均与成型壳体滑动连接,所述顶出杆外表面靠近顶出板的一侧设有压缩弹簧,所述顶出板远离多个压缩弹簧的一端与联动装置固定连接。Preferably, the ejection device includes an ejection plate. One end of the ejection plate close to the molded housing is provided with a plurality of ejection rods. The plurality of ejection rods all penetrate the molding shell. The ejection rods are all slidingly connected to the molded shell. A compression spring is provided on the side of the outer surface of the ejection rod close to the ejection plate. One end of the ejection plate away from the plurality of compression springs is fixedly connected to the linkage device.

优选的,所述联动装置包括两个转板,两个所述转板中部设有转轴,所述转轴与固定块活动连接,两个所述转板相互靠近的一端前部设有活动柱二,所述活动柱二靠近T形块的一端与T形块固定连接,两个所述转板相互靠近的一端后部设有活动柱一,所述活动柱一靠近顶出板的一端与顶出板固定连接。Preferably, the linkage device includes two rotating plates, a rotating shaft is provided in the middle of the two rotating plates, the rotating shaft is movably connected with the fixed block, and two movable columns are provided at the front of one end of the two rotating plates that are close to each other. , the end of the second movable column close to the T-shaped block is fixedly connected to the T-shaped block, a movable column 1 is provided at the rear of the end of the two rotating plates close to each other, and the end of the movable column 1 close to the ejection plate is connected to the ejection plate. Outboard fixed connection.

优选的,两个所述转板的形状为菱形。Preferably, the shape of the two rotating plates is rhombus.

优选的,所述冷凝管的形状为螺旋形。Preferably, the shape of the condenser tube is spiral.

优选的,多个所述顶出杆均与冷却管交错分布。Preferably, the plurality of ejection rods are staggered with the cooling tubes.

优选的,所述安装壳体底部开设有通槽,所述液压缸安装于通槽底部。Preferably, a through slot is provided at the bottom of the installation housing, and the hydraulic cylinder is installed at the bottom of the through slot.

与现有技术相比,本发明具有如下有益效果:Compared with the prior art, the present invention has the following beneficial effects:

1、本发明中,利用设置的两个输送轮对未成型的输送带进行输送,使未成型的输送带从两个输送轮中穿入,利用设置的同步装置可带动上下两侧的成型装置进行相反方向进行移动,当两个成型装置相互靠近时,可对输送带的外表面进行成型,此时的联动装置在同步装置的带动下会使顶出装置在成型装置内部,此时不对输送带顶出,当两个成型装置相互远离时,此时的联动装置会带动顶出装置穿过成型装置从而对输送带顶出,实现脱模,防止输送带上的纹路卡住,最终利用设置的收卷辊对输送带进收卷。1. In the present invention, the unformed conveyor belt is transported by two provided conveyor wheels, so that the unformed conveyor belt penetrates through the two conveyor wheels, and the provided synchronization device is used to drive the forming devices on the upper and lower sides. Move in opposite directions. When the two forming devices are close to each other, the outer surface of the conveyor belt can be formed. At this time, the linkage device, driven by the synchronization device, will make the ejection device inside the forming device. At this time, there is no conveying. Belt ejection, when the two molding devices are far away from each other, the linkage device at this time will drive the ejection device to pass through the molding device to eject the conveyor belt, achieve demoulding, prevent the lines on the conveyor belt from getting stuck, and finally use the setting The winding roller winds up the conveyor belt.

2、本发明中,设置的冷却管可对输送带进行冷却,从而使输送带的冷却时间变短,同时为了使冷却管内部的冷却液始终保持冷却,利用设置的冷却组件可对冷却管内部的冷却液进行冷却,从而缩短输送带冷却的时间,从而使装置的功能增多,增加装置的适用性。2. In the present invention, the cooling pipe is provided to cool the conveyor belt, thereby shortening the cooling time of the conveyor belt. At the same time, in order to keep the cooling liquid inside the cooling pipe always cool, the cooling assembly is used to cool the inside of the cooling pipe. The coolant is used for cooling, thereby shortening the cooling time of the conveyor belt, thereby increasing the functions of the device and increasing the applicability of the device.

附图说明Description of drawings

图1为本发明的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the present invention;

图2为本发明的另一角度结构示意图;Figure 2 is a schematic structural diagram of the present invention from another angle;

图3为本发明的同步装置结构示意图;Figure 3 is a schematic structural diagram of the synchronization device of the present invention;

图4为本发明的成型装置结构示意图;Figure 4 is a schematic structural diagram of the forming device of the present invention;

图5为本发明的图4中A处放大示意图;Figure 5 is an enlarged schematic diagram of position A in Figure 4 of the present invention;

图6为本发明的顶出装置结构示意图;Figure 6 is a schematic structural diagram of the ejection device of the present invention;

图7为本发明的联动装置结构示意图;Figure 7 is a schematic structural diagram of the linkage device of the present invention;

图8为本发明的整体另一状态示意图;Figure 8 is a schematic diagram of another state of the present invention;

图9为本发明的同步装置以及联动装置另一状态示意图;Figure 9 is a schematic diagram of another state of the synchronization device and linkage device of the present invention;

图10为本发明的顶出装置另一状态示意图。Figure 10 is a schematic diagram of another state of the ejection device of the present invention.

图中:1、收卷辊;2、安装壳体;3、固定块;4、输送轮;5、连接板;6、同步装置;7、联动装置;8、顶出装置;9、成型装置;60、液压缸;61、同步板;62、L形板;63、齿轮;64、齿条;90、冷却管;91、成型壳体;92、抽水泵;93、冷却组件;94、T形块;930、冷却壳体;931、冷凝管;932、出液管;933、入液管;934、半导体制冷片;80、顶出杆;81、压缩弹簧;82、顶出板;70、活动柱一;71、转板;72、活动柱二。In the picture: 1. Winding roller; 2. Installation shell; 3. Fixed block; 4. Conveyor wheel; 5. Connecting plate; 6. Synchronization device; 7. Linkage device; 8. Ejection device; 9. Forming device ; 60. Hydraulic cylinder; 61. Synchronous plate; 62. L-shaped plate; 63. Gear; 64. Rack; 90. Cooling pipe; 91. Molded shell; 92. Water pump; 93. Cooling component; 94. T Shape block; 930, cooling shell; 931, condenser tube; 932, liquid outlet pipe; 933, liquid inlet pipe; 934, semiconductor refrigeration piece; 80, ejection rod; 81, compression spring; 82, ejection plate; 70 , movable column one; 71, rotating plate; 72, movable column two.

具体实施方式Detailed ways

为使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施方式,进一步阐述本发明。In order to make the technical means, creative features, objectives and effects achieved by the present invention easy to understand, the present invention will be further elaborated below in conjunction with specific implementation modes.

实施例一Embodiment 1

如图1-图2所示,一种橡胶输送带生产制作用的脱模装置,包括安装壳体2和收卷辊1,安装壳体2左右两端均设有连接板5,连接板5后端上部设有两个输送轮4,安装壳体2相互靠近的一端中部均设有固定块3,收卷辊1贯穿于右部的连接板5,如图2所示,收卷辊1前端设有电机,安装壳体2前部设有同步装置6,同步装置6后端上下部均设有成型装置9,两个成型装置9相互远离的一端左右两侧均设有联动装置7,多个联动装置7分别与上下两侧的固定块3活动连接,多个联动装置7远离安装壳体2的一端均设有顶出装置8,两个顶出装置8分别贯穿于上下两侧的成型装置9;As shown in Figures 1 and 2, a demoulding device for the production of rubber conveyor belts includes an installation shell 2 and a winding roller 1. The left and right ends of the installation shell 2 are provided with connecting plates 5. The connecting plates 5 There are two conveying wheels 4 at the upper part of the rear end, and a fixing block 3 is provided in the middle of the end of the installation housing 2 that is close to each other. The winding roller 1 penetrates the connecting plate 5 on the right, as shown in Figure 2, the winding roller 1 A motor is provided at the front end, and a synchronization device 6 is provided at the front of the installation housing 2. A forming device 9 is provided at the upper and lower parts of the rear end of the synchronizing device 6. The two forming devices 9 are provided with linkage devices 7 on the left and right sides of the end far away from each other. A plurality of linkage devices 7 are movably connected to the fixed blocks 3 on the upper and lower sides respectively. Each of the plurality of linkage devices 7 is provided with an ejection device 8 at one end away from the mounting housing 2. The two ejection devices 8 penetrate through the upper and lower sides respectively. Forming device 9;

利用设置的两个输送轮4对未成型的输送带进行输送,使未成型的输送带从两个输送轮4中穿入,然后利用设置同步装置6带动上下两侧的成型装置9进行相反方向移动,可对未成型的输送带进行定型,同时设置的两个成型装置9还可对输送带进行冷却,从而使输送带的冷却时间缩短,同步装置6工作的同时还会使上下两侧的联动装置7进行工作,从而对成型后的输送带顶出,不仅防止脱模时损坏输送带,而且方便对输送带进行收卷,收卷辊1前端设置的电机,所以当需要对输送带进行收卷时,启动电机,即可使收卷辊1进行转动,从而对脱模后的输送带进行收卷。The unformed conveyor belt is conveyed by using the two conveyor wheels 4 provided, so that the unformed conveyor belt penetrates through the two conveyor wheels 4, and then the synchronizing device 6 is used to drive the forming devices 9 on the upper and lower sides in opposite directions. Move, the unformed conveyor belt can be shaped, and the two forming devices 9 provided at the same time can also cool the conveyor belt, thereby shortening the cooling time of the conveyor belt. When the synchronization device 6 works, it will also make the upper and lower sides The linkage device 7 works to eject the formed conveyor belt, which not only prevents damage to the conveyor belt during demoulding, but also facilitates the rewinding of the conveyor belt. A motor is installed at the front end of the rewinding roller 1, so when the conveyor belt needs to be retracted When rewinding, starting the motor will cause the rewinding roller 1 to rotate, thereby rewinding the demolded conveyor belt.

如图3所示,同步装置6包括齿轮63和液压缸60,齿轮63前端与安装壳体2转动连接,齿轮63外表面左右两侧均设有齿条64,两个齿条64前端均与安装壳体2滑动连接,两个齿条64后端远离齿轮63的一侧均设有同步板61,两个同步板61前端均与安装壳体2滑动连接,两个同步板61相互靠近的一端左右部均设有L形板62,多个L形板62均与成型装置9固定连接,液压缸60输出端与下部的同步板61固定连接,液压缸60下端与安装壳体2固定连接,安装壳体2底部开设有通槽,液压缸60安装于通槽底部;As shown in Figure 3, the synchronization device 6 includes a gear 63 and a hydraulic cylinder 60. The front end of the gear 63 is rotatably connected to the installation housing 2. The left and right sides of the outer surface of the gear 63 are provided with racks 64. The front ends of the two racks 64 are connected to The installation shell 2 is slidingly connected. The rear ends of the two racks 64 are provided with synchronization plates 61 on the side away from the gear 63. The front ends of the two synchronization plates 61 are slidingly connected to the installation shell 2. The two synchronization plates 61 are close to each other. L-shaped plates 62 are provided on the left and right sides of one end, and the plurality of L-shaped plates 62 are fixedly connected to the forming device 9. The output end of the hydraulic cylinder 60 is fixedly connected to the lower synchronization plate 61, and the lower end of the hydraulic cylinder 60 is fixedly connected to the installation shell 2. , a through slot is provided at the bottom of the installation housing 2, and the hydraulic cylinder 60 is installed at the bottom of the through slot;

此图中为两个成型装置9相互远离时的状态,启动液压缸60使下部的同步板61向下部进行移动,带动右部的齿条64向下部进行移动,从而会使齿轮63进行转动,从而会使左部的齿条64向上部进行移动,从而会带动上下两侧的两个L形板62向相反方向进行移动,由于设置的多个L形板62均与上下两侧的成型装置9固定连接,所以当上下两侧的L形板62向相反方向进行移动时,此时的两个成型装置9相互远离,此时不对传输带成型。This figure shows the state when the two forming devices 9 are far away from each other. The hydraulic cylinder 60 is activated to move the lower synchronization plate 61 downward, driving the right rack 64 to move downward, thereby causing the gear 63 to rotate. As a result, the left rack 64 will move upward, which will drive the two L-shaped plates 62 on the upper and lower sides to move in opposite directions. 9 are fixedly connected, so when the L-shaped plates 62 on the upper and lower sides move in opposite directions, the two forming devices 9 are away from each other at this time, and the transmission belt is not formed at this time.

如图4所示,成型装置9包括成型壳体91和抽水泵92,成型壳体91前端分别与两个L形板62固定连接,成型壳体91内部设有冷却管90,抽水泵92入水端与冷却管90的左端固定连接,抽水泵92出水端设有冷却组件93,成型壳体91左右两端前部均设有T形块94,两个T形块94靠近联动装置7的一端与联动装置7固定连接;As shown in Figure 4, the molding device 9 includes a molding shell 91 and a water pump 92. The front end of the molding shell 91 is fixedly connected to two L-shaped plates 62 respectively. A cooling pipe 90 is provided inside the molding shell 91, and the water pump 92 enters water. The end of the cooling pipe 90 is fixedly connected to the left end of the cooling pipe 90. The outlet end of the water pump 92 is provided with a cooling assembly 93. T-shaped blocks 94 are provided at the front of both left and right ends of the molded housing 91. Two T-shaped blocks 94 are close to one end of the linkage device 7. Fixedly connected to the linkage device 7;

当上下两侧的成型壳体91均与传输带接触时,为了使传输带成型的速度加快,使冷却管90内部充满冷却液,从而对传输带进行冷却,从而加快传输带的成型,同时为了使冷却管90内部的冷却液始终保持冷却,利用抽水泵92使冷却管90内部的冷却液抽入到冷却组件93内部,所以利用设置的冷却组件93可对冷却管90内部的冷却液进行冷却,从而实现冷却管90内部的冷却液循环,最终达到对传输带进行冷却的作用。When the molding shells 91 on both sides of the upper and lower sides are in contact with the conveyor belt, in order to speed up the molding of the conveyor belt, the cooling pipe 90 is filled with coolant to cool the conveyor belt, thereby speeding up the molding of the conveyor belt. The cooling liquid inside the cooling pipe 90 is always kept cool, and the cooling liquid inside the cooling pipe 90 is pumped into the cooling assembly 93 by using the water pump 92. Therefore, the cooling liquid inside the cooling pipe 90 can be cooled by the provided cooling assembly 93. , thereby realizing the cooling liquid circulation inside the cooling pipe 90, and finally achieving the cooling effect of the conveyor belt.

详细的,请参阅图5,冷却组件93包括冷却壳体930,冷却壳体930内部设有冷凝管931,冷却管90右端与冷凝管931相通,冷却壳体930外表面上部入液管933,冷却壳体930外表面下部设有出液管932,冷却壳体930内部充满冷却液,冷却壳体930外表面右部设有半导体制冷片934,半导体制冷片934右端与T形块94固定连接,冷凝管931的形状为螺旋形;For details, please refer to Figure 5. The cooling assembly 93 includes a cooling shell 930. A condensation pipe 931 is provided inside the cooling shell 930. The right end of the cooling pipe 90 communicates with the condensation pipe 931. There is a liquid inlet pipe 933 on the outer surface of the cooling shell 930. A liquid outlet pipe 932 is provided at the lower part of the outer surface of the cooling housing 930. The inside of the cooling housing 930 is filled with cooling liquid. A semiconductor refrigeration piece 934 is provided on the right side of the outer surface of the cooling case 930. The right end of the semiconductor refrigeration piece 934 is fixedly connected to the T-shaped block 94. , the shape of the condenser tube 931 is spiral;

需要对冷却管90内部的冷却液进行冷却时,利用设置的抽水泵92将冷却管90内部的冷却液抽入到冷凝管931的内部,冷却壳体930内部充满冷却液,利用设置的半导体制冷片934对冷却壳体930内部的冷却液进行冷却,由于设置的冷凝管931的形状为螺旋形,从而会使冷却管90内部的冷却液的流动路径变长,从而使冷却管90内部的冷却液充分地得到冷却,最终实现对冷却管90内部的冷却液循环使用,利用设置的入液管933可对冷却壳体930内部的冷却液进行更换,同时设置的出液管932可将冷却壳体930内部的排出。When the cooling liquid inside the cooling pipe 90 needs to be cooled, the cooling liquid inside the cooling pipe 90 is pumped into the condenser pipe 931 using the provided water pump 92. The cooling shell 930 is filled with the cooling liquid, and the semiconductor refrigeration device is used. The piece 934 cools the cooling liquid inside the cooling shell 930. Since the shape of the cooling pipe 931 is spiral, the flow path of the cooling liquid inside the cooling pipe 90 will be lengthened, thereby reducing the cooling effect inside the cooling pipe 90. The liquid is fully cooled, and finally the cooling liquid inside the cooling pipe 90 is circulated. The cooling liquid inside the cooling shell 930 can be replaced by using the liquid inlet pipe 933 provided, and the liquid outlet pipe 932 provided at the same time can connect the cooling shell Discharge from inside the body 930.

需要说明的是,本发明中半导体制冷片934,为现有技术中的常规设计,其原理为,当一块N型半导体材料和一块P型半导体材料联结成的热电偶对中有电流通过时,两端之间就会产生热量转移,热量就会从一端转移到另一端,从而产生温差形成冷热端,从而实现对变压器油进行冷却,本发明不作详细阐述。It should be noted that the semiconductor refrigeration piece 934 in the present invention is a conventional design in the prior art. The principle is that when a current passes through a thermocouple pair formed by a piece of N-type semiconductor material and a piece of P-type semiconductor material, Heat will be transferred between the two ends, and the heat will be transferred from one end to the other end, thereby generating a temperature difference to form a hot and cold end, thereby realizing cooling of the transformer oil. This invention will not be elaborated in detail.

如图6所示,顶出装置8包括顶出板82,顶出板82靠近成型壳体91的一端设有多个顶出杆80,多个顶出杆80均贯穿于成型壳体91,多个顶出杆80均与成型壳体91滑动连接,顶出杆80外表面靠近顶出板82的一侧设有压缩弹簧81,顶出板82远离多个压缩弹簧81的一端与联动装置7固定连接,多个顶出杆80均与冷却管90交错分布;As shown in Figure 6, the ejection device 8 includes an ejection plate 82. An end of the ejection plate 82 close to the molding shell 91 is provided with a plurality of ejection rods 80. The plurality of ejection rods 80 all penetrate the molding shell 91. The plurality of ejector rods 80 are slidingly connected to the molded shell 91. The outer surface of the ejector rod 80 is provided with a compression spring 81 on one side close to the ejector plate 82. The end of the ejector plate 82 away from the plurality of compression springs 81 is connected to the linkage device. 7. Fixed connection, multiple ejection rods 80 are staggered with the cooling pipes 90;

此时的状态为对传输带的顶出状态,这时的多个压缩弹簧81处于压缩状态,同时设置的多个顶出杆80穿过成型壳体91,从而对成型的传输带进行顶出,从而方便对成型的传输带进行脱模。The state at this time is the ejection state of the conveyor belt. At this time, the plurality of compression springs 81 are in a compressed state, and the plurality of ejection rods 80 provided at the same time pass through the molding shell 91 to eject the formed conveyor belt. , so as to facilitate the demoulding of the formed transmission belt.

如图7所示,联动装置7包括两个转板71,两个转板71中部设有转轴,转轴与固定块3活动连接,两个转板71相互靠近的一端前部设有活动柱二72,活动柱二72靠近T形块94的一端与T形块94固定连接,两个转板71相互靠近的一端后部设有活动柱一70,活动柱一70靠近顶出板82的一端与顶出板82固定连接,两个转板71的形状为菱形;As shown in Figure 7, the linkage device 7 includes two rotating plates 71. A rotating shaft is provided in the middle of the two rotating plates 71. The rotating shaft is movably connected to the fixed block 3. Two movable columns are provided at the front of one end of the two rotating plates 71 that are close to each other. 72. The end of the second movable column 72 close to the T-shaped block 94 is fixedly connected to the T-shaped block 94. There is a movable column 70 at the rear of the end of the two rotating plates 71 close to each other. The end of the movable column 70 is close to the ejection plate 82. Fixedly connected to the ejection plate 82, the shape of the two rotating plates 71 is diamond;

此时的状态为对传输带的顶出状态,这时上下两侧的L形板62为互相远离,由于设置的上下两侧的L形板62分别与上下部的成型壳体91固定连接,所以这时的两个成型壳体91也处于相互远离的状态,由于设置的多个T形块94均与同侧的成型壳体91以及活动柱二72固定连接,所以当两个成型壳体91相互远离时,也会带动上下两侧的活动柱二72相互远离,从而会使多个转板71进行转动,从而会带动上下两侧的活动柱一70相互靠近,会带动上下两侧的多个顶出板82以及顶出杆80相互靠近,此时的多个压缩弹簧81为压缩状态,从而对成型的传输带进行顶出,最终利用设置的收卷辊1对成型的输送带进行收卷。The state at this time is the ejection state of the conveyor belt. At this time, the L-shaped plates 62 on the upper and lower sides are far away from each other. Since the L-shaped plates 62 on the upper and lower sides are fixedly connected to the upper and lower molded shells 91 respectively, Therefore, the two molded shells 91 are also in a state of being far away from each other at this time. Since the multiple T-shaped blocks 94 are fixedly connected to the molded shell 91 and the movable column 2 72 on the same side, when the two molded shells When 91 moves away from each other, it will also drive the movable columns 72 on the upper and lower sides to move away from each other, thereby causing the plurality of rotating plates 71 to rotate, which will drive the movable columns 70 on the upper and lower sides to approach each other, which will drive the movable columns 72 on the upper and lower sides to move closer to each other. The plurality of ejection plates 82 and the ejection rods 80 are close to each other. At this time, the plurality of compression springs 81 are in a compressed state, thereby ejecting the formed conveyor belt. Finally, the formed conveyor belt is ejected by the provided winding roller 1. Winding.

其具体实施方式为:需要对传输带进行顶出时,启动液压缸60使下部的同步板61向下移动,从而会使右部的齿条64向下部进行移动,从而会带动齿轮63进行转动,会使左部的齿条64向上部进行移动,从而使上下两侧的L形板62向相反方向进行移动,从而会使上下两侧的成型壳体91相互远离,同时上下两侧的活动柱二72会随着成型壳体91的移动而移动,从而会使上下两侧的多个转板71进行转动,从而会带动上下两侧的活动柱一70向相互靠近的一侧进行移动,从而会使两个顶出板82也向相互靠近的一侧进行移动,从而带动上下两侧的多个压缩弹簧81脱离成型壳体91,从而对成型的输送带进行顶出。The specific implementation method is: when the transmission belt needs to be ejected, the hydraulic cylinder 60 is started to move the lower synchronization plate 61 downward, so that the right rack 64 moves downward, thereby driving the gear 63 to rotate. , the left rack 64 will move upward, causing the L-shaped plates 62 on the upper and lower sides to move in opposite directions, thereby causing the molded shells 91 on the upper and lower sides to move away from each other. The second column 72 will move with the movement of the molded shell 91, which will cause the plurality of rotating plates 71 on the upper and lower sides to rotate, thereby driving the movable column one 70 on the upper and lower sides to move toward the side closer to each other. As a result, the two ejection plates 82 will also move toward the side closer to each other, thereby driving the plurality of compression springs 81 on the upper and lower sides to separate from the molded housing 91, thereby ejecting the molded conveyor belt.

实施例二Embodiment 2

本实施例在实施例一的基础上对联动装置7、顶出装置8以及成型装置9进行进一步的改进,如图8-图10所示,此时为对传输带成型时的状态,这时的两个成型装置9相互靠近,从而对传输带的表面印上纹路,同时缩短传输带的冷却时间,这时上下两侧的顶出装置8不对传输带顶出,此时不实现对输送带的脱模。This embodiment further improves the linkage device 7, the ejection device 8 and the forming device 9 on the basis of the first embodiment, as shown in Figures 8 to 10. This is the state when the conveyor belt is formed. The two forming devices 9 are close to each other, thereby printing texture on the surface of the conveyor belt, and at the same time shortening the cooling time of the conveyor belt. At this time, the ejection devices 8 on the upper and lower sides do not eject the conveyor belt, and the conveyor belt is not ejected at this time. of demoulding.

如图9-图10所示,启动液压缸60使下部的同步板61向上部进行移动,从而会使右部的齿条64向上部进行移动,会使齿轮63进行转动,从而使左部的齿条64向下部进行移动,会使上下两侧的L形板62相互靠近,从而带动上下两侧的成型壳体91也相互靠近,从而对传输带的表面进行成型工作,成型过程中,利用设置的冷却管90内部的冷却液对传输带进行冷却,从而加快传输带冷却的速度,当上下两侧的成型壳体91相互靠近时,会使上下两侧的T形块94也相互靠近,从而会使上下两侧的活动柱二72也相互靠近,会使多个转板71进行转动,从而会带动上下两侧的活动柱一70相互远离,从而会使上下两侧的顶出板82相互远离,从而会使上下两侧的顶出杆80进入到成型壳体91内部,这时多个顶出板82处于扩张状态,此时不实现对输送带脱模的状态。As shown in Figures 9 and 10, starting the hydraulic cylinder 60 causes the lower synchronizing plate 61 to move upward, causing the right rack 64 to move upward, causing the gear 63 to rotate, causing the left rack 64 to move upward. When the rack 64 moves downward, the L-shaped plates 62 on the upper and lower sides will be closer to each other, thereby driving the molding shells 91 on the upper and lower sides to also be closer to each other, thereby forming the surface of the transmission belt. During the forming process, use The cooling liquid inside the provided cooling pipe 90 cools the conveyor belt, thereby accelerating the cooling speed of the conveyor belt. When the molded shells 91 on the upper and lower sides are close to each other, the T-shaped blocks 94 on the upper and lower sides will also be close to each other. As a result, the movable columns 72 on the upper and lower sides will also approach each other, causing the plurality of rotating plates 71 to rotate, which will drive the movable columns 70 on the upper and lower sides to move away from each other, thus causing the ejection plates 82 on the upper and lower sides. away from each other, so that the ejector rods 80 on the upper and lower sides will enter the inside of the molding housing 91. At this time, the plurality of ejector plates 82 are in an expanded state, and the conveyor belt is not demolded at this time.

其具体实施方式为:需要对输送带进行成型工作时,启动液压缸60使下部的同步板61向上部进行移动,从而会使右部的齿条64向上部进行移动,会使齿轮63进行转动,从而使左部的齿条64向下部进行移动,会使上下两侧的L形板62相互靠近,从而给带动上下两侧的成型装置9相互靠近,设置的两个成型装置9可对输送带进行成型工作,同时还可缩短冷却时间,此时的多个顶出杆80在成型壳体91内部,不对输送带顶出,此时不能对输送带进行脱模。The specific implementation method is: when the conveyor belt needs to be formed, the hydraulic cylinder 60 is started to move the lower synchronization plate 61 upward, thereby causing the right rack 64 to move upward and the gear 63 to rotate. , so that the rack 64 on the left moves downward, which will bring the L-shaped plates 62 on the upper and lower sides closer to each other, thereby driving the forming devices 9 on the upper and lower sides closer to each other, and the two forming devices 9 can be conveyed The belt is molded, and the cooling time can also be shortened. At this time, the plurality of ejection rods 80 are inside the molding shell 91 and do not eject the conveyor belt. At this time, the conveyor belt cannot be demoulded.

以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。The basic principles and main features of the present invention and the advantages of the present invention have been shown and described above. Those skilled in the industry should understand that the present invention is not limited by the above embodiments. The above embodiments and descriptions only illustrate the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention will also have other aspects. Various changes and modifications are possible, which fall within the scope of the claimed invention. The scope of protection of the present invention is defined by the appended claims and their equivalents.

Claims (10)

1. The utility model provides a shedder for rubber conveyer belt production system, includes installation casing (2) and wind-up roll (1), its characterized in that: the utility model discloses a motor, including installation casing (2), connecting plate (5) both ends all are equipped with connecting plate (5), connecting plate (5) rear end upper portion is equipped with two delivery wheels (4), the one end middle part that installation casing (2) are close to each other all is equipped with fixed block (3), wind-up roll (1) run through in connecting plate (5) on right part, wind-up roll (1) front end is equipped with the motor, installation casing (2) front portion is equipped with synchronizer (6), the lower part all is equipped with forming device (9) about synchronizer (6) rear end, two the one end left and right sides that forming device (9) kept away from each other all is equipped with aggregate unit (7), a plurality of aggregate unit (7) respectively with fixed block (3) swing joint of upper and lower both sides, a plurality of aggregate unit (7) are kept away from the one end of installation casing (2) all is equipped with ejecting device (8), two ejecting device (8) run through respectively in forming device (9) of upper and lower both sides.
2. The demolding device for producing rubber conveyor belts according to claim 1, wherein: the synchronous device comprises a gear (63) and a hydraulic cylinder (60), wherein the front end of the gear (63) is rotationally connected with a mounting shell (2), racks (64) are respectively arranged on the left side and the right side of the outer surface of the gear (63), the front ends of the racks (64) are slidably connected with the mounting shell (2), the rear ends of the racks (64) are respectively provided with a synchronous plate (61) on one side, far away from the gear (63), of the two synchronous plates (61), the front ends of the synchronous plates are respectively slidably connected with the mounting shell (2), L-shaped plates (62) are respectively arranged on the left and right sides of one end, close to each other, of the synchronous plates (61), the L-shaped plates (62) are respectively fixedly connected with a forming device (9), and the output end of the hydraulic cylinder (60) is fixedly connected with the synchronous plates (61) on the lower portion of the hydraulic cylinder (60), and the lower end of the hydraulic cylinder (60) is fixedly connected with the mounting shell (2).
3. The demolding device for producing rubber conveyor belts according to claim 2, characterized in that: the forming device comprises a forming shell (91) and a water suction pump (92), wherein the front end of the forming shell (91) is fixedly connected with two L-shaped plates (62) respectively, a cooling pipe (90) is arranged inside the forming shell (91), the water inlet end of the water suction pump (92) is fixedly connected with the left end of the cooling pipe (90), a cooling assembly (93) is arranged at the water outlet end of the water suction pump (92), T-shaped blocks (94) are arranged at the front parts of the left end and the right end of the forming shell (91), and two T-shaped blocks (94) are fixedly connected with one end, close to a linkage device (7), of the T-shaped blocks (94).
4. A stripper for rubber conveyer belt manufacturing as defined in claim 3, wherein: the cooling assembly (93) comprises a cooling shell (930), a condensation pipe (931) is arranged inside the cooling shell (930), the right end of the cooling pipe (90) is communicated with the condensation pipe (931), a liquid inlet pipe (933) is arranged on the upper portion of the outer surface of the cooling shell (930), a liquid outlet pipe (932) is arranged on the lower portion of the outer surface of the cooling shell (930), cooling liquid is filled inside the cooling shell (930), a semiconductor refrigerating piece (934) is arranged on the right portion of the outer surface of the cooling shell (930), and the right end of the semiconductor refrigerating piece (934) is fixedly connected with a T-shaped block (94).
5. A stripper for rubber conveyer belt manufacturing as defined in claim 3, wherein: the ejector device comprises an ejector plate (82), wherein a plurality of ejector rods (80) are arranged at one end, close to a molded shell (91), of the ejector plate (82), the ejector rods (80) penetrate through the molded shell (91), the ejector rods (80) are slidably connected with the molded shell (91), compression springs (81) are arranged at one side, close to the ejector plate (82), of the outer surface of the ejector rod (80), and one end, far away from the compression springs (81), of the ejector plate (82) is fixedly connected with a linkage device (7).
6. The demolding device for producing rubber conveyor belts according to claim 5, wherein: the linkage device (7) comprises two rotating plates (71), a rotating shaft is arranged in the middle of each rotating plate (71), the rotating shaft is movably connected with a fixed block (3), two movable columns II (72) are arranged at the front parts of one ends of the rotating plates (71) close to each other, one ends of the movable columns II (72) close to T-shaped blocks (94) are fixedly connected with the T-shaped blocks (94), two movable columns I (70) are arranged at the rear parts of one ends of the rotating plates (71) close to each other, and one ends of the movable columns I (70) close to ejector plates (82) are fixedly connected with the ejector plates (82).
7. The demolding device for producing rubber conveyor belts as claimed in claim 6, wherein: the two swivel plates (71) are diamond-shaped.
8. The demolding device for producing rubber conveyor belts according to claim 4, wherein: the shape of the condensation pipe (931) is spiral.
9. The demolding device for producing rubber conveyor belts according to claim 5, wherein: the ejector rods (80) are distributed in a staggered manner with the cooling pipes (90).
10. The demolding device for producing rubber conveyor belts according to claim 2, characterized in that: the bottom of the installation shell (2) is provided with a through groove, and the hydraulic cylinder (60) is installed at the bottom of the through groove.
CN202311272794.2A 2023-09-28 2023-09-28 A demoulding device for producing rubber conveyor belts Active CN117283857B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311272794.2A CN117283857B (en) 2023-09-28 2023-09-28 A demoulding device for producing rubber conveyor belts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311272794.2A CN117283857B (en) 2023-09-28 2023-09-28 A demoulding device for producing rubber conveyor belts

Publications (2)

Publication Number Publication Date
CN117283857A true CN117283857A (en) 2023-12-26
CN117283857B CN117283857B (en) 2025-04-15

Family

ID=89251461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311272794.2A Active CN117283857B (en) 2023-09-28 2023-09-28 A demoulding device for producing rubber conveyor belts

Country Status (1)

Country Link
CN (1) CN117283857B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104943203A (en) * 2015-05-26 2015-09-30 杭州市机械科学研究院有限公司 Rubber sheet pre-complexing automatic production line and pre-complexing production technology
CN109311310A (en) * 2016-05-17 2019-02-05 雷恩哈德库兹基金两合公司 Equipment for surface treatment of substrates by means of metal conveyor belts
WO2022171733A1 (en) * 2021-02-15 2022-08-18 Kurtz Gmbh & Co. Kg Process and apparatus for producing a molded fiber article
CN217648792U (en) * 2022-06-27 2022-10-25 山东晨光胶带有限公司 Vulcanization equipment of patterned conveying belt
CN116214788A (en) * 2021-12-06 2023-06-06 青岛广能橡胶制造有限公司 A rubber seaming auxiliary machine for rubber belt production
CN116985885A (en) * 2023-09-06 2023-11-03 遂宁鑫鸿泰精密模具有限公司 Transfer device capable of avoiding abrasion for mold production

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104943203A (en) * 2015-05-26 2015-09-30 杭州市机械科学研究院有限公司 Rubber sheet pre-complexing automatic production line and pre-complexing production technology
CN109311310A (en) * 2016-05-17 2019-02-05 雷恩哈德库兹基金两合公司 Equipment for surface treatment of substrates by means of metal conveyor belts
US20190210823A1 (en) * 2016-05-17 2019-07-11 Leonhard Kurz Stiftung & Co. Kg Device for the Surface Treatment of a Substrate, Comprising a Metallic Conveyor Belt
WO2022171733A1 (en) * 2021-02-15 2022-08-18 Kurtz Gmbh & Co. Kg Process and apparatus for producing a molded fiber article
CN116214788A (en) * 2021-12-06 2023-06-06 青岛广能橡胶制造有限公司 A rubber seaming auxiliary machine for rubber belt production
CN217648792U (en) * 2022-06-27 2022-10-25 山东晨光胶带有限公司 Vulcanization equipment of patterned conveying belt
CN116985885A (en) * 2023-09-06 2023-11-03 遂宁鑫鸿泰精密模具有限公司 Transfer device capable of avoiding abrasion for mold production

Also Published As

Publication number Publication date
CN117283857B (en) 2025-04-15

Similar Documents

Publication Publication Date Title
CN114536668A (en) Ball head dust cover die capable of achieving batch demolding
CN118358133A (en) A composite material bag injection molding process
CN115383100B (en) Casting molding device for aluminum ingot processing production and use method
CN117283857B (en) A demoulding device for producing rubber conveyor belts
CN210996410U (en) Quick cooling device of casting pouring mold
CN220973313U (en) Cooling device of plastic sucking machine
CN219488611U (en) Vertical reciprocating conveyor
CN218429491U (en) Injection molding shell burr hot melting device
CN222039546U (en) A PVC pipe production hosting device
CN214488326U (en) Be applicable to aluminium alloy shaping cooling device
CN112276085B (en) A metal 3D printing device forming mechanism
CN203910350U (en) Cable injection machine
CN217144701U (en) Power charger shell injection moulding's mould
CN211662465U (en) Cooling device is used in production of plastic packaging case
CN210501520U (en) Extrusion and plastic uptake molding integrated machine
CN220630887U (en) Quick shaping equipment for crisp cylinder production line
CN117245836B (en) Extrusion molding polystyrene board foaming extrusion cooling forming device
CN115157527B (en) Supporting rotary table for producing foaming products
CN206169140U (en) Diameter is greater than 30mm's copper ball production line
CN106238634B (en) A kind of copper ball production line
CN219703454U (en) Die carrier with unloading buffering function
CN221776746U (en) A conveying device for aluminum profile production line
CN217663514U (en) Low molecular weight polyethylene wax grinder
CN220808601U (en) Tire vulcanizing device
CN220390240U (en) Injection molding machine for plastic tableware

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250422

Address after: 064400 North Iron and Steel Logistics Industry Agglomeration Zone, Qian'an City, Tangshan City, Hebei Province, No. 006 Yigang Street (inside the courtyard of Tiandao Warehousing Logistics (Qian'an) Co., Ltd.)

Patentee after: Tangshan Tianchi Industrial Co.,Ltd.

Country or region after: China

Address before: 071000 Dukan Village, Liwu Town, Li County, Baoding City, Hebei Province

Patentee before: Lixian Huadu Rubber Belt Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right