CN117266040B - Integral high-level carrying construction method of bridge girder erection machine - Google Patents

Integral high-level carrying construction method of bridge girder erection machine

Info

Publication number
CN117266040B
CN117266040B CN202311162353.7A CN202311162353A CN117266040B CN 117266040 B CN117266040 B CN 117266040B CN 202311162353 A CN202311162353 A CN 202311162353A CN 117266040 B CN117266040 B CN 117266040B
Authority
CN
China
Prior art keywords
girder
transport vehicle
bridge
erecting machine
bridge erecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311162353.7A
Other languages
Chinese (zh)
Other versions
CN117266040A (en
Inventor
李晓龙
段卫旭
张亚海
朱晓亮
沈伟
闻斯洋
卢怡陶
史文通
欧阳孝桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge East China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge East China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202311162353.7A priority Critical patent/CN117266040B/en
Publication of CN117266040A publication Critical patent/CN117266040A/en
Application granted granted Critical
Publication of CN117266040B publication Critical patent/CN117266040B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E01D21/06—Methods or apparatus specially adapted for erecting or assembling bridges by translational movement of the bridge or bridge sections
    • E01D21/065—Incremental launching

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种架桥机整体高位驮运施工方法,在架桥机完成最后一孔桥架设后,将两台运梁车行驶到架桥机下方,在两运梁车上分别设置垫墩,利用架桥机的两台天车前后移动作为配重,将架桥机整体平稳支撑到两台运梁车上,两运梁车驮运架桥机返回提梁站。本发明可实现千吨级架桥机整体高位驮运,不占用大型起吊辅助设备,工序简单,可节约工期,安全高效。

This invention relates to a method for the overall high-level transport of a bridge erecting machine. After the bridge erecting machine completes the erection of the last span, two beam transport vehicles are driven under the machine. Support piers are placed on each of the two vehicles. Using the two overhead cranes of the bridge erecting machine moving back and forth as counterweights, the entire bridge erecting machine is stably supported onto the two beam transport vehicles. The two beam transport vehicles then carry the bridge erecting machine back to the lifting station. This invention enables the overall high-level transport of a thousand-ton bridge erecting machine without requiring large lifting auxiliary equipment. The process is simple, saves construction time, and is safe and efficient.

Description

Integral high-level carrying construction method of bridge girder erection machine
Technical Field
The invention relates to the technical field of bridge construction, in particular to a construction method for carrying out high-level integral carrying on a bridge girder erection machine by adopting a girder transporting vehicle, which ensures the stability and safety of the bridge girder erection machine in the integral carrying process.
Background
When the bridge erecting machine is used for bridge erecting facilities, under the condition that a bridge is erected in two directions, after the bridge erecting machine finishes carrying the box girders in the saddle directions, the bridge erecting machine needs to be carried to a girder lifting station for turning around and erecting the box girders in the secondary frame direction. The bridge girder erection machine generally comprises a girder, a front supporting leg, a middle supporting leg and a rear supporting leg which are used for supporting the girder, and a front crown block and a rear crown block which walk on the girder, wherein the traditional bridge girder erection machine carrying method is to dismantle the supporting leg and the crown block of the bridge girder erection machine on site, and to lower the girder to a girder transporting vehicle for binding and fixing and carrying.
The patent CN114370006A discloses a construction method for transferring a bridge girder transporting vehicle to carry out a bridge girder erection machine, which is characterized in that a front carrying support and a rear carrying support are arranged on a girder transporting vehicle, the girder transporting vehicle is driven to the lower part of the bridge girder erection machine, the bridge girder erection machine is supported by the front carrying support and the rear carrying support to carry out the bridge girder erection machine, the high-level carrying can be realized by the mode, but the method is only suitable for a small bridge girder erection machine, and for a kiloton bridge girder erection machine, the two girder transporting vehicles are required to be matched for carrying out the bridge girder erection machine due to long girder length and large cantilever, the multi-working condition stress conversion is involved in the process of transporting the Liang Chezhi bridge girder erection machine, and the method cannot be directly used.
Disclosure of Invention
The invention aims to solve the problems and provides a construction method for carrying the whole bridge girder erection machine at high position, which realizes the whole bridge girder erection machine at high position to accelerate the construction progress.
The technical scheme of the invention is as follows:
the utility model provides a bridge girder erection machine whole high-order piggy back construction method, the bridge girder erection machine includes girder for support girder's front leg, well landing leg and back landing leg, and preceding, the back overhead traveling crane of walking on the girder, its characterized in that includes following steps:
(1) After the bridge girder erection machine is provided with the last hole bridge, in the state of maintaining the girder of the bridge girder erection machine at the front and rear crown blocks and all the supporting legs, the two girder transporting vehicles sequentially drive under the bridge girder erection machine, wherein the front girder transporting vehicle drives to the front end close to the middle supporting leg, and the rear girder transporting vehicle drives under the rear supporting leg;
(2) The front cushion pier is arranged on the front girder transporting vehicle, and the front girder transporting vehicle is lifted to be hung, so that the front cushion pier is supported on the bottom surface of the girder of the bridge girder erection machine;
(3) The bridge girder erection machine lifts the middle supporting leg, moves the middle supporting leg forward until the middle supporting leg is close to the front supporting leg, then descends the middle supporting leg, and supports the stress with the front supporting leg;
(4) The front crown block is moved to the forefront end of the girder, and the front girder transporting vehicle is retracted to hang, so that the front cushion pier is separated from contact with the girder of the bridge girder erection machine;
(5) The front conveyor Liang Cheqian moves to the position where the center of the front cushion pier is opposite to the main beam and the distance from the front end of the main beam is 1/3 of the total length of the main beam, and the front cushion pier is lifted and hung to re-support the main beam of the bridge girder erection machine;
(6) The rear crown block is moved forward to the upper part of the front beam transporting vehicle;
(7) The rear support leg is lifted and separated from the rear girder transporting vehicle, the rear transport Liang Cheqian is moved to the front end of the rear transport vehicle to be close to the rear end of the front girder transporting vehicle, and then the rear support leg is lowered to support the bridge deck;
(8) The rear crown block moves back to the position above a rear cushion pier on the rear beam transporting vehicle, and the front beam transporting vehicle is lowered to hang;
(9) The front conveyor Liang Cheqian moves to the front end close to the middle supporting leg, and lifts the front girder transporting vehicle to hang and support the girder;
(10) The front crown block moves back to the upper part between the front beam transporting vehicle and the rear beam transporting vehicle, the rear crown block moves back to the position staggered with the supporting position of the rear cushion pier, the front, middle and rear supporting legs of the bridge girder erection machine are retracted, the bridge girder erection machine is all carried by the two beam transporting vehicles, and the two beam transporting vehicles carry the bridge girder erection machine back to the girder lifting station.
The invention utilizes the cooperation of the two girder transporting vehicles to carry the whole large-tonnage bridge girder erection machine at high position, utilizes the front and back movement of the two sky of the bridge girder erection machine as the counterweight, can stably place the whole bridge girder erection machine on the two girder transporting vehicles, and has the advantages of saving construction period, simple working procedure, no occupation of large-scale hoisting auxiliary equipment, safety, high efficiency and the like.
Drawings
FIG. 1 is a schematic view of two girder transporting vehicles when they are driven under a bridge girder erection machine;
FIG. 2 is a schematic view of the middle part of a forward Liang Chezhi strut bridge girder erection machine;
FIG. 3 is a schematic view showing a state of the bridge girder erection machine after the forward movement of the supporting legs;
FIG. 4 is a schematic view of the front truck when it is out of contact with the girder of the bridge girder erection machine;
FIG. 5 is a schematic view showing a state where the front carriage Liang Cheqian moves and re-supports the girder of the bridge girder erection machine;
FIG. 6 is a schematic view of the rear overhead travelling crane as it advances to the forward Liang Cheqian end;
FIG. 7 is a schematic diagram of the rear carriage Liang Cheqian in position;
FIG. 8 is a schematic view of the rear crown block moving rearward above the rear girder carrier;
FIG. 9 is a schematic diagram of the front carriage Liang Cheqian in position;
FIG. 10 is a schematic view of the bridge girder erection machine in a state where it is fully carried by two girder transporting vehicles.
Detailed Description
The following describes a process according to an embodiment of the present invention with reference to fig. 1 to 10. In this embodiment, the bridge girder erection machine comprises a girder 1, a front supporting leg 2, a middle supporting leg 3 and a rear supporting leg 4 for supporting the girder, and a front crown block 5 and a rear crown block 6 for walking on the girder, wherein the length of the girder is about 80m.
(1) As shown in fig. 1, after the bridge girder erection machine is erected to finish the final hole bridge, in the state that the front and rear crown blocks and all the supporting legs of the bridge girder erection machine are kept at the girder positions, two girder transporting vehicles sequentially drive under the bridge girder erection machine, wherein the front girder transporting vehicle 7 drives to the front end close to the middle supporting leg 3, and the rear girder transporting vehicle 8 drives to the lower side of the rear supporting leg 4. The bridge girder erection machine is in a suspended state in a girder erection state, and after the girder transporting vehicle runs in place, the rear supporting leg 4 is lowered to be supported on the spandrel girder of the girder transporting vehicle 8.
(2) As shown in figure 2, a front cushion pier 9 is arranged on a front girder transporting vehicle 7, the front girder transporting vehicle is lifted to be hung, the front cushion pier 9 is supported at the bottom of a girder 1 of a bridge girder erection machine, a rear crown block 6 of the bridge girder erection machine is moved to the tail part of the bridge girder erection machine, and a front crown block 5 is moved to the upper part of the front girder transporting vehicle 7.
(3) As shown in figure 3, the bridge girder erection machine lifts the middle supporting leg, moves the middle supporting leg 3 forward to be close to the front supporting leg 2, then descends the middle supporting leg, supports and bears force simultaneously with the front supporting leg, and because the middle supporting leg lacks support in the middle of the girder after moving forward, the front crown block and the rear crown block are moved to the rear part of the bridge girder erection machine in the step (2), so that the crown block gravity can be prevented from causing the middle of the girder to flex downwards, and meanwhile, the crown block is used as a counterweight at the rear end of the girder.
(4) As shown in fig. 4, the front crown block 5 moves to the forefront end of the girder, and the front girder transporting vehicle 7 is retracted to hang, so that the front cushion pier 9 is separated from contact with the girder 1 of the bridge girder erection machine.
The front crown block is moved to the forefront end of the main beam, and the front crown block is prevented from being bent downwards due to gravity after the front cushion pier 9 is lowered.
(5) As shown in fig. 5, the front girder transporting vehicle 7 moves forward until the distance from the position, opposite to the main girder, of the center of the front cushion pier 9 to the front end of the main girder is 1/3 of the total length of the main girder, and the front girder transporting vehicle is lifted to suspend, so that the front cushion pier 9 re-supports the main girder of the bridge girder erection machine.
(6) As shown in fig. 6, the rear crown block 6 is moved forward over the front girder car 7 in preparation for the rear carriage Liang Cheqian.
(7) As shown in fig. 7, the rear supporting leg is lifted and separated from the rear girder transporting vehicle, the rear girder transporting vehicle 8 moves forward until the front end of the rear girder transporting vehicle approaches the rear end of the front girder transporting vehicle, the rear supporting leg 4 is lowered to support the bridge deck, the rear cushion pier 10 is arranged on the rear girder transporting vehicle 8, the distance from the center of the rear cushion pier to the rear end of the main girder is 1/3 of the total length of the main girder, and the rear girder transporting vehicle is lifted and suspended, so that the rear cushion pier 10 supports the main girder 1 of the bridge girder erection machine.
When the rear supporting leg is lifted, the rear end of the main beam is in a cantilever state, the rear crown block is moved to the position above the front beam transporting vehicle in the step (6), and meanwhile, the front crown block is arranged at the front end of the main beam, so that the front crown block and the rear crown block can be used as counterweights to prevent the rear end of the main beam from overturning when in the cantilever state.
(8) As shown in fig. 8, the rear crown block 6 is moved back over the rear cushion pier 10 on the rear girder carrier 8 and then the front girder carrier is lowered to suspend in preparation for the forward transport Liang Cheqian.
(9) As shown in fig. 9, the front girder carrier 7 is moved forward to the front end near the middle leg 3, and then the front girder carrier is lifted again to hang so that the front cushion pier supports the main girder.
(10) As shown in figure 10, the front crown block 5 moves back to the upper part between the front beam transporting car and the rear beam transporting car, the rear crown block 6 moves back to be staggered with the supporting position of the rear cushion pier, the front supporting leg, the middle supporting leg and the rear supporting leg of the bridge girder erection machine are retracted, the bridge girder erection machine is carried by the two beam transporting cars, and the two beam transporting cars are synchronously driven to carry the bridge girder erection machine back to the girder lifting station. The supporting positions of the two girder transporting vehicles on the main girders and the positions of the two crown blocks are determined after the center of gravity of the bridge girder erection machine under the working condition is calculated, so that the bridge girder erection machine can be balanced and stable on the two girder transporting vehicles in the carrying process.

Claims (1)

1.一种架桥机整体高位驮运施工方法,所述架桥机包括主梁,用于支撑主梁的前支腿、中支腿和后支腿,以及在主梁上行走的前、后天车,其特征在于,包括以下步骤:1. A method for high-level transport construction of a bridge erecting machine, the bridge erecting machine comprising a main beam, front legs, middle legs, and rear legs for supporting the main beam, and front and rear overhead cranes traveling on the main beam, characterized by comprising the following steps: (1)架桥机架设完成最后一孔桥后,在架桥机的前后天车和所有支腿位置保持架梁状态下,两台运梁车依次驶入桥机下方,其中前运梁车行驶到前端靠近中支腿,后运梁车行驶到后支腿下方;降低后支腿,使其支撑到后运梁车的承重梁上;(1) After the bridge erecting machine completes the last span of the bridge, while the bridge erecting machine is in the beam erection state at the front and rear trolleys and all outriggers, two beam transport vehicles drive under the bridge machine in sequence. The front beam transport vehicle drives to the front end and close to the middle outrigger, and the rear beam transport vehicle drives to the bottom of the rear outrigger. The rear outrigger is lowered so that it is supported on the load-bearing beam of the rear beam transport vehicle. (2)在前运梁车上设置前垫墩,升高前运梁车悬挂,使前垫墩支撑在架桥机主梁底面;将架桥机前天车和后天车移动到架桥机尾部;(2) Set up a front support on the front beam transport vehicle, raise the suspension of the front beam transport vehicle so that the front support is supported on the bottom surface of the main beam of the bridge erecting machine; move the front and rear overhead cranes of the bridge erecting machine to the rear of the bridge erecting machine. (3)架桥机升高中支腿,前移中支腿至靠近前支腿,然后下降中支腿,与前支腿同时支撑受力;(3) The bridge erecting machine raises the middle support leg, moves the middle support leg forward to be close to the front support leg, and then lowers the middle support leg to support the force at the same time as the front support leg; (4)前天车移动到主梁最前端;收回前运梁车悬挂,使前垫墩与架桥机主梁脱离接触;(4) Move the front beam to the front end of the main beam; retract the suspension of the front beam transport vehicle so that the front support pier is no longer in contact with the main beam of the bridge erecting machine. (5)前运梁车前移至前垫墩中心正对主梁位置距主梁前端距离为主梁总长度1/3,升高悬挂,使前垫墩重新支撑架桥机主梁;(5) The front beam transport vehicle moves forward to the position of the center of the front support pier directly opposite the main beam. The distance from the front end of the main beam is 1/3 of the total length of the main beam. The suspension is raised so that the front support pier can support the main beam of the bridge erecting machine again. (6)前移后天车到前运梁车上方;(6) Move the rear overhead crane to above the front beam transport vehicle; (7)升高后支腿与后运梁车脱离,后运梁车前移至其前端靠近前运梁车后端,再下降后支腿支撑桥面;在后运梁车上安装后垫墩,后垫墩中心正对主梁位置距主梁后端距离为主梁总长度1/3,升高后运梁车悬挂,使后垫墩支撑架桥机主梁;(7) Raise the rear outriggers to separate them from the rear beam transport vehicle. Move the rear beam transport vehicle forward to its front end close to the rear end of the front beam transport vehicle. Then lower the rear outriggers to support the bridge deck. Install the rear pad pier on the rear beam transport vehicle. The center of the rear pad pier is directly opposite the main beam. The distance from the rear end of the main beam to the main beam is 1/3 of the total length of the main beam. Raise the suspension of the rear beam transport vehicle so that the rear pad pier supports the main beam of the bridge erecting machine. (8)后天车后移到后运梁车上的后垫墩上方,下降前运梁车悬挂;(8) The rear vehicle is moved to the rear pad on the rear beam transport vehicle and the suspension of the front beam transport vehicle is lowered. (9)前运梁车前移到前端靠近中支腿,升高前运梁车悬挂,支撑主梁;(9) The front beam transport vehicle moves forward to the front end near the middle support leg, and the suspension of the front beam transport vehicle is raised to support the main beam; (10)前天车后移到前后运梁车之间上方,后天车后移至与后垫墩支撑位置错开;收回架桥机前、中、后支腿,架桥机全部由两运梁车承载,两运梁车驮运架桥机返回提梁站。(10) The front girder car is moved to the space between the front and rear girder transport cars, and the rear girder car is moved to a position that is offset from the support position of the rear pier. The front, middle and rear outriggers of the bridge erecting machine are retracted, and the bridge erecting machine is carried by two girder transport cars. The two girder transport cars carry the bridge erecting machine back to the beam lifting station.
CN202311162353.7A 2023-09-09 2023-09-09 Integral high-level carrying construction method of bridge girder erection machine Active CN117266040B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311162353.7A CN117266040B (en) 2023-09-09 2023-09-09 Integral high-level carrying construction method of bridge girder erection machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311162353.7A CN117266040B (en) 2023-09-09 2023-09-09 Integral high-level carrying construction method of bridge girder erection machine

Publications (2)

Publication Number Publication Date
CN117266040A CN117266040A (en) 2023-12-22
CN117266040B true CN117266040B (en) 2026-02-24

Family

ID=89213446

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311162353.7A Active CN117266040B (en) 2023-09-09 2023-09-09 Integral high-level carrying construction method of bridge girder erection machine

Country Status (1)

Country Link
CN (1) CN117266040B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117266041B (en) * 2023-09-09 2026-02-10 中交路桥华东工程有限公司 A method for turning around on a bridge using a bridge erecting machine

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239936A (en) * 2018-02-09 2018-07-03 中铁工程机械研究设计院有限公司 Wheelspan adjustable U-shaped tunnel beam car and its feeding beam method excessively
CN112323643A (en) * 2020-11-18 2021-02-05 多门朗工程技术(上海)有限公司 Beam transporting vehicle and method for carrying bridge girder erection machine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2715048B2 (en) * 1994-03-11 1998-02-16 東京フアブリック工業株式会社 Pre-slide type bridge girder support method
CN114370006B (en) * 2022-02-16 2024-10-18 中铁十一局集团有限公司 Construction method for transferring bridge girder erection machine carried by girder transporting vehicle

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108239936A (en) * 2018-02-09 2018-07-03 中铁工程机械研究设计院有限公司 Wheelspan adjustable U-shaped tunnel beam car and its feeding beam method excessively
CN112323643A (en) * 2020-11-18 2021-02-05 多门朗工程技术(上海)有限公司 Beam transporting vehicle and method for carrying bridge girder erection machine

Also Published As

Publication number Publication date
CN117266040A (en) 2023-12-22

Similar Documents

Publication Publication Date Title
CN104631335B (en) Large-tonnage Bridge Erector and construction method thereof
CN109653105B (en) Main truss system of box girder bridge cantilever construction hanging basket and use method thereof
CN110130229A (en) It a kind of several juxtaposed double cantilever erections machines and its sets a roof beam in place and passing method
CN109024291A (en) A kind of integration Bridge Erector and its working method
CN107747282B (en) On across both wired old bridge overall pulling down methods
CN104594198B (en) For the method for setting up juxtaposition case beam in tunnel
CN111675112B (en) A height-adjustable bridge pier hoisting machine, construction method and overpass method
CN203807947U (en) Fixed-point hoisting type bridge girder erection machine
CN1609342A (en) Down beam type bridge-erecting machine and bridge erecting method thereof
CN106939554A (en) Wide body steel main girder erecting machine and beam erecting method
CN117513185A (en) A new type of continuous beam suspension cast-in-place bridge building machine
CN114855632A (en) Steel composite beam cable-stayed bridge construction system and construction method of steel composite beam
CN2675729Y (en) Double guiding-beam bridge-laying machine for high-speed railway
CN103194977A (en) Placing method for girder guiding machine before first hole box girder erection by integrated transportation and erection type bridge girder erection machine
CN110697571B (en) Single guide beam downward type beam feeding device and beam feeding method thereof
CN206635657U (en) A kind of symmetrical formula Bridge Erector of setting a roof beam in place
CN117266040A (en) A kind of overall high-position piggyback construction method for bridge erecting machine
CN201972096U (en) Cross-tunnel lower guide beam type fixed-point hoisting bridge girder erection machine
CN100415995C (en) Half span type down guide frame bridging machine and its beam building method
CN209260561U (en) A kind of integration Bridge Erector
CN115369771A (en) Novel cast-in-place support system of steel-concrete composite beam bridge deck cantilever
CN213059940U (en) A height-adjustable bridge pier hoisting machine
CN112320584B (en) Three-dimensional bridge floor crane for steel box girder and steel box girder hoisting method
CN108532462A (en) A kind of symmetrically set a roof beam in place and its is set a roof beam in place, passing method at formula Bridge Erector
CN110904861A (en) Cable-stayed bridge girder erection crane and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant