Integral high-level carrying construction method of bridge girder erection machine
Technical Field
The invention relates to the technical field of bridge construction, in particular to a construction method for carrying out high-level integral carrying on a bridge girder erection machine by adopting a girder transporting vehicle, which ensures the stability and safety of the bridge girder erection machine in the integral carrying process.
Background
When the bridge erecting machine is used for bridge erecting facilities, under the condition that a bridge is erected in two directions, after the bridge erecting machine finishes carrying the box girders in the saddle directions, the bridge erecting machine needs to be carried to a girder lifting station for turning around and erecting the box girders in the secondary frame direction. The bridge girder erection machine generally comprises a girder, a front supporting leg, a middle supporting leg and a rear supporting leg which are used for supporting the girder, and a front crown block and a rear crown block which walk on the girder, wherein the traditional bridge girder erection machine carrying method is to dismantle the supporting leg and the crown block of the bridge girder erection machine on site, and to lower the girder to a girder transporting vehicle for binding and fixing and carrying.
The patent CN114370006A discloses a construction method for transferring a bridge girder transporting vehicle to carry out a bridge girder erection machine, which is characterized in that a front carrying support and a rear carrying support are arranged on a girder transporting vehicle, the girder transporting vehicle is driven to the lower part of the bridge girder erection machine, the bridge girder erection machine is supported by the front carrying support and the rear carrying support to carry out the bridge girder erection machine, the high-level carrying can be realized by the mode, but the method is only suitable for a small bridge girder erection machine, and for a kiloton bridge girder erection machine, the two girder transporting vehicles are required to be matched for carrying out the bridge girder erection machine due to long girder length and large cantilever, the multi-working condition stress conversion is involved in the process of transporting the Liang Chezhi bridge girder erection machine, and the method cannot be directly used.
Disclosure of Invention
The invention aims to solve the problems and provides a construction method for carrying the whole bridge girder erection machine at high position, which realizes the whole bridge girder erection machine at high position to accelerate the construction progress.
The technical scheme of the invention is as follows:
the utility model provides a bridge girder erection machine whole high-order piggy back construction method, the bridge girder erection machine includes girder for support girder's front leg, well landing leg and back landing leg, and preceding, the back overhead traveling crane of walking on the girder, its characterized in that includes following steps:
(1) After the bridge girder erection machine is provided with the last hole bridge, in the state of maintaining the girder of the bridge girder erection machine at the front and rear crown blocks and all the supporting legs, the two girder transporting vehicles sequentially drive under the bridge girder erection machine, wherein the front girder transporting vehicle drives to the front end close to the middle supporting leg, and the rear girder transporting vehicle drives under the rear supporting leg;
(2) The front cushion pier is arranged on the front girder transporting vehicle, and the front girder transporting vehicle is lifted to be hung, so that the front cushion pier is supported on the bottom surface of the girder of the bridge girder erection machine;
(3) The bridge girder erection machine lifts the middle supporting leg, moves the middle supporting leg forward until the middle supporting leg is close to the front supporting leg, then descends the middle supporting leg, and supports the stress with the front supporting leg;
(4) The front crown block is moved to the forefront end of the girder, and the front girder transporting vehicle is retracted to hang, so that the front cushion pier is separated from contact with the girder of the bridge girder erection machine;
(5) The front conveyor Liang Cheqian moves to the position where the center of the front cushion pier is opposite to the main beam and the distance from the front end of the main beam is 1/3 of the total length of the main beam, and the front cushion pier is lifted and hung to re-support the main beam of the bridge girder erection machine;
(6) The rear crown block is moved forward to the upper part of the front beam transporting vehicle;
(7) The rear support leg is lifted and separated from the rear girder transporting vehicle, the rear transport Liang Cheqian is moved to the front end of the rear transport vehicle to be close to the rear end of the front girder transporting vehicle, and then the rear support leg is lowered to support the bridge deck;
(8) The rear crown block moves back to the position above a rear cushion pier on the rear beam transporting vehicle, and the front beam transporting vehicle is lowered to hang;
(9) The front conveyor Liang Cheqian moves to the front end close to the middle supporting leg, and lifts the front girder transporting vehicle to hang and support the girder;
(10) The front crown block moves back to the upper part between the front beam transporting vehicle and the rear beam transporting vehicle, the rear crown block moves back to the position staggered with the supporting position of the rear cushion pier, the front, middle and rear supporting legs of the bridge girder erection machine are retracted, the bridge girder erection machine is all carried by the two beam transporting vehicles, and the two beam transporting vehicles carry the bridge girder erection machine back to the girder lifting station.
The invention utilizes the cooperation of the two girder transporting vehicles to carry the whole large-tonnage bridge girder erection machine at high position, utilizes the front and back movement of the two sky of the bridge girder erection machine as the counterweight, can stably place the whole bridge girder erection machine on the two girder transporting vehicles, and has the advantages of saving construction period, simple working procedure, no occupation of large-scale hoisting auxiliary equipment, safety, high efficiency and the like.
Drawings
FIG. 1 is a schematic view of two girder transporting vehicles when they are driven under a bridge girder erection machine;
FIG. 2 is a schematic view of the middle part of a forward Liang Chezhi strut bridge girder erection machine;
FIG. 3 is a schematic view showing a state of the bridge girder erection machine after the forward movement of the supporting legs;
FIG. 4 is a schematic view of the front truck when it is out of contact with the girder of the bridge girder erection machine;
FIG. 5 is a schematic view showing a state where the front carriage Liang Cheqian moves and re-supports the girder of the bridge girder erection machine;
FIG. 6 is a schematic view of the rear overhead travelling crane as it advances to the forward Liang Cheqian end;
FIG. 7 is a schematic diagram of the rear carriage Liang Cheqian in position;
FIG. 8 is a schematic view of the rear crown block moving rearward above the rear girder carrier;
FIG. 9 is a schematic diagram of the front carriage Liang Cheqian in position;
FIG. 10 is a schematic view of the bridge girder erection machine in a state where it is fully carried by two girder transporting vehicles.
Detailed Description
The following describes a process according to an embodiment of the present invention with reference to fig. 1 to 10. In this embodiment, the bridge girder erection machine comprises a girder 1, a front supporting leg 2, a middle supporting leg 3 and a rear supporting leg 4 for supporting the girder, and a front crown block 5 and a rear crown block 6 for walking on the girder, wherein the length of the girder is about 80m.
(1) As shown in fig. 1, after the bridge girder erection machine is erected to finish the final hole bridge, in the state that the front and rear crown blocks and all the supporting legs of the bridge girder erection machine are kept at the girder positions, two girder transporting vehicles sequentially drive under the bridge girder erection machine, wherein the front girder transporting vehicle 7 drives to the front end close to the middle supporting leg 3, and the rear girder transporting vehicle 8 drives to the lower side of the rear supporting leg 4. The bridge girder erection machine is in a suspended state in a girder erection state, and after the girder transporting vehicle runs in place, the rear supporting leg 4 is lowered to be supported on the spandrel girder of the girder transporting vehicle 8.
(2) As shown in figure 2, a front cushion pier 9 is arranged on a front girder transporting vehicle 7, the front girder transporting vehicle is lifted to be hung, the front cushion pier 9 is supported at the bottom of a girder 1 of a bridge girder erection machine, a rear crown block 6 of the bridge girder erection machine is moved to the tail part of the bridge girder erection machine, and a front crown block 5 is moved to the upper part of the front girder transporting vehicle 7.
(3) As shown in figure 3, the bridge girder erection machine lifts the middle supporting leg, moves the middle supporting leg 3 forward to be close to the front supporting leg 2, then descends the middle supporting leg, supports and bears force simultaneously with the front supporting leg, and because the middle supporting leg lacks support in the middle of the girder after moving forward, the front crown block and the rear crown block are moved to the rear part of the bridge girder erection machine in the step (2), so that the crown block gravity can be prevented from causing the middle of the girder to flex downwards, and meanwhile, the crown block is used as a counterweight at the rear end of the girder.
(4) As shown in fig. 4, the front crown block 5 moves to the forefront end of the girder, and the front girder transporting vehicle 7 is retracted to hang, so that the front cushion pier 9 is separated from contact with the girder 1 of the bridge girder erection machine.
The front crown block is moved to the forefront end of the main beam, and the front crown block is prevented from being bent downwards due to gravity after the front cushion pier 9 is lowered.
(5) As shown in fig. 5, the front girder transporting vehicle 7 moves forward until the distance from the position, opposite to the main girder, of the center of the front cushion pier 9 to the front end of the main girder is 1/3 of the total length of the main girder, and the front girder transporting vehicle is lifted to suspend, so that the front cushion pier 9 re-supports the main girder of the bridge girder erection machine.
(6) As shown in fig. 6, the rear crown block 6 is moved forward over the front girder car 7 in preparation for the rear carriage Liang Cheqian.
(7) As shown in fig. 7, the rear supporting leg is lifted and separated from the rear girder transporting vehicle, the rear girder transporting vehicle 8 moves forward until the front end of the rear girder transporting vehicle approaches the rear end of the front girder transporting vehicle, the rear supporting leg 4 is lowered to support the bridge deck, the rear cushion pier 10 is arranged on the rear girder transporting vehicle 8, the distance from the center of the rear cushion pier to the rear end of the main girder is 1/3 of the total length of the main girder, and the rear girder transporting vehicle is lifted and suspended, so that the rear cushion pier 10 supports the main girder 1 of the bridge girder erection machine.
When the rear supporting leg is lifted, the rear end of the main beam is in a cantilever state, the rear crown block is moved to the position above the front beam transporting vehicle in the step (6), and meanwhile, the front crown block is arranged at the front end of the main beam, so that the front crown block and the rear crown block can be used as counterweights to prevent the rear end of the main beam from overturning when in the cantilever state.
(8) As shown in fig. 8, the rear crown block 6 is moved back over the rear cushion pier 10 on the rear girder carrier 8 and then the front girder carrier is lowered to suspend in preparation for the forward transport Liang Cheqian.
(9) As shown in fig. 9, the front girder carrier 7 is moved forward to the front end near the middle leg 3, and then the front girder carrier is lifted again to hang so that the front cushion pier supports the main girder.
(10) As shown in figure 10, the front crown block 5 moves back to the upper part between the front beam transporting car and the rear beam transporting car, the rear crown block 6 moves back to be staggered with the supporting position of the rear cushion pier, the front supporting leg, the middle supporting leg and the rear supporting leg of the bridge girder erection machine are retracted, the bridge girder erection machine is carried by the two beam transporting cars, and the two beam transporting cars are synchronously driven to carry the bridge girder erection machine back to the girder lifting station. The supporting positions of the two girder transporting vehicles on the main girders and the positions of the two crown blocks are determined after the center of gravity of the bridge girder erection machine under the working condition is calculated, so that the bridge girder erection machine can be balanced and stable on the two girder transporting vehicles in the carrying process.