CN117260987A - Drilling device for wall construction - Google Patents

Drilling device for wall construction Download PDF

Info

Publication number
CN117260987A
CN117260987A CN202311509564.3A CN202311509564A CN117260987A CN 117260987 A CN117260987 A CN 117260987A CN 202311509564 A CN202311509564 A CN 202311509564A CN 117260987 A CN117260987 A CN 117260987A
Authority
CN
China
Prior art keywords
plate
sliding plate
fixed
horizontal
groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202311509564.3A
Other languages
Chinese (zh)
Other versions
CN117260987B (en
Inventor
卢晶伟
汤保华
顾百盛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dongguan Heng'an Electric Maintenance Co ltd
Original Assignee
Wuxi Henglifu Building Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Henglifu Building Development Co ltd filed Critical Wuxi Henglifu Building Development Co ltd
Priority to CN202311509564.3A priority Critical patent/CN117260987B/en
Publication of CN117260987A publication Critical patent/CN117260987A/en
Application granted granted Critical
Publication of CN117260987B publication Critical patent/CN117260987B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28D—WORKING STONE OR STONE-LIKE MATERIALS
    • B28D1/00—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor
    • B28D1/14—Working stone or stone-like materials, e.g. brick, concrete or glass, not provided for elsewhere; Machines, devices, tools therefor by boring or drilling
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28D—WORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00—Accessories specially adapted for use with machines or devices of the preceding groups
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B28—WORKING CEMENT, CLAY, OR STONE
    • B28D—WORKING STONE OR STONE-LIKE MATERIALS
    • B28D7/00—Accessories specially adapted for use with machines or devices of the preceding groups
    • B28D7/02—Accessories specially adapted for use with machines or devices of the preceding groups for removing or laying dust, e.g. by spraying liquids; for cooling work

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

本申请公开了一种墙体施工用钻孔装置,涉及建筑施工的技术领域,其包括底座,所述底座的底部安装有多个脚刹轮,所述底座的顶部安装有竖板,所述竖板上开设有第一通孔,所述第一通孔内沿竖向滑移连接有移动板,所述竖板上安装有用于驱动移动板移动的驱动机构;所述移动板的顶部安装有第一电动推杆,所述第一电动推杆的活塞杆安装有钻机座,所述钻机座上安装有电钻。本申请能够降低操作人员的劳动强度。

This application discloses a drilling device for wall construction, which relates to the technical field of building construction. It includes a base, a plurality of foot brake wheels are installed on the bottom of the base, and a vertical plate is installed on the top of the base. A first through hole is provided on the vertical plate, and a moving plate is slidably connected in the vertical direction in the first through hole. A driving mechanism for driving the moving plate is installed on the vertical plate; the top of the moving plate is installed There is a first electric push rod, the piston rod of the first electric push rod is installed with a drill base, and an electric drill is installed on the drill base. This application can reduce the labor intensity of operators.

Description

一种墙体施工用钻孔装置A drilling device for wall construction

技术领域Technical field

本申请涉及建筑施工的技术领域,尤其是涉及一种墙体施工用钻孔装置。The present application relates to the technical field of construction, and in particular to a drilling device for wall construction.

背景技术Background technique

目前,土建施工是建筑工程施工的前期部分,也是最为重要的一部分,在土建施工过程中往往需要对墙体进行钻孔。At present, civil construction is the early stage and the most important part of construction projects. During the civil construction process, it is often necessary to drill holes in the wall.

但是,土建施工用墙体钻孔均是由人工手持电钻对墙体进行钻孔,在钻孔过程中人员需要长时间举起电钻,手臂容易出现酸痛的症状,因而劳动强度大。However, wall drilling for civil construction uses manual hand-held electric drills to drill the walls. During the drilling process, workers need to lift the electric drill for a long time, and their arms are prone to soreness, so the labor intensity is high.

发明内容Contents of the invention

本申请提供一种墙体施工用钻孔装置,能够降低操作人员的劳动强度,采用如下的技术方案:This application provides a drilling device for wall construction, which can reduce the labor intensity of operators and adopts the following technical solution:

一种墙体施工用钻孔装置,包括底座,所述底座的底部安装有多个脚刹轮,所述底座的顶部安装有竖板,所述竖板上开设有第一通孔,所述第一通孔内沿竖向滑移连接有移动板,所述竖板上安装有用于驱动移动板移动的驱动机构;所述移动板的顶部安装有第一电动推杆,所述第一电动推杆的活塞杆安装有钻机座,所述钻机座上安装有电钻。A drilling device for wall construction, including a base. A plurality of foot brake wheels are installed on the bottom of the base. A vertical plate is installed on the top of the base. A first through hole is provided on the vertical plate. A moving plate is slidably connected vertically in the first through hole, and a driving mechanism for driving the moving plate is installed on the vertical plate; a first electric push rod is installed on the top of the moving plate, and the first electric push rod is installed on the top of the moving plate. The piston rod of the push rod is installed with a drill base, and an electric drill is installed on the drill base.

优选的,所述驱动机构包括开设于第一通孔两侧的两个移动槽、转动连接于一移动槽侧壁的丝杠以及固接于另一移动槽侧壁的导杆;所述移动板的两侧分别固接有滑套,一所述滑套螺纹连接于丝杠,另一所述滑套滑移连接于导杆;所述丝杠的顶部连接有驱动电机,所述驱动电机安装于竖板的顶部。Preferably, the driving mechanism includes two moving grooves opened on both sides of the first through hole, a lead screw rotatably connected to the side wall of one moving groove, and a guide rod fixed to the side wall of the other moving groove; the moving Sliding sleeves are fixed on both sides of the plate, one of the sliding sleeves is threadedly connected to the screw, and the other sliding sleeve is slidingly connected to the guide rod; a driving motor is connected to the top of the screw, and the driving motor Installed on the top of the riser.

优选的,所述移动板的底部固接有第一滑板,所述第一滑板靠近墙面的一侧固接有水平板,所述水平板上滑移安装有活动板,所述活动板靠近墙面的一侧安装有收灰框;所述水平板上安装有用于驱动活动板移动的驱动组件。Preferably, a first sliding plate is fixedly connected to the bottom of the moving plate, a horizontal plate is fixed to the side of the first sliding plate close to the wall, and a movable plate is slidably installed on the horizontal plate, and the movable plate is close to the A dust collection frame is installed on one side of the wall; a driving assembly for driving the movement of the movable board is installed on the horizontal plate.

优选的,所述驱动组件包括安装于水平板底部的第二电动推杆以及固接于第二电动推杆活塞杆的第二滑板;所述活动板上开设有用于供第二滑板滑移的条形孔,所述第二滑板的顶部固接于活动板的底部。Preferably, the driving assembly includes a second electric push rod installed at the bottom of the horizontal plate and a second sliding plate fixed to the piston rod of the second electric pushing rod; the movable plate is provided with a sliding hole for the second sliding plate to slide. Strip hole, the top of the second sliding plate is fixed to the bottom of the movable plate.

优选的,所述活动板靠近收灰框的一侧开设有第一水平槽,所述收灰框靠近活动板的一侧固接有第三滑板,所述第三滑板滑移连接于第一水平槽;所述第三滑板的一侧固接有第四滑板,所述第一水平槽的一侧开设有用于供第四滑板滑移的第二水平槽;所述第四滑板远离收灰框的一侧固接有第一弹簧,所述第一弹簧远离第四滑板的一端固接于第二水平槽远离收灰框的一端内壁。Preferably, a first horizontal groove is provided on the side of the movable plate close to the ash collecting frame, and a third sliding plate is fixedly connected to the side of the ash collecting frame close to the movable plate, and the third sliding plate is slidingly connected to the first sliding plate. Horizontal groove; a fourth sliding plate is fixedly connected to one side of the third sliding plate, and a second horizontal groove is provided on one side of the first horizontal groove for the fourth sliding plate to slide; the fourth sliding plate is away from the ash collection A first spring is fixed to one side of the frame, and an end of the first spring away from the fourth sliding plate is fixed to an inner wall of an end of the second horizontal groove away from the ash collecting frame.

优选的,所述收灰框的底部固接有推板,所述水平板的顶部开设有用于供推板滑移的第三水平槽,所述第三水平槽内滑移连接有第五滑板,所述第五滑板靠近活动板的一侧固接有第二弹簧,所述第二弹簧远离推板的一端固接于第三水平槽靠近活动板的一端内壁;所述推板抵接于第五滑板。Preferably, a push plate is fixedly connected to the bottom of the ash collection frame, and a third horizontal groove for the push plate to slide is provided at the top of the horizontal plate, and a fifth sliding plate is slidingly connected in the third horizontal groove. , a second spring is fixedly connected to the side of the fifth sliding plate close to the movable plate, and the end of the second spring away from the push plate is fixed to the inner wall of the end of the third horizontal groove close to the movable plate; the push plate is in contact with Fifth skateboard.

优选的,所述收灰框的一侧开设有第二通孔,所述第二通孔内滑移连接有抽屉,所述收灰框的底部安装有用于对抽屉进行固定的固定组件。Preferably, a second through hole is provided on one side of the ash collection frame, a drawer is slidably connected in the second through hole, and a fixing component for fixing the drawer is installed at the bottom of the ash collection frame.

优选的,所述固定组件包括开设于收灰框底部的第一竖槽、沿竖向滑移连接于第一竖槽的抵接块、固接于抵接块一侧的第六滑板以及固接于第六滑板一侧的第三弹簧;所述第一竖槽的一侧开设有用于供第六滑板滑移的第二竖槽,所述第三弹簧远离第六滑板的一端固接于第二竖槽的槽底;所述抵接块的顶部设置有斜面且抵接于抽屉的底部;所述抽屉的一端设置有把手。Preferably, the fixing assembly includes a first vertical slot opened at the bottom of the ash collection frame, an abutment block slidingly connected to the first vertical slot in the vertical direction, a sixth sliding plate fixed to one side of the abutment block, and a fixing block. A third spring connected to one side of the sixth sliding plate; a second vertical slot for sliding the sixth sliding plate is provided on one side of the first vertical groove, and one end of the third spring away from the sixth sliding plate is fixed on the The bottom of the second vertical groove; the top of the contact block is provided with a slope and contacts the bottom of the drawer; and one end of the drawer is provided with a handle.

优选的,所述收灰框远离第二通孔的一侧开设有第一安装槽,所述抽屉远离把手的一端插接于第一安装槽;所述第一安装槽内滑移连接有第七滑板,所述抽屉远离把手的一端能够抵接于第七滑板的一侧;Preferably, a first installation slot is provided on the side of the dust collection frame away from the second through hole, and the end of the drawer away from the handle is plugged into the first installation slot; a third installation slot is slidably connected in the first installation slot. Seven sliding plates, the end of the drawer away from the handle can abut one side of the seventh sliding plate;

所述第一安装槽内还滑移连接有第八滑板,所述第七滑板与第八滑板之间设置有齿条,所述第八滑板远离齿条的一侧固接有第四弹簧,所述第四弹簧远离第八滑板的一端固接于第一安装槽的槽底;An eighth sliding plate is also slidably connected in the first installation groove. A rack is provided between the seventh sliding plate and the eighth sliding plate. A fourth spring is fixedly connected to the side of the eighth sliding plate away from the rack. One end of the fourth spring away from the eighth sliding plate is fixed to the bottom of the first installation groove;

所述第一安装槽内转动连接有竖轴,所述竖轴上套设固定有正齿轮,所述正齿轮与齿条啮合;所述第一安装槽的上方在收灰框的侧壁开设有第二安装槽,所述竖轴远离正齿轮的一端贯穿第二安装槽的底壁设置且固接有第一锥齿轮,所述第二安装槽内转动连接有水平轴,所述水平轴上固接有第二锥齿轮,所述第一锥齿轮与第二锥齿轮相啮合;A vertical shaft is rotatably connected in the first installation slot, and a spur gear is fixed on the vertical shaft. The spur gear meshes with the rack; an opening is provided on the side wall of the ash collecting frame above the first installation slot. There is a second installation groove. One end of the vertical shaft away from the spur gear is provided through the bottom wall of the second installation groove and is fixedly connected with the first bevel gear. A horizontal shaft is rotatably connected in the second installation groove. The horizontal axis A second bevel gear is fixedly connected to the top, and the first bevel gear meshes with the second bevel gear;

所述水平轴上固接有转动块,所述转动块上固接有第一临时挡板,所述收灰框远离水平轴的一端固接有第二临时挡板,所述第一临时挡板抵接于第二临时挡板的底部;所述收灰框的顶部以及第二临时挡板上均开设置导流面。A rotating block is fixed on the horizontal axis, a first temporary baffle is fixed on the rotating block, and a second temporary baffle is fixed on one end of the ash collection frame away from the horizontal axis. The first temporary baffle is fixed on the horizontal axis. The plate is in contact with the bottom of the second temporary baffle; the top of the ash collection frame and the second temporary baffle are both provided with flow guide surfaces.

优选的,所述转动块的顶部固接有弹性密封条,所述弹性密封条远离转动块的一端固接于第二安装槽的侧壁。Preferably, an elastic sealing strip is fixed on the top of the rotating block, and one end of the elastic sealing strip away from the rotating block is fixed on the side wall of the second installation groove.

综上所述,本申请具有以下有益效果:To sum up, this application has the following beneficial effects:

1.当需要对墙壁进行钻孔时,先通过驱动机构驱动移动板移动,移动板移动带动电钻移动,当电钻移动到合适的位置后,然后启动电钻,接着启动第一电动推杆,此时便可对墙壁进行钻孔;综上,通过采用上述方案,无需操作人员一直手持电钻,从而能够降低操作人员的劳动强度;1. When it is necessary to drill holes in the wall, first drive the moving plate to move through the driving mechanism, and the moving plate drives the electric drill to move. When the electric drill moves to the appropriate position, then start the electric drill, and then start the first electric push rod. At this time The wall can be drilled; in summary, by adopting the above solution, the operator does not need to hold an electric drill all the time, thus reducing the operator's labor intensity;

2.当第二电动推杆的活塞杆驱动活动板复位时,此时活动板带动收灰框复位,收灰框复位带动推板复位,推板复位对第五滑板进行抵压,此时在第一弹簧以及第二弹簧的作用下,能够使收灰框形成短时间的往复移动,从而便于将收灰框内壁的灰尘振下;2. When the piston rod of the second electric push rod drives the movable plate to reset, the movable plate drives the ash collecting frame to reset. The ash collecting frame resets to drive the push plate to reset. The push plate resets to press the fifth sliding plate. At this time, Under the action of the first spring and the second spring, the dust collection frame can be reciprocated in a short period of time, thereby facilitating vibration of the dust on the inner wall of the dust collection frame;

3.当需要收集碎渣时,先通过把手驱动抽屉插接于第一安装槽,此时抽屉远离把手的一端推动第七滑板移动,第七滑板移动带动齿条以及第八滑板移动,一方面,齿条移动驱动正齿轮转动,正齿轮转动带动竖轴转动,竖轴转动带动第一锥齿轮转动,第一锥齿轮转动驱动第二锥齿轮转动,第二锥齿轮转动带动水平轴转动,水平轴转动带动转动块转动,转动块转动带动第一临时挡板向下转动,然后便可对碎渣进行收集;另一方面,第八滑板移动对第四弹簧进行抵压;当抽屉内碎渣较多需要清理时,先通过把手驱动抽屉向外移动,此时第八滑板在第四弹簧的作用下驱动齿条复位,此时齿条驱动正齿轮反向转动,正齿轮反向转动带动竖轴反向转动,竖轴反向转动带动第一锥齿轮反向转动,第一锥齿轮反向转动驱动第二锥齿轮反向转动,第二锥齿轮反向转动带动水平轴反向转动,水平轴反向转动带动转动块反向转动,转动块反向转动带动第一临时挡板向上转动使第一临时挡板抵接于第二临时挡板,这样便于对碎渣进行临时收集,从而无需停工对抽屉内的碎渣进行清理。3. When it is necessary to collect debris, first drive the drawer through the handle and insert it into the first installation slot. At this time, the end of the drawer away from the handle pushes the seventh slider to move. The movement of the seventh slider drives the rack and the eighth slider to move. On the one hand, , the movement of the rack drives the spur gear to rotate, the rotation of the spur gear drives the vertical axis to rotate, the rotation of the vertical axis drives the first bevel gear to rotate, the rotation of the first bevel gear drives the second bevel gear to rotate, the rotation of the second bevel gear drives the horizontal axis to rotate, the horizontal The rotation of the shaft drives the rotating block to rotate, and the rotation of the rotating block drives the first temporary baffle to rotate downward, and then the debris can be collected; on the other hand, the eighth slide plate moves to resist the fourth spring; when the debris in the drawer When more cleaning is required, first drive the drawer outward through the handle. At this time, the eighth sliding plate drives the rack to reset under the action of the fourth spring. At this time, the rack drives the spur gear to rotate in the opposite direction, and the spur gear rotates in the opposite direction to drive the vertical drawer. The shaft rotates in the opposite direction, and the reverse rotation of the vertical axis drives the first bevel gear to rotate in the reverse direction. The reverse rotation of the first bevel gear drives the second bevel gear to rotate in the reverse direction. The reverse rotation of the second bevel gear drives the horizontal axis to rotate in the reverse direction. The horizontal The reverse rotation of the shaft drives the rotating block to rotate in the opposite direction, and the reverse rotation of the rotating block drives the first temporary baffle to rotate upward so that the first temporary baffle contacts the second temporary baffle, which facilitates the temporary collection of debris and eliminates the need for Stop work to clean out the debris in the drawer.

附图说明Description of the drawings

图1为本申请实施例的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of an embodiment of the present application;

图2为本申请实施例中凸显驱动机构的结构示意图;Figure 2 is a schematic structural diagram of the highlighted driving mechanism in the embodiment of the present application;

图3为本申请实施例中凸显水平板以及活动板内部结构的剖视图;Figure 3 is a cross-sectional view highlighting the internal structure of the horizontal plate and the movable plate in the embodiment of the present application;

图4为本申请实施例中凸显收灰框内部结构的剖视图;Figure 4 is a cross-sectional view highlighting the internal structure of the dust collection frame in the embodiment of the present application;

图5为本申请实施例中凸显固定组件的剖视图。Figure 5 is a cross-sectional view of the protruding fixing component in the embodiment of the present application.

附图标记说明:1、底座;11、脚刹轮;2、竖板;21、第一通孔;22、移动板;23、第一电动推杆;24、钻机座;25、电钻;26、第一滑板;3、驱动机构;31、移动槽;32、丝杠;33、导杆;34、滑套;35、驱动电机;4、水平板;41、活动板;411、第一水平槽;412、第二水平槽;42、收灰框;421、第三滑板;422、第四滑板;423、第一弹簧;424、推板;425、第二通孔;426、第一安装槽;427、第二安装槽;43、第三水平槽;44、第五滑板;45、第二弹簧;46、第七滑板;461、第八滑板;462、齿条;463、第四弹簧;464、竖轴;465、正齿轮;466、第一锥齿轮;47、水平轴;471、第二锥齿轮;472、转动块;473、第一临时挡板;474、弹性密封条;5、驱动组件;51、第二电动推杆;52、第二滑板;53、条形孔;6、抽屉;61、把手;7、固定组件;71、第一竖槽;72、抵接块;721、斜面;73、第六滑板;74、第三弹簧;75、第二竖槽;8、第二临时挡板;81、导流面。Explanation of reference signs: 1. Base; 11. Foot brake wheel; 2. Vertical plate; 21. First through hole; 22. Moving plate; 23. First electric push rod; 24. Drill base; 25. Electric drill; 26 , the first sliding plate; 3. driving mechanism; 31. moving groove; 32. screw; 33. guide rod; 34. sliding sleeve; 35. driving motor; 4. horizontal plate; 41. movable plate; 411. first level slot; 412, second horizontal slot; 42, dust collecting frame; 421, third sliding plate; 422, fourth sliding plate; 423, first spring; 424, push plate; 425, second through hole; 426, first installation slot; 427, second mounting slot; 43, third horizontal slot; 44, fifth sliding plate; 45, second spring; 46, seventh sliding plate; 461, eighth sliding plate; 462, rack; 463, fourth spring ; 464. Vertical axis; 465. Spur gear; 466. First bevel gear; 47. Horizontal axis; 471. Second bevel gear; 472. Rotating block; 473. First temporary baffle; 474. Elastic sealing strip; 5 , driving component; 51. second electric push rod; 52. second sliding plate; 53. strip hole; 6. drawer; 61. handle; 7. fixed component; 71. first vertical slot; 72. abutment block; 721. Incline; 73. Sixth sliding plate; 74. Third spring; 75. Second vertical groove; 8. Second temporary baffle; 81. Guide surface.

实施方式Implementation

以下结合附图1-5对本申请作进一步详细说明。The present application will be further described in detail below in conjunction with Figures 1-5.

其中相同的零部件用相同的附图标记表示。需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”、“下”、“底面”和“顶面”指的是附图中的方向,词语 “内”和“外”分别指的是朝向或远离特定部件几何中心的方向。Identical components are designated with the same reference numerals. It should be noted that the words "front", "back", "left", "right", "upper", "lower", "bottom" and "top" used in the following description refer to those in the accompanying drawings. Direction, the words "inside" and "outside" refer to the direction toward or away from the geometric center of a particular component, respectively.

本申请公开一种墙体施工用钻孔装置,包括底座1,底座1的底部安装有多个脚刹轮11,底座1的顶部安装有竖板2,竖板2上开设有第一通孔21,第一通孔21内沿竖向滑移连接有移动板22,竖板2上安装有用于驱动移动板22移动的驱动机构3;移动板22的顶部安装有第一电动推杆23,第一电动推杆23的活塞杆安装有钻机座24,钻机座24上安装有电钻25。当需要对墙壁进行钻孔时,先通过驱动机构3驱动移动板22移动,移动板22移动带动电钻25移动,当电钻25移动到合适的位置后,然后启动电钻25,接着启动第一电动推杆23,此时便可对墙壁进行钻孔;综上,通过采用上述方案,无需操作人员一直手持电钻25,从而能够降低操作人员的劳动强度。This application discloses a drilling device for wall construction, which includes a base 1. A plurality of foot brake wheels 11 are installed on the bottom of the base 1. A vertical plate 2 is installed on the top of the base 1. A first through hole is provided on the vertical plate 2. 21. A moving plate 22 is slidably connected in the first through hole 21 in the vertical direction. A driving mechanism 3 for driving the moving plate 22 is installed on the vertical plate 2; a first electric push rod 23 is installed on the top of the moving plate 22. The piston rod of the first electric push rod 23 is installed with a drill base 24, and an electric drill 25 is installed on the drill base 24. When it is necessary to drill a wall, the driving mechanism 3 is used to drive the moving plate 22 to move. The moving plate 22 drives the electric drill 25 to move. When the electric drill 25 moves to a suitable position, the electric drill 25 is started, and then the first electric pusher is started. Rod 23 is used to drill the wall; in summary, by adopting the above solution, the operator does not need to hold the electric drill 25 all the time, thereby reducing the labor intensity of the operator.

驱动机构3包括开设于第一通孔21两侧的两个移动槽31、通过轴承竖直转动连接于一移动槽31侧壁的丝杠32以及竖直固接于另一移动槽31侧壁的导杆33;移动板22的两侧分别固接有滑套34,一滑套34螺纹连接于丝杠32,另一滑套34沿竖向滑移连接于导杆33;丝杠32的顶部连接有驱动电机35,驱动电机35的输出轴固接于丝杠32的顶部,驱动电机35竖直安装于竖板2的顶部。当需要驱动移动板22移动时,先启动驱动电机35,此时驱动电机35的输出轴驱动丝杠32转动,丝杠32转动驱动滑套34移动,滑套34移动便可驱动移动板22移动;设置的驱动机构3,便于驱动移动板22移动。The driving mechanism 3 includes two moving grooves 31 opened on both sides of the first through hole 21 , a screw 32 vertically rotatably connected to the side wall of one moving groove 31 through a bearing, and a screw 32 vertically fixed to the side wall of the other moving groove 31 The guide rod 33; sliding sleeves 34 are fixed on both sides of the moving plate 22, one sliding sleeve 34 is threadedly connected to the screw 32, and the other sliding sleeve 34 is slidably connected to the guide rod 33 in the vertical direction; the screw 32 A driving motor 35 is connected to the top. The output shaft of the driving motor 35 is fixed to the top of the screw 32 . The driving motor 35 is vertically installed on the top of the vertical plate 2 . When it is necessary to drive the moving plate 22 to move, the driving motor 35 is started first. At this time, the output shaft of the driving motor 35 drives the screw 32 to rotate. The screw 32 rotates to drive the sliding sleeve 34 to move. The sliding sleeve 34 moves to drive the moving plate 22 to move. ; The driving mechanism 3 is provided to facilitate driving the moving plate 22 to move.

移动板22的底部固接有第一滑板26,第一滑板26靠近墙面的一侧固接有水平板4,水平板4上滑移安装有活动板41,活动板41靠近墙面的一侧安装有收灰框42;水平板4上安装有用于驱动活动板41移动的驱动组件5。设置的收灰框42,便于对电钻25钻下的碎渣进行收集。A first sliding plate 26 is fixedly connected to the bottom of the moving plate 22. A horizontal plate 4 is fixed to the side of the first sliding plate 26 close to the wall. A movable plate 41 is slidably installed on the horizontal plate 4. The movable plate 41 is connected to a side close to the wall. A dust collection frame 42 is installed on the side; a driving assembly 5 for driving the movable plate 41 to move is installed on the horizontal plate 4. The ash collection frame 42 is provided to facilitate the collection of debris drilled by the electric drill 25 .

驱动组件5包括安装于水平板4底部的第二电动推杆51以及固接于第二电动推杆51活塞杆的第二滑板52;活动板41上开设有用于供第二滑板52沿水平板4的长度方向滑移的条形孔53,第二滑板52的顶部固接于活动板41的底部。当需要驱动活动板41移动时,先通过第二电动推杆51的活塞杆驱动第二滑板52移动,第二滑板52移动便可驱动活动板41移动;设置的驱动组件5,便于驱动活动板41移动。The driving assembly 5 includes a second electric push rod 51 installed at the bottom of the horizontal plate 4 and a second sliding plate 52 fixed to the piston rod of the second electric push rod 51; the movable plate 41 is provided with a hole for the second sliding plate 52 to move along the horizontal plate. The top of the second sliding plate 52 is fixed to the bottom of the movable plate 41. When it is necessary to drive the movable plate 41 to move, first drive the second sliding plate 52 to move through the piston rod of the second electric push rod 51, and then the movement of the second sliding plate 52 can drive the movable plate 41 to move; the driving assembly 5 is provided to facilitate driving the movable plate. 41 moves.

活动板41靠近收灰框42的一侧开设有第一水平槽411,收灰框42靠近活动板41的一侧固接有第三滑板421,第三滑板421沿水平板4的长度方向滑移连接于第一水平槽411;第三滑板421的一侧固接有第四滑板422,第一水平槽411的一侧开设有用于供第四滑板422沿水平板4的长度方向滑移的第二水平槽412;第四滑板422远离收灰框42的一侧固接有第一弹簧423,第一弹簧423沿水平板4的长度方向设置,第一弹簧423远离第四滑板422的一端固接于第二水平槽412远离收灰框42的一端内壁。设置的第三滑板421、第四滑板422以及第一弹簧423,能够便于使收灰框42抵紧于墙壁。A first horizontal slot 411 is provided on the side of the movable plate 41 close to the ash collecting frame 42. A third sliding plate 421 is fixedly connected to the side of the ash collecting frame 42 close to the movable plate 41. The third sliding plate 421 slides along the length direction of the horizontal plate 4. The third sliding plate 421 is fixedly connected to the fourth sliding plate 422 on one side of the first horizontal groove 411 , and is provided on one side of the first horizontal groove 411 for the fourth sliding plate 422 to slide along the length direction of the horizontal plate 4 the second horizontal groove 412; the side of the fourth sliding plate 422 away from the dust collection frame 42 is fixed with a first spring 423, the first spring 423 is arranged along the length direction of the horizontal plate 4, and the first spring 423 is away from one end of the fourth sliding plate 422 It is fixed to the inner wall of one end of the second horizontal groove 412 away from the dust collection frame 42 . The third sliding plate 421, the fourth sliding plate 422 and the first spring 423 are provided to facilitate the ash collecting frame 42 to press against the wall.

收灰框42的底部固接有推板424,水平板4的顶部开设有用于供推板424沿水平板4的长度方向滑移的第三水平槽43,第三水平槽43内沿水平板4的长度方向滑移连接有第五滑板44,第五滑板44靠近活动板41的一侧固接有第二弹簧45,第二弹簧45沿水平板4的长度方向设置,第二弹簧45远离推板424的一端固接于第三水平槽43靠近活动板41的一端内壁;推板424抵接于第五滑板44。当第二电动推杆51的活塞杆驱动活动板41复位时,此时活动板41带动收灰框42复位,收灰框42复位带动推板424复位,推板424复位对第五滑板44进行抵压,此时在第一弹簧423以及第二弹簧45的作用下,能够使收灰框42形成短时间的往复移动,从而便于将收灰框42内壁的灰尘振下。A push plate 424 is fixedly connected to the bottom of the ash collection frame 42, and a third horizontal groove 43 for the push plate 424 to slide along the length direction of the horizontal plate 4 is provided at the top of the horizontal plate 4. The inner edge of the third horizontal groove 43 is along the horizontal plate. A fifth sliding plate 44 is slidingly connected in the length direction of the horizontal plate 4. A second spring 45 is fixedly connected to the side of the fifth sliding plate 44 close to the movable plate 41. The second spring 45 is arranged along the length direction of the horizontal plate 4, and the second spring 45 moves away from the horizontal plate 4. One end of the push plate 424 is fixed to the inner wall of one end of the third horizontal groove 43 close to the movable plate 41 ; the push plate 424 is in contact with the fifth sliding plate 44 . When the piston rod of the second electric push rod 51 drives the movable plate 41 to reset, the movable plate 41 drives the ash collecting frame 42 to reset, and the ash collecting frame 42 resets to drive the push plate 424 to reset. The push plate 424 resets the fifth sliding plate 44 . At this time, under the action of the first spring 423 and the second spring 45, the dust collecting frame 42 can be reciprocated in a short period of time, thereby facilitating vibration of the dust on the inner wall of the dust collecting frame 42.

收灰框42的一侧开设有第二通孔425,第二通孔425内沿水平方向滑移连接有抽屉6,收灰框42的底部安装有用于对抽屉6进行固定的固定组件7。设置的抽屉6,便于对收灰框42内的灰尘进行回收处理。A second through hole 425 is formed on one side of the dust collection frame 42 . A drawer 6 is slidably connected in the horizontal direction in the second through hole 425 . A fixing component 7 for fixing the drawer 6 is installed at the bottom of the dust collection frame 42 . The drawer 6 is provided to facilitate recycling of dust in the dust collection frame 42 .

固定组件7包括开设于收灰框42底部的多个第一竖槽71、沿竖向滑移连接于第一竖槽71的抵接块72、固接于抵接块72一侧的第六滑板73以及固接于第六滑板73一侧的第三弹簧74;第一竖槽71的一侧开设有用于供第六滑板73沿竖向滑移的第二竖槽75,第三弹簧74竖直设置,第三弹簧74远离第六滑板73的一端固接于第二竖槽75的槽底;抵接块72的顶部设置有斜面721且抵接于抽屉6的底部;抽屉6的一端设置有把手61。当抽屉6向收灰框42内移动时,此时抽屉6的侧壁在斜面721的作用下驱动抵接块72向下移动,抵接块72向下移动带动第六滑板73向下移动,第六滑板73向下移动对第三弹簧74进行抵压;当抽屉6移动到合适的位置后,此时第六滑板73在第三弹簧74的作用下驱动抵接块72对抽屉6进行固定;设置的固定组件7,便于对抽屉6进行固定。The fixing component 7 includes a plurality of first vertical slots 71 opened at the bottom of the dust collection frame 42 , an abutment block 72 slidably connected to the first vertical slots 71 in the vertical direction, and a sixth block fixed to one side of the abutment block 72 . The sliding plate 73 and the third spring 74 fixed to one side of the sixth sliding plate 73; a second vertical slot 75 for the sixth sliding plate 73 to slide vertically is provided on one side of the first vertical groove 71, and the third spring 74 Set vertically, one end of the third spring 74 away from the sixth sliding plate 73 is fixed to the bottom of the second vertical groove 75; the top of the contact block 72 is provided with a slope 721 and is in contact with the bottom of the drawer 6; one end of the drawer 6 A handle 61 is provided. When the drawer 6 moves into the dust collection frame 42, the side wall of the drawer 6 drives the abutment block 72 to move downward under the action of the inclined surface 721. The downward movement of the abutment block 72 drives the sixth sliding plate 73 to move downward. The sixth sliding plate 73 moves downward to resist the third spring 74; when the drawer 6 moves to a suitable position, the sixth sliding plate 73 drives the abutment block 72 under the action of the third spring 74 to fix the drawer 6. ; The fixing component 7 is provided to facilitate fixing the drawer 6.

收灰框42远离第二通孔425的一侧开设有第一安装槽426,抽屉6远离把手61的一端插接于第一安装槽426;第一安装槽426内滑移连接有第七滑板46,抽屉6远离把手61的一端能够抵接于第七滑板46的一侧;第一安装槽426内还滑移连接有第八滑板461,第七滑板46与第八滑板461之间设置有齿条462,齿条462的两端分别固接于第七滑板46与第八滑板461的相对内侧,第八滑板461远离齿条462的一侧固接有多个第四弹簧463,第四弹簧463远离第八滑板461的一端固接于第一安装槽426的槽底;第一安装槽426内通过轴承转动连接有竖轴464,竖轴464上套设固定有正齿轮465,正齿轮465与齿条462啮合;第一安装槽426的上方在收灰框42的侧壁开设有第二安装槽427,竖轴464远离正齿轮465的一端贯穿第二安装槽427的底壁设置且固接有第一锥齿轮466,第二安装槽427内转动连接有水平轴47,水平轴47上固接有第二锥齿轮471,第一锥齿轮466与第二锥齿轮471相啮合;水平轴47上固接有转动块472,转动块472上固接有第一临时挡板473,收灰框42远离水平轴47的一端固接有第二临时挡板8,第一临时挡板473抵接于第二临时挡板8的底部;收灰框42的顶部以及第二临时挡板8上均开设置导流面81;多个第三弹簧74驱动抵接块72对抽屉6的水平分力(或者说摩擦力)远远大于多个第四弹簧463对抽屉6的推力,这样便于抽屉6的一端静止在第一安装槽426内。当需要收集碎渣时,先通过把手61驱动抽屉6插接于第一安装槽426,此时抽屉6远离把手61的一端推动第七滑板46移动,第七滑板46移动带动齿条462以及第八滑板461移动,一方面,齿条462移动驱动正齿轮465转动,正齿轮465转动带动竖轴464转动,竖轴464转动带动第一锥齿轮466转动,第一锥齿轮466转动驱动第二锥齿轮471转动,第二锥齿轮471转动带动水平轴47转动,水平轴47转动带动转动块472转动,转动块472转动带动第一临时挡板473向下转动,然后便可对碎渣进行收集;另一方面,第八滑板461移动对第四弹簧463进行抵压;当抽屉6内碎渣较多需要清理时,先通过把手61驱动抽屉6向外移动,此时第八滑板461在第四弹簧463的作用下驱动齿条462复位,此时齿条462驱动正齿轮465反向转动,正齿轮465反向转动带动竖轴464反向转动,竖轴464反向转动带动第一锥齿轮466反向转动,第一锥齿轮466反向转动驱动第二锥齿轮471反向转动,第二锥齿轮471反向转动带动水平轴47反向转动,水平轴47反向转动带动转动块472反向转动,转动块472反向转动带动第一临时挡板473向上转动使第一临时挡板473抵接于第二临时挡板8,这样便于对碎渣进行临时收集,从而无需停工对抽屉6内的碎渣进行清理。A first installation slot 426 is provided on the side of the dust collection frame 42 away from the second through hole 425. The end of the drawer 6 away from the handle 61 is inserted into the first installation slot 426; a seventh sliding plate is slidably connected in the first installation slot 426. 46. The end of the drawer 6 away from the handle 61 can abut against one side of the seventh sliding plate 46; an eighth sliding plate 461 is also slidably connected in the first installation groove 426, and there is a gap between the seventh sliding plate 46 and the eighth sliding plate 461. The rack 462 has two ends fixed to the opposite inner sides of the seventh sliding plate 46 and the eighth sliding plate 461 respectively. A plurality of fourth springs 463 are fixed to the side of the eighth sliding plate 461 away from the rack 462. One end of the spring 463 away from the eighth sliding plate 461 is fixed to the bottom of the first installation groove 426; a vertical shaft 464 is rotatably connected to the first installation groove 426 through a bearing, and a spur gear 465 is set and fixed on the vertical shaft 464. The spur gear 465 meshes with the rack 462; a second mounting slot 427 is provided above the first mounting slot 426 on the side wall of the dust collection frame 42, and the end of the vertical axis 464 away from the spur gear 465 is provided through the bottom wall of the second mounting slot 427 and The first bevel gear 466 is fixedly connected, and the horizontal shaft 47 is rotatably connected in the second mounting groove 427. The second bevel gear 471 is fixedly connected to the horizontal shaft 47, and the first bevel gear 466 meshes with the second bevel gear 471; horizontal A rotating block 472 is fixed on the shaft 47, and a first temporary baffle 473 is fixed on the rotating block 472. An end of the dust collection frame 42 away from the horizontal axis 47 is fixed on a second temporary baffle 8, and the first temporary baffle 473 is fixed on the shaft 47. It is in contact with the bottom of the second temporary baffle 8; the top of the dust collecting frame 42 and the second temporary baffle 8 are both provided with flow guide surfaces 81; a plurality of third springs 74 drive the abutting block 72 to level the drawer 6 The component force (or friction force) is much greater than the pushing force of the plurality of fourth springs 463 on the drawer 6, so that one end of the drawer 6 can be stationary in the first installation groove 426. When the debris needs to be collected, the drawer 6 is first driven through the handle 61 to be inserted into the first installation groove 426. At this time, the end of the drawer 6 away from the handle 61 pushes the seventh sliding plate 46 to move, and the seventh sliding plate 46 moves to drive the rack 462 and the third sliding plate 46. The eight sliding plates 461 move. On the one hand, the rack 462 moves and drives the spur gear 465 to rotate. The rotation of the spur gear 465 drives the vertical shaft 464 to rotate. The rotation of the vertical shaft 464 drives the first bevel gear 466 to rotate. The first bevel gear 466 rotates to drive the second bevel. The gear 471 rotates, the second bevel gear 471 rotates to drive the horizontal shaft 47 to rotate, the horizontal shaft 47 rotates to drive the rotating block 472 to rotate, the rotating block 472 rotates to drive the first temporary baffle 473 to rotate downward, and then the debris can be collected; On the other hand, the eighth sliding plate 461 moves to press the fourth spring 463; when there is a lot of debris in the drawer 6 and needs to be cleaned, the handle 61 is first used to drive the drawer 6 to move outward. At this time, the eighth sliding plate 461 is in the fourth position. The drive rack 462 is reset under the action of the spring 463. At this time, the rack 462 drives the spur gear 465 to rotate in the reverse direction. The spur gear 465 rotates in the reverse direction to drive the vertical shaft 464 to rotate in the reverse direction. The vertical shaft 464 rotates in the reverse direction to drive the first bevel gear 466. Reverse rotation, the first bevel gear 466 reversely rotates to drive the second bevel gear 471 to reversely rotate, the second bevel gear 471 reversely rotates to drive the horizontal shaft 47 to reversely rotate, the horizontal shaft 47 reversely rotates to drive the rotating block 472 to reverse Rotate, the rotating block 472 rotates in the opposite direction to drive the first temporary baffle 473 to rotate upward to make the first temporary baffle 473 contact the second temporary baffle 8. This facilitates the temporary collection of debris and eliminates the need to stop work to clean the inside of the drawer 6. The debris is cleaned.

转动块472的顶部固接有弹性密封条474,弹性密封条474远离转动块472的一端固接于第二安装槽427的侧壁。设置的弹性密封条474,能够减少杂物进入第二安装槽427内。An elastic sealing strip 474 is fixed on the top of the rotating block 472 , and one end of the elastic sealing strip 474 away from the rotating block 472 is fixed on the side wall of the second installation groove 427 . The elastic sealing strip 474 provided can reduce the entry of debris into the second installation groove 427 .

工作原理:当需要对墙壁进行钻孔时,先启动驱动电机35,此时驱动电机35的输出轴驱动丝杠32转动,丝杠32转动驱动滑套34移动,滑套34移动驱动移动板22移动,移动板22移动带动电钻25移动,当电钻25移动到合适的位置后,然后启动电钻25,接着启动第一电动推杆23,此时便可对墙壁进行钻孔;综上,通过采用上述方案,无需操作人员一直手持电钻25,从而能够降低操作人员的劳动强度。Working principle: When it is necessary to drill holes in the wall, first start the drive motor 35. At this time, the output shaft of the drive motor 35 drives the screw 32 to rotate. The screw 32 rotates to drive the sliding sleeve 34 to move. The sliding sleeve 34 moves to drive the moving plate 22. The movement of the moving plate 22 drives the electric drill 25 to move. When the electric drill 25 moves to a suitable position, the electric drill 25 is started, and then the first electric push rod 23 is started. At this time, the wall can be drilled; in summary, by using The above scheme eliminates the need for the operator to hold the electric drill 25 all the time, thereby reducing the operator's labor intensity.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the scope of protection of the present application. Therefore, any equivalent changes made based on the structure, shape, and principle of the present application shall be covered by the scope of protection of the present application. Inside.

Claims (10)

1.一种墙体施工用钻孔装置,其特征在于:包括底座(1),所述底座(1)的底部安装有多个脚刹轮(11),所述底座(1)的顶部安装有竖板(2),所述竖板(2)上开设有第一通孔(21),所述第一通孔(21)内沿竖向滑移连接有移动板(22),所述竖板(2)上安装有用于驱动移动板(22)移动的驱动机构(3);所述移动板(22)的顶部安装有第一电动推杆(23),所述第一电动推杆(23)的活塞杆安装有钻机座(24),所述钻机座(24)上安装有电钻(25)。1. A drilling device for wall construction, characterized in that: it includes a base (1), a plurality of foot brake wheels (11) are installed at the bottom of the base (1), and a plurality of foot brake wheels (11) are installed at the top of the base (1). There is a vertical plate (2), a first through hole (21) is provided on the vertical plate (2), and a moving plate (22) is slidably connected in the vertical direction inside the first through hole (21). A driving mechanism (3) for driving the moving plate (22) is installed on the vertical plate (2); a first electric push rod (23) is installed on the top of the moving plate (22), and the first electric push rod The piston rod of (23) is installed with a drill base (24), and an electric drill (25) is installed on the drill base (24). 2.根据权利要求1所述的一种墙体施工用钻孔装置,其特征在于:所述驱动机构(3)包括开设于第一通孔(21)两侧的两个移动槽(31)、转动连接于一移动槽(31)侧壁的丝杠(32)以及固接于另一移动槽(31)侧壁的导杆(33);所述移动板(22)的两侧分别固接有滑套(34),一所述滑套(34)螺纹连接于丝杠(32),另一所述滑套(34)滑移连接于导杆(33);所述丝杠(32)的顶部连接有驱动电机(35),所述驱动电机(35)安装于竖板(2)的顶部。2. A drilling device for wall construction according to claim 1, characterized in that the driving mechanism (3) includes two moving grooves (31) opened on both sides of the first through hole (21). , the screw (32) rotatably connected to the side wall of one moving groove (31) and the guide rod (33) fixed to the side wall of the other moving groove (31); both sides of the moving plate (22) are fixed respectively. There are sliding sleeves (34) connected, one of the sliding sleeves (34) is threadedly connected to the screw (32), and the other sliding sleeve (34) is slidingly connected to the guide rod (33); the screw (32) ) is connected to the top of the drive motor (35), and the drive motor (35) is installed on the top of the vertical plate (2). 3.根据权利要求1所述的一种墙体施工用钻孔装置,其特征在于:所述移动板(22)的底部固接有第一滑板(26),所述第一滑板(26)靠近墙面的一侧固接有水平板(4),所述水平板(4)上滑移安装有活动板(41),所述活动板(41)靠近墙面的一侧安装有收灰框(42);所述水平板(4)上安装有用于驱动活动板(41)移动的驱动组件(5)。3. A drilling device for wall construction according to claim 1, characterized in that: a first sliding plate (26) is fixedly connected to the bottom of the moving plate (22), and the first sliding plate (26) A horizontal plate (4) is fixedly connected to the side close to the wall. A movable plate (41) is slidably installed on the horizontal plate (4). A dust collection device is installed on the side of the movable plate (41) close to the wall. Frame (42); a driving assembly (5) for driving the movable plate (41) to move is installed on the horizontal plate (4). 4.根据权利要求3所述的一种墙体施工用钻孔装置,其特征在于:所述驱动组件(5)包括安装于水平板(4)底部的第二电动推杆(51)以及固接于第二电动推杆(51)活塞杆的第二滑板(52);所述活动板(41)上开设有用于供第二滑板(52)滑移的条形孔(53),所述第二滑板(52)的顶部固接于活动板(41)的底部。4. A drilling device for wall construction according to claim 3, characterized in that the driving assembly (5) includes a second electric push rod (51) installed at the bottom of the horizontal plate (4) and a fixed The second sliding plate (52) is connected to the piston rod of the second electric push rod (51); the movable plate (41) is provided with a strip hole (53) for the second sliding plate (52) to slide. The top of the second sliding plate (52) is fixed to the bottom of the movable plate (41). 5.根据权利要求3所述的一种墙体施工用钻孔装置,其特征在于:所述活动板(41)靠近收灰框(42)的一侧开设有第一水平槽(411),所述收灰框(42)靠近活动板(41)的一侧固接有第三滑板(421),所述第三滑板(421)滑移连接于第一水平槽(411);所述第三滑板(421)的一侧固接有第四滑板(422),所述第一水平槽(411)的一侧开设有用于供第四滑板(422)滑移的第二水平槽(412);所述第四滑板(422)远离收灰框(42)的一侧固接有第一弹簧(423),所述第一弹簧(423)远离第四滑板(422)的一端固接于第二水平槽(412)远离收灰框(42)的一端内壁。5. A drilling device for wall construction according to claim 3, characterized in that: a first horizontal groove (411) is provided on the side of the movable plate (41) close to the ash collecting frame (42). A third sliding plate (421) is fixedly connected to the side of the dust collection frame (42) close to the movable plate (41), and the third sliding plate (421) is slidingly connected to the first horizontal groove (411); A fourth sliding plate (422) is fixedly connected to one side of the three sliding plates (421), and a second horizontal groove (412) for sliding the fourth sliding plate (422) is provided on one side of the first horizontal groove (411). ; The first spring (423) is fixedly connected to the side of the fourth sliding plate (422) away from the dust collection frame (42), and the end of the first spring (423) away from the fourth sliding plate (422) is fixed to the first spring (423). The two horizontal grooves (412) are located away from the inner wall of one end of the dust collecting frame (42). 6.根据权利要求3所述的一种墙体施工用钻孔装置,其特征在于:所述收灰框(42)的底部固接有推板(424),所述水平板(4)的顶部开设有用于供推板(424)滑移的第三水平槽(43),所述第三水平槽(43)内滑移连接有第五滑板(44),所述第五滑板(44)靠近活动板(41)的一侧固接有第二弹簧(45),所述第二弹簧(45)远离推板(424)的一端固接于第三水平槽(43)靠近活动板(41)的一端内壁;所述推板(424)抵接于第五滑板(44)。6. A drilling device for wall construction according to claim 3, characterized in that: a push plate (424) is fixedly connected to the bottom of the ash collection frame (42), and a push plate (424) is fixed on the bottom of the horizontal plate (4). A third horizontal groove (43) is provided at the top for the sliding movement of the push plate (424). A fifth sliding plate (44) is slidably connected in the third horizontal groove (43). The fifth sliding plate (44) A second spring (45) is fixed on the side close to the movable plate (41), and one end of the second spring (45) away from the push plate (424) is fixed on the third horizontal groove (43) close to the movable plate (41). ); the push plate (424) is in contact with the fifth sliding plate (44). 7.根据权利要求3所述的一种墙体施工用钻孔装置,其特征在于:所述收灰框(42)的一侧开设有第二通孔(425),所述第二通孔(425)内滑移连接有抽屉(6),所述收灰框(42)的底部安装有用于对抽屉(6)进行固定的固定组件(7)。7. A drilling device for wall construction according to claim 3, characterized in that: a second through hole (425) is provided on one side of the dust collection frame (42), and the second through hole A drawer (6) is slidably connected inside the (425), and a fixing component (7) for fixing the drawer (6) is installed at the bottom of the ash collecting frame (42). 8.根据权利要求7所述的一种墙体施工用钻孔装置,其特征在于:所述固定组件(7)包括开设于收灰框(42)底部的第一竖槽(71)、沿竖向滑移连接于第一竖槽(71)的抵接块(72)、固接于抵接块(72)一侧的第六滑板(73)以及固接于第六滑板(73)一侧的第三弹簧(74);所述第一竖槽(71)的一侧开设有用于供第六滑板(73)滑移的第二竖槽(75),所述第三弹簧(74)远离第六滑板(73)的一端固接于第二竖槽(75)的槽底;所述抵接块(72)的顶部设置有斜面(721)且抵接于抽屉(6)的底部;所述抽屉(6)的一端设置有把手(61)。8. A drilling device for wall construction according to claim 7, characterized in that: the fixing component (7) includes a first vertical groove (71) opened at the bottom of the ash collection frame (42), The abutment block (72) vertically slidably connected to the first vertical groove (71), the sixth sliding plate (73) fixed to one side of the abutting block (72), and the sixth sliding plate (73) fixed to one side of the abutting block (72). The third spring (74) on the side of the first vertical groove (71) is provided with a second vertical groove (75) for the sixth sliding plate (73) to slide. The third spring (74) One end away from the sixth sliding plate (73) is fixed to the bottom of the second vertical groove (75); the top of the contact block (72) is provided with a slope (721) and contacts the bottom of the drawer (6); One end of the drawer (6) is provided with a handle (61). 9.根据权利要求7所述的一种墙体施工用钻孔装置,其特征在于:所述收灰框(42)远离第二通孔(425)的一侧开设有第一安装槽(426),所述抽屉(6)远离把手(61)的一端插接于第一安装槽(426);所述第一安装槽(426)内滑移连接有第七滑板(46),所述抽屉(6)远离把手(61)的一端能够抵接于第七滑板(46)的一侧;9. A drilling device for wall construction according to claim 7, characterized in that: a first installation slot (426) is opened on the side of the dust collecting frame (42) away from the second through hole (425). ), one end of the drawer (6) away from the handle (61) is plugged into the first installation groove (426); a seventh sliding plate (46) is slidably connected in the first installation groove (426), and the drawer (6) (6) The end far away from the handle (61) can contact one side of the seventh slide plate (46); 所述第一安装槽(426)内还滑移连接有第八滑板(461),所述第七滑板(46)与第八滑板(461)之间设置有齿条(462),所述第八滑板(461)远离齿条(462)的一侧固接有第四弹簧(463),所述第四弹簧(463)远离第八滑板(461)的一端固接于第一安装槽(426)的槽底;An eighth sliding plate (461) is also slidably connected in the first mounting groove (426), and a rack (462) is provided between the seventh sliding plate (46) and the eighth sliding plate (461). A fourth spring (463) is fixed on the side of the eighth sliding plate (461) away from the rack (462), and the end of the fourth spring (463) far away from the eighth sliding plate (461) is fixed on the first installation groove (426). ) the bottom of the tank; 所述第一安装槽(426)内转动连接有竖轴(464),所述竖轴(464)上套设固定有正齿轮(465),所述正齿轮(465)与齿条(462)啮合;所述第一安装槽(426)的上方在收灰框(42)的侧壁开设有第二安装槽(427),所述竖轴(464)远离正齿轮(465)的一端贯穿第二安装槽(427)的底壁设置且固接有第一锥齿轮(466),所述第二安装槽(427)内转动连接有水平轴(47),所述水平轴(47)上固接有第二锥齿轮(471),所述第一锥齿轮(466)与第二锥齿轮(471)相啮合;A vertical shaft (464) is rotatably connected in the first installation groove (426). A spur gear (465) is fixedly mounted on the vertical shaft (464). The spur gear (465) and the rack (462) Engagement; a second mounting slot (427) is provided above the first mounting slot (426) on the side wall of the ash collecting frame (42), and the end of the vertical shaft (464) away from the spur gear (465) passes through the third mounting slot (427). A first bevel gear (466) is provided and fixedly connected to the bottom wall of the second installation groove (427). A horizontal shaft (47) is rotatably connected in the second installation groove (427). The horizontal shaft (47) is fixed on the bottom wall. A second bevel gear (471) is connected, and the first bevel gear (466) meshes with the second bevel gear (471); 所述水平轴(47)上固接有转动块(472),所述转动块(472)上固接有第一临时挡板(473),所述收灰框(42)远离水平轴(47)的一端固接有第二临时挡板(8),所述第一临时挡板(473)抵接于第二临时挡板(8)的底部;所述收灰框(42)的顶部以及第二临时挡板(8)上均开设置导流面(81)。A rotating block (472) is fixed on the horizontal shaft (47), a first temporary baffle (473) is fixed on the rotating block (472), and the ash collection frame (42) is far away from the horizontal shaft (47). ) is fixedly connected to a second temporary baffle (8) at one end, and the first temporary baffle (473) is in contact with the bottom of the second temporary baffle (8); the top of the ash collection frame (42) and The second temporary baffles (8) are evenly provided with flow guide surfaces (81). 10.根据权利要求9所述的一种墙体施工用钻孔装置,其特征在于:所述转动块(472)的顶部固接有弹性密封条(474),所述弹性密封条(474)远离转动块(472)的一端固接于第二安装槽(427)的侧壁。10. A drilling device for wall construction according to claim 9, characterized in that: an elastic sealing strip (474) is fixed on the top of the rotating block (472), and the elastic sealing strip (474) One end away from the rotating block (472) is fixed to the side wall of the second installation slot (427).
CN202311509564.3A 2023-11-14 2023-11-14 Drilling device for wall construction Active CN117260987B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311509564.3A CN117260987B (en) 2023-11-14 2023-11-14 Drilling device for wall construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311509564.3A CN117260987B (en) 2023-11-14 2023-11-14 Drilling device for wall construction

Publications (2)

Publication Number Publication Date
CN117260987A true CN117260987A (en) 2023-12-22
CN117260987B CN117260987B (en) 2024-05-10

Family

ID=89221834

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311509564.3A Active CN117260987B (en) 2023-11-14 2023-11-14 Drilling device for wall construction

Country Status (1)

Country Link
CN (1) CN117260987B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN211440639U (en) * 2019-12-13 2020-09-08 安徽乾州工程建设有限公司 Building construction wall drilling machine
CN213382300U (en) * 2020-07-16 2021-06-08 广东正盾人防工程防护设备有限公司 A drilling device for civil air defense engineering
CN113183335A (en) * 2021-04-21 2021-07-30 山西四建集团有限公司 Civil building wall napping processing apparatus
CN113601731A (en) * 2021-08-18 2021-11-05 深圳市同鑫达物业管理有限公司 Wall drilling machine for house repairing
CN214819797U (en) * 2021-05-09 2021-11-23 中国建筑第五工程局有限公司 A wall drilling device for civil construction
CN214914617U (en) * 2021-05-27 2021-11-30 孙屹杰 Civil engineering construction dust collection device
CN215311072U (en) * 2021-07-28 2021-12-28 广州市晟誉木制品有限公司 Biomass particle production dust collector
CN114346292A (en) * 2022-01-15 2022-04-15 温岭市大精模具有限公司 Drilling device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN211440639U (en) * 2019-12-13 2020-09-08 安徽乾州工程建设有限公司 Building construction wall drilling machine
CN213382300U (en) * 2020-07-16 2021-06-08 广东正盾人防工程防护设备有限公司 A drilling device for civil air defense engineering
CN113183335A (en) * 2021-04-21 2021-07-30 山西四建集团有限公司 Civil building wall napping processing apparatus
CN214819797U (en) * 2021-05-09 2021-11-23 中国建筑第五工程局有限公司 A wall drilling device for civil construction
CN214914617U (en) * 2021-05-27 2021-11-30 孙屹杰 Civil engineering construction dust collection device
CN215311072U (en) * 2021-07-28 2021-12-28 广州市晟誉木制品有限公司 Biomass particle production dust collector
CN113601731A (en) * 2021-08-18 2021-11-05 深圳市同鑫达物业管理有限公司 Wall drilling machine for house repairing
CN114346292A (en) * 2022-01-15 2022-04-15 温岭市大精模具有限公司 Drilling device

Also Published As

Publication number Publication date
CN117260987B (en) 2024-05-10

Similar Documents

Publication Publication Date Title
CN213105522U (en) Aluminum alloy door and window drilling equipment that polishes
CN112170894B (en) A power equipment drilling equipment for electric power field
CN222643932U (en) Drilling device for machining convenient to clearance
CN213052834U (en) Kitchen cabinet plate drilling device with dust removal mechanism
CN211464897U (en) A fully automatic door panel drilling device
CN117260987B (en) Drilling device for wall construction
CN221065492U (en) Bench drilling machine convenient to collect sweeps
CN220330039U (en) Pin shaft drilling equipment with positioning mechanism
CN209304153U (en) An aluminum alloy window frame drilling machine
CN217475497U (en) Rotary type water cooling equipment of numerical control vertical drilling machine
CN116787617A (en) Wall perforating device is used in installation of interior decoration hanging wardrobe
CN115476194A (en) Vertical double-end drilling machine tool
CN221734868U (en) Flange production device
CN221910744U (en) Clamping platform for numerical control machine tool
CN222958826U (en) A drilling machine for wooden door processing
CN219685967U (en) Dust type cutting device
CN223044230U (en) A grinding device for bearing processing
CN221966821U (en) Novel numerical control drilling machine
CN221517048U (en) Connecting rod drilling machine
CN224089327U (en) A wall drilling waste collection device
CN217493571U (en) Scrap collecting device for sheet metal part machining
CN218429220U (en) Building engineering drilling equipment with dust collecting structure
CN219748280U (en) Drilling equipment is used in production of TPU protective sheath
CN222360443U (en) A slotting machine for construction
CN224089319U (en) Wall grooving device for indoor construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250126

Address after: Room 102 and Room 201, No. 30, Shuijiao Industrial Road, Lichuan, Dongcheng Street, Dongguan City, Guangdong Province 523000

Patentee after: Dongguan Heng'an Electric Maintenance Co.,Ltd.

Country or region after: China

Address before: 214000 Xiuxi Road, Binhu District, Wuxi City, Jiangsu Province 58-22-501

Patentee before: WUXI HENGLIFU BUILDING DEVELOPMENT Co.,Ltd.

Country or region before: China