CN117188784A - Assembled building wall positioner - Google Patents

Assembled building wall positioner Download PDF

Info

Publication number
CN117188784A
CN117188784A CN202311035560.6A CN202311035560A CN117188784A CN 117188784 A CN117188784 A CN 117188784A CN 202311035560 A CN202311035560 A CN 202311035560A CN 117188784 A CN117188784 A CN 117188784A
Authority
CN
China
Prior art keywords
fixed
lifting
rod
positioning
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202311035560.6A
Other languages
Chinese (zh)
Inventor
张会胜
仲伟
许丽
陶涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Qingzhou Construction Co ltd
Original Assignee
Anhui Qingzhou Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Qingzhou Construction Co ltd filed Critical Anhui Qingzhou Construction Co ltd
Priority to CN202311035560.6A priority Critical patent/CN117188784A/en
Publication of CN117188784A publication Critical patent/CN117188784A/en
Withdrawn legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开了一种装配式建筑墙体定位装置,包括底座、竖板和角度调节组件,底座的数量为两个,且两个底座的一侧与U型架的端部固定连接,U型架的中间设有对预制墙板竖直测量的检测组件,底座的上方均开设有调节槽;竖板的一端固定设有调节块;本发明通过增设底座、定位夹板、升降组件和角度调节组件以及配合使用的传动组件,能够实现对预制墙板起到夹持固定的作用,角度调节组件能够实现预制墙板倾斜后对其夹持调节,使预制墙板调节后竖直放置,该装置结构简单,避免工作人员反复启动起吊机然后由其他多名工作人员进行推动调整,有效的降低了工作人员的劳动,强度增加了预制墙板安装定位的便捷性,提高了预制墙板安装定位的效率。

The invention discloses a prefabricated building wall positioning device, which includes a base, a vertical plate and an angle adjustment component. The number of bases is two, and one side of the two bases is fixedly connected to the end of the U-shaped frame. In the middle of the frame, there is a detection component for vertical measurement of the prefabricated wall panels, and there are adjustment grooves above the base; one end of the vertical plate is fixed with an adjustment block; in the present invention, a base, a positioning splint, a lifting assembly and an angle adjustment assembly are added. And the transmission component used in conjunction with it can clamp and fix the prefabricated wall panels. The angle adjustment component can clamp and adjust the prefabricated wall panels after they are tilted, so that the prefabricated wall panels can be placed vertically after adjustment. The device structure It is simple and avoids workers from repeatedly starting the crane and then having multiple other workers push and adjust it, which effectively reduces the labor of workers, increases the convenience of installation and positioning of prefabricated wall panels, and improves the efficiency of installation and positioning of prefabricated wall panels. .

Description

一种装配式建筑墙体定位装置A kind of prefabricated building wall positioning device

技术领域Technical field

本发明涉及装配式墙体定位装置的技术领域,具体为一种装配式建筑墙体定位装置。The present invention relates to the technical field of prefabricated wall positioning devices, specifically a prefabricated building wall positioning device.

背景技术Background technique

装配式建筑是指使用预先制作好的构件在工地上装配成型的建筑,这样装配成型的建筑具有建造时间短,受天气制约小的优点,而装配式建筑在搭建过程中一般需要人工或者是定位装置对预先制作好的构件进行定位,以保证构件能够准确地对准装配的位置。Prefabricated buildings refer to buildings that are assembled on the construction site using prefabricated components. Such prefabricated buildings have the advantages of short construction time and less weather restrictions. Prefabricated buildings generally require manual labor or positioning during the construction process. The device positions the prefabricated components to ensure that the components can be accurately aligned with the assembly position.

装配式建筑在搭建的时候,一般是通过起重机将墙板吊起,然后控制起重机将预制墙板吊到指定的地方,并且需要将预制墙板一侧的安装孔放置到建筑体上的螺纹钢上,此时就需要很多工人在一旁调整预制墙板的位置和角度,使预制墙板上的安装孔放置到建筑体上的螺纹钢上,套设完成后此时需要通过定位组件对于放置好的预制墙板进行固定,然后再由将浇筑设备的出料管的一端插入到预制墙体上的浇筑孔中,向安装孔中进行灌注混凝土,实现对于预制墙体与建筑体之间的安装When building a prefabricated building, the wall panels are usually lifted by a crane, and then the crane is controlled to lift the prefabricated wall panels to a designated place, and the mounting holes on one side of the prefabricated wall panels need to be placed into the rebar on the building body. At this time, many workers are required to adjust the position and angle of the prefabricated wall panels so that the mounting holes on the prefabricated wall panels can be placed on the rebar on the building body. After the installation is completed, the positioning components need to be used to place the The prefabricated wall panels are fixed, and then one end of the discharge pipe of the pouring equipment is inserted into the pouring hole on the prefabricated wall, and concrete is poured into the installation hole to realize the installation between the prefabricated wall and the building.

但是在将预制墙体一侧的安装孔插入到建筑体上的螺纹钢上时,需要工作人员反复的启动起重机对预制墙板吊起然后再由多名工作人员对预制墙板进行推动调整,使预制墙板竖直放置,若检测到预制墙板倾斜需要再次的对预制墙板吊起调整,增加了预制墙体放置的麻烦性,降低了预制墙体放置的便捷性,反复调整操作降低了预制墙体按搭接的效率,由于开起重机的工人只能通过听从别人指挥进行操作,造成预制墙板的定位过程耗时耗力和安装不方便的问题。However, when inserting the mounting holes on one side of the prefabricated wall into the rebar on the building, workers need to repeatedly start the crane to lift the prefabricated wall panels and then have multiple workers push and adjust the prefabricated wall panels. Place the prefabricated wall panels vertically. If the tilt of the prefabricated wall panels is detected, the prefabricated wall panels need to be lifted and adjusted again, which increases the trouble of placing the prefabricated walls and reduces the convenience of placing the prefabricated walls. Repeated adjustment operations reduce the cost of the prefabricated wall panels. The efficiency of overlapping prefabricated walls is reduced. Since the workers operating the crane can only operate according to the instructions of others, the positioning process of prefabricated wall panels is time-consuming and labor-intensive and the installation is inconvenient.

发明内容Contents of the invention

本发明的目的在于提供一种能够方便预制墙板定位提高安装工作效率的装配式建筑墙体定位装置,以解决上述背景技术中提出的问题。The object of the present invention is to provide a prefabricated wall panel positioning device that can facilitate the positioning of prefabricated wall panels and improve installation work efficiency, so as to solve the problems raised in the above background technology.

为实现上述目的,本发明提供如下技术方案:一种装配式建筑墙体定位装置,包括底座、竖板和角度调节组件,所述底座的数量为两个,所述底座的两侧均设有移动轮,所述移动轮为刹车式移动轮,且两个所述底座的一侧与U型架的端部固定连接,所述U型架的中间设有对预制墙板竖直测量的检测组件,所述底座的上方均开设有调节槽;所述竖板的一端固定设有调节块,所述调节块滑动设于所述调节槽的内部,且所述调节块的一侧与千斤顶的输出端连接,所述竖板的一侧设有定位夹板,每个所述定位夹板与所述竖板之间通过升降组件连接,两个所述升降组件的一端通过传动组件连接;角度调节组件安装于所述定位夹板的一侧,对所述定位夹板的倾斜角度调节,实现对两个所述定位夹板之间夹持的预制墙板的倾斜角度调节,通过增设底座、定位夹板、升降组件和角度调节组件以及配合使用的传动组件,能够实现对预制墙板起到夹持固定的作用,角度调节组件能够实现预制墙板倾斜后对其夹持调节,使预制墙板调节后竖直放置,该装置结构简单,避免工作人员反复启动起吊机然后由其他多名工作人员进行推动调整,有效的降低了工作人员的劳动,强度增加了预制墙板安装定位的便捷性,提高了预制墙板安装定位的效率。In order to achieve the above object, the present invention provides the following technical solution: a prefabricated building wall positioning device, including a base, a vertical plate and an angle adjustment component. The number of the bases is two, and both sides of the base are provided with Moving wheel, the moving wheel is a brake-type moving wheel, and one side of the two bases is fixedly connected to the end of the U-shaped frame, and a detection device for vertical measurement of the prefabricated wall panel is provided in the middle of the U-shaped frame. Assembly, an adjustment slot is provided above the base; an adjustment block is fixed at one end of the vertical plate, the adjustment block is slidably located inside the adjustment slot, and one side of the adjustment block is in contact with the jack. The output end is connected, and a positioning splint is provided on one side of the vertical plate. Each positioning splint is connected to the vertical plate through a lifting assembly. One end of the two lifting assemblies is connected through a transmission assembly; the angle adjustment assembly Installed on one side of the positioning splint, the tilt angle of the positioning splint is adjusted to realize the tilt angle adjustment of the prefabricated wall panel clamped between the two positioning splints, by adding a base, positioning splint, and lifting assembly The angle adjustment component and the transmission component used together can clamp and fix the prefabricated wall panels. The angle adjustment component can clamp and adjust the prefabricated wall panels after they are tilted, so that the prefabricated wall panels can be placed vertically after adjustment. , the device has a simple structure, which prevents the staff from repeatedly starting the crane and then having multiple other staff push and adjust it, effectively reducing the labor of the staff, increasing the strength and convenience of installing and positioning the prefabricated wall panels, and improving the efficiency of the prefabricated wall panels. The efficiency of installation positioning.

优选的,所述升降组件包括开设于所述竖板一侧的升降槽,所述升降槽的内部滑动设有升降块,所述升降块螺纹套设于螺杆上,且所述螺杆转动安装于所述升降槽的内部,所述升降块的一侧设有安装块,所述安装块与所述升降块之间通过转轴连接,且所述安装块固定设于所述转轴上,所述安装块的另一侧通过加强板与所述定位夹板的一侧固定连接,其中所述螺杆的一端均与所述传动组件连接,所述转轴的一端与所述角度调节组件连接,升降组件能够带动调节块在升降槽的内部升降调节,即可实现对于定位夹板在竖直方向上的升降调节,即而实现对定位夹板之间的预制墙板起到夹持升降调节的作用,增加了预制墙板升降调节的方便性。Preferably, the lifting assembly includes a lifting groove opened on one side of the vertical plate, a lifting block is slidably provided inside the lifting groove, the lifting block is threadedly sleeved on the screw, and the screw is rotatably installed on the screw. Inside the lifting slot, a mounting block is provided on one side of the lifting block. The mounting block and the lifting block are connected through a rotating shaft, and the mounting block is fixed on the rotating shaft. The other side of the block is fixedly connected to one side of the positioning splint through a reinforcing plate, one end of the screw is connected to the transmission assembly, one end of the rotating shaft is connected to the angle adjustment assembly, and the lifting assembly can drive The adjustment block can be adjusted up and down inside the lifting slot to realize the lifting and lowering adjustment of the positioning splints in the vertical direction. That is, the prefabricated wall panels between the positioning splints can be clamped and lifted to adjust, and the prefabricated wall has been increased. Convenience of board lift adjustment.

优选的,所述角度调节组件包括固定设于所述转轴一端的蜗轮,所述蜗轮的一侧啮合设有蜗杆,所述蜗杆的一端与支撑杆转动连接,所述支撑杆的一端与所述升降块的侧壁固定连接,所述蜗杆的另一端固定设有插杆,所述插杆的侧壁上等距离开设有限位槽,所述插杆的一端插设于插筒的内部,且所述插筒的内壁上等距离固定设有与所述限位槽相匹配的限位条,所述插筒的另一端与吊箱的侧壁转动连接,且所述插筒的一端贯穿所述吊箱的侧壁且向其内部延伸与第一伞齿的一侧固定连接,两个所述第一伞齿的一侧啮合设有第二伞齿,所述第二伞齿的一侧与第一电机的输出端连接,所述吊箱与支撑组件连接,在定位夹板的一侧设有角度调节组件,能够实现对定位夹板的倾斜角度进行调节,即可实现对定位夹板之间夹持的预制墙板起到角度调节的作用,实现对预制墙板竖直调节时的方便性,避免工作员再次使用起吊机吊起调节,降低了调节的难度,降低了工作人员的劳动强度。Preferably, the angle adjustment assembly includes a worm gear fixed on one end of the rotating shaft, a worm gear is engaged with one side of the worm gear, one end of the worm gear is rotatably connected to a support rod, and one end of the support rod is connected to the support rod. The side walls of the lifting block are fixedly connected, the other end of the worm is fixed with a plug-in rod, the side walls of the plug-in rod are provided with limited slots at equal distances, one end of the plug-in rod is inserted into the inside of the plug-in barrel, and The inner wall of the inserting barrel is fixedly provided with limit strips matching the limiting grooves at equal distances. The other end of the inserting barrel is rotationally connected to the side wall of the hanging box, and one end of the inserting barrel runs through the The side wall of the hanging box extends inwards and is fixedly connected to one side of the first bevel teeth. One side of the two first bevel teeth is engaged with a second bevel tooth. One side of the second bevel teeth Connected to the output end of the first motor, the hanging box is connected to the support component. An angle adjustment component is provided on one side of the positioning splints, which can adjust the inclination angle of the positioning splints, thereby realizing clamping between the positioning splints. The supported prefabricated wall panels play the role of angle adjustment, making the vertical adjustment of the prefabricated wall panels more convenient, avoiding the need for workers to use a crane to lift and adjust again, reducing the difficulty of adjustment and reducing the labor intensity of workers.

优选的,所述传动组件包括固定设于所述螺杆一端的第一齿轮,所述第一齿轮的一侧均设有第二齿轮,所述第一齿轮和所述第二齿轮之间均通过齿链啮合连接;Preferably, the transmission assembly includes a first gear fixedly provided at one end of the screw, a second gear is provided on one side of the first gear, and there is a passage between the first gear and the second gear. Tooth chain meshing connection;

所述传动组件还包括设于两个所述第一齿轮之间的张紧辊,所述张紧辊转动安装于滑块的一侧,所述滑块的一侧设有支架,所述支架的一端与所述U型架的一侧固定连接,且所述支架上开设有与所述滑块相匹配的滑槽,所述滑块滑动设于所述滑槽的内部,所述滑块螺纹套设于丝杆上,所述丝杆安装于所述滑槽的内部,且所述丝杆的一端贯穿所述滑槽且向外延伸与摇柄固定连接,其中所述第二齿轮分别转动设于所述支架的两端,其中一个所述第一齿轮的一侧设有第二电机,且所述第二电机的一端与所述螺杆的一端连接,在螺杆的一端设有传动组件,能够实现启动第二电机时带动两侧的螺杆同时转动,减少驱动设备的通入使用,增加了定位夹板升降调节的便捷性。The transmission assembly also includes a tension roller located between the two first gears. The tension roller is rotatably mounted on one side of the slide block. A bracket is provided on one side of the slide block. The bracket One end of the U-shaped frame is fixedly connected to one side of the U-shaped frame, and a chute matching the slider is provided on the bracket. The slider is slidably located inside the chute. The slider The thread is sleeved on the screw rod, the screw rod is installed inside the chute, and one end of the screw rod penetrates the chute and extends outward to be fixedly connected to the rocker, wherein the second gears are respectively Rotation is provided at both ends of the bracket, one side of the first gear is provided with a second motor, and one end of the second motor is connected to one end of the screw, and a transmission assembly is provided at one end of the screw. , can drive the screws on both sides to rotate simultaneously when starting the second motor, reducing the access and use of driving equipment, and increasing the convenience of lifting and lowering the positioning splint.

优选的,所述检测组件包括固定设于所述U型架中间一侧的量角器,所述U型架的中间固定设有圆柱,所述圆柱上固定设有绳索,所述绳索的一端固定设有锥型铅球,检测组件能够实现对于定位夹板之间夹持的预制墙板放置状态起到检测的作用,减少预制墙板竖直放置状态检测设备的使用,同时该检测组件能够对底座的水平放置起到检测的作用。Preferably, the detection component includes a protractor fixed on the middle side of the U-shaped frame, a cylinder is fixed in the middle of the U-shaped frame, a rope is fixed on the cylinder, and one end of the rope is fixed. With a conical lead ball, the detection component can detect the placement status of prefabricated wall panels clamped between positioning splints, reducing the use of vertical placement status detection equipment for prefabricated wall panels. At the same time, the detection component can detect the level of the base. Placement plays a role in detection.

优选的,所述支撑组件包括固定设于所述支撑杆一侧的防护箱,所述蜗轮和蜗杆均设于所述防护箱的内部,所述防护箱的顶部固定设于导向槽,所述导向槽的内部滑动设有支撑导杆,所述支撑导杆的一侧与所述吊箱的顶部固定连接,支撑组件能够对吊箱起到支撑的作用,避免吊箱的悬空放置,增加了吊箱放置的安全性。Preferably, the support assembly includes a protective box fixed on one side of the support rod, the worm gear and the worm are both installed inside the protective box, the top of the protective box is fixed on the guide groove, A support guide rod is slidably provided inside the guide groove. One side of the support guide rod is fixedly connected to the top of the suspension box. The support assembly can support the suspension box, avoid placing the suspension box in the air, and increase the cost of the suspension. Safety of hanging box placement.

优选的,所述第一电机的下方一侧设有放置板,所述放置板的一端与所述吊箱的一侧固定连接,所述第一电机通过夹箍与所述放置板连接,所述夹箍的两侧通过锁紧螺栓与所述放置板连接,放置板能够对第一电机起到支撑的作用,增加了第一电机放置的安全性。Preferably, a placement plate is provided on the lower side of the first motor, one end of the placement plate is fixedly connected to one side of the hanging box, and the first motor is connected to the placement plate through a clamp, so Both sides of the clamp are connected to the placing plate through locking bolts. The placing plate can support the first motor, thereby increasing the safety of placing the first motor.

优选的,所述第二电机安装于支撑架上,所述支撑架固定设于所述竖板的一侧,所述千斤顶的下方设有支撑板,且所述千斤顶的两侧均通过固定螺栓与所述支撑板连接,第二电机通过支撑架与竖板之间连接,能够对第二电机起到支撑的作用,避免第二电机的悬空放置,增加第二电机放置使用的安全性,在底座的一侧设有支撑板,能够对千斤顶起到安装放置的作用。Preferably, the second motor is installed on a support frame, the support frame is fixed on one side of the vertical plate, a support plate is provided below the jack, and both sides of the jack are fixed with fixing bolts. Connected to the support plate, the second motor is connected through the support frame and the vertical plate, which can support the second motor, prevent the second motor from being placed in the air, and increase the safety of the second motor when placed and used. There is a support plate on one side of the base, which can play a role in installing and placing the jack.

优选的,所述底座远离所述U型架的一侧均固定设有竖杆,所述竖杆的一侧和所述U型架的两侧均固定设有加强杆,所述加强杆的另一端均与所述底座的上方固定连接,在底座的一侧设有竖杆,且竖杆的一侧和U型架的两侧均固定设有加强杆,能够增加底座放置的稳定性。Preferably, a vertical rod is fixed on one side of the base away from the U-shaped frame, and a reinforcing rod is fixed on one side of the vertical rod and both sides of the U-shaped frame, and the reinforcing rod is fixed on one side. The other end is fixedly connected to the top of the base. A vertical rod is provided on one side of the base, and reinforcing rods are fixed on one side of the vertical rod and on both sides of the U-shaped frame, which can increase the stability of the base.

优选的,所述升降块的两端均开设有导向孔,所述导向孔套设于导向杆上,所述导向杆的一端与所述调节块的一侧固定连接,升降块的两侧设有导向孔,且导向孔滑动设于导向杆上,能够对升降块升降的过程中起到导向限位的作用,增加升降块升降的稳定性。Preferably, guide holes are provided at both ends of the lifting block, and the guide holes are sleeved on the guide rods. One end of the guide rods is fixedly connected to one side of the adjustment block, and there are guide holes on both sides of the lifting block. There is a guide hole, and the guide hole is slidably located on the guide rod, which can play a guiding and limiting role during the lifting and lowering of the lifting block and increase the stability of the lifting block.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

本发明通过对现有的装配式建筑预制墙板的安装定位装置进行优化,通过增设底座、竖板、定位夹板、千斤顶、升降组件和角度调节组件以及配合使用的传动组件,能够实现对预制墙板起到夹持固定的作用,同时预制墙板夹持固定后能够实现对预制墙板的位置移动使其底部安装孔与建筑体上的螺纹钢之间对其,增加了移动的方便性,同时角度调节组件能够实现预制墙板倾斜后对其夹持调节,使预制墙板调节后竖直放置,增加了预制墙板夹持定位的方便性且能够实现角度调节,该装置结构简单,避免工作人员反复启动起吊机然后由其他多名工作人员进行推动调整,有效的降低了工作人员的劳动,强度增加了预制墙板安装定位的便捷性,提高了预制墙板安装定位的效率。The present invention optimizes the installation and positioning device of the existing prefabricated wall panels for prefabricated buildings, and adds a base, a vertical plate, a positioning splint, a jack, a lifting component, an angle adjustment component, and a transmission component used in conjunction, so as to realize the installation and positioning of the prefabricated wall panel. The board plays the role of clamping and fixing. At the same time, after the prefabricated wall panel is clamped and fixed, the position of the prefabricated wall panel can be moved so that the bottom mounting hole is aligned with the rebar on the building body, which increases the convenience of movement. At the same time, the angle adjustment component can realize the clamping and adjustment of the prefabricated wall panels after they are tilted, so that the prefabricated wall panels can be placed vertically after adjustment, which increases the convenience of clamping and positioning the prefabricated wall panels and enables angle adjustment. The device has a simple structure and avoids The staff repeatedly started the crane and then pushed and adjusted it by many other staff, which effectively reduced the labor of the staff, increased the convenience of installation and positioning of the prefabricated wall panels, and improved the efficiency of the installation and positioning of the prefabricated wall panels.

附图说明Description of the drawings

图1为本发明的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the present invention;

图2为本发明中定位夹板对预制墙板固定的结构示意图;Figure 2 is a schematic structural diagram of the positioning splint fixing the prefabricated wall panel in the present invention;

图3为本发明中传动组件与U型架连接的结构示意图;Figure 3 is a schematic structural diagram of the connection between the transmission assembly and the U-shaped frame in the present invention;

图4为图3的正视图;Figure 4 is a front view of Figure 3;

图5为本发明中底座的结构示意图;Figure 5 is a schematic structural diagram of the base in the present invention;

图6为图5的爆炸图;Figure 6 is an exploded view of Figure 5;

图7为本发明中定位夹板与调节块连接的结构示意图;Figure 7 is a schematic structural diagram of the connection between the positioning splint and the adjustment block in the present invention;

图8为本发明中角度调节组件的结构示意图;Figure 8 is a schematic structural diagram of the angle adjustment assembly in the present invention;

图9为图8的爆炸图;Figure 9 is an exploded view of Figure 8;

图10为本发明中传动组件的结构示意图;Figure 10 is a schematic structural diagram of the transmission assembly in the present invention;

图11为本发明中插杆与插筒分离的结构示意图。Figure 11 is a schematic structural diagram of the separation of the inserting rod and the inserting sleeve in the present invention.

图中:1、底座;2、U型架;3、调节槽;4、竖板;5、调节块;6、千斤顶;7、定位夹板;8、升降槽;9、升降块;10、螺杆;11、安装块;12、转轴;13、加强板;14、蜗轮;15、蜗杆;16、支撑杆;17、插杆;18、限位槽;19、插筒;20、限位条;21、吊箱;22、第一伞齿;23、第二伞齿;24、第一电机;25、第一齿轮;26、第二齿轮;27、齿链;28、张紧辊;29、滑块;30、支架;31、滑槽;32、丝杆;33、摇柄;34、第二电机;35、量角器;36、绳索;37、锥型铅球;38、防护箱;39、导向槽;40、支撑导杆;41、放置板;42、支撑架;43、支撑板;44、竖杆;45、加强杆;46、导向孔;47、导向杆。In the picture: 1. Base; 2. U-shaped frame; 3. Adjustment slot; 4. Vertical plate; 5. Adjustment block; 6. Jack; 7. Positioning splint; 8. Lifting slot; 9. Lifting block; 10. Screw ; 11. Installation block; 12. Rotating shaft; 13. Reinforcement plate; 14. Worm gear; 15. Worm; 16. Support rod; 17. Insert rod; 18. Limiting groove; 19. Inserting sleeve; 20. Limiting bar; 21. Hanging box; 22. The first bevel gear; 23. The second bevel gear; 24. The first motor; 25. The first gear; 26. The second gear; 27. Tooth chain; 28. Tension roller; 29. Slider; 30, bracket; 31, chute; 32, screw rod; 33, crank handle; 34, second motor; 35, protractor; 36, rope; 37, tapered shot put; 38, protective box; 39, guide Slot; 40, support guide rod; 41, placement plate; 42, support frame; 43, support plate; 44, vertical rod; 45, reinforcing rod; 46, guide hole; 47, guide rod.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, rather than all the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts fall within the scope of protection of the present invention.

实施例1Example 1

请参阅图1-图11,图示中的一种装配式建筑墙体定位装置,包括底座1、竖板4和角度调节组件,底座1的数量为两个,底座1的两侧均设有移动轮,移动轮为刹车式移动轮,且两个底座1的一侧与U型架2的端部固定连接,U型架2的中间设有对预制墙板竖直测量的检测组件,底座1的上方均开设有调节槽3;竖板4的一端固定设有调节块5,调节块5滑动设于调节槽3的内部,且调节块5的一侧与千斤顶6的输出端连接,竖板4的一侧设有定位夹板7,每个定位夹板7与竖板4之间通过升降组件连接,两个升降组件的一端通过传动组件连接;角度调节组件安装于定位夹板7的一侧,对定位夹板7的倾斜角度调节,实现对两个定位夹板7之间夹持的预制墙板的倾斜角度调节。Please refer to Figures 1 to 11. The figure shows a prefabricated building wall positioning device, including a base 1, a vertical plate 4 and an angle adjustment component. The number of bases 1 is two, and there are two bases on both sides of the base 1. The moving wheel is a brake-type moving wheel, and one side of the two bases 1 is fixedly connected to the end of the U-shaped frame 2. A detection component for vertical measurement of the prefabricated wall panels is provided in the middle of the U-shaped frame 2. The base Adjustment slots 3 are provided above 1; one end of the vertical plate 4 is fixed with an adjustment block 5, which is slidably located inside the adjustment slot 3, and one side of the adjustment block 5 is connected to the output end of the jack 6. There is a positioning splint 7 on one side of the board 4. Each positioning splint 7 is connected to the vertical plate 4 through a lifting assembly. One end of the two lifting assemblies is connected through a transmission assembly; the angle adjustment assembly is installed on one side of the positioning plywood 7. The inclination angle adjustment of the positioning plywood 7 realizes the inclination angle adjustment of the prefabricated wall panel clamped between the two positioning plywood 7 .

请参阅图3、图5和图6,图示中的升降组件包括开设于竖板4一侧的升降槽8,升降槽8的内部滑动设有升降块9,升降块9螺纹套设于螺杆10上,且螺杆10转动安装于升降槽8的内部,升降块9的一侧设有安装块11,安装块11与升降块9之间通过转轴12连接,且安装块11固定设于转轴12上,安装块11的另一侧通过加强板13与定位夹板7的一侧固定连接,其中螺杆10的一端均与传动组件连接,转轴12的一端与角度调节组件连接。Please refer to Figure 3, Figure 5 and Figure 6. The lifting assembly in the illustration includes a lifting slot 8 opened on one side of the vertical plate 4. A lifting block 9 is slidably provided inside the lifting slot 8. The lifting block 9 is threadedly sleeved on the screw. 10, and the screw 10 is rotatably installed inside the lifting slot 8. A mounting block 11 is provided on one side of the lifting block 9. The mounting block 11 and the lifting block 9 are connected by a rotating shaft 12, and the mounting block 11 is fixed on the rotating shaft 12. On the other side, the other side of the mounting block 11 is fixedly connected to one side of the positioning clamping plate 7 through the reinforcing plate 13. One end of the screw rod 10 is connected to the transmission assembly, and one end of the rotating shaft 12 is connected to the angle adjustment assembly.

请参阅图1-图9和图11,图示中的角度调节组件包括固定设于转轴12一端的蜗轮14,蜗轮14的一侧啮合设有蜗杆15,蜗杆15的一端与支撑杆16转动连接,支撑杆16的一端与升降块9的侧壁固定连接,蜗杆15的另一端固定设有插杆17,插杆17的侧壁上等距离开设有限位槽18,插杆17的一端插设于插筒19的内部,且插筒19的内壁上等距离固定设有与限位槽18相匹配的限位条20,插筒19的另一端与吊箱21的侧壁转动连接,且插筒19的一端贯穿吊箱21的侧壁且向其内部延伸与第一伞齿22的一侧固定连接,两个第一伞齿22的一侧啮合设有第二伞齿23,第二伞齿23的一侧与第一电机24的输出端连接,吊箱21与支撑组件连接。Please refer to Figures 1 to 9 and 11. The angle adjustment component in the illustrations includes a worm gear 14 fixed on one end of the rotating shaft 12. One side of the worm gear 14 is engaged with a worm 15, and one end of the worm 15 is rotatably connected to the support rod 16. , one end of the support rod 16 is fixedly connected to the side wall of the lifting block 9, the other end of the worm 15 is fixed with an insertion rod 17, the side wall of the insertion rod 17 is provided with limited slots 18 at equal distances, and one end of the insertion rod 17 is inserted Inside the insert sleeve 19, and the inner wall of the insert sleeve 19 is fixed with limit bars 20 matching the limit groove 18 at equal distances. The other end of the insert sleeve 19 is rotationally connected to the side wall of the hanging box 21, and the insert sleeve 19 is One end of the tube 19 penetrates the side wall of the hanging box 21 and extends inwards to be fixedly connected to one side of the first bevel teeth 22. One side of the two first bevel teeth 22 is engaged with a second bevel tooth 23. One side of the tooth 23 is connected to the output end of the first motor 24, and the hanging box 21 is connected to the support assembly.

请参阅图1-图3、图7和图10,图示中的传动组件包括固定设于螺杆10一端的第一齿轮25,第一齿轮25的一侧均设有第二齿轮26,第一齿轮25和第二齿轮26之间均通过齿链27啮合连接;Please refer to Figures 1 to 3, 7 and 10. The transmission assembly in the figures includes a first gear 25 fixed on one end of the screw 10. A second gear 26 is provided on one side of the first gear 25. The gear 25 and the second gear 26 are meshed and connected through a tooth chain 27;

请参阅图1-图3、图7和图10,图示中的传动组件还包括设于两个第一齿轮25之间的张紧辊28,张紧辊28转动安装于滑块29的一侧,滑块29的一侧设有支架30,支架30的一端与U型架2的一侧固定连接,且支架30上开设有与滑块29相匹配的滑槽31,滑块29滑动设于滑槽31的内部,滑块29螺纹套设于丝杆32上,丝杆32安装于滑槽31的内部,且丝杆32的一端贯穿滑槽31且向外延伸与摇柄33固定连接,其中第二齿轮26分别转动设于支架30的两端,其中一个第一齿轮25的一侧设有第二电机34,且第二电机34的一端与螺杆10的一端连接。Please refer to Figures 1-3, 7 and 10. The transmission assembly in the illustrations also includes a tension roller 28 located between the two first gears 25. The tension roller 28 is rotatably mounted on a slider 29. side, one side of the slider 29 is provided with a bracket 30, one end of the bracket 30 is fixedly connected to one side of the U-shaped frame 2, and a slide groove 31 matching the slider 29 is provided on the bracket 30, and the slider 29 is slidably provided Inside the chute 31, the slide block 29 is threaded on the screw rod 32. The screw rod 32 is installed inside the chute 31, and one end of the screw rod 32 penetrates the chute 31 and extends outward to be fixedly connected to the crank handle 33. , wherein the second gears 26 are respectively rotatably installed at both ends of the bracket 30 , a second motor 34 is provided on one side of one of the first gears 25 , and one end of the second motor 34 is connected to one end of the screw 10 .

在对装配式预制墙板与建筑体之间进行定位安装时:首先将底座1移动当值到预制墙板需要安装定位的位置两端,然后通过起吊机将预制墙板吊置到需要安装的位置,并且使预制墙板放置于定位夹板7之间,然后同时启动底座1一侧的千斤顶6,千斤顶6推动调节槽3中的调节块5移动,即可实现带动底座1上的竖板4移动,竖板4移动能够带动一侧的定位夹板7之间相向运动和反向运动,即可实现对于不同厚度的定位预制墙板进行夹持固定,即可实现对于底座1之间的预制墙板进行夹持固定,待定位夹板7对预制墙板夹持固定完成后此时即可撤去起吊机对预制墙板的起吊;When positioning and installing the prefabricated wall panels and the building: first move the base 1 to both ends of the location where the prefabricated wall panels need to be installed and positioned, and then hoist the prefabricated wall panels to the location that needs to be installed via a crane. position, and place the prefabricated wall panels between the positioning splints 7, and then start the jack 6 on one side of the base 1 at the same time. The jack 6 pushes the adjustment block 5 in the adjustment slot 3 to move, so that the vertical plate 4 on the base 1 can be driven. The movement of the vertical plate 4 can drive the positioning splints 7 on one side to move toward each other and in the opposite direction, so that the positioning prefabricated wall panels of different thicknesses can be clamped and fixed, and the prefabricated walls between the bases 1 can be realized. The boards are clamped and fixed. After the positioning splints 7 have completed clamping and fixing the prefabricated wall panels, the crane can be removed from lifting the prefabricated wall panels;

在对预制墙板底部的安装孔与建筑条上的螺纹钢之间插设连接时,首先移动底座1带动预制墙板移动,在移动底座1的底部设有移动轮,能够实现对底座1移动的方便性,待预制墙板地步的安装孔与建筑体上的螺纹钢之间对齐即可实现对于底座1停止推动,并且将移动轮上的刹车启动使移动轮停止移动,增加底座1放置的稳定性,实现预制墙板底部安装孔与建筑体上的螺纹钢之间对其;When connecting the mounting holes at the bottom of the prefabricated wall panel with the rebar on the construction strip, first move the base 1 to drive the prefabricated wall panel to move. There is a moving wheel at the bottom of the movable base 1 to enable movement of the base 1 For convenience, the base 1 can be pushed when the mounting holes of the prefabricated wall panel are aligned with the rebar on the building, and the brake on the moving wheel is activated to stop the moving wheel, increasing the number of places where the base 1 is placed. Stability, achieving alignment between the bottom mounting holes of the prefabricated wall panels and the rebar on the building body;

然后启动升降组件对竖板4上的升降块9进行升降调节,启动时首先启动螺杆10一端的传动组件,能够实现带动两侧竖板4上的螺杆10同时转动,增加了升降块9升降调节的方便性;启动传动组件中的第二电机34,在对于第二电机34启动之前,先对于齿链27的张紧度进行调节,由于在对于定位夹板7进行夹持时,两侧的竖板4之间相向运动或者方向运动造成两个第一齿轮25之间的距离反生改变,存在齿链27的拉紧和松弛,此时转动支架30上的丝杆32,丝杆32转动能够带动丝杆32上螺纹连接的滑块29在滑槽31的内部滑动,即可实现带动一侧的张紧辊28移动,此时张紧辊28能够对于齿链27的外侧壁进行挤压推动,带齿链27被张紧辊28挤压张紧时,停止对于丝杆32的转动,实现对于齿链27张紧度的调节,然后再启动第二电机34,第二电机34的启动能够带动其中一个螺杆10转动,同时带动该螺杆10上的第一齿轮25转动,由于第一齿轮25的一侧均设有第二齿轮26,且第二齿轮26与第一齿轮25之间通过齿链27啮合连接,即可实现该第一齿轮25转动时通过齿链27和第二齿轮26带动另一个第一齿轮25转动,即可实现带动另一个螺杆10的转动,实现两侧升降槽8中的螺杆10同步转动,螺杆10转动时能够带动升降块9在升降槽8的内部进行升降,升降块9升降时能够带动一侧的定位夹板7升降,即可实现对于定位夹板7之间夹持固定的预制墙板进行夹持升降,使预制墙板下降时底部的安装孔插入到建筑体上的螺纹钢中,实现预制墙板与建筑体之间安装,预制墙板放置安装后通过检测组件对于预制墙板的竖直状态进行检测,若预制墙板出现倾斜时,此时通过角度调节组件对于预制墙板的倾斜角度进行调节;Then start the lifting assembly to adjust the lifting block 9 on the vertical plate 4. When starting, first start the transmission assembly at one end of the screw 10, which can drive the screw 10 on the vertical plates 4 on both sides to rotate at the same time. This increases the lifting adjustment of the lifting block 9. Convenience; start the second motor 34 in the transmission assembly. Before starting the second motor 34, first adjust the tension of the tooth chain 27, because when clamping the positioning splint 7, the vertical The relative movement or directional movement between the plates 4 causes the distance between the two first gears 25 to change, and the tooth chain 27 is tightened and relaxed. At this time, the screw 32 on the bracket 30 is rotated, and the screw 32 can rotate. By driving the slider 29 threaded on the screw rod 32 to slide inside the chute 31, the tension roller 28 on one side can be driven to move. At this time, the tension roller 28 can squeeze and push the outer wall of the tooth chain 27. When the toothed chain 27 is squeezed and tightened by the tension roller 28, the rotation of the screw rod 32 is stopped to adjust the tension of the toothed chain 27, and then the second motor 34 is started. The starting of the second motor 34 can One of the screws 10 is driven to rotate, and at the same time, the first gear 25 on the screw 10 is driven to rotate. Since the second gear 26 is provided on one side of the first gear 25, and the second gear 26 and the first gear 25 are connected by a gear, The chain 27 is meshed and connected, so that when the first gear 25 rotates, the tooth chain 27 and the second gear 26 can drive the other first gear 25 to rotate, thereby driving the other screw 10 to rotate, thereby realizing the lifting slots 8 on both sides. The screw 10 in the center rotates synchronously. When the screw 10 rotates, it can drive the lifting block 9 to lift inside the lifting slot 8. When the lifting block 9 lifts, it can drive the positioning splint 7 on one side to lift, so that the clamping between the positioning splints 7 can be realized. Hold fixed prefabricated wall panels for clamping and lifting, so that when the prefabricated wall panels are lowered, the bottom mounting holes are inserted into the rebar on the building body to achieve installation between the prefabricated wall panels and the building body. The prefabricated wall panels pass the inspection after being placed and installed. The component detects the vertical status of the prefabricated wall panel. If the prefabricated wall panel is tilted, the angle adjustment component is used to adjust the tilt angle of the prefabricated wall panel;

对于预制墙板的倾斜角度进行调节时,首先启动吊箱21一侧的第一电机24,第一电机24启动能够带动第一电机24输出端的第二伞齿23转动,由于第二伞齿23与第一伞齿22之间啮合,即可实现第二伞齿23转动的同时带动第一伞齿22的转动,第一伞齿22转动能够带动一侧的插筒19转动,由于插杆17插设于插筒19中,并且插筒19的内壁固定设有与插杆17外壁上开设的限位槽18相匹配的限位条20,即可实现插杆17与插筒19之间在圆周方向上进行限位,插杆17与插筒19在轴向上进行滑动,所以在插筒19转动时带动插杆17进行转动,插杆17的一端与蜗杆15的端部固定连接,即可带动蜗杆15转动,蜗杆15转动能够啮合带动蜗轮14转动,蜗轮14转动能够带动一侧的转轴12转动,转轴12与安装块11之间固定连接,且安装块11的一侧通过加强板13与定位夹板7的一侧固定连接,转轴12带动安装块11转动时,能够带动定位夹板7进行转动,定位夹板7转动带动预制墙板的转动,即可实现预制墙板的角度调节,待预制墙板在底座1之间处于竖直状态时,即可实现对于第一电机24的停止启动,实现预制墙板在竖直方向上角度调节的方便性,避免工作人员反复启动起吊机然后由其他多名工作人员进行推动调整,有效的降低了工作人员的劳动强度,提高了预制墙板固定后的调节,同时能够实现对于预制墙板起到定位的作用,增加了预制墙板安装定位的便捷性,提高了预制墙板安装定位的效率。When adjusting the inclination angle of the prefabricated wall panel, first start the first motor 24 on one side of the hanging box 21. The first motor 24 can drive the second bevel gear 23 at the output end of the first motor 24 to rotate. Since the second bevel gear 23 By meshing with the first bevel teeth 22, the second bevel teeth 23 can rotate while driving the first bevel teeth 22. The rotation of the first bevel teeth 22 can drive the insert barrel 19 on one side to rotate. Since the insert rod 17 It is inserted into the inserting barrel 19, and the inner wall of the inserting barrel 19 is fixedly provided with a limiting strip 20 that matches the limiting groove 18 opened on the outer wall of the inserting rod 17, so that the gap between the inserting rod 17 and the inserting sleeve 19 can be realized. The position is limited in the circumferential direction, and the insertion rod 17 and the insertion sleeve 19 slide in the axial direction, so when the insertion sleeve 19 rotates, the insertion rod 17 is driven to rotate, and one end of the insertion rod 17 is fixedly connected to the end of the worm 15, that is, It can drive the worm 15 to rotate. The rotation of the worm 15 can mesh and drive the worm gear 14 to rotate. The rotation of the worm gear 14 can drive the rotating shaft 12 on one side to rotate. The rotating shaft 12 is fixedly connected to the mounting block 11, and one side of the mounting block 11 passes through the reinforcing plate 13. It is fixedly connected to one side of the positioning splint 7. When the rotating shaft 12 drives the installation block 11 to rotate, it can drive the positioning splint 7 to rotate. The rotation of the positioning splint 7 drives the rotation of the prefabricated wall panel, thereby realizing the angle adjustment of the prefabricated wall panel. When the wall panels are in a vertical state between the bases 1, the first motor 24 can be stopped and started, making it easy to adjust the angle of the prefabricated wall panels in the vertical direction, and avoiding the need for workers to repeatedly start the crane and then use it by other people. Multiple staff members promoted the adjustment, which effectively reduced the labor intensity of the staff, improved the adjustment after the prefabricated wall panels were fixed, and at the same time played a role in positioning the prefabricated wall panels, increasing the convenience of installation and positioning of the prefabricated wall panels. It improves the efficiency of installation and positioning of prefabricated wall panels.

实施例2Example 2

请参阅图1-图11,本实施方式对于实施例1进一步说明,图示中的底座1、竖板4和角度调节组件,底座1的数量为两个,底座1的两侧均设有移动轮,移动轮为刹车式移动轮,且两个底座1的一侧与U型架2的端部固定连接,U型架2的中间设有对预制墙板竖直测量的检测组件,底座1的上方均开设有调节槽3;竖板4的一端固定设有调节块5,调节块5滑动设于调节槽3的内部,且调节块5的一侧与千斤顶6的输出端连接,竖板4的一侧设有定位夹板7,每个定位夹板7与竖板4之间通过升降组件连接,两个升降组件的一端通过传动组件连接;角度调节组件安装于定位夹板7的一侧,对定位夹板7的倾斜角度调节,实现对两个定位夹板7之间夹持的预制墙板的倾斜角度调节;Please refer to Figures 1 to 11. This embodiment further explains Embodiment 1. In the figures, the number of the base 1, the vertical plate 4 and the angle adjustment assembly is two. There are moving parts on both sides of the base 1. The moving wheel is a brake-type moving wheel, and one side of the two bases 1 is fixedly connected to the end of the U-shaped frame 2. A detection component for vertical measurement of the prefabricated wall panels is provided in the middle of the U-shaped frame 2. The base 1 Adjustment slots 3 are provided on the tops of the adjustment slots 3; one end of the vertical plate 4 is fixedly provided with an adjustment block 5, which is slidably located inside the adjustment slot 3, and one side of the adjustment block 5 is connected to the output end of the jack 6. The vertical plate There is a positioning splint 7 on one side of 4. Each positioning splint 7 is connected to the vertical plate 4 through a lifting assembly. One end of the two lifting assemblies is connected through a transmission assembly; the angle adjustment assembly is installed on one side of the positioning plywood 7, and the The inclination angle adjustment of the positioning plywood 7 realizes the inclination angle adjustment of the prefabricated wall panel clamped between the two positioning plywood 7;

请参阅图1-图6,图示中的检测组件包括固定设于U型架2中间一侧的量角器35,U型架2的中间固定设有圆柱,圆柱上固定设有绳索36,绳索36的一端固定设有锥型铅球37;Please refer to Figures 1 to 6. The detection component in the illustrations includes a protractor 35 fixed on the middle side of the U-shaped frame 2. A cylinder is fixed in the middle of the U-shaped frame 2, and a rope 36 is fixed on the cylinder. The rope 36 One end is fixedly provided with a tapered shot put 37;

请参阅图1-图4和图7-图9,图示中的支撑组件包括固定设于支撑杆16一侧的防护箱38,蜗轮14和蜗杆15均设于防护箱38的内部,防护箱38的顶部固定设于导向槽39,导向槽39的内部滑动设有支撑导杆40,支撑导杆40的一侧与吊箱21的顶部固定连接。Please refer to Figures 1-4 and 7-9. The support assembly in the illustrations includes a protective box 38 fixed on one side of the support rod 16. The worm gear 14 and the worm 15 are both located inside the protective box 38. The protective box The top of 38 is fixedly arranged in the guide groove 39. A support guide rod 40 is slidably provided inside the guide groove 39. One side of the support guide rod 40 is fixedly connected to the top of the hanging box 21.

本实施方案中,在U型架2的一侧中间设有检测组件,能够实现定位夹板7对于预制墙板夹持定位后对预制墙板的竖直状态进行检测,同时在对于底座1放置时能够对于底座1的水平状态进行检测;In this embodiment, a detection component is provided in the middle of one side of the U-shaped frame 2, which can detect the vertical state of the prefabricated wall panel after the positioning splint 7 clamps and positions the prefabricated wall panel. At the same time, when the base 1 is placed, Able to detect the horizontal state of base 1;

将底座1放置于预制墙板需要放置的位置两侧,放置完成后此时工作人员对于U型架2侧壁上的锥型铅球37进行观察,锥型铅球37受到重力的作用拉动绳索36下坠,使绳索36位于量角器35的一侧,当绳索36位于量角器35的中间位置时,则说明底座1放置水平,若绳索36偏向量角器35中间的任何一边时,则说明底座1未放置水平,由工作人员对其进行调整,直到绳索36位于量角器35的中间位置即可,该过程能够实现对于底座1水平放置的测量;Place the base 1 on both sides of the position where the prefabricated wall panels need to be placed. After the placement is completed, the staff will observe the cone-shaped lead ball 37 on the side wall of the U-shaped frame 2. The cone-shaped lead ball 37 is pulled by the force of gravity and the rope 36 falls. , so that the rope 36 is located on one side of the protractor 35. When the rope 36 is in the middle of the protractor 35, it means that the base 1 is placed horizontally. If the rope 36 deviates to any side of the middle of the protractor 35, it means that the base 1 is not placed horizontally. The staff adjusts it until the rope 36 is located at the middle position of the protractor 35. This process can realize the measurement of the horizontal placement of the base 1;

在定位夹板7对于预制墙板进行夹持固定时,同理观察预制墙板的侧壁是否与绳索36平行,若平行则预制墙板实现竖直放置,若二者之间存在夹角则需要通过角度调节组件对定位夹板7的倾斜角度进行调节,即可实现对预制墙板的角度调节,实现对于预制墙板竖直放置的测量,增加了使用的方便性;When the positioning splint 7 is clamping and fixing the prefabricated wall panel, similarly observe whether the side wall of the prefabricated wall panel is parallel to the rope 36. If parallel, the prefabricated wall panel will be placed vertically. If there is an angle between the two, it is necessary to By adjusting the inclination angle of the positioning splint 7 through the angle adjustment component, the angle adjustment of the prefabricated wall panel can be realized, and the measurement of the vertical placement of the prefabricated wall panel can be realized, which increases the convenience of use;

在吊箱21的上方设有支撑组件,能够实现对吊箱21起到支撑的作用,避免吊箱21的悬空放置,在吊箱21的顶部固定设有支撑导杆40,支撑导杆40的两端与导向槽39滑动连接,并且导向槽39固定安装于防护箱38的顶部,防护箱38的侧壁与支撑杆16固定连接,支撑杆16与升降块9的一侧固定连接,即可实现对于吊箱21起到支撑的作用,能够实现升降块9升降调节的同时通过支撑杆16带动防护箱38升降,防护箱38通过支撑导杆40带动吊箱21进行升降,实现吊箱21与升降块9升降的同步性,同时在调节块5左右移动对竖板4之间距离进行调节时,此时支撑杆16能够拉动防护箱38运动,实现支撑导杆40在导向槽39内部的滑动,同时导向槽39任能够对支撑导杆40起到支撑的作用,增加吊箱21安装放置的安全性,同时避免了吊箱21的悬空放置。A support component is provided above the hanging box 21, which can support the hanging box 21 and prevent the hanging box 21 from being placed in the air. A supporting guide rod 40 is fixed on the top of the hanging box 21, and the supporting guide rod 40 is Both ends are slidingly connected to the guide groove 39, and the guide groove 39 is fixedly installed on the top of the protective box 38. The side wall of the protective box 38 is fixedly connected to the support rod 16, and the support rod 16 is fixedly connected to one side of the lifting block 9. That's it. To achieve the function of supporting the hanging box 21, the lifting block 9 can be adjusted up and down while driving the protective box 38 to lift through the support rod 16. The protective box 38 drives the hanging box 21 to lift through the supporting guide rod 40, thus realizing the lifting and lowering of the hanging box 21 and the hanging box 21. When the adjustment block 5 moves left and right to adjust the distance between the vertical plates 4, the support rod 16 can pull the protective box 38 to move, thereby realizing the sliding of the support guide rod 40 inside the guide groove 39. , at the same time, the guide groove 39 can play a role in supporting the support guide rod 40, increasing the safety of the installation and placement of the hanging box 21, and avoiding the suspended placement of the hanging box 21.

实施例3Example 3

请参阅图1-图11,本实施方式对于其它实施例进一步说明,图示中的底座1、竖板4和角度调节组件,底座1的数量为两个,底座1的两侧均设有移动轮,移动轮为刹车式移动轮,且两个底座1的一侧与U型架2的端部固定连接,U型架2的中间设有对预制墙板竖直测量的检测组件,底座1的上方均开设有调节槽3;竖板4的一端固定设有调节块5,调节块5滑动设于调节槽3的内部,且调节块5的一侧与千斤顶6的输出端连接,竖板4的一侧设有定位夹板7,每个定位夹板7与竖板4之间通过升降组件连接,两个升降组件的一端通过传动组件连接;角度调节组件安装于定位夹板7的一侧,对定位夹板7的倾斜角度调节,实现对两个定位夹板7之间夹持的预制墙板的倾斜角度调节。Please refer to Figures 1 to 11. This embodiment further explains other embodiments. In the figures, the number of the base 1, the vertical plate 4 and the angle adjustment assembly is two. There are moving parts on both sides of the base 1. The moving wheel is a brake-type moving wheel, and one side of the two bases 1 is fixedly connected to the end of the U-shaped frame 2. A detection component for vertical measurement of the prefabricated wall panels is provided in the middle of the U-shaped frame 2. The base 1 Adjustment slots 3 are provided on the tops of the adjustment slots 3; one end of the vertical plate 4 is fixedly provided with an adjustment block 5, which is slidably located inside the adjustment slot 3, and one side of the adjustment block 5 is connected to the output end of the jack 6. The vertical plate There is a positioning splint 7 on one side of 4. Each positioning splint 7 is connected to the vertical plate 4 through a lifting assembly. One end of the two lifting assemblies is connected through a transmission assembly; the angle adjustment assembly is installed on one side of the positioning plywood 7, and the The inclination angle adjustment of the positioning plywood 7 realizes the inclination angle adjustment of the prefabricated wall panel clamped between the two positioning plywood 7 .

请参阅图3-图6、图8和图9,图示中的第一电机24的下方一侧设有放置板41,放置板41的一端与吊箱21的一侧固定连接,第一电机24通过夹箍与放置板41连接,夹箍的两侧通过锁紧螺栓与放置板41连接;第二电机34安装于支撑架42上,支撑架42固定设于竖板4的一侧,千斤顶6的下方设有支撑板43,且千斤顶6的两侧均通过固定螺栓与支撑板43连接;Please refer to Figures 3 to 6, Figure 8 and Figure 9. A placement plate 41 is provided on the lower side of the first motor 24 in the figures. One end of the placement plate 41 is fixedly connected to one side of the hanging box 21. The first motor 24 is connected to the placement plate 41 through a clamp, and both sides of the clamp are connected to the placement plate 41 through locking bolts; the second motor 34 is installed on the support frame 42, and the support frame 42 is fixed on one side of the vertical plate 4, and the jack A support plate 43 is provided below 6, and both sides of the jack 6 are connected to the support plate 43 through fixing bolts;

请参阅图5和图6,图示中的底座1远离U型架2的一侧均固定设有竖杆44,竖杆44的一侧和U型架2的两侧均固定设有加强杆45,加强杆45的另一端均与底座1的上方固定连接。Please refer to Figures 5 and 6. Vertical rods 44 are fixed on the side of the base 1 away from the U-shaped frame 2 in the figures. Reinforcement rods are fixed on one side of the vertical rod 44 and on both sides of the U-shaped frame 2. 45. The other ends of the reinforcing rods 45 are fixedly connected to the top of the base 1.

请参阅图5和图6、图8和图9,图示中的升降块9的两端均开设有导向孔46,导向孔46套设于导向杆47上,导向杆47的一端与调节块5的一侧固定连接。Please refer to Figures 5 and 6, Figures 8 and 9. The lifting block 9 in the figures is provided with guide holes 46 at both ends. The guide holes 46 are sleeved on the guide rod 47. One end of the guide rod 47 is in contact with the adjustment block. 5 is fixedly connected on one side.

本实施方案中,通过在第一电机24的下方设有放置板41,且放置板41的一端与吊箱21的侧壁固定连接,能够放置板41放置的稳定性,同时能够对第一电机24起到支撑的作用,避免第一电机24的悬空放置,将第一电机24通过夹箍与放置板41连接,能够起到对于第一电机24固定的作用,增加第一电机24放置在放置板41上的安全性和稳定性;在第二电机34的下方设有与竖板4侧壁固定连接的支撑架42,能够实现对于第二电机34起到支撑放置的作用,避免第二电机34的悬空放置;在千斤顶6的一侧设有支撑板43,能够对千斤顶6起到支撑放置的作用,增加千斤顶6放置的稳定性,在对底座1移动时能够带动千斤顶6同步移动;In this embodiment, by providing a placement plate 41 below the first motor 24, and having one end of the placement plate 41 fixedly connected to the side wall of the hanging box 21, the stability of the placement of the placement plate 41 can be improved, and at the same time, the first motor can be improved. 24 plays a supporting role to prevent the first motor 24 from being placed in the air. Connecting the first motor 24 to the placement plate 41 through a clamp can play a role in fixing the first motor 24 and increase the placement of the first motor 24. The safety and stability on the board 41; a support frame 42 fixedly connected to the side wall of the vertical plate 4 is provided below the second motor 34, which can support the placement of the second motor 34 and prevent the second motor from being placed. 34 is placed in the air; a support plate 43 is provided on one side of the jack 6, which can support the placement of the jack 6, increase the stability of the placement of the jack 6, and drive the jack 6 to move synchronously when the base 1 is moved;

在底座1的一侧固定设有竖杆44且竖杆44的一侧和U型架2的两侧均固定设有加强杆45,能够增加对底座1放置的稳定性;升降块9的两侧均设有导向孔46,且导向孔46的内部设有导向杆47,导向杆47固定安装于调节块5上,能够实现升降块9升降调节时,避免升降块9在水平方向上的偏移,增加了升降块9升降调节的稳定性。A vertical rod 44 is fixed on one side of the base 1, and reinforcing rods 45 are fixed on one side of the vertical rod 44 and both sides of the U-shaped frame 2, which can increase the stability of the placement of the base 1; both sides of the lifting block 9 Guide holes 46 are provided on both sides, and a guide rod 47 is provided inside the guide hole 46. The guide rod 47 is fixedly installed on the adjustment block 5, which can prevent the lifting block 9 from deflecting in the horizontal direction when the lifting block 9 is raised and lowered. The movement increases the stability of the lifting adjustment of the lifting block 9.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that these entities or operations are mutually exclusive. any such actual relationship or sequence exists between them. Furthermore, the terms "comprises," "comprises," or any other variations thereof are intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements, but also those not expressly listed other elements, or elements inherent to the process, method, article or equipment.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those of ordinary skill in the art will understand that various changes, modifications, and substitutions can be made to these embodiments without departing from the principles and spirit of the invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (10)

1.一种装配式建筑墙体定位装置,其特征在于,包括:1. A prefabricated building wall positioning device, which is characterized in that it includes: 底座(1),所述底座(1)的数量为两个,所述底座(1)的两侧均设有移动轮,所述移动轮为刹车式移动轮,且两个所述底座(1)的一侧与U型架(2)的端部固定连接,所述U型架(2)的中间设有对预制墙板竖直测量的检测组件,所述底座(1)的上方均开设有调节槽(3);Base (1), the number of the bases (1) is two, and moving wheels are provided on both sides of the base (1). The moving wheels are brake-type moving wheels, and the two bases (1) ) is fixedly connected to the end of the U-shaped frame (2). A detection component for vertical measurement of prefabricated wall panels is provided in the middle of the U-shaped frame (2). There are openings above the base (1). There are adjustment grooves (3); 竖板(4),所述竖板(4)的一端固定设有调节块(5),所述调节块(5)滑动设于所述调节槽(3)的内部,且所述调节块(5)的一侧与千斤顶(6)的输出端连接,所述竖板(4)的一侧设有定位夹板(7),每个所述定位夹板(7)与所述竖板(4)之间通过升降组件连接,两个所述升降组件的一端通过传动组件连接;The vertical plate (4) has an adjusting block (5) fixed at one end of the vertical plate (4). The adjusting block (5) is slidably installed inside the adjusting groove (3), and the adjusting block (5) 5) is connected to the output end of the jack (6), one side of the vertical plate (4) is provided with a positioning splint (7), and each of the positioning splints (7) is connected to the vertical plate (4) They are connected through a lifting assembly, and one end of the two lifting assemblies is connected through a transmission assembly; 角度调节组件,安装于所述定位夹板(7)的一侧,对所述定位夹板(7)的倾斜角度调节,实现对两个所述定位夹板(7)之间夹持的预制墙板的倾斜角度调节。The angle adjustment component is installed on one side of the positioning plywood (7), and adjusts the inclination angle of the positioning plywood (7) to realize the adjustment of the prefabricated wall panels clamped between the two positioning plywood (7). Tilt angle adjustment. 2.根据权利要求1所述的一种装配式建筑墙体定位装置,其特征在于,所述升降组件包括开设于所述竖板(4)一侧的升降槽(8),所述升降槽(8)的内部滑动设有升降块(9),所述升降块(9)螺纹套设于螺杆(10)上,且所述螺杆(10)转动安装于所述升降槽(8)的内部,所述升降块(9)的一侧设有安装块(11),所述安装块(11)与所述升降块(9)之间通过转轴(12)连接,且所述安装块(11)固定设于所述转轴(12)上,所述安装块(11)的另一侧通过加强板(13)与所述定位夹板(7)的一侧固定连接,其中所述螺杆(10)的一端均与所述传动组件连接,所述转轴(12)的一端与所述角度调节组件连接。2. A prefabricated building wall positioning device according to claim 1, characterized in that the lifting assembly includes a lifting slot (8) opened on one side of the vertical plate (4), and the lifting slot (8) is provided with a lifting block (9) for sliding movement inside. The lifting block (9) is threaded on the screw rod (10), and the screw rod (10) is rotatably installed inside the lifting groove (8). , a mounting block (11) is provided on one side of the lifting block (9), the mounting block (11) and the lifting block (9) are connected through a rotating shaft (12), and the mounting block (11) ) is fixedly installed on the rotating shaft (12), and the other side of the mounting block (11) is fixedly connected to one side of the positioning splint (7) through a reinforcing plate (13), wherein the screw (10) One end of the rotating shaft (12) is connected to the transmission component, and one end of the rotating shaft (12) is connected to the angle adjustment component. 3.根据权利要求2所述的一种装配式建筑墙体定位装置,其特征在于,所述角度调节组件包括固定设于所述转轴(12)一端的蜗轮(14),所述蜗轮(14)的一侧啮合设有蜗杆(15),所述蜗杆(15)的一端与支撑杆(16)转动连接,所述支撑杆(16)的一端与所述升降块(9)的侧壁固定连接,所述蜗杆(15)的另一端固定设有插杆(17),所述插杆(17)的侧壁上等距离开设有限位槽(18),所述插杆(17)的一端插设于插筒(19)的内部,且所述插筒(19)的内壁上等距离固定设有与所述限位槽(18)相匹配的限位条(20),所述插筒(19)的另一端与吊箱(21)的侧壁转动连接,且所述插筒(19)的一端贯穿所述吊箱(21)的侧壁且向其内部延伸与第一伞齿(22)的一侧固定连接,两个所述第一伞齿(22)的一侧啮合设有第二伞齿(23),所述第二伞齿(23)的一侧与第一电机(24)的输出端连接,所述吊箱(21)与支撑组件连接。3. A prefabricated building wall positioning device according to claim 2, characterized in that the angle adjustment component includes a worm gear (14) fixed on one end of the rotating shaft (12), and the worm gear (14) ) is meshed with a worm (15) on one side, one end of the worm (15) is rotatably connected to the support rod (16), and one end of the support rod (16) is fixed to the side wall of the lifting block (9) connection, the other end of the worm (15) is fixed with an insertion rod (17), and the side walls of the insertion rod (17) are provided with limited slots (18) at equal distances. One end of the insertion rod (17) It is inserted inside the insertion sleeve (19), and the inner wall of the insertion sleeve (19) is fixed with limiting bars (20) matching the limiting groove (18) at equal distances. The other end of (19) is rotatably connected to the side wall of the hanging box (21), and one end of the insert (19) penetrates the side wall of the hanging box (21) and extends inwards to connect with the first bevel tooth ( 22) is fixedly connected to one side, and a second bevel gear (23) is provided on one side of the two first bevel gears (22). One side of the second bevel gear (23) is connected to the first motor (22). The output end of 24) is connected, and the hanging box (21) is connected with the support component. 4.根据权利要求2所述的一种装配式建筑墙体定位装置,其特征在于,所述传动组件包括固定设于所述螺杆(10)一端的第一齿轮(25),所述第一齿轮(25)的一侧均设有第二齿轮(26),所述第一齿轮(25)和所述第二齿轮(26)之间均通过齿链(27)啮合连接;4. A prefabricated building wall positioning device according to claim 2, characterized in that the transmission assembly includes a first gear (25) fixed on one end of the screw (10), and the first gear (25) is fixed on one end of the screw (10). A second gear (26) is provided on one side of the gear (25), and the first gear (25) and the second gear (26) are meshed and connected by a tooth chain (27); 所述传动组件还包括设于两个所述第一齿轮(25)之间的张紧辊(28),所述张紧辊(28)转动安装于滑块(29)的一侧,所述滑块(29)的一侧设有支架(30),所述支架(30)的一端与所述U型架(2)的一侧固定连接,且所述支架(30)上开设有与所述滑块(29)相匹配的滑槽(31),所述滑块(29)滑动设于所述滑槽(31)的内部,所述滑块(29)螺纹套设于丝杆(32)上,所述丝杆(32)安装于所述滑槽(31)的内部,且所述丝杆(32)的一端贯穿所述滑槽(31)且向外延伸与摇柄(33)固定连接,其中所述第二齿轮(26)分别转动设于所述支架(30)的两端,其中一个所述第一齿轮(25)的一侧设有第二电机(34),且所述第二电机(34)的一端与所述螺杆(10)的一端连接。The transmission assembly also includes a tension roller (28) located between the two first gears (25). The tension roller (28) is rotatably mounted on one side of the slide block (29). A bracket (30) is provided on one side of the slider (29), one end of the bracket (30) is fixedly connected to one side of the U-shaped frame (2), and the bracket (30) is provided with a The slider (29) is matched with the slider (31). The slider (29) is slidably located inside the slider (31). The slider (29) is threadedly sleeved on the screw rod (32). ), the screw rod (32) is installed inside the chute (31), and one end of the screw rod (32) penetrates the chute (31) and extends outward to connect with the crank handle (33) Fixed connection, wherein the second gears (26) are respectively rotatably installed at both ends of the bracket (30), a second motor (34) is provided on one side of one of the first gears (25), and the One end of the second motor (34) is connected to one end of the screw (10). 5.根据权利要求1所述的一种装配式建筑墙体定位装置,其特征在于,所述检测组件包括固定设于所述U型架(2)中间一侧的量角器(35),所述U型架(2)的中间固定设有圆柱,所述圆柱上固定设有绳索(36),所述绳索(36)的一端固定设有锥型铅球(37)。5. A prefabricated building wall positioning device according to claim 1, characterized in that the detection component includes a protractor (35) fixed on the middle side of the U-shaped frame (2), and the A cylinder is fixed in the middle of the U-shaped frame (2), a rope (36) is fixed on the cylinder, and a conical lead ball (37) is fixed on one end of the rope (36). 6.根据权利要求3所述的一种装配式建筑墙体定位装置,其特征在于,所述支撑组件包括固定设于所述支撑杆(16)一侧的防护箱(38),所述蜗轮(14)和蜗杆(15)均设于所述防护箱(38)的内部,所述防护箱(38)的顶部固定设于导向槽(39),所述导向槽(39)的内部滑动设有支撑导杆(40),所述支撑导杆(40)的一侧与所述吊箱(21)的顶部固定连接。6. A prefabricated building wall positioning device according to claim 3, characterized in that the support assembly includes a protective box (38) fixed on one side of the support rod (16), and the worm gear (14) and the worm (15) are both arranged inside the protective box (38). The top of the protective box (38) is fixedly installed on the guide groove (39), and the internal sliding device of the guide groove (39) is There is a support guide rod (40), and one side of the support guide rod (40) is fixedly connected to the top of the hanging box (21). 7.根据权利要求3所述的一种装配式建筑墙体定位装置,其特征在于,所述第一电机(24)的下方一侧设有放置板(41),所述放置板(41)的一端与所述吊箱(21)的一侧固定连接,所述第一电机(24)通过夹箍与所述放置板(41)连接,所述夹箍的两侧通过锁紧螺栓与所述放置板(41)连接。7. A prefabricated building wall positioning device according to claim 3, characterized in that a placement plate (41) is provided on the lower side of the first motor (24), and the placement plate (41) One end of the clamp is fixedly connected to one side of the hanging box (21), the first motor (24) is connected to the placement plate (41) through a clamp, and both sides of the clamp are connected to the mounting plate through locking bolts. The placement plate (41) is connected. 8.根据权利要求4所述的一种装配式建筑墙体定位装置,其特征在于,所述第二电机(34)安装于支撑架(42)上,所述支撑架(42)固定设于所述竖板(4)的一侧,所述千斤顶(6)的下方设有支撑板(43),且所述千斤顶(6)的两侧均通过固定螺栓与所述支撑板(43)连接。8. A prefabricated building wall positioning device according to claim 4, characterized in that the second motor (34) is installed on a support frame (42), and the support frame (42) is fixed on A support plate (43) is provided on one side of the vertical plate (4) and below the jack (6), and both sides of the jack (6) are connected to the support plate (43) through fixing bolts. . 9.根据权利要求1所述的一种装配式建筑墙体定位装置,其特征在于,所述底座(1)远离所述U型架(2)的一侧均固定设有竖杆(44),所述竖杆(44)的一侧和所述U型架(2)的两侧均固定设有加强杆(45),所述加强杆(45)的另一端均与所述底座(1)的上方固定连接。9. A prefabricated building wall positioning device according to claim 1, characterized in that vertical rods (44) are fixed on the side of the base (1) away from the U-shaped frame (2). , one side of the vertical rod (44) and both sides of the U-shaped frame (2) are fixed with reinforcing rods (45), and the other ends of the reinforcing rods (45) are connected with the base (1 ) is fixedly connected above. 10.根据权利要求2所述的一种装配式建筑墙体定位装置,其特征在于,所述升降块(9)的两端均开设有导向孔(46),所述导向孔(46)套设于导向杆(47)上,所述导向杆(47)的一端与所述调节块(5)的一侧固定连接。10. A prefabricated building wall positioning device according to claim 2, characterized in that guide holes (46) are provided at both ends of the lifting block (9), and the guide holes (46) are It is provided on the guide rod (47), and one end of the guide rod (47) is fixedly connected to one side of the adjustment block (5).
CN202311035560.6A 2023-08-15 2023-08-15 Assembled building wall positioner Withdrawn CN117188784A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311035560.6A CN117188784A (en) 2023-08-15 2023-08-15 Assembled building wall positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311035560.6A CN117188784A (en) 2023-08-15 2023-08-15 Assembled building wall positioner

Publications (1)

Publication Number Publication Date
CN117188784A true CN117188784A (en) 2023-12-08

Family

ID=88989634

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311035560.6A Withdrawn CN117188784A (en) 2023-08-15 2023-08-15 Assembled building wall positioner

Country Status (1)

Country Link
CN (1) CN117188784A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118756976A (en) * 2024-09-03 2024-10-11 中铁七局集团西安铁路工程有限公司 Prefabricated building wall panel installation positioning and mold layout device and construction method
CN118979646A (en) * 2024-10-08 2024-11-19 宿迁新居科技有限公司 Installation and positioning device for building construction and installation and positioning method thereof
CN119411840A (en) * 2025-01-09 2025-02-11 福建理工大学 A wall positioning device for assembled building

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118756976A (en) * 2024-09-03 2024-10-11 中铁七局集团西安铁路工程有限公司 Prefabricated building wall panel installation positioning and mold layout device and construction method
CN118979646A (en) * 2024-10-08 2024-11-19 宿迁新居科技有限公司 Installation and positioning device for building construction and installation and positioning method thereof
CN119411840A (en) * 2025-01-09 2025-02-11 福建理工大学 A wall positioning device for assembled building

Similar Documents

Publication Publication Date Title
CN117188784A (en) Assembled building wall positioner
CN114682985B (en) Counter-positioning device for large diameter steel pipe welding
CN116239026B (en) A hoisting device for assembled building construction
CN211470530U (en) Slide rail hanger plate for mechanical automation equipment installation
CN116692656A (en) A device and method for hoisting and assembling adjustment of prefabricated parts
CN115626567A (en) A hoisting device for super-high-rise variable-section unit glass curtain walls
CN112919361B (en) Pipeline vertical hoisting device
CN113503043B (en) Assembly type building installation equipment
CN211078316U (en) Adjustable pipeline installation crane
CN109110667B (en) Portable supplementary siding wall splicing apparatus
CN117658014A (en) Auxiliary installation device for water heating pipe fitting
CN116692670B (en) Steel house lid lifting device for steel structure factory building equipment
CN118639859A (en) A template connection structure
CN107989355B (en) A kind of support platform and window construction method of floaing for window construction of floaing
CN118145549A (en) Autoclaved aerated concrete slat mounting equipment
CN113931425B (en) Elevator shaft construction platform
CN216341054U (en) Auxiliary device for beam and column installation of steel structure building
CN116607796A (en) A quick positioning and installation device for building assembled structural wall panels
CN215484755U (en) Liftable support for construction engineering construction
CN116357100A (en) Auxiliary device for reinforcing portal steel frame
CN114753651A (en) Simple large-size partition plate vertical plate machine
CN219158375U (en) Scaffold reinforcing apparatus
CN222574203U (en) Movable indoor pipeline elevator
CN220336907U (en) Construction trolley with stable clamping structure
CN219792148U (en) Full-automatic hoisting device of prefabricated structure for underground station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20231208

WW01 Invention patent application withdrawn after publication