CN117166540B - Waterproof node with hidden beam for side wall and bottom plate of assembled subway station and construction process - Google Patents

Waterproof node with hidden beam for side wall and bottom plate of assembled subway station and construction process

Info

Publication number
CN117166540B
CN117166540B CN202311160973.7A CN202311160973A CN117166540B CN 117166540 B CN117166540 B CN 117166540B CN 202311160973 A CN202311160973 A CN 202311160973A CN 117166540 B CN117166540 B CN 117166540B
Authority
CN
China
Prior art keywords
leaf plate
cast
waterproof
plate
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311160973.7A
Other languages
Chinese (zh)
Other versions
CN117166540A (en
Inventor
庄海洋
杨帆
刘旭晨
张季
许紫刚
刘巍
何新宇
魏云翔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East China Jiaotong University
Original Assignee
East China Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East China Jiaotong University filed Critical East China Jiaotong University
Priority to CN202311160973.7A priority Critical patent/CN117166540B/en
Publication of CN117166540A publication Critical patent/CN117166540A/en
Application granted granted Critical
Publication of CN117166540B publication Critical patent/CN117166540B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses an assembly type subway station side wall-bottom plate waterproof node with a hidden beam and a construction process, and belongs to the technical field of underground structure construction. The cast-in-situ bottom plate is provided with a reserved groove, two sides of the reserved groove are respectively provided with a waterproof groove and a reinforcing steel bar joint, the inner blade plate is connected with the cast-in-situ bottom plate through a grouting sleeve, the outer blade plate is connected with the cast-in-situ bottom plate through a flexible waterproof strip, the inner blade plate and the outer blade plate are connected through truss reinforcing steel bars and tie bars, a hidden beam is placed in the reserved groove, a middle cavity is formed between the inner blade plate and the outer blade plate, a pouring area is formed by the inner blade plate, the outer blade plate, the middle cavity and the reserved groove, and concrete in the pouring area and the prefabricated side wall jointly form a tenon structure embedded in the cast-in-situ bottom plate after pouring. The invention greatly improves the construction efficiency while ensuring the stress performance of the structure, reduces the die consumption of the construction site, and has obvious economical efficiency and environmental protection.

Description

Waterproof node with hidden beam for side wall and bottom plate of assembled subway station and construction process
Technical Field
The invention belongs to the technical field of underground structure assembly type construction, and particularly relates to an assembly type subway station side wall-bottom plate waterproof node with a hidden beam and a construction process.
Background
In recent years, with the continuous maturity of the fabricated technology and the strong support of the national development of fabricated buildings, the development of fabricated buildings is rapid. The assembled building is more and more favored because of the advantages of high efficiency, environmental protection, convenience and the like.
At present, the assembly type technology is widely applied to the upper structure, and the exploration of the underground assembly type structure is still in a starting stage. At present, the social and economic development and the urban process of China are continuously accelerated, the problem of urban land resource shortage is increasingly outstanding, the common ground traffic cannot meet the daily travel demands of people, and reasonable utilization and development of underground space resources are important means for solving the sustainable development of cities, so that the development of underground space development underground traffic on a large scale becomes a necessary condition for relieving traffic jam, and subways become one of main underground traffic schemes.
However, the current subway station construction is mainly based on open cut cast-in-place, the method also brings the problem of longer construction period and long-term influence on peripheral traffic caused by the construction period, and in addition, the longer construction period also makes various factors inducing foundation pit collapse more difficult to predict and causes harm to the construction site and the safety of peripheral buildings. For example, in 2015, a great amount of precipitation from the Beijing east station of the No. 4 line of the Nanjing subway floods into the foundation pit to cause ground collapse, and in the same year, the drainage box culvert of the Beijing east station of the No. 4 line of the Nanjing subway is corroded by the geological environment of silt for a long time to seriously leak water to cause pavement collapse.
In addition, the traditional full cast-in-situ construction process is easy to bring the defects of dust and noise pollution, template material consumption, numerous people in construction sites, high labor intensity, difficult engineering quality control and the like. Therefore, the application of the full-propulsion assembly type technology in the field of subway station construction has obvious necessity, urgency and innovation.
In view of the above, there is a need for an improvement over the deficiencies in the prior art to solve the above-described problems.
Disclosure of Invention
The invention aims to provide an assembled subway station side wall-bottom plate waterproof node with a hidden beam and a construction process, which are used for solving the problems of long construction period, poor joint waterproof performance, large mould consumption and the like of the existing subway station.
In order to achieve the above purpose, the present invention provides the following technical solutions:
take waterproof node of assembled subway station side wall-bottom plate of hidden roof beam, include:
The cast-in-situ bottom plate is provided with a horizontal straight reserved groove, one side along the length direction of the reserved groove is provided with a row of steel bar joints, and the other side is provided with a waterproof groove;
prefabricating the side wall, include:
The inner blade plate is connected with one side of the cast-in-situ bottom plate, which is provided with a reinforcing steel bar joint, a row of grouting sleeves are vertically arranged on the inner side of the bottom of the inner blade plate, the lower ends of one row of grouting sleeves are open, the inside of one row of grouting sleeves is hollow, and one row of reinforcing steel bar joint is embedded into one row of grouting sleeves so that the inner blade plate is rigidly connected with the cast-in-situ bottom plate, and an inner reinforcing steel bar net is arranged in the inner blade plate;
the outer blade plate is connected with one side of the cast-in-situ bottom plate, which is provided with a waterproof groove, a flexible waterproof strip is integrally formed on the outer side of the bottom of the outer blade plate, the waterproof groove is embedded into the lower end of the flexible waterproof strip, so that the outer blade plate is flexibly and hermetically connected with the cast-in-situ bottom plate, and an outer reinforcing steel bar net is arranged in the outer blade plate;
the truss steel bar is used for connecting the inner blade plate and the outer blade plate so as to improve the connection rigidity of the inner blade plate and the outer blade plate, one side of the truss steel bar is positioned between the inner blade plate and the outer blade plate, extends into the inner blade plate and is connected with the inner steel bar mesh, and the other side of the truss steel bar is extended into the outer blade plate and is connected with the outer steel bar mesh;
The height value of the hidden beam is larger than the depth value of the reserved groove, and the hidden beam is placed in the reserved groove;
And a middle cavity is formed between the inner blade plate and the outer blade plate, the middle cavity and the reserved groove form a casting area, and after casting, concrete in the casting area and the prefabricated side wall jointly form a tenon structure embedded into the cast-in-situ bottom plate.
Further, grooves are formed in two sides of the middle of the flexible waterproof strip, and after the flexible waterproof strip is compacted, enough expansion space is reserved in two sides of the middle, so that the joint between the flexible waterproof groove and the waterproof strip is spliced compactly.
Further, the inner blade plate and the outer blade plate are horizontally arranged in parallel, one end of the inner blade plate is connected with the inner reinforcing steel bar mesh in the inner blade plate, the other end of the inner blade plate is connected with the outer reinforcing steel bar mesh of the outer blade plate, and the tie bars penetrate through the hidden beam so that the hidden beam, the inner blade plate and the outer blade plate form a whole.
Further, the upper end of the grouting sleeve is in threaded connection with the bottom of the vertical steel bars of the inner steel bar mesh and is arranged in the inner blade plate, one side of the grouting sleeve is provided with a grouting pipe and a grouting pipe which are communicated up and down, and one ends of the grouting pipe and the grouting pipe, which are far away from the grouting sleeve body, are leveled with the outer surface of the inner blade plate.
Further, the hidden beam comprises longitudinal ribs and stirrups which are sequentially arranged along the length direction of the longitudinal ribs.
Further, the flexible waterproof strip is made of rubber or polyurethane resin material.
Further, the height of the junction of the cast-in-situ bottom plate is 1/3 of the height of the station bottom layer, and the height of the cast-in-situ bottom plate is less than 2m.
Further, the inner rebar mesh is disposed throughout the inner leaf, and the outer rebar mesh is disposed throughout the outer leaf.
A construction process of an assembled subway station side wall-bottom plate waterproof node with a hidden beam comprises the following steps:
s1, respectively pouring prefabricated side walls and a cast-in-situ bottom plate in advance;
When the cast-in-situ bottom plate is poured, a reserved groove is formed in the cast-in-situ bottom plate, and a reinforcing steel bar joint and a waterproof groove are respectively arranged on two sides of the reserved groove along the length direction;
When the prefabricated side wall is poured, a grouting sleeve is arranged at the bottom of the inner blade plate, a flexible waterproof strip is integrally formed at the bottom of the outer blade plate, truss steel bars are used for fixing the inner blade plate and the outer blade plate, in addition, tie bars are connected between the inner blade plate and the outer blade plate and penetrate through the hidden beam, so that the hidden beam, the inner blade plate and the outer blade plate form a whole;
S2, correspondingly connecting an inner leaf plate provided with a grouting sleeve with a cast-in-situ bottom plate provided with a reinforcing steel bar joint, correspondingly connecting an outer leaf plate integrally formed with a flexible waterproof strip with the cast-in-situ bottom plate provided with a waterproof groove, and placing a hidden beam in a reserved groove on the cast-in-situ bottom plate, wherein the height value of the hidden beam is larger than the depth value of the reserved groove;
S3, after the reinforced bar joint on the cast-in-situ bottom plate is embedded into the grouting sleeve, grouting is carried out in the grouting sleeve through the grouting pipe, so that the connection between the inner blade plate and the cast-in-situ bottom plate is further fastened, and after the grouting pipe is subjected to grouting, the grouting pipe and the grouting pipe are respectively subjected to sealing treatment;
s4, a middle cavity is formed between the inner blade plate and the outer blade plate, a casting area is formed by the middle cavity and the reserved groove, after casting, a tenon structure is formed by concrete in the casting area and the prefabricated side wall together, and the tenon structure is embedded into the cast-in-situ bottom plate to form a stable waterproof structure.
Compared with the prior art, the invention has the beneficial effects that:
(1) The prefabricated side wall can avoid the formwork supporting process of a wall body on a construction site by prefabricating the inner prefabricated wall board and the outer prefabricated wall board, simplifies the site construction process, is economical and environment-friendly, and simultaneously resists slippage between new and old concrete interfaces by arranging truss reinforcing steel bars and tie bars between the two prefabricated boards, thereby ensuring the rigidity of the whole wall body.
(2) The joint structure between the side wall and the bottom plate is characterized in that a tension area is reserved at the inner side of the joint structure, so that grouting sleeve connection is reserved at the inner side of the joint structure, a compression area is reserved at the outer side of the joint structure, a special waterproof strip is arranged at the outer side joint, in addition, a casting area formed by a reserved groove and a cavity in the middle of the prefabricated side wall is arranged on the cast-in-situ bottom plate, a tenon is formed together with the prefabricated wall plate after casting, and a connecting node of the cast-in-situ bottom plate and the prefabricated side wall belongs to semi-rigid connection and has a certain degree of freedom under the action of soil pressure. Under the action of soil pressure, the connection part of the grouting sleeve at the inner side resists tensile stress, and the special waterproof strip at the outer side joint is compacted by itself under the action of compressive stress, so that the waterproof performance of the joint is ensured.
Drawings
The technical solution of the present invention and its advantageous effects will be made apparent by the following detailed description of the specific embodiments of the present invention with reference to the accompanying drawings.
Fig. 1 is a perspective view of an assembled subway station side wall-bottom plate waterproof node with a hidden beam according to an embodiment of the invention;
fig. 2 is a front view of an assembled subway station sidewall-bottom plate waterproof node with a hidden beam according to an embodiment of the present invention;
Fig. 3 is a top view of an assembled subway station side wall-bottom plate waterproof node prefabricated side wall with a hidden beam according to an embodiment of the invention;
Fig. 4 is a schematic view of a cast-in-situ slab structure of a waterproof node of a side wall-slab of an assembled subway station with a hidden beam according to an embodiment of the invention
Fig. 5 is a schematic view of a hidden beam structure of a waterproof node of a side wall and a bottom plate of an assembled subway station with a hidden beam according to an embodiment of the present invention;
fig. 6 is a schematic view of flexible waterproof strip assembly of a waterproof node of a side wall and a bottom plate of an assembled subway station with a hidden beam according to an embodiment of the invention;
Fig. 7 is an assembly schematic diagram of an assembled subway station side wall-bottom plate waterproof node prefabricated side wall with a hidden beam and a cast-in-situ bottom plate according to an embodiment of the invention;
Fig. 8 is a grouting sleeve connection schematic diagram of an assembled subway station side wall-bottom plate waterproof node with a hidden beam according to an embodiment of the invention.
In the figure, 1, prefabricated side walls, 11, inner blades, 12, outer blades, 13, inner reinforcing steel bars, 14, outer reinforcing steel bars, 15, tie bars, 16, truss reinforcing steel bars, 2, cast-in-situ bottom plates, 21, reinforcing steel bar joints, 22, reserved grooves, 23, waterproof grooves, 3, grouting sleeves, 31, connecting threads, 32, grouting pipes, 33, grouting pipes, 34, grouting areas, 4, hidden beams, 41, longitudinal bars, 42, stirrups, 5 and flexible waterproof strips.
Detailed Description
The present invention will be described in further detail with reference to the following examples in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In order to solve the problems of long construction period, poor joint waterproof performance, large mould consumption and the like of the existing subway station, the invention particularly provides an assembled subway station side wall-bottom plate waterproof node with a hidden beam;
According to the design scheme, a large number of forms can be prevented from being supported in the construction process by prefabricating two wallboards of the inner blade plate 11 and the outer blade plate 12, a reserved groove 22 is formed in the cast-in-situ bottom plate 2, waterproof grooves 22 and reinforcing steel bar joints 21 are respectively formed in the cast-in-situ bottom plate 2 on two sides of the reserved groove 22, the inner blade plate 11 provided with a grouting sleeve 3 is correspondingly connected with the cast-in-situ bottom plate 2 on one side provided with the reinforcing steel bar joints 21, and the outer blade plate 12 integrally formed with the flexible waterproof strip 5 is correspondingly connected with the cast-in-situ bottom plate 2 on one side provided with the waterproof groove 23;
meanwhile, a middle cavity is formed between the inner blade plate 11 and the outer blade plate 12, the middle cavity and the reserved groove 22 form a casting area, after casting, concrete in the casting area and the prefabricated side wall 1 jointly form a tenon structure, and the tenon structure is embedded into the cast-in-situ bottom plate 2 to form a stable waterproof structure.
The tenon structure formed by casting has a certain degree of freedom, the flexible waterproof strip 5 is arranged at the joint of the outer blade 12 and the cast-in-situ bottom plate 2, the flexible waterproof strip 5 is connected with the waterproof groove 23 in an embedded manner, and the tenon structure is compacted by itself under the action of soil pressure, so that better waterproof performance can be realized. For further explanation of the structure of the present invention, the detailed description is as follows in connection with the accompanying drawings:
As shown in fig. 1, the embodiment of the invention discloses an assembled subway station side wall-bottom plate waterproof node with a hidden beam, which comprises a prefabricated side wall 1, a cast-in-situ bottom plate 2, a grouting sleeve 3, a hidden beam 4 and a flexible waterproof strip 5;
A horizontal straight reserved groove 22 is formed in the cast-in-situ bottom plate 2, one side of the reserved groove 22 along the length direction is provided with a row of steel bar joints 21, and the other side is provided with a waterproof groove 23;
The prefabricated side wall 1 comprises an inner blade 11 and an outer blade 12 which are arranged in parallel, and truss steel bars 16 are arranged between the inner blade 11 and the outer blade 12 and used for fixedly connecting the inner blade 11 and the outer blade 1 so that the inner blade 11 and the outer blade 12 form a whole;
The inner blade plate 11 and the outer blade plate 12 are respectively connected with two sides of a reserved groove 22 on the cast-in-situ bottom plate 2;
the inner blade plate 11 is connected with one side of the cast-in-situ bottom plate 2, which is provided with a reinforcing steel bar joint 21, a row of grouting sleeves 3 is vertically arranged on the inner side of the bottom of the inner blade plate 11, a row of reinforcing steel bar joints 21 are correspondingly embedded into a row of grouting sleeves 3, so that the inner blade plate 11 is connected with the cast-in-situ bottom plate 2, and an inner reinforcing steel bar net 13 is arranged in the inner blade plate 11;
as shown in fig. 2 and 6, the outer blade 12 is connected with one side of the cast-in-situ bottom plate 2, which is provided with a waterproof groove 23, a flexible waterproof strip 5 is integrally formed at the outer side of the bottom of the outer blade 12, the waterproof groove 23 is matched and connected with the lower end of the flexible waterproof strip 5 to improve the seam waterproof performance, the outer blade 12 is connected with the waterproof groove 23 through the flexible waterproof strip 5, and an outer reinforcing steel mesh is arranged in the outer blade 12;
As shown in fig. 3, truss steel bars 16 are used for connecting the inner leaf 11 and the outer leaf 12 to improve the connection rigidity of the inner leaf 11 and the outer leaf 12, the truss steel bars 16 are located between the inner leaf 11 and the outer leaf 12, one side of each truss steel bar is extended into the inner leaf 11 and connected with the inner steel bar mesh 13, and the other side is extended into the outer leaf 12 and connected with the outer steel bar mesh 14;
the reserved groove 22 is used for accommodating the hidden beam 4, and the height value of the hidden beam 4 is larger than the depth value of the reserved groove 22;
After the inner blade plate 11 and the outer blade plate 12 are respectively installed with the cast-in-situ bottom plate 2, a middle cavity is formed between the inner blade plate 11 and the outer blade plate 12, the middle cavity and the reserved groove 22 form a casting area, and after casting, concrete in the casting area and the prefabricated side wall 1 jointly form a tenon structure embedded into the cast-in-situ bottom plate 2.
As shown in fig. 2,3 and 5, a plurality of tie bars 15 parallel to each other are further arranged at the lower ends between the inner blade plate 11 and the outer blade plate 12, the tie bars 15 are positioned at the lower ends of the middle cavities between the inner blade plate 11 and the outer blade plate 12, and the plurality of tie bars penetrate through the hidden beams so that the hidden beams, the inner blade plate 11 and the outer blade plate 12 form a whole.
The upper part of the flexible waterproof strip 5 is integrally prefabricated with the outer blade 12, the lower part of the flexible waterproof strip 5 is connected with the waterproof groove 23 in an embedded way, the flexible waterproof strip 5 is longitudinally arranged along the outer blade 12, the longitudinal length of the flexible waterproof strip 5 is 3m, the height of the flexible waterproof strip is 50mm, the transverse width of the flexible waterproof strip is not less than 40mm, the flexible waterproof strip 5 comprises an upper part, a middle part and a lower part from top to bottom,
The upper part is embedded to the bottom of the outer blade plate 12, the embedded depth is 20mm, the lower part is 20mm embedded into the waterproof groove 23 of the cast-in-situ bottom plate 2, the middle part is 10mm, grooves are formed in the two sides of the middle part along the length direction of the waterproof groove 23, after the flexible waterproof strip 5 is compacted, the flexible waterproof strip 5 is ensured to leave enough expansion space on the two sides of the flexible waterproof strip 5 under the compaction effect, and therefore joints between the flexible waterproof strip 5 and the waterproof groove 23 are spliced tightly. The cross section of the waterproof groove 23 is 40mm multiplied by 20mm, the width is 40mm, the depth is 20mm, and the length of the waterproof groove 23 is not more than 3 meters because the waterproof groove 23 is connected with the flexible waterproof strip 5 in an embedded manner;
As shown in fig. 8, the grouting sleeve 3 is open at the bottom end, hollow in the interior, installed at the bottom end of the vertical steel bars of the inner steel bar mesh 13 and built in the inner blade plate 11, the bottom end of the vertical steel bars is provided with external threads, the upper end of the grouting sleeve 3 is correspondingly provided with internal threads matched with the external threads, and the grouting sleeve 3 is in threaded connection with the bottom end of the vertical steel bars;
The grouting sleeve 3 is arranged in such a way, so that the connection between the grouting sleeve 3 and the inner blade plate 11 is firmer, the grouting sleeve 3 is internally embedded into the reinforcing steel bar joint 21 on the cast-in-situ bottom plate 2, and the inner blade plate 11 and the cast-in-situ bottom plate 2 are more firmly connected.
Specifically, the grouting sleeve 3 comprises a connecting thread 31 at the upper end, a grouting pipe 32 and a grouting pipe 33 which are transversely arranged on the side edge up and down, and a grouting area 34 with a hollow inside, wherein the grouting pipe 32 and the grouting pipe 33 are communicated with the grouting area 34, and one ends of the grouting pipe 32 and the grouting pipe 33, which are far away from the cylinder body of the grouting sleeve 3, are leveled with the surface of the inner blade plate 11. The upper end of the grouting sleeve 3 is connected with the bottom of the longitudinal steel bars of the inner steel bar mesh 13 through threads 31. When the grouting device is installed, the steel bar joint 21 on the cast-in-situ bottom plate 2 stretches into the grouting area 34 from the opening at the lower end of the grouting sleeve 3, grouting is carried out on the grouting pipe 32 after the grouting device is installed in place, when the grouting material flows out of the grouting pipe 33 to indicate that the grouting material in the grouting area 34 is compact, grouting is stopped, and the grouting pipe 32 and the grouting pipe 33 are plugged by rubber plugs.
As shown in fig. 7, the hidden beam 4 includes longitudinal ribs 41 that are longitudinally arranged and a plurality of stirrups 42 that are sequentially arranged along the length direction of the longitudinal ribs, wherein the longitudinal ribs include four longitudinal ribs 41 that are parallel to each other, two longitudinal ribs 41 that are parallel to each other and located above, two longitudinal ribs 42 that are parallel to each other and located below, and the stirrups 42 are square structures, and the stirrups 42 include a plurality of longitudinal ribs 41 that are sequentially arranged along the length direction of the longitudinal ribs 41, and four corners of the stirrups 42 are respectively welded and fixed with the four longitudinal ribs 41.
The flexible waterproof strip 5 is made of rubber or polyurethane resin material, and the flexible waterproof strip 5 on the outer blade 12 is compacted in a waterproof groove under the action of soil pressure, so that water can be prevented from penetrating into a casting area.
The tie bars 15 comprise a plurality of tie bars 15 which are horizontally arranged in parallel, are arranged at the lower end of a cavity between the inner blade plate 11 and the outer blade plate 12, and are respectively connected with the inner reinforcing steel mesh 13 and the outer reinforcing steel mesh 14 at two ends, and the plurality of tie bars 15 penetrate through the lower parts of the two longitudinal bars 41 at the upper end of the hidden beam 4, so that the hidden beam 4 is connected with the inner blade plate 11 and the outer blade plate 12 into a whole.
As shown in fig. 4, the height of the junction of the cast-in-situ bottom plate 2 is greater than 1/3 of the height of the bottom layer of the station (not shown in the figure) (H in fig. 4 is the height of the junction of the cast-in-situ bottom plate), so as to ensure that the connection section between the grouting sleeve 3 of the inner blade plate 11 and the reinforcing steel bar joint 21 effectively resists tensile stress under the action of soil pressure, the lower part of the flexible waterproof strip 5 on the outer blade plate 12 is automatically compacted in the waterproof groove 23 under the action of compressive stress, and the height of the cast-in-situ bottom plate 2 is less than 2m, so as to avoid a large number of formwork supports on site.
Under the action of lateral soil pressure, the cast-in-situ bottom plate 2 can displace along the stress direction, the cast-in-situ bottom plate 2 is regarded as a rigid frame which is uniformly loaded, the middle part of the cast-in-situ bottom plate 2 can generate deflection along the stress direction, so that the inner side of the section of the cast-in-situ bottom plate 21 generates tensile stress, the outer side generates compressive stress, a bending moment diagram of the cast-in-situ bottom plate is determined by calculating the load of a subway station, the bottom layer height (the bottom floor to top floor height) of the station is assumed to be h, and the inner side tension area is found to be at least between h/3 and 2h/3, so that the junction height of the cast-in-situ bottom plate 2 is ensured to be 1/3 of the bottom layer height.
The inner reinforcing mesh 13 is disposed over the inner blade 11, and the outer reinforcing mesh 14 is disposed over the outer blade 12, so that the rigidity of the inner blade 11 and the outer blade 12 can be enhanced.
A construction process of an assembled subway station side wall-bottom plate waterproof node with a hidden beam comprises the following steps:
s1, respectively pouring prefabricated side walls and a cast-in-situ bottom plate 2 in advance;
when the cast-in-situ bottom plate 2 is poured, a reserved groove is arranged on the cast-in-situ bottom plate 2, and a reinforcing steel bar joint and a waterproof groove are respectively arranged on two sides along the length direction of the reserved groove;
When the prefabricated side wall is poured, a grouting sleeve is arranged at the bottom of the inner blade plate, a flexible waterproof strip is integrally formed at the bottom of the outer blade plate, truss steel bars are used for fixing the inner blade plate and the outer blade plate, in addition, tie bars are connected between the inner blade plate and the outer blade plate and penetrate through the hidden beam, so that the hidden beam, the inner blade plate and the outer blade plate form a whole;
S2, correspondingly connecting an inner leaf plate provided with a grouting sleeve with a cast-in-situ bottom plate 2 at one side provided with a reinforcing steel bar joint, correspondingly connecting an outer leaf plate integrally formed with a flexible waterproof strip with the cast-in-situ bottom plate 2 at one side provided with a waterproof groove, and placing a hidden beam in a reserved groove on the cast-in-situ bottom plate 2, wherein the height value of the hidden beam is larger than the depth value of the reserved groove;
S3, after the reinforced bar joint on the cast-in-situ bottom plate 2 is embedded into the grouting sleeve, grouting is carried out in the grouting sleeve through a grouting pipe, so that the connection between the inner blade plate and the cast-in-situ bottom plate 2 is further fastened, and after the grouting pipe is subjected to grouting, the grouting pipe and the grouting pipe are respectively subjected to sealing treatment;
S4, forming a middle cavity between the inner blade plate and the outer blade plate, forming a pouring area with the reserved groove, and after pouring, jointly forming a tenon structure by concrete in the pouring area and the prefabricated side wall, wherein the tenon structure is embedded into the cast-in-situ bottom plate 2 to form a stable waterproof structure.
As shown in fig. 7, after the prefabricated side wall 1 and the cast-in-situ bottom plate 2 are installed, a casting area is formed by the hollow cavity in the middle of the prefabricated side wall 1 and the reserved groove 22 of the cast-in-situ bottom plate 2, a tenon structure formed by concrete cast in the casting area and the prefabricated side wall 1 is embedded into the cast-in-situ bottom plate 2 to form a stable structure, and the flexible waterproof strips 5 of the outer blades 12 on the outer side of the prefabricated side wall 1 are compacted by themselves under the action of compressive stress, so that the waterproof performance of a joint is ensured. The inner blade plate 11 on the inner side of the prefabricated side wall 1 is provided with a grouting sleeve 3 to be connected with the reinforced joint 21 on the cast-in-situ bottom plate 2, and after the inner blade plate 11 is connected with the cast-in-situ bottom plate 2, grouting is carried out on a grouting area 34 at the joint of the grouting pipeline 3 and the reinforced joint 21 through a grouting pipe 33 on the grouting pipeline 3, so that the inner blade plate 11 is more firmly connected with the cast-in-situ bottom plate 2.
The prefabricated side wall 1 is connected with the cast-in-situ bottom plate 2 in a semi-rigid mode, and has a certain degree of freedom under the action of soil pressure, so that the flexible waterproof strip 5 can be compacted automatically under the action of the soil pressure.
In the actual installation process, the prefabricated side wall 1 and the cast-in-situ bottom plate 2 are respectively poured in advance, the prefabricated side wall 1 which is poured in advance is connected with the cast-in-situ bottom plate 2, grouting sealing is carried out on the grouting pipeline 3, and finally, the middle cavity between the inner blade plate 11 and the outer blade plate 12 and the reserved groove 22 are poured.
The manufacturing process of the prefabricated side wall 1 specifically comprises the following steps:
s1, binding a reinforcement frame of the prefabricated side wall 1, wherein the reinforcement frame comprises a bound inner reinforcement mesh 13 and an bound outer reinforcement mesh 14, binding and connecting two sides of truss reinforcement 16 with the inner reinforcement mesh 13 and the outer reinforcement mesh 14 respectively, and penetrating a hidden beam 4 through a tie bar 15 to enable the hidden beam 4 to be connected with the inner reinforcement mesh 13 and the outer reinforcement mesh 14 of the prefabricated side wall 1, wherein a grouting sleeve 3 is connected with the bottom of a vertical reinforcement of the inner reinforcement mesh 13 in a threaded manner
S2, cleaning and scribing the template of the prefabricated side wall 1, and determining the positions of the template of the prefabricated side wall 1 and the prefabricated side wall 1;
s3, placing the reinforcement frame of the prefabricated side wall 1 into a mould, arranging protective layer plastic cushion blocks at the bottom according to plum blossom shapes, wherein the heights of the cushion blocks are consistent with the thickness of the concrete protective layer, placing flexible waterproof strips 5 at the bottom of the outer reinforcement net 14, after casting, reserving the upper parts of the flexible waterproof strips 5 in the outer leaf plates 12,
S4, pouring the inner leaf plates at the pouring stage, wherein the inner leaf plates comprise wall surfaces and bracket legs, so that a mold is controlled during pouring, a wall surface part template is placed on a mold table, the bracket leg part template is suspended from the mold table, and a support is applied below the bracket leg part template to ensure the level of a pouring surface;
S5, after casting, before the concrete reaches an initial setting state, napping the overlapped surface, wherein the difference of the roughness of the rough surface is not smaller than 4mm;
S6, after the concrete is solidified and curing is completed, the inner leaf template is removed;
S7, turning over the plate, and casting the outer blade;
S8, removing the outer blade template after maintenance is completed, and repairing the slight damage position of the component, which does not affect the structural performance.
Further, the concrete installation steps of the prefabricated side wall 1 and the cast-in-situ bottom plate 2 are as follows:
S1, transporting the prefabricated side wall to a construction site after the prefabricated side wall is manufactured by a component factory, hoisting the prefabricated side wall after casting and curing of the cast-in-situ bottom plate 2 are completed, and pre-placing seam plugging adhesive tapes on the inner and outer planes of the reinforced joint before hoisting the side wall in order to prevent slurry leakage of the seam in the subsequent grouting process of the sleeve;
S2, hoisting the prefabricated side wall to a position 1m of the working surface, then guiding the prefabricated side wall to fall by an operator by hand, placing a small mirror on the extending surface of the reinforced joint of the cast-in-situ bottom plate 2 to observe whether the grouting sleeve and the reinforced joint are in place or not, and correcting the reinforced joint in time when the grouting sleeve and the reinforced joint are not in place;
s3, after the butt joint is in place, slowly descending to the joint surface of the cast-in-situ bottom plate 2, stopping, and correcting the side wall surface by using an inclined support;
S4, installing other prefabricated side walls according to the scheme;
S5, grouting is carried out on the grouting sleeve, grouting material is poured in from the grouting pipe, grouting is stopped when the grouting material flows out from the grouting pipe, and the grouting pipe are blocked by the rubber plug.
S6, after the grouting sleeve meets the strength requirement, the middle cavity of the prefabricated side wall and the reserved groove on the cast-in-situ bottom plate 2 form a casting area, concrete is cast in the casting area, the concrete in the casting area and the prefabricated side wall jointly form a tenon structure, the tenon structure is embedded into the cast-in-situ bottom plate 2 to form a stable waterproof structure, and maintenance is performed after casting.
The foregoing is only a preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art, who is within the scope of the present invention, should make equivalent substitutions or modifications according to the technical scheme of the present invention and the inventive concept thereof, and should be covered by the scope of the present invention.

Claims (9)

1.带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,包括1. A waterproof joint for the side wall and base slab of a prefabricated subway station with concealed beams, characterized in that it includes... 现浇底板,现浇底板上设置有水平笔直的预留凹槽,沿所述预留凹槽长度方向的一侧设置有一排钢筋接头,另一侧设置有防水槽;The cast-in-place base slab has a horizontal and straight reserved groove. A row of steel bar joints is provided on one side along the length of the reserved groove, and a waterproof groove is provided on the other side. 预制侧墙,包括:Precast sidewalls, including: 内叶板,与所述现浇底板上设置有钢筋接头的一侧连接,所述内叶板的底部内侧竖向设置有一排灌浆套筒,一排所述灌浆套筒下端开口、内部中空,一排所述钢筋接头嵌入一排所述灌浆套筒,以使内叶板与现浇底板刚性连接,所述内叶板内设置有内钢筋网;The inner leaf plate is connected to the side of the cast-in-place base plate where the steel bar joint is provided. A row of grouting sleeves is vertically arranged on the inner bottom side of the inner leaf plate. The lower end of the row of grouting sleeves is open and the inside is hollow. The row of steel bar joints is embedded in the row of grouting sleeves so that the inner leaf plate is rigidly connected to the cast-in-place base plate. An inner steel bar mesh is provided inside the inner leaf plate. 外叶板,与所述现浇底板上设置有防水槽的一侧连接,所述外叶板底部外侧一体成型有柔性防水条,所述柔性防水条的下端嵌入防水槽,以使外叶板与现浇底板柔性密封连接,所述外叶板内设置有外钢筋网;The outer leaf plate is connected to the side of the cast-in-place base plate that is provided with a waterproof groove. A flexible waterproof strip is integrally formed on the outer bottom side of the outer leaf plate. The lower end of the flexible waterproof strip is embedded in the waterproof groove so that the outer leaf plate and the cast-in-place base plate are flexibly and sealed. An outer steel mesh is provided inside the outer leaf plate. 桁架钢筋,用于连接内叶板与外叶板,以提高内叶板与外叶板的连接刚度,桁架钢筋位于所述内叶板与所述外叶板之间,其一侧伸入所述内叶板内部,与所述内钢筋网连接,另一侧伸入所述外叶板内部,与所述外钢筋网连接;Truss reinforcement is used to connect the inner leaf plate and the outer leaf plate to improve the connection stiffness between the inner leaf plate and the outer leaf plate. The truss reinforcement is located between the inner leaf plate and the outer leaf plate, with one side extending into the interior of the inner leaf plate and connecting with the inner reinforcement mesh, and the other side extending into the interior of the outer leaf plate and connecting with the outer reinforcement mesh. 暗梁,其高度值大于所述预留凹槽的深度值,且放置在所述预留凹槽内;A concealed beam, the height of which is greater than the depth of the reserved groove, is placed within the reserved groove; 在所述内叶板、外叶板之间形成中部空腔,所述中部空腔与所述预留凹槽形成浇注区域,在浇注后,所述浇注区域的混凝土与预制侧墙共同形成嵌入现浇底板的榫头结构。A central cavity is formed between the inner leaf plate and the outer leaf plate. The central cavity and the reserved groove form a casting area. After casting, the concrete in the casting area and the precast side wall together form a tenon structure embedded in the cast-in-place base plate. 2.根据权利要求1所述的带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,所述柔性防水条的中部两侧均设有凹槽,压实后,所述柔性防水条两侧留有足够的膨胀空间,从而使得所述防水槽与所述柔性防水条之间的接缝拼接密实。2. The prefabricated subway station side wall-bottom slab waterproof joint with concealed beam as described in claim 1, characterized in that the flexible waterproof strip has grooves on both sides of the middle part, and after compaction, the flexible waterproof strip has sufficient expansion space on both sides, so that the joint between the waterproof groove and the flexible waterproof strip is tightly spliced. 3.根据权利要求1所述的带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,还包括多根拉结筋,水平平行设置在所述内叶板与所述外叶板之间,其一端与所述内叶板中的内钢筋网连接,另一端与所述外叶板的外钢筋网连接,拉结筋穿过暗梁以使暗梁与内叶板、外叶板形成一个整体。3. The prefabricated subway station side wall-bottom slab waterproof node with concealed beam according to claim 1, characterized in that it further includes multiple tie bars, which are horizontally and parallelly arranged between the inner leaf plate and the outer leaf plate, one end of which is connected to the inner steel mesh in the inner leaf plate, and the other end is connected to the outer steel mesh in the outer leaf plate. The tie bars pass through the concealed beam so that the concealed beam, the inner leaf plate, and the outer leaf plate form an integral whole. 4.根据权利要求1所述的带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,所述灌浆套筒上端与所述内钢筋网的竖向钢筋底部螺纹连接,并内置于内叶板中,所述灌浆套筒的一侧分别连通设置有出浆管和注浆管,出浆管和注浆管远离灌浆套筒的一端与内叶板外表面持平。4. The prefabricated subway station side wall-bottom slab waterproof node with hidden beam according to claim 1, characterized in that the upper end of the grouting sleeve is threaded to the bottom of the vertical steel bar of the inner steel mesh and is built into the inner leaf plate, and a grout outlet pipe and a grout injection pipe are respectively connected to one side of the grouting sleeve, and the end of the grout outlet pipe and the grout injection pipe away from the grouting sleeve is flush with the outer surface of the inner leaf plate. 5.根据权利要求1所述的带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,所述暗梁包括纵筋及沿纵筋长度方向依次布置的箍筋。5. The prefabricated subway station side wall-bottom slab waterproof joint with concealed beam according to claim 1, characterized in that the concealed beam includes longitudinal reinforcement and stirrups arranged sequentially along the length of the longitudinal reinforcement. 6.根据权利要求1所述的带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,所述柔性防水条由橡胶或聚氨酯树脂材料制成。6. The prefabricated subway station side wall-bottom slab waterproof joint with concealed beam according to claim 1, characterized in that the flexible waterproof strip is made of rubber or polyurethane resin material. 7.根据权利要求1所述的带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,所述现浇底板的接面高度大于车站底层层高的1/3,且所述现浇底板的高度小于2m。7. The prefabricated subway station side wall-bottom slab waterproof joint with hidden beam as described in claim 1, characterized in that the joint height of the cast-in-place bottom slab is greater than 1/3 of the height of the station's ground floor, and the height of the cast-in-place bottom slab is less than 2m. 8.根据权利要求1-7中任一所述的带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,所述内钢筋网遍布设置在所述内叶板内,所述外钢筋网遍布设置在所述外叶板内。8. The prefabricated subway station side wall-bottom slab waterproof joint with concealed beams according to any one of claims 1-7, characterized in that the inner steel mesh is distributed throughout the inner leaf plate, and the outer steel mesh is distributed throughout the outer leaf plate. 9.一种带暗梁的装配式地铁站侧墙-底板防水型节点的施工工艺,基于权利要求8所述的带暗梁的装配式地铁站侧墙-底板防水型节点,其特征在于,包括以下步骤:9. A construction process for a waterproof joint between the side wall and bottom slab of a prefabricated subway station with a concealed beam, based on the waterproof joint between the side wall and bottom slab of a prefabricated subway station with a concealed beam as described in claim 8, characterized by comprising the following steps: S1、分别预先浇注好预制侧墙与现浇底板;S1. Precast side walls and cast-in-place base slabs are precast separately; 浇注现浇底板时,在现浇底板上设置有预留凹槽,沿预留凹槽长度方向的两侧分别设置有钢筋接头和防水槽;When casting the cast-in-place base slab, a pre-reserved groove is set on the cast-in-place base slab, and a steel bar joint and a waterproof groove are respectively set on both sides along the length of the pre-reserved groove. 浇注预制侧墙时,在内叶板的底部设置有灌浆套筒,在外叶板的底部一体成型有柔性防水条,并且内叶板与外叶板之间使用桁架钢筋进行固定,此外,内叶板与外叶板之间连接有拉结筋,拉结筋穿过暗梁,以使暗梁与内叶板、外叶板形成一个整体;When pouring the precast sidewall, a grouting sleeve is installed at the bottom of the inner leaf plate, and a flexible waterproof strip is integrally formed at the bottom of the outer leaf plate. The inner leaf plate and the outer leaf plate are fixed with truss steel bars. In addition, tie bars are connected between the inner leaf plate and the outer leaf plate. The tie bars pass through the hidden beam so that the hidden beam, the inner leaf plate, and the outer leaf plate form a whole. S2、将设置有灌浆套筒的内叶板与设有钢筋接头一侧的现浇底板对应连接,将一体成型有柔性防水条的外叶板与设有防水槽一侧的现浇底板对应连接,暗梁放置在现浇底板上的预留凹槽内,且暗梁的高度值大于预留凹槽的深度值;S2. Connect the inner leaf plate with the grouting sleeve to the cast-in-place base plate with the steel bar joint on the corresponding side. Connect the outer leaf plate with the flexible waterproof strip in one piece to the cast-in-place base plate with the waterproof groove on the corresponding side. Place the hidden beam in the reserved groove on the cast-in-place base plate, and the height of the hidden beam is greater than the depth of the reserved groove. S3、现浇底板上的钢筋接头嵌入灌浆套筒后,通过注浆管对灌浆套筒内进行注浆,进一步使得内叶板与现浇底板连接的更加紧固,待出浆管出浆后,分别对注浆管与出浆管密封处理;S3. After the steel bar joints on the cast-in-place base slab are embedded in the grouting sleeve, grout is injected into the grouting sleeve through the grouting pipe to further tighten the connection between the inner leaf plate and the cast-in-place base slab. After the grout comes out of the grouting pipe, the grouting pipe and the grouting pipe are sealed respectively. S4、在内叶板、外叶板之间存在中部空腔,中部空腔与预留凹槽形成浇注区域,在浇注后,浇注区域的混凝土与预制侧墙共同形成榫头结构,所述榫头结构嵌入现浇底板,形成一个稳固的防水结构。S4. There is a central cavity between the inner leaf plate and the outer leaf plate. The central cavity and the reserved groove form a casting area. After casting, the concrete in the casting area and the precast side wall together form a tenon structure. The tenon structure is embedded in the cast-in-place base plate to form a stable waterproof structure.
CN202311160973.7A 2023-09-08 2023-09-08 Waterproof node with hidden beam for side wall and bottom plate of assembled subway station and construction process Active CN117166540B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311160973.7A CN117166540B (en) 2023-09-08 2023-09-08 Waterproof node with hidden beam for side wall and bottom plate of assembled subway station and construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311160973.7A CN117166540B (en) 2023-09-08 2023-09-08 Waterproof node with hidden beam for side wall and bottom plate of assembled subway station and construction process

Publications (2)

Publication Number Publication Date
CN117166540A CN117166540A (en) 2023-12-05
CN117166540B true CN117166540B (en) 2026-03-10

Family

ID=88942655

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311160973.7A Active CN117166540B (en) 2023-09-08 2023-09-08 Waterproof node with hidden beam for side wall and bottom plate of assembled subway station and construction process

Country Status (1)

Country Link
CN (1) CN117166540B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN121853590B (en) * 2026-03-19 2026-05-19 中建海峡建设发展有限公司 A Highly Stable Subway Station Enclosure Structure and Its Construction Method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208578067U (en) * 2018-05-31 2019-03-05 中国建筑第八工程局有限公司 Semi-prefabricated integrated pipe gallery
CN115787721A (en) * 2022-11-24 2023-03-14 中国建筑第七工程局有限公司 A mixed-assembled comprehensive pipe gallery with ring buckle lamination and sleeve grouting and its construction method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105862916A (en) * 2016-06-03 2016-08-17 长沙远大住宅工业集团股份有限公司 Superimposed assembled type underground pipe gallery system and construction and manufacturing process
KR102310265B1 (en) * 2020-08-19 2021-10-07 시지엔지니어링(주) Construction method of vertical cutoff wall foundation
CN112900619B (en) * 2021-01-27 2021-12-03 海南大学 Fabricated concrete beam-column joint and construction method thereof
CN215857879U (en) * 2021-09-18 2022-02-18 广东银辉建设有限公司 A back pouring belt for basement floor
CN217758939U (en) * 2022-08-23 2022-11-08 深圳市建安(集团)股份有限公司 Be used for double-deck coincide wall of municipal administration utility tunnel and bottom plate connection structure

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN208578067U (en) * 2018-05-31 2019-03-05 中国建筑第八工程局有限公司 Semi-prefabricated integrated pipe gallery
CN115787721A (en) * 2022-11-24 2023-03-14 中国建筑第七工程局有限公司 A mixed-assembled comprehensive pipe gallery with ring buckle lamination and sleeve grouting and its construction method

Also Published As

Publication number Publication date
CN117166540A (en) 2023-12-05

Similar Documents

Publication Publication Date Title
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN103410317A (en) Construction method for site assembly and casting integral wall body by adopting wall body prefabricated part
CN112112295A (en) A kind of rear-enclosed exterior wall post-casting belt reinforcement construction method
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN108005387A (en) A kind of assembled wallboard and the cast-in-place main body method for synchronously constructing of shear wall with short piers
CN102251540A (en) Construction installation method for fast-easy setback grid of bottom plate construction joint
CN111851825A (en) A prefabricated formwork-free prefabricated steel truss floor and its construction method
CN108951840B (en) Method for constructing arc-shaped outer wall of basement based on single-side formwork support of shaped support
CN212223971U (en) Post-cast strip side-fixing inner-supporting steel plate combined template
CN114635323A (en) A lightweight foam concrete composite embankment structure and construction method based on FRP reinforcement
CN211499326U (en) A synchronous construction structure of concrete infill wall and cast-in-place structure
CN108589769A (en) A kind of embedding rock T shapes combined type column plate high gear wall construction method of overlength
CN117166540A (en) Prefabricated subway station side wall with concealed beams - base plate waterproof joints and construction technology
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN204311628U (en) The precast prestressed floor slab structure of fall arrest
CN215166455U (en) Low, multi-layer fully prefabricated assembled concrete structure
CN111173042B (en) Advanced water stop post-cast strip of foundation slab and construction method
CN212802189U (en) An assembled formwork without dismantling
CN214143657U (en) A dry-connected prefabricated grid underground continuous wall
CN212802185U (en) A prefabricated formwork-free prefabricated steel truss floor
CN211143050U (en) Grouting Diaphragm Wall with Prefabricated Columns and Wall Panels
CN204435616U (en) Truss bars double layer fibre gypsum plank, non-dismantling formwork wall body structure
CN116220244B (en) Construction method of thermal insulation exterior wall structure with window sill opening
CN112064824A (en) Combined-connection prefabricated shear wall system
CN202148608U (en) Fast-easy closing-up net construction installation structure of bottom board construction seam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant