CN117145177A - Glass curtain wall construction equipment - Google Patents

Glass curtain wall construction equipment Download PDF

Info

Publication number
CN117145177A
CN117145177A CN202310734682.8A CN202310734682A CN117145177A CN 117145177 A CN117145177 A CN 117145177A CN 202310734682 A CN202310734682 A CN 202310734682A CN 117145177 A CN117145177 A CN 117145177A
Authority
CN
China
Prior art keywords
plate
positioning
bearing
curtain wall
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310734682.8A
Other languages
Chinese (zh)
Other versions
CN117145177B (en
Inventor
赵肖
李永轩
胡舟
唐勇
刘佳乐
曾威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Construction Investment Group Co ltd
Hunan Provincial Construction Technology Research Institute
Hunan Construction Engineering Group Co Ltd
Original Assignee
Hunan Construction Investment Group Co ltd
Hunan Provincial Construction Technology Research Institute
Hunan Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Construction Investment Group Co ltd, Hunan Provincial Construction Technology Research Institute, Hunan Construction Engineering Group Co Ltd filed Critical Hunan Construction Investment Group Co ltd
Priority to CN202310734682.8A priority Critical patent/CN117145177B/en
Publication of CN117145177A publication Critical patent/CN117145177A/en
Application granted granted Critical
Publication of CN117145177B publication Critical patent/CN117145177B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/18Implements for finishing work on buildings for setting wall or ceiling slabs or plates
    • E04F21/1838Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements
    • E04F21/1844Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one
    • E04F21/1872Implements for finishing work on buildings for setting wall or ceiling slabs or plates for setting a plurality of similar elements by applying them one by one using suction-cups

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The construction device of the glass curtain wall comprises a bearing suction plate, wherein a limit ring frame is arranged on the top surface of the bearing suction plate, the inner surface of the limit ring frame is of a hollow structure, a bearing component is arranged on the inner surface of the limit ring frame, an adjusting component is connected onto the bearing component, and a positioning component is connected onto the adjusting component. According to the invention, through arranging the bearing component and the positioning component, the corresponding bearing treatment can be directly provided for other components through the bearing component, the corresponding positioning treatment can also be provided through the positioning component, and through mutual cooperation among a plurality of components, the technical problem that the position deviation is easy to occur when the glass plate is subsequently installed due to the lack of the corresponding bearing and positioning treatments is avoided as much as possible, and the use problem that the whole installation effect is influenced by the deviation of the subsequent installation position is avoided.

Description

Construction device for glass curtain wall
Technical Field
The invention relates to the technical field of construction components, in particular to a construction device of a glass curtain wall.
Background
Glass curtain walls are a common form of building exterior walls, consisting of light steel keels and glass panels. The glass curtain wall mounting method has the characteristics of light weight, sound insulation, heat insulation and the like, is widely applied to modern buildings, and is required to be correspondingly mounted before the glass curtain wall is actually put into use, in the mounting process of a traditional construction method, a glass plate which is expected to be mounted is required to be placed at a pre-buried light steel keel in advance in a lifting mode, the glass plate is fastened after the position is manually adjusted, and finally sealing treatment is carried out, so that the mounting work of the glass curtain wall is completed, in the mounting process of the glass plate, due to the lack of a corresponding construction auxiliary component, a worker cannot quickly and accurately bear the glass plate which is expected to be mounted, positioning treatment is required to be carried out manually, and due to the lack of corresponding bearing and positioning treatment, the position deviation is easy to occur when the glass plate is mounted subsequently, and the mounting position is offset is caused, so that the integral mounting effect is influenced.
Disclosure of Invention
The invention aims to solve the technical problem of providing a construction device for a glass curtain wall, which can solve the problem that the installation position is deviated and the integral installation effect is affected due to the fact that the corresponding receiving and positioning treatment is lacked and the position deviation is easy to occur when the glass plate is installed subsequently.
The technical scheme adopted for solving the technical problems is as follows:
the construction device of the glass curtain wall comprises a bearing suction plate, wherein a limit ring frame is arranged on the top surface of the bearing suction plate, the inner surface of the limit ring frame is of a hollow structure, a bearing component is arranged on the inner surface of the limit ring frame, an adjusting component is connected onto the bearing component, and a positioning component is connected onto the adjusting component.
Further, accept the subassembly including the hydraulic rod that is connected with spacing ring frame internal surface, the output of hydraulic rod extends to the outside of spacing ring frame, the surface cover of hydraulic rod is equipped with and accepts the ring plate, it all is equipped with the side frame board to accept the surface both sides of ring plate, the standing groove has been seted up to the surface of side frame board, the standing groove department of side frame board is equipped with the connecting axle pole.
Further, the output end of the hydraulic rod is connected with a top cover.
Further, the adjusting component comprises a bearing shaft plate connected with the connecting shaft rod, a threaded rod is arranged at the outer end of the bearing shaft plate, and the outer surface of the threaded rod is in threaded connection with the positioning component.
Further, the locating component comprises an adjusting shaft plate connected with the adjusting component, a locating rod is inserted into the outer surface of the adjusting shaft plate, a supporting frame plate is arranged at the bottom end of the locating rod, and the locating rod is connected with a sucker through the supporting frame plate.
Further, a circular plate is arranged at the top end of the positioning rod.
Compared with the prior art, the invention has the following beneficial effects:
according to the invention, through arranging the bearing component and the positioning component, the corresponding bearing treatment can be directly provided for other components through the bearing component, the corresponding positioning treatment can also be provided through the positioning component, and through mutual cooperation among a plurality of components, the technical problem that the position deviation is easy to occur when the glass plate is subsequently installed due to the lack of the corresponding bearing and positioning treatments is avoided as much as possible, and the use problem that the whole installation effect is influenced by the deviation of the subsequent installation position is avoided.
Drawings
FIG. 1 is a schematic perspective view of the whole assembly of a construction device for a glass curtain wall;
fig. 2 is a schematic bottom perspective view of an overall assembly of a construction device for a glass curtain wall according to the present invention;
FIG. 3 is a schematic top perspective view of the whole assembly of a construction device for a glass curtain wall according to the present invention;
FIG. 4 is a perspective view of an adjusting assembly and a positioning assembly in a construction apparatus for a glass curtain wall according to the present invention;
in the figure: 1. a receiving suction plate; 2. a limiting ring frame; 3. a receiving assembly; 4. an adjustment assembly; 5. a positioning assembly; 301. a hydraulic rod; 302. a receiving ring plate; 303. a top cover; 304. a side frame plate; 305. a connecting shaft lever; 401. a bearing shaft plate; 402. a threaded rod; 501. adjusting the shaft plate; 502. a positioning rod; 503. a circular plate; 504. a supporting frame plate; 505. and a sucking disc.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-4, a construction device for a glass curtain wall comprises a receiving suction plate 1, wherein a limiting ring frame 2 is arranged on the top surface of the receiving suction plate 1, the inner surface of the limiting ring frame 2 is of a hollow structure, a receiving component 3 is arranged on the inner surface of the limiting ring frame 2, an adjusting component 4 is connected onto the receiving component 3, and a positioning component 5 is connected onto the adjusting component 4.
In this embodiment, the bearing assembly 3 includes the hydraulic rod 301 that is connected with spacing ring frame 2 internal surface, the output of hydraulic rod 301 extends to spacing ring frame 2's outside, the surface cover of hydraulic rod 301 is equipped with and bears the crown plate 302, it all is equipped with the sideframe board 304 to accept the surface both sides of crown plate 302, the output of hydraulic rod 301 is connected with top cap 303, the standing groove has been seted up to the surface of sideframe board 304, the standing groove department of sideframe board 304 is equipped with connecting shaft 305.
When the receiving assembly 3 is used, the corresponding height adjustment process is needed first, the predicted adjustment height is needed first, after confirmation, the hydraulic rod 301 can be started, after the hydraulic rod 301 is started, the output end of the hydraulic rod 301 drives the receiving ring plate 302 to move, other assemblies connected with the receiving ring plate 302 displace along with the receiving ring plate, the output end of the hydraulic rod is continuously adjusted until the receiving ring plate 302 drives the other assemblies to move to the predicted height, and the output end of the hydraulic rod 301 can be subjected to limit process, so that the current height is kept high.
In this embodiment, the adjusting assembly 4 includes a receiving shaft plate 401 connected to the connecting shaft 305, a threaded rod 402 is disposed at an outer end of the receiving shaft plate 401, and an outer surface of the threaded rod 402 is in threaded connection with the positioning assembly 5.
In this embodiment, the positioning assembly 5 includes an adjusting shaft plate 501 connected with the adjusting assembly 4, a positioning rod 502 is inserted on the outer surface of the adjusting shaft plate 501, a circular plate 503 is disposed on the top end of the positioning rod 502, a supporting frame plate 504 is disposed on the bottom end of the positioning rod 502, and the positioning rod 502 is connected with a suction cup 505 through the supporting frame plate 504.
When the adjusting component 4 is used, firstly, the expected adjusting angle needs to be confirmed, after the expected adjusting is confirmed, the adjusting component 4 can be used for corresponding angle adjustment, in the adjusting process, firstly, the adjusting shaft plate 501 needs to be held, the adjusting shaft plate 501 rotates towards the expected adjusting direction, in the rotating process, the adjusting shaft plate 501 slides on the outer surface of the threaded rod 402, the adjusting shaft plate 501 continuously rotates until the adjusting shaft plate 501 drives other components to move to the expected adjusting angle, the rotation can be stopped, and then the adjusting shaft plate 501 on the other side can be synchronously adjusted according to the operation content.
When the positioning assembly 5 is used, the corresponding angle adjustment treatment is needed through the adjusting assembly 4, after the adjustment is finished, the positioning assembly 5 can be used for carrying out the corresponding positioning treatment, the circular plate 503 is needed to be held firstly, then the circular plate 503 is slowly pressed downwards, in the pressing process, the circular plate 503 drives the positioning rod 502 to drive, in the driving process, the positioning rod 502 drives the bearing frame plate 504 and the sucking disc 505 to synchronously displace, the circular plate 503 is continuously pressed until the bottom surface of the sucking disc 505 is attached to a glass plate which is expected to be installed, the circular plate 503 is continuously pressed down, after the sucking disc 505 is completely attached to and adsorbed by the light steel joist, the pressing down can be stopped, then the sucking disc 505 on the other side is synchronously fixed according to the operation content, and after the fixing is finished, the positioning treatment can be finished.
It should be noted that, in the above description, the main body of the receiving suction plate 1 is made of rubber, and the working principle of the receiving suction plate is the same as that of the conventional suction assembly, and the receiving suction plate is sucked by pressure.
Working principle:
when the glass plate mounting device is in actual use, the corresponding height adjustment treatment is needed to be carried out by the bearing assembly 3, after the height adjustment treatment is finished, the bearing suction plate 1 can be used for carrying out adsorption fixation on the glass plate, firstly, the center of the bottom surface of the bearing suction plate 1 is attached to the outer surface of the glass plate to be mounted, after the attachment is finished, the glass plate is placed at the position to be mounted in advance and calibrated, after the calibration is finished, the corresponding angle adjustment treatment is carried out on the positioning assembly 5 by the adjusting assembly 4, after the angle adjustment is finished, the light steel keels are adsorbed and fixed by the positioning assembly 5, and after the fixation is finished, three bearing supporting points can be provided for the glass plate to be mounted in advance, so that the mounting treatment is assisted.
It should be noted that the above-mentioned embodiments are merely preferred embodiments of the present invention, and are not intended to limit the present invention in any way, and any equivalent embodiments which can be changed or modified by the technical disclosure may be applied to other fields by those skilled in the art, but any simple modification, equivalent change and modification made to the above-mentioned embodiments according to the technical matter of the present invention without departing from the technical disclosure of the present invention still falls within the scope of the technical disclosure of the present invention.

Claims (6)

1. Construction equipment of glass curtain wall, its characterized in that: the device comprises a receiving suction plate, wherein a limit ring frame is arranged on the top surface of the receiving suction plate, the inner surface of the limit ring frame is of a hollow structure, a receiving assembly is arranged on the inner surface of the limit ring frame, an adjusting assembly is connected onto the receiving assembly, and a positioning assembly is connected onto the adjusting assembly.
2. The construction device for a glass curtain wall according to claim 1, wherein: the bearing assembly comprises a hydraulic rod connected with the inner surface of the limiting ring frame, the output end of the hydraulic rod extends to the outside of the limiting ring frame, a bearing ring plate is sleeved on the outer surface of the hydraulic rod, side frame plates are arranged on two sides of the outer surface of the bearing ring plate, a placing groove is formed in the outer surface of the side frame plates, and a connecting shaft rod is arranged at the placing groove of the side frame plates.
3. The construction device for a glass curtain wall according to claim 2, wherein: the output end of the hydraulic rod is connected with a top cover.
4. A construction device for a glass curtain wall according to claim 2 or 3, characterized in that: the adjusting component comprises a bearing shaft plate connected with the connecting shaft rod, a threaded rod is arranged at the outer end of the bearing shaft plate, and the outer surface of the threaded rod is in threaded connection with the positioning component.
5. The construction device for a glass curtain wall according to claim 1 or 2, wherein: the positioning assembly comprises an adjusting shaft plate connected with the adjusting assembly, a positioning rod is inserted into the outer surface of the adjusting shaft plate, a supporting frame plate is arranged at the bottom end of the positioning rod, and the positioning rod is connected with a sucking disc through the supporting frame plate.
6. The construction device for a glass curtain wall according to claim 5, wherein: a circular plate is arranged at the top end of the positioning rod.
CN202310734682.8A 2023-06-20 2023-06-20 Construction device for glass curtain wall Active CN117145177B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310734682.8A CN117145177B (en) 2023-06-20 2023-06-20 Construction device for glass curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310734682.8A CN117145177B (en) 2023-06-20 2023-06-20 Construction device for glass curtain wall

Publications (2)

Publication Number Publication Date
CN117145177A true CN117145177A (en) 2023-12-01
CN117145177B CN117145177B (en) 2025-10-31

Family

ID=88904961

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310734682.8A Active CN117145177B (en) 2023-06-20 2023-06-20 Construction device for glass curtain wall

Country Status (1)

Country Link
CN (1) CN117145177B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007000940A (en) * 2005-06-21 2007-01-11 Central Glass Co Ltd Method and apparatus of loading pallet with glass plate
CN109972774A (en) * 2019-03-25 2019-07-05 惠安县万物电子商务有限责任公司 A kind of curtain wall grille three dimensional adjustment device
CN211548834U (en) * 2020-01-08 2020-09-22 陕西工业职业技术学院 Building curtain wall mounting and fixing support
CN212001778U (en) * 2020-02-03 2020-11-24 中天星建设工程有限公司 Glass curtain wall mounting structure
CN112761286A (en) * 2021-01-23 2021-05-07 宁波袁翔建筑装饰工程有限公司 Glass curtain wall positioning and mounting method
CN217680645U (en) * 2022-03-28 2022-10-28 杨伟 Curtain wall glass stabilizing and suspending device for building engineering
CN217680629U (en) * 2022-04-28 2022-10-28 浙江互创建筑工程有限公司 Multipoint adsorption equipment for glass curtain wall construction
CN115506561A (en) * 2022-10-10 2022-12-23 王志辉 Glass curtain wall installation auxiliary system and method for green building construction
CN220080673U (en) * 2023-06-20 2023-11-24 湖南建工集团有限公司 Construction device for glass curtain wall

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007000940A (en) * 2005-06-21 2007-01-11 Central Glass Co Ltd Method and apparatus of loading pallet with glass plate
CN109972774A (en) * 2019-03-25 2019-07-05 惠安县万物电子商务有限责任公司 A kind of curtain wall grille three dimensional adjustment device
CN211548834U (en) * 2020-01-08 2020-09-22 陕西工业职业技术学院 Building curtain wall mounting and fixing support
CN212001778U (en) * 2020-02-03 2020-11-24 中天星建设工程有限公司 Glass curtain wall mounting structure
CN112761286A (en) * 2021-01-23 2021-05-07 宁波袁翔建筑装饰工程有限公司 Glass curtain wall positioning and mounting method
CN217680645U (en) * 2022-03-28 2022-10-28 杨伟 Curtain wall glass stabilizing and suspending device for building engineering
CN217680629U (en) * 2022-04-28 2022-10-28 浙江互创建筑工程有限公司 Multipoint adsorption equipment for glass curtain wall construction
CN115506561A (en) * 2022-10-10 2022-12-23 王志辉 Glass curtain wall installation auxiliary system and method for green building construction
CN220080673U (en) * 2023-06-20 2023-11-24 湖南建工集团有限公司 Construction device for glass curtain wall

Also Published As

Publication number Publication date
CN117145177B (en) 2025-10-31

Similar Documents

Publication Publication Date Title
CN220080673U (en) Construction device for glass curtain wall
CN211101693U (en) Building construction house dalle drilling equipment
CN113898166A (en) Green energy-saving glass curtain wall construction equipment and construction method thereof
CN113323410A (en) Equipment is adjusted well in installation of green integral type assembly type structure wallboard
CN117145177B (en) Construction device for glass curtain wall
CN220313281U (en) Door and window auxiliary installation structure
CN221481126U (en) Indoor glass curtain wall mounting frame
CN117108080B (en) Glass curtain wall construction device and construction method based on green building
CN215926623U (en) Floor tile leveling device
CN215630884U (en) Curtain wall upright post clamping device
CN214688565U (en) Glazing machine convenient to adjust
CN210909796U (en) Photovoltaic module assists installation device
CN223577510U (en) Automatic wall brick device that pastes of building
CN114179112A (en) Building detection hexapod robot
CN114856159A (en) Temporary attachment device for attached lifting scaffold
CN221761255U (en) A construction arm for construction engineering
CN219132359U (en) Automobile seat installation power-assisted mechanical arm
CN222404147U (en) A temporary support fixture for welding delicate steel structure components
CN223946744U (en) Riveting compaction device
CN224173757U (en) Positioning device for curtain wall installation
CN208107324U (en) A kind of plumbing pipe installation support frame for building
CN218815290U (en) Be used for decorating curtain installation fixed knot to construct
CN220599084U (en) Assembled building construction platform
CN221682397U (en) An assembled building construction platform
CN222227566U (en) U-shaped plate leveling device for steel structure ground assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant