Construction method for ultra-high ALC wallboard node
Technical Field
The application relates to the technical field of building construction, in particular to an ultra-high ALC wallboard node construction method.
Background
In the present stage, the economic construction of China rapidly develops, along with the reduction of urban land resources, high-rise buildings continuously emerge in each city, and the requirement on the main structure of the super high-rise is higher and higher, and most of the previous projects adopt aerated block partition walls, aerated block walls need to be subjected to multiple working procedures such as masonry, constructional column manufacturing, lintel prefabrication, scaffold erection, plastering and the like, and the aerated block walls cannot form walls once, so that the masonry height is limited every time, the project progress is not facilitated, the multi-species cross operation is not facilitated, the porous brick walls are limited by the height-thickness ratio, the flatness of the walls and the perpendicularity of the walls are not easy to control. Compared with the traditional aerated block, the ALC plate has the advantages of heat preservation and insulation, sound insulation, fire resistance, durability, environmental protection and the like, and is widely popularized in companies and industries.
The popularization and the use of the ALC wallboard construction drive the construction industry to advance from the lagging wet construction to the advanced dry construction, thereby realizing the industrialization of residential component generation, modernization of technical equipment, intensive mass production and integration of construction equipment, improving the practical area of the residence, reducing the structural load and improving the shock resistance and the safety performance of the building. The ALC wallboard has the comprehensive advantages of light weight, high strength, environmental protection, durability and the like which are incomparable with other wall materials. However, the wallboard also has certain defects, when the on-site plate assembly construction is carried out, the condition that the construction joints are more often occurs, shrinkage cracks are easy to occur at the joints in the plate installation process, and the generated cracks often bring certain adverse effects to the later-stage finish repair construction, so that the further popularization and application of the ALC wallboard are influenced.
Disclosure of Invention
In order to overcome the defects of the prior art, the construction method for the ultra-high ALC wallboard node effectively improves the stability of the board after the board is installed, ensures the safety and reliability of the ultra-high wall part through steel column and steel beam reinforcement, and can effectively avoid the phenomena of board cracking and the like.
The technical scheme adopted for solving the technical problems is as follows: in the construction method of the ultra-high ALC wallboard node, the improvement is that the construction method comprises the following steps:
s10: preparing construction, determining a site environment, and establishing perfect protection measures;
s20: drawing a layout, and typesetting steel columns, steel beams and plates in an ultrahigh area in advance;
s30: paying off positioning and buried piece fixing are carried out according to the layout;
s40: arranging steel columns and steel beams, wherein the steel columns and the steel beams are arranged on the buried plates, and the joints are connected in a full-welded mode;
s50: the lower ALC wallboard is provided with a U-shaped clamp;
s60: pouring the steel beam and the lower steel column;
s70: the upper ALC wallboard is provided with a U-shaped clamp;
s80: and pouring the steel beam and the lower steel column, and timely pouring and curing.
In the above step, in the step S40,
s401: preparing required tools and materials according to design drawings and actual conditions on site;
s402: positioning by using a laser level meter and a scale, and confirming accurate coordinates of the steel column and the steel beam;
s403: lifting the steel column and the steel beam to the accurate positions by using a vertical plate machine, and ensuring the stability of the steel column and the steel beam by adopting a lifting and pulling mode;
s404: fully welding the steel column and the steel beam on the buried plate, and fully welding the joint of the steel column and the steel beam;
s405: cleaning welding slag and spraying silver antirust paint.
In the above step, in the step S50,
s501: installing a lower ALC wallboard according to the layout of the typesetting diagram;
s502: uniformly scraping adhesive mortar on the tongue-and-groove part of the lower ALC wallboard and the top surface of the board;
s503: reserving an installation gap from the top end of the slat to the structural beam, and adjusting according to the field condition;
s504: filling mortar into the reserved gaps;
s505: the side, top and bottom of the lower ALC wallboard are provided with U-shaped clamps, the U-shaped clamps close to the steel column are required to be in spot welding connection with the steel beam, and the spot welding number of each side of the U-shaped clamps is not less than three.
In the above step, in the step S60,
s601: using a wood template to fix the two sides of the part to be poured and the split bolts and the steel pipe by the template;
s602: paving a small amount of pure cement paste at the bottom of the steel beam;
s603: pouring the steel beam and the lower steel column.
In the above step, in the step S70,
s701: installing an upper ALC wallboard according to the layout of the typesetting diagram;
s702: uniformly scraping adhesive mortar on the rabbet of the upper ALC wallboard and the top surface of the board;
s703: reserving an installation gap from the bottom end of the slat to the ground, and adjusting according to the field condition;
s704: filling mortar into a gap reserved from the bottom end of the slat to the ground;
s705: the bottom of the upper ALC wallboard is connected with the steel beam, the side edge of the upper ALC wallboard is connected with the steel column, and the joint is fixed by using a U-shaped clamp.
Further, in step S403, after the steel column and the steel beam are lifted in place, the laser level gauge and the scale are used for rechecking, and the verticality and flatness of the steel column and the steel beam are adjusted.
Further, in the step S704, the mortar filled in the gap is 1:3 cement mortar or ALC special adhesive mortar.
Further, in step S20, before typesetting, the positioning of the steel columns and the steel beams, the number of the section plates and the size of the plates to be cut need to be determined, so as to reduce the waste of materials.
Further, in the step S60, the pouring process is performed by using a small vibrating rod to ensure the compaction of concrete, and the local position is vibrated by tapping with a rubber hammer.
Furthermore, in the step S80, before pouring the upper constructional column formwork, an edge line is required to be pasted by using a foam tape, so that the pouring leakage can be effectively prevented, and the concrete forming quality is improved.
The beneficial effects of the application are as follows: stability after the panel installation is accomplished has effectively been promoted, through steel column and girder steel reinforcement guarantee superelevation wall body part safe and reliable, can effectively avoid appearing phenomenon such as panel fracture, and this reinforcement mode accords with the normative requirement, has promoted project safety construction, has improved project construction engineering's security.
Drawings
FIG. 1 is a flow chart of a method of construction of an ultra-high ALC wallboard node of the present application;
fig. 2 is an ultra-high section structural view of an ultra-high ALC wallboard joint construction method of the present application.
Detailed Description
The application will be further described with reference to the drawings and examples.
The conception, specific structure, and technical effects produced by the present application will be clearly and completely described below with reference to the embodiments and the drawings to fully understand the objects, features, and effects of the present application. It is apparent that the described embodiments are only some embodiments of the present application, but not all embodiments, and that other embodiments obtained by those skilled in the art without inventive effort are within the scope of the present application based on the embodiments of the present application. In addition, all the coupling/connection relationships referred to in the patent are not direct connection of the single-finger members, but rather, it means that a better coupling structure can be formed by adding or subtracting coupling aids depending on the specific implementation. The technical features in the application can be interactively combined on the premise of no contradiction and conflict.
Referring to fig. 1 to 2, the application further provides a construction method of the ultra-high ALC wallboard node, and in this embodiment, the method includes the following steps:
s10: preparing construction, determining a site environment, and establishing perfect protection measures;
s20: drawing a layout, and typesetting steel columns 10, steel beams 20 and plates in an ultrahigh area in advance;
s30: paying off positioning and buried piece fixing are carried out according to the layout;
s40: arranging a steel column 10 and a steel beam 20, wherein the steel column 10 and the steel beam 20 are arranged on a buried plate 50, and the joint is connected in a full-welded mode;
s50: the lower ALC wall panel 40 is installed and provided with a U-shaped card 70;
s60: pouring the steel beam 20 and the lower steel column 10;
s70: the upper ALC wall panel 30 is installed and provided with a U-shaped card 70;
s80: and pouring the steel beam 20 and the lower steel column 10, and timely pouring and curing.
According to the construction method, through the series of operations, the steel columns 10 and the steel beams 20 are used for reinforcing at the ultrahigh nodes of the wall body, so that the safety and reliability of the wall body under the action of load and external force can be ensured to a great extent under the condition that the integral strength and the stability of the wall body can be fully ensured. The steel columns 10 and beams 20 serve as high strength structural materials, which can provide additional support and rigidity, and increase the compressive, bending and shear resistance of the wall. The construction method ensures the reinforcement effect and the structural stability, so that project safety construction can be promoted, the quality and the reliability of engineering are improved, and the construction period is saved, and the construction cost is reduced.
Referring to fig. 1 to 2, in the step S20, after determining the field environment, the positioning of the steel columns 10 and the steel beams 20, the number of section boards and the size of the ALC wallboard boards to be cut need to be determined before typesetting, so as to reduce the waste of materials. The preset ALC wallboard is arranged in such a way that the wall length exceeds 5m and the door opening width is more than 2m, steel columns 10 are required to be arranged, the lower edge of the steel beam 20 is arranged at the height of 5.3m, and the width of a single ALC wallboard plate is 300-600 mm, and the height is not more than 6m.
Further, in the step S30, the steel columns 10 and the steel beams 20 are positioned according to the layout, the buried plate 50 for fixing the buried member is 8mm thick, and the cross-sectional dimension is 120×200mm, and is disposed on the structural column 80. One end of the steel ball is fixedly connected to the structural beam 90 using the M12 expansion bolts 60, and the steel beam 20 is fixedly connected between the two structural columns 80. And the base layer needs to be cleaned before the embedded parts are fixed, and the embedded parts are arranged to be fixed by the expansion bolts 60.
In the step S40 of the above-mentioned process,
s401: preparing required tools and materials according to design drawings and actual conditions on site;
s402: positioning by using a laser level meter and a scale, and confirming accurate coordinates of the steel column 10 and the steel beam 20;
s403: the vertical plate machine is used for lifting the steel column 10 and the steel beam 20 to the accurate positions, and the stability of the steel column 10 and the steel beam 20 is ensured by adopting a lifting and pulling mode;
s404: fully welding the steel column 10 and the steel beam 20 on the buried plate 50, and fully welding the joint of the steel column 10 and the steel beam 20;
s405: cleaning welding slag and spraying silver antirust paint.
Specifically, the steel beam 20 and the steel column 10 are made of materials with wall thickness of 9mm and cross section dimension of 100×180mm. And the stability of the steel column 10 and the steel beam 20 is ensured by adopting a method of lifting and pulling down in the lifting process; after the steel column 10 and the steel beam 20 are lifted in place, the verticality and flatness of the steel column 10 and the steel beam 20 are adjusted by rechecking with a laser level gauge and a scale.
Next, in said step S50,
s501: installing the lower ALC wallboard 40 in a layout;
s502: uniformly scraping adhesive mortar on the top surface of the lower ALC wallboard 40 at the rabbet;
s503: reserving an installation gap from the top end of the slat to the structural beam 90, and adjusting according to the field condition;
s504: filling mortar into the reserved gaps;
s505: the side, top and bottom of the lower ALC wallboard 40 are provided with U-shaped clamps 70, the U-shaped clamps 70 close to the steel column 10 are required to be in spot welding connection with the steel beam 20, and the spot welding number of each side of the U-shaped clamps 70 is not less than three.
Specifically, the reserved gap is kept between 20 and 40 mm (namely, when the plate is blanked, the length of the plate is reduced by 20 to 40 mm according to the net height dimension of the floor structure), and the plate can be adjusted according to the site condition. The proportion of the filled mortar is 1:3 cement mortar or ALC special adhesive mortar.
In the step S60 of the above-mentioned process,
s601: using a wood template to fix the two sides of the part to be poured and the split bolts and the steel pipe by the template;
s602: paving a small amount of pure cement paste at the bottom of the steel beam 20;
s603: the steel beam 20 and the lower steel column 10 are poured.
Further, in the step S60, the pouring process is performed by using a small vibrating rod to ensure the compaction of concrete, and the local position is vibrated by tapping with a rubber hammer.
In the step S70 of the above-mentioned process,
s701: installing the upper ALC wallboard 30 according to a layout of a typesetting diagram;
s702: uniformly scraping adhesive mortar at the rabbet of the upper ALC wallboard 30 and on the top surface of the board;
s703: reserving an installation gap from the bottom end of the slat to the ground, and adjusting according to the field condition;
s704: filling mortar into a gap reserved from the bottom end of the slat to the ground;
s705: the bottom of the upper ALC wallboard 30 is connected with the steel beam 20, the side edge of the upper ALC wallboard 30 is connected with the steel column 10, and the connecting part is fixed by using a U-shaped clamp 70.
Still further, in step S70, the mortar filled in the gap is 1:3 cement mortar or ALC special adhesive mortar, so as to increase the anti-seismic performance of the wall and improve the overall stability and durability of the wall. In the step S80, before pouring the upper constructional column formwork, an edge line is required to be pasted by using a foam tape, so that the pouring leakage can be effectively prevented, and the concrete forming quality is improved.
The ultra-high ALC wallboard node construction method is really a method for effectively improving the stability of the board after the installation is completed by combining the steel columns 10 and the steel beams 20 for reinforcement. The steel column 10 serves as a vertical supporting element, and can bear vertical load of the wall body, and disperse and reduce stress of the joint part. The steel beam 20 is used as a horizontal supporting element, can bear the horizontal load of the wall body, and increases the stability and the overall rigidity of the wall body. Through the reinforcement of steel column 10 and girder steel 20, can effectively avoid the emergence of phenomenon such as the fracture of wallboard in super high node department.
While the preferred embodiment of the present application has been described in detail, the present application is not limited to the embodiments, and those skilled in the art can make various equivalent modifications or substitutions without departing from the spirit of the present application, and the equivalent modifications or substitutions are included in the scope of the present application as defined in the appended claims.