CN117027352A - Large-span high altitude vestibule curtain wall construction operation platform - Google Patents
Large-span high altitude vestibule curtain wall construction operation platform Download PDFInfo
- Publication number
- CN117027352A CN117027352A CN202310911273.0A CN202310911273A CN117027352A CN 117027352 A CN117027352 A CN 117027352A CN 202310911273 A CN202310911273 A CN 202310911273A CN 117027352 A CN117027352 A CN 117027352A
- Authority
- CN
- China
- Prior art keywords
- hanging
- corridor
- cantilever beam
- uniformly distributed
- curtain wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 38
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 28
- 239000010959 steel Substances 0.000 claims abstract description 28
- 239000000725 suspension Substances 0.000 claims description 42
- 238000009434 installation Methods 0.000 description 10
- 230000007246 mechanism Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/30—Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables
- E04G3/32—Hoisting devices; Safety devices
- E04G3/325—Safety devices for stabilising the mobile platform, e.g. to avoid it swinging in the wind
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/34—Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/006—Scaffold with cantilevered sections, e.g. to accommodate overhangs or recesses in the facade
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/007—Devices and methods for erecting scaffolds, e.g. automatic scaffold erectors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/286—Mobile scaffolds; Scaffolds with mobile platforms mobile vertically
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G2005/008—Hoisting devices specially adapted as part of a scaffold system
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域Technical field
本发明属于建筑施工连廊幕墙施工操作平台,特别一种大跨度高空连廊幕墙施工操作平台。The invention belongs to a building construction corridor curtain wall construction operation platform, especially a large-span high-altitude corridor curtain wall construction operation platform.
背景技术Background technique
随着建筑业的发展,异型高层建筑及建筑外立面幕墙设计层出不穷,同时为了提高建筑物使用效率或满足使用需求,经常在建筑物不同楼栋之间设计大垮度高空连廊,而大跨度高空连廊外部装修施工难度大,工期长,施工危险因素多,对项目安全、技术及施工工期管理产生较大的影响。With the development of the construction industry, special-shaped high-rise buildings and building facade curtain wall designs emerge one after another. At the same time, in order to improve the use efficiency of the building or meet the needs of use, large-slump high-altitude corridors are often designed between different buildings of the building. The external decoration construction of high-span high-altitude corridors is difficult, has a long construction period, and has many construction risk factors, which will have a great impact on project safety, technology and construction period management.
发明内容Contents of the invention
本发明的目的在于提供一种大跨度高空连廊幕墙施工操作平台,其结构合理,可以解决大跨度高空连廊幕墙施工难题,缩短幕墙施工工期,降低施工安全风险,有效提高施工质量。The purpose of the present invention is to provide a large-span high-altitude corridor curtain wall construction operation platform with a reasonable structure, which can solve the construction problems of large-span high-altitude corridor curtain wall, shorten the curtain wall construction period, reduce construction safety risks, and effectively improve the construction quality.
本发明的目的是这样实现的:一种大跨度高空连廊幕墙施工操作平台,包括在相邻的塔楼之间设置着大跨度高空连廊,在高空连廊内设置着连廊顶板和连廊结构地板,在长方形的连廊轮廓线框前、后两侧的轮廓线外侧设置着前、后两排均布排列的外吊篮,在连廊轮廓线框内,根据连廊施工需要均布设置着内吊篮,在连廊顶板前、后两侧的顶板上分别固装着均布对称的两排悬挂有配重平衡的悬臂梁悬挂装置,在悬臂梁悬挂装置伸出连廊顶板前、后两侧的外悬臂梁端部连接着悬挂钢丝绳,悬挂钢丝绳的下端分别连接着相对应的外吊篮,在连廊结构地板上分别均布固装着具有横梁、悬挂器的支撑架悬挂装置,该均布的支撑架悬挂装置的悬挂器通过连接的悬挂钢丝绳分别连接着相对应的内吊篮,纵横交错的水平钢管和扣件搭设的支撑平台与均布的内、外吊篮连接在一起。The object of the present invention is achieved as follows: a large-span high-altitude corridor curtain wall construction operation platform, including a large-span high-altitude corridor provided between adjacent towers, and a corridor roof and a corridor installed in the high-altitude corridor. Structural floor, on the outside of the outline of the front and rear sides of the rectangular corridor outline frame, there are two rows of outer hanging baskets evenly distributed in the front and back rows. Within the corridor outline frame, they are evenly distributed according to the construction needs of the corridor. There is an inner hanging basket, and two rows of evenly distributed and symmetrical cantilever beam suspension devices with counterweights are fixed on the roofs at the front and rear sides of the corridor roof. The cantilever beam suspension devices extend out from the front and rear of the corridor roof. The ends of the external cantilever beams on both sides of the rear are connected to suspension wire ropes, and the lower ends of the suspension wire ropes are connected to corresponding external hanging baskets. Support frame suspension devices with cross beams and hangers are evenly distributed on the corridor structural floor. The hangers of the uniformly distributed support frame suspension device are connected to the corresponding inner hanging baskets through connected suspension wire ropes. The support platform set up by crisscrossing horizontal steel pipes and fasteners is connected to the uniformly distributed inner and outer hanging baskets. .
本发明包括悬挂机构,悬挂内、外吊篮,支撑平台。悬挂机构由两种,一种支撑架悬挂装置,安装在连廊结构地板上;另一种是悬臂梁悬挂装置,安装在连廊顶板上。吊篮通过钢丝绳悬挂安装在连廊下方,钢丝绳上端固定在所属悬挂机构上,安装拆时可以电动升降。支撑平台使用扣件式圆钢管搭设在悬挂内、外吊篮上。悬挂内、外吊篮通过支撑平台实现连通,形成整体式操作平台。The invention includes a suspension mechanism, hanging inner and outer hanging baskets, and a supporting platform. There are two types of suspension mechanisms: one is a support frame suspension device, which is installed on the floor of the corridor structure; the other is a cantilever beam suspension device, which is installed on the roof of the corridor. The hanging basket is suspended and installed under the corridor through a steel wire rope. The upper end of the steel wire rope is fixed on the corresponding suspension mechanism. It can be lifted and lowered electrically during installation and removal. The support platform uses fastener-type round steel pipes to set up on the hanging inner and outer hanging baskets. The suspended inner and outer hanging baskets are connected through the support platform to form an integrated operating platform.
支撑架悬挂装置由横梁、悬挂器及由圆钢管搭设的支撑架组成(包含立杆、水平杆、扣件)。悬挂器安装在横梁正中间,横梁水平安装在支撑架上。支撑架用圆钢管和扣件搭设,安装在连廊地板上。The support frame suspension device consists of cross beams, hangers, and support frames built from round steel pipes (including vertical poles, horizontal poles, and fasteners). The hanger is installed in the middle of the cross beam, and the cross beam is installed horizontally on the support frame. The support frame is built with round steel pipes and fasteners and installed on the corridor floor.
先搭设立杆,接着在立杆上使用扣件固定水平杆,将第四排水平杆搭设完成后,在水平杆上方安装横梁,在横梁正中间安装悬挂器,最后安装最后两排水平杆,通过第四排水平杆和第五排水平杆卡住横梁,完成支撑架悬挂装置的制作。First set up the vertical poles, then use fasteners on the vertical poles to fix the horizontal poles. After the fourth row of horizontal poles is erected, install the cross beams above the horizontal poles, install the hangers in the middle of the cross beams, and finally install the last two rows of horizontal poles. The cross beam is clamped by the fourth row of horizontal rods and the fifth row of horizontal rods to complete the production of the support frame suspension device.
悬挂机构有两种,第一种是支撑架悬挂装置,安装在连廊结构地板上,用于悬挂安装连廊正下方吊篮,悬挂机构体积小,便于在狭小的空间内安装。另一种悬臂梁悬挂装置使用吊篮支架悬挂机构,安装在连廊屋面上,用于悬挂安装连廊侧下方两排吊篮安装,成品支架安装和拆除速度快,安全可靠。There are two types of suspension mechanisms. The first one is a support frame suspension device, which is installed on the floor of the corridor structure and is used to suspend the hanging basket directly below the corridor. The suspension mechanism is small and easy to install in a small space. Another cantilever beam suspension device uses a hanging basket bracket suspension mechanism, which is installed on the roof of the corridor. It is used to install the two rows of hanging baskets below the side of the corridor. The installation and removal of the finished bracket is fast, safe and reliable.
支撑架悬挂装置横梁使用吊篮支架前梁,便于悬挂器安装,悬挂器使用吊篮支架悬挂器,横梁和悬挂器与吊篮同时进场,无需单独采购,成本低。The cross beam of the support frame suspension device uses the front beam of the hanging basket bracket, which facilitates the installation of the hanger. The hanger uses the hanging basket bracket hanger. The cross beam and hanger enter the site at the same time as the hanging basket. There is no need to purchase it separately and the cost is low.
支撑架悬挂装置支撑架使用圆钢管及扣件搭设,灵活使用,安拆速度快,且满足受力要求。Support frame suspension device The support frame is erected using round steel pipes and fasteners, which is flexible to use, fast in installation and disassembly, and meets the stress requirements.
悬挂内、外吊篮由围栏、提升机、安全锁、工作钢丝绳、安全钢丝绳和电气箱及电气控制系统组成。围栏通过钢丝绳和安全钢丝绳固定在悬挂装置上。提升机固定在短边围栏正中间。工作钢丝绳一端穿过提升机下垂,另一端固定在悬挂装置上。安全钢丝绳一端穿过安全锁下垂,另一端固定在悬挂装置上。安全锁固定在短边围栏正中间。电气箱和电气控制系统安装在后围栏正中间。The suspended inner and outer hanging baskets are composed of fences, hoists, safety locks, working wire ropes, safety wire ropes, electrical boxes and electrical control systems. The fence is attached to the suspension device by means of wire ropes and safety wire ropes. The hoist is fixed in the middle of the short side fence. One end of the working wire rope hangs through the hoist, and the other end is fixed on the suspension device. One end of the safety wire rope hangs through the safety lock, and the other end is fixed on the suspension device. The safety lock is fixed in the middle of the short side fence. The electrical box and electrical control system are installed in the middle of the rear fence.
悬挂内、外吊篮采用电动成品吊篮,吊篮可以地面组装,安拆时通过电动提升装置实现快速升降,安拆速度快。The hanging inner and outer hanging baskets adopt electric finished hanging baskets. The hanging baskets can be assembled on the ground. During installation and disassembly, the electric lifting device can be used to realize rapid lifting and lowering, and the installation and disassembly speed is fast.
安装组装悬挂内、外吊篮,首先在地面组装围栏,在两短边围栏侧安装提升机,在长边围栏侧正中间安装电气箱及电气控制系统,工作钢丝绳一端穿过提升机,另一端固定在悬挂装置上,安全钢丝绳一端穿过安全锁中,另一端固定在悬挂装置上,悬挂内、外吊篮提升至连廊下方一定高度,最终完成悬挂内、外吊篮的组装和安装。To install and assemble the suspended inner and outer hanging baskets, first assemble the fence on the ground, install the hoist on the two short side fence sides, install the electrical box and electrical control system in the middle of the long side fence side, pass the working wire rope through the hoist at one end, and pass the other end of the working wire rope through the hoist. Fixed on the suspension device, one end of the safety wire rope passes through the safety lock, and the other end is fixed on the suspension device. The hanging inner and outer hanging baskets are raised to a certain height below the corridor, and the assembly and installation of the hanging inner and outer hanging baskets are finally completed.
悬挂内、外吊篮上通过搭设水平架,以吊篮为受力结构,通过水平架实现各吊篮之间的连通,形成整体操作平台,便于操作人员多人协调施工,相比独立操作平台,人员活动范围不受限制,施工效率高。Horizontal frames are set up on the suspended inner and outer hanging baskets, and the hanging baskets are used as stress-bearing structures. The horizontal frames are used to connect the hanging baskets to form an overall operating platform, which facilitates the coordination of construction by multiple operators. Compared with independent operating platforms , the scope of personnel activities is not restricted, and the construction efficiency is high.
支撑平台由纵向水平杆、横向水平杆、扣件及钢脚手板组成。横向水平杆使用扣件固定在悬挂内、外吊篮上,纵向水平杆通过扣件固定在横向水平杆下方。The support platform consists of longitudinal horizontal rods, transverse horizontal rods, fasteners and steel scaffolding boards. The horizontal horizontal rods are fixed on the inner and outer suspension baskets using fasteners, and the longitudinal horizontal rods are fixed below the horizontal horizontal rods through fasteners.
支撑平台使用圆钢管搭设,材料可以周转使用,搭设时可以根据水平架搭设参数任意调整钢管间距,安装灵活。The support platform is built using round steel pipes, and the materials can be recycled. When erecting, the distance between the steel pipes can be adjusted according to the horizontal frame erection parameters, making the installation flexible.
支撑平台上铺设钢脚手板,刚脚手板重量轻,使用寿命长,可周转使用,经济可靠。Steel scaffolding boards are laid on the support platform. Steel scaffolding boards are light in weight, have a long service life, can be used in turnaround, and are economical and reliable.
幕墙施工操作平台支撑方式采用下挂式,将吊篮下挂安装在连廊下方。The support method of the curtain wall construction operating platform adopts the bottom-hanging type, and the hanging basket is installed under the corridor.
幕墙施工操作平台吊篮沿连廊纵向布置,吊篮数量最少,且满足受力要求,连廊底部幕墙安装完成后,最外侧两排吊篮可以使用在连廊两侧幕墙安装中,无需拆除重新安装。可节省工期和成本。The hanging baskets of the curtain wall construction operation platform are arranged longitudinally along the corridor, with the minimum number of hanging baskets and meeting the stress requirements. After the installation of the curtain wall at the bottom of the corridor is completed, the outer two rows of hanging baskets can be used in the installation of the curtain walls on both sides of the corridor without removal. re-install. Can save construction time and cost.
本发明结构合理,解决了大跨度高空连廊幕墙施工难题,缩短了幕墙施工工期,降低了施工安全风险,有效提高了施工质量。The invention has a reasonable structure, solves the problem of curtain wall construction in large-span high-altitude corridors, shortens the construction period of the curtain wall, reduces construction safety risks, and effectively improves the construction quality.
附图说明Description of the drawings
下面将结合附图对本发明做进一步的描述,图1为本发明的吊篮布置图,图2为本发明的横向剖视结构示意图,图3为吊篮主视结构示意图,图4为支撑架悬挂装置的主视结构示意图,图5为支撑平台的俯视结构示意图。The present invention will be further described below with reference to the accompanying drawings. Figure 1 is a layout diagram of the hanging basket of the present invention. Figure 2 is a schematic cross-sectional structural diagram of the present invention. Figure 3 is a schematic structural view of the hanging basket from the front. Figure 4 is a support frame. The front structural schematic diagram of the suspension device, and Figure 5 is the top structural schematic diagram of the support platform.
具体实施方式Detailed ways
一种大跨度高空连廊幕墙施工操作平台,如图1、图2、图3、图4、图5所示,包括在相邻的塔楼1之间设置着大跨度高空连廊,在高空连廊内设置着连廊顶板5和连廊结构地板6,在长方形的连廊轮廓线框2前、后两侧的轮廓线外侧设置着前、后两排均布排列的外吊篮3,在连廊轮廓线框2内,根据连廊施工需要均布设置着内吊篮4,在连廊顶板5前、后两侧的顶板上分别固装着均布对称的两排悬挂有配重平衡的悬臂梁悬挂装置,在悬臂梁悬挂装置伸出连廊顶板5前、后两侧的外悬臂梁9端部连接着悬挂钢丝绳,悬挂钢丝绳的下端分别连接着相对应的外吊篮3,在连廊结构地板6上分别均布固装着具有横梁23、悬挂器7的支撑架悬挂装置,该均布的支撑架悬挂装置的悬挂器7通过连接的悬挂钢丝绳分别连接着相对应的内吊篮4,纵横交错的水平钢管和扣件搭设的支撑平台13与均布的内、外吊篮4、3连接在一起。内、外吊篮4、3的结构为长方形吊篮底面14的周边设置着围栏15,位于两短边围栏侧的吊篮底面14上分别设置着提升机16和安全锁17,在长边围栏侧中部的吊篮底面14上设置着电气控制箱18,提升机16连接的工作钢丝绳19和与安全锁17配合的安全钢丝绳20分别与悬臂梁悬挂装置或支撑梁悬挂装置相连接。悬臂梁悬挂装置的结构为在连廊顶板5上固接着立柱8,立柱8的上部通过扣件固接着悬臂横梁,悬臂横梁由外悬臂梁9和内悬臂梁10构成,在立柱8上端固接的加强钢丝绳11,加强钢丝绳11一端连接着外悬臂梁9的端部,另一端连接着内悬臂梁10的端部,在外悬臂梁9的端部通过悬挂器连接着悬挂钢丝绳,在内悬臂梁10的端部吊挂着配重12。支撑架悬挂装置的结构为在连廊结构地板6上设置着通过扣件连接着由对称纵横交错的水平杆21构成下水平杆组,在下水平杆组的横向水平杆上通过扣件连接着两根对称的立杆22,在两根立杆22的上部分别通过扣件连接着纵横交错的中水平杆组和上水平杆组,在中、上水平杆组之间固装着横梁23,在横梁23的正中间安装着悬挂器7。在支撑平台13上铺设着钢板。A large-span high-altitude corridor curtain wall construction operation platform, as shown in Figures 1, 2, 3, 4, and 5, includes a large-span high-altitude corridor between adjacent towers 1. There is a corridor roof 5 and a corridor structural floor 6 in the corridor. On the outside of the outline of the front and rear sides of the rectangular corridor outline frame 2, two rows of front and rear outer hanging baskets 3 are arranged evenly. Within the corridor outline frame 2, inner hanging baskets 4 are evenly distributed according to the corridor construction needs, and two rows of uniformly distributed and symmetrical hanging baskets with counterweights and balances are fixed on the roofs on the front and rear sides of the corridor roof 5. Cantilever beam suspension device, the ends of the outer cantilever beams 9 at the front and rear sides of the corridor roof 5 extending out of the cantilever beam suspension device are connected to suspension wire ropes, and the lower ends of the suspension wire ropes are respectively connected to corresponding outer hanging baskets 3. Support frame suspension devices with cross beams 23 and hangers 7 are evenly installed on the corridor structure floor 6. The hangers 7 of the evenly distributed support frame suspension devices are connected to the corresponding inner hanging baskets 4 through connected suspension wire ropes. , the support platform 13 set up by criss-crossing horizontal steel pipes and fasteners is connected to the uniformly distributed inner and outer hanging baskets 4 and 3. The structure of the inner and outer hanging baskets 4 and 3 is that a fence 15 is arranged around the bottom surface 14 of the rectangular hanging basket. A hoist 16 and a safety lock 17 are respectively installed on the bottom surface 14 of the hanging basket on the sides of the two short side fences. On the long side fence An electrical control box 18 is provided on the bottom surface 14 of the hanging basket in the middle part of the side. The working wire rope 19 connected to the hoist 16 and the safety wire rope 20 matched with the safety lock 17 are respectively connected to the cantilever beam suspension device or the support beam suspension device. The structure of the cantilever beam suspension device is that a column 8 is fixed on the corridor roof 5. The upper part of the column 8 is fixed to the cantilever beam through a fastener. The cantilever beam is composed of an outer cantilever beam 9 and an inner cantilever beam 10. The upper end of the column 8 is fixed. Reinforcement wire rope 11, one end of the reinforcement wire rope 11 is connected to the end of the outer cantilever beam 9, and the other end is connected to the end of the inner cantilever beam 10. The end of the outer cantilever beam 9 is connected to the suspension wire rope through a hanger, and the inner cantilever beam The end of 10 is hung with counterweight 12. The structure of the support frame suspension device is that a lower horizontal rod group is composed of symmetrically crisscrossed horizontal rods 21 connected by fasteners on the corridor structural floor 6, and two horizontal horizontal rods of the lower horizontal rod group are connected by fasteners. A symmetrical vertical pole 22 is connected with a criss-crossing middle horizontal pole group and an upper horizontal pole group through fasteners on the upper part of the two vertical poles 22. A cross beam 23 is fixed between the middle and upper horizontal pole groups. The cross beam 23 The hanger 7 is installed in the middle. Steel plates are laid on the support platform 13.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310911273.0A CN117027352A (en) | 2023-07-24 | 2023-07-24 | Large-span high altitude vestibule curtain wall construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310911273.0A CN117027352A (en) | 2023-07-24 | 2023-07-24 | Large-span high altitude vestibule curtain wall construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN117027352A true CN117027352A (en) | 2023-11-10 |
Family
ID=88632726
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310911273.0A Pending CN117027352A (en) | 2023-07-24 | 2023-07-24 | Large-span high altitude vestibule curtain wall construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN117027352A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120094679A (en) * | 2011-02-17 | 2012-08-27 | 대한중공업(주) | Gondola of wire lift type for buinding management |
CN212926981U (en) * | 2020-06-19 | 2021-04-09 | 中建新疆建工集团第一建筑工程有限公司 | I-steel support of encorbelmenting bears hanging flower basket device |
CN115306137A (en) * | 2022-08-22 | 2022-11-08 | 北京建工四建工程建设有限公司 | Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof |
CN115893221A (en) * | 2022-11-11 | 2023-04-04 | 中国建筑第二工程局有限公司 | Electric hanging basket for complex curtain wall and construction method thereof |
-
2023
- 2023-07-24 CN CN202310911273.0A patent/CN117027352A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20120094679A (en) * | 2011-02-17 | 2012-08-27 | 대한중공업(주) | Gondola of wire lift type for buinding management |
CN212926981U (en) * | 2020-06-19 | 2021-04-09 | 中建新疆建工集团第一建筑工程有限公司 | I-steel support of encorbelmenting bears hanging flower basket device |
CN115306137A (en) * | 2022-08-22 | 2022-11-08 | 北京建工四建工程建设有限公司 | Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof |
CN115893221A (en) * | 2022-11-11 | 2023-04-04 | 中国建筑第二工程局有限公司 | Electric hanging basket for complex curtain wall and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102864936B (en) | Combination lifting construction method for large-scale high hollow building roof of steel structure | |
CN110748139B (en) | Hanging basket support system | |
WO2023208250A1 (en) | Curtain wall construction platform | |
WO2022252829A1 (en) | Liftable scaffold, lifting and installation methods thereof, and construction method for prefabricated building | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN115306137A (en) | Operation platform structure for mounting suspended ceiling at bottom of overhead corridor and construction method thereof | |
CN220376298U (en) | Hanging basket lifting device | |
CN110965757A (en) | Scaffold applicable to wall with flanging structure and construction method thereof | |
CN117027352A (en) | Large-span high altitude vestibule curtain wall construction operation platform | |
CN107035037B (en) | Tower top curtain wall frame and mounting method thereof | |
CN112942789B (en) | Water drop type curtain wall construction method | |
CN215253414U (en) | Steel structural framework and modularized additional elevator | |
CN214302804U (en) | Double-layer hanging basket of riding horse type | |
CN212336673U (en) | Scaffold and scaffold subassembly suitable for have flange structure wall body | |
CN206844417U (en) | A kind of high building top layer curtain wall frame | |
CN206581578U (en) | Double-layer basket constructing device for overhanging scaffold | |
CN113445723A (en) | Construction platform for mounting overhanging structure curtain wall and mounting method | |
CN113550550A (en) | Overhanging unit type scaffold convenient to assemble and disassemble | |
CN111456399A (en) | A large-span cantilever support system for a corridor between high-rise units and its construction method | |
CN218623252U (en) | Hanging basket installation fixing system at framework | |
CN205558305U (en) | Steel gallery promotes reinforcing apparatus | |
CN215829977U (en) | A suspended door formula support for high altitude tower building vestibule fitment | |
CN218114742U (en) | Carrying pole beam hoisting system and carrying pole beam hoisting system | |
CN216766245U (en) | High-rise large-span steel concrete beam connection structure | |
CN104675093B (en) | Dish-type node type scaffold |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |