CN117019479B - Zero medicament treatment system for coating wastewater - Google Patents

Zero medicament treatment system for coating wastewater

Info

Publication number
CN117019479B
CN117019479B CN202311173118.XA CN202311173118A CN117019479B CN 117019479 B CN117019479 B CN 117019479B CN 202311173118 A CN202311173118 A CN 202311173118A CN 117019479 B CN117019479 B CN 117019479B
Authority
CN
China
Prior art keywords
plate
fixedly connected
paint
water
exhaust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202311173118.XA
Other languages
Chinese (zh)
Other versions
CN117019479A (en
Inventor
陈友伶
黄钧军
武奇文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Zhonglida Environmental Protection Technology Co ltd
Original Assignee
Suzhou Zhonglida Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Zhonglida Environmental Protection Technology Co ltd filed Critical Suzhou Zhonglida Environmental Protection Technology Co ltd
Priority to CN202311173118.XA priority Critical patent/CN117019479B/en
Publication of CN117019479A publication Critical patent/CN117019479A/en
Application granted granted Critical
Publication of CN117019479B publication Critical patent/CN117019479B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/46Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by washing the air charged with excess material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B14/00Arrangements for collecting, re-using or eliminating excess spraying material
    • B05B14/40Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths
    • B05B14/43Arrangements for collecting, re-using or eliminating excess spraying material for use in spray booths by filtering the air charged with excess material
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Landscapes

  • Details Or Accessories Of Spraying Plant Or Apparatus (AREA)

Abstract

本发明涉及喷漆房技术领域,且公开了涂装废水零药剂处理系统,包括:喷漆主体机构,所述喷漆主体机构的一侧设置有排风机构,所述排风机构的一侧安装有改性水存储机构,所述排风机构的上方安装有水帘机构,且水帘机构和所述改性水存储机构均位于喷漆主体机构的内部,所述排风机构的内部安装有扰流机构,所述喷漆主体机构一侧的底部设置有漆雾捕捉机构,且漆雾捕捉机构位于排风机构的底部,所述漆雾捕捉机构的内部设置有导流机构。该涂装废水零药剂处理系统,能够在进行喷漆作业时,将大量未被工件附着的飞散漆雾捕捉,提高安全性,减少后续带来的环境压力,漆渣打捞容易,易于分离,水体无需频繁更换,降低了使用成本。

This invention relates to the field of spray booth technology and discloses a zero-chemical wastewater treatment system for painting, comprising: a main spray booth structure; an exhaust system on one side of the main spray booth structure; a modified water storage system on one side of the exhaust system; a water curtain system above the exhaust system; both the water curtain system and the modified water storage system are located inside the main spray booth structure; a turbulence-inducing mechanism inside the exhaust system; and a paint mist-catching mechanism at the bottom of one side of the main spray booth structure, located at the bottom of the exhaust system, with a flow-guiding mechanism inside the paint mist-catching mechanism. This zero-chemical wastewater treatment system for painting can capture a large amount of scattered paint mist that is not attached to the workpiece during spray painting operations, improving safety, reducing subsequent environmental pressure, facilitating paint residue removal and separation, eliminating the need for frequent water changes, and reducing operating costs.

Description

Zero medicament treatment system for coating wastewater
Technical Field
The invention relates to the technical field of paint spray booths, in particular to a zero-reagent treatment system for coating wastewater.
Background
The paint spray booth, as the name implies, performs paint-spraying coloring treatment on a filtered paint spray object in one room. The paint spray booth is also called a paint baking room, is equipment for providing special environment for painting operation, can meet the requirements of the painting operation on temperature, humidity, illuminance, air cleanliness and the like, can limit and treat paint mist and organic waste gas generated during the painting operation, and is environment-friendly painting equipment.
Traditional spray paint is sprayed on an appliance by using a spray head in the open air, a large amount of paint mist can be generated in a spray painting area and dispersed in the air, the paint mist can pollute the air along with the diffusion of air flow, and the suction of the paint mist by workers can be unfavorable to the body, so that a zero-medicament treatment system for the coating waste water is required.
Disclosure of Invention
In order to overcome the defects in the prior art, the invention provides a zero medicament treatment system for coating wastewater, and solves the problems in the background.
The invention provides a coating wastewater zero medicament treatment system which comprises a paint spraying main body mechanism, wherein an exhaust mechanism is arranged on one side of the paint spraying main body mechanism, a modified water storage mechanism is arranged on one side of the exhaust mechanism, a water curtain mechanism is arranged above the exhaust mechanism, the water curtain mechanism and the modified water storage mechanism are both positioned in the paint spraying main body mechanism, a turbulence mechanism is arranged in the exhaust mechanism, a paint mist capturing mechanism is arranged at the bottom of one side of the paint spraying main body mechanism, the paint mist capturing mechanism is positioned at the bottom of the exhaust mechanism, a diversion mechanism is arranged in the paint mist capturing mechanism, a water mist separating mechanism is arranged in the exhaust mechanism, and the water mist separating mechanism is positioned above the turbulence mechanism.
Preferably, the main paint spraying mechanism comprises an upper paint spraying room body, a lower paint spraying room body, a paint spraying room chamber, an operation room chamber, a pressure equalizing cover, a partition plate, a paint spraying area air inlet fan, an operation area air inlet fan, a paint spraying area air inlet pipe, an operation area air inlet pipe and a paint spraying operation table, wherein the lower paint spraying room body is fixedly connected to the bottom of the upper paint spraying room body, the paint spraying room chamber and the operation room chamber are arranged between the upper paint spraying room body and the lower paint spraying room body, the pressure equalizing cover is fixedly arranged at the top of the upper paint spraying room body, the partition plate is integrally arranged in the middle of the pressure equalizing cover, the paint spraying area air inlet fan and the operation area air inlet fan are fixedly arranged in the pressure equalizing cover, the paint spraying area air inlet fan is arranged above the paint spraying room chamber, the paint spraying area air inlet pipe is fixedly arranged at the top of the pressure equalizing cover, the paint spraying area air inlet pipe is arranged above the air inlet fan, the operation area air inlet pipe is arranged above the operation area air inlet fan, the partition plate is fixedly connected to the inner wall of the paint spraying room body, and the glass is fixedly connected to one side of the paint spraying room body.
Preferably, the exhaust mechanism comprises a cleaning tower, a radiating plate, an exhaust fan and a silk screen filter, wherein the cleaning tower is fixedly inserted into the top of the paint spraying operation table, the cleaning tower is positioned on one side of a paint spraying room, the radiating plate is fixedly connected to the inner wall of the cleaning tower on one side far away from the paint spraying room, the exhaust fan is fixedly arranged at the top of the cleaning tower, the silk screen filter is fixedly arranged on the inner wall of the cleaning tower, and a bending table is arranged at the top of the cleaning tower.
Preferably, the modified water storage mechanism comprises a storage tank connecting frame, a modified water storage tank, an overflow valve, a liquid inlet pipeline, a water level transparent window, an electromagnetic valve, a first liquid discharge pipeline, a first liquid pump, a second liquid discharge pipeline, a distribution pipeline and an atomizer, wherein the storage tank connecting frame is fixedly connected to the inner wall of an upper room body of a spray booth, one side of the storage tank connecting frame is fixedly connected with one side of a cleaning tower, the modified water storage tank is fixedly installed in the storage tank connecting frame, the overflow valve and the liquid inlet pipeline are fixedly installed at the top of the modified water storage tank, the water level transparent window is fixedly installed on the surface of the modified water storage tank, the water level transparent window is located on one side of a glass plate, the electromagnetic valve is fixedly installed at the bottom of the modified water storage tank, the first liquid discharge pipeline is fixedly installed at the output end of the electromagnetic valve, the first liquid pump is fixedly installed on the upper surface of the spray booth, the input end of the first liquid pump is fixedly connected with the output end of the first liquid discharge pipeline, the second liquid discharge pipeline is fixedly installed at the output end of the first liquid pump, the distribution pipeline is fixedly connected to the inner wall of the distribution pipeline, and the output end of the distribution pipeline is fixedly installed on the output end of the distribution pipeline.
Preferably, the water curtain mechanism comprises a water curtain groove, an overflow port, a lower connecting pipeline, a second liquid pump, a first backflow pipeline, a second backflow pipeline and a guide plate, wherein the water curtain groove is fixedly connected to the surface of the bending table, the water curtain groove is located at one side of a spray booth, the overflow port penetrates through one side of the water curtain groove, the lower connecting pipeline is fixedly installed at the bottom of the water curtain groove, the second liquid pump is fixedly installed on the upper surface of a spray booth, the first backflow pipeline is fixedly installed at the input end of the second liquid pump, the second backflow pipeline is fixedly installed at the output end of the second liquid pump, the guide plate is fixedly connected to the bottom of the water curtain groove, and two sides of the guide plate are fixedly connected with the inner wall arm of the spray booth.
Preferably, the vortex mechanism includes enhancement frame, spoiler and aeration board, the quantity of enhancement frame is two, and two equal fixed connection of enhancement frames are at the inside wall of washing tower, the quantity of spoiler is three, and the equal fixed connection of three spoiler between two enhancement frames, and the equal slope setting of three spoiler, aeration board fixed mounting is at the inner wall of spoiler, and the surface of aeration board runs through and has seted up the round hole of ventilating.
Preferably, the paint mist capturing mechanism comprises a gas washing water tank, a tank cover plate, a gas guide bucket, a paint spraying bearing plate and an exhaust port, wherein the gas washing water tank is fixedly connected with the inner bottom wall of a lower room body of the paint spraying room, the tank cover plate is fixedly connected with the top of the gas washing water tank, the upper surface of the tank cover plate is fixedly connected with the bottom of the cleaning tower, the gas guide bucket is integrally arranged on one side of the upper surface of the tank cover plate, the outer wall of the gas guide bucket is fixedly connected with the inner wall of the paint spraying operation table, the bottom of the gas guide bucket is provided with the gas guide port, the paint spraying bearing plate is fixedly connected with the inner wall of the gas guide bucket, the surface of the paint spraying bearing plate is provided with a through hole in a penetrating manner, and the exhaust port is arranged on the upper surface of the tank cover plate and is positioned below the cleaning tower.
Preferably, the paint mist capturing mechanism further comprises a liquid level meter, a waste liquid pipeline and a flip cover, wherein the liquid level meter and the waste liquid pipeline are respectively and fixedly installed on two sides of the gas washing water tank, a valve is installed on the surface of the waste liquid pipeline, and the flip cover is rotationally connected to the upper surface of the tank cover plate.
Preferably, the guiding mechanism comprises a slag penetrating plate, a gas guiding plate, a gas sealing plate and a slag penetrating hole, wherein the slag penetrating plate is fixedly connected to the inner wall of the air outlet, an air exhausting gap is formed between the slag penetrating plate and the air outlet, the gas guiding plate and the gas sealing plate are respectively positioned on two sides of the slag penetrating plate, a gas washing channel is formed between the gas guiding plate and the tank cover plate, and the slag penetrating hole penetrates through the surface of the slag penetrating plate.
Preferably, the water mist separation mechanism comprises a heat exchange tube, a condensation plate, a reflux plate and an exhaust plate, wherein the heat exchange tube is fixedly connected to the bottom of a lower connecting pipeline, the condensation plate is slidably connected to the surface of the heat exchange tube, the reflux plate is fixedly connected to the surface of the condensation plate, the exhaust plate penetrates through the inner wall of the reflux plate, the surface of the exhaust plate is provided with a reflux waist hole, the reflux plate is obliquely arranged, the surface of the reflux plate is fixedly connected with the inner wall of the cleaning tower, and the reflux plate is positioned above the spoiler.
Compared with the prior art, the invention has the following beneficial effects:
this zero medicament processing system of application waste water, through the main part mechanism that sprays paint that sets up, exhaust mechanism, modified water storage mechanism, cascade mechanism, vortex mechanism, coating cloud catching mechanism, water conservancy diversion mechanism and water fog separating mechanism, can be when spraying paint the operation, with a large amount of scattered coating cloud that is not attached by the work piece catch, need not special medicine, improve the security, reduce the environmental pressure that follow-up brought, the coating cloud is salvaged easily, easily separation, and the water need not frequent change, has reduced use cost.
This zero medicament processing system of application waste water, through the main part mechanism that sprays paint that sets up, exhaust mechanism, modified water storage mechanism, the cascade mechanism, vortex mechanism, the mechanism is caught to the coating cloud, guiding mechanism and water fog separating mechanism, owing to the alkaline state of water, can not produce the microorganism when the water uses for a long time, thereby the water uses for a long time can not stink, owing to the simple separation of coating cloud, can long-time keep a relative clean state of water, also make the water need not to change and can used repeatedly, above all, after coating cloud combines with the active hydrogen ion, form and be non-sticky, make coating cloud also can not with the intractable adhesion of equipment, make the clearance of equipment clean and become relatively easy portably.
According to the zero-medicament treatment system for the coating wastewater, through the cleaning tower, the radiating plate, the exhaust fan and the silk screen filter, negative pressure suction paint mist and air mixture can be generated so as to be cleaned gradually along the cleaning tower, and an operation channel and heat dissipation can be provided through the cleaning tower conveniently.
This zero medicament processing system of application waste water through storage tank link, modified water storage tank, overflow valve, feed liquor pipeline, water level transparent window, solenoid valve, first fluid-discharge tube, first liquid pump, second fluid-discharge tube, distribution pipeline and the atomizer that sets up to the modified water of storage is convenient for, and produces high pressure and atomizes the modified water.
According to the zero-reagent coating wastewater treatment system, paint mist can be taken away by a water curtain through the water curtain groove, the overflow port, the lower connecting pipeline, the second liquid pump, the first backflow pipeline, the second backflow pipeline and the guide plate, and heat can be dissipated to water and the cleaning tower.
This zero medicament processing system of application waste water through strengthening frame, spoiler and the aeration board that sets up to the granule group that receives the impact rising is blockked in the convenience, and the guarantee granule group falls back.
This zero medicament processing system of application waste water through the wash-gas flume, the groove apron, air guide fill, spray paint loading board, gas vent, level gauge, waste liquid pipeline and flip that set up to the modified water of storage, conveniently persist the pellet inside the water, avoid the pellet to splash.
Zero medicament processing system of application waste water is through oozing slag plate, air guide plate, gas seal board and the oozing slag hole that sets up to form venturi structure with wash tank and capping board cooperation, be convenient for accelerate paint mist, improve its and water smoke's collision degree, improve mixed effect.
The zero medicament processing system of coating waste water through heat exchange tube, condensing piece, backward flow board and the exhaust plate that sets up to can utilize the inside cold water of cascade tank to the inside water smoke condensation of cleaning tower, make things convenient for the water smoke condensation backward flow.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a side cross-sectional view of the present invention;
FIG. 3 is a schematic view of the structure of the exhaust mechanism of the present invention;
FIG. 4 is a schematic view of the structure of the water curtain mechanism of the present invention;
FIG. 5 is a schematic diagram of the connection structure of the water curtain mechanism and the water mist separating mechanism;
FIG. 6 is a schematic view of an explosive structure inside the water mist separating mechanism of the present invention;
FIG. 7 is a schematic view of a water curtain mechanism according to the present invention;
FIG. 8 is a schematic diagram of a modified water storage mechanism according to the present invention;
FIG. 9 is a schematic diagram of a paint mist capturing mechanism according to the present invention;
FIG. 10 is a side cross-sectional view of the paint mist capturing mechanism of the present invention;
FIG. 11 is a schematic view of a spoiler mechanism according to the present invention.
101, A spray booth upper room body; 102, a lower room body of the paint spray booth; 103, spray booth, 104, operation booth, 105, pressure equalizing hood, 106, partition, 107, spray booth intake fan, 108, operation booth intake fan, 109, spray booth intake duct, 110, operation booth intake duct, 111, spray booth, 201, wash tower, 202, radiator, 203, exhaust fan, 204, screen filter, 301, tank connection rack, 302, modified water storage tank, 303, overflow valve, 304, liquid intake duct, 305, water level transparent window, 306, solenoid valve, 307, first drain duct, 308, first liquid pump, 309, second drain duct, 310, distribution duct, 311, atomizer, 401, water curtain tank, 402, overflow port, 403, lower connection duct, 404, second liquid pump, 405, first return duct, 406, second return duct, 407, deflector, 501, reinforcement rack, 502, spoiler, 503, aeration panel, 601, gas sink, 602, tank cover panel, gas guide, 604, paint carrier panel, 605, gas outlet, 607, 606, liquid level meter, 310, distribution duct, 311, atomization nozzle, 401, water return duct, 311, drain panel, 803, slag guide panel, water guide, 803, slag guide panel, slag guide, 803, slag guide panel, water guide, and slag guide panel, 803.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-11, the zero medicament treatment system for the coating wastewater comprises a spray painting main body mechanism, wherein an exhaust mechanism is arranged on one side of the spray painting main body mechanism, a modified water storage mechanism is arranged on one side of the exhaust mechanism, a water curtain mechanism is arranged above the exhaust mechanism, the water curtain mechanism and the modified water storage mechanism are both positioned in the spray painting main body mechanism, a turbulence mechanism is arranged in the exhaust mechanism, a paint mist capturing mechanism is arranged at the bottom of one side of the spray painting main body mechanism, the paint mist capturing mechanism is positioned at the bottom of the exhaust mechanism, a diversion mechanism is arranged in the paint mist capturing mechanism, a water mist separating mechanism is arranged in the exhaust mechanism, and the water mist separating mechanism is positioned above the turbulence mechanism.
Wherein the paint spraying main body mechanism comprises a paint spraying room upper room body 101, a paint spraying room lower room body 102, a paint spraying room 103, an operation room 104, a pressure equalizing cover 105, a baffle 106, a paint spraying area air inlet fan 107, an operation area air inlet fan 108, a paint spraying area air inlet pipe 109, a paint spraying area air inlet pipe, the paint spray booth comprises an operation area air inlet pipe 110 and a paint spray operation table 111, a paint spray booth lower room body 102 is fixedly connected to the bottom of a paint spray booth upper room body 101, a paint spray booth 103 and an operation area air inlet pipe 104 are both arranged between the paint spray booth upper room body 101 and the paint spray booth lower room body 102, a pressure equalizing cover 105 is fixedly installed on the top of the paint spray booth upper room body 101, a partition plate 106 is integrally arranged in the middle of the pressure equalizing cover 105, a paint spray area air inlet fan 107 and an operation area air inlet fan 108 are both fixedly installed in the pressure equalizing cover 105, the paint spray area air inlet fan 107 is located above the paint spray booth 103, the operation area air inlet fan 108 is located above the operation room 104, the paint spray area air inlet pipe 109 and the operation area air inlet pipe 110 are both fixedly installed on the top of the pressure equalizing cover 105, the paint spray booth air inlet fan 109 is located above the paint spray booth air inlet fan 107, the operation area air inlet pipe 110 is located above the operation area air inlet fan 108, the partition plate 106 is fixedly connected to the inner wall of the paint spray booth 103, and one side of the upper room body 101 is fixedly connected with a glass plate through a set paint spray booth main body mechanism, an exhaust mechanism, a modified water storage mechanism, a water curtain mechanism, a turbulent flow mechanism, a paint mist capturing mechanism, The utility model provides a water purification device, the paint spraying device comprises a diversion mechanism and a water mist separating mechanism, can be when carrying out the operation of spraying paint, with a large amount of scattered paint mist that is not adhered by the work piece, need not special medicine, improve the security, reduce the environmental pressure that brings subsequently, the paint sediment is salvaged easily, easily separate, the water need not frequent change, and reduced use cost, the modified water machine is when the electrolysis water, the raw materials is the pure water after the running water is purified, only the pH value that produces is nine to the electrolysis alkaline water between thirteen, be called modified water, the modified water active ingredient is hydroxide ion and active hydrogen ion, no other material discharges, there is active hydrogen ion and the resin structure of paint can form special water repellent structure under this special pH value's condition, the principle of water repellent structure is: the water molecules are high-polarity molecules, water exists in a liquid state in a water molecule group mode due to the action of active hydrogen ions, the water molecules can be continuously scattered and separated, the polar water molecules can form sub-groups around certain ions under the action of electric field force formed by local ions, when the electric field reaches a certain strength and ions with certain concentration are used as a bracket, the water of the macromolecular groups can be changed into water of small molecular groups, so the water has better permeability, so that paint slag of the structure can be simply separated from water, the paint slag can be simply and efficiently removed, microorganisms are not generated when the water body is used for a long time due to the alkaline state of the water body, the water body can not be odorized when the water body is used for a long time, the water body can be kept in a relatively clean state for a long time due to the simple separation of the paint slag, the water body can be repeatedly used without replacement, and most importantly, the paint slag is not stained after being combined with the active hydrogen ions, the paint slag can not adhere to the equipment intractable, so that the cleaning of the equipment becomes easier and simpler.
The air exhausting mechanism comprises a cleaning tower 201, a radiating plate 202, an air exhausting fan 203 and a wire mesh filter 204, wherein the cleaning tower 201 is fixedly inserted into the top of the paint spraying operation table 111, the cleaning tower 201 is positioned on one side of the paint spraying chamber 103, the radiating plate 202 is fixedly connected to the inner wall of one side of the cleaning tower 201 far away from the paint spraying chamber 103, the air exhausting fan 203 is fixedly arranged on the top of the cleaning tower 201, the wire mesh filter 204 is fixedly arranged on the inner wall of the cleaning tower 201, and the top of the cleaning tower 201 is provided with a bending table, so that a negative pressure can be generated to attract paint mist and air mixture to clean gradually along the cleaning tower 201, and an operation channel and heat dissipation can be conveniently provided through the cleaning tower 201.
The modified water storage mechanism comprises a storage tank connecting frame 301, a modified water storage tank 302, an overflow valve 303, a liquid inlet pipeline 304, a water level transparent window 305, an electromagnetic valve 306, a first liquid discharge pipeline 307, a first liquid pump 308, a second liquid discharge pipeline 309, a distribution pipeline 310 and an atomizing nozzle 311, wherein the storage tank connecting frame 301 is fixedly connected to the inner wall of the upper room body 101 of the spray booth, one side of the storage tank connecting frame 301 is fixedly connected with one side of the cleaning tower 201, the modified water storage tank 302 is fixedly arranged in the storage tank connecting frame 301, the overflow valve 303 and the liquid inlet pipeline 304 are fixedly arranged at the top of the modified water storage tank 302, the water level transparent window 305 is fixedly arranged on the surface of the modified water storage tank 302, the water level transparent window 305 is positioned on one side of a glass plate, the electromagnetic valve 306 is fixedly arranged at the bottom of the modified water storage tank 302, the first liquid discharge pipeline 307 is fixedly arranged at the output end of the electromagnetic valve 306, the first liquid pump 308 is fixedly arranged on the upper surface of the spray booth 111, the input end of the first liquid pump 308 is fixedly connected with the output end of the first liquid discharge pipeline 307, the second liquid discharge pipeline 309 is fixedly arranged at the output end of the first liquid pump 308, the output end of the first liquid pump 308 is fixedly connected with the output end of the first liquid discharge pipeline 308, the overflow pipeline 308 is fixedly arranged at the output end of the first liquid discharge pipeline 308, the output end of the first liquid pump 308 is fixedly connected with the liquid discharge pipeline 308, the liquid discharge pipeline 308 is fixedly arranged at the output end of the liquid discharge pipeline 308, the liquid level of the liquid discharge pipeline is fixedly arranged at the output end of the liquid outlet pipeline 308, the liquid is arranged at the output end of the liquid level of the liquid discharge pipeline 308, and is convenient to be connected with the liquid level, and is arranged at the liquid level, and is easy to be connected with the liquid, and is stored by the liquid.
The water curtain mechanism comprises a water curtain groove 401, an overflow port 402, a lower connecting pipeline 403, a second liquid pump 404, a first backflow pipeline 405, a second backflow pipeline 406 and a guide plate 407, wherein the water curtain groove 401 is fixedly connected to the surface of the bending table, the water curtain groove 401 is located on one side of the spray booth 103, the overflow port 402 penetrates through one side of the water curtain groove 401, the lower connecting pipeline 403 is fixedly arranged at the bottom of the water curtain groove 401, the second liquid pump 404 is fixedly arranged on the upper surface of the spray booth 111, the first backflow pipeline 405 is fixedly arranged at the input end of the second liquid pump 404, the second backflow pipeline 406 is fixedly arranged at the output end of the second liquid pump 404, the guide plate 407 is fixedly connected to the bottom of the water curtain groove 401, and two side monarch sides of the guide plate 407 are fixedly connected with the inner wall arms of the spray booth 103, and the water curtain groove 401, the overflow port 402, the lower connecting pipeline 403, the second liquid pump 404, the first backflow pipeline 405, the second backflow pipeline 406 and the guide plate are arranged so as to conveniently generate water curtain mist, and simultaneously, the water curtain mist can be taken away, and the heat dissipation of the water body 201 can be carried away.
The spoiler mechanism comprises two reinforcing frames 501, spoilers 502 and ventilation plates 503, wherein the reinforcing frames 501 are fixedly connected to the inner side wall of the cleaning tower 201, the spoilers 502 are three in number, the spoilers 502 are fixedly connected between the two reinforcing frames 501, the spoilers 502 are obliquely arranged, the ventilation plates 503 are fixedly mounted on the inner wall of the spoilers 502, ventilation round holes are formed in the surfaces of the ventilation plates 503 in a penetrating mode, and particles which are impacted and ascend are prevented from falling back through the reinforcing frames 501, the spoilers 502 and the ventilation plates 503.
The paint mist capturing mechanism comprises a gas washing water tank 601, a tank cover plate 602, a gas guide hopper 603, a paint spraying bearing plate 604 and an exhaust port 605, wherein the gas washing water tank 601 is fixedly connected to the inner bottom wall of the lower room body 102 of the paint spraying room, the tank cover plate 602 is fixedly connected to the top of the gas washing water tank 601, the upper surface of the tank cover plate 602 is fixedly connected with the bottom of the cleaning tower 201, the gas guide hopper 603 is integrally arranged on one side of the upper surface of the tank cover plate 602, the outer wall of the gas guide hopper 603 is fixedly connected with the inner wall of the paint spraying operation table 111, the bottom of the gas guide hopper 603 is provided with a gas guide port, the paint spraying bearing plate 604 is fixedly connected to the inner wall of the gas guide hopper 603, through holes are formed in the surface of the paint spraying bearing plate 604 in a penetrating manner, the exhaust port 605 is formed in the upper surface of the tank cover plate 602 in a penetrating manner, and the exhaust port 605 is located below the cleaning tower 201.
The paint mist capturing mechanism further comprises a liquid level meter 606, a waste liquid pipeline 607 and a flip cover 608, wherein the liquid level meter 606 and the waste liquid pipeline 607 are respectively and fixedly arranged on two sides of the gas washing water tank 601, a valve is arranged on the surface of the waste liquid pipeline 607, the flip cover 608 is rotationally connected to the upper surface of the tank cover plate 602, and the gas washing water tank 601, the tank cover plate 602, the gas guide hopper 603, the paint spraying bearing plate 604, the exhaust port 605, the liquid level meter 606, the waste liquid pipeline 607 and the flip cover 608 are arranged to store modified water conveniently, so that particle clusters can be reserved in a water body conveniently, and splashing of the particle clusters can be avoided.
The flow guide mechanism comprises a slag penetrating plate 701, an air guide plate 702, an air sealing plate 703 and slag penetrating holes 704, wherein the slag penetrating plate 701 is fixedly connected to the inner wall of the exhaust port 605, an exhaust gap is formed between the slag penetrating plate 701 and the exhaust port 605, the air guide plate 702 and the air sealing plate 703 are respectively positioned on two sides of the slag penetrating plate 701, a gas washing channel is formed between the air guide plate 702 and the groove cover plate 602, the slag penetrating holes 704 penetrate through the surface of the slag penetrating plate 701, and venturi structures are formed by the aid of the slag penetrating plate 701, the air guide plate 702, the air sealing plate 703 and the slag penetrating holes 704, so that paint mist can be accelerated conveniently, the collision degree between the paint mist and the water mist can be improved, and the mixing effect can be improved.
The water mist separating mechanism comprises a heat exchange tube 801, a condensation plate 802, a reflux plate 803 and an exhaust plate 804, wherein the heat exchange tube 801 is fixedly connected to the bottom of a lower connecting pipeline 403, the condensation plate 802 is slidably connected to the surface of the heat exchange tube 801, the reflux plate 803 is fixedly connected to the surface of the condensation plate 802, the exhaust plate 804 penetrates through the inner wall of the reflux plate 803, the surface of the exhaust plate 804 is provided with a reflux waist hole, the reflux plate 803 is obliquely arranged, the surface of the reflux plate 803 is fixedly connected with the inner wall of the cleaning tower 201, the reflux plate 803 is located above the spoiler 502, and water mist inside the cleaning tower 201 can be condensed conveniently by using cold water inside the water curtain groove 401.
In the installation process, an external filter device and an auxiliary filter liquid pump are installed between a liquid inlet pipeline 304 and a waste liquid pipeline 607, a tank cover plate 602 is opened, an electromagnetic valve 306 is closed, modified water is injected into a gas washing tank 601, then the auxiliary filter liquid pump of the external filter device is started to filter the modified water and then pump the filtered water into the modified water storage tank 302, so that the water level in the modified water storage tank 302 and the water level in the gas washing tank 601 reach a certain height, then the electromagnetic valve 306 is opened, a first liquid pump 308 is started, so that the pumping flow rate of the first liquid pump 308 is the same as that of the auxiliary filter liquid pump of the external filter device, the modified water in the modified water storage tank 302 is continuously pressurized and atomized from an atomization nozzle 311 and finally falls into the gas washing tank 601, the modified water in the gas washing tank 601 is continuously pumped and filtered from the waste liquid pipeline 607 and then returns to the modified water storage tank 302 from the liquid inlet pipeline 304, and thus circulation is formed, and an air inlet fan 107 in a paint spraying area is started, The exhaust fan 203 and the second liquid pump 404, the second liquid pump 404 continuously pumps the modified water in the spray booth 601 into the water curtain groove 401, then the modified water overflows from the overflow port 402 and flows downwards along the guide plate 407, thereby forming a water curtain on the surface of the guide plate 407, the downwards flowing water flows into the air guide hopper 603 through the paint spraying bearing plate 604 and finally flows back into the spray booth 601, the air inlet fan 107 in the paint spraying area supplements the processed air into the spray booth 103 during paint spraying, the exhaust fan 203 forms negative pressure to pump the paint mist generated in the spray booth 103 outwards, the paint mist firstly passes through the paint spraying bearing plate 604 and enters the air guide hopper 603, then enters the spray booth 601 and is discharged into the cleaning tower 201 from an exhaust gap on one side of the slag penetrating plate 701 along a gas washing channel between the modified water level and the tank cover plate 602, and at this time, the air guide hopper 603, A slotted cover 602, The venturi tube structure is formed between the slag penetrating plate 701 and the modified water page, paint mist is pressurized and accelerated to be sprayed upwards from the exhaust gap and is impacted with atomized modified water sprayed by the atomization spray nozzle 311, meanwhile, the paint mist is fully impacted with the liquid level of the modified water when passing through the gas washing channel, so that the paint mist is fully mixed with the modified water, oil or other fat is decomposed when meeting the modified water, grease pollutants are in a state of being easier to separate through saponification, the modified water can cut and disperse the grease pollutants through emulsification, so that the grease pollutants are easier to peel off, most pollutant ions have strong negative potential under the action of active hydrogen ions of the modified water, and meanwhile, a plurality of surfaces of objects to be cleaned also have negative charges, repulsive force is generated between the two, so that the paint mist has strong decontamination effect, in addition, the repulsive force can also prevent the surfaces of the objects to be cleaned from being polluted again, and the alkaline electrolyzed water contains abundant dissolved hydrogen, which has a certain effect on pollutant removal, the unabsorbed air and a small part of particle clusters rise along the cleaning tower 201, the rising mixture is firstly blocked by the spoiler 502 to flow back, the rest particle clusters are impacted and fall down, the air continuously passes through the ventilation plate 503 to rise after flowing back, the rising air is gradually cooled by the heat dissipation plate 202 in a heat conduction manner, so that part of water vapor is condensed and flows back, then the other air continuously rises, the rising air is blocked by the reflux plate 803 to flow back again, and is cooled again by the heat exchange tube 801 and cold water in the condensation plate 802, so that the water vapor is condensed and flows back again, then the air continuously rises to be filtered by the silk screen filter 204 and is fully intercepted, finally the water mist is dropped and flows back together with the modified water, the air passing through the wire mesh filter 204 is finally discharged.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1.涂装废水零药剂处理系统,其特征在于,包括:喷漆主体机构,所述喷漆主体机构的一侧设置有排风机构,所述排风机构的一侧安装有改性水存储机构,所述排风机构的上方安装有水帘机构,且水帘机构和所述改性水存储机构均位于喷漆主体机构的内部,所述排风机构的内部安装有扰流机构,所述喷漆主体机构一侧的底部设置有漆雾捕捉机构,且漆雾捕捉机构位于排风机构的底部,所述漆雾捕捉机构的内部设置有导流机构,所述排风机构的内部安装有水雾分离机构,且水雾分离机构位于扰流机构的上方;1. A zero-chemical treatment system for painting wastewater, characterized in that it comprises: a main spraying unit, an exhaust system on one side of the main spraying unit, a modified water storage system on one side of the exhaust system, a water curtain system above the exhaust system, both the water curtain system and the modified water storage system being located inside the main spraying unit, a turbulence-inducing mechanism inside the exhaust system, a paint mist capturing mechanism at the bottom of one side of the main spraying unit, the paint mist capturing mechanism being located at the bottom of the exhaust system, a flow guiding mechanism inside the paint mist capturing mechanism, and a water mist separation mechanism inside the exhaust system, the water mist separation mechanism being located above the turbulence-inducing mechanism; 所述喷漆主体机构包括喷漆房上房体(101)、喷漆房下房体(102)和喷漆房室(103),洗净塔(201)位于喷漆房室(103)的一侧,且洗净塔(201)的顶部设置有弯折台,洗气水槽(601)固定连接在喷漆房下房体(102)的内底壁,槽盖板(602)固定连接在洗气水槽(601)的顶部,排气口(605)贯穿开设在槽盖板(602)的上表面,且排气口(605)位于洗净塔(201)的下方,The main spraying structure includes an upper spray booth (101), a lower spray booth (102), and a spray booth chamber (103). A cleaning tower (201) is located on one side of the spray booth chamber (103), and a bending platform is provided on the top of the cleaning tower (201). A scrubbing water tank (601) is fixedly connected to the inner bottom wall of the lower spray booth (102), and a tank cover plate (602) is fixedly connected to the top of the scrubbing water tank (601). An exhaust port (605) is opened through the upper surface of the tank cover plate (602), and the exhaust port (605) is located below the cleaning tower (201). 所述水帘机构包括水帘槽(401)固定连接在弯折台的表面,下接管道(403)固定安装在水帘槽(401)的底部,The water curtain mechanism includes a water curtain trough (401) fixedly connected to the surface of the bending table, and a lower connecting pipe (403) fixedly installed at the bottom of the water curtain trough (401). 所述扰流机构包括两个加强架(501)均固定连接在洗净塔(201)的内侧壁,三个扰流板(502)均固定连接在两个加强架(501)之间,The turbulence-disrupting mechanism includes two reinforcing frames (501) fixedly connected to the inner wall of the washing tower (201), and three turbulence-disrupting plates (502) fixedly connected between the two reinforcing frames (501). 所述导流机构包括渗渣板(701)、导气板(702)、封气板(703)和渗渣孔(704),所述渗渣板(701)固定连接在排气口(605)的内壁,且渗渣板(701)与排气口(605)之间设置有排气间隙,所述导气板(702)和所述封气板(703)分别位于渗渣板(701)的两侧,且导气板(702)与槽盖板(602)之间设置有洗气通道,所述渗渣孔(704)贯穿开设在渗渣板(701)的表面;The flow guiding mechanism includes a slag-permeable plate (701), a gas guide plate (702), a gas sealing plate (703), and a slag-permeable hole (704). The slag-permeable plate (701) is fixedly connected to the inner wall of the exhaust port (605), and an exhaust gap is provided between the slag-permeable plate (701) and the exhaust port (605). The gas guide plate (702) and the gas sealing plate (703) are located on both sides of the slag-permeable plate (701), and a gas washing channel is provided between the gas guide plate (702) and the tank cover plate (602). The slag-permeable hole (704) is opened through the surface of the slag-permeable plate (701). 所述水雾分离机构包括换热管(801)、冷凝片(802)、回流板(803)和排气板(804),所述换热管(801)固定连接在下接管道(403)的底部,所述冷凝片(802)滑动连接在换热管(801)的表面,所述回流板(803)固定连接在冷凝片(802)的表面,所述排气板(804)贯穿开设在回流板(803)的内壁,且排气板(804)的表面开设有回流腰孔,且回流板(803)倾斜设置,且回流板(803)的表面与洗净塔(201)的内壁固定连接,且回流板(803)位于扰流板(502)的上方。The water mist separation mechanism includes a heat exchange tube (801), a condenser plate (802), a reflux plate (803), and an exhaust plate (804). The heat exchange tube (801) is fixedly connected to the bottom of the lower connecting pipe (403). The condenser plate (802) is slidably connected to the surface of the heat exchange tube (801). The reflux plate (803) is fixedly connected to the surface of the condenser plate (802). The exhaust plate (804) is opened through the inner wall of the reflux plate (803). The surface of the exhaust plate (804) is provided with a reflux hole. The reflux plate (803) is inclined. The surface of the reflux plate (803) is fixedly connected to the inner wall of the washing tower (201). The reflux plate (803) is located above the baffle plate (502). 2.根据权利要求1所述的涂装废水零药剂处理系统,其特征在于,所述喷漆主体机构还包括操作房室(104)、均压罩(105)、隔板(106)、喷漆区进气风扇(107)、操作区进气风扇(108)、喷漆区进风管(109)、操作区进风管(110)和喷漆操作台(111),所述喷漆房下房体(102)固定连接在喷漆房上房体(101)的底部,所述喷漆房室(103)和所述操作房室(104)均设置在喷漆房上房体(101)和喷漆房下房体(102)之间,所述均压罩(105)固定安装在喷漆房上房体(101)的顶部,所述隔板(106)一体式设置在均压罩(105)的中间,所述喷漆区进气风扇(107)和操作区进气风扇(108)均固定安装在均压罩(105)的内部,且喷漆区进气风扇(107)位于喷漆房室(103)的上方,且操作区进气风扇(108)位于操作房室(104)的上方,所述喷漆区进风管(109)和所述操作区进风管(110)均固定安装在均压罩(105)的顶部,且喷漆区进风管(109)位于喷漆区进气风扇(107)的上方,且操作区进风管(110)位于操作区进气风扇(108)的上方,所述喷漆操作台(111)固定连接在喷漆房室(103)的内壁,且喷漆房上房体(101)的一侧固定连接有玻璃板。2. The paint wastewater zero-chemical treatment system according to claim 1, characterized in that the main spraying structure further includes an operating room (104), a pressure equalizing hood (105), a partition (106), a spraying area air intake fan (107), an operating area air intake fan (108), a spraying area air intake pipe (109), an operating area air intake pipe (110), and a spraying operating table (111). The lower spraying booth (102) is fixedly connected to the bottom of the upper spraying booth (101). The spraying room (103) and the operating room (104) are both located between the upper spraying booth (101) and the lower spraying booth (102). The pressure equalizing hood (105) is fixedly installed on the top of the upper spraying booth (101). The partition (106) is integrally installed on the pressure equalizing hood (107). In the middle of 5), the air intake fan (107) of the spray painting area and the air intake fan (108) of the operation area are both fixedly installed inside the pressure equalization hood (105), and the air intake fan (107) of the spray painting area is located above the spray painting chamber (103), and the air intake fan (108) of the operation area is located above the operation chamber (104). The air intake pipe (109) of the spray painting area and the air intake pipe (110) of the operation area are both fixedly installed on the top of the pressure equalization hood (105), and the air intake pipe (109) of the spray painting area is located above the air intake fan (107), and the air intake pipe (110) of the operation area is located above the air intake fan (108). The spray painting operation table (111) is fixedly connected to the inner wall of the spray painting chamber (103), and a glass plate is fixedly connected to one side of the upper body (101) of the spray painting chamber. 3.根据权利要求2所述的涂装废水零药剂处理系统,其特征在于,所述排风机构包括洗净塔(201)、散热板(202)、排气风机(203)和丝网过滤器(204),所述洗净塔(201)固定插接在喷漆操作台(111)顶部,所述散热板(202)固定连接在洗净塔(201)远离喷漆房室(103)一侧的内壁,所述排气风机(203)固定安装在洗净塔(201)的顶部,所述丝网过滤器(204)固定安装在洗净塔(201)的内壁。3. The paint wastewater zero-chemical treatment system according to claim 2, characterized in that the exhaust mechanism includes a cleaning tower (201), a heat dissipation plate (202), an exhaust fan (203), and a wire mesh filter (204), wherein the cleaning tower (201) is fixedly inserted into the top of the spray painting workbench (111), the heat dissipation plate (202) is fixedly connected to the inner wall of the cleaning tower (201) on the side away from the spray painting chamber (103), the exhaust fan (203) is fixedly installed on the top of the cleaning tower (201), and the wire mesh filter (204) is fixedly installed on the inner wall of the cleaning tower (201). 4.根据权利要求3所述的涂装废水零药剂处理系统,其特征在于,所述改性水存储机构包括储罐连接架(301)、改性水存储罐(302)、溢流阀(303)、进液管道(304)、水位透明窗(305)、电磁阀(306)、第一排液管道(307)、第一液泵(308)、第二排液管道(309)、分配管道(310)和雾化喷头(311),所述储罐连接架(301)固定连接在喷漆房上房体(101)的内壁,且储罐连接架(301)的一侧与洗净塔(201)的一侧固定连接,所述改性水存储罐(302)固定安装在储罐连接架(301)的内部,所述溢流阀(303)和所述进液管道(304)均固定安装在改性水存储罐(302)的顶部,所述水位透明窗(305)固定安装在改性水存储罐(302)的表面,且水位透明窗(305)位于玻璃板的一侧,所述电磁阀(306)固定安装在改性水存储罐(302)的底部,所述第一排液管道(307)固定安装在电磁阀(306)的输出端,所述第一液泵(308)固定安装在喷漆操作台(111)的上表面,且第一液泵(308)的输入端与第一排液管道(307)的输出端固定连接,所述第二排液管道(309)固定安装在第一液泵(308)的输出端,所述分配管道(310)固定连接在洗净塔(201)的内壁,且分配管道(310)的输入端与第二排液管道(309)的输出端固定连接,所述雾化喷头(311)固定安装在分配管道(310)的表面。4. The paint wastewater zero-reagent treatment system according to claim 3, characterized in that the modified water storage mechanism includes a tank connecting frame (301), a modified water storage tank (302), an overflow valve (303), an inlet pipe (304), a water level transparent window (305), a solenoid valve (306), a first drain pipe (307), a first liquid pump (308), a second drain pipe (309), a distribution pipe (310), and an atomizing nozzle (311). The tank connecting frame (301) is fixedly connected to the inner wall of the upper body (101) of the paint booth, and one side of the tank connecting frame (301) is fixedly connected to one side of the washing tower (201). The modified water storage tank (302) is fixedly installed inside the tank connecting frame (301). The overflow valve (303) and the inlet pipe (304) are both fixedly installed on the top of the modified water storage tank (302). A transparent window (305) is fixedly installed on the surface of the modified water storage tank (302), and the water level transparent window (305) is located on one side of the glass plate. The solenoid valve (306) is fixedly installed at the bottom of the modified water storage tank (302). The first drain pipe (307) is fixedly installed at the output end of the solenoid valve (306). The first liquid pump (308) is fixedly installed on the upper surface of the spray painting workbench (111), and the input end of the first liquid pump (308) is fixedly connected to the output end of the first drain pipe (307). The second drain pipe (309) is fixedly installed at the output end of the first liquid pump (308). The distribution pipe (310) is fixedly connected to the inner wall of the washing tower (201), and the input end of the distribution pipe (310) is fixedly connected to the output end of the second drain pipe (309). The atomizing nozzle (311) is fixedly installed on the surface of the distribution pipe (310). 5.根据权利要求3所述的涂装废水零药剂处理系统,其特征在于,所述水帘机构还包括溢流口(402)、第二液泵(404)、第一回流管道(405)、第二回流管道(406)和导流板(407),水帘槽(401)位于喷漆房室(103)的一侧,所述溢流口(402)贯穿开设在水帘槽(401)的一侧,所述第二液泵(404)固定安装在喷漆操作台(111)的上表面,所述第一回流管道(405)固定安装在第二液泵(404)的输入端,所述第二回流管道(406)固定安装在第二液泵(404)的输出端,所述导流板(407)固定连接在水帘槽(401)的底部,且导流板(407)的两侧君与喷漆房室(103)的内壁臂固定连接。5. The paint wastewater zero-chemical treatment system according to claim 3, characterized in that the water curtain mechanism further includes an overflow port (402), a second liquid pump (404), a first return pipe (405), a second return pipe (406), and a guide plate (407), the water curtain trough (401) is located on one side of the spray booth (103), the overflow port (402) is opened through on one side of the water curtain trough (401), the second liquid pump (404) is fixedly installed on the upper surface of the spray booth (111), the first return pipe (405) is fixedly installed at the input end of the second liquid pump (404), the second return pipe (406) is fixedly installed at the output end of the second liquid pump (404), and the guide plate (407) is fixedly connected to the bottom of the water curtain trough (401), and both sides of the guide plate (407) are fixedly connected to the inner wall of the spray booth (103). 6.根据权利要求5所述的涂装废水零药剂处理系统,其特征在于,所述扰流机构包括还通气板(503),三个扰流板(502)均倾斜设置,所述通气板(503)固定安装在扰流板(502)的内壁,且通气板(503)的表面贯穿开设有通气圆孔。6. The coating wastewater zero-chemical treatment system according to claim 5, characterized in that the turbulence mechanism includes a venting plate (503), three turbulence plates (502) are all inclined, the venting plate (503) is fixedly installed on the inner wall of the turbulence plate (502), and a venting hole is provided through the surface of the venting plate (503). 7.根据权利要求3所述的涂装废水零药剂处理系统,其特征在于,所述漆雾捕捉机构包括洗气水槽(601)、槽盖板(602)、导气斗(603)、喷漆承载板(604)和排气口(605),槽盖板(602)的上表面与洗净塔(201)的底部固定连接,所述导气斗(603)一体式设置在槽盖板(602)上表面的一侧,且导气斗(603)的外壁与喷漆操作台(111)的内壁固定连接,且导气斗(603)的底部设置有导气口,所述喷漆承载板(604)固定连接在导气斗(603)的内壁,且喷漆承载板(604)的表面贯穿开设有通孔。7. The paint wastewater zero-reagent treatment system according to claim 3, characterized in that the paint mist capture mechanism includes a washing water tank (601), a tank cover plate (602), an air guide hopper (603), a paint spraying support plate (604), and an exhaust port (605). The upper surface of the tank cover plate (602) is fixedly connected to the bottom of the washing tower (201). The air guide hopper (603) is integrally disposed on one side of the upper surface of the tank cover plate (602), and the outer wall of the air guide hopper (603) is fixedly connected to the inner wall of the paint spraying operating table (111). An air guide port is provided at the bottom of the air guide hopper (603). The paint spraying support plate (604) is fixedly connected to the inner wall of the air guide hopper (603), and a through hole is provided on the surface of the paint spraying support plate (604). 8.根据权利要求7所述的涂装废水零药剂处理系统,其特征在于,所述漆雾捕捉机构还包括液位计(606)、废液管道(607)和翻盖(608),所述液位计(606)和所述废液管道(607)分别固定安装在洗气水槽(601)的两侧,且废液管道(607)的表面安装有阀门,所述翻盖(608)转动连接在槽盖板(602)的上表面。8. The paint wastewater zero-reagent treatment system according to claim 7, characterized in that the paint mist capture mechanism further includes a level gauge (606), a waste liquid pipe (607) and a flip cover (608), the level gauge (606) and the waste liquid pipe (607) are respectively fixedly installed on both sides of the air washing tank (601), and a valve is installed on the surface of the waste liquid pipe (607), and the flip cover (608) is rotatably connected to the upper surface of the tank cover plate (602).
CN202311173118.XA 2023-09-12 2023-09-12 Zero medicament treatment system for coating wastewater Active CN117019479B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311173118.XA CN117019479B (en) 2023-09-12 2023-09-12 Zero medicament treatment system for coating wastewater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311173118.XA CN117019479B (en) 2023-09-12 2023-09-12 Zero medicament treatment system for coating wastewater

Publications (2)

Publication Number Publication Date
CN117019479A CN117019479A (en) 2023-11-10
CN117019479B true CN117019479B (en) 2026-02-24

Family

ID=88626527

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311173118.XA Active CN117019479B (en) 2023-09-12 2023-09-12 Zero medicament treatment system for coating wastewater

Country Status (1)

Country Link
CN (1) CN117019479B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050094770A (en) * 2005-06-14 2005-09-28 주식회사 세다 Moisture type painting booth device
CN217774553U (en) * 2022-06-13 2022-11-11 南京塔塔汽车零部件系统有限公司 Water-spinning paint mist catching device for spraying line

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3105957B2 (en) * 1991-09-11 2000-11-06 サンエス工業株式会社 Simple painting booth
CN106345210A (en) * 2016-09-19 2017-01-25 杭州五源科技实业有限公司 System and method for trapping and purifying wooden toy coating waste gas
CN206215438U (en) * 2016-09-21 2017-06-06 东莞市金森工业机械有限公司 A swirling liquid spray booth for efficiently capturing paint mist
CN210159865U (en) * 2018-10-16 2020-03-20 苏州互友工业设备有限公司 Paint spray booth with high paint mist capture rate

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050094770A (en) * 2005-06-14 2005-09-28 주식회사 세다 Moisture type painting booth device
CN217774553U (en) * 2022-06-13 2022-11-11 南京塔塔汽车零部件系统有限公司 Water-spinning paint mist catching device for spraying line

Also Published As

Publication number Publication date
CN117019479A (en) 2023-11-10

Similar Documents

Publication Publication Date Title
CN201366390Y (en) Water curtain venturi-type spray-painting booth
CN106140545A (en) Double air intake water rotation type water-screen cabinets
CN117019479B (en) Zero medicament treatment system for coating wastewater
JP3223688U (en) Wet scrubber
CN114405239A (en) Wet-type waste gas treatment device
CN219333657U (en) Intelligent paint spraying waste gas treatment system
CN201505597U (en) High-pressure suction roll type paint spraying treatment equipment
CN202427304U (en) Coating waste gas integrated treatment cabinet
CN206104221U (en) Two air inlet water rotating formula cascade cabinets
CN216320877U (en) Device for removing particulate matters in gas
CN213349474U (en) Automatic water lifting paint spray booth paint mist treatment system
CN105013653A (en) Atomization oil coating chamber residual mist recovery system
CN212166874U (en) Water curtain system for paint mist trapping
CN204448406U (en) A new type of high-vortex water curtain spraying room for a fully automatic dust-free coating line for plastic parts
CN104492214B (en) A kind of device and method removing acid-mist-removing
CN201140026Y (en) Coating wire paint mist capturing device of vehicle
CN2897453Y (en) Pumpless Water Curtain Spray Booth
CN209348318U (en) A swirl paint mist purification equipment
CN221156042U (en) Horizontal spray tower
CN217550196U (en) Liquid spraying exhaust-gas treatment's water revolves cabinet equipment
CN222417601U (en) Automatic jet-cleanable exhaust hood structure for kitchen equipment
CN115889053B (en) Environment-friendly double-port gas cyclone paint spraying table
CN212596641U (en) Drip and drench absorption formula coating cloud circulation collection box
CN216396825U (en) Spray collection and cyclic utilization device
CN218130939U (en) Negative pressure formula ammonia recovery processing system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant