CN117005720A - Flexible truss temporary supporting structure for laminated slab, laminated slab and method - Google Patents
Flexible truss temporary supporting structure for laminated slab, laminated slab and method Download PDFInfo
- Publication number
- CN117005720A CN117005720A CN202310980900.6A CN202310980900A CN117005720A CN 117005720 A CN117005720 A CN 117005720A CN 202310980900 A CN202310980900 A CN 202310980900A CN 117005720 A CN117005720 A CN 117005720A
- Authority
- CN
- China
- Prior art keywords
- truss
- laminated
- laminated slab
- support structure
- temporary support
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/48—Supporting structures for shutterings or frames for floors or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G25/00—Shores or struts; Chocks
- E04G25/04—Shores or struts; Chocks telescopic
- E04G25/06—Shores or struts; Chocks telescopic with parts held together by positive means
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域Technical field
本发明涉及叠合板施工领域,尤其是一种叠合板用可伸缩桁架临时支撑结构、叠合板及方法。The invention relates to the field of laminated board construction, in particular to a retractable truss temporary support structure for laminated boards, a laminated board and a method.
背景技术Background technique
本部分的陈述仅仅是提供了与本发明相关的背景技术信息,不必然构成在先技术。The statements in this section merely provide background technical information related to the present invention and do not necessarily constitute prior art.
装配式建筑结构在建筑施工的过程中越来越受欢迎。装配式建筑是采用标准化设计、工厂化生产、装配化施工、信息化管理、智能化应用的方式,是现代工业化生产方式的代表。装配式建筑具有建筑构件质量可靠,节能环保,施工速度快,工业化程度高等优点。Prefabricated building structures are becoming more and more popular in the construction process. Prefabricated buildings adopt standardized design, factory production, assembly construction, information management, and intelligent application. They are representatives of modern industrial production methods. Prefabricated buildings have the advantages of reliable quality of building components, energy saving and environmental protection, fast construction speed, and high degree of industrialization.
叠合板是装配式建筑的常见构件之一,是由预制板和现浇混凝土叠合而成的装配整体式楼板。叠合板整体性好,适用于对整体刚度要求较高的高层建筑和大开间建筑。对于跨度大的叠合板,在施工现场浇筑过程中,在现浇混凝土自重和建筑设备以及各种活荷载的作用下,跨中位置处容易出现过大的挠度,会导致预制底板出现裂缝,甚至会使结构性能受到严重影响,因此叠合板在施工时需设置临时支撑。传统的支撑方法是搭设钢管支撑结构来作为叠合板的临时支撑,来保证叠合板的强度要求,发明人发现,搭设钢管结构的支撑方法需要临时搭建,拆装麻烦,效率偏低;现场搭建再根据叠合板的跨度进行临时支撑长度的调整,而且临时搭设支撑件会占用叠合板下部的施工空间。Composite panels are one of the common components of prefabricated buildings. They are prefabricated monolithic floor slabs made of prefabricated panels and cast-in-situ concrete. Composite panels have good integrity and are suitable for high-rise buildings and large-bay buildings that require higher overall stiffness. For composite slabs with long spans, during the pouring process at the construction site, under the action of the self-weight of the cast-in-place concrete, construction equipment, and various live loads, excessive deflection is prone to occur at the mid-span position, which may lead to cracks in the precast floor, or even The structural performance will be seriously affected, so temporary supports need to be installed during construction of the composite panels. The traditional support method is to erect a steel pipe support structure as a temporary support for the laminated panels to ensure the strength requirements of the laminated panels. The inventor found that the support method of erecting the steel pipe structure requires temporary construction, which is troublesome to disassemble and assemble, and has low efficiency; The length of the temporary support is adjusted according to the span of the composite slab, and the temporary support will occupy the construction space under the composite slab.
发明内容Contents of the invention
针对现有技术存在的不足,本发明的目的是提供一种叠合板用可伸缩桁架临时支撑结构,有效解决传统临时支撑所导致的拆卸麻烦、效率偏低、占用叠合板下部施工空间的问题。In view of the shortcomings of the existing technology, the purpose of the present invention is to provide a retractable truss temporary support structure for composite panels, which effectively solves the problems of troublesome disassembly, low efficiency, and occupying the construction space under the composite panels caused by traditional temporary supports.
为了实现上述目的,本发明是通过如下的技术方案来实现:In order to achieve the above objects, the present invention is achieved through the following technical solutions:
一种叠合板用可伸缩桁架临时支撑结构,包括位于叠合板下方的若干组支撑结构件,相邻两组支撑结构件之间间隔设定距离设置以在叠合板的下方预留施工空间,每一组支撑结构件均包括位于同一平面的第一桁架和第二桁架,第一桁架的一端与移动件的一端固连,第二桁架朝向第一桁架的一端设置卡槽,移动件的另一端可卡入卡槽并沿着卡槽移动,第一锁紧件穿过第二桁架卡槽壁并与移动件抵接,第二锁紧件穿过第一桁架或第二桁架与叠合板可拆卸连接。A retractable truss temporary support structure for laminated boards, including several sets of support structural members located below the laminated boards. The adjacent two groups of support structure members are spaced at a set distance to reserve construction space under the laminated boards. A set of supporting structural members includes a first truss and a second truss located on the same plane. One end of the first truss is fixedly connected to one end of the moving part. The second truss is provided with a slot toward one end of the first truss. The other end of the moving part It can be locked into the slot and moved along the slot. The first locking piece passes through the slot wall of the second truss and abuts against the moving piece. The second locking piece can pass through the first truss or the second truss and the stacked plate. Disassemble the connection.
上述的临时支撑结构,通过移动件连接第一桁架和第二桁架,移动件外露于第二桁架的长度可调,实现支撑结构件长度的可调以满足于不同跨度的叠合板,拓宽了临时支撑结构的使用范围;而且整体无需搭设外部支撑结构如脚手架等装置,在提高施工效率的同时,有效保证对叠合板的可靠支撑;另外通过设置若干组支撑结构件,相邻两支撑结构件之间间隔设定距离设置,这样在叠合板的下方支撑结构件之间或支撑结构件的侧部预留有施工空间,实现多项施工工序可同时进行,有利于提高施工效率;The above-mentioned temporary support structure connects the first truss and the second truss through a moving part. The length of the moving part exposed on the second truss is adjustable, so that the length of the supporting structure can be adjusted to meet the needs of laminates of different spans, and the temporary support structure can be expanded. The scope of use of the support structure; and there is no need to set up external support structures such as scaffolding and other devices, which improves construction efficiency and effectively ensures reliable support for the composite panels; in addition, by setting up several groups of support structure members, between two adjacent support structure members The spacing is set so that there is a construction space reserved between the supporting structural members below the laminated plate or on the side of the supporting structural members, so that multiple construction processes can be carried out at the same time, which is beneficial to improving construction efficiency;
如上所述的一种叠合板用可伸缩桁架临时支撑结构,移动件为杆件,移动件沿着所述第一桁架或所述第二桁架的长度方向设置刻度线;A retractable truss temporary support structure for laminated plates as described above, the moving member is a rod, and the moving member is provided with scale marks along the length direction of the first truss or the second truss;
如上所述的一种叠合板用可伸缩桁架临时支撑结构,杆件为中空结构件,杆件内设置加劲肋,中空的杆件有利于减轻杆件的重量,且便于移动件外露于第二桁架长度的调整。As described above, a retractable truss temporary support structure is used for composite panels. The rods are hollow structural members and stiffening ribs are provided inside the rods. The hollow rods are conducive to reducing the weight of the rods and facilitate the exposure of the movable parts to the second Adjustment of truss length.
如上所述的一种叠合板用可伸缩桁架临时支撑结构,所述第一桁架与所述第二桁架的结构相同。As described above, a telescopic truss temporary support structure is used for laminated panels, and the structures of the first truss and the second truss are the same.
如上所述的一种叠合板用可伸缩桁架临时支撑结构,所述第一桁架包括上弦杆和下弦杆,上弦杆和下弦杆之间连接有多组V型组件,由此保证第一桁架和第二桁架连接的可靠性。As described above, a retractable truss temporary support structure is used for composite panels. The first truss includes an upper chord and a lower chord. Multiple sets of V-shaped components are connected between the upper chord and the lower chord, thereby ensuring that the first truss and Reliability of the second truss connection.
如上所述的一种叠合板用可伸缩桁架临时支撑结构,为避免叠合板安装于梁体时支撑结构件与梁体发生干涉,所述上弦杆的长度大于下弦杆的长度。As described above, a telescopic truss temporary support structure for composite panels is used. In order to avoid interference between the support structure and the beam body when the composite panels are installed on the beam body, the length of the upper chord is greater than the length of the lower chord.
如上所述的一种叠合板用可伸缩桁架临时支撑结构,所述第一桁架与所述第二桁架各自朝向所述移动件的一端设置有竖向杆,即上弦杆和下弦杆靠近所述移动件的一端连接有竖向杆,竖向杆的设置有利于增强支撑结构件中段的支撑强度。As described above, a retractable truss temporary support structure for laminated plates, the first truss and the second truss are respectively provided with vertical rods toward one end of the moving member, that is, the upper chord rod and the lower chord rod are close to the One end of the moving part is connected with a vertical rod, and the arrangement of the vertical rod is conducive to enhancing the support strength of the middle section of the support structure.
如上所述的一种叠合板用可伸缩桁架临时支撑结构,所述移动件包括连接所述第一桁架与第二桁架中两处上弦杆之间的第一杆件,还包括连接第一桁架与第二桁架中两处下弦杆之间的第二杆件。As described above, a retractable truss temporary support structure for composite panels, the moving member includes a first rod connecting two upper chords in the first truss and the second truss, and also includes a connecting member connecting the first truss and the second member between the two lower chords in the second truss.
第二方面,本发明还提供了一种叠合板,叠合板为预制件,叠合板下侧面预埋有套筒,套筒内设置内螺纹,所述的一种叠合板用可伸缩桁架临时支撑结构中所述的第二锁紧件与套筒通过螺纹结构连接,通过预埋套筒的设置,方便第一桁架、第二桁架与叠合板的可拆卸连接,无需现场打孔;In a second aspect, the invention also provides a laminated plate. The laminated plate is a prefabricated part. A sleeve is embedded in the lower side of the laminated plate. Internal threads are provided in the sleeve. The laminated plate is temporarily supported by a telescopic truss. The second locking piece and the sleeve described in the structure are connected through a threaded structure, and the setting of the embedded sleeve facilitates the detachable connection of the first truss, the second truss and the composite plate without the need for on-site drilling;
叠合板内设置第一钢板,第一钢板与套筒的一端连接,套筒的另一端穿过第二钢板,第二钢板与叠合板的下侧面齐平。A first steel plate is arranged in the laminated plate. The first steel plate is connected to one end of the sleeve. The other end of the sleeve passes through the second steel plate. The second steel plate is flush with the lower side of the laminated plate.
如上所述的一种叠合板的施工方法,包括如下内容:The above-mentioned construction method of laminated panels includes the following contents:
在工厂预制叠合板、移动件、第一桁架和第二桁架,在叠合板预制过程中,在叠合板的设定位置预埋套筒;The laminated panels, moving parts, first truss and second truss are prefabricated in the factory. During the prefabrication process of the laminated panels, sleeves are pre-embedded at the set positions of the laminated panels;
将第一桁架与移动件的一端连接,移动件的另一端插入第二桁架的卡槽处,根据叠合板的跨度以及套筒的位置,调整移动件相对于第二桁架的位置,通过第一锁紧件对移动件进行固定;Connect the first truss to one end of the moving part, insert the other end of the moving part into the slot of the second truss, adjust the position of the moving part relative to the second truss according to the span of the stacked plate and the position of the sleeve, and pass the first The locking piece fixes the moving parts;
在第一桁架与第二桁架的对应位置开设开孔以便于第二锁紧件的设置;Opening holes are provided at corresponding positions of the first truss and the second truss to facilitate the installation of the second locking member;
将叠合板与叠合板用可伸缩桁架临时支撑结构运输到施工现场;Transport laminates and laminates to the construction site using retractable truss temporary support structures;
在施工现场,将叠合板竖立靠放在规定位置,并安装方木支垫进行稳固;At the construction site, stand the laminated board at the specified position and install square wood support pads for stability;
在施工现场,对叠合板的套筒进行清孔处理;At the construction site, clean the sleeves of the composite panels;
将第一桁架与第二桁架设置的开孔与对应的叠合板套筒对准,并设置第二锁紧件;Align the openings provided in the first truss and the second truss with the corresponding stacked plate sleeves, and set the second locking piece;
将叠合板和叠合板用可伸缩桁架临时支撑结构连成整体后,进行施工定位,通过吊车整体吊装到钢梁上;After the laminated board and the laminated board are connected as a whole using a telescopic truss temporary support structure, they are positioned for construction and hoisted to the steel beam as a whole by a crane;
进行叠合板上部混凝土的现场浇筑工作,浇筑完成且达到养护要求后,将叠合板用可伸缩桁架临时支撑结构拆除。Carry out on-site pouring of concrete on the upper part of the composite slab. After the pouring is completed and the maintenance requirements are met, the composite slab will be dismantled using a retractable truss temporary support structure.
上述本发明的有益效果如下:The above-mentioned beneficial effects of the present invention are as follows:
1)本发明通过临时支撑结构的设置,可在工厂提前预制,无需现场搭设脚手架等装置,有效提高施工效率;移动件连接第一桁架和第二桁架,移动件外露于第二桁架的长度可调整,从而实现支撑结构件长度的调整,由此可根据叠合板的跨度调整临时支撑结构的长度,适用于不同跨度的叠合板。1) The present invention can be prefabricated in the factory in advance by setting up a temporary support structure, without the need to set up scaffolding and other devices on site, effectively improving construction efficiency; the movable part connects the first truss and the second truss, and the length of the movable part exposed to the second truss can be Adjustment to achieve adjustment of the length of the support structure, whereby the length of the temporary support structure can be adjusted according to the span of the laminated panels, and is suitable for laminated panels of different spans.
2)本发明通过在叠合板的下方设置若干组支撑结构件,相邻两组支撑结构件之间间隔设定距离设置,这样可以在叠合板的下方预留施工空间,基本不占用预制叠合板下部的施工空间,多项施工工序可以同时进行,提高施工效率。2) In the present invention, several sets of supporting structural members are arranged below the laminated board, and the adjacent two groups of supporting structural members are spaced at a set distance, so that construction space can be reserved under the laminated board and basically does not occupy the prefabricated laminated board. In the lower construction space, multiple construction processes can be carried out simultaneously to improve construction efficiency.
3)本发明通过在叠合板预埋有套筒,第二锁紧件与套筒可拆卸连接,方便拆卸,各部件可反复使用,整装整拆,既不需要临时搭建,提高施工效率,也符合绿色低碳的要求。3) In the present invention, a sleeve is pre-embedded in the laminated board, and the second locking piece is detachably connected to the sleeve, which facilitates disassembly. Each component can be used repeatedly and assembled and disassembled in one piece. It does not require temporary construction and improves construction efficiency. It also meets the requirements of green and low carbon.
4)本发明提供的叠合板施工方法,叠合板和可伸缩桁架临时支撑结构均在预制工厂加工处理,施工质量和结构的性能可以得到保障。4) In the composite panel construction method provided by the present invention, the composite panels and the retractable truss temporary support structure are all processed in the prefabrication factory, and the construction quality and structural performance can be guaranteed.
附图说明Description of the drawings
构成本发明的一部分的说明书附图用来提供对本发明的进一步理解,本发明的示意性实施例及其说明用于解释本发明,并不构成对本发明的不当限定。The description and drawings that constitute a part of the present invention are used to provide a further understanding of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation of the present invention.
图1是本发明根据一个或多个实施方式的一种叠合板用可伸缩桁架临时支撑结构支撑叠合板的示意图一。Figure 1 is a schematic diagram 1 of a composite panel using a retractable truss temporary support structure to support the composite panel according to one or more embodiments of the present invention.
图2是本发明根据一个或多个实施方式的一种叠合板用可伸缩桁架临时支撑结构支撑叠合板的示意图二。Figure 2 is a second schematic view of a composite panel using a retractable truss temporary support structure to support the composite panel according to one or more embodiments of the present invention.
图3是本发明根据一个或多个实施方式的一种叠合板用可伸缩桁架临时支撑结构支撑叠合板的主视图。Figure 3 is a front view of a retractable truss temporary support structure used to support a composite panel according to one or more embodiments of the present invention.
图4是本发明根据一个或多个实施方式的一种叠合板用可伸缩桁架临时支撑结构的主视图。Figure 4 is a front view of a retractable truss temporary support structure for composite panels according to one or more embodiments of the present invention.
图5是本发明根据一个或多个实施方式的一种叠合板用可伸缩桁架临时支撑结构中部分结构放大的主视图。Figure 5 is an enlarged front view of part of the temporary support structure of a telescopic truss for composite panels according to one or more embodiments of the present invention.
图6是本发明根据一个或多个实施方式的一种叠合板用可伸缩桁架临时支撑结构中部分结构放大的示意图。FIG. 6 is an enlarged schematic diagram of a partial structure of a temporary support structure using retractable trusses for composite panels according to one or more embodiments of the present invention.
图7是本发明根据一个或多个实施方式的一种叠合板用可伸缩桁架临时支撑结构中移动杆的剖视图。7 is a cross-sectional view of a moving rod in a retractable truss temporary support structure for composite panels according to one or more embodiments of the present invention.
图8是本发明根据一个或多个实施方式的一种叠合板内套筒设置的示意图。Figure 8 is a schematic diagram of a sleeve arrangement in a laminated panel according to one or more embodiments of the present invention.
图中:为显示各部位位置而夸大了互相间间距或尺寸,示意图仅作示意。In the figure: The spacing or size between each part is exaggerated to show the position of each part, and the schematic diagram is for illustration only.
其中:1.叠合板,2.第二桁架,3.第一桁架,4.梁体,5.第二螺栓,6.套筒,7.第二钢板,8.第一钢板,9.竖向杆,10.杆件;Among them: 1. Composite plate, 2. Second truss, 3. First truss, 4. Beam body, 5. Second bolt, 6. Sleeve, 7. Second steel plate, 8. First steel plate, 9. Vertical to rod, 10. rod;
101.垫板,102.第一螺栓,103.加劲肋;101. Backing plate, 102. First bolt, 103. Stiffening rib;
201.上弦杆,202.下弦杆,203.第一斜杆,204.第二斜杆。201. Upper chord, 202. Lower chord, 203. First inclined rod, 204. Second inclined rod.
具体实施方式Detailed ways
应该指出,以下详细说明都是例示性的,旨在对本发明提供进一步的说明。除非另有指明,本发明使用的所有技术和科学术语具有与本发明所属技术领域的普通技术人员通常理解的相同含义。It should be noted that the following detailed description is illustrative and is intended to provide further explanation of the present invention. Unless otherwise specified, all technical and scientific terms used herein have the same meanings commonly understood by one of ordinary skill in the art to which this invention belongs.
需要注意的是,这里所使用的术语仅是为了描述具体实施方式,而非意图限制根据本发明的示例性实施方式。如在这里所使用的,除非本发明另外明确指出,否则单数形式也意图包括复数形式,此外,还应当理解的是,当在本说明书中使用术语“包含”和/或“包括”时,其指明存在特征、步骤、操作、器件、组件和/或它们的组合;It should be noted that the terms used herein are for the purpose of describing specific embodiments only, and are not intended to limit the exemplary embodiments according to the present invention. As used herein, the singular forms are intended to include the plural forms as well, unless the invention clearly dictates otherwise. Furthermore, it will be understood that when the terms "comprises" and/or "includes" are used in this specification, they Indicate the existence of features, steps, operations, devices, components and/or combinations thereof;
正如背景技术所介绍的,现有技术中存在叠合板施工时搭设的临时支撑需要现场搭建的问题,为了解决如上的技术问题,本发明提出了一种叠合板用可伸缩桁架临时支撑结构。As introduced in the background art, there is a problem in the prior art that temporary supports erected during the construction of composite panels need to be constructed on site. In order to solve the above technical problems, the present invention proposes a retractable truss temporary support structure for composite panels.
实施例一Embodiment 1
本发明的一种典型的实施方式中,参考图1和图2所示,一种叠合板用可伸缩桁架临时支撑结构,包括位于叠合板1下方的若干组支撑结构件,相邻两组支撑结构件之间间隔设定距离设置以在叠合板1的下方预留施工空间,每一组支撑结构件均包括位于同一平面的第一桁架3和第二桁架2,第一桁架3的一端与移动件的一端固连,第二桁架2朝向第一桁架3的一端设置卡槽,移动件的另一端可卡入卡槽并沿着卡槽移动,第一锁紧件穿过第二桁架2卡槽壁并与移动件抵接,第二锁紧件穿过第一桁架3或第二桁架2与叠合板1可拆卸连接。In a typical implementation of the present invention, as shown in Figures 1 and 2, a retractable truss temporary support structure for laminated panels includes several groups of support structural members located below the laminated panels 1. Two adjacent groups of supports The structural members are spaced at a set distance to reserve construction space under the laminated plate 1. Each set of supporting structural members includes a first truss 3 and a second truss 2 located on the same plane. One end of the first truss 3 is connected to One end of the moving member is fixed, and a slot is provided at one end of the second truss 2 toward the first truss 3. The other end of the moving member can be clamped into the slot and move along the slot. The first locking member passes through the second truss 2. The slot wall is in contact with the moving part, and the second locking part passes through the first truss 3 or the second truss 2 and is detachably connected to the laminated plate 1 .
需要解释地是,第一桁架3与第二桁架2的结构相同。It should be explained that the structures of the first truss 3 and the second truss 2 are the same.
本实施例中,第一桁架3包括上弦杆201和下弦杆202,上弦杆201和下弦杆202之间连接有多组V型组件,V型组件与上弦杆201或下弦杆202组成三角框型结构,是较为稳定的几何不变结构,V型组件包括第一斜杆203和第二斜杆204,第一斜杆203和第二斜杆204之间形成锐角或直角,第一斜杆203一端与上弦杆201连接,另一端与下弦杆202连接,且第一斜杆203一端与第二斜杆204一端接触(第一斜杆、第二斜杆在上弦杆、下弦杆的焊接点并不接触,二者焊接完成后可接触或间隔设定距离),第二斜杆204的一端与下弦杆202连接,另一端与上弦杆201连接,由此保证第一桁架和第二桁架连接的可靠性。In this embodiment, the first truss 3 includes an upper chord 201 and a lower chord 202. Multiple sets of V-shaped components are connected between the upper chord 201 and the lower chord 202. The V-shaped components form a triangular frame with the upper chord 201 or the lower chord 202. The structure is a relatively stable geometrically invariant structure. The V-shaped component includes a first inclined rod 203 and a second inclined rod 204. The first inclined rod 203 and the second inclined rod 204 form an acute or right angle. The first inclined rod 203 One end is connected to the upper chord 201, the other end is connected to the lower chord 202, and one end of the first inclined rod 203 is in contact with one end of the second inclined rod 204 (the first and second inclined rods are at the welding points of the upper and lower chords. do not contact, they can contact or be separated by a set distance after welding is completed), one end of the second diagonal rod 204 is connected to the lower chord 202, and the other end is connected to the upper chord 201, thereby ensuring the connection between the first truss and the second truss. reliability.
可以理解地是,上弦杆201、下弦杆202、移动件、第一斜杆203和第二斜杆204可为圆杆或矩形杆。It can be understood that the upper chord 201, the lower chord 202, the moving member, the first inclined rod 203 and the second inclined rod 204 can be round rods or rectangular rods.
为避免叠合板1安装于梁体4时支撑结构件与梁体4发生干涉,上弦杆201的长度大于下弦杆202的长度。In order to avoid interference between the supporting structure and the beam 4 when the laminated plate 1 is installed on the beam 4, the length of the upper chord 201 is greater than the length of the lower chord 202.
可以理解地是,第一桁架3、第二桁架2和移动件的材质可以是钢材,也可以是铝合金。It can be understood that the materials of the first truss 3, the second truss 2 and the moving parts may be steel or aluminum alloy.
考虑到第一桁架3、第二桁架2与叠合板1的连接,第一桁架3或第二桁架2的上弦杆201分别设置若干处开孔,开孔为圆孔,开孔的直径较螺栓螺杆的外径大0-3mm。Considering the connection between the first truss 3 and the second truss 2 and the composite plate 1 , the upper chord 201 of the first truss 3 or the second truss 2 is respectively provided with several openings. The openings are round holes, and the diameter of the openings is larger than that of the bolts. The outer diameter of the screw is 0-3mm larger.
另外,容易理解地是,参考图3和图4所示,第一桁架3与第二桁架2各自朝向移动件的一端设置有竖向杆9,即上弦杆201和下弦杆202靠近移动件的一端连接有竖向杆9,竖向杆9与上弦杆201、下弦杆202均垂直设置,竖向杆9的设置有利于增强支撑结构件中段的支撑强度。In addition, it is easy to understand that, with reference to Figures 3 and 4, the first truss 3 and the second truss 2 are each provided with a vertical rod 9 at one end facing the moving part, that is, the upper chord 201 and the lower chord 202 are close to the moving part. A vertical rod 9 is connected to one end. The vertical rod 9 is arranged vertically with the upper chord 201 and the lower chord 202. The arrangement of the vertical rod 9 is conducive to enhancing the support strength of the middle section of the support structure.
其中,可以理解地是,移动件为杆件10,而且杆件10长度方向也就是沿着上弦杆201的长度方向设置刻度线,根据刻度线方便对移动件外露于第二桁架卡槽端处长度的准确调整;具体地,杆件10一端与第一桁架3焊接,另一端与第二桁架2插套配合连接,本实施例中,移动件的外径或边长小于上弦杆的内径或边长,第二桁架上弦杆201的一端设置卡槽,移动件一端插入卡槽设置,卡槽的尺寸与杆件10一端尺寸相适配,实现二者的卡合。Among them, it can be understood that the moving member is the rod 10, and the length direction of the rod 10 is to set a scale line along the length direction of the upper chord 201. According to the scale line, it is convenient for the moving member to be exposed at the end of the second truss slot. Accurate adjustment of the length; specifically, one end of the rod 10 is welded to the first truss 3, and the other end is connected to the second truss 2 through a sleeve. In this embodiment, the outer diameter or side length of the moving member is smaller than the inner diameter or length of the upper chord rod. side length, one end of the upper chord 201 of the second truss is provided with a slot, and one end of the moving member is inserted into the slot. The size of the slot matches the size of one end of the rod 10 to achieve the engagement of the two.
参考图7所示,杆件10为中空结构件,杆件10内设置加劲肋103,中空的杆件10有利于减轻杆件的重量,且便于移动件外露于第二桁架长度的调整。Referring to Figure 7, the rod 10 is a hollow structural member with stiffening ribs 103 provided inside the rod 10. The hollow rod 10 is conducive to reducing the weight of the rod and facilitates the adjustment of the length of the second truss when the moving parts are exposed.
具体地,移动件包括连接第一桁架3与第二桁架2中两处上弦杆201之间的第一杆件,还包括连接第一桁架3与第二桁架2中两处下弦杆202之间的第二杆件。Specifically, the moving member includes a first rod connecting two upper chords 201 in the first truss 3 and the second truss 2, and also includes a first rod connecting two lower chords 202 in the first truss 3 and the second truss 2. the second member.
为实现移动件相对于第二桁架2移动后进行固定,第二桁架2的上弦杆201或下弦杆202卡槽壁设置第一孔,参考图5和图6所示,卡槽壁在第一孔外侧设置垫板101,垫板101设置的螺孔与第一孔对齐,第一锁紧件如第一螺栓102穿过垫板101的螺孔与第一孔实现锁紧。In order to realize the fixation of the moving part after moving relative to the second truss 2, the upper chord 201 or the lower chord 202 of the second truss 2 is provided with a first hole in the slot wall. Referring to Figures 5 and 6, the slot wall is in the first hole. A backing plate 101 is provided outside the hole. The screw hole provided in the backing plate 101 is aligned with the first hole. A first locking member such as a first bolt 102 passes through the screw hole of the backing plate 101 and locks with the first hole.
容易理解地是,第一孔、螺孔的内径均比第一螺栓102的最大外径大0-1mm。It is easy to understand that the inner diameters of the first hole and the screw hole are both 0-1 mm larger than the maximum outer diameter of the first bolt 102 .
另外,在一些示例中,为进一步提高临时支撑结构对叠合板的稳定支撑,相邻两支撑结构件之间设置纵向杆,纵向杆连接同侧的第一桁架的上弦杆,或者同侧第二桁架的上弦杆,纵向杆中空设置,端部设置端板,端板与上弦杆垂直,且通过第三锁紧件如第三螺栓连接,第三螺栓穿过端板和上弦杆后通过螺母进行固定。In addition, in some examples, in order to further improve the stable support of the composite panels by the temporary support structure, longitudinal rods are set between two adjacent support structural members, and the longitudinal rods are connected to the upper chord of the first truss on the same side, or the second truss on the same side. The upper chord of the truss, the longitudinal rod is hollow, and the end is provided with an end plate. The end plate is perpendicular to the upper chord and is connected through a third locking piece such as a third bolt. The third bolt passes through the end plate and the upper chord and is then tightened by a nut. fixed.
本实施例提供的临时支撑结构,通过移动件连接第一桁架和第二桁架,移动件外露于第二桁架的长度可调,实现支撑结构件长度的可调以满足于不同跨度的叠合板,拓宽了临时支撑结构的使用范围;而且整体无需搭设外部支撑结构如脚手架等装置,在提高施工效率的同时,有效保证对叠合板的可靠支撑;另外通过设置若干组支撑结构件,相邻两支撑结构件之间间隔设定距离设置,这样在叠合板的下方支撑结构件之间或支撑结构件的侧部预留有施工空间,实现多项施工工序可同时进行,有利于提高施工效率。The temporary support structure provided by this embodiment connects the first truss and the second truss through a moving member. The length of the moving member exposed to the second truss is adjustable, so that the length of the supporting structure member can be adjusted to meet the needs of laminated plates with different spans. It broadens the scope of use of temporary support structures; and there is no need to erect external support structures such as scaffolding, which improves construction efficiency and effectively ensures reliable support for composite panels; in addition, by setting up several sets of support structure members, two adjacent supports The intervals between the structural members are set at a set distance, so that construction space is reserved between the supporting structural members below the laminated plate or on the sides of the supporting structural members, so that multiple construction processes can be carried out at the same time, which is beneficial to improving construction efficiency.
实施例二Embodiment 2
本实施例提供了一种叠合板,参考图8所示,叠合板1为预制件,叠合板下侧面预埋有套筒6,套筒6内设置内螺纹,实施例一中所述的一种叠合板用可伸缩桁架临时支撑结构中第二锁紧件如第二螺栓5与套筒6通过螺纹结构连接,套筒6内径比第二螺栓5的最大外径大0-2mm,通过预埋套筒的设置,方便第一桁架3、第二桁架2与叠合板1的可拆卸连接,无需现场打孔。This embodiment provides a laminated plate. As shown in Figure 8, the laminated plate 1 is a prefabricated part. A sleeve 6 is pre-embedded on the lower side of the laminated plate. Internal threads are provided in the sleeve 6. The one described in Embodiment 1 In the temporary support structure of a telescopic truss for composite plates, the second locking member such as the second bolt 5 is connected to the sleeve 6 through a threaded structure. The inner diameter of the sleeve 6 is 0-2mm larger than the maximum outer diameter of the second bolt 5. The setting of the buried sleeve facilitates the detachable connection of the first truss 3, the second truss 2 and the composite plate 1 without the need for on-site drilling.
本实施例中,叠合板1为钢筋混凝土叠合板,叠合板1内设置有底板纵向钢筋,底板横向钢筋。In this embodiment, the laminated plate 1 is a reinforced concrete laminated plate, and the laminated plate 1 is provided with longitudinal steel bars of the bottom plate and transverse steel bars of the bottom plate.
其中,叠合板1内设置第一钢板8,第一钢板8的下表面与套筒6的一端连接,具体可焊接连接,套筒6的另一端穿过第二钢板7,第二钢板7与叠合板1的下侧面齐平;可以理解地是,第一钢板8或第二钢板7与底板纵向钢筋或底板横向钢筋焊接连接。Among them, a first steel plate 8 is provided in the laminated plate 1. The lower surface of the first steel plate 8 is connected to one end of the sleeve 6. Specifically, the connection can be welded. The other end of the sleeve 6 passes through the second steel plate 7. The second steel plate 7 is connected to the second steel plate 7. The lower side of the laminated plate 1 is flush; it can be understood that the first steel plate 8 or the second steel plate 7 is welded to the longitudinal steel bars of the bottom plate or the transverse steel bars of the bottom plate.
具体地,套筒6底端穿过第二钢板7开设的通孔,并与第二钢板7的下表面平齐,第二钢板7的上表面与套筒6焊接连接,第二钢板7通孔边缘涂有胶水以固定套筒6。Specifically, the bottom end of the sleeve 6 passes through the through hole opened in the second steel plate 7 and is flush with the lower surface of the second steel plate 7. The upper surface of the second steel plate 7 is welded to the sleeve 6, and the second steel plate 7 passes through The edge of the hole is coated with glue to secure the sleeve 6.
实施例三Embodiment 3
本实施例提供了一种叠合板的施工方法,包括如下内容:This embodiment provides a construction method for laminated panels, including the following:
在工厂预制叠合板、移动件、第一桁架和第二桁架,在叠合板预制过程中,在叠合板的设定位置预埋套筒;The laminated panels, moving parts, first truss and second truss are prefabricated in the factory. During the prefabrication process of the laminated panels, sleeves are pre-embedded at the set positions of the laminated panels;
将第一桁架与移动件的一端连接,移动件的另一端插入第二桁架的卡槽处,根据叠合板的跨度以及套筒的位置,调整移动件相对于第二桁架的位置,通过第一锁紧件如第一螺栓穿过卡槽壁与移动件抵接,实现移动件与第二桁架位置的固定;Connect the first truss to one end of the moving part, insert the other end of the moving part into the slot of the second truss, adjust the position of the moving part relative to the second truss according to the span of the stacked plate and the position of the sleeve, and pass the first The locking member such as the first bolt passes through the slot wall and contacts the moving member to fix the position of the moving member and the second truss;
在第一桁架与第二桁架的对应位置开设开孔以便于第二锁紧件的设置;Opening holes are provided at corresponding positions of the first truss and the second truss to facilitate the installation of the second locking member;
将叠合板与叠合板用可伸缩桁架临时支撑结构运输到施工现场;Transport laminates and laminates to the construction site using retractable truss temporary support structures;
在施工现场,将叠合板竖立靠放在规定位置,并安装方木支垫进行稳固;At the construction site, stand the laminated board at the specified position and install square wood support pads for stability;
在施工现场,对叠合板的套筒进行清孔处理;At the construction site, clean the sleeves of the composite panels;
将第一桁架与第二桁架设置的开孔与对应的叠合板套筒对准,并设置第二锁紧件;Align the openings provided in the first truss and the second truss with the corresponding stacked plate sleeves, and set the second locking piece;
将叠合板和叠合板用可伸缩桁架临时支撑结构连成整体后,进行施工定位,通过吊车整体吊装到钢梁上;After the laminated board and the laminated board are connected as a whole using a telescopic truss temporary support structure, they are positioned for construction and hoisted to the steel beam as a whole by a crane;
进行叠合板上部混凝土的现场浇筑工作,浇筑完成且达到养护要求后,将叠合板用可伸缩桁架临时支撑结构拆除。Carry out on-site pouring of concrete on the upper part of the composite slab. After the pouring is completed and the maintenance requirements are met, the composite slab will be dismantled using a retractable truss temporary support structure.
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention and are not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and changes. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310980900.6A CN117005720A (en) | 2023-08-04 | 2023-08-04 | Flexible truss temporary supporting structure for laminated slab, laminated slab and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310980900.6A CN117005720A (en) | 2023-08-04 | 2023-08-04 | Flexible truss temporary supporting structure for laminated slab, laminated slab and method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN117005720A true CN117005720A (en) | 2023-11-07 |
Family
ID=88575829
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310980900.6A Pending CN117005720A (en) | 2023-08-04 | 2023-08-04 | Flexible truss temporary supporting structure for laminated slab, laminated slab and method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN117005720A (en) |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB554193A (en) * | 1941-10-21 | 1943-06-24 | Fromson Bertram William | Improvements in or relating to extendible bearers or supports for temporary or permanent use in building construction |
| CN107795124A (en) * | 2017-10-31 | 2018-03-13 | 中建四局第六建筑工程有限公司 | A kind of laminated floor slab truss support device for steel building |
| CN111411721A (en) * | 2020-03-30 | 2020-07-14 | 北京工业大学 | A prefabricated prefabricated sub-beam composite member |
| CN114135037A (en) * | 2021-12-16 | 2022-03-04 | 贵州大学 | A kind of plate truss formwork structure and construction method |
| CN115199058A (en) * | 2022-07-23 | 2022-10-18 | 龙元明筑科技有限责任公司 | Assembled floor support truss that does not fall to ground |
| CN217924839U (en) * | 2022-06-28 | 2022-11-29 | 中国建筑第八工程局有限公司 | Temporary support system |
| CN218643646U (en) * | 2022-11-15 | 2023-03-17 | 万宁市海建装配式建筑工程有限公司 | A assembled superimposed sheet for steel construction building |
-
2023
- 2023-08-04 CN CN202310980900.6A patent/CN117005720A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB554193A (en) * | 1941-10-21 | 1943-06-24 | Fromson Bertram William | Improvements in or relating to extendible bearers or supports for temporary or permanent use in building construction |
| CN107795124A (en) * | 2017-10-31 | 2018-03-13 | 中建四局第六建筑工程有限公司 | A kind of laminated floor slab truss support device for steel building |
| CN111411721A (en) * | 2020-03-30 | 2020-07-14 | 北京工业大学 | A prefabricated prefabricated sub-beam composite member |
| CN114135037A (en) * | 2021-12-16 | 2022-03-04 | 贵州大学 | A kind of plate truss formwork structure and construction method |
| CN217924839U (en) * | 2022-06-28 | 2022-11-29 | 中国建筑第八工程局有限公司 | Temporary support system |
| CN115199058A (en) * | 2022-07-23 | 2022-10-18 | 龙元明筑科技有限责任公司 | Assembled floor support truss that does not fall to ground |
| CN218643646U (en) * | 2022-11-15 | 2023-03-17 | 万宁市海建装配式建筑工程有限公司 | A assembled superimposed sheet for steel construction building |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110644664A (en) | Fabricated building construction method and laminated slab construction supporting system | |
| CN110468963A (en) | A kind of assembled architecture primary and secondary joist steel connecting joint structure | |
| CN113482152A (en) | Assembled steel node | |
| CN217924842U (en) | Adjustable support-free truss for steel structure cast-in-place floor | |
| WO2015090094A1 (en) | Building frame system and assembly method thereof | |
| CN112709430A (en) | Template device based on BIM | |
| CN221896205U (en) | A support structure for cantilevered composite floor | |
| CN109555313A (en) | A kind of adjustable gib truss for assembled floor | |
| CN105275203A (en) | Telescopic beam, adjustable mold base system made by using same and mold base construction method | |
| CN212866305U (en) | Multilayer assembled steel bamboo wood integrated configuration system | |
| CN112281625A (en) | Prefabricated construction trestle and its construction method | |
| CN111155759A (en) | A new type unit truss type concrete frame structure formwork support system and its construction method | |
| CN2818421Y (en) | Upper bearing frame for laminated floorslab construction | |
| CN110593559A (en) | A concrete beam formwork support device and its construction technology | |
| CN116411694A (en) | An adjustable modular disc buckle support system and its support method | |
| CN116201230A (en) | Design and construction method of a new prefabricated mortise and tenon type steel-concrete beam-column joint | |
| CN111550045B (en) | Secondary grouting steel formwork for embedded steel column foot plate and construction method thereof | |
| CN112443159A (en) | Template tapping-free clamp and construction method thereof | |
| CN219773324U (en) | Concrete beam plate structure | |
| CN112227688A (en) | A stiffened plate-supported construction platform without outer frame and its method for residential buildings | |
| CN218668507U (en) | Steel bar truss floor support plate supporting structure | |
| CN116065745A (en) | Building assembled form removal-free building carrier plate supporting integrated structure | |
| CN220184735U (en) | Supporting structure based on assembled floor | |
| CN222498476U (en) | Core section of thick bamboo tower crane attachment device | |
| CN210164039U (en) | Steel skeleton structure house |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |