CN116971277B - Method for installing double-amplitude small-spacing curve steel box girder - Google Patents

Method for installing double-amplitude small-spacing curve steel box girder

Info

Publication number
CN116971277B
CN116971277B CN202310535202.5A CN202310535202A CN116971277B CN 116971277 B CN116971277 B CN 116971277B CN 202310535202 A CN202310535202 A CN 202310535202A CN 116971277 B CN116971277 B CN 116971277B
Authority
CN
China
Prior art keywords
box girder
lifting assembly
lifting
curve
curved
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310535202.5A
Other languages
Chinese (zh)
Other versions
CN116971277A (en
Inventor
季自刚
李锦航
田小旭
刘实旺
潘辉
韩臻
张学辉
宋战平
王朝光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an University of Architecture and Technology
CCCC Construction Group Co Ltd
Original Assignee
Xi'an University of Architecture and Technology
CCCC Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an University of Architecture and Technology, CCCC Construction Group Co Ltd filed Critical Xi'an University of Architecture and Technology
Priority to CN202310535202.5A priority Critical patent/CN116971277B/en
Publication of CN116971277A publication Critical patent/CN116971277A/en
Application granted granted Critical
Publication of CN116971277B publication Critical patent/CN116971277B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00—Structural or constructional details of bridges
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2/00—Bridges characterised by the cross-section of their bearing spanning structure
    • E01D2/04—Bridges characterised by the cross-section of their bearing spanning structure of the box-girder type

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种双幅小间距曲线钢箱梁安装方法,属于桥梁安装技术领域,用于左幅桥梁与右幅桥梁的安装,避免安装过程中并排设置的左幅桥梁与右幅桥梁发生碰撞。本发明提供的方法将并排设置的桥墩上其中一个桥墩上设置的曲线箱梁升高,并采用顶推法将升高的曲线箱梁顶进,完成两个桥墩之间的跨度,再将曲线箱梁下降并安装在两个桥墩上,由于其中一个曲线箱梁高于另一个曲线箱梁,避免在安装曲线钢箱梁的过程中发生碰撞和侧翻。

The present invention discloses a method for installing a double-span, small-spacing curved steel box girder, belonging to the technical field of bridge installation. The method is used for installing a left-span bridge and a right-span bridge, preventing collisions between the two bridges, which are arranged side by side, during installation. The method provided by the present invention elevates a curved box girder installed on one of the side-by-side piers and uses a jacking method to push the raised curved box girder forward to complete the span between the two piers. The curved box girder is then lowered and installed on the two piers. Because one curved box girder is higher than the other, collisions and rollovers during the installation of the curved steel box girder are avoided.

Description

Method for installing double-amplitude small-spacing curve steel box girder
Technical Field
The invention belongs to the technical field of bridge installation, is used for installing a left bridge and a right bridge, avoids collision between the left bridge and the right bridge which are arranged side by side in the installation process, and particularly relates to a double-width small-space curve steel box girder installation method.
Background
The double-frame steel box girder bridge is two steel box girder bridges which are arranged side by side, each road bridge only allows vehicles to run in one direction, and the two road bridges are arranged side by side when the vehicles run at high speed or on a first-level road, namely the coming lanes are separated. In the construction of roads, railways or urban bridge roads, the double-frame steel box girder bridge is widely applied to the upper structure of the bridge due to the excellent mechanical properties, prefabrication and other factors, and the steel box girder has the advantages of light dead weight, large elastic modulus, large bearing capacity and low manufacturing cost, and is convenient to construct by adopting a plurality of different construction methods.
The double-width small-space curve steel box girder bridge shown in fig. 1 comprises bridge piers arranged side by side, wherein one bridge pier is provided with a curve box girder. In the prior art, a pushing method is adopted to construct the double-width small-spacing curve steel box girder bridge, in the construction process, the left-width bridge and the right-width bridge are easily transversely offset and collide due to the small distance between the left-width bridge and the right-width bridge and the curve form in the construction process, the pushing position of the small-spacing curve bridge cannot be well controlled by adopting the pushing method for construction, the collision between the left-width bridge and the right-width bridge is easily caused, the girder body of the steel box girder is damaged, side turning to the box girder is likely to be caused, and serious engineering accidents are likely to be caused.
Disclosure of Invention
The invention aims to provide a method for installing a double-width small-space curve steel box girder, which solves the problem that a left-width bridge and a right-width bridge are easy to collide when being installed in the prior art.
The technical scheme adopted by the invention is that the method for installing the double-width small-space curve steel box girder comprises bridge piers which are arranged side by side, wherein one bridge pier is provided with the curve box girder, and the method comprises the following steps:
The installation equipment comprises a lifting mechanism and a pushing mechanism, wherein the lifting mechanism is detachably installed on the other pier, the pushing mechanism is installed on the lifting mechanism, and then the curved box girder is installed on the pushing mechanism;
lifting the curved box girder through the lifting mechanism, wherein the height of the curved box girder is higher than that of the curved box girder on one of the piers;
pushing the curved box girder, wherein the pushing mechanism drives the curved box girder to advance to a proper position above the two piers;
and the curved box girder is descended to a proper position by the lifting mechanism and is arranged on the two piers.
The mounting equipment further comprises a widening supporting frame, the widening supporting frame comprises an upper bracket and a lower bracket, and the lifting mechanism comprises a first lifting assembly, a second lifting assembly and a third lifting assembly;
the lower bracket is detachably arranged on a capping beam of the bridge pier;
The first lifting assembly and the second lifting assembly are respectively and detachably arranged on the lower bracket, wherein the upper end of the first lifting assembly is contacted with the upper bracket, and the upper end of the second lifting assembly extends out of the upper end of the upper bracket;
mounting the pushing mechanism on an upper bracket;
and installing a third lifting assembly on the pier, wherein the upper end of the third lifting assembly stretches into the widened bracket.
The first lifting assembly, the second lifting assembly and the third lifting assembly respectively comprise a jack and a plurality of mounting support seats;
a plurality of mounting support seats on the first lifting assembly and the second lifting assembly are respectively mounted on the lower bracket;
the jacks on the first lifting component and the second lifting component are respectively arranged on the installation supporting seats, and the remaining installation supporting seats are arranged on the jacks, wherein the installation supporting seats on the first lifting component are in contact with the lower end of the upper bracket, and the installation supporting seats on the second lifting component extend out of the upper end of the upper bracket;
And installing a plurality of installation supporting seats on the third lifting assembly on the bridge piers respectively, installing a jack on the third lifting assembly on the installation supporting seats, and installing the rest installation supporting seats on the jack, wherein the upper ends of the installation supporting seats extend into the lower support.
The mounting device further comprises a translation mechanism, wherein the translation mechanism comprises a telescopic assembly and a sliding plate, and the push rod end of the telescopic assembly is connected with the sliding plate:
fixedly mounting the telescopic assembly on the upper bracket;
the sliding plate is arranged on the upper bracket in a sliding way;
And then the pushing mechanism is arranged on the sliding plate.
The lifting curve box girder comprises detecting the height of the curve box girder installed on the pushing mechanism, wherein the height comprises the curve box girder higher than the curve box girder on one pier and the curve box girder lower than the curve box girder on one pier, and when the curve box girder is higher than the curve box girder on one pier, the next operation is performed.
The curved box girder below one of the piers comprises lifting the curved box girder;
increasing the number of mounting support seats on the second lifting assembly, wherein the upper end surfaces of the mounting support seats are parallel to the lower end of the curved box girder;
Lifting the curved box girder by a jack on the second lifting assembly, wherein the height of the curved box girder is higher than that of the curved box girder on one of the piers;
Starting a jack arranged on part of the first lifting assembly on the lower bracket to lift the upper bracket and the pushing mechanism, wherein the upper end of the pushing mechanism is parallel to the lower end of the curved box girder;
The number of the installation supporting seats is increased on the first lifting assemblies which are adjacently arranged, and the upper end faces of the installation supporting seats are parallel to the lower ends of the upper brackets.
The pushing of the curved box girder comprises moving two ends of the curved box girder to proper positions above two piers by adopting a pushing method;
And when the two ends of the curved box girder are respectively positioned at proper positions above the two piers, performing the next operation on the curved box girder.
The descent curve box girder includes:
the curve box girder is lifted again through a jack on the second lifting assembly, wherein a certain interval exists between the lower end face of the curve box girder and the pushing mechanism, and the pushing mechanism and the upper bracket are removed;
Lowering the curved box girder through a jack on the second lifting assembly, wherein the lower end surface of the curved box girder is contacted with the first lifting assembly, and removing the second lifting assembly;
lifting the curved box girder through a jack on the third lifting assembly, wherein a certain distance exists between the lower end surface of the curved box girder and the first lifting assembly, and removing the first lifting assembly and the lower bracket;
And descending the curve box girder through a jack on the third lifting assembly, wherein the lower end surface of the curve box girder is contacted with a support on the pier, and removing the third lifting assembly.
The first lifting assembly, the second lifting assembly and the third lifting assembly respectively adopt a mode of extracting the installation supporting seat block by block to fall the beam, and the beam falling device comprises:
Lifting a mounting support seat arranged on the jack by using the jack on the second lifting assembly, wherein the lifting height is the height of one mounting support seat;
Removing an upper bracket on the widened bracket and a mounting support on the first lifting assembly;
The height of the mounting support seats arranged on the second lifting assembly is lowered, wherein the height is the height of two mounting support seats, and one mounting support seat on the second lifting assembly is taken out;
Repeating the steps to finish that the curve box girder falls on the lower bracket of the widened bracket.
In summary, due to the adoption of the technical scheme, the beneficial effects of the invention are as follows:
According to the method, the curve box girder A is preferentially installed on one pier of the piers arranged side by side, the lifting mechanism is installed on the other pier, the pushing mechanism is installed on the lifting mechanism, the curve box girder B is installed on the pushing mechanism, the lifting mechanism drives the pushing mechanism and the curve box girder B to ascend and surpass the curve box girder A, the pushing mechanism drives the curve box girder B to finish the span between the two piers, the curve box girder B is installed on the other pier after the completion, and the curve box girder B is higher than the curve box girder A due to the fact that the curve box girder A is preferentially installed, and collision and rollover of the curve box girder B and the curve box girder A are avoided in the installation process.
The method provided by the invention has the advantages that the curve box girders arranged on one of the bridge piers arranged side by side are lifted, the lifted curve box girders are jacked in by adopting a jacking method, the span between the two bridge piers is completed, and then the curve box girders are lowered and are arranged on the two bridge piers, and as one curve box girder is higher than the other curve box girder, collision and rollover in the process of arranging the curve steel box girders are avoided.
Drawings
FIG. 1 is a schematic view of a prior art installation of a curvilinear steel box girder;
FIG. 2 is a schematic view of the installation of a curved steel box girder in this embodiment;
fig. 3 is a schematic diagram illustrating installation of bridge piers and devices in the present embodiment;
FIG. 4 is a schematic view illustrating the installation of a widening stand and a pier in the present embodiment;
FIG. 5 is a schematic view illustrating the installation of the widening stand and the lifting assembly in the present embodiment;
FIG. 6 is a schematic view of a lifting assembly according to the present embodiment;
fig. 7 is a flow chart of the present invention.
In the figure, a curve box girder 1, a bridge pier 2, a pushing mechanism 3, a lifting mechanism 4, a translation mechanism 5, a widening support frame 6 and a support column 7 are arranged.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples, in order to make the objects, technical solutions and advantages of the present invention more apparent. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the invention.
As shown in fig. 2-3, the method for installing the double-width small-spacing curve steel box girder comprises the steps of adopting an installation device to complete the installation of the double-width small-spacing curve steel box girder, wherein the installation device comprises bridge piers 2 arranged side by side, one bridge pier 2 is provided with a curve box girder 1, the device comprises a lifting mechanism 4 arranged on the other bridge pier 2, the lifting mechanism 4 is provided with a pushing mechanism 3, the pushing mechanism 3 is provided with the curve box girder 1, the height of the curve box girder 1 positioned on the pushing mechanism exceeds that of the curve box girder 1 arranged on the one bridge pier 2, the pushing mechanism 3 drives the curve box girder 1 to complete the installation between the two bridge piers 2 and is downwards installed on the other bridge pier 2 through the lifting mechanism 4, and as one curve box girder 1 is preferentially installed, the other curve box girder 1 is lifted up to the curve box girder 1 which is installed on one bridge pier through the lifting mechanism 4, so that the two curve box girders are prevented from collision and rollover in the installation process.
As shown in fig. 1, a curved box girder 1 is installed on one pier 2 of the piers 2 arranged side by side, the curved box girder 1 is installed by adopting a pushing method, the bridge pushing method is constructed, the girder body is poured or assembled at the bridge head section by section, the girder body is longitudinally pushed by a jack, the girder body is positioned by a temporary sliding support of each pier top, the method is the prior art, the installation of the curved box girder 1 on one pier 2 of the piers 2 arranged side by side is completed by the method, the double curve steel box girder bridge in the example is realized, wherein the total length 413m of the left bridge is positioned in a right leveling curve and a buffer curve section of r=460 m, ls=80 m, the total length 406m of the right bridge is positioned in a right leveling curve and buffer curve section of r=375 m, ls=80 m, and the maximum distance is 0.488m.
As shown in fig. 4 to 6, in combination with the above embodiment, a curved box girder 1 on another pier 2 of the piers 2 arranged side by side is installed, a lifting mechanism 4 is installed on the pier 2, and the lifting mechanism 4 includes a first lifting assembly, a second lifting assembly, a third lifting assembly, a first lifting assembly, a second lifting assembly, a third lifting assembly, The third lifting assembly comprises a jack and a plurality of mounting support seats respectively, each lifting assembly comprises a jack and a plurality of mounting support seats respectively, the lifting assembly is mutually overlapped to form a certain height, the lifting assembly drives the mounting support seats to lift through the jack to finish lifting of the curved box girder 1, the third lifting assembly is respectively arranged on the bridge pier 2, four support seats are respectively arranged at four corners of the bridge pier 2, one of the mounting support seats is respectively arranged on the bridge pier 2, the jack is respectively arranged on the mounting support seats, the plurality of mounting support seats are respectively overlapped and arranged on the jack in sequence, the widening support frame 6 is arranged on the bridge pier 2, the widening support frame 6 comprises an upper support frame and a lower support frame, the upper support frame and the lower support frame respectively comprise two transverse plates which are oppositely arranged, the transverse plates are I-shaped steel, the two I-shaped steel which are oppositely arranged are detachably connected through connecting plates and bolts, the lower support frame is arranged on the bridge pier 2, two support plates are respectively obliquely arranged at two sides of the lower end of the lower support frame, the other ends of the two support plates are respectively connected with the two sides of the bridge pier 2 in a detachable mode, the lower support frame is respectively through the lifting assembly, and the lower support frame is arranged between the two support frames, and the lower support frames are respectively penetrated through the upper support frames 7 and pass through the lower support frames, and pass through the lower support frames are respectively arranged between the lower support frames, and the lower support frames are respectively, and the supporting frames and are respectively and are arranged, The two ends of the plurality of first lifting components and the second lifting components are respectively contacted with the upper end of the upper bracket and the lower end of the upper bracket, the lower ends of the plurality of first lifting components are contacted with the upper end of the lower bracket, the upper ends of the plurality of first lifting components are contacted with the lower end of the upper bracket, the upper bracket and the lower bracket are connected and supported by the plurality of first lifting components and the plurality of supporting columns 7 to form a lifting mechanism 4 for lifting the curve box girder 1, the upper bracket is pressed on the plurality of first lifting components and the plurality of supporting columns 7 by the weight of the upper bracket, the widening supporting frames 6 formed by the upper bracket, the lower bracket, the plurality of first lifting components and the plurality of supporting columns 7 are placed on the bent cap girders of the bridge pier 2, the weight of the curve box girder 1 can be borne while widening and heightening the bridge pier is realized, the curve box girder 1 is improved, the later disassembly is convenient, and the purpose of the widening supporting frames 6 is that the distance between the first curve box girder 1 and the second curve box girder 1 is smaller, and the curve box girder 1 is prevented from being pushed against the first curve box girder 1 in the process due to the fact that the curve form is influenced by the lateral deviation which can not be generated; the lower ends of the second lifting components are contacted with the upper end of the lower bracket, the upper ends of the second lifting components respectively penetrate through the upper end of the upper bracket, namely penetrate through a gap between two transverse plates in the upper bracket, two translation mechanisms 5 are oppositely arranged on the upper bracket, a space is reserved between the two translation mechanisms 5, each translation mechanism 5 comprises a sliding plate and a telescopic component, the fixed end of the telescopic component is fixedly connected with the upper bracket, the push rod end of the telescopic component is connected with the sliding plate, the lower end face of the sliding plate is in sliding connection with the upper bracket, the sliding plate is directly arranged on the upper bracket, the pushing mechanisms 3 are respectively arranged on the sliding plate, the pushing mechanisms 3 are walking type pushing jacks, the telescopic components are longitudinal jacks, the jacks drive the sliding plate to stretch back and forth, and further drive the walking type pushing jacks to stretch back and forth, so that deviation correction is conveniently carried out on the curve box girder 1 arranged on the pushing mechanisms 3.
As shown in figure 2, a curved box girder 1 is installed, the curved box girder 1 is pushed, the double-amplitude curved box girder 1 is positioned at a flat curved section, unavoidable lateral deflection occurs in the pushing process, and collision of the curved box girders 1 which are adjacently arranged can occur, so that a widening support frame 6 is adopted to widen and heighten piers to provide a lateral deflection tolerance in the pushing process, one end of the curved box girder 1 is installed on a walking type pushing jack through an auxiliary tool, the span between two piers 2 is completed through a pushing method, and the pushing method adopted here has the same principle as the pushing method used in the implementation, and the purpose is a construction method for positioning the curved box girder 1 through temporary sliding supports on the tops of piers. In the process of pushing the curve box girder 1, the two translation mechanisms 5 are used for correcting the deviation of the curve box girder 1, namely correcting the deviation of the central line of the curve box girder 1, a transverse deviation control method is adopted for correcting the curve box girder 1, central line deviation monitoring points are arranged on the top surfaces of the front end and the tail end of the curve box girder 1, a red paint pen is used for marking the distance between the marking lines 1m on the outer side of the central line of the pushing system on the bottom surface of the curve box girder 1, a scale is drawn on the outer side by the paint pen, an operator positioned beside each pushing mechanism 3 can intuitively observe whether the footage at two sides is synchronous or not in the process of pushing, continuous observation is carried out in the process of pushing, if the central line deviation of the whole curve box girder 1 occurs in the construction process, pushing construction is suspended, and the deviation correction is carried out, when the central line deviation monitoring points are combined, the displacement of the curve box girder 1 is transversely adjusted by utilizing two jacks until the curve box girder 1 returns to an initial state, and the transverse deviation control method is adopted here, the transverse deviation correction method is adopted is corrected into the prior art, the embodiment completes the central line deviation correction of the curve box girder 1 by the method, and the bridge pier 1 is arranged side by side, and the bridge pier 2 is arranged side by side. Because the curved box girders 1 arranged on the bridge piers 2 side by side are not at a horizontal height, when one of the curved box girders 1 is installed, the other curved box girder 1 is much higher, so that the curved box girders 1 are prevented from being transversely deflected to collide in the pushing process.
The method comprises the steps of firstly, increasing the number of mounting support seats on a second lifting assembly, wherein the upper end of the second lifting assembly extends out of an upper support, so that the number of the mounting support seats needs to be overlapped to be in contact with the lower end of the curve box girder 1, then the curve box girder 1 is jacked up by a jack to be separated from a jacking mechanism 3, at the moment, the curve box girder 1 is supported by the second lifting assembly, then, the jacking mechanism 3 and a translation mechanism 5 which are arranged on the upper support are detached, and then, the curve box girder 1 is lowered to be parallel to the upper support by the second lifting assembly, at the moment, the curve box girder 1 is supported by the upper support, the first lifting assembly and the second lifting assembly, and the widening support frame 6 is detached, and meanwhile, the upper support and the lower support are respectively composed of two transverse plates and connecting plates which are oppositely arranged, and at the moment, the curve box girder 1 needs to be lowered by the way of carrying out the step-by-step falling of the mode of installing the mounting support seats by the second lifting assembly.
The method comprises the steps of extracting the mounting support base, lifting the upper support through the first lifting assembly, taking out the support column 7, descending the upper support through the first lifting assembly, taking out one mounting support base arranged on the first lifting assembly, respectively, descending the curved box girder 1 on the upper support through the second lifting assembly, simultaneously keeping the distance between the curved box girder 1 and the upper support within a certain range, namely the height of one mounting support base, avoiding displacement of the curved box girder 1, sliding down on the upper support when the curved box girder 1 is displaced from the second lifting assembly, taking out the support column 7, descending the upper support through the first lifting assembly, taking out one mounting support base arranged on the first lifting assembly, respectively, descending the curved box girder 1 on the upper support through the second lifting assembly, respectively taking out one mounting support base on the second lifting assembly, at the moment, descending the height of the curved box girder 1 to the height of one mounting support base, and taking out the curved box girder 1 to the position of one mounting support base according to the step, and taking out the curved box girder 1 to the position of the bridge pier, and the bridge pier is conveniently and finally carrying out the bridge pier in a mode. When the mounting support seat arranged on the second lifting assembly on the upper bracket is removed, the curve box girder 1 is jacked up by the third lifting assembly and is higher than the second lifting assembly, at the moment, the curve box girder 1 is supported by the third lifting assembly, the curve box girder 1 is higher than the second lifting assembly by one mounting support seat, the second lifting assembly is conveniently removed from the lower bracket, meanwhile, the accident is reduced, the curve box girder 1 falls on the lower bracket through the third lifting assembly, the third lifting assembly is lowered again, and one mounting support seat on the third lifting assembly is taken out, at the moment, the curve box girder 1 is supported by the lower bracket; the curved box girder 1 is jacked up through the third lifting component and is higher than the height of an installation supporting seat of the lower bracket, at the moment, the curved box girder 1 is supported by the third lifting component, the lower bracket is removed from the bent cap of the pier 2, because the lower bracket consists of two transverse plates and a connecting plate, the connecting plate is connected with the transverse plates through bolts, bolts on the connecting plate are removed, the curved box girder 1 is taken out from the third lifting component to the curved box girder 1, the curved box girder 1 falls on the supporting seat of the pier 2 through the third lifting component again, the girder falling is completed, the girder falling is carried out in a mode of extracting the installation supporting seat block by block, the displacement of the curved box girder 1 is avoided, and the girder falling risk is reduced.
The method for installing the double-width small-space curve steel box girder comprises bridge piers 2 which are arranged side by side, wherein one bridge pier 2 is provided with a curve box girder 1, the method is characterized by comprising the following steps of installing equipment, namely, the equipment comprises a lifting mechanism 4 and a pushing mechanism 3, the lifting mechanism 4 is detachably installed on the other bridge pier 2, the pushing mechanism 3 is installed on the lifting mechanism 4, the curve box girder 1 is installed on the pushing mechanism 3, the curve box girder is lifted, namely, the curve box girder 1 is lifted through the lifting mechanism 4, the height of the curve box girder 1 is higher than that of the curve box girder 1 on one bridge pier 2, the curve box girder is pushed, the pushing mechanism drives the curve box girder 1 to advance to a proper position above the two bridge piers 2, the curve box girder is lowered through the lifting mechanism 4, the curve box girder 1 is installed on the two bridge piers 2 at a proper position, the bridge piers 2 are arranged on the bridge piers 2, the bridge pier 2 is lifted, the curve box girder 1 is lifted by adopting the lifting mechanism 4, the curve box girder 1 is installed on the bridge girder 1, and the curve box girder 1 is prevented from being laterally overturned in a curve box girder 1, and the curve box girder is installed between the bridge girders 2 is lifted, and the curve box girder is prevented from being overturned in a curve box girder is installed, and the curve box girder is overturned.
As shown in fig. 7, the equipment required for installing the curved steel box girder comprises a widening support frame 6, a lifting mechanism 4, a translation mechanism 5 and a pushing mechanism 3, wherein the widening support frame 6 comprises an upper support and a lower support, the lower support is installed on a capping beam of a pier 2, the lifting mechanism 4 is installed on the pier 2 and the lower support, the lifting mechanism 4 comprises a first lifting assembly, a second lifting assembly and a third lifting assembly, the first lifting assembly, the second lifting assembly and the third lifting assembly respectively comprise a jack and an installation support seat, the installation support seats on the third lifting assemblies are respectively installed on the pier 2, the jack is installed on the installation support seats, the rest installation support seats are installed on the jack, the installation support seat positioned at the upper end of the jack extends into the lower support, the first lifting assembly, the second lifting assembly and the support column are installed on the lower support, the jack is installed on the installation support seat, the rest installation support seat is installed on the jack, the rest installation support seat is installed on the support column, the jack is installed on the rest support seat is installed on the support seat, and the rest installation support seat is installed on the support seat, and the lifting assembly is installed on the support seat; two translation mechanisms 5 are arranged on the upper bracket, the two translation mechanisms 5 are oppositely arranged and keep a certain distance, the two translation mechanisms 5 respectively comprise a telescopic component and a sliding plate, the push rod end of the telescopic component is connected with the sliding plate, the fixed end of the telescopic component is fixedly connected with the upper bracket, then two pushing mechanisms 3 are respectively arranged on the two sliding plates, the pushing mechanisms 3 adopt walking type pushing equipment, the telescopic component is a jack, one end of the curved box girder 1 is installed on the two pushing mechanisms 3, the other end of the curved box girder 1 is installed on the ground through equipment, and the equipment has the same structure as the equipment in the above description and is used for pushing the curved box girder 1 to advance simultaneously.
The method comprises the steps of detecting the height of a curve box girder currently installed on a pushing mechanism 3 according to the position of the curve box girder 1, lifting the curve box girder 1 on one pier 2 when the curve box girder on the pier and the curve box girder lower than the curve box girder on the pier are located, carrying out next operation when the curve box girder on the pier and the curve box girder higher than the pier are located, pushing the curve box girder, lifting the curve box girder 1, increasing the number of mounting support seats on a second lifting assembly, enabling the upper end face of the mounting support seat to be parallel to the lower end of the curve box girder 1, lifting the curve box girder 1 through a jack on the second lifting assembly, simultaneously lifting the first lifting assembly, enabling an upper support of the curve box girder 1 to be parallel to the lower end of the curve box girder 1, and enabling the curve box girder 1 to be lifted through the first lifting assembly and the second lifting assembly and exceed the height of one curve box girder 1.
And pushing the curved box girder, namely pushing by adopting walking type pushing equipment, longitudinally pushing the walking type pushing equipment arranged on a sliding plate by using a translation mechanism 5, and transversely pushing the pushing equipment on a sliding way by using the translation mechanism 5 in the transverse deviation correcting process. The pushing curve box girder is installed by adopting a pushing method, the construction of the bridge pushing method refers to the casting or assembling of the girder body at the bridge head section by section, the girder body is longitudinally pushed by a jack, the construction method for positioning the girder body through the temporary sliding support of each pier top is the prior art, and the method is used for completing the installation of the curved box girder 1 on one of the piers 2 arranged side by side. In the pushing process, deviation correction is carried out on the curve box girder 1 through the two translation mechanisms 5, namely, the center line deviation correction is carried out on the curve box girder 1, a transverse deviation control method is adopted to correct the curve box girder 1, center line deviation monitoring points are arranged on the top surfaces of the front end and the tail end of the curve box girder 1, a red paint pen is used as a mileage marking on the outer side of the center line of a pushing system on the bottom surface of the curve box girder 1, the marking distance is 1m, meanwhile, a scale is drawn on the outer side by the paint pen, operators positioned beside each pushing mechanism 3 in the pushing process can intuitively observe whether two side footage are synchronous or not, continuous observation is carried out in the pushing process, if the center line deviation of the whole curve box girder 1 occurs in the construction process, pushing construction is suspended, deviation correction is carried out, and when the center line deviation monitoring points are combined, the displacement of the curve box girder 1 is transversely adjusted by utilizing two jacks until the center line deviation monitoring points are restored to the initial state with the curve box girder 1, and the transverse deviation control method adopted is corrected in the prior art, and the embodiment is used to finish center line deviation correction of the curve box girder 1 by the method, and the side bridge pier 2 is arranged. Because the curved box girders 1 arranged on the bridge piers 2 side by side are not at a horizontal height, when one of the curved box girders 1 is installed, the other curved box girder 1 is much higher, so that the curved box girders 1 are prevented from being transversely deflected to collide in the pushing process.
The method comprises the steps of lowering a curved box girder 1, namely, after the curved box girder 1 is pushed in place, adopting a mode of gradually extracting mounting support seats to fall the girder, firstly, increasing the number of the mounting support seats on a second lifting assembly, wherein the upper end of the second lifting assembly extends out of an upper bracket, so that the number of the mounting support seats needs to be overlapped to be in contact with the lower end of the curved box girder 1, then jacking the curved box girder 1 through a jack and separating from a pushing mechanism 3, at the moment, the curved box girder 1 is supported through the second lifting assembly, then, removing the pushing mechanism 3 and a translating mechanism 5 which are arranged on the upper bracket, and then, lowering the curved box girder 1 to be parallel to the upper bracket through the second lifting assembly, at the moment, removing a widening support frame 6, and at the same time, the upper bracket and the lower bracket respectively consist of two transverse plates and a connecting plate which are oppositely arranged, and adopting a mode of gradually extracting the mounting support seats to fall the girder due to the self weight of the curved box girder 1.
The method comprises the steps of extracting the mounting support base, lifting the upper support through the first lifting assembly, taking out the support column 7, descending the upper support through the first lifting assembly, taking out one mounting support base arranged on the first lifting assembly, respectively, descending the curved box girder 1 on the upper support through the second lifting assembly, simultaneously keeping the distance between the curved box girder 1 and the upper support within a certain range, namely the height of one mounting support base, avoiding displacement of the curved box girder 1, sliding down on the upper support when the curved box girder 1 is displaced from the second lifting assembly, taking out the support column 7, descending the upper support through the first lifting assembly, taking out one mounting support base arranged on the first lifting assembly, respectively, descending the curved box girder 1 on the upper support through the second lifting assembly, respectively taking out one mounting support base on the second lifting assembly, at the moment, descending the height of the curved box girder 1 to the height of one mounting support base, and taking out the curved box girder 1 to the position of one mounting support base according to the step, and taking out the curved box girder 1 to the position of the bridge pier, and the bridge pier is conveniently and finally carrying out the bridge pier in a mode.
When the mounting support seat arranged on the second lifting assembly on the upper bracket is removed, the curve box girder 1 is jacked up by the third lifting assembly and is higher than the second lifting assembly, at the moment, the curve box girder 1 is supported by the third lifting assembly, the curve box girder 1 is higher than the second lifting assembly by one mounting support seat, the second lifting assembly is conveniently removed from the lower bracket, meanwhile, the accident is reduced, the curve box girder 1 falls on the lower bracket through the third lifting assembly, the third lifting assembly is lowered again, and one mounting support seat on the third lifting assembly is taken out, at the moment, the curve box girder 1 is supported by the lower bracket; the curved box girder 1 is jacked up through the third lifting component and is higher than the height of an installation supporting seat of the lower bracket, at the moment, the curved box girder 1 is supported by the third lifting component, the lower bracket is removed from the bent cap of the pier 2, because the lower bracket consists of two transverse plates and a connecting plate, the connecting plate is connected with the transverse plates through bolts, bolts on the connecting plate are removed, the lower bracket is taken out from between the third lifting component and the curved box girder 1, the curved box girder 1 falls on the supporting seat of the pier 2 through the third lifting component again, the girder falling is completed, the girder falling is carried out in a mode of extracting the installation supporting seat block by block, the displacement of the curved box girder 1 is avoided, and the girder falling risk is reduced.
The foregoing description of the preferred embodiments of the invention is not intended to be limiting, but rather is intended to cover all modifications, equivalents, and alternatives falling within the spirit and principles of the invention.

Claims (7)

1. The method for installing the double-width small-space curve steel box girder comprises bridge piers which are arranged side by side, wherein a curve box girder A is arranged on one bridge pier, and the method is characterized by comprising the following steps:
The installation equipment comprises a lifting mechanism and a pushing mechanism, wherein the lifting mechanism is detachably installed on the other pier, the pushing mechanism is installed on the lifting mechanism, and then the curve box girder B is installed on the pushing mechanism;
lifting the curved box girder B through the lifting mechanism, wherein the height of the curved box girder B is higher than that of the curved box girder A on one pier;
Pushing the curved box girder B, wherein the pushing mechanism drives the curved box girder B to advance to a proper position above the two piers;
the curve box girder B is descended to a proper position through the lifting mechanism and is arranged on the two piers;
The mounting equipment further comprises a widening supporting frame, the widening supporting frame comprises an upper bracket and a lower bracket, and the lifting mechanism comprises a first lifting assembly, a second lifting assembly and a third lifting assembly;
the lower bracket is detachably arranged on a capping beam of the bridge pier;
The first lifting assembly and the second lifting assembly are respectively and detachably arranged on the lower bracket, wherein the upper end of the first lifting assembly is contacted with the upper bracket, and the upper end of the second lifting assembly extends out of the upper end of the upper bracket;
mounting the pushing mechanism on an upper bracket;
The third lifting assembly is arranged on the pier, and the upper end of the third lifting assembly stretches into the widened supporting frame;
The first lifting assembly, the second lifting assembly and the third lifting assembly respectively comprise a jack and a plurality of mounting support seats;
a plurality of mounting support seats on the first lifting assembly and the second lifting assembly are respectively mounted on the lower bracket;
the jacks on the first lifting component and the second lifting component are respectively arranged on the installation supporting seats, and the remaining installation supporting seats are arranged on the jacks, wherein the installation supporting seats on the first lifting component are in contact with the lower end of the upper bracket, and the installation supporting seats on the second lifting component extend out of the upper end of the upper bracket;
And installing a plurality of installation supporting seats on the third lifting assembly on the bridge piers respectively, installing a jack on the third lifting assembly on the installation supporting seats, and installing the rest installation supporting seats on the jack, wherein the upper ends of the installation supporting seats extend into the lower support.
2. The method of claim 1, wherein the mounting apparatus further comprises a translation mechanism comprising a telescoping assembly and a sled, a pushrod end of the telescoping assembly being connected to the sled:
Mounting the fixed end of the telescopic assembly on the upper bracket;
the sliding plate is arranged on the upper bracket in a sliding way;
And then the pushing mechanism is arranged on the sliding plate.
3. The method of claim 2, wherein raising the curved box girder B includes detecting a height of the curved box girder B mounted on the pushing mechanism, the height including a height of the curved box girder B being higher than a height of the curved box girder a on the one of the piers and lower than a height of the curved box girder a on the one of the piers, wherein the curved box girder B is operated next when the height of the curved box girder B is higher than the height of the curved box girder a on the one of the piers.
4. A method according to claim 3, wherein the curved box girder B is raised when the height of the curved box girder B is lower than the curved box girder a on the one pier;
The number of mounting supporting seats on the second lifting assembly is increased, and the upper end faces of the mounting supporting seats are parallel to the lower end of the curved box girder B;
Lifting the curved box girder B through a jack on the second lifting assembly, so that the height of the curved box girder B is higher than that of the curved box girder A on one pier;
starting a jack arranged on part of the first lifting assembly on the lower bracket to lift the upper bracket and the pushing mechanism, wherein the upper end of the pushing mechanism is parallel to the lower end of the curved box girder B;
The number of the installation supporting seats is increased on the first lifting assemblies which are adjacently arranged, and the upper end faces of the installation supporting seats are parallel to the lower ends of the upper brackets.
5. The method of claim 4, wherein pushing the curved box girder B comprises moving both ends of the curved box girder B to a proper position above two piers by a pushing method;
And when the two ends of the curve box girder B are respectively positioned at proper positions above the two piers, performing the next operation on the curve box girder B.
6. The method according to any one of claims 1-5, wherein the descent curve box girder B comprises:
The curve box girder B is lifted again through a jack on the second lifting assembly, wherein a certain interval exists between the lower end face of the curve box girder B and the pushing mechanism, and the pushing mechanism and the upper bracket are removed;
Lowering the curved box girder B by a jack on the second lifting assembly, wherein the lower end surface of the curved box girder B contacts the first lifting assembly, and removing the second lifting assembly;
Lifting the curved box girder B by a jack on the third lifting assembly, wherein a certain distance exists between the lower end surface of the curved box girder B and the first lifting assembly, and removing the first lifting assembly and the lower bracket;
and descending the curve box girder B through a jack on the third lifting assembly, wherein the lower end surface of the curve box girder B is contacted with a support on the pier, and the third lifting assembly is removed.
7. The method of claim 6, wherein the first lifting assembly, the second lifting assembly, and the third lifting assembly each drop beams by extracting the mounting support block by block, comprising:
Lifting a mounting support seat arranged on the jack by using the jack on the second lifting assembly, wherein the lifting height is the height of one mounting support seat;
removing the upper bracket on the widened support frame and one mounting support seat on the first lifting assembly;
The height of the mounting support seats arranged on the second lifting assembly is lowered, wherein the height is the height of two mounting support seats, and one mounting support seat on the second lifting assembly is taken out;
Repeating the steps to finish that the curve box girder B falls on the lower bracket of the widened supporting frame.
CN202310535202.5A 2023-05-12 2023-05-12 Method for installing double-amplitude small-spacing curve steel box girder Active CN116971277B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310535202.5A CN116971277B (en) 2023-05-12 2023-05-12 Method for installing double-amplitude small-spacing curve steel box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310535202.5A CN116971277B (en) 2023-05-12 2023-05-12 Method for installing double-amplitude small-spacing curve steel box girder

Publications (2)

Publication Number Publication Date
CN116971277A CN116971277A (en) 2023-10-31
CN116971277B true CN116971277B (en) 2025-09-16

Family

ID=88480442

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310535202.5A Active CN116971277B (en) 2023-05-12 2023-05-12 Method for installing double-amplitude small-spacing curve steel box girder

Country Status (1)

Country Link
CN (1) CN116971277B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117926723A (en) * 2024-01-18 2024-04-26 中铁北京工程局集团第二工程有限公司 Construction method for pushing and falling beams of small-radius curve steel box girder overpass bridge

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200316029Y1 (en) * 2002-09-04 2003-06-12 최병렬 installation system in one united body for prefabrication upper part of bridge using lifting system with push pull mechanism
CN109537460A (en) * 2018-11-30 2019-03-29 中建五局第三建设有限公司 High-position beam falling construction method for pushing bridge

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106192755A (en) * 2015-04-29 2016-12-07 江苏沪宁钢机股份有限公司 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN214271732U (en) * 2020-12-10 2021-09-24 云南交投公路建设第六工程有限公司 A towing device for bridge construction across railway lines
CN115217040B (en) * 2022-05-26 2024-11-01 中交第四公路工程局有限公司 A method for top-pushing construction of super-long curved steel box composite beams
CN115821794B (en) * 2022-12-12 2025-08-05 安徽省交通建设股份有限公司 A construction method for double steel box girders to prevent deviation by alternate jacking
CN219637719U (en) * 2023-05-12 2023-09-05 中交第四公路工程局有限公司 Double-amplitude small-spacing curve steel box girder installation equipment

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR200316029Y1 (en) * 2002-09-04 2003-06-12 최병렬 installation system in one united body for prefabrication upper part of bridge using lifting system with push pull mechanism
CN109537460A (en) * 2018-11-30 2019-03-29 中建五局第三建设有限公司 High-position beam falling construction method for pushing bridge

Also Published As

Publication number Publication date
CN116971277A (en) 2023-10-31

Similar Documents

Publication Publication Date Title
CN110528405B (en) Bridge high-altitude lifting and shifting device based on vehicle set and construction method thereof
KR101287455B1 (en) System and method for launching upper structure of bridege
CN110670485B (en) Bridge construction method combining rotation and height adjustment
KR101916168B1 (en) Transporter for hypothesis of Bridge
CN219637719U (en) Double-amplitude small-spacing curve steel box girder installation equipment
CN113832863B (en) Method for double-frame bridge
CN109537460A (en) High-position beam falling construction method for pushing bridge
KR101400302B1 (en) Height flexible transporter for hypothesis of bridge
CN108729357B (en) High-position beam falling method based on jacking construction
KR101120466B1 (en) Temporary Ventilation Lifting Device and Structure Demolition or New Installation Method Using the Same
CN222435958U (en) Temporary support frame used in the top-pushing of the existing station building expansion
CN108385530A (en) A kind of highway over strait spells wide section prefabricated case beam and sets up tooling and erection method
CN116971277A (en) A method for installing double-width small-spacing curved steel box beams
KR100478701B1 (en) Pulling up, repair and reinforcement method for the upper structure of a bridge
CN110847045B (en) Self-propelled portal template system for large-span arm bent cap of urban viaduct and construction method
CN220550458U (en) Construction device for sliding and installing plate girder on rail in height-limiting environment
CN219195677U (en) Curved beam pushing device
CN112921718B (en) Light rail track beam continuous jacking installation device and its use method
CN117684456A (en) Methods of erecting prefabricated beams in limited space
CN212454446U (en) Anchor section trolley is widened to tunnel both sides
CN101774516B (en) Lifting device and construction method for replacing rake crane bridge
CN110562287B (en) Quick jacking and resetting device for derailing vehicle and using method of quick jacking and resetting device
CN111945572B (en) Multi-connected arch bridge erecting machine and multi-connected arch bridge erecting method
KR100478702B1 (en) Successively replacement method of the upper structure of a bridge
CN221373595U (en) A tunnel partition wall construction template trolley

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant