CN116969358A - A tower crane installation structure for deep foundation pits - Google Patents
A tower crane installation structure for deep foundation pits Download PDFInfo
- Publication number
- CN116969358A CN116969358A CN202310944247.8A CN202310944247A CN116969358A CN 116969358 A CN116969358 A CN 116969358A CN 202310944247 A CN202310944247 A CN 202310944247A CN 116969358 A CN116969358 A CN 116969358A
- Authority
- CN
- China
- Prior art keywords
- rod
- sleeve
- supporting
- locating
- sliding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/16—Applications of indicating, registering, or weighing devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/88—Safety gear
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
- B66C2700/03—Cranes with arms or jibs; Multiple cranes
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
Abstract
The application relates to the technical field of tower crane structures, and discloses a tower crane installation structure of a deep foundation pit, which solves the problem that operators are required to support standard joints for alignment during positioning in the prior art. The application can provide the installation structure for preventing the operator from manually supporting the corresponding calibration of the standard section, so as to increase project efficiency and ensure personal safety of the operator.
Description
Technical Field
The application relates to the technical field of tower crane structures, in particular to a tower crane installation structure of a deep foundation pit.
Background
A tower crane (tower crane) is called a tower crane for short. The rotary crane with the movable arm installed on the upper part of the high-rise tower body. The device has large operation space and is mainly used for vertical and horizontal conveying of materials and installation of building components in house building construction.
The tower crane in the prior art comprises a metal structure, a working mechanism and an electric system. The metal structure comprises a tower body, a movable arm, a base, an attaching rod and the like. The working mechanism comprises four parts of lifting, amplitude changing, rotation and walking. The electrical system comprises a motor, a controller, a power distribution cabinet, a connecting line, a signal and lighting device and the like. The specific steps of the tower crane during installation are as follows: 1. and (5) performing foundation construction according to design requirements, and arranging a cushion layer and a base. 2. The support leg and the first standard section are arranged on the base and fixed by the sleeve frame. 3. And installing the root of the crane boom and a cab. 4. And installing the middle part of the lifting arm and the jacking cylinder. 5. And installing a lifting arm tip and a luffing trolley. 6. And installing the root of the balance arm and a slewing mechanism. 7. And installing a balance arm middle part and a balance weight frame. 8. The balance arm tip and balance weight are installed. 9. And installing electric equipment such as a tower top, a winch, a power distribution cabinet and the like. 10. Various cables, signal lines, hydraulic pipes, etc. are connected. 11. It is checked whether the connection of the parts is firm, whether various limiters are effective, and whether various indicators are accurate. 12. And carrying out no-load test operation, and checking whether various actions are normal or not and whether various parameters meet the requirements or not. 13. And (3) removing the connection between the sleeve frame and the first section of standard section, and starting to work by the jacking cylinder to push the upper half parts of the sleeve frame and the tower crane to move upwards. 14. And lifting a second standard section which is ready on the ground by using a winch of the tower crane until the second standard section is kept horizontal with the sleeve frame, and plugging the second standard section into the sleeve frame to connect the second standard section and the first standard section. 15. Steps 13 and 14 are repeated until all standard knots are installed to the desired height.
According to the related technology, when the tower crane is arranged in a deep foundation pit, the positioning difficulty of the standard section is improved, the standard section is required to be lifted to a proper position through the crane, then the standard section is lowered to the corresponding standard section, and the standard section is in butt joint through the hand of an operator, so that the standard section is dangerous.
Disclosure of Invention
In order to overcome the defect that operators are required to support standard joints to align during positioning in the prior art, the application provides a tower crane installation structure of a deep foundation pit.
The following technical scheme is adopted:
the utility model provides a tower machine mounting structure of deep basal pit, set up between adjacent standard festival or standard festival and base, including a plurality of connecting pieces, locating frame and correction subassembly, the locating frame passes through a plurality of the connecting piece is connected in the one end that the standard festival is close to ground, the connecting piece includes slide bar, branch and adapter sleeve, a plurality of the adapter sleeve is along the vertical setting of circumference array on the outer wall of standard festival, a plurality of slide bar sliding connection is in corresponding in the adapter sleeve, a plurality of the ball joint of branch one end corresponds the slide bar, the other end ball joint the locating frame, branch can follow the slide bar slip gets into in the adapter sleeve, the locating frame internal diameter is greater than standard festival outer wall extension face, correction subassembly set up in the locating frame, correction subassembly includes fixed column, a plurality of locating lever and a plurality of spacer sleeve, the fixing column is vertically arranged in the middle of the positioning frame, the fixing column extends outwards of the positioning frame, one end of the positioning sleeve is circumferentially arrayed and vertical to the fixing column, one end of the positioning rod is slidably connected in the positioning sleeve, the other end of the positioning rod horizontally extends towards the inner wall of the positioning frame and is provided with an abutting block, an elastic piece which enables the positioning rod to always move towards the direction of the extending surface of the inner wall of the positioning frame is arranged between the positioning rod and the positioning sleeve, one end of the adjacent standard section or base, which is close to the positioning frame, is vertically provided with a plurality of supporting rods, the abutting block abuts against the supporting rods after moving along with the positioning frame to guide the positioning frame and the extending surface of the supporting rods in a matching way, the sliding sleeve is provided with a first fixing piece for fixing the sliding rod after the supporting rods enter the sliding rod, the outer side of the positioning frame is provided with a second fixing piece for fixing the supporting rod.
By adopting the technical scheme, the mounting structure is divided into two parts, wherein a plurality of connecting pieces, positioning frames, correction components and fixing pieces are arranged at the bottom of the standard joint to be combined, and the supporting rod is fixedly connected with one end of the base far away from the ground or one end of the standard joint fixed on the base far away from the ground; when the correction device is used, the base is fixed with the ground surface through concrete, the standard knot is hung above the base through the crane, the positioning frame is close to the base from top to bottom, and the correction component falls into a space surrounded by a plurality of support rods of the base; at this time, because the function of the elastic piece all moves to the direction far away from the locating column, make the abutting block abut against the supporting rod, several locating rods regard locating column as the centre of a circle, under the reaction force of the elastic piece, drive the locating frame to move to the position corresponding to centre of the base or standard festival, can observe the relative position of locating frame and standard festival to be installed by the cab at this moment, adjust to the standard festival to be installed and locating frame in the vertical state, and will wait to install the standard festival and gradually drop, make the fulcrum bar wear to establish in the sliding sleeve, wait to install standard festival and base or fixed standard festival at this moment on the same straight line, until wait to install standard festival place on base or fixed standard festival steadily, through first fixed part and second fixed part carry on the structural fixation, in order to finish installing; therefore, the installation structure for preventing the operator from manually supporting the corresponding calibration of the standard section is provided, so that the project efficiency is improved, and the personal safety of the operator is ensured.
Optionally, the inner wall of the positioning frame is provided with a plurality of supporting sleeves with positions corresponding to the supporting rods, and the supporting rods can be penetrated into the supporting sleeves from bottom to top.
Through adopting above-mentioned technical scheme, through the cooperation of supporting sleeve and bracing piece, when making to install standard festival in butt base or fixed standard festival, provide the prefixed to make things convenient for subsequent reinforcement means's application.
Optionally, the second fixing piece can pass through in proper order the locating frame the support cover is extremely in the bracing piece, the second fixing piece is the bolt, the bracing piece be provided with the screw thread that the second fixing piece corresponds.
Through adopting above-mentioned technical scheme, link to each other bracing piece and supporting sleeve through the second mounting to the fixed standard festival of waiting to install.
Optionally, the fixed column circumference sliding connection have a plurality of with the stopper that corresponds of spacer sleeve, the stopper can be followed spacer sleeve length direction removes to the butt the one end of locating lever, be provided with the drive in the fixed column the drive subassembly of stopper motion.
Through adopting above-mentioned technical scheme, wait to install standard festival vaulting pole and support the cover and be connected the back, through slip stopper butt locating lever to restrict the removal of locating lever, promote the butt piece to the butt bracing piece, with providing extra restriction of waiting to install standard festival, increase overall structure's stability.
Optionally, the mounting groove has been seted up along the axis to the fixed column, drive assembly includes screw rod, sliding sleeve and a plurality of push rod, the screw rod passes through the mounting groove rotate connect in the fixed column, the screw rod passes through the sliding sleeve, the sliding sleeve with screw rod threaded connection, the fixed column circumference vertical array has a plurality of first grooves of stepping down, first step down the groove with the mounting groove intercommunication, a plurality of the locating sleeve is last all offered with the second groove of stepping down that corresponds of first groove of stepping down, push rod one end articulates the sliding sleeve, and the other end passes in proper order first groove of stepping down with the second groove of stepping down articulates in on the stopper.
By adopting the technical scheme, the screw is rotated to drive the sliding sleeve to move along the length direction of the screw, so that the limiting block is driven to move by the push rod, the limiting block moves towards the direction far away from the fixed column and pushes the abutting block of the positioning rod to abut against the supporting rod, and the screw and the sliding sleeve are self-locked, so that stable support is provided for the supporting rod; simultaneously, the first groove of stepping down still provides the spacing to the sliding sleeve, avoids the sliding sleeve to rotate for the sliding sleeve only moves along screw rod length direction.
Optionally, an end of the abutting block, which is close to the inner wall of the positioning frame, is provided with an abutting groove for abutting the supporting rod, and the abutting groove is in an inward concave arc shape.
By adopting the technical scheme, the abutting groove provides opposite effect when abutting the supporting rod so as to provide small-amplitude rotation guide for the positioning frame and adjust the relative position of the positioning frame and the supporting rod; meanwhile, after the limiting block limits the positioning rod, the contact area of the contact block and the supporting rod is as large as possible due to the arrangement of the contact groove, so that more stable support is provided for the positioning frame and the supporting rod.
Optionally, a chamfer for abutting the support rod is arranged on one side, close to the ground, of the abutting block.
Through adopting above-mentioned technical scheme, when the butt piece was supreme and when the butt bracing piece down, through the chamfer in order to reduce the relative resistance that the butt piece received to the smooth and easy degree of structure when improving the installation.
Optionally, a screw hole is formed in the outer wall of the connecting sleeve, an opening corresponding to the screw hole is formed in the sliding rod, and the first fixing piece can penetrate through the screw hole to the opening.
Through adopting above-mentioned technical scheme to first mounting connection sliding sleeve and branch to restrict the removal of locating frame, in order to provide more stable mounting means.
Optionally, one end of the screw far away from the stud penetrates out of the fixed column and is provided with an end block which is convenient for a human hand to rotate the screw.
In summary, the present application includes at least one of the following beneficial effects:
1. providing a mounting structure for preventing operators from manually supporting corresponding calibration of standard sections, so as to increase project efficiency and ensure personal safety of the operators;
2. the standard section to be installed is reinforced and connected through the first fixing piece and the second fixing piece, so that the stability of structural installation is improved.
Drawings
Fig. 1 is a schematic view of the structure of the present embodiment when to be mounted;
FIG. 2 is a schematic view of the structure of the present example after installation;
FIG. 3 is a schematic view showing the structure of the joint of the present embodiment;
FIG. 4 is a schematic diagram of a calibration assembly;
fig. 5 is a schematic diagram of the drive assembly structure.
Reference numerals illustrate: 1. standard knots to be installed; 11. a first fixing member; 2. a connecting piece; 21. a slide bar; 211. an anti-falling block; 22. a support rod; 23. connecting sleeves; 231. a screw hole; 3. a positioning frame; 31. a support sleeve; 4. a correction assembly; 41. fixing the column; 411. a mounting groove; 412. a first relief groove; 42. a positioning rod; 421. a guide block; 43. a positioning sleeve; 431. a limit groove; 432. a guide groove; 433. a second relief groove; 44. an abutment block; 441. an abutment groove; 442. chamfering; 45. an elastic member; 46. a limiting block; 5. a drive assembly; 51. a screw; 511. an end block; 52. a sliding sleeve; 53. a push rod; 6. fixing a standard knot; 61. a support rod; 62. and a second fixing member.
Detailed Description
The present application will be described in further detail with reference to fig. 1 to 5.
Referring to fig. 1 to 3, an embodiment of the present application discloses a tower crane installation structure for a deep foundation pit, in order to distinguish different standard knots, a standard knot lifted by a crane is referred to as a standard knot 1 to be installed, and a standard knot of a fixed target is referred to as a fixed standard knot 6. The mounting structure is arranged between the adjacent standard section 1 to be mounted and the fixed standard section 6 or between the standard section 1 to be mounted and the base, and is arranged on the corresponding structure during production and used for improving the stability of the standard section during mounting. Specifically, the mounting structure includes two portions: the first one is arranged at one end of the standard section 1 to be installed, which is close to the ground, and comprises a plurality of connecting pieces 2, a positioning frame 3 and a correction component 4; and secondly, the support rod 61 is arranged at one end of the fixed standard joint 6 or the base far away from the ground and comprises a plurality of support rods 61 which are vertically arranged.
With reference to fig. 3 to 5, further, the connecting piece 2 comprises a slide bar 21, a strut 22 and a connecting sleeve 23. The four connecting sleeves 23 are vertically arranged on the outer wall of the standard joint 1 to be installed along the circumferential array, the four sliding rods 21 are connected in the corresponding connecting sleeves 23 in a sliding mode, and one end, far away from the ground, of each sliding rod 21 is provided with an anti-falling block 211 with the outer diameter larger than the inner diameter of the connecting sleeve 23. The number and the positions of the supporting rods 22 are corresponding to those of the sliding rods 21, one end of each supporting rod 22 is in ball joint with the corresponding sliding rod 21, the other end of each supporting rod 22 is in ball joint with the positioning frame 3, the inner diameter of the connecting sleeve 23 is enough to accommodate the ball joint to enter the sleeve, and the supporting rods 22 can slide along with the sliding rods 21 to enter the connecting sleeve 23. The internal diameter of the positioning frame 3 is larger than the extension surface of the outer wall of the standard joint, so that the positioning frame 3 can easily frame four support rods 61 in the positioning frame 3 when the standard joint 1 to be installed is lowered onto the fixed standard joint 6. The correction component 4 is arranged in the positioning frame 3, the correction component 4 comprises a fixing column 41, four positioning rods 42 and four positioning sleeves 43, and the fixing column 41 is vertically arranged in the middle of the positioning frame 3 and is connected with the positioning frame 3 through a plurality of reinforcing rods. The fixed column 41 extends outwards of the positioning frame 3, the positioning sleeve 43 is a hollow rectangular pipe body, one end of the positioning sleeve 43 is circumferentially arrayed and is perpendicular to the fixed column 41, the rectangular rod of the positioning rod 42 is arranged, one end of the positioning rod 42 is slidably connected in the positioning sleeve 43 along the length direction of the positioning sleeve 43, and the other end of the positioning rod 42 horizontally extends towards the inner wall direction of the positioning frame 3 and is provided with an abutting block 44. An elastic piece 45 which enables the positioning rod 42 to move towards the direction of the extending surface of the inner wall of the positioning frame 3 is arranged between the positioning rod 42 and the positioning sleeve 43, the elastic piece 45 is a spring, and is preferable for supporting the elastic piece 45, the elastic piece 45 is sleeved outside the positioning rod 42, and two ends of the elastic piece 45 are respectively connected with the positioning sleeve 43 and the abutting block 44. The abutment block 44 abuts against the corresponding support rod 61 to guide the positioning frame 3 to be aligned with the extension plane of the support rod 61 in cooperation with the elastic member 45 after moving along with the positioning frame 3, the sliding sleeve 52 is provided with a first fixing member 11 for fixing the support rod 22 after the support rod 22 enters the sliding rod 21, and the outer side of the positioning frame 3 is provided with a second fixing member 62 for fixing the support rod 61.
Referring to fig. 3 to 5, further, the positioning frame 3 is a rectangular frame structure, four supporting sleeves 31 corresponding to the supporting rods 61 are disposed on the inner wall of the positioning frame 3, the supporting sleeves 31 are vertically disposed, and an opening of the supporting sleeve 31 is disposed at the bottom towards the supporting rods 61. The lower surface of the support sleeve 31 is vertically higher than the highest point of the abutment block 44. The support rod 61 can be inserted into the support sleeve 31 downward and upward. The cooperation of the supporting sleeve 31 and the supporting rod 61 enables the standard joint 1 to be installed to provide pre-fixing when abutting against the base or fixing the standard joint 6, so as to facilitate the application of subsequent reinforcing means. The second fixing member 62 may sequentially pass through the positioning frame 3 and the supporting sleeve 31 to the supporting rod 61, the second fixing member 62 is a bolt, and the supporting rod 61 is provided with threads corresponding to the second fixing member 62. The support rod 61 is connected to the support sleeve 31 by a second fixing member 62 to fix the standard knot 1 to be installed.
Referring to fig. 3 to 5, four limiting blocks 46 corresponding to the positioning sleeve 43 are slidably connected to the fixing column 41 in the circumferential direction, a limiting groove 431 for sliding the limiting block 46 is formed in the positioning sleeve 43, the limiting groove 431 is rectangular, and the limiting block 46 is a corresponding rectangular rod. One end of the positioning rod 42, which is close to the limiting block 46, is provided with a guide block 421, and the guide block 421 and the positioning block form a T-shaped structure. A guide groove 432 for sliding the guide block 421 is formed in the positioning sleeve 43. The guide groove 432 cooperates with the guide block 421 to prevent the positioning rod 42 from rotating or the positioning rod 42 from being separated from the positioning sleeve 43. The limiting block 46 can move to abut against one end of the positioning rod 42 along the length direction of the positioning sleeve 43, and a driving assembly 5 for driving the limiting block 46 to move is arranged in the fixed column 41. After the support rod 61 of the standard joint 1 to be installed is connected with the support sleeve 31, the sliding limiting block 46 abuts against the positioning rod 42 to limit the movement of the positioning rod 42, and the abutting block 44 is pushed to abut against the support rod 61, so that additional limitation of the standard joint 1 to be installed is provided, and the stability of the overall structure is improved.
Referring to fig. 3 to 5, further, the fixing column 41 is vertically provided with a mounting slot 411 along an axis, and the driving assembly 5 includes a screw 51, a sliding sleeve 52 and a plurality of push rods 53. Screw 51 is provided with the screw thread in the middle part, and both ends are polished rod, and screw 51 passes through mounting groove 411 rotation to be connected in fixed column 41. Alternatively, the rotational stability of the screw 51 may be increased by adding bearings. The sliding sleeve 52 is penetrated to the screw rod 51, the sliding sleeve 52 is in threaded connection with the screw rod 51, a plurality of first abdication grooves 412 are formed in the circumferential vertical array of the fixed column 41, the first abdication grooves 412 are communicated with the mounting groove 411, second abdication grooves 433 corresponding to the first abdication grooves 412 are formed in the plurality of positioning sleeves 43, one end of the pushing rod is hinged to the sliding sleeve 52, and the other end of the pushing rod sequentially penetrates through the first abdication grooves 412 and the second abdication grooves 433 to be hinged to the limiting block 46. The screw rod 51 is rotated to drive the sliding sleeve 52 to move along the length direction of the screw rod 51, so that the limiting block 46 is driven to move through the push rod 53, the limiting block 46 moves away from the fixed column 41 and pushes the abutting block 44 of the positioning rod 42 to abut against the supporting rod 61, and the screw rod 51 and the sliding sleeve 52 are self-locked, so that stable support is provided for the supporting rod 61; meanwhile, the first yielding groove 412 also provides a limit for the sliding sleeve 52, preventing the sliding sleeve 52 from rotating, so that the sliding sleeve 52 only moves along the length direction of the screw 51.
Referring to fig. 3 to 5, the positioning rod 42 is disposed along a diagonal line of the positioning frame 3, and the width of the abutment block 44 should be at least 1.5 times greater than the diameter of the support rod 61 to facilitate abutment of the abutment block 44 against the support rod 61. The end of the abutting block 44 close to the inner wall of the positioning frame 3 is provided with an abutting groove 441 for abutting the supporting rod 61, and the abutting groove 441 is in an inward concave arc shape. The space surrounded by the abutting groove 441 and the inner wall of the positioning block frame is the fault-tolerant space of the butt-joint supporting rod 61 controllable by the crane. The abutting groove 441 provides a relative function when abutting the support rod 61, so as to provide small-amplitude rotation guide for the positioning frame 3, and adjust the relative position of the positioning frame 3 and the support rod 61; meanwhile, after the limiting block 46 limits the positioning rod 42, the contact area between the contact block 44 and the supporting rod 61 is as large as possible due to the arrangement of the contact groove 441, so as to provide a more stable support for the positioning frame 3 and the supporting rod 61. The abutment block 44 is provided with a chamfer 442 on a side thereof close to the ground for abutment against the support rod 61. When the abutting block 44 abuts against the support rod 61 from top to bottom, the chamfer 442 reduces the relative resistance to the abutting block 44, thereby improving the smoothness of the structure during installation.
Referring to fig. 3 to 5, the outer wall of the connecting sleeve 23 is provided with a screw hole 231, the slide rod 21 is provided with an opening corresponding to the screw hole 231, and the first fixing member 11 can pass through the screw hole 231 to the opening. The sliding sleeve 52 is connected with the supporting rod 22 by the first fixing piece 11, so that the movement of the positioning frame 3 is limited, and a more stable installation mode is provided.
Referring to fig. 3 to 5, the end of the screw 51 remote from the stud is provided with a fixing post 41 and an end block 511 which facilitates rotation of the screw 51 by a human hand. End block 511 is cylindrical and the surface of end block 511 is provided with friction lines.
The implementation principle of the tower crane installation structure of the deep foundation pit provided by the embodiment of the application is as follows:
when the correction device is used, the base is fixed with the ground surface through concrete, the standard knot is hung above the base through the crane, the positioning frame 3 is close to the base from top to bottom, and the correction component 4 falls into a space surrounded by a plurality of support rods 61 of the base.
At this time, due to the action of the elastic member 45, the positioning rods 42 move in a direction away from the positioning column, so that the abutment block 44 abuts against the supporting rod 61, and the positioning rods 42 drive the positioning frame 3 to move to a position corresponding to the center of the base or the standard joint under the reaction force of the elastic member 45 by taking the positioning column as the center of the circle.
At this time, the cab is started by the crane to observe the relative positions of the positioning frame 3 and the standard section 1 to be installed, the positioning frame 3 and the standard section 1 to be installed are adjusted to be in a vertical state, the standard section 1 to be installed is gradually lowered, so that the supporting rod 22 is penetrated into the connecting sleeve 23, at this time, the standard section 1 to be installed and the base or the fixed standard section are in the same straight line, and after the standard section 1 to be installed is stably placed on the base or the fixed standard section, the structure is fixed through the first fixing piece 11 and the second fixing piece 62, so that the installation is completed.
Therefore, the installation structure for preventing the operator from manually supporting the corresponding calibration of the standard section is provided, so that the project efficiency is improved, and the personal safety of the operator is ensured.
The above embodiments are not intended to limit the scope of the present application, so: all equivalent changes in structure, shape and principle of the application should be covered in the scope of protection of the application.
Claims (9)
1. A tower machine mounting structure of deep basal pit, its characterized in that: the positioning frame (3) is connected to one end of the standard joint close to the ground through a plurality of connecting pieces (2), each connecting piece (2) comprises a sliding rod (21), a supporting rod (22) and a connecting sleeve (23), the connecting sleeves (23) are vertically arranged on the outer wall of the standard joint along a circumferential array, the sliding rods (21) are slidably connected in the corresponding connecting sleeves (23), one ends of the supporting rods (22) are in ball hinge connection with the sliding rods (21), the other ends of the supporting rods (22) are in ball hinge connection with the positioning frame (3), the supporting rods (22) can slide into the connecting sleeves (23) along with the sliding rods (21), the inner diameter of the positioning frame (3) is larger than the extending surface of the outer wall of the standard joint, the correcting assembly (4) is arranged in the positioning frame (3), each correcting assembly (4) comprises a fixing column (41), a plurality of positioning rods (42) and a plurality of positioning sleeves (43), one ends of the supporting rods (22) are vertically hinged with the sliding rods (21), one ends of the supporting rods (41) are vertically hinged to the fixing columns (41) and extend to the middle portions of the fixing columns (41) to the fixing columns (41), one end of the locating rod (42) is slidably connected to the locating sleeve (43), the other end of the locating rod (42) horizontally extends towards the inner wall direction of the locating frame (3) and is provided with an abutting block (44), an elastic piece (45) which enables the locating rod (42) to move towards the direction where the extending surface of the inner wall of the locating frame (3) is located is arranged between the locating rod (42) and the locating sleeve (43), a plurality of supporting rods (61) are vertically arranged at one end, close to the locating frame (3), of each adjacent standard section or base, and the abutting block (44) abuts against the corresponding supporting rod (61) after moving along with the locating frame (3) so as to match with the elastic piece (45) to guide the locating frame (3) to be aligned with the extending surface of the supporting rod (61), a first fixing piece (11) used for fixing the sliding rod (21) after the supporting rod (22) enters the sliding rod (21) is arranged on the connecting sleeve (23), and a second fixing piece (62) used for fixing the supporting rod (61) is arranged on the outer side of the locating frame (3).
2. The tower crane mounting structure of a deep foundation pit according to claim 1, wherein: the inner wall of the positioning frame (3) is provided with a plurality of supporting sleeves (31) with positions corresponding to the supporting rods (61), and the supporting rods (61) can be penetrated into the supporting sleeves (31) from bottom to top.
3. The tower crane mounting structure of a deep foundation pit according to claim 2, wherein: the second fixing piece (62) can sequentially penetrate through the positioning frame (3) and the supporting sleeve (31) to the inside of the supporting rod (61), the second fixing piece (62) is a bolt, and the supporting rod (61) is provided with threads corresponding to the second fixing piece (62).
4. The tower crane mounting structure of a deep foundation pit according to claim 1, wherein: the fixed column (41) is connected with a plurality of limiting blocks (46) corresponding to the locating sleeve (43) in a circumferential sliding mode, the limiting blocks (46) can move to abut against one ends of the locating rods (42) along the length direction of the locating sleeve (43), and driving components (5) for driving the limiting blocks (46) to move are arranged in the fixed column (41).
5. The deep foundation pit tower crane mounting structure of claim 4, wherein: the utility model provides a fixed column (41) has seted up mounting groove (411) along the axis, drive assembly (5) include screw rod (51), sliding sleeve (52) and a plurality of push rod (53), screw rod (51) pass through mounting groove (411) rotate connect in fixed column (41), screw rod (51) are worn to establish sliding sleeve (52), sliding sleeve (52) with screw rod (51) threaded connection, fixed column (41) circumference vertical array has a plurality of first grooves of stepping down (412), first groove of stepping down (412) with mounting groove (411) intercommunication, a plurality of second grooves of stepping down (433) that correspond with first groove of stepping down (412) have all been seted up on spacer sleeve (43), push rod one end articulates sliding sleeve (52), the other end is worn in proper order first groove of stepping down (412) with second grooves of stepping down (433) articulate in stopper (46).
6. The tower crane mounting structure of a deep foundation pit according to claim 1, wherein: an abutting groove (441) for abutting the supporting rod (61) is formed in one end, close to the inner wall of the positioning frame (3), of the abutting block (44), and the abutting groove (441) is of an inward concave arc shape.
7. The deep foundation pit tower crane mounting structure of claim 6, wherein: a chamfer (442) for abutting the support rod (61) is arranged on one side, close to the ground, of the abutting block (44).
8. The deep foundation pit tower crane mounting structure of claim 5, wherein: screw holes (231) are formed in the outer wall of the connecting sleeve (23), holes corresponding to the screw holes (231) are formed in the sliding rod (21), and the first fixing piece (11) can penetrate through the screw holes (231) to the holes.
9. The deep foundation pit tower crane mounting structure of claim 5, wherein: one end of the screw rod (51) far away from the stud penetrates out of the fixed column (41) and is provided with an end block (511) which is convenient for a human hand to rotate the screw rod (51).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310944247.8A CN116969358B (en) | 2023-07-29 | 2023-07-29 | A tower crane installation structure for deep foundation pits |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310944247.8A CN116969358B (en) | 2023-07-29 | 2023-07-29 | A tower crane installation structure for deep foundation pits |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116969358A true CN116969358A (en) | 2023-10-31 |
| CN116969358B CN116969358B (en) | 2026-06-26 |
Family
ID=88479077
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310944247.8A Active CN116969358B (en) | 2023-07-29 | 2023-07-29 | A tower crane installation structure for deep foundation pits |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116969358B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119615970A (en) * | 2025-02-14 | 2025-03-14 | 福州市规划设计研究院集团有限公司 | Prefabricated assembled inspection well with bracket structure |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102011009592A1 (en) * | 2011-01-27 | 2012-08-02 | Liebherr-Werk Biberach Gmbh | Foundation anchoring for working machine |
| WO2014079248A1 (en) * | 2012-11-26 | 2014-05-30 | 徐州徐工随车起重机有限公司 | Skid-proof support leg apparatus and mobile machinery |
| CN112239157A (en) * | 2020-11-04 | 2021-01-19 | 常德市荣程机械有限公司 | Tower crane jacking is with standard festival convenient to installation |
| CN113562629A (en) * | 2021-07-15 | 2021-10-29 | 海通建设集团有限公司 | Lattice column positioning and verticality adjusting system |
-
2023
- 2023-07-29 CN CN202310944247.8A patent/CN116969358B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| DE102011009592A1 (en) * | 2011-01-27 | 2012-08-02 | Liebherr-Werk Biberach Gmbh | Foundation anchoring for working machine |
| WO2014079248A1 (en) * | 2012-11-26 | 2014-05-30 | 徐州徐工随车起重机有限公司 | Skid-proof support leg apparatus and mobile machinery |
| CN112239157A (en) * | 2020-11-04 | 2021-01-19 | 常德市荣程机械有限公司 | Tower crane jacking is with standard festival convenient to installation |
| CN113562629A (en) * | 2021-07-15 | 2021-10-29 | 海通建设集团有限公司 | Lattice column positioning and verticality adjusting system |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119615970A (en) * | 2025-02-14 | 2025-03-14 | 福州市规划设计研究院集团有限公司 | Prefabricated assembled inspection well with bracket structure |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116969358B (en) | 2026-06-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN110695584B (en) | Device for aligning concentricity of pile planting butt joint and automatically welding | |
| CN113562629B (en) | Lattice column positioning and verticality adjusting system | |
| CN113789853B (en) | A support system for tree-shaped column structure installation | |
| CN111005383B (en) | A subway steel pipe pile alignment component | |
| CN209670898U (en) | A kind of ground drilling rig | |
| CN112681309B (en) | Cast-in-place pile reinforcement cage hoisting and fixing device and construction method thereof | |
| JP2011149163A (en) | Overhaul facility for steel tower support structure and method for overhauling the same | |
| CN116971627A (en) | Installation appurtenance of assembled building | |
| CN116255011A (en) | A vibrating system for concrete pouring | |
| CN221590451U (en) | Vibrating system for concrete pouring | |
| CN115450425B (en) | Fixing device for lifting hovering plane of net rack and using method | |
| CN115784033B (en) | Obliquely attached tower crane and operating method thereof | |
| CN115415444B (en) | A pile head steel bar protection sleeve limiting device | |
| CN216689374U (en) | Building concrete pipe pile extension ware that bending resistance is strong | |
| CN116289938A (en) | A pipe pile joint vertical centering device and pipe pile construction method | |
| CN215411010U (en) | Stator circle measuring equipment | |
| CN110258629B (en) | Assembling equipment and assembling method for prefabricated parts | |
| CN117127524A (en) | An existing bridge settlement in-situ reinforcement device and construction method | |
| CN211283517U (en) | Lifting hoisting machine for elevator shaft construction | |
| CN222822358U (en) | A test equipment for testing the bearing capacity of rigid composite piles | |
| CN223019636U (en) | A pipeline connection bracket | |
| CN224133749U (en) | Steel reinforcement cage installation positioner | |
| CN220725724U (en) | Outer wall hanging flower basket reinforcing apparatus | |
| CN216613866U (en) | Auxiliary adjusting device for anchor cable tensioning jack | |
| CN119160794B (en) | High-precision hydraulic mechanical arm lifting system and method for assembled station |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |