CN116905348A - A kind of bridge inspection hanger - Google Patents

A kind of bridge inspection hanger Download PDF

Info

Publication number
CN116905348A
CN116905348A CN202311085792.2A CN202311085792A CN116905348A CN 116905348 A CN116905348 A CN 116905348A CN 202311085792 A CN202311085792 A CN 202311085792A CN 116905348 A CN116905348 A CN 116905348A
Authority
CN
China
Prior art keywords
hanging basket
fixedly connected
inner cavity
gear
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202311085792.2A
Other languages
Chinese (zh)
Inventor
何磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Traffic Engineering Group Co ltd
Original Assignee
Hangzhou Traffic Engineering Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Traffic Engineering Group Co ltd filed Critical Hangzhou Traffic Engineering Group Co ltd
Priority to CN202311085792.2A priority Critical patent/CN116905348A/en
Publication of CN116905348A publication Critical patent/CN116905348A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a bridge inspection hanger, which relates to the technical field of bridge engineering and comprises a hanging basket I, wherein a stabilizing arm is fixedly arranged on one side of the hanging basket I, a channel stabilizing arm is fixedly connected with the upper surface of the other side of the hanging basket I, and a fixing plate is fixedly connected with the upper surface of the channel stabilizing arm. According to the invention, the right end of the hanging basket II is movably sleeved in the inner cavity of the hanging basket I, the outer wall of the fixed plugboard is movably sleeved with the inner cavity of the hanging basket I, the first gear is rotated by rotating the turntable, so that the second gear and the third gear rotate under the action of the rotating rod, the fourth gear rotates under the action of the third gear, so that the ring gear rotates, the threaded rod rotates under the action of the ring gear, so that the fixed square column moves upwards to the inner cavity of the fixed plugboard under the action of the sliding rod, and the fixed plugboard is fixed in the inner cavity of the hanging basket I under the action of the fixed square column.

Description

一种桥检挂架A kind of bridge inspection hanger

技术领域Technical field

本发明涉及桥梁工程技术领域,具体涉及一种桥检挂架。The invention relates to the technical field of bridge engineering, and in particular to a bridge inspection hanger.

背景技术Background technique

在桥梁施工中,预制梁安装架设后,有多道工序需要在桥底施工作业,如空心板梁梁底勾缝、先简后连梁拆除临时支座、T形梁负弯束桥下预应力施工,这时需要使用到桥检挂架。In bridge construction, after the prefabricated beams are installed, there are many processes that need to be carried out under the bridge, such as jointing of hollow plate beams, removal of temporary supports first and then connecting beams, and precasting of T-shaped beams under negative bending beams. For stress construction, the bridge inspection hanger needs to be used.

针对现有技术存在以下问题:There are the following problems with existing technology:

在使用时,现有的桥检挂架不能够很好地根据不同情况进行安全过跨,且在移动时晃动较大。When in use, the existing bridge inspection hanger cannot safely cross the span according to different situations, and it shakes greatly when moving.

发明内容Contents of the invention

本发明提供一种桥检挂架,以解决上述背景技术中提出的问题。The present invention provides a bridge inspection hanger to solve the problems raised in the above background technology.

为解决上述技术问题,本发明所采用的技术方案是:In order to solve the above technical problems, the technical solution adopted by the present invention is:

一种桥检挂架,包括吊篮一,所述吊篮一的一侧固定安装有稳定臂,所述吊篮一的另一侧上表面固定连接有通道稳定臂,所述通道稳定臂的上表面固定连接有固定板。A bridge inspection hanger includes a hanging basket. One side of the hanging basket is fixedly equipped with a stabilizing arm. The upper surface of the other side of the hanging basket is fixedly connected with a channel stabilizing arm. The channel stabilizing arm is fixedly connected to the upper surface of the hanging basket. The upper surface is fixedly connected with a fixing plate.

所述吊篮一的内腔活动套接有吊篮二,所述吊篮二的一侧与吊篮一的一侧搭接,所述吊篮二上固定连接有配重安装架,所述吊篮二活动套接有转盘,所述转盘的上端位于吊篮二的上方,所述转盘的下表面固定连接有齿轮一,所述齿轮一啮合有齿轮二,所述齿轮二的一侧固定连接有旋转杆,所述旋转杆的外壁与吊篮二的内腔活动套接,所述旋转杆的另一侧固定连接有齿轮三,所述齿轮三啮合有齿轮四,所述齿轮四的外壁与吊篮二的内腔活动套接,所述齿轮四的另一侧啮合有环形齿轮,所述环形齿轮的外壁与吊篮一的内腔活动套接,所述环形齿轮固定套接有螺纹杆,所述螺纹杆的外壁与吊篮一的内腔活动套接。The inner cavity of the hanging basket 1 is movablely connected with a hanging basket 2. One side of the hanging basket 2 overlaps with one side of the hanging basket 1. A counterweight mounting frame is fixedly connected to the hanging basket 2. The second hanging basket is movablely connected with a turntable. The upper end of the turntable is located above the second hanging basket. The lower surface of the turntable is fixedly connected with gear one. The first gear meshes with the second gear. One side of the second gear is fixed. A rotating rod is connected, and the outer wall of the rotating rod is movablely connected to the inner cavity of the hanging basket two. The other side of the rotating rod is fixedly connected with a gear three, and the gear three meshes with a gear four. The gear four The outer wall is movablely connected to the inner cavity of the hanging basket 2. The other side of the gear 4 is meshed with a ring gear. The outer wall of the ring gear is movablely connected to the inner cavity of the hanging basket 1. The ring gear is fixedly connected to the inner cavity of the hanging basket 1. Threaded rod, the outer wall of the threaded rod is movablely connected to the inner cavity of the hanging basket one.

所述通道稳定臂的一侧固定连接有横梁走道,所述横梁走道的下表面固定连接有吊篮升降机,所述吊篮升降机的下表面固定连接有支撑架,所述支撑架的内腔活动套接有导杆,所述导杆的外壁固定套接有支撑圆板,所述支撑圆板的外壁与支撑架的内腔活动套接。One side of the channel stabilizing arm is fixedly connected to a crossbeam walkway, the lower surface of the crossbeam walkway is fixedly connected to a gondola lift, the lower surface of the gondola lift is fixedly connected to a support frame, and the inner cavity of the support frame is movable. A guide rod is connected to the outer wall of the guide rod, and a supporting circular plate is fixedly connected to the outer wall of the guide rod. The outer wall of the supporting circular plate is movable connected to the inner cavity of the support frame.

本发明技术方案的进一步改进在于:所述螺纹杆的外壁螺纹套接有固定方柱,所述固定方柱的外壁与吊篮一的内腔活动套接,所述固定方柱滑动连接有滑杆,所述滑杆的上下两侧与吊篮一的内腔固定连接。A further improvement of the technical solution of the present invention is that: the outer wall of the threaded rod is threadedly connected with a fixed square column, the outer wall of the fixed square column is movablely connected with the inner cavity of the hanging basket 1, and the fixed square column is slidingly connected with a sliding Rod, the upper and lower sides of the sliding rod are fixedly connected to the inner cavity of the hanging basket one.

本发明技术方案的进一步改进在于:所述固定方柱的外壁活动套接有固定插板,所述固定插板的外壁与吊篮一的内腔活动套接,所述固定插板的另一侧与吊篮二的一侧固定连接。A further improvement of the technical solution of the present invention is that: the outer wall of the fixed square column is movably connected with a fixed plug-in plate, the outer wall of the fixed plug-in plate is movably connected with the inner cavity of the hanging basket one, and the other side of the fixed plug-in plate is movably connected. The side is fixedly connected to one side of hanging basket 2.

本发明技术方案的进一步改进在于:所述支撑圆板的上表面且位于导杆的一侧固定连接有减震器,所述减震器的上端与支撑架的内腔固定连接,所述支撑圆板的下表面固定连接有弹簧一,所述弹簧一的内腔与导杆的外壁活动套接,所述弹簧一的下表面固定连接有连接杆,所述连接杆的上表面与导杆的下表面固定连接,所述连接杆的外壁与支撑架的内腔活动套接,所述连接杆的外壁活动套接有密封圈,所述连接杆和稳定臂的底部连接有用于在桥体上行走的行走机构。A further improvement of the technical solution of the present invention is that a shock absorber is fixedly connected to the upper surface of the support circular plate and located on one side of the guide rod, and the upper end of the shock absorber is fixedly connected to the inner cavity of the support frame. A spring is fixedly connected to the lower surface of the circular plate. The inner cavity of the spring is movablely connected to the outer wall of the guide rod. A connecting rod is fixedly connected to the lower surface of the spring. The upper surface of the connecting rod is connected to the guide rod. The lower surface of the connecting rod is fixedly connected, the outer wall of the connecting rod is movablely socketed with the inner cavity of the support frame, the outer wall of the connecting rod is movablely socketed with a sealing ring, and the bottom of the connecting rod and the stabilizing arm is connected with a seal for mounting on the bridge body The walking mechanism for walking on the ground.

本发明技术方案的进一步改进在于:所述密封圈的外壁与支撑架的内腔固定连接,所述行走机构包括电动行走底盘,所述连接杆与所述电动行走底盘固定连接,所述电动行走底盘用于在桥体上行走。A further improvement of the technical solution of the present invention is that the outer wall of the sealing ring is fixedly connected to the inner cavity of the support frame, the walking mechanism includes an electric walking chassis, the connecting rod is fixedly connected to the electric walking chassis, and the electric walking The chassis is used for walking on the bridge.

本发明技术方案的进一步改进在于:所述固定板固定连接有固定圆柱,所述固定圆柱的外壁活动套接有滑板,所述滑板的外壁与固定板的内腔活动套接,所述固定圆柱位于滑板上方的部分活动套接有弹簧二。A further improvement of the technical solution of the present invention is that the fixed plate is fixedly connected to a fixed cylinder, the outer wall of the fixed cylinder is movablely connected to a sliding plate, the outer wall of the sliding plate is movable connected to the inner cavity of the fixed plate, and the fixed cylinder The part of the movable sleeve located above the skateboard is connected with spring 2.

本发明技术方案的进一步改进在于:所述弹簧二的下端与滑板固定连接,所述滑板的两侧固定连接有连接板。A further improvement of the technical solution of the present invention is that the lower end of the second spring is fixedly connected to the sliding plate, and connecting plates are fixedly connected to both sides of the sliding plate.

本发明技术方案的进一步改进在于:所述连接板固定连接有钢绳,所述钢绳固定连接有吊环,所述吊环的下端与连接板固定连接。A further improvement of the technical solution of the present invention is that the connecting plate is fixedly connected with a steel rope, the steel rope is fixedly connected with a lifting ring, and the lower end of the lifting ring is fixedly connected with the connecting plate.

由于采用了上述技术方案,本发明相对现有技术来说,取得的技术进步是:Due to the adoption of the above technical solution, the technical progress achieved by the present invention compared with the existing technology is:

1、本发明提供一种桥检挂架,采用吊篮一、转盘、吊篮二、配重安装架、齿轮一、齿轮二、旋转杆、齿轮三、齿轮四、环形齿轮、螺纹杆、固定方柱、滑杆、固定插板之间的相互配合,通过将吊篮二的右端活动套接于吊篮一的内腔中,使固定插板的外壁与吊篮一的内腔活动套接,通过转动转盘,使齿轮一进行旋转,从而使齿轮二和齿轮三在旋转杆的作用下进行旋转,通过齿轮三的作用,使齿轮四进行旋转,从而使环形齿轮进行旋转,通过环形齿轮的作用,使螺纹杆进行旋转,从而使固定方柱在滑杆的作用下向上移动至固定插板的内腔中,通过固定方柱的作用,使固定插板固定在吊篮一的内腔中,从而使吊篮二固定在吊篮一的左侧,当需要过跨时,将稳定臂拆卸下来,使吊篮一和通道稳定臂在配重安装架的平衡作用下保持稳定,从而使吊篮一在吊起装置的作用下向左移动至桥体的一侧,通过吊起装置的移动,使吊篮一和稳定臂移动过跨,使装置在吊起装置的作用下平衡起吊过跨,如果桥下场地平整,也可使用桥下转运设备过跨,从而达到根据不同情况进行过跨并且使用成本更低,效益更突出。1. The present invention provides a bridge inspection hanger, which adopts hanging basket one, turntable, hanging basket two, counterweight mounting frame, gear one, gear two, rotating rod, gear three, gear four, ring gear, threaded rod, fixed The mutual cooperation between the square column, the sliding rod and the fixed inserting plate allows the right end of the hanging basket 2 to be movablely connected to the inner cavity of the hanging basket 1, so that the outer wall of the fixed inserting plate is movablely connected to the inner cavity of the hanging basket 1. , by rotating the turntable, gear one is rotated, so that gear two and gear three are rotated under the action of the rotating rod. Through the action of gear three, gear four is rotated, so that the ring gear is rotated. Through the action of the ring gear action, causing the threaded rod to rotate, so that the fixed square column moves upward to the inner cavity of the fixed insert plate under the action of the sliding rod. Through the action of the fixed square column, the fixed insert plate is fixed in the inner cavity of the hanging basket one. , so that the hanging basket two is fixed on the left side of the hanging basket one. When it is necessary to cross the span, the stable arm is removed so that the hanging basket one and the channel stabilizing arm remain stable under the balancing effect of the counterweight installation frame, so that the hanging basket Basket 1 moves to the left to one side of the bridge under the action of the lifting device. Through the movement of the lifting device, basket 1 and the stabilizing arm move across the span, so that the device is lifted across the span in a balanced manner under the action of the lifting device. , if the site under the bridge is flat, the transfer equipment under the bridge can also be used to cross the span, so that the span can be crossed according to different conditions with lower cost and more outstanding benefits.

2、本发明提供一种桥检挂架,采用支撑架、导杆、支撑圆板、减震器、弹簧一、连接杆、电动行走底盘之间的相互配合,通过弹簧一和导杆的作用,使连接杆和支撑架之间有一定的缓冲,从而使电动行走底盘在使用时能够有一定的缓冲,同时通过固定连接在支撑圆板上表面的减震器的作用,使支撑圆板和支撑架之间能够减震,从而使电动行走底盘在移动时不会对桥检挂架产生影响,从而达到在移动时进行减震减少晃动的目的。2. The present invention provides a bridge inspection hanger, which adopts the mutual cooperation between the support frame, the guide rod, the support disc, the shock absorber, the spring one, the connecting rod and the electric walking chassis, and through the action of the spring one and the guide rod , so that there is a certain buffer between the connecting rod and the support frame, so that the electric walking chassis can have a certain buffer when in use. At the same time, through the function of the shock absorber fixedly connected to the upper surface of the support circular plate, the support circular plate and The support frames can absorb shock, so that the electric walking chassis will not affect the bridge inspection hanger when moving, thereby achieving the purpose of shock absorption and reducing shaking when moving.

3、本发明提供一种桥检挂架,采用固定圆柱、滑板、弹簧二、连接板、钢绳、吊环、固定板之间的相互配合,通过固定圆柱和弹簧二的作用,使滑板在固定板的内腔中有一定的缓冲空间,通过连接板和钢绳的作用,使吊环固定在固定板的上方,通过吊起装置,使吊环向上移动,从而使桥检挂架向上移动,在移动的过程中通过弹簧二和固定圆柱的作用,使桥检挂架在移动时能够有一定的缓冲,从而减少大的晃动,从而达到便于在吊起时进行缓冲的目的。3. The present invention provides a bridge inspection hanger, which adopts the mutual cooperation between the fixed cylinder, the sliding plate, the spring 2, the connecting plate, the steel rope, the lifting ring and the fixed plate. Through the action of the fixed cylinder and the spring 2, the sliding plate is fixed. There is a certain buffer space in the inner cavity of the plate. Through the action of the connecting plate and the steel rope, the lifting ring is fixed above the fixed plate. The lifting device moves the lifting ring upward, so that the bridge inspection hanger moves upward. During the process, through the action of the spring and the fixed cylinder, the bridge inspection hanger can have a certain buffering when moving, thereby reducing large shaking, thereby achieving the purpose of facilitating buffering during lifting.

附图说明Description of the drawings

图1为本发明的结构示意图;Figure 1 is a schematic structural diagram of the present invention;

图2为本发明的剖视结构示意图;Figure 2 is a schematic cross-sectional structural diagram of the present invention;

图3为本发明A处放大结构示意图;Figure 3 is an enlarged structural schematic diagram of point A of the present invention;

图4为本发明B处放大结构示意图;Figure 4 is an enlarged structural schematic diagram of position B of the present invention;

图5为本发明C处放大结构示意图;Figure 5 is an enlarged structural schematic diagram of position C of the present invention;

图6为本发明D处放大结构示意图。Figure 6 is an enlarged structural schematic diagram of position D of the present invention.

图中:1、吊篮一;2、稳定臂;3、通道稳定臂;4、固定板;11、转盘;12、吊篮二;13、配重安装架;14、齿轮一;15、齿轮二;16、旋转杆;17、齿轮三;18、齿轮四;19、环形齿轮;110、螺纹杆;111、固定方柱;112、滑杆;113、固定插板;31、横梁走道;32、吊篮升降机;33、支撑架;34、导杆;35、支撑圆板;36、减震器;37、弹簧一;38、连接杆;39、密封圈;310、电动行走底盘;311、桥体;41、固定圆柱;42、滑板;43、弹簧二;44、连接板;45、钢绳;46、吊环。In the picture: 1. Hanging basket one; 2. Stabilizing arm; 3. Channel stabilizing arm; 4. Fixed plate; 11. Turntable; 12. Hanging basket two; 13. Counterweight mounting bracket; 14. Gear one; 15. Gear Two; 16. Rotating rod; 17. Gear three; 18. Gear four; 19. Ring gear; 110. Threaded rod; 111. Fixed square column; 112. Sliding rod; 113. Fixed insert plate; 31. Cross beam walkway; 32 , hanging basket lift; 33. support frame; 34. guide rod; 35. support disc; 36. shock absorber; 37. spring one; 38. connecting rod; 39. sealing ring; 310. electric walking chassis; 311. Bridge body; 41, fixed cylinder; 42, sliding plate; 43, spring two; 44, connecting plate; 45, steel rope; 46, lifting ring.

具体实施方式Detailed ways

下面结合实施例对本发明做进一步详细说明:The present invention will be further described in detail below in conjunction with the examples:

实施例1Example 1

如图1-6所示,本发明提供了一种桥检挂架,包括吊篮一1,吊篮一1的一侧固定安装有稳定臂2,吊篮一1的另一侧上表面固定连接有通道稳定臂3,通道稳定臂3的上表面固定连接有固定板4,吊篮一1的内腔活动套接有吊篮二12,吊篮二12的一侧与吊篮一1的一侧搭接,吊篮二12上固定连接有配重安装架13,吊篮二12活动套接有转盘11,转盘11的上端位于吊篮二12的上方,转盘11的下表面固定连接有齿轮一14,齿轮一14啮合有齿轮二15,齿轮二15的一侧固定连接有旋转杆16,旋转杆16的外壁与吊篮二12的内腔活动套接,旋转杆16的另一侧固定连接有齿轮三17,齿轮三17啮合有齿轮四18,齿轮四18的外壁与吊篮二12的内腔活动套接,齿轮四18的另一侧啮合有环形齿轮19,环形齿轮19的外壁与吊篮一1的内腔活动套接,环形齿轮19固定套接有螺纹杆110,螺纹杆110的外壁与吊篮一1的内腔活动套接,通道稳定臂3的一侧固定连接有横梁走道31,横梁走道31的下表面固定连接有吊篮升降机32,吊篮升降机32的下表面固定连接有支撑架33,支撑架33的内腔活动套接有导杆34,导杆34的外壁固定套接有支撑圆板35,支撑圆板35的外壁与支撑架33的内腔活动套接。As shown in Figures 1-6, the present invention provides a bridge inspection hanger, which includes a hanging basket 1. A stabilizing arm 2 is fixedly installed on one side of the hanging basket 1, and the upper surface of the other side of the hanging basket 1 is fixed. A channel stabilizing arm 3 is connected. The upper surface of the channel stabilizing arm 3 is fixedly connected with a fixing plate 4. The inner cavity of the hanging basket 1 is movablely connected to a hanging basket 2 12. One side of the hanging basket 2 12 is connected to the hanging basket 1 1. One side is overlapped, and a counterweight installation frame 13 is fixedly connected to the hanging basket 2 12. A turntable 11 is movablely connected to the hanging basket 2 12. The upper end of the turntable 11 is located above the hanging basket 2 12. The lower surface of the turntable 11 is fixedly connected to Gear one 14, gear one 14 meshes with gear two 15, one side of gear two 15 is fixedly connected with a rotating rod 16, the outer wall of the rotating rod 16 is movablely connected with the inner cavity of the hanging basket two 12, and the other side of the rotating rod 16 Gear three 17 is fixedly connected, and gear three 17 is meshed with gear four 18. The outer wall of gear four 18 is movablely connected to the inner cavity of hanging basket two 12. The other side of gear four 18 is meshed with a ring gear 19, and the ring gear 19 The outer wall is movablely connected to the inner cavity of the hanging basket 1. The ring gear 19 is fixedly connected to a threaded rod 110. The outer wall of the threaded rod 110 is movablely connected to the inner cavity of the hanging basket 1. One side of the channel stabilizing arm 3 is fixedly connected. There is a crossbeam walkway 31, a hanging basket lift 32 is fixedly connected to the lower surface of the crossbeam walkway 31, a support frame 33 is fixedly connected to the lower surface of the gondola lift 32, and a guide rod 34 is movablely connected to the inner cavity of the support frame 33. The guide rod 34 A supporting circular plate 35 is fixedly connected to the outer wall of the supporting circular plate 35, and the outer wall of the supporting circular plate 35 is movable connected to the inner cavity of the supporting frame 33.

在本实施例中,将吊篮二12的右端活动套接于吊篮一1的内腔中,使固定插板113的外壁与吊篮一1的内腔活动套接,通过转动转盘11,使齿轮一14进行旋转,从而使齿轮二15和齿轮三17在旋转杆16的作用下进行旋转,通过齿轮三17的作用,使齿轮四18进行旋转,从而使环形齿轮19进行旋转,通过环形齿轮19的作用,使螺纹杆110进行旋转,从而使固定方柱111在滑杆112的作用下向上移动至固定插板113的内腔中,通过固定方柱111的作用,使固定插板113固定在吊篮一1的内腔中,从而使吊篮二12固定在吊篮一1的左侧,通过在配重安装架13的作用,使装置在吊起装置的作用下平衡起吊过跨,如果桥下场地平整,也可使用桥下转运设备过跨。In this embodiment, the right end of the hanging basket 12 is movably connected to the inner cavity of the hanging basket 1, so that the outer wall of the fixed inserting plate 113 is movablely connected to the inner cavity of the hanging basket 1. By rotating the turntable 11, Gear one 14 is rotated, so that gear two 15 and gear three 17 rotate under the action of the rotating rod 16. Through the action of gear three 17, gear four 18 is rotated, so that the ring gear 19 is rotated. The action of the gear 19 causes the threaded rod 110 to rotate, so that the fixed square post 111 moves upward into the inner cavity of the fixed insert plate 113 under the action of the sliding rod 112. Through the action of the fixed square post 111, the fixed insert plate 113 It is fixed in the inner cavity of the hanging basket 1, so that the hanging basket 2 12 is fixed on the left side of the hanging basket 1. Through the action of the counterweight installation frame 13, the device is balanced and hoisted across the span under the action of the lifting device. , if the site under the bridge is flat, you can also use under-bridge transfer equipment to cross the span.

实施例2Example 2

如图1-6所示,在实施例1的基础上,本发明提供一种技术方案:优选的,螺纹杆110的外壁螺纹套接有固定方柱111,固定方柱111的外壁与吊篮一1的内腔活动套接,固定方柱111滑动连接有滑杆112,滑杆112的上下两侧与吊篮一1的内腔固定连接,固定方柱111的外壁活动套接有固定插板113,固定插板113的外壁与吊篮一1的内腔活动套接,固定插板113的另一侧与吊篮二12的一侧固定连接。As shown in Figures 1-6, based on Embodiment 1, the present invention provides a technical solution: preferably, the outer wall of the threaded rod 110 is threaded with a fixed square column 111, and the outer wall of the fixed square column 111 is connected to the hanging basket. The inner cavity of one 1 is movablely connected. The fixed square column 111 is slidingly connected with a sliding rod 112. The upper and lower sides of the sliding rod 112 are fixedly connected with the inner cavity of the hanging basket 11. The outer wall of the fixed square column 111 is movablely connected with a fixed plug. Board 113, the outer wall of the fixed plug-in plate 113 is movablely connected to the inner cavity of the hanging basket 1, and the other side of the fixed plug-in plate 113 is fixedly connected to one side of the hanging basket 2 12.

在本实施例中,将吊篮二12的右端活动套接于吊篮一1的内腔中,使固定插板113的外壁与吊篮一1的内腔活动套接,通过转动转盘11,使齿轮一14进行旋转,从而使齿轮二15和齿轮三17在旋转杆16的作用下进行旋转,通过齿轮三17的作用,使齿轮四18进行旋转,从而使环形齿轮19进行旋转,通过环形齿轮19的作用,使螺纹杆110进行旋转,从而使固定方柱111在滑杆112的作用下向上移动至固定插板113的内腔中,通过固定方柱111的作用,使固定插板113固定在吊篮一1的内腔中,从而使吊篮二12固定在吊篮一1的左侧,将稳定臂2拆卸下来,使吊篮一1和通道稳定臂3在配重安装架的平衡作用下保持稳定,从而使吊篮一1在吊起装置的作用下向左移动至桥体311的一侧,通过吊起装置的移动,使吊篮一1和稳定臂2移动过跨,从而使装置在吊起装置的作用下平衡起吊过跨,如果桥下场地平整,也可使用桥下转运设备过跨,从而达到根据不同情况进行过跨并且使用成本更低,效益更突出。In this embodiment, the right end of the hanging basket 12 is movably connected to the inner cavity of the hanging basket 1, so that the outer wall of the fixed inserting plate 113 is movablely connected to the inner cavity of the hanging basket 1. By rotating the turntable 11, Gear one 14 is rotated, so that gear two 15 and gear three 17 rotate under the action of the rotating rod 16. Through the action of gear three 17, gear four 18 is rotated, so that the ring gear 19 is rotated. The action of the gear 19 causes the threaded rod 110 to rotate, so that the fixed square post 111 moves upward into the inner cavity of the fixed insert plate 113 under the action of the sliding rod 112. Through the action of the fixed square post 111, the fixed insert plate 113 Fixed in the inner cavity of hanging basket one 1, so that hanging basket two 12 is fixed on the left side of hanging basket one 1, remove the stabilizing arm 2, so that hanging basket one 1 and channel stabilizing arm 3 are on the counterweight installation frame It remains stable under the action of balance, so that the hanging basket 1 moves to the left to one side of the bridge 311 under the action of the lifting device. Through the movement of the lifting device, the hanging basket 1 and the stabilizing arm 2 move across the span. This allows the device to balance and lift across the span under the action of the hoisting device. If the site under the bridge is flat, the under-bridge transfer equipment can also be used to cross the span, so that the span can be crossed according to different conditions with lower usage costs and more outstanding benefits.

实施例3Example 3

如图1-6所示,在实施例1的基础上,本发明提供一种技术方案:优选的,支撑圆板35的上表面且位于导杆34的一侧固定连接有减震器36,减震器36的上端与支撑架33的内腔固定连接,支撑圆板35的下表面固定连接有弹簧一37,弹簧一37的内腔与导杆34的外壁活动套接,弹簧一37的下表面固定连接有连接杆38,连接杆38的上表面与导杆34的下表面固定连接,连接杆38的外壁与支撑架33的内腔活动套接,连接杆38的外壁活动套接有密封圈39,连接杆38和稳定臂2的底部连接有用于在桥体311上行走的行走机构,密封圈39的外壁与支撑架33的内腔固定连接,行走机构包括电动行走底盘310,连接杆38与电动行走底盘310固定连接,电动行走底盘310用于在桥体311上行走。As shown in Figures 1-6, based on Embodiment 1, the present invention provides a technical solution: preferably, a shock absorber 36 is fixedly connected to the upper surface of the supporting circular plate 35 and located on one side of the guide rod 34, The upper end of the shock absorber 36 is fixedly connected to the inner cavity of the support frame 33. The lower surface of the support circular plate 35 is fixedly connected to a spring 37. The inner cavity of the spring 37 is movablely connected to the outer wall of the guide rod 34. The spring 37 The lower surface is fixedly connected with a connecting rod 38. The upper surface of the connecting rod 38 is fixedly connected with the lower surface of the guide rod 34. The outer wall of the connecting rod 38 is movablely socketed with the inner cavity of the support frame 33. The outer wall of the connecting rod 38 is movablely socketed with The sealing ring 39, the connecting rod 38 and the bottom of the stabilizing arm 2 are connected with a traveling mechanism for walking on the bridge body 311. The outer wall of the sealing ring 39 is fixedly connected to the inner cavity of the support frame 33. The traveling mechanism includes an electric walking chassis 310, which is connected The rod 38 is fixedly connected to the electric traveling chassis 310, which is used to walk on the bridge body 311.

在本实施例中,通过弹簧一37和导杆34的作用,使连接杆38和支撑架33之间有一定的缓冲,从而使电动行走底盘310在使用时能够有一定的缓冲,同时通过固定连接在支撑圆板35上表面的减震器36的作用,使支撑圆板35和支撑架33之间能够减震,从而使电动行走底盘310在移动时不会对桥检挂架产生影响,从而达到在移动时进行减震减少晃动的目的。In this embodiment, through the action of the spring 37 and the guide rod 34, there is a certain buffer between the connecting rod 38 and the support frame 33, so that the electric walking chassis 310 can have a certain buffer when in use. At the same time, by fixing The function of the shock absorber 36 connected to the upper surface of the support circular plate 35 enables shock absorption between the support circular plate 35 and the support frame 33, so that the electric walking chassis 310 will not affect the bridge inspection hanger when moving. This achieves the purpose of shock absorption and reducing shaking when moving.

实施例4Example 4

如图1-6所示,在实施例1的基础上,本发明提供一种技术方案:优选的,固定板4固定连接有固定圆柱41,固定圆柱41的外壁活动套接有滑板42,滑板42的外壁与固定板4的内腔活动套接,固定圆柱41位于滑板42上方的部分活动套接有弹簧二43,弹簧二43的下端与滑板42固定连接,滑板42的两侧固定连接有连接板44,连接板44固定连接有钢绳45,钢绳45固定连接有吊环46,吊环46的下端与连接板44固定连接。As shown in Figures 1-6, on the basis of Embodiment 1, the present invention provides a technical solution: preferably, the fixed plate 4 is fixedly connected to a fixed cylinder 41, and the outer wall of the fixed cylinder 41 is movably connected with a sliding plate 42. The outer wall of 42 is movablely connected to the inner cavity of the fixed plate 4. The part of the fixed cylinder 41 located above the sliding plate 42 is movable connected with the second spring 43. The lower end of the second spring 43 is fixedly connected to the sliding plate 42. Both sides of the sliding plate 42 are fixedly connected with The connecting plate 44 is fixedly connected with a steel rope 45 , the steel rope 45 is fixedly connected with a lifting ring 46 , and the lower end of the lifting ring 46 is fixedly connected with the connecting plate 44 .

在本实施例中,通过固定圆柱41和弹簧二43的作用,使滑板42在固定板4的内腔中有一定的缓冲空间,通过连接板44和钢绳45的作用,使吊环46固定在固定板4的上方,通过吊起装置,使吊环46向上移动,从而使桥检挂架向上移动,在移动的过程中通过弹簧二43和固定圆柱41的作用,使桥检挂架在移动时能够有一定的缓冲,从而减少大的晃动,从而达到便于在吊起时进行缓冲的目的。In this embodiment, through the action of the fixed cylinder 41 and the spring 43, the sliding plate 42 has a certain buffer space in the inner cavity of the fixed plate 4, and through the action of the connecting plate 44 and the steel rope 45, the lifting ring 46 is fixed in the inner cavity of the fixed plate 4. Above the fixed plate 4, a lifting device is used to move the lifting ring 46 upward, thereby causing the bridge inspection hanger to move upward. During the movement, the bridge inspection hanger is moved by the action of the spring 2 43 and the fixed cylinder 41. It can provide a certain amount of buffering, thereby reducing large shaking, thereby achieving the purpose of facilitating buffering during lifting.

下面具体说一下该桥检挂架的工作原理。Let’s talk about the working principle of the bridge inspection hanger in detail.

如图1-6所示,在完成了本跨下部施工,挂架要转换到前一跨作业,通过将吊篮二12的右端活动套接于吊篮一1的内腔中,使固定插板113的外壁与吊篮一1的内腔活动套接,通过转动转盘11,使齿轮一14进行旋转,从而使齿轮二15和齿轮三17在旋转杆16的作用下进行旋转,通过齿轮三17的作用,使齿轮四18进行旋转,从而使环形齿轮19进行旋转,通过环形齿轮19的作用,使螺纹杆110进行旋转,从而使固定方柱111在滑杆112的作用下向上移动至固定插板113的内腔中,通过固定方柱111的作用,使固定插板113固定在吊篮一1的内腔中,从而使吊篮二12固定在吊篮一1的左侧,当需要过跨时,将稳定臂2拆卸下来,使吊篮一1和通道稳定臂3在配重安装架的平衡作用下保持稳定,从而使吊篮一1在吊起装置的作用下向左移动至桥体311的一侧,通过吊起装置的移动,使吊篮一1和稳定臂2移动过跨,从而使装置在吊起装置的作用下平衡起吊过跨,通过吊起装置使吊篮一1移动至311的下方,通过固定圆柱41和弹簧二43的作用,使滑板42在固定板4的内腔中有一定的缓冲空间,通过连接板44和钢绳45的作用,使吊环46固定在固定板4的上方,通过吊起装置,使吊环46向上移动,从而使桥检挂架向上移动,在移动的过程中通过弹簧二43和固定圆柱41的作用,使桥检挂架在移动时能够有一定的缓冲,从而减少大的晃动,如果桥下场地平整,也可使用桥下转运设备过跨,就用挂架上部自带电动葫芦,下放施工挂架用运输车辆或挖机铲车等转运至前跨,此时不须加设配重段,通过弹簧一37和导杆34的作用,使连接杆38和支撑架33之间有一定的缓冲,从而使电动行走底盘310在使用时能够有一定的缓冲,同时通过固定连接在支撑圆板35上表面的减震器36的作用,使支撑圆板35和支撑架33之间能够减震,从而使电动行走底盘310在移动时不会对桥检挂架产生影响。As shown in Figure 1-6, after the construction of the lower part of this span is completed, the hanger needs to be transferred to the previous span. The right end of hanging basket 12 is movablely connected to the inner cavity of hanging basket 1, so that the fixed plug The outer wall of the plate 113 is movablely connected to the inner cavity of the hanging basket 1. By rotating the turntable 11, the gear 14 is rotated, so that the gear 2 15 and the gear 3 17 rotate under the action of the rotating rod 16. Through the gear 3 17, the gear 418 is rotated, thereby causing the ring gear 19 to rotate. Through the action of the ring gear 19, the threaded rod 110 is rotated, so that the fixed square column 111 moves upward to the fixed position under the action of the sliding rod 112. In the inner cavity of the inserting plate 113, the fixed inserting plate 113 is fixed in the inner cavity of the hanging basket one 1 through the function of the fixed square column 111, so that the hanging basket two 12 is fixed on the left side of the hanging basket one 1. When needed When crossing the span, remove the stabilizing arm 2 so that the hanging basket 1 and the channel stabilizing arm 3 remain stable under the balancing effect of the counterweight installation frame, so that the hanging basket 1 moves to the left under the action of the lifting device. On one side of the bridge body 311, through the movement of the lifting device, the hanging basket 1 and the stabilizing arm 2 move across the span, so that the device is balanced and lifted across the span under the action of the lifting device, and the hanging basket 1 is moved across the span through the lifting device. 1 moves to the bottom of 311, through the action of the fixed cylinder 41 and the spring 2 43, the sliding plate 42 has a certain buffer space in the inner cavity of the fixed plate 4, and through the action of the connecting plate 44 and the steel rope 45, the lifting ring 46 is fixed Above the fixed plate 4, the lifting ring 46 is moved upward through the lifting device, so that the bridge inspection hanger moves upward. During the movement, the bridge inspection hanger is moved by the action of the spring 2 43 and the fixed cylinder 41. There can be a certain amount of buffering to reduce large shaking. If the site under the bridge is flat, you can also use the under-bridge transfer equipment to cross the span. Use the electric hoist built in the upper part of the pylon, and use a transport vehicle or excavator shovel to lower the construction pylon. The vehicle is transferred to the front span. At this time, there is no need to add a counterweight section. Through the action of the spring 37 and the guide rod 34, there is a certain buffer between the connecting rod 38 and the support frame 33, so that the electric walking chassis 310 can There can be a certain amount of buffering during use, and at the same time, through the action of the shock absorber 36 fixedly connected to the upper surface of the supporting circular plate 35, shock absorption can be achieved between the supporting circular plate 35 and the supporting frame 33, so that the electric walking chassis 310 can move It will not affect the bridge inspection hanger.

上文一般性的对本发明做了详尽的描述,但在本发明基础上,可以对之做一些修改或改进,这对于技术领域的一般技术人员是显而易见的。因此,在不脱离本发明思想精神的修改或改进,均在本发明的保护范围之内。The present invention has been generally described in detail above, but on the basis of the present invention, some modifications or improvements can be made, which is obvious to those of ordinary skill in the technical field. Therefore, any modifications or improvements that do not depart from the spirit of the present invention are within the scope of the present invention.

Claims (8)

1.一种桥检挂架,包括吊篮一(1),其特征在于:所述吊篮一(1)的一侧固定安装有稳定臂(2),所述吊篮一(1)的另一侧上表面固定连接有通道稳定臂(3),所述通道稳定臂(3)的上表面固定连接有固定板(4);1. A bridge inspection hanger, including a hanging basket (1), characterized in that: a stabilizing arm (2) is fixedly installed on one side of the hanging basket (1), and a stable arm (2) is fixedly installed on one side of the hanging basket (1). A channel stabilizing arm (3) is fixedly connected to the upper surface of the other side, and a fixing plate (4) is fixedly connected to the upper surface of the channel stabilizing arm (3); 所述吊篮一(1)的内腔活动套接有吊篮二(12),所述吊篮二(12)的一侧与吊篮一(1)的一侧搭接,所述吊篮二(12)上固定连接有配重安装架(13),所述吊篮二(12)活动套接有转盘(11),所述转盘(11)的上端位于吊篮二(12)的上方,所述转盘(11)的下表面固定连接有齿轮一(14),所述齿轮一(14)啮合有齿轮二(15),所述齿轮二(15)的一侧固定连接有旋转杆(16),所述旋转杆(16)的外壁与吊篮二(12)的内腔活动套接,所述旋转杆(16)的另一侧固定连接有齿轮三(17),所述齿轮三(17)啮合有齿轮四(18),所述齿轮四(18)的外壁与吊篮二(12)的内腔活动套接,所述齿轮四(18)的另一侧啮合有环形齿轮(19),所述环形齿轮(19)的外壁与吊篮一(1)的内腔活动套接,所述环形齿轮(19)固定套接有螺纹杆(110),所述螺纹杆(110)的外壁与吊篮一(1)的内腔活动套接;The inner cavity of the hanging basket one (1) is movablely connected with the hanging basket two (12). One side of the hanging basket two (12) overlaps with one side of the hanging basket one (1). The hanging basket A counterweight mounting frame (13) is fixedly connected to the second hanging basket (12), and a turntable (11) is movably connected to the second hanging basket (12). The upper end of the turntable (11) is located above the second hanging basket (12). , the lower surface of the turntable (11) is fixedly connected with gear one (14), the gear one (14) is meshed with gear two (15), and one side of the gear two (15) is fixedly connected with a rotating rod ( 16). The outer wall of the rotating rod (16) is movablely connected to the inner cavity of the hanging basket two (12). The other side of the rotating rod (16) is fixedly connected with the gear three (17). The gear three (17) Gear four (18) is engaged. The outer wall of the gear four (18) is movablely connected to the inner cavity of the hanging basket two (12). A ring gear (18) is engaged on the other side of the gear four (18). 19), the outer wall of the ring gear (19) is movablely connected to the inner cavity of the hanging basket one (1), the ring gear (19) is fixedly connected with a threaded rod (110), and the threaded rod (110) The outer wall is movablely connected to the inner cavity of hanging basket one (1); 所述通道稳定臂(3)的一侧固定连接有横梁走道(31),所述横梁走道(31)的下表面固定连接有吊篮升降机(32),所述吊篮升降机(32)的下表面固定连接有支撑架(33),所述支撑架(33)的内腔活动套接有导杆(34),所述导杆(34)的外壁固定套接有支撑圆板(35),所述支撑圆板(35)的外壁与支撑架(33)的内腔活动套接。A crossbeam walkway (31) is fixedly connected to one side of the channel stabilizing arm (3), a gondola lift (32) is fixedly connected to the lower surface of the crossbeam walkway (31), and a gondola lift (32) is fixedly connected to the lower surface of the gondola lift (32). A support frame (33) is fixedly connected to the surface, a guide rod (34) is movably connected to the inner cavity of the support frame (33), and a support circular plate (35) is fixedly connected to the outer wall of the guide rod (34). The outer wall of the supporting circular plate (35) is movably connected with the inner cavity of the supporting frame (33). 2.根据权利要求1所述的一种桥检挂架,其特征在于:所述螺纹杆(110)的外壁螺纹套接有固定方柱(111),所述固定方柱(111)的外壁与吊篮一(1)的内腔活动套接,所述固定方柱(111)滑动连接有滑杆(112),所述滑杆(112)的上下两侧与吊篮一(1)的内腔固定连接。2. A bridge inspection hanger according to claim 1, characterized in that: the outer wall of the threaded rod (110) is threaded with a fixed square column (111), and the outer wall of the fixed square column (111) Movably connected with the inner cavity of hanging basket one (1), the fixed square column (111) is slidingly connected with a sliding rod (112), and the upper and lower sides of the sliding rod (112) are connected with the inner cavity of hanging basket one (1). Inner cavity fixed connection. 3.根据权利要求2所述的一种桥检挂架,其特征在于:所述固定方柱(111)的外壁活动套接有固定插板(113),所述固定插板(113)的外壁与吊篮一(1)的内腔活动套接,所述固定插板(113)的另一侧与吊篮二(12)的一侧固定连接。3. A bridge inspection hanger according to claim 2, characterized in that: a fixed plug-in plate (113) is movably connected to the outer wall of the fixed square column (111), and the fixed plug-in plate (113) is The outer wall is movablely connected to the inner cavity of hanging basket one (1), and the other side of the fixed inserting plate (113) is fixedly connected to one side of hanging basket two (12). 4.根据权利要求1所述的一种桥检挂架,其特征在于:所述支撑圆板(35)的上表面且位于导杆(34)的一侧固定连接有减震器(36),所述减震器(36)的上端与支撑架(33)的内腔固定连接,所述支撑圆板(35)的下表面固定连接有弹簧一(37),所述弹簧一(37)的内腔与导杆(34)的外壁活动套接,所述弹簧一(37)的下表面固定连接有连接杆(38),所述连接杆(38)的上表面与导杆(34)的下表面固定连接,所述连接杆(38)的外壁与支撑架(33)的内腔活动套接,所述连接杆(38)的外壁活动套接有密封圈(39),所述连接杆(38)和稳定臂(2)的底部连接有用于在桥体(311)上行走的行走机构。4. A bridge inspection hanger according to claim 1, characterized in that: a shock absorber (36) is fixedly connected to the upper surface of the supporting circular plate (35) and is located on one side of the guide rod (34). , the upper end of the shock absorber (36) is fixedly connected to the inner cavity of the support frame (33), and the lower surface of the support circular plate (35) is fixedly connected with a spring (37), and the spring (37) The inner cavity of the spring is movablely connected to the outer wall of the guide rod (34). The lower surface of the spring (37) is fixedly connected with a connecting rod (38). The upper surface of the connecting rod (38) is connected to the guide rod (34). The lower surface of the connecting rod (38) is fixedly connected, and the outer wall of the connecting rod (38) is movablely sleeved with the inner cavity of the support frame (33). The outer wall of the connecting rod (38) is movablely sleeved with a sealing ring (39). The connection The rod (38) and the bottom of the stabilizing arm (2) are connected with a walking mechanism for walking on the bridge body (311). 5.根据权利要求4所述的一种桥检挂架,其特征在于:所述密封圈(39)的外壁与支撑架(33)的内腔固定连接,所述行走机构包括电动行走底盘(310),所述连接杆(38)与所述电动行走底盘(310)固定连接,所述电动行走底盘(310)用于在桥体(311)上行走。5. A bridge inspection hanger according to claim 4, characterized in that: the outer wall of the sealing ring (39) is fixedly connected to the inner cavity of the support frame (33), and the traveling mechanism includes an electric traveling chassis ( 310), the connecting rod (38) is fixedly connected to the electric walking chassis (310), and the electric walking chassis (310) is used to walk on the bridge (311). 6.根据权利要求1所述的一种桥检挂架,其特征在于:所述固定板(4)固定连接有固定圆柱(41),所述固定圆柱(41)的外壁活动套接有滑板(42),所述滑板(42)的外壁与固定板(4)的内腔活动套接,所述固定圆柱(41)位于滑板(42)上方的部分活动套接有弹簧二(43)。6. A bridge inspection hanger according to claim 1, characterized in that: the fixed plate (4) is fixedly connected to a fixed cylinder (41), and a sliding plate is movablely connected to the outer wall of the fixed cylinder (41). (42), the outer wall of the sliding plate (42) is movablely connected to the inner cavity of the fixed plate (4), and the part of the fixed cylinder (41) located above the sliding plate (42) is movable connected with two springs (43). 7.根据权利要求6所述的一种桥检挂架,其特征在于:所述弹簧二(43)的下端与滑板(42)固定连接,所述滑板(42)的两侧固定连接有连接板(44)。7. A bridge inspection hanger according to claim 6, characterized in that: the lower end of the second spring (43) is fixedly connected to the sliding plate (42), and there are connections on both sides of the sliding plate (42). Board(44). 8.根据权利要求7所述的一种桥检挂架,其特征在于:所述连接板(44)固定连接有钢绳(45),所述钢绳(45)固定连接有吊环(46),所述吊环(46)的下端与连接板(44)固定连接。8. A bridge inspection hanger according to claim 7, characterized in that: the connecting plate (44) is fixedly connected with a steel rope (45), and the steel rope (45) is fixedly connected with a lifting ring (46) , the lower end of the lifting ring (46) is fixedly connected to the connecting plate (44).
CN202311085792.2A 2023-08-25 2023-08-25 A kind of bridge inspection hanger Pending CN116905348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202311085792.2A CN116905348A (en) 2023-08-25 2023-08-25 A kind of bridge inspection hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202311085792.2A CN116905348A (en) 2023-08-25 2023-08-25 A kind of bridge inspection hanger

Publications (1)

Publication Number Publication Date
CN116905348A true CN116905348A (en) 2023-10-20

Family

ID=88365208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202311085792.2A Pending CN116905348A (en) 2023-08-25 2023-08-25 A kind of bridge inspection hanger

Country Status (1)

Country Link
CN (1) CN116905348A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265417A (en) * 1999-03-12 2000-09-26 Kawaju Koji Kk Moving timbering construction method for bridge floor slab overhang section
CN210507143U (en) * 2019-05-24 2020-05-12 河南世起工程机械有限公司 Bridge bottom construction hanging flower basket
CN212316704U (en) * 2020-12-01 2021-01-08 新乡市英昊建工机械有限公司 Bridge construction hanging basket capable of passing pier
CN113089477A (en) * 2021-04-06 2021-07-09 四川川交路桥有限责任公司 Hanging basket suspension system
CN215829248U (en) * 2021-05-06 2022-02-15 贵州遵义路桥工程有限公司 Hanging basket for bridge construction detection
CN218756982U (en) * 2022-10-24 2023-03-28 谢召旺 Novel bridge maintenance platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265417A (en) * 1999-03-12 2000-09-26 Kawaju Koji Kk Moving timbering construction method for bridge floor slab overhang section
CN210507143U (en) * 2019-05-24 2020-05-12 河南世起工程机械有限公司 Bridge bottom construction hanging flower basket
CN212316704U (en) * 2020-12-01 2021-01-08 新乡市英昊建工机械有限公司 Bridge construction hanging basket capable of passing pier
CN113089477A (en) * 2021-04-06 2021-07-09 四川川交路桥有限责任公司 Hanging basket suspension system
CN215829248U (en) * 2021-05-06 2022-02-15 贵州遵义路桥工程有限公司 Hanging basket for bridge construction detection
CN218756982U (en) * 2022-10-24 2023-03-28 谢召旺 Novel bridge maintenance platform

Similar Documents

Publication Publication Date Title
CN105000482B (en) Tower crane with traveling mechanism
CN102862615B (en) Wheel-crawler-variable chassis
CN104746883B (en) A kind of arcuate space truss lifts construction method of installation with three machines
CN110469106A (en) A kind of high rise elevator well jacking formwork system and its construction method
CN106368127A (en) Whole support landing device and method for box girder support
CN102587277A (en) Mobile equipment special for construction and maintenance of bridge barriers
CN115557388A (en) Integral Deck Crane with Double Cable Plane Steel Box Girder with High Load Capacity
CN116062626A (en) A super high-rise building tower crown part curtain wall hoisting equipment and hoisting method
CN103774857A (en) Hoisting construction method for fixed hydraulic lifting large-sized equipment in frame
CN204980946U (en) Take running gear's tower crane
CN100431942C (en) Technological method for hoisting special large-sized equipment using rotary balance process
CN103601078B (en) Suspension type hanging device
CN206617175U (en) A kind of automatic liquid pressure type inverted arch trestle
CN111155438B (en) Construction equipment applied to steel tower column and construction process thereof
CN210684485U (en) Steel arch frame dismantling device for deck box type arch bridge construction
CN116411517A (en) Concrete beam bracket-free integral lifting construction method
CN116905348A (en) A kind of bridge inspection hanger
CN205170209U (en) A type gate -type hoisting apparatus
CN204455867U (en) The bracing structure of front outriggers of novel large-tonnage Bridge Erector midfoot support device
CN110562848B (en) A high-low position conversion device for box beam transportation
CN106002240B (en) Hydraulic press frame installation method
CN116605801A (en) Bearing device and pipeline installation equipment
CN101660660B (en) Novel installing method of gas cabinet
CN106938826A (en) A kind of crawler type crane of balance and stability
CN206408527U (en) A kind of box beam bracket integrally falls rack device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination