CN116856694A - Long jacking support system suitable for socket type disc buckle and construction method thereof - Google Patents
Long jacking support system suitable for socket type disc buckle and construction method thereof Download PDFInfo
- Publication number
- CN116856694A CN116856694A CN202310887041.6A CN202310887041A CN116856694A CN 116856694 A CN116856694 A CN 116856694A CN 202310887041 A CN202310887041 A CN 202310887041A CN 116856694 A CN116856694 A CN 116856694A
- Authority
- CN
- China
- Prior art keywords
- double
- long
- long jacking
- jacking
- channel steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
技术领域Technical field
本发明属于工程施工技术领域,特别涉及一种适用于承插型盘扣的长顶托支撑体系及其施工方法。The invention belongs to the technical field of engineering construction, and particularly relates to a long jacking support system suitable for socket-type disc buckles and a construction method thereof.
背景技术Background technique
随着建筑行业的不断发展和对施工工艺工法创新的不断追求,施工企业对现场施工技术的改进和施工效率的提升越来越重视。现有的常规作业普遍使用承插型盘扣支撑架,承插型盘扣支撑架主要由主杆,平主杆,横杆,斜杆,定位杆,标准基座,辅助杆,下调基座,U型顶托,销板及连接棒等构件组成,承插型盘扣支撑架的承载力高,适用于超重构件的支模体系,然而在盘扣顶部支模作业时,承插型盘扣支撑架受到梁底模板传递到下方三层龙骨的集中荷载,常规的作业方式支撑高度不易调节,施工过程繁琐,材料用量大,人工消耗多,已不能满足现阶段施工对于进度及成本的需求。With the continuous development of the construction industry and the continuous pursuit of innovation in construction technology and methods, construction companies are paying more and more attention to the improvement of on-site construction technology and the improvement of construction efficiency. Socket-type disc buckle support frames are commonly used in existing conventional operations. The socket-type disc buckle support frames are mainly composed of main rods, flat main rods, horizontal rods, inclined rods, positioning rods, standard bases, auxiliary rods, and downward-adjusting bases. , composed of U-shaped jacking brackets, pin plates, connecting rods and other components. The socket-type disc buckle support frame has a high bearing capacity and is suitable for the formwork system of overweight components. However, when the formwork is operated at the top of the disc buckle, the socket-type disc buckle support frame The buckle support frame is subject to the concentrated load transmitted from the bottom formwork of the beam to the three-layer keel below. The support height is not easy to adjust with the conventional operation method. The construction process is cumbersome, uses a large amount of materials, and consumes a lot of labor. It can no longer meet the progress and cost requirements of the current construction stage. .
发明内容Contents of the invention
为了解决上述问题,本发明提供了一种适用于承插型盘扣的长顶托支撑体系及其施工方法,以解决现有的承插型盘扣在盘扣顶部支模作业时,支撑高度不易调节,施工过程繁琐的问题。In order to solve the above problems, the present invention provides a long jacking support system suitable for socket-type buckles and a construction method thereof, so as to solve the problem of the support height of the existing socket-type buckles when the molding operation is performed on the top of the buckle. It is difficult to adjust and the construction process is cumbersome.
为实现上述目的,本发明提供了一种适用于承插型盘扣的长顶托支撑体系,包括:In order to achieve the above object, the present invention provides a long jacking support system suitable for socket-type disc buckles, including:
两个对称设置的长顶托,长顶托的表面设有螺纹,长顶托的顶部设置有U型托, U型托与长顶托焊接固定,长顶托由上至下依次穿设有第一盘扣,第一螺母,第二盘扣,第二螺母和第三螺母,第一盘扣,第一螺母,第二盘扣,第二螺母和第三螺母分别与长顶托螺纹连接,长顶托的底部设置有立杆,长顶托插设在立杆的内部,两个长顶托之间设置有双槽钢托梁,双槽钢托梁位于第二盘扣的上方,双槽钢托梁的上方放置有多根龙骨,龙骨上方支设有模板。There are two symmetrically arranged long jacking brackets. The surface of the long jacking bracket is provided with threads. The top of the long jacking bracket is provided with a U-shaped bracket. The U-shaped bracket and the long jacking bracket are welded and fixed. The long jacking brackets are threaded from top to bottom. The first disk buckle, the first nut, the second disk buckle, the second nut and the third nut, the first disk buckle, the first nut, the second disk buckle, the second nut and the third nut are respectively connected with the long jack thread. , a vertical pole is provided at the bottom of the long jacking bracket, and the long jacking bracket is inserted inside the vertical pole. There are double channel steel joists between the two long jacking brackets. The double channel steel joists are located above the second plate buckle. Multiple keels are placed above the double channel steel joists, and templates are supported above the keels.
根据本发明的一个具体实施例,龙骨由木方和方钢沿梁跨度混铺组成。According to a specific embodiment of the present invention, the keel is composed of wooden squares and square steels mixed along the beam span.
根据本发明的一个具体实施例,木方的尺寸为50*100mm。According to a specific embodiment of the present invention, the size of the wooden cube is 50*100mm.
根据本发明的一个具体实施例,方钢的尺寸为50*100*3mm。According to a specific embodiment of the present invention, the size of the square steel is 50*100*3mm.
根据本发明的一个具体实施例,双槽钢托梁采用双拼10#槽钢。According to a specific embodiment of the present invention, the double channel steel joist adopts double 10# channel steel.
根据本发明的一个具体实施例,双槽钢托梁包括两个背对设置的槽钢,槽钢上开设有多个连接孔,连接孔内设置有圆管,两个槽钢通过圆管和螺栓固定连接。According to a specific embodiment of the present invention, the double channel steel joist includes two channel steels arranged back to back. A plurality of connecting holes are provided on the channel steels, and round tubes are arranged in the connecting holes. The two channel steels pass through the round tubes and Bolted connections.
一种适用于承插型盘扣的长顶托支撑体系的施工方法,包括:A construction method for a long jack support system suitable for socket-type disc buckles, including:
步骤一、通过测量放线确定立杆安装位置,并根据模板和龙骨的高度确定第二盘扣高度;Step 1. Determine the installation position of the vertical pole by measuring and setting out the lines, and determine the height of the second plate buckle according to the height of the template and keel;
步骤二、采用直径60mm的盘扣立杆和48mm的盘扣横杆搭设架体;Step 2: Use 60mm diameter plate buckle vertical poles and 48mm diameter plate buckle horizontal bars to erect the frame;
步骤三、根据层高、板厚和板底龙骨高度计算出长顶托顶部标高,根据立杆顶部标高及长顶托长度确定长顶托插入立杆长度,再将长顶托插入立杆固定并拉结横杆;Step 3: Calculate the top elevation of the long jacking bracket based on the floor height, plate thickness and plate bottom keel height. Determine the length of the long jacking bracket inserted into the pole based on the top elevation of the pole and the length of the long jacking bracket. Then insert the long jacking bracket into the pole to fix it. and tie the crossbar;
步骤四、通过对层高、梁高、立杆底部标高、立杆顶部标高、双槽钢托梁高及龙骨高度的核查,确认第二盘扣高度并固定第二盘扣;Step 4: Confirm the height of the second plate buckle and fix the second plate buckle by checking the floor height, beam height, pole bottom elevation, pole top elevation, double channel steel joist height and keel height;
步骤五、根据不同立杆间距选择不同长度的槽钢制作双槽钢托梁,并将双槽钢托梁放置于第二盘扣上,双槽钢托梁安装完毕后,检验双槽钢托梁的连接是否稳固,若不稳固则加固双槽钢托梁;Step 5: Select channel steel of different lengths according to different pole spacing to make double-channel steel joists, and place the double-channel steel joists on the second plate buckle. After the double-channel steel joists are installed, inspect the double-channel steel joists. Check whether the connection of the beams is stable. If not, reinforce the double channel steel joists;
步骤六、采用50*100mm木方与50*100*3mm方钢作为龙骨材料,梁底梁侧采用木方作为固定支撑,中间铺设方钢,将木方与方钢搭设在双槽钢托梁上并垂直于双槽钢托梁,沿梁跨度方向排布。Step 6: Use 50*100mm wooden squares and 50*100*3mm square steel as keel materials. Use wooden squares on the bottom beam side of the beam as a fixed support. Lay square steel in the middle. Set the wooden squares and square steel on the double channel steel joists. Above and perpendicular to the double channel steel joists, arranged along the span direction of the beams.
与现有技术相比,本发明提供的一种适用于承插型盘扣的长顶托支撑体系及其施工方法,通过将带螺纹长顶托替换常规盘扣支架,在进行支架顶部施工时,固定长顶托位置并调整盘扣位置后直接搭设双槽钢托梁及模板外楞,省去龙骨施工时间,提高施工效率,节约施工时间。通过增加盘扣和双槽钢托梁的组合使用,省去了可调托座及一层龙骨,减少了顶部支撑体系的材料用量,降低成本投入。本发明解决了盘扣顶部支模作业操作复杂的难题,优化了传统支模方式,节约了龙骨材料,提升了施工效率,增强了模板支架体系顶部支撑稳定性,在保证质量和安全的前提下确保了工期,取得了良好的效果。Compared with the existing technology, the present invention provides a long jacking support system suitable for socket-type disc buckles and a construction method thereof. By replacing the conventional disc buckle bracket with a threaded long jacking bracket, when constructing the top of the bracket, , fix the long jacking position and adjust the plate buckle position to directly erect the double channel steel joist and formwork outer corrugation, which saves keel construction time, improves construction efficiency, and saves construction time. By increasing the combined use of plate buckles and double-channel steel joists, the adjustable brackets and a layer of keels are omitted, reducing the amount of material used in the top support system and reducing cost investment. The invention solves the problem of complex formwork operation at the top of the plate buckle, optimizes the traditional formwork method, saves keel materials, improves construction efficiency, and enhances the stability of the top support of the formwork bracket system, while ensuring quality and safety. The construction period was ensured and good results were achieved.
附图说明Description of the drawings
图1是根据本发明一实施例提供的适用于承插型盘扣的长顶托支撑体系结构示意图。Figure 1 is a schematic structural diagram of a long jack support system suitable for socket-type buckles according to an embodiment of the present invention.
图2是根据本发明一实施例提供的适用于承插型盘扣的长顶托支撑体系施工方法流程图。Figure 2 is a flow chart of a construction method of a long jack support system suitable for socket-type disc buckles according to an embodiment of the present invention.
附图标记:Reference signs:
1-U型托;2-第一盘扣;3-第一螺母;4-长顶托;5-第二盘扣;6-第二螺母;7-第三螺母;8-立杆;9-龙骨;10-双槽钢托梁。1-U-shaped bracket; 2-first plate buckle; 3-first nut; 4-long top bracket; 5-second plate buckle; 6-second nut; 7-third nut; 8-vertical pole; 9 -Joists; 10-Double channel steel joists.
具体实施方式Detailed ways
为了使本领域技术人员更加清楚地理解本发明的概念和思想,以下结合具体实施例详细描述本发明。应理解,本文给出的实施例都只是本发明可能具有的所有实施例的一部分。本领域技术人员在阅读本申请的说明书以后,有能力对下述实施例的部分或整体作出改进、改造、或替换,这些改进、改造、或替换也都包含在本发明要求保护的范围内。In order to enable those skilled in the art to understand the concepts and ideas of the present invention more clearly, the present invention is described in detail below with reference to specific embodiments. It should be understood that the embodiments set forth herein are only part of all possible embodiments of the present invention. After reading the description of this application, those skilled in the art are capable of making improvements, transformations, or replacements to part or all of the following embodiments, and these improvements, transformations, or substitutions are also included in the scope of protection claimed by the present invention.
在本文中,术语“第一”、“第二”和其它类似词语并不意在暗示任何顺序、数量和重要性,而是仅仅用于对不同的元件进行区分。在本文中,术语“一”、“一个”和其它类似词语并不意在表示只存在一个事物,而是表示有关描述仅仅针对事物中的一个,事物可能具有一个或多个。在本文中,术语“包含”、“包括”和其它类似词语意在表示逻辑上的相互关系,而不能视作表示空间结构上的关系。例如,“A包括B”意在表示在逻辑上B属于A,而不表示在空间上B位于A的内部。另外,术语“包含”、“包括”和其它类似词语的含义应视为开放性的,而非封闭性的。例如,“A包括B”意在表示B属于A,但是B不一定构成A的全部,A还可能包括C、D、E等其它元素。In this document, the terms "first", "second" and other similar words are not intended to imply any order, quantity or importance, but are merely used to distinguish different elements. In this article, the terms "a", "an" and other similar words are not intended to mean that there is only one thing, but that the description is directed to only one of the things, and there may be one or more things. In this article, the terms "comprising", "includes" and other similar words are intended to indicate logical interrelationships and cannot be regarded as indicating spatial structural relationships. For example, "A includes B" is intended to mean that B belongs to A logically, but does not mean that B is located inside A spatially. In addition, the terms "includes," "includes," and other similar words are to be considered open-ended rather than closed-ended. For example, "A includes B" is intended to mean that B belongs to A, but B does not necessarily constitute all of A. A may also include other elements such as C, D, and E.
在本文中,术语“实施例”、“本实施例”、“一实施例”、“一个实施例”并不表示有关描述仅仅适用于一个特定的实施例,而是表示这些描述还可能适用于另外一个或多个实施例中。本领域技术人员应理解,在本文中,任何针对某一个实施例所做的描述都可以与另外一个或多个实施例中的有关描述进行替代、组合、或者以其它方式结合,替代、组合、或者以其它方式结合所产生的新实施例是本领域技术人员能够容易想到的,属于本发明的保护范围。In this article, the terms "embodiment", "this embodiment", "an embodiment" and "an embodiment" do not mean that the relevant description is only applicable to a specific embodiment, but mean that the description may also be applicable to in one or more embodiments. Those skilled in the art should understand that any description of a certain embodiment in this article can be replaced, combined, or otherwise combined with the relevant description of one or more embodiments. Or the new embodiments generated by combining them in other ways can be easily thought of by those skilled in the art, and belong to the protection scope of the present invention.
实施例1Example 1
本发明的实施方式的附加方面和优点将在下面的描述中部分给出,部分将从下面的描述中变得明显,或通过本发明的实施方式的实践了解到。结合图1,本发明实施例提供了一种适用于承插型盘扣的长顶托支撑体系,包括:Additional aspects and advantages of embodiments of the invention will be set forth in part in the description which follows, and in part will be obvious from the description, or may be learned by practice of embodiments of the invention. With reference to Figure 1, the embodiment of the present invention provides a long jack support system suitable for socket-type disc buckles, including:
两个对称设置的长顶托4,长顶托4的表面设有螺纹,长顶托4的顶部设置有U型托1, U型托1与长顶托4焊接固定,长顶托4由上至下依次穿设有第一盘扣2,第一螺母3,第二盘扣5,第二螺母6和第三螺母7,第一盘扣2,第一螺母3,第二盘扣5,第二螺母6和第三螺母7分别与长顶托4螺纹连接,长顶托4的底部设置有立杆8,长顶托4插设在立杆8的内部,两个长顶托4之间设置有双槽钢托梁10,双槽钢托梁10位于第二盘扣2的上方,双槽钢托梁10的上方放置有多根龙骨9,龙骨9上方支设有模板。其中第三螺母7用于调节长顶托4的高度,以便将带螺纹的长顶托4能够稳固地插入下部立杆8中,第一螺母3用于调节第一盘扣2的高度,第二螺母6用于调节第二盘扣5的高度,通过调节第二盘扣5的高度进而控制双槽钢托梁10的高度 ,以便适应模板的高度,将双槽钢托梁10置于第二盘扣5上稳固连接能够托住上方龙骨9 。通过将带螺纹长顶托4替换常规盘扣支架,在进行支架顶部施工时,固定长顶托4位置并调整第二盘扣5的位置后直接搭设双槽钢托梁10及模板外楞,省去龙骨施工时间,提高了施工效率,节约施工时间。通过增加盘扣和双槽钢托梁10的组合使用,省去了常规施工的可调托座及一层龙骨,减少了顶部支撑体系的材料用量,降低成本投入。There are two symmetrically arranged long jacking brackets 4. The surface of the long jacking bracket 4 is provided with threads. The top of the long jacking bracket 4 is provided with a U-shaped bracket 1. The U-shaped bracket 1 and the long jacking bracket 4 are welded and fixed. The long jacking bracket 4 is made of From top to bottom, there are first disk buckle 2, first nut 3, second disk buckle 5, second nut 6 and third nut 7, first disk buckle 2, first nut 3, second disk buckle 5. , the second nut 6 and the third nut 7 are threadedly connected to the long jack 4 respectively, the bottom of the long jack 4 is provided with a vertical pole 8, the long jack 4 is inserted inside the vertical pole 8, and the two long jacks 4 There are double channel steel joists 10 between them. The double channel steel joists 10 are located above the second plate buckle 2. A plurality of keels 9 are placed above the double channel steel joists 10. A formwork is supported above the keels 9. The third nut 7 is used to adjust the height of the long jack 4 so that the threaded long jack 4 can be stably inserted into the lower vertical pole 8. The first nut 3 is used to adjust the height of the first buckle 2. The two nuts 6 are used to adjust the height of the second plate buckle 5. By adjusting the height of the second plate buckle 5, the height of the double channel steel joist 10 is controlled to adapt to the height of the formwork, and the double channel steel joist 10 is placed on the third The two plate buckles 5 are firmly connected to support the upper keel 9 . By replacing the conventional plate buckle bracket with the threaded long jack 4, when constructing the top of the bracket, fix the position of the long jack 4 and adjust the position of the second plate buckle 5, then directly erect the double channel steel joist 10 and the outer corrugation of the formwork. It saves keel construction time, improves construction efficiency and saves construction time. By adding the combined use of plate buckles and double-channel steel joists 10, the adjustable brackets and a layer of keels in conventional construction are omitted, reducing the amount of material used in the top support system and reducing cost investment.
具体的,龙骨9由木方和方钢沿梁跨度混铺组成。优选的,木方的尺寸为50*100mm,方钢的尺寸为50*100*3mm。Specifically, the keel 9 is composed of wooden squares and square steel paved along the span of the beam. Preferably, the size of the wooden square is 50*100mm, and the size of the square steel is 50*100*3mm.
具体的,双槽钢托梁10采用双拼10#槽钢。双槽钢托梁10包括两个背对设置的槽钢,槽钢上开设有多个连接孔,连接孔内设置有圆管,两个槽钢通过圆管和螺栓固定连接。Specifically, the double channel steel joist 10 adopts double 10# channel steel. The double channel steel joist 10 includes two channel steels arranged back to back. A plurality of connecting holes are provided on the channel steels, and round pipes are arranged in the connecting holes. The two channel steels are fixedly connected through the round pipes and bolts.
实施例2Example 2
结合图2,本发明实施例提供一种适用于承插型盘扣的长顶托支撑体系的施工方法,具体包括:With reference to Figure 2, the embodiment of the present invention provides a construction method for a long jacking support system suitable for socket-type disc buckles, which specifically includes:
S1、通过测量放线确定立杆8安装位置,并根据模板和龙骨9的高度确定第二盘扣5的高度,第二盘扣5的高度及龙骨9的高度应当保证与模板高度相契合。S1. Determine the installation position of the vertical pole 8 by measuring and setting out the line, and determine the height of the second plate buckle 5 according to the height of the template and the keel 9. The height of the second plate buckle 5 and the height of the keel 9 should ensure that they are consistent with the height of the template.
S2、采用直径60mm的盘扣立杆和48mm的盘扣横杆搭设架体,立杆8的高度需要综合考虑层高及长顶托4的高度,根据层高决定立杆8的组合方式。S2. Use 60mm diameter disc-buckle vertical poles and 48mm 48mm disc-buckle horizontal bars to erect the frame. The height of the vertical poles 8 needs to comprehensively consider the floor height and the height of the long jack 4. The combination of the vertical poles 8 is determined based on the floor height.
S3、根据层高、板厚和板底龙骨高度计算出长顶托4顶部标高,根据立杆8顶部标高及长顶托4长度确定长顶托4插入立杆8长度,确定材料性能后再将长顶托4插入立杆8固定,检查长顶托4的稳定性并拉结横杆。S3. Calculate the top elevation of the long jacking bracket 4 based on the floor height, plate thickness and plate bottom keel height. Determine the length of the long jacking bracket 4 inserted into the vertical pole 8 based on the top elevation of the vertical pole 8 and the length of the long jacking bracket 4. Determine the material properties before proceeding. Insert the long jack 4 into the vertical pole 8 and fix it, check the stability of the long jack 4 and tie the crossbar.
S4、通过对层高、梁高、立杆8底部标高、立杆8顶部标高、双槽钢托梁10高及龙骨9高度的核查,确认第二盘扣5高度并固定第二盘扣5。S4. Confirm the height of the second plate buckle 5 and fix the second plate buckle 5 by checking the floor height, beam height, bottom elevation of pole 8, top elevation of pole 8, double channel steel joist 10 height and keel 9 height. .
S5、根据不同立杆8间距选择不同长度的槽钢制作双槽钢托梁10,应注意槽钢不宜过长导致其他施工空间受限制,并将双槽钢托梁10放置于第二盘扣5上,双槽钢托梁10安装完毕后,检验双槽钢托梁10的连接是否稳固,若不稳固则加固双槽钢托梁10。S5. Select channel steel of different lengths according to the spacing of different vertical poles 8 to make double channel steel joists 10. It should be noted that the channel steel should not be too long to limit other construction space, and the double channel steel joists 10 should be placed on the second plate buckle. 5. After the double-channel steel joist 10 is installed, check whether the connection of the double-channel steel joist 10 is stable. If it is not stable, reinforce the double-channel steel joist 10.
S6、采用50*100mm木方与50*100*3mm方钢作为龙骨材料,梁底梁侧采用木方作为固定支撑,中间铺设方钢,将木方与方钢搭设在双槽钢托梁10上并垂直于双槽钢托梁10,沿梁跨度方向排布。S6. Use 50*100mm wooden squares and 50*100*3mm square steel as keel materials. Use wooden squares on the bottom beam side of the beam as a fixed support, lay square steel in the middle, and set the wooden squares and square steel on the double channel steel joists 10 and perpendicular to the double channel steel joists 10, arranged along the span direction of the beams.
综上所述,本发明提供的一种适用于承插型盘扣的长顶托支撑体系及其施工方法,通过将带螺纹长顶托替换常规盘扣支架,在进行支架顶部施工时,固定长顶托位置并调整盘扣位置后直接搭设双槽钢托梁及模板外楞,省去龙骨施工时间,提高施工效率,节约施工时间。通过增加盘扣和双槽钢托梁的组合使用,省去了可调托座及一层龙骨,减少了顶部支撑体系的材料用量,降低成本投入。本发明解决了盘扣顶部支模作业操作复杂的难题,优化了传统支模方式,节约了龙骨材料,提升了施工效率,增强了模板支架体系顶部支撑稳定性,在保证质量和安全的前提下确保了工期,取得了良好的效果。In summary, the present invention provides a long jacking support system suitable for socket-type disk buckles and a construction method thereof. By replacing the conventional disk buckle bracket with a threaded long jacking bracket, the bracket is fixed during the construction of the top of the bracket. After elongating the jacking position and adjusting the plate buckle position, the double channel steel joist and formwork outer corrugation are directly erected, which saves keel construction time, improves construction efficiency, and saves construction time. By increasing the combined use of plate buckles and double-channel steel joists, the adjustable brackets and a layer of keels are omitted, reducing the amount of material used in the top support system and reducing cost investment. The invention solves the problem of complex formwork operation at the top of the plate buckle, optimizes the traditional formwork method, saves keel materials, improves construction efficiency, and enhances the stability of the top support of the formwork bracket system, while ensuring quality and safety. The construction period was ensured and good results were achieved.
以上结合具体实施方式(包括实施例和实例)详细描述了本发明的概念、原理和思想。本领域技术人员应理解,本发明的实施方式不止上文给出的这几种形式,本领域技术人员在阅读本申请文件以后,可以对上述实施方式中的步骤、方法、系统、部件做出任何可能的改进、替换和等同形式,这些改进、替换和等同形式应视为落入在本发明的范围内,本发明的保护范围仅以权利要求书为准。The concepts, principles and ideas of the present invention are described in detail above in conjunction with specific implementations (including embodiments and examples). Those skilled in the art should understand that the embodiments of the present invention are more than the forms given above. After reading this application document, those skilled in the art can make decisions about the steps, methods, systems, and components in the above embodiments. Any possible improvements, substitutions and equivalent forms shall be deemed to fall within the scope of the present invention, and the protection scope of the present invention shall be subject only to the claims.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310887041.6A CN116856694A (en) | 2023-07-19 | 2023-07-19 | Long jacking support system suitable for socket type disc buckle and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310887041.6A CN116856694A (en) | 2023-07-19 | 2023-07-19 | Long jacking support system suitable for socket type disc buckle and construction method thereof |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN116856694A true CN116856694A (en) | 2023-10-10 |
Family
ID=88235764
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310887041.6A Pending CN116856694A (en) | 2023-07-19 | 2023-07-19 | Long jacking support system suitable for socket type disc buckle and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116856694A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118793261A (en) * | 2024-09-12 | 2024-10-18 | 山西建投建筑产业有限公司 | A common formwork support system for cross beam nodes and beam-slabs |
| CN119777592A (en) * | 2024-11-30 | 2025-04-08 | 中冶建工集团有限公司 | Construction method of post-cast strip with independent support system |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107165392A (en) * | 2017-05-25 | 2017-09-15 | 上海建工二建集团有限公司 | Socket joint type disk button jacking screw structure and its application method |
| CN214402717U (en) * | 2020-12-11 | 2021-10-15 | 浙江欣捷建设有限公司 | Support for plate fastener frame |
| CN113944309A (en) * | 2021-11-18 | 2022-01-18 | 天津鼎维固模架工程股份有限公司 | Cold-formed steel support beam framework and construction method thereof |
| CN218715072U (en) * | 2022-10-27 | 2023-03-24 | 河南省建设集团有限公司 | Adjusting component and plate buckle frame beam bottom formwork supporting device |
-
2023
- 2023-07-19 CN CN202310887041.6A patent/CN116856694A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107165392A (en) * | 2017-05-25 | 2017-09-15 | 上海建工二建集团有限公司 | Socket joint type disk button jacking screw structure and its application method |
| CN214402717U (en) * | 2020-12-11 | 2021-10-15 | 浙江欣捷建设有限公司 | Support for plate fastener frame |
| CN113944309A (en) * | 2021-11-18 | 2022-01-18 | 天津鼎维固模架工程股份有限公司 | Cold-formed steel support beam framework and construction method thereof |
| CN218715072U (en) * | 2022-10-27 | 2023-03-24 | 河南省建设集团有限公司 | Adjusting component and plate buckle frame beam bottom formwork supporting device |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118793261A (en) * | 2024-09-12 | 2024-10-18 | 山西建投建筑产业有限公司 | A common formwork support system for cross beam nodes and beam-slabs |
| CN119777592A (en) * | 2024-11-30 | 2025-04-08 | 中冶建工集团有限公司 | Construction method of post-cast strip with independent support system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN116856694A (en) | Long jacking support system suitable for socket type disc buckle and construction method thereof | |
| CN111441244A (en) | A steel-concrete composite beam concrete bridge deck construction support and construction method thereof | |
| CN112012389A (en) | Support system for conical concrete roof of squat silo and installation method | |
| CN221001112U (en) | Auxiliary tool for raft foundation reinforcement construction | |
| CN211922298U (en) | Recyclable tunnel anchor cable strand embedded pipe fine adjustment device | |
| CN212270703U (en) | Bridge deck bearing combined support | |
| CN115045192A (en) | Steel beam splicing adjustable pedestal system, device and construction method | |
| CN202627214U (en) | Beam-column connecting structure for steel reinforced concrete composite structure of high-rise building | |
| CN114263343A (en) | Formwork erecting method for combined building construction | |
| CN206554500U (en) | Steel structure concrete, which is poured, uses adjustable transverse support bar | |
| CN118390801A (en) | A cantilevered inclined column reinforcement structure and construction method | |
| CN217378583U (en) | Crossbeam support structure with main tower column stull function | |
| CN216429078U (en) | Jacking and discharging device for temporary steel support supporting system | |
| CN106351429A (en) | Heavy support system and construction method thereof | |
| CN117302746A (en) | Bearing frame for stacking reinforcing steel bars convenient to assemble | |
| CN115354788A (en) | Template-free supporting and reinforcing structure for steel frame composite floor slab and construction method thereof | |
| CN115680281A (en) | Construction process of ultralimit formwork | |
| CN116025170A (en) | A device for tying and positioning device and construction method for above-water crossbeam reinforcement in wharf engineering | |
| CN116397548A (en) | Continuous steel bridge No. 0 block construction bracket system and construction method thereof | |
| CN212250056U (en) | Support arrangement for tunnel mould side form | |
| CN220394301U (en) | A detachable and adjustable temporary support system for steel box beams | |
| CN222909361U (en) | YJ disassembly-free bottom die steel bar truss floor support plate adjustable support based on full framing | |
| CN117071913B (en) | Steel structure cantilevered steel truss floor deck hanging formwork construction device | |
| CN221941921U (en) | Adjustable floor carrier plate temporary supporting device capable of being used in turnover mode | |
| CN219240888U (en) | Double-arm-extending shaping assembly type supporting structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |