CN116791872A - Curtain wall construction hanging basket mounting structure and construction method - Google Patents

Curtain wall construction hanging basket mounting structure and construction method Download PDF

Info

Publication number
CN116791872A
CN116791872A CN202310951727.7A CN202310951727A CN116791872A CN 116791872 A CN116791872 A CN 116791872A CN 202310951727 A CN202310951727 A CN 202310951727A CN 116791872 A CN116791872 A CN 116791872A
Authority
CN
China
Prior art keywords
plate
hanging
steel wire
pulley
locating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310951727.7A
Other languages
Chinese (zh)
Inventor
张威
杨磊
耿林
郑代荣
叶舟
陈进财
秦新歌
张琪
刘世奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202310951727.7A priority Critical patent/CN116791872A/en
Publication of CN116791872A publication Critical patent/CN116791872A/en
Pending legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to the technical field of hanging basket installation, in particular to a hanging basket installation structure for curtain wall construction and a construction method, comprising the following steps: the surface of the supporting seat is provided with a hanging plate and a second hanging plate, one end of the second hanging plate is provided with a steel wire rope, the bottom of the hanging plate is provided with an inclined pulling plate, and the side surface of the supporting seat is provided with a positioning frame; the beneficial effects are as follows: when the hanging basket device is used, the supporting seat is fixed on the surface of the wall body, then the hanging plate is supported by utilizing the cooperation of the inclined pull plate and the locating frame, the hanging plate is stably supported by utilizing the cooperation of the traction ropes and the vertical plate, then the steel wire ropes arranged at one end of the second hanging plate are connected to the winding engine, the winding engine is placed on the hanging platform, the whole hanging basket device can be installed on the wall body, the supporting effect of the inclined pull plate, which is matched with the locating frame, on the bottom of the hanging plate can be avoided, occupied space can be reduced by using counterweight equipment, and the stability of the whole device can be further improved by utilizing the arrangement of some traction ropes.

Description

Curtain wall construction hanging basket mounting structure and construction method
Technical Field
The invention relates to the technical field of hanging basket installation, in particular to a hanging basket installation structure for curtain wall construction and a construction method.
Background
The hanging machine frame is arranged on a building or a structure, the elevator drives the hanging platform to move up and down along the vertical face through a steel wire rope, and the hanging basket for high-altitude operation is a relatively special construction engineering machine which uses a special steel wire rope to move up and down along the vertical face through the hanging mechanism under the action of the climbing elevator.
In the prior art, because the general factory building span is big, the construction height is high, so can utilize hanging flower basket device for convenient construction when building curtain, the staff just can stand and construct comparatively conveniently on hanging the platform like this.
However, the general conventional weight-balancing type hanging basket construction method consumes a large amount of construction time, has long construction period, is difficult to meet the actual requirements of quick construction of a factory building, and has the advantages that the weight added by adding the weight to stabilize the hanging basket occupies a large space and affects the construction conflict of a roof and an outdoor pipe network.
Disclosure of Invention
The invention aims to provide a curtain wall construction hanging basket installation structure and a construction method, which are used for solving the problems in the background technology.
In order to achieve the above purpose, the present invention provides the following technical solutions: the hanging basket installation structure for curtain wall construction comprises a wall body, wherein a supporting seat is arranged on the surface of the wall body, a hanging plate and a second hanging plate are arranged in the supporting seat, a vertical plate is arranged on the surface of the supporting seat, a rotating rod is inserted into the vertical plate, a pulley is sleeved on the surface of the rotating rod, a positioning block is arranged at one end of the second hanging plate, a steel wire rope is arranged on the side surface of the positioning block, one end of the steel wire rope is connected in a winch, a hanging platform is arranged at the bottom of the winch, and a limit stop is sleeved on the surface of the steel wire rope;
the locating rack, the locating rack side has offered the standing groove, the locating rack side has support bars, the surface cover of support bar has oblique pulling plates, insert the cardboard in the standing groove, one end of the cardboard has baffles;
the surface of the suspension plate is provided with a second vertical plate and a fixed plate, the inner side surface of the second vertical plate is provided with a second pulley, the surface of the second pulley is sleeved with a traction rope, one end of the traction rope is provided with a hanging ring, the side surface of the fixed plate is provided with a second bearing, the surface of the second bearing is provided with a nut, a movable screw is connected in the nut in a threaded manner, and one end of the movable screw is provided with a hook.
Preferably, the winch is fixedly connected to the hanging platform, one end of the steel wire rope is fixedly connected to the side face of the positioning block, a second steel wire rope is arranged on the other side face of the positioning block, and one end of the second steel wire rope is connected to the side face of the vertical plate.
Preferably, the support base is fixed on the surface of the wall body by using a fixing bolt, and the hanging plate and the second hanging plate are also fixed on the surface of the support base by using a fixing bolt.
Preferably, one end of the traction rope is fixedly connected to the side face of the positioning block, the traction rope winds around the pulley and the second pulley, and the hanging ring arranged at the other end of the traction rope can be hung and buckled on the hanging hook.
Preferably, the pulley side is provided with a groove, a bearing is arranged in the groove, the bearing side is provided with a rotating plate, the rotating plate is of an annular plate-shaped structure, the rotating plate is provided with two groups, and the two groups of rotating plates are symmetrically distributed about the pulley.
Preferably, the locating rack utilizes bolt fixed connection to be in the side of wall body, and the locating rack surface is provided with the locating lever, and the locating lever is provided with two sets of, and two sets of locating levers are about locating rack upper and lower symmetric distribution.
Preferably, the spacing groove has been seted up to bracing piece one end, and the baffle side is provided with the gag lever post, and the gag lever post can insert into the spacing inslot, and the cardboard is "L" template column structure, and the cardboard surface is provided with the lifter, and the lifter surface cover is equipped with the second locating plate, and the hole has been seted up on the second locating plate surface, and the hole cover that the usable of second locating plate was seted up is established on the locating lever, and the second locating plate can slide on the lifter.
Preferably, the lifting rod is sleeved with a spring, one end of the spring is fixedly connected to the surface of the clamping plate, the other end of the spring is fixedly connected to the surface of the second positioning plate, and the other end of the inclined pulling plate is fixed in the hanging plate by bolts.
Preferably, the bottom of the fixing plate is fixedly connected to the surface of the hanging plate, a hole is formed in the side face of the fixing plate, the movable screw rod can penetrate through the fixing plate, a third fixing plate is arranged on the surface of the hook, a screw rod penetrates through the fixing plate, and one end of the screw rod is in threaded connection with a second nut.
A construction method of a hanging basket installation structure for curtain wall construction comprises the following steps:
s1: firstly, fixing a supporting seat on the surface of a wall body, and then fixing a hanging plate and a second hanging plate in the supporting seat;
s2: secondly, connecting the hoisting machine with a steel wire rope, and carrying out traction reinforcement on the suspension plate and the second suspension plate by utilizing a traction rope matched with the pulley and the second pulley;
s3: finally, the bottom of the hanging plate is fixedly supported by the cooperation of the inclined pulling plate and the locating frame, and then the hanging platform can be used by the winch in cooperation with the steel wire rope.
Compared with the prior art, the invention has the beneficial effects that:
according to the hanging basket installation structure and the hanging basket installation method for curtain wall construction, when the hanging basket installation structure is used, the supporting seat is firstly fixed on the surface of a wall body, then the hanging plate is supported by utilizing the matching of the inclined pull plate and the locating frame, the hanging plate is stably supported by utilizing the matching of the traction ropes and the vertical plates, then the steel wire rope arranged at one end of the second hanging plate is connected to the winch, the winch is placed on the hanging platform, the whole hanging basket device can be installed on the wall body, the supporting effect of the inclined pull plate matched with the locating frame on the bottom of the hanging plate can avoid the reduction of occupied space by using counterweight equipment, the stability of the whole hanging basket installation method is further improved by utilizing the arrangement of some traction ropes, so that the conventional hanging basket installation method is avoided, a large amount of construction time is consumed, the construction period is long, the actual requirement of quick construction of a factory building is difficult to meet, the increased counterweight stably causes the hanging basket to occupy a large space, and the problem of roof and outdoor pipe network construction conflict is solved.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is an enlarged schematic view of the structure of FIG. 1A;
FIG. 3 is a plan view of a factory building basket construction;
FIG. 4 is a side view of the structure of the present invention;
FIG. 5 is a partial cross-sectional view of the structure of the present invention;
FIG. 6 is an enlarged schematic view of the structure of FIG. 5B;
FIG. 7 is a top plan view of the structure of the present invention;
fig. 8 is an enlarged schematic view of fig. 7 at C.
In the figure: 1. a wall body; 2. a support base; 3. a hanging plate; 4. a vertical plate; 5. a rotating lever; 6. a pulley; 7. a second suspension plate; 8. a positioning block; 9. a wire rope; 10. a hoist; 11. suspending the platform; 12. a positioning frame; 13. a placement groove; 14. a support rod; 15. a diagonal draw plate; 16. a clamping plate; 17. a baffle; 18. a second vertical plate; 19. a second pulley; 20. a traction rope; 21. hanging rings; 22. a fixing plate; 23. a second bearing; 24. a nut; 25. moving the screw; 26. a hook; 27. a second wire rope; 28. a groove; 29. a bearing; 30. a rotating plate; 31. a positioning rod; 32. a limit groove; 33. a limit rod; 34. a lifting rod; 35. a second positioning plate; 36. a spring; 37. a third fixing plate; 38. a screw; 39. a second nut; 40. and a limit stop.
Detailed Description
In order to make the objects, technical solutions, and advantages of the present invention more apparent, the embodiments of the present invention will be further described in detail with reference to the accompanying drawings. It should be understood that the specific embodiments described herein are some, but not all, embodiments of the present invention, are intended to be illustrative only and not limiting of the embodiments of the present invention, and that all other embodiments obtained by persons of ordinary skill in the art without making any inventive effort are within the scope of the present invention.
In the description of the present invention, it should be noted that the terms "center," "middle," "upper," "lower," "left," "right," "inner," "outer," "top," "bottom," "side," "vertical," "horizontal," and the like indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, merely to facilitate description of the present invention and simplify the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present invention. Furthermore, the terms "a," an, "" the first, "" the second, "" the third, "" the fourth, "" the fifth, "and the sixth" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present invention will be understood in specific cases by those of ordinary skill in the art.
For purposes of brevity and description, the principles of the embodiments are described primarily by reference to examples. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the embodiments. It will be apparent, however, to one of ordinary skill in the art that the embodiments may be practiced without limitation to these specific details. In some instances, well-known methods and structures have not been described in detail so as not to unnecessarily obscure the embodiments. In addition, all embodiments may be used in combination with each other.
Example 1
Referring to fig. 1 to 8, the present invention provides a technical solution: the hanging basket installation structure for curtain wall construction comprises a wall body 1, wherein a supporting seat 2 is arranged on the surface of the wall body 1, a hanging plate 3 and a second hanging plate 7 are arranged in the supporting seat 2, a vertical plate 4 is arranged on the surface of the supporting seat 2, a rotating rod 5 is inserted into the vertical plate 4, a pulley 6 is sleeved on the surface of the rotating rod 5, a positioning block 8 is arranged at one end of the second hanging plate 7, a steel wire rope 9 is arranged on the side surface of the positioning block 8, one end of the steel wire rope 9 is connected into a winch 10, a hanging platform 11 is arranged at the bottom of the winch 10, and a limit stop 40 is sleeved on the surface of the steel wire rope 9; the positioning frame 12, the side of the positioning frame 12 is provided with a placing groove 13, the side of the positioning frame 12 is provided with a supporting rod 14, the surface of the supporting rod 14 is sleeved with an inclined pull plate 15, a clamping plate 16 is inserted into the placing groove 13, and one end of the clamping plate 16 is provided with a baffle 17; the surface of the suspension plate 3 is provided with a second vertical plate 18 and a fixed plate 22, the inner side surface of the second vertical plate 18 is provided with a second pulley 19, the surface of the second pulley 19 is sleeved with a traction rope 20, one end of the traction rope 20 is provided with a hanging ring 21, the side surface of the fixed plate 22 is provided with a second bearing 23, the surface of the second bearing 23 is provided with a nut 24, a movable screw 25 is screwed in the nut 24, and one end of the movable screw 25 is provided with a hook 26;
when the hanging basket device is used, the supporting seat 2 is fixed on the surface of the wall body 1, then the hanging plate 3 is supported by utilizing the cooperation of the inclined pull plate 15 and the positioning frame 12, the hanging plate 3 is stably supported by utilizing the cooperation of the traction ropes 20 and the vertical plates 4, then the steel wire ropes 9 arranged at one end of the second hanging plate 7 are connected to the windlass 10, the windlass 10 is placed on the hanging platform 11, the whole hanging basket device can be installed on the wall body 1, the supporting effect of the inclined pull plate 15, which is matched with the positioning frame 12, on the bottom of the hanging plate 3 can avoid the reduction of occupied space when using counterweight equipment, and the stability of the whole device is further improved when utilizing the arrangement of some traction ropes 20.
Example two
The first embodiment is characterized in that a supporting seat 2 is arranged on the basis of the first embodiment, the supporting seat 2 is fixed on the surface of the wall body 1 by using a fixing bolt, a hanging plate 3 and a second hanging plate 7 are also fixed on the surface of the supporting seat 2 by using a fixing bolt, a winch 10 is fixedly connected to a hanging platform 11, one end of a steel wire rope 9 is fixedly connected to the side surface of a positioning block 8, a second steel wire rope 27 is arranged on the other side surface of the positioning block 8, one end of the second steel wire rope 27 is connected to the side surface of a vertical plate 4, one end of a traction rope 20 is fixedly connected to the side surface of the positioning block 8, the traction rope 20 bypasses a pulley 6 and a second pulley 19, a hanging ring 21 arranged at the other end of the traction rope 20 can be hung and buckled on a hook 26, a plate-shaped groove 28 is formed in the side surface of the pulley 6, a bearing 29 is arranged in the groove 28, a rotating plate 30 is arranged on the side surface of the bearing 29, the rotating plate 30 is in an annular structure, two groups of rotating plates 30 are symmetrically distributed about the pulley 6;
when the device is used, the supporting seat 2, the hanging plate 3 and the second hanging plate 7 are fixed by using the fixing bolts, so that the subsequent disassembly is convenient, the rotating plate 30 is arranged on the inner side surface of the pulley 6, the rotating plate 30 is matched with the bearing 29 to move along with the movement of the traction rope 20 when the traction rope 20 is moved, the friction of the side surface of the pulley 6 to the traction rope 20 is reduced, the traction rope 20 is matched with the vertical plate 4 to support the hanging plate 3 and the two ends of the second hanging plate 7, the stability of the whole device fixed on the wall body 1 is improved, when the device is used, workers only need to stand in the hanging platform 11, and then the winch 10 is started to use the shrinkage effect of the winch 10 to the steel wire rope 9 to enable the hanging platform 11 to ascend or descend so as to facilitate construction.
Example III
The second embodiment is characterized in that the positioning frame 12 is arranged on the basis of the second embodiment, the positioning frame 12 is fixedly connected to the side face of the wall body 1 by utilizing bolts, the surface of the positioning frame 12 is provided with positioning rods 31, the positioning rods 31 are provided with two groups, the two groups of positioning rods 31 are vertically symmetrically distributed about the positioning frame 12, one end of each supporting rod 14 is provided with a limiting groove 32, the side face of each baffle 17 is provided with a limiting rod 33, the limiting rods 33 can be inserted into the limiting grooves 32, each clamping plate 16 is of an L-shaped plate structure, the surface of each clamping plate 16 is provided with a lifting rod 34, the surface of each lifting rod 34 is sleeved with a second positioning plate 35, the surface of each second positioning plate 35 is provided with a hole, the second positioning plate 35 can slide on the lifting rods 34 by utilizing the holes, the surface of each lifting rod 34 is sleeved with a spring 36, one end of each spring 36 is fixedly connected to the surface of each clamping plate 16, the other end of each spring 36 is fixedly connected to the surface of each second positioning plate 35, the other ends of the inclined pulling plates 15 are fixedly connected to the surfaces of the hanging plates 3 by utilizing bolts, the bottoms of the fixing plates 22 are fixedly connected to the surfaces of the hanging plates 3, the side faces of the fixing plates 22 are provided with holes, the side faces of the fixing plates 22, the fixing plates 22 are provided with the side faces of the fixing plates 22, the movable plates 25 can penetrate through the third screw rods 37 and the surfaces of the fixing plates 37 to be fixedly connected with the screw rods 38, and the screw rods 38 are fixedly connected to the third screw rods 37, and the screw rods 38 are arranged on the surfaces of the third sides of the fixing plates and pass through the surfaces of the fixing plates and the screw rods 38;
when the cable-stayed plate 15 is required to be fixedly installed in use, firstly, one end of the cable-stayed plate 15 is sleeved on the supporting rod 14, then the second positioning plate 35 is pulled upwards, the clamping plate 16 and the limiting rod 33 are respectively inserted into the placing groove 13 and the limiting groove 32, when the baffle 17 is clamped into the positioning frame 12 by the clamping plate 16 and the limiting rod 33, the second positioning plate 35 is loosened, one end of the second positioning plate 35 is sleeved on the positioning rod 31, the baffle 17 and the positioning frame 12 are fixed, the cable-stayed plate 15 is prevented from being separated from the positioning frame 12, one end of the cable-stayed plate 15 is fixed on the hanging plate 3 by bolts, when the pulling force of the pulling rope 20 on the hanging plate 3 and the second hanging plate 7 is required to be adjusted, the nut 24 is rotated by rotating the nut 24 to be matched with the second bearing 23, the moving screw 25 is displaced, when the moving to a proper position is stopped to rotate the nut 24, the screw 38 is inserted into the fixing plate 22, the problem of shifting the pulling rope 20 is avoided, and the other convenient screw 38 is matched with the second nut 39, and the pulling force of the pulling rope 20 is prevented from being loosened, so that the pulling force of the pulling rope is changed.
When the hanging basket device is actually used, the supporting seat 2 is fixed on the surface of the wall body 1, then the hanging plate 3 is supported by utilizing the matching of the inclined pull plate 15 and the positioning frame 12, the hanging plate 3 is stably supported by utilizing the matching of the traction ropes 20 and the vertical plates 4, then the steel wire ropes 9 arranged at one end of the second hanging plate 7 are connected to the winding machine 10, the winding machine 10 is placed on the hanging platform 11, the whole hanging basket device can be installed on the wall body 1, the supporting effect of the inclined pull plate 15 on the bottom of the hanging plate 3 by matching with the positioning frame 12 can avoid the reduction of occupied space by using counterweight equipment, the stability of the whole device is further improved by utilizing the arrangement of a plurality of traction ropes 20, thus the common traditional hanging basket construction method is avoided, a large amount of construction time is consumed, the construction period is long, the actual requirement of quick construction of a factory building is difficult to meet, and the added counterweight stably causes the hanging basket to occupy a large space and influence the problem of the outdoor pipe network construction conflict.
A construction method of a hanging basket installation structure for curtain wall construction comprises the following steps:
s1: firstly, fixing a supporting seat 2 on the surface of a wall body 1, and then fixing a hanging plate 3 and a second hanging plate 7 in the supporting seat 2;
s2: secondly, the steel wire rope 9 is connected to the winch 10, and the traction rope 20 is matched with the pulley 6 and the second pulley 19 to carry out traction reinforcement on the suspension plate 3 and the second suspension plate 7;
s3: finally, the bottom of the hanging plate 3 is fixedly supported by the cooperation of the inclined pull plate 15 and the positioning frame 12, and then the hanging platform 11 can be used by the winch 10 in cooperation with the steel wire rope 9.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides a curtain construction hanging flower basket mounting structure, includes wall body (1), and wall body (1) surface is provided with supporting seat (2), its characterized in that: a hanging plate (3) and a second hanging plate (7) are arranged in the supporting seat (2), a vertical plate (4) is arranged on the surface of the supporting seat (2), a rotating rod (5) is inserted in the vertical plate (4), a pulley (6) is sleeved on the surface of the rotating rod (5), a positioning block (8) is arranged at one end of the second hanging plate (7), a steel wire rope (9) is arranged on the side surface of the positioning block (8), one end of the steel wire rope (9) is connected in a winch (10), a hanging platform (11) is arranged at the bottom of the winch (10), and a limit stop (40) is sleeved on the surface of the steel wire rope (9);
the positioning device comprises a positioning frame (12), wherein a placing groove (13) is formed in the side surface of the positioning frame (12), a supporting rod (14) is arranged on the side surface of the positioning frame (12), an inclined pull plate (15) is sleeved on the surface of the supporting rod (14), a clamping plate (16) is inserted into the placing groove (13), and a baffle (17) is arranged at one end of the clamping plate (16);
the utility model discloses a hanger plate, including hanging board (3), fixed plate (22), second riser (18) medial surface is provided with second pulley (19), second pulley (19) surface cover is equipped with haulage rope (20), haulage rope (20) one end is provided with link (21), fixed plate (22) side is provided with second bearing (23), second bearing (23) surface is provided with nut (24), the spiro union has movable screw (25) in nut (24), movable screw (25) one end is provided with couple (26).
2. The curtain wall construction basket mounting structure according to claim 1, wherein: the winch (10) is fixedly connected to the hanging platform (11), one end of the steel wire rope (9) is fixedly connected to the side face of the positioning block (8), a second steel wire rope (27) is arranged on the other side face of the positioning block (8), and one end of the second steel wire rope (27) is connected to the side face of the vertical plate (4).
3. The curtain wall construction basket mounting structure according to claim 2, wherein: the supporting seat (2) is fixed on the surface of the wall body (1) by using a fixing bolt, and the hanging plate (3) and the second hanging plate (7) are also fixed on the surface of the supporting seat (2) by using the fixing bolt.
4. A curtain wall construction basket mounting structure according to claim 3, wherein: one end of the traction rope (20) is fixedly connected to the side face of the positioning block (8), the traction rope (20) winds around the pulley (6) and the second pulley (19), and a hanging ring (21) arranged at the other end of the traction rope (20) can be hung and buckled on the hanging hook (26).
5. The curtain wall construction hanging basket mounting structure according to claim 4, wherein: the pulley (6) side has offered recess (28), is provided with bearing (29) in recess (28), and bearing (29) side is provided with rotor plate (30), and rotor plate (30) are annular platy structure, and rotor plate (30) are provided with two sets of, and two sets of rotor plates (30) are about pulley (6) symmetric distribution.
6. The curtain wall construction hanging basket mounting structure according to claim 5, wherein: the locating rack (12) utilizes bolt fixed connection to be in the side of wall body (1), and locating rack (12) surface is provided with locating lever (31), and locating lever (31) are provided with two sets of, and two sets of locating levers (31) are about locating rack (12) upper and lower symmetric distribution.
7. The curtain wall construction basket mounting structure according to claim 6, wherein: spacing groove (32) has been seted up to bracing piece (14) one end, baffle (17) side is provided with gag lever post (33), gag lever post (33) insertable into spacing groove (32), cardboard (16) are "L" template column structure, cardboard (16) surface is provided with lifter (34), lifter (34) surface cover is equipped with second locating plate (35), hole has been seted up on second locating plate (35) surface, hole cover that second locating plate (35) available offered is established on locating lever (31), second locating plate (35) can slide on lifter (34).
8. The curtain wall construction basket installation structure according to claim 7, wherein: the lifting rod (34) is sleeved with a spring (36), one end of the spring (36) is fixedly connected to the surface of the clamping plate (16), the other end of the spring (36) is fixedly connected to the surface of the second positioning plate (35), and the other end of the inclined pull plate (15) is fixed in the hanging plate (3) through bolts.
9. The curtain wall construction basket mounting structure according to claim 8, wherein: the bottom of the fixing plate (22) is fixedly connected to the surface of the hanging plate (3), a hole is formed in the side face of the fixing plate (22), the movable screw rod (25) can penetrate through the fixing plate (22), a third fixing plate (37) is arranged on the surface of the hook (26), a screw rod (38) is arranged on the side face of the third fixing plate (37), the screw rod (38) penetrates through the fixing plate (22), and one end of the screw rod (38) is in threaded connection with a second nut (39).
10. The construction method of the hanging basket installation structure for curtain wall construction according to any one of claims 1 to 9, wherein: the method comprises the following steps:
s1: firstly, fixing a supporting seat (2) on the surface of a wall body (1), and then fixing a hanging plate (3) and a second hanging plate (7) in the supporting seat (2);
s2: secondly, connecting the hoisting machine (10) by using a steel wire rope (9), and carrying out traction reinforcement on the suspension plate (3) and the second suspension plate (7) by using a traction rope (20) matched with the pulley (6) and the second pulley (19);
s3: finally, the bottom of the hanging plate (3) is fixedly supported by the cooperation of the inclined pull plate (15) and the locating frame (12), and then the hanging platform (11) can be used by the winch (10) in cooperation with the steel wire rope (9).
CN202310951727.7A 2023-07-24 2023-07-24 Curtain wall construction hanging basket mounting structure and construction method Pending CN116791872A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310951727.7A CN116791872A (en) 2023-07-24 2023-07-24 Curtain wall construction hanging basket mounting structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310951727.7A CN116791872A (en) 2023-07-24 2023-07-24 Curtain wall construction hanging basket mounting structure and construction method

Publications (1)

Publication Number Publication Date
CN116791872A true CN116791872A (en) 2023-09-22

Family

ID=88039700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310951727.7A Pending CN116791872A (en) 2023-07-24 2023-07-24 Curtain wall construction hanging basket mounting structure and construction method

Country Status (1)

Country Link
CN (1) CN116791872A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119843876A (en) * 2025-03-05 2025-04-18 中国建筑第二工程局有限公司 Construction method for steel movable hanging basket of special-shaped curtain wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206769356U (en) * 2017-06-05 2017-12-19 兖矿东华建设有限公司 Self-balancing type is sat on the fence hanging device
CN208586885U (en) * 2018-07-05 2019-03-08 中建八局第一建设有限公司 A kind of novel hanging basket lateral traction bracket
CN211256707U (en) * 2019-09-10 2020-08-14 中建八局第二建设有限公司 Self-anchored construction hanging basket suspension mechanism based on existing structure
CN214462437U (en) * 2021-03-10 2021-10-22 中国新兴建设开发有限责任公司 An adjustable hanging bracket for hanging basket riding on the wall

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206769356U (en) * 2017-06-05 2017-12-19 兖矿东华建设有限公司 Self-balancing type is sat on the fence hanging device
CN208586885U (en) * 2018-07-05 2019-03-08 中建八局第一建设有限公司 A kind of novel hanging basket lateral traction bracket
CN211256707U (en) * 2019-09-10 2020-08-14 中建八局第二建设有限公司 Self-anchored construction hanging basket suspension mechanism based on existing structure
CN214462437U (en) * 2021-03-10 2021-10-22 中国新兴建设开发有限责任公司 An adjustable hanging bracket for hanging basket riding on the wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119843876A (en) * 2025-03-05 2025-04-18 中国建筑第二工程局有限公司 Construction method for steel movable hanging basket of special-shaped curtain wall
CN119843876B (en) * 2025-03-05 2025-12-02 中国建筑第二工程局有限公司 A construction method for steel movable hanging baskets for irregularly shaped curtain walls

Similar Documents

Publication Publication Date Title
CN114908959A (en) Climbing belt type automatic jacking system of construction integrated platform and its use method
CN202273397U (en) Lifting device for reversal hanging lifting frame
CN116791872A (en) Curtain wall construction hanging basket mounting structure and construction method
CN115043343A (en) Light partition board installation construction device and construction method thereof
CN112523112A (en) Method for dismantling overhead suspension casting hanging basket
CN202990389U (en) Vertical double-frame guide rail attaching lift scaffold
CN220580578U (en) Various steel sheet wallboard installation cage of steel construction factory building
CN219860047U (en) Large plate glass lifting device in narrow space
CN218579523U (en) Safety valve hoisting device
CN118373305A (en) Building carrier plate hoist device
CN217535151U (en) Device suitable for large and medium-sized space prefabricated unit part balance hoisting
CN118479353A (en) Hoisting device for water heating pipeline construction
CN217732419U (en) Hoisting construction structure of scaffold and tower crane
CN114737538B (en) A high safety factor maintenance platform for hydropower station generator sets
CN118167013A (en) A fixed restraint device for a mid-lift triangular suspended operating platform
CN214090904U (en) Inverted lifting scaffold with novel hanging assembly
CN214302804U (en) Double-layer hanging basket of riding horse type
CN213294483U (en) Novel portable high-rise hoisting machine
CN212336718U (en) Climbing formwork scaffold
CN210759347U (en) Mounting equipment
CN217175641U (en) An electric hanging basket suspension mechanism
CN201459602U (en) Equipment for bridge construction
CN114412192A (en) Interlayer complex special-shaped aluminum veneer curtain wall and construction method thereof
CN214653196U (en) Tower crane climbing frame convenient to dismantle
CN221370145U (en) Cage door counterweight device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20230922