CN116791865A - Movable combined type feeding construction safety ladder cage - Google Patents
Movable combined type feeding construction safety ladder cage Download PDFInfo
- Publication number
- CN116791865A CN116791865A CN202310776079.6A CN202310776079A CN116791865A CN 116791865 A CN116791865 A CN 116791865A CN 202310776079 A CN202310776079 A CN 202310776079A CN 116791865 A CN116791865 A CN 116791865A
- Authority
- CN
- China
- Prior art keywords
- column
- frame
- loading
- unit
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/003—Devices for storing material on the scaffold
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/02—Scaffold feet, e.g. with arrangements for adjustment
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/24—Scaffolds primarily resting on the ground comprising essentially special base constructions; comprising essentially special ground-engaging parts, e.g. inclined struts, wheels
- E04G2001/242—Scaffolds movable on wheels or tracks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G2005/008—Hoisting devices specially adapted as part of a scaffold system
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
Abstract
Description
技术领域Technical field
本发明涉及安全梯笼技术领域,尤其涉及一种可移动组合式上料施工安全梯笼。The invention relates to the technical field of safety ladder cages, and in particular to a movable combined loading construction safety ladder cage.
背景技术Background technique
路基边坡锚杆框格梁施工完成后,骨架内需铺砌植生袋后挂铁丝网喷有机基材质草灌,植生袋充填种植土后沿坡面平铺,由于边坡存在坡率且高度较高,人员在施工过程中存在高空作业、起重吊装等风险。针对该类施工,大多项目采用吊车吊装运料斗或者采用吊运平台。该类装置虽然能达到施工目的,但是,存在安全隐患大、标准化程度低、人员上下采用吊车吊运、施工效率低等缺点。After the construction of anchor frame beams on the roadbed slope is completed, planting bags need to be laid in the framework and then wire mesh should be hung to spray organic grass irrigation. The planting bags should be filled with planting soil and then spread along the slope. Due to the slope and high height of the slope, During the construction process, personnel are exposed to risks such as working at heights and lifting. For this type of construction, most projects use a crane to lift the hopper or a lifting platform. Although this type of device can achieve the purpose of construction, it has shortcomings such as high safety hazards, low degree of standardization, the use of cranes to lift personnel, and low construction efficiency.
目前,针对该类施工,大多项目采用吊车吊装运料斗或者采用吊运平台。该类装置虽然能达到施工目的,但是,存在安全隐患大、标准化程度低、人员上下采用吊车吊运、施工效率低等缺点。At present, for this type of construction, most projects use cranes to lift hoppers or use lifting platforms. Although this type of device can achieve the purpose of construction, it has shortcomings such as high safety hazards, low degree of standardization, the use of cranes to lift personnel, and low construction efficiency.
如何设计一种可移动组合式上料施工安全梯笼,为提高施工标准化程度,提升作业安全性,降低隐患等级、提高工作效率,施工方法简便,整体费用低,可周转且适应性强的安全梯笼成为本领域技术人员亟需解决的技术问题。How to design a movable combined loading construction safety ladder cage, in order to improve the standardization of construction, improve work safety, reduce the level of hidden dangers, and improve work efficiency, the construction method is simple, the overall cost is low, the safety ladder is turnable and adaptable Ladder cages have become an urgent technical problem that those skilled in the art need to solve.
发明内容Contents of the invention
本发明的目的是提供一种可移动组合式上料施工安全梯笼,解决背景技术中所列的问题。The purpose of the present invention is to provide a movable combined loading construction safety ladder cage to solve the problems listed in the background technology.
为解决上述技术问题,本发明采用如下技术方案:In order to solve the above technical problems, the present invention adopts the following technical solutions:
本发明一种可移动组合式上料施工安全梯笼,包括底座框架单元、移动单元、立柱框架单元、工作平台和上料单元,所述底座框架单元的四角安装有所述移动单元,所述底座框架单元上铰接所述立柱框架单元,所述立柱框架单元的内部铰接有至少一个所述工作平台,所述上料单元安装在所述立柱框架单元的外表面,所述立柱框架单元的内表面使用时抵接在工作面上。A movable combined loading construction safety ladder cage of the present invention includes a base frame unit, a moving unit, a column frame unit, a working platform and a loading unit. The moving units are installed at the four corners of the base frame unit. The column frame unit is hinged to the base frame unit, and at least one of the working platforms is hinged to the interior of the column frame unit. The loading unit is installed on the outer surface of the column frame unit, and the inner surface of the column frame unit is hinged. When the surface is used, it is pressed against the working surface.
优选的,底座框架单元包括底纵梁、限位轨道、限位块、铰接底座和底横梁;两个所述底纵梁平行对称设置,且两个所述底纵梁的相对面上固定连接有多个所述底横梁;所述底纵梁的上表面上均对称固定安装有所述限位轨道,多个可滑动的所述限位块安装在所述限位轨道上;所述铰接底座固定安装在所述底纵梁的上表面且对称布置于两端。Preferably, the base frame unit includes a bottom longitudinal beam, a limit rail, a limit block, a hinged base and a bottom cross beam; the two bottom longitudinal beams are arranged in parallel and symmetrical manner, and the opposite surfaces of the two bottom longitudinal beams are fixedly connected. There are a plurality of bottom beams; the limit rails are symmetrically and fixedly installed on the upper surfaces of the bottom longitudinal beams, and a plurality of slidable limit blocks are installed on the limit rails; the hinged The base is fixedly installed on the upper surface of the bottom longitudinal beam and is symmetrically arranged at both ends.
优选的,所述立柱框架单元包括立柱接触框架和立柱上料框架,所述立柱接触框架和立柱上料框架对称平行设置在前后两侧,且所述立柱接触框架和立柱上料框架的底部分别铰接在前后两组铰接底座上,所述立柱接触框架和立柱上料框架的相对面上对称安装有立柱铰接座,两个相对的所述立柱铰接座间铰接有连杆,所述立柱接触框架抵接在工作面上,所述立柱上料框架上安装有上料轨道;所述立柱接触框架通过多片接触框架单体组成,相邻的两个所述接触框架单体通过套管拼接在一起,所述立柱上料框架通过多片上料框架单体组成,相邻的两个所述上料框架单体通过套管拼接在一起。Preferably, the column frame unit includes a column contact frame and a column feeding frame. The column contact frame and the column feeding frame are symmetrically arranged in parallel on the front and rear sides, and the bottoms of the column contact frame and the column feeding frame are respectively Hinged on two sets of hinged bases at the front and rear, a column hinge seat is symmetrically installed on the opposite surface of the column contact frame and the column loading frame, a connecting rod is hinged between the two opposite column hinge seats, and the column contact frame Abutting on the working surface, a feeding rail is installed on the column loading frame; the column contact frame is composed of multiple contact frame monomers, and two adjacent contact frame monomers are spliced together through casings. Together, the column loading frame is composed of multiple feeding frame monomers, and two adjacent feeding frame monomers are spliced together through sleeves.
优选的,所述立柱接触框架和立柱上料框架连接后的左右两侧面上安装有安全网。Preferably, safety nets are installed on the left and right sides after the connection between the column contact frame and the column loading frame.
优选的,所述接触框架单体和上料框架单体结构相同,包括立柱和系杆,两个所述立柱的相对面上固定连接有所述系杆,所述立柱上安装有所述上料导轨。Preferably, the structure of the contact frame unit and the feeding frame unit are the same, including upright columns and tie rods. The tie rods are fixedly connected to the opposite surfaces of the two upright columns, and the upper frame is installed on the upright columns. material guide rail.
优选的,所述立柱与所述系杆采用焊接或螺栓连接。Preferably, the upright column and the tie rod are connected by welding or bolting.
优选的,所述系杆上安装有可连接安全绳的吊环。Preferably, the tie rod is equipped with a lifting ring that can be connected to a safety rope.
优选的,所述工作平台包括安装板、安装杆、转轴以及安装在所述立柱上的轴承,所述轴承间转动安装有所述转轴,所述转轴间固定安装有所述安装板,所述安装板上安装有多个所述安装杆。Preferably, the working platform includes a mounting plate, a mounting rod, a rotating shaft and a bearing installed on the upright column. The rotating shaft is rotatably installed between the bearings, and the mounting plate is fixedly installed between the rotating shafts. A plurality of the mounting rods are mounted on the mounting plate.
优选的,所述移动单元包括移动轮、定位杆和转换杆,所述移动轮均转动安装在所述底纵梁的两端,所述转换杆的一端固定安装在所述底纵梁的侧面,所述转换杆的另一端连接有可上下活动的所述定位杆。Preferably, the moving unit includes a moving wheel, a positioning rod and a conversion rod. The moving wheels are rotatably installed at both ends of the bottom longitudinal beam, and one end of the conversion rod is fixedly installed on the side of the bottom longitudinal beam. , the other end of the conversion rod is connected to the positioning rod that can move up and down.
优选的,所述上料单元包括固定杆、卷扬机和上料斗,所述固定杆固定安装在最顶部的所述系杆的上表面,所述固定杆上安装有所述卷扬机,所述卷扬机通过钢丝绳连接所述上料斗,所述上料斗靠近所述立柱上料框架的一侧滑动连接在所述上料轨道上。Preferably, the loading unit includes a fixed rod, a winch and a loading hopper. The fixed rod is fixedly installed on the upper surface of the tie rod at the top. The winch is installed on the fixed rod. The winch passes through A steel wire rope is connected to the loading hopper, and the side of the loading hopper close to the column loading frame is slidingly connected to the loading track.
与现有技术相比,本发明的有益技术效果:Compared with the existing technology, the beneficial technical effects of the present invention are:
一种可移动组合式上料施工安全梯笼,包括底座框架单元、移动单元、立柱框架单元、工作平台和上料单元,所述底座框架单元的四角安装有所述移动单元,所述底座框架单元上铰接所述立柱框架单元,所述立柱框架单元的内部铰接有所述工作平台,所述上料单元安装在所述立柱框架单元的外表面,能够在施工环境下安全快速,操作简便的实现组装作业,便于工人能够在多个植生袋框架上同步进行植生袋的铺设作业,有效缩短了施工周期,费用低、稳定可靠,适应性强、可周转。A movable combined loading construction safety ladder cage, including a base frame unit, a mobile unit, a column frame unit, a working platform and a loading unit. The mobile units are installed at the four corners of the base frame unit. The base frame The column frame unit is hinged to the unit, and the working platform is hinged to the inside of the column frame unit. The loading unit is installed on the outer surface of the column frame unit, which can be used safely, quickly and easily in a construction environment. The assembly operation is realized, so that workers can simultaneously lay the planting bags on multiple planting bag frames, effectively shortening the construction period, low cost, stable and reliable, strong adaptability and turnover.
附图说明Description of the drawings
下面结合附图说明对本发明作进一步说明。The present invention will be further described below in conjunction with the accompanying drawings.
图1为本发明一种可移动组合式上料施工安全梯笼示意图。Figure 1 is a schematic diagram of a movable combined loading construction safety ladder cage of the present invention.
附图标记说明:1、移动轮;2、定位杆;3、底纵梁;4、限位轨道;5、限位块;6、转换杆;7、铰接底座;8、底横梁;9、立柱;10、系杆;11、套管;12、柱铰接座;13、连杆;14、固定安装杆;15、卷扬机;16、安装板;17、安装杆;18、轴承;19、转轴;20、上料斗。Explanation of reference signs: 1. Moving wheel; 2. Positioning rod; 3. Bottom longitudinal beam; 4. Limit track; 5. Limit block; 6. Conversion rod; 7. Hinged base; 8. Bottom beam; 9. Column; 10. Tie rod; 11. Casing; 12. Column hinge seat; 13. Connecting rod; 14. Fixed mounting rod; 15. Winch; 16. Mounting plate; 17. Mounting rod; 18. Bearing; 19. Rotating shaft ; 20. Load the hopper.
具体实施方式Detailed ways
为了使本发明所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。In order to make the technical problems, technical solutions and beneficial effects to be solved by the present invention clearer, the present invention will be further described in detail below with reference to the drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention and are not intended to limit the present invention.
如图1所示,一种可移动组合式上料施工安全梯笼,包括底座框架单元、移动单元、立柱框架单元、工作平台和上料单元,所述底座框架单元的四角安装有所述移动单元,所述底座框架单元上铰接有至少一个所述立柱框架单元,所述立柱框架单元的内部铰接有所述工作平台,所述上料单元安装在所述立柱框架单元的外表面,所述立柱框架单元的内表面使用时抵接在工作面上;As shown in Figure 1, a movable combined loading construction safety ladder cage includes a base frame unit, a mobile unit, a column frame unit, a working platform and a loading unit. The four corners of the base frame unit are equipped with the mobile unit, at least one of the column frame units is hinged to the base frame unit, the working platform is hinged to the inside of the column frame unit, the loading unit is installed on the outer surface of the column frame unit, the The inner surface of the column frame unit is in contact with the working surface when in use;
工作时,本发明通过活动安装在底座框架单元上的移动单元,沿着边坡进行位移,移动到待施工的作业面时,立柱框架单元抵接在待作业面上,工人安全登上各个工作平台后,上料单元开始在每个上料平台间进行上料作业。When working, the present invention displaces along the slope through the moving unit movablely installed on the base frame unit. When moving to the working surface to be constructed, the column frame unit contacts the working surface, and workers safely board the various working surfaces. After loading the platform, the loading unit starts loading operations between each loading platform.
具体的,底座框架单元包括底纵梁3、限位轨道4、限位块5、铰接底座7和底横梁8;两个所述底纵梁3平行对称设置,且两个所述底纵梁3的相对面上固定连接有多个所述底横梁8;所述底纵梁3的上表面上均对称固定安装有所述限位轨道4,多个可滑动的所述限位块5安装在所述限位轨道4上;所述铰接底座7固定安装在所述底纵梁3的上表面,且对称安装在所述限位轨道4的两端。Specifically, the base frame unit includes a bottom longitudinal beam 3, a limiting track 4, a limiting block 5, a hinged base 7 and a bottom beam 8; two of the bottom longitudinal beams 3 are arranged in parallel and symmetrical manner, and the two bottom longitudinal beams are A plurality of the bottom cross beams 8 are fixedly connected to the opposite surfaces of the bottom longitudinal beam 3; the limit rails 4 are symmetrically fixed and installed on the upper surface of the bottom longitudinal beam 3, and a plurality of sliding limit blocks 5 are installed. On the limit rail 4, the hinge base 7 is fixedly installed on the upper surface of the bottom longitudinal beam 3, and is symmetrically installed on both ends of the limit rail 4.
具体的,所述立柱框架单元包括立柱接触框架和立柱上料框架,所述立柱接触框架和立柱上料框架对称平行设置在前后两侧,且所述立柱接触框架和立柱上料框架的底部分别铰接在前后两组铰接底座7上,通过限位块在限位轨道上进行移动,实现对立柱接触框架和立柱上料框架的限位,便于立柱框架单元抵接在待作业面上的同时,保证了立柱框架单元的稳定性及抗倾覆性,使得整体结构安全可靠,且能够适应不同坡率的待作业面。Specifically, the column frame unit includes a column contact frame and a column feeding frame. The column contact frame and the column feeding frame are symmetrically arranged in parallel on the front and rear sides, and the bottoms of the column contact frame and the column feeding frame are respectively Hinged on the front and rear sets of hinged bases 7, the limit blocks move on the limit track to limit the column contact frame and the column feeding frame, so that the column frame unit can be in contact with the surface to be worked. It ensures the stability and overturning resistance of the column frame unit, making the overall structure safe and reliable, and can adapt to the working surface with different slope rates.
具体的,所述立柱接触框架和立柱上料框架的相对面上对称安装有立柱铰接座12,两个相对的所述立柱铰接座12间铰接有连杆13,所述立柱接触框架抵接在工作面上,所述立柱上料框架上安装有上料轨道;所述立柱接触框架通过多片接触框架单体组成,相邻的两个所述接触框架单体通过套管11拼接在一起,所述立柱上料框架通过多片上料框架单体组成,相邻的两个所述上料框架单体通过套管11拼接在一起,实现了立柱框架单元的上下延伸,能够适应不同高度的待作业面,进一步的,为工人提供了多个作业平台,便于多个待作业面同时进行施工了,提高了植生袋施工时的工作效率,极大的缩短了施工周期。Specifically, a column hinge seat 12 is installed symmetrically on the opposite surface of the column contact frame and the column loading frame. A connecting rod 13 is hinged between the two opposite column hinge seats 12. The column contact frame abuts on On the working surface, a feeding track is installed on the column loading frame; the column contact frame is composed of multiple contact frame units, and two adjacent contact frame units are spliced together through sleeves 11. The column loading frame is composed of multiple feeding frame monomers. Two adjacent feeding frame monomers are spliced together through sleeves 11 to realize the up and down extension of the column frame unit and can adapt to different heights. The working surface further provides workers with multiple working platforms, which facilitates the simultaneous construction of multiple working surfaces, improves the work efficiency during planting bag construction, and greatly shortens the construction cycle.
具体的,所述立柱接触框架和立柱上料框架连接后的左右两侧面上安装有安全网,增大了工人在施工时的安全性,能够有效降低工人和施工物料坠落的风险。Specifically, safety nets are installed on the left and right sides of the connection between the column contact frame and the column loading frame, which increases the safety of workers during construction and can effectively reduce the risk of workers and construction materials falling.
具体的,所述接触框架单体和上料框架单体结构相同,包括立柱9和系杆10,两个所述立柱9的相对面上固定连接有所述系杆10,所述立柱9上安装有所述上料导轨。Specifically, the structure of the contact frame unit and the feeding frame unit are the same, including upright columns 9 and tie rods 10. The tie rods 10 are fixedly connected to the opposite surfaces of the two upright columns 9. The loading guide rail is installed.
具体的,所述立柱9与所述系杆10采用焊接或螺栓连接,高边坡施工时,立柱与系杆采用焊接的方式,能够提高立柱接触框架和立柱上料框架的连接刚性,使得立柱框架单元安全可靠;低边坡施工时,立柱与系杆采用螺栓连接,便于拆卸和周转。Specifically, the column 9 and the tie rod 10 are connected by welding or bolting. During high slope construction, the column and the tie rod are welded, which can improve the connection rigidity of the column contact frame and the column loading frame, making the column The frame unit is safe and reliable; during low-slope construction, the columns and tie rods are connected with bolts to facilitate disassembly and turnover.
具体的,所述系杆10上安装有可连接安全绳的吊环,便于工人能够将安全绳挂钩挂在吊环上,进一步的,保证工人的生命安全。Specifically, the tie rod 10 is equipped with a lifting ring that can be connected to a safety rope, so that workers can hang the safety rope hook on the lifting ring, further ensuring the safety of workers.
具体的,所述工作平台包括安装板16、安装杆17、转轴19以及安装在所述立柱9上的轴承18,所述轴承18间转动安装有所述转轴19,所述转轴19间固定安装有所述安装板16,所述安装板16上安装有多个所述安装杆17,使得工作平台抵接在待作业面时能够保持水平状态,便于工人施工以及物料的堆放作业。Specifically, the working platform includes a mounting plate 16, a mounting rod 17, a rotating shaft 19 and a bearing 18 installed on the upright column 9. The rotating shaft 19 is rotatably installed between the bearings 18, and the rotating shaft 19 is fixedly installed between the bearings 18. There is the installation plate 16, and a plurality of the installation rods 17 are installed on the installation plate 16, so that the working platform can maintain a horizontal state when it is in contact with the work surface, which facilitates workers' construction and material stacking operations.
具体的,所述移动单元包括移动轮1、定位杆2和转换杆6,所述移动轮1均转动安装在所述底纵梁3的两端,所述转换杆6的一端固定安装在所述底纵梁3的侧面,所述转换杆6的另一端连接有可上下活动的所述定位杆2,当植生袋铺设完毕后,移动单元带动本发明整体移动到下一个待作业面进行施工作业,减少了吊车的使用和吊装时间,节约了人材机的使用成本,有利于安全文明施工,进一步的移动轮带有自锁金装置,通过定位杆与转换杆的配合能够保证在施工时本发明的的整体稳定性。Specifically, the moving unit includes a moving wheel 1, a positioning rod 2 and a conversion rod 6. The moving wheels 1 are rotatably installed at both ends of the bottom longitudinal beam 3, and one end of the conversion rod 6 is fixedly installed at the bottom longitudinal beam 3. On the side of the bottom longitudinal beam 3, the other end of the conversion rod 6 is connected to the positioning rod 2 that can move up and down. After the planting bags are laid, the mobile unit drives the whole invention to move to the next work surface for construction. operation, reducing the use of the crane and hoisting time, saving the cost of using the manpower machine, and is conducive to safe and civilized construction. The further moving wheel is equipped with a self-locking device, and the cooperation of the positioning rod and the conversion rod can ensure that the machine is installed properly during construction. The overall stability of the invention.
当移动单元带动本发明移动到待作业面后,移动轮锁紧并在移动轮的两侧放置挡块,同时将定位杆向下旋转抵接在地面上,极大的保证了本发明的安全稳定性能。When the mobile unit drives the invention to move to the working surface, the moving wheel is locked and blocks are placed on both sides of the moving wheel. At the same time, the positioning rod is rotated downward to abut against the ground, which greatly ensures the safety of the invention. Stable performance.
具体的,所述上料单元包括固定杆14、卷扬机15和上料斗20,所述立柱框架单元组装完毕,且立柱接触框架抵接在待作业面上时,将所述固定杆14通过螺栓与螺母配合固定安装在最顶部的所述系杆10上,所述固定杆14上通过螺栓与螺母配合固定安装有所述卷扬机15,所述卷扬机15通过钢丝绳连接所述上料斗20,所述上料斗20靠近所述立柱上料框架的一侧滑动连接在所述上料轨道上。Specifically, the loading unit includes a fixed rod 14, a hoist 15 and a loading hopper 20. After the column frame unit is assembled and the column contact frame is in contact with the surface to be worked, the fixed rod 14 is connected to the work surface through bolts. Nuts are fixedly installed on the tie rod 10 at the top. The winch 15 is fixedly installed on the fixed rod 14 through bolts and nuts. The winch 15 is connected to the upper hopper 20 through a wire rope. The side of the hopper 20 close to the column loading frame is slidingly connected to the loading track.
具体的,所述上料轨道通过螺栓安装在立柱框架上,上料斗上对称设置有多个内凹滚轮,所述内凹滚轮与上料轨道相配合,实现上料单元为多个工作平台进行不间断的上料,有助于提高植生袋施工时的工作效率。Specifically, the loading track is installed on the column frame through bolts, and a plurality of concave rollers are symmetrically arranged on the loading hopper. The concave rollers cooperate with the loading track to realize the loading unit for multiple working platforms. Uninterrupted feeding helps improve work efficiency during planting bag construction.
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that these entities or operations are mutually exclusive. any such actual relationship or sequence exists between them. Furthermore, the terms "comprises," "comprises," or any other variations thereof are intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements, but also those not expressly listed other elements, or elements inherent to the process, method, article or equipment.
以上所述的实施例仅是对本发明的优选方式进行描述,并非对本发明的范围进行限定,在不脱离本发明设计精神的前提下,本领域普通技术人员对本发明的技术方案做出的各种变形和改进,均应落入本发明权利要求书确定的保护范围内。The above-described embodiments only describe the preferred modes of the present invention and do not limit the scope of the present invention. Without departing from the design spirit of the present invention, those of ordinary skill in the art can make various modifications to the technical solutions of the present invention. All deformations and improvements shall fall within the protection scope determined by the claims of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310776079.6A CN116791865A (en) | 2023-06-28 | 2023-06-28 | Movable combined type feeding construction safety ladder cage |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310776079.6A CN116791865A (en) | 2023-06-28 | 2023-06-28 | Movable combined type feeding construction safety ladder cage |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN116791865A true CN116791865A (en) | 2023-09-22 |
Family
ID=88043593
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310776079.6A Pending CN116791865A (en) | 2023-06-28 | 2023-06-28 | Movable combined type feeding construction safety ladder cage |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116791865A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117588026A (en) * | 2023-11-07 | 2024-02-23 | 中冶天工集团有限公司 | Pipeline transportation device and method of use |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105649312A (en) * | 2016-03-14 | 2016-06-08 | 湖州中辰建设有限公司 | Movable-type lifting working platform |
| CN107386690A (en) * | 2017-08-10 | 2017-11-24 | 扬州市宏建工程材料有限公司 | A kind of Combined type safety ladder cage |
| CN210421859U (en) * | 2019-07-04 | 2020-04-28 | 烟台新科钢结构有限公司 | A portable lift truck for furred ceiling installation |
| CN111364799A (en) * | 2020-04-30 | 2020-07-03 | 郑州宝冶钢结构有限公司 | Steel structure support frame |
| CN212613932U (en) * | 2020-06-24 | 2021-02-26 | 南京科技职业学院 | Dangerous wall supporting device for constructional engineering |
| CN113565304A (en) * | 2021-08-30 | 2021-10-29 | 云南省建设投资控股集团有限公司 | A mobile work trolley that can lift materials |
| CN217352547U (en) * | 2022-05-30 | 2022-09-02 | 中国市政工程华北设计研究总院有限公司 | Ecological slope protection construction platform |
| CN115807528A (en) * | 2022-11-18 | 2023-03-17 | 中国十九冶集团有限公司 | Portable side slope protection operation platform |
| CN218815429U (en) * | 2022-11-03 | 2023-04-07 | 山东洲盛建筑工程有限公司 | Triangular steel structure support frame |
| CN115973371A (en) * | 2022-12-03 | 2023-04-18 | 江苏速捷模架科技有限公司 | Frame upright post unit of construction platform module of enclosure system |
-
2023
- 2023-06-28 CN CN202310776079.6A patent/CN116791865A/en active Pending
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105649312A (en) * | 2016-03-14 | 2016-06-08 | 湖州中辰建设有限公司 | Movable-type lifting working platform |
| CN107386690A (en) * | 2017-08-10 | 2017-11-24 | 扬州市宏建工程材料有限公司 | A kind of Combined type safety ladder cage |
| CN210421859U (en) * | 2019-07-04 | 2020-04-28 | 烟台新科钢结构有限公司 | A portable lift truck for furred ceiling installation |
| CN111364799A (en) * | 2020-04-30 | 2020-07-03 | 郑州宝冶钢结构有限公司 | Steel structure support frame |
| CN212613932U (en) * | 2020-06-24 | 2021-02-26 | 南京科技职业学院 | Dangerous wall supporting device for constructional engineering |
| CN113565304A (en) * | 2021-08-30 | 2021-10-29 | 云南省建设投资控股集团有限公司 | A mobile work trolley that can lift materials |
| CN217352547U (en) * | 2022-05-30 | 2022-09-02 | 中国市政工程华北设计研究总院有限公司 | Ecological slope protection construction platform |
| CN218815429U (en) * | 2022-11-03 | 2023-04-07 | 山东洲盛建筑工程有限公司 | Triangular steel structure support frame |
| CN115807528A (en) * | 2022-11-18 | 2023-03-17 | 中国十九冶集团有限公司 | Portable side slope protection operation platform |
| CN115973371A (en) * | 2022-12-03 | 2023-04-18 | 江苏速捷模架科技有限公司 | Frame upright post unit of construction platform module of enclosure system |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117588026A (en) * | 2023-11-07 | 2024-02-23 | 中冶天工集团有限公司 | Pipeline transportation device and method of use |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202345727U (en) | Flat-plate transport trolley | |
| CN107191676B (en) | Construction method of buried pipeline | |
| CN110195411A (en) | A kind of self-propelled bridge formwork Mobile workbench | |
| CN116791865A (en) | Movable combined type feeding construction safety ladder cage | |
| CN208748661U (en) | A kind of profile steel bracket device for staying support to remove | |
| CN213265442U (en) | Movable assembled gantry crane | |
| CN210049105U (en) | Self-propelled bridge formwork operation trolley | |
| CN212270693U (en) | Bridge deck boundary beam hogging moment stretch-draw operating means | |
| CN221141062U (en) | Cutter disc center block disassembling device of assembled shell-discarding disassembly shield machine | |
| CN212176516U (en) | Attached type lifting scaffold wall-attached support for floor slab | |
| CN217894149U (en) | Material and equipment conveying system for photovoltaic field area of complex mountain land | |
| CN219174087U (en) | Hydropower station electric hoist installation and dismounting device | |
| CN212897458U (en) | Operation platform for self-made movable suspension operation | |
| CN216445795U (en) | Bridge formwork support convenient to dismantle fast | |
| CN207361652U (en) | Moving device for large steel pipe | |
| CN117803418A (en) | Horizontal lamellar surrounding rock tunnel construction lining template trolley and using method thereof | |
| CN212668989U (en) | Movable gantry crane suitable for maintenance of petrochemical equipment | |
| CN204897102U (en) | Electronic cat ladder of instrument formula | |
| CN212639713U (en) | Movable portable gantry type hoisting device | |
| CN209907435U (en) | Pipe rack platform truck for comprehensive pipe rack building construction | |
| CN216740605U (en) | Safety work protection platform for construction | |
| CN209385140U (en) | An existing tunnel safety protection multi-functional platform for in-situ expansion tunnel construction | |
| CN219262404U (en) | Inter-frame conveying device for hydraulic support of fully mechanized mining face | |
| CN207390857U (en) | A kind of portable offshore platform crane truss-like arm more changing device | |
| CN207209829U (en) | A kind of oil tank transport, installation integrated apparatus |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |