CN116677335A - Christmas tree cap running tool - Google Patents
Christmas tree cap running tool Download PDFInfo
- Publication number
- CN116677335A CN116677335A CN202310759403.3A CN202310759403A CN116677335A CN 116677335 A CN116677335 A CN 116677335A CN 202310759403 A CN202310759403 A CN 202310759403A CN 116677335 A CN116677335 A CN 116677335A
- Authority
- CN
- China
- Prior art keywords
- ring
- tree cap
- christmas tree
- limiting
- main body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B23/00—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
- E21B23/04—Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells operated by fluid means, e.g. actuated by explosion
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B33/00—Sealing or packing boreholes or wells
- E21B33/02—Surface sealing or packing
- E21B33/03—Well heads; Setting-up thereof
- E21B33/035—Well heads; Setting-up thereof specially adapted for underwater installations
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Portable Nailing Machines And Staplers (AREA)
Abstract
本发明公开了一种采油树帽送入工具,包括工具主体,其特征在于:工具主体包括承载主体、限位环、驱动环和胀裂环;承载主体由上往下依次套装有限位环、驱动环和胀裂环;承载主体的顶部具有与锁定腔和解锁腔一一对应接通设置的液压接口;当驱动环推顶胀裂环处在圆筒型面且胀裂环下端与胀裂环用台阶相抵接时,胀裂环的径向外端凸出于胀裂环用台阶外侧并构成用于卡入采油树帽连接卡槽内的锁齿。本发明具有的优点是:能够更好确保采油树帽的下放、安装与回收作业顺利开展,具有更好的使用效果。
The invention discloses a Christmas tree cap feeding tool, which includes a tool body, and is characterized in that: the tool body includes a bearing body, a limiting ring, a driving ring and a bursting ring; the bearing body is sequentially fitted with a limiting ring, The drive ring and the expansion ring; the top of the bearing body has a hydraulic interface corresponding to the locking cavity and the unlocking cavity; when the drive ring is pushed to the top, the expansion ring is on the cylindrical surface and the When the steps of the rings abut against each other, the radially outer end of the expansion ring protrudes from the outer side of the steps of the expansion ring and constitutes locking teeth for snapping into the connecting groove of the Christmas tree cap. The invention has the advantages of being able to better ensure the smooth implementation of the operations of lowering, installing and recovering the Christmas tree cap, and having a better use effect.
Description
技术领域technical field
本发明属于采油树帽领域,具体涉及一种采油树帽送入工具。The invention belongs to the field of christmas tree caps, and in particular relates to a tool for feeding christmas tree caps.
背景技术Background technique
水下采油树是水下油气生产系统中的重要装备。水下采油树按其安装方式主要分为两大类:水下立式采油树和水下卧式采油树,由于采油树类别有所不同,因此采油树帽也有所区别,本技术方案中的采油树帽是指立式采油树的采油树帽。The subsea Christmas tree is an important equipment in the subsea oil and gas production system. Subsea Christmas trees are mainly divided into two categories according to their installation methods: underwater vertical Christmas trees and underwater horizontal Christmas trees. Since the types of Christmas trees are different, the caps of the Christmas trees are also different. In this technical solution The Christmas tree cap refers to the Christmas tree cap of the vertical Christmas tree.
采油树帽是位于水下采油树最顶部的重要组成部分,它起着对生产孔及环空孔的可靠密封作用,同时采油树帽上的液压回路与水下采油树液压回路相连接,对整个油/气开采的控制及开采效率起着重要作用。The Christmas tree cap is an important part located at the top of the subsea tree. It plays a reliable role in sealing the production hole and the annular hole. At the same time, the hydraulic circuit on the tree cap is connected with the hydraulic circuit of the subsea tree. The control and production efficiency of the entire oil/gas production play an important role.
采油树帽送入工具是水下采油树配套工具之一,采油树帽送入工具直接关系着采油树帽的下放、安装、回收等操作的顺利开展,故十分关键。The Christmas tree cap feeding tool is one of the supporting tools of the underwater Christmas tree. The Christmas tree cap feeding tool is directly related to the smooth operation of the tree cap's lowering, installation, and recovery, so it is very critical.
现有技术中公告号CN213269820U公开了一种水下采油树树帽取送工具,该工具仍存在的不足是:In the prior art, notification number CN213269820U discloses a kind of underwater Christmas tree tree cap pick-up and delivery tool, and the deficiencies that still exist in this tool are:
该工具无吊放结构,不便于下放与取回;实际使用时,通过其中的转盘来拆取,然而,转盘转动的扭矩较小且在水下操作起来较为繁琐费时,不易使用,故会对采油树帽的送装回收作业造成不利影响。The tool has no hanging structure, so it is inconvenient to lower and retrieve; in actual use, it can be disassembled through the turntable. However, the rotating torque of the turntable is relatively small, and it is cumbersome and time-consuming to operate underwater, so it is difficult to use. The loading and recycling operations of Christmas tree caps have caused adverse effects.
基于此,申请人考虑设计一种能够更好帮助采油树帽下放、安装与回收作业顺利开展的采油树帽送入工具。Based on this, the applicant considers designing a Christmas tree cap feeding tool that can better help the tree caps to be lowered, installed and recovered smoothly.
发明内容Contents of the invention
针对上述现有技术的不足,本发明所要解决的技术问题是:如何提供一种能够更好帮助采油树帽下放、安装与回收作业顺利开展的采油树帽送入工具。Aiming at the deficiencies of the above-mentioned prior art, the technical problem to be solved by the present invention is: how to provide a Christmas tree cap feeding tool that can better help the tree caps to be lowered, installed and recovered smoothly.
为了解决上述技术问题,本发明采用了如下的技术方案:In order to solve the problems of the technologies described above, the present invention adopts the following technical solutions:
采油树帽送入工具,包括工具主体,其特征在于:A Christmas tree cap running tool, including a tool body, characterized by:
所述工具主体包括承载主体、限位环、驱动环和胀裂环;The tool body includes a bearing body, a limit ring, a drive ring and an expansion ring;
所述承载主体整体呈圆柱型结构,且顶面具有上凸且用于与钻杆连接用的吊运连接用接头;所述承载主体的外侧面由上往下依次间隔设置有外径逐渐增大的限位环用台阶、驱动环用台阶和胀裂环用台阶;The bearing main body has a cylindrical structure as a whole, and the top surface has an upwardly convex joint for lifting and connecting with the drill pipe; Steps for large limit rings, steps for drive rings and steps for expansion rings;
所述承载主体由上往下依次套装有所述限位环、驱动环和胀裂环;The bearing body is sequentially fitted with the limiting ring, driving ring and expansion ring from top to bottom;
所述限位环与所述承载主体之间为固定连接;所限位环的下端面与所述限位环用台阶相抵接并限位;There is a fixed connection between the limiting ring and the bearing body; the lower end surface of the limiting ring abuts against the limiting ring with steps to limit the position;
所述驱动环的内侧高度方向中部位置具有内凸的推动凸肩,所述推动凸肩与位于限位环用台阶至驱动环用台阶之间的承载主体外侧面为滑动连接;且所述推动凸肩的上侧环空密封腔构成用于驱动所述推动凸肩下移的锁定腔,所述推动凸肩的下侧环空密封腔构成用于驱动所述推动凸肩上移的解锁腔;所述承载主体的顶部具有与所述锁定腔和解锁腔一一对应接通设置的液压接口;The middle position of the inside height direction of the driving ring has an inwardly protruding pushing shoulder, and the pushing shoulder is slidingly connected to the outer surface of the bearing body between the step for the limit ring and the step for the driving ring; and the pushing The upper annular sealing chamber of the shoulder constitutes a locking chamber for driving the pushing shoulder to move downward, and the lower annular sealing chamber of the pushing shoulder constitutes an unlocking chamber for driving the pushing shoulder to move upward ; The top of the carrying body has a hydraulic interface that is connected to the locking cavity and the unlocking cavity one by one;
所述驱动环用台阶和胀裂环用台阶之间的承载主体外侧面为胀裂用型面,且所述胀裂用型面的下段的外直径大于上段且该下段从上往下依次为圆锥型面和圆筒型面;所述胀裂环可滑动的套装在所述胀裂用型面处,所述驱动环的下端面与所述胀裂环的上端面抵接;且当所述驱动环推顶所述胀裂环处在所述圆筒型面且胀裂环下端与所述胀裂环用台阶相抵接时,所述胀裂环的径向外端凸出于所述胀裂环用台阶外侧并构成用于卡入采油树帽连接卡槽内的锁齿。The outer surface of the bearing body between the step for the drive ring and the step for the expansion ring is a profile for expansion, and the outer diameter of the lower section of the profile for expansion is larger than that of the upper section, and the lower section from top to bottom is Conical profile and cylindrical profile; the expansion ring is slidably set on the profile for expansion, and the lower end surface of the drive ring abuts against the upper end surface of the expansion ring; and when the When the drive ring pushes the expansion ring to the cylindrical surface and the lower end of the expansion ring abuts against the expansion ring with a step, the radially outer end of the expansion ring protrudes from the The outer side of the step of the expansion ring constitutes a locking tooth for snapping into the connection slot of the Christmas tree cap.
本技术方案的采油树帽送入工具的使用过程为:The use process of the Christmas tree cap of this technical proposal is sent into tool as follows:
通过钻杆来承载主体上的吊运连接用接头紧固相连后即可吊运下放或回收;The hoisting connection on the main body is carried by the drill pipe and can be hoisted and lowered or recovered after being fastened with joints;
当采油树帽工具与采油树帽相对接后,通过液压接头向驱动环锁定腔内加压,驱动环在液压的作用下向下驱动胀裂环向着锥面移动,胀裂环在锥面的作用下由径向向外膨胀,使得胀裂环外缘进入采油树帽的连接卡槽内,从而将采油树帽与工具连接在一起;When the Christmas tree cap tool is docked with the Christmas tree cap, pressurize the locking cavity of the drive ring through the hydraulic joint, and the drive ring drives the expansion ring downward under the action of hydraulic pressure to move toward the cone surface, and the expansion ring is on the cone surface. Under the action, it expands from the radial direction outward, so that the outer edge of the expansion ring enters the connection slot of the Christmas tree cap, thereby connecting the Christmas tree cap and the tool together;
当安装完毕需要解锁的时候,通过液压接头向解锁腔内加压,驱动环在液压(一般为3000psi)的作用下向上移动,同时胀裂环从采油树帽卡槽内退出,实现采油树帽与工具的解锁。When it needs to be unlocked after installation, pressurize the unlocking chamber through the hydraulic joint, and the driving ring moves upward under the action of hydraulic pressure (generally 3000psi), and at the same time, the expansion ring withdraws from the slot of the Christmas tree cap to realize the oil tree cap. with tools for unlocking.
由上,同现有技术相比较,本技术方案的采油树帽送入工具具有的优点是:From the above, compared with the prior art, the advantages of the Christmas tree cap feeding tool of the technical solution are:
通过钻杆来连接与吊运,通过液压来驱动驱动环上下移动来驱动胀裂环胀开或回缩,便捷的实现与采油树之间的锁定与解锁,故能够更好确保采油树帽的下放、安装与回收作业顺利开展,具有更好的使用效果。It is connected and hoisted by the drill pipe, and the hydraulic pressure is used to drive the drive ring to move up and down to drive the expansion ring to expand or retract, and it is convenient to realize the locking and unlocking with the Christmas tree, so it can better ensure the safety of the Christmas tree cap. Decentralization, installation and recovery operations are carried out smoothly, with better use effect.
附图说明Description of drawings
图1为采油树的俯视图Figure 1 is a top view of the Christmas tree
图2为采油树帽的剖视图Figure 2 is a cross-sectional view of the Christmas tree cap
图3为本发明采油树帽送入工具携带采油树帽下放的结构示意图Fig. 3 is a schematic diagram of the structure of the Christmas tree cap feeding tool of the present invention carrying the Christmas tree cap down
图4为本发明采油树帽送入工具将采油树帽安装至采油树的结构示意图Fig. 4 is a structural schematic diagram of installing the Christmas tree cap to the Christmas tree with the Christmas tree cap feeding tool of the present invention
图5为本发明采油树帽送入工具退回的结构示意图Fig. 5 is the structure schematic diagram that the Christmas tree cap of the present invention is sent into the tool to return
图6为装有采油树帽的采油树的结构示意图Figure 6 is a structural schematic diagram of a Christmas tree equipped with a Christmas tree cap
图7为本发明采油树帽送入工具(装有导向架)的俯视图Fig. 7 is the top view of the Christmas tree cap feeding tool (equipped with guide frame) of the present invention
图8为本发明采油树帽送入工具(装有导向架)的剖视图Fig. 8 is a cross-sectional view of the Christmas tree cap feeding tool (equipped with a guide frame) of the present invention
图9为本发明采油树帽送入工具(未装导向架)的剖视图Fig. 9 is a cross-sectional view of the Christmas tree cap feeding tool (without guide frame) of the present invention
图中标记为:Labeled in the figure:
A海底A bottom
B基座B base
C采油树:C1生产孔、C2液压接头C Christmas tree: C1 production hole, C2 hydraulic joint
D钻杆D drill pipe
E1转换短节、E2钻杆接头E1 conversion nipple, E2 tool joint
F采油树帽:F1位置指示器、F2液压接头、F3生产孔密封芯轴、F4环空密封芯轴F Christmas tree cap: F1 position indicator, F2 hydraulic joint, F3 production hole seal mandrel, F4 annular space seal mandrel
G采油树帽送入工具(装有导向架)G Christmas tree cap feeding tool (with guide frame)
H导向绳H guide rope
10承载主体:101限位环用台阶、102驱动环用台阶、103胀裂环用台阶、104胀裂用型面、105吊运连接用接头、106支承限位用台阶、107锁定腔、108解锁腔10 Bearing body: 101 steps for limit ring, 102 steps for drive ring, 103 steps for expansion ring, 104 profile for expansion, 105 joint for lifting connection, 106 steps for support limit, 107 lock cavity, 108 unlock cavity
20限位环20 limit ring
30驱动环:301环形槽30 drive ring: 301 ring groove
40胀裂环40 expansion ring
50预紧弹簧50 preload spring
60导向限位销60 guide limit pin
安全退出机构:71复位用压缩弹簧、72中心套筒、73活塞Safety exit mechanism: 71 compression spring for reset, 72 center sleeve, 73 piston
80导向架:81中心安装筒、82悬臂、83导向漏斗、84水平仪、85吊耳、86承载板80 guide frame: 81 center mounting tube, 82 cantilever, 83 guide funnel, 84 spirit level, 85 lifting lug, 86 bearing plate
90矛杆90 spear shaft
具体实施方式Detailed ways
下面结合附图对本发明作进一步的详细说明。The present invention will be further described in detail below in conjunction with the accompanying drawings.
具体实施时:如图3至图9所示,During specific implementation: as shown in Figure 3 to Figure 9,
采油树帽送入工具,包括工具主体,所述工具主体包括承载主体、限位环、驱动环和胀裂环;The Christmas tree cap running tool includes a tool body, and the tool body includes a bearing body, a limit ring, a drive ring and an expansion ring;
所述承载主体整体呈圆柱型结构,且顶面具有上凸且用于与钻杆连接用的吊运连接用接头;所述承载主体的外侧面由上往下依次间隔设置有外径逐渐增大的限位环用台阶、驱动环用台阶和胀裂环用台阶;The bearing main body has a cylindrical structure as a whole, and the top surface has an upwardly convex joint for lifting and connecting with the drill pipe; Steps for large limit rings, steps for drive rings and steps for expansion rings;
所述承载主体由上往下依次套装有所述限位环、驱动环和胀裂环;The bearing body is sequentially fitted with the limiting ring, driving ring and expansion ring from top to bottom;
所述限位环与所述承载主体之间为固定连接;所限位环的下端面与所述限位环用台阶相抵接并限位;There is a fixed connection between the limiting ring and the bearing body; the lower end surface of the limiting ring abuts against the limiting ring with steps to limit the position;
所述驱动环的内侧高度方向中部位置具有内凸的推动凸肩,所述推动凸肩与位于限位环用台阶至驱动环用台阶之间的承载主体外侧面为滑动连接;且所述推动凸肩的上侧环空密封腔构成用于驱动所述推动凸肩下移的锁定腔,所述推动凸肩的下侧环空密封腔构成用于驱动所述推动凸肩上移的解锁腔;所述承载主体的顶部具有与所述锁定腔和解锁腔一一对应接通设置的液压接口;The middle position of the inside height direction of the driving ring has an inwardly protruding pushing shoulder, and the pushing shoulder is slidingly connected to the outer surface of the bearing body between the step for the limit ring and the step for the driving ring; and the pushing The upper annular sealing chamber of the shoulder constitutes a locking chamber for driving the pushing shoulder to move downward, and the lower annular sealing chamber of the pushing shoulder constitutes an unlocking chamber for driving the pushing shoulder to move upward ; The top of the carrying body has a hydraulic interface that is connected to the locking cavity and the unlocking cavity one by one;
所述驱动环用台阶和胀裂环用台阶之间的承载主体外侧面为胀裂用型面,且所述胀裂用型面的下段的外直径大于上段且该下段从上往下依次为圆锥型面和圆筒型面;所述胀裂环可滑动的套装在所述胀裂用型面处,所述驱动环的下端面与所述胀裂环的上端面抵接;且当所述驱动环推顶所述胀裂环处在所述圆筒型面且胀裂环下端与所述胀裂环用台阶相抵接时,所述胀裂环的径向外端凸出于所述胀裂环用台阶外侧并构成用于卡入采油树帽连接卡槽内的锁齿。The outer surface of the bearing body between the step for the drive ring and the step for the expansion ring is a profile for expansion, and the outer diameter of the lower section of the profile for expansion is larger than that of the upper section, and the lower section from top to bottom is Conical profile and cylindrical profile; the expansion ring is slidably set on the profile for expansion, and the lower end surface of the drive ring abuts against the upper end surface of the expansion ring; and when the When the drive ring pushes the expansion ring to the cylindrical surface and the lower end of the expansion ring abuts against the expansion ring with a step, the radially outer end of the expansion ring protrudes from the The outer side of the step of the expansion ring constitutes a locking tooth for snapping into the connection slot of the Christmas tree cap.
实施时,如图3至图5所示,吊运连接用接头通过转换短节与钻杆实现同轴可拆式固定连接。During implementation, as shown in Fig. 3 to Fig. 5, the coaxial detachable fixed connection of the joint for hoisting connection and the drill pipe is realized through the conversion pup joint.
实施时,关于锁定腔和解锁腔的密封结构即为在各自型腔的贴合的两个型面上设置有填充有密封圈的密封凹槽。关于液压型腔的密封为现有技术,在此不作赘述。During implementation, the sealing structure of the locking cavity and the unlocking cavity is that sealing grooves filled with sealing rings are provided on the two fitted surfaces of the respective cavity. The sealing of the hydraulic cavity is a prior art, and will not be repeated here.
采油树帽送入工具,还包括预紧弹簧和导向限位销;Christmas tree cap running tool, also includes preload spring and guide limit pin;
所述驱动环和所述限位环之间正对的端面上设置有放置有所述预紧弹簧的弹簧安装槽;A spring installation groove for placing the pre-tension spring is provided on the end face facing between the drive ring and the limit ring;
所述驱动环的上端面固定安装有所述导向限位销,所述导向限位销的上段滑动插接至所述限位环上对应设置的导向孔内。The upper end surface of the drive ring is fixedly mounted with the guide and limit pin, and the upper section of the guide and limit pin is slidably inserted into the corresponding guide hole provided on the limit ring.
采用以上预紧弹簧能够对驱动环施加下压力,从而更好维持胀裂环的胀开锁紧状态,确保锁紧连接的可靠性。The use of the above pre-tightening spring can exert a downward pressure on the drive ring, so as to better maintain the expanded and locked state of the expansion ring and ensure the reliability of the locked connection.
采用以上导向限位销与导向孔相配合的结构后,能够避免驱动环在圆周方向转动、降低因旋转导致的密封圈的磨损,以及避免使得预紧弹簧因扭矩导致变形失效,确保结构持久使用的可靠性。After adopting the above-mentioned structure of matching the guide limit pin and the guide hole, it can prevent the drive ring from rotating in the circumferential direction, reduce the wear of the sealing ring caused by the rotation, and avoid the failure of the pre-tightening spring due to deformation caused by torque, ensuring the long-term use of the structure reliability.
所述承载主体的外侧面上位于所述驱动环用台阶和胀裂环用台阶之间的高度方向中部位置还设置有支承限位用台阶,该支承限位用台阶的外直径大于所述驱动环用台阶的外直径且小于所述胀裂环用台阶的外直径;The outer surface of the bearing body is located in the middle position in the height direction between the step for the driving ring and the step for the expansion ring, and a step for supporting and limiting is also provided. The outer diameter of the step for supporting and limiting is larger than that of the driving ring. The outer diameter of the step for the ring is smaller than the outer diameter of the step for the expansion ring;
所述驱动环内侧位于所述推动凸肩下方的位置具有用于与所述支承限位用台阶对接配合用的环形槽。A position inside the driving ring below the pushing shoulder has an annular groove for docking with the supporting and limiting step.
承载主体上设置了以上支承限位用台阶与驱动环之间的环形槽配合后,能够增大驱动环的接触受力面,更好避免驱动环因在锁紧驱动过程中出现局部应力集中而变形,更好确保驱动环结构的可靠性,从而更好确保锁定解锁动作的顺利实现。After the bearing body is equipped with the above-mentioned support limit steps and the annular groove between the drive ring, the contact force surface of the drive ring can be increased, and the drive ring can be better avoided due to local stress concentration during the locking drive process. Deformation can better ensure the reliability of the drive ring structure, thereby better ensuring the smooth realization of the locking and unlocking action.
采油树帽送入工具,还包括安全退出机构,所述安全退出机构包括复位用压缩弹簧、中心套筒和活塞;The Christmas tree cap running tool also includes a safety exit mechanism, and the safety exit mechanism includes a compression spring for reset, a central sleeve and a piston;
所述承载主体的下段内部为下端开口的内腔,所述中心套筒插装固定在所述内腔的顶壁的安装孔内;所述中心套筒的下端位于所述内腔内部且具有一圈外凸的凸缘;The interior of the lower section of the bearing body is an inner cavity with an open lower end, and the central sleeve is inserted and fixed in the installation hole of the top wall of the inner cavity; the lower end of the central sleeve is located inside the inner cavity and has a ring of outwardly convex flanges;
所述活塞整体为套装在所述中心套筒外部的筒形结构,且所述活塞的顶部径向内侧面与中心套筒之间为密封滑动连接,所述活塞的顶部径向外侧面与所述内腔侧壁之间为密封滑动连接;所述活塞的顶部、中心套筒以及所述内腔之间共同围形成有顶出液压腔,所述承载主体的顶部具有与所述顶出液压腔对应接通设置的液压接口;The piston as a whole is a cylindrical structure sleeved on the outside of the central sleeve, and the top radial inner surface of the piston is in a sealed sliding connection with the central sleeve, and the top radial outer surface of the piston is in contact with the central sleeve. There is a sealed sliding connection between the side walls of the inner cavity; the top of the piston, the central sleeve and the inner cavity jointly form an ejection hydraulic chamber, and the top of the bearing body has a hydraulic pressure chamber that is compatible with the ejection hydraulic pressure The cavity corresponds to the hydraulic interface set;
位于所述活塞内侧的中心套筒外部套装有所述复位用压缩弹簧,所述复位用压缩弹簧的两端抵接于所述活塞的顶部端板与所述中心套筒底部的凸缘之间。The center sleeve located inside the piston is covered with the reset compression spring, and the two ends of the reset compression spring are abutted between the top end plate of the piston and the flange at the bottom of the center sleeve .
如图1和图2所示,采油树的顶部设置有与采油树帽上对接的多个液压接头,这就要求采油树帽在采油树上的安装与退出需更为精准次才能够更好确保各个连接处的连接可靠性。假如工具在升降过程中出现晃动,则就可能破坏某连接位置的结构形态,进而影响后续油气开采的可控性与开采效率。As shown in Figure 1 and Figure 2, the top of the Christmas tree is provided with multiple hydraulic joints that are docked with the Christmas tree cap, which requires more precise installation and withdrawal of the Christmas tree cap on the Christmas tree to be better Ensure connection reliability at each connection. If the tool shakes during the lifting process, it may damage the structural form of a certain connection position, thereby affecting the controllability and production efficiency of subsequent oil and gas production.
为此,本技术方案设置了以上安全退出机构后,即可在完成采油树帽在采油树的安装后,通过液压来驱动活塞缓慢精准的上升、确保工具可靠的退出采油树帽后,即可快速的完成后续的回收。For this reason, after the above safety exit mechanism is set up in this technical solution, after the installation of the Christmas tree cap on the Christmas tree is completed, the piston can be driven to rise slowly and accurately through hydraulic pressure to ensure that the tool can be reliably withdrawn from the Christmas tree cap. Quickly complete the follow-up recovery.
与此同时,以上安全退出机构设置在承载主体内部,也充分的利用了承载主体的内部空间,使得承载主体整体结构更为紧凑的同时也帮助降低了承载主体的自重。At the same time, the above safety exit mechanism is arranged inside the carrying body, which also makes full use of the internal space of the carrying body, making the overall structure of the carrying body more compact and helping to reduce the weight of the carrying body.
采油树帽送入工具,还包括导向架,所述导向架包括中心安装筒、悬臂和导向漏斗;The Christmas tree cap feeding tool also includes a guide frame, and the guide frame includes a central installation cylinder, a cantilever and a guide funnel;
所述中心安装筒可拆式套装固定在所述承载主体的上段外部;The detachable set of the central mounting cylinder is fixed on the outside of the upper section of the bearing main body;
所述中心安装筒外侧面在圆周方向均匀间隔设置有至少一对所述悬臂,每个所述悬臂的外端固定安装有轴心线与所述中心安装筒的轴心线平行的导向漏斗,所述导向漏斗的上段为筒形结构,下段为开口逐渐增加的喇叭口型结构。At least one pair of cantilever arms are evenly spaced on the outer surface of the central installation cylinder in the circumferential direction, and the outer end of each cantilever is fixedly equipped with a guide funnel whose axis line is parallel to the axis line of the central installation cylinder. The upper section of the guiding funnel is a cylindrical structure, and the lower section is a trumpet-shaped structure with gradually increasing openings.
导向架起着对工具及采油树帽的支撑作用以及下方回收进行导向,确保整个工具在操作过程中的安全性;The guide frame acts as a support for the tool and the Christmas tree cap and guides the recovery below to ensure the safety of the entire tool during operation;
其中的导向漏斗主要有两个方面的导向作用:一方面是在工具送入的时候漏斗中间穿入与采油树相连接的导向绳,在导向绳的辅助下进行导向;另一方面用在当采油树帽与工具连接需要安放在运输架(如LRP运输架)上时,通过导向漏斗与运输架上的导向杆的配合来进行导向固定。Among them, the guide funnel mainly has two guiding functions: on the one hand, when the tool is fed in, the guide rope connected with the Christmas tree is penetrated in the middle of the funnel, and the guide is guided with the help of the guide rope; When the connection between the Christmas tree cap and the tool needs to be placed on the transport frame (such as the LRP transport frame), guide and fix it through the cooperation of the guide funnel and the guide rod on the transport frame.
实施时,承载主体的顶部边缘具有一圈上凸的连接用凸起,所述连接用凸起与中心安装筒之间通过连接件固定连接。During implementation, the top edge of the carrying body has a circle of upwardly protruding connecting protrusions, and the connecting protrusions are fixedly connected to the central mounting cylinder through a connecting piece.
采油树帽送入工具,还包括在所述悬臂上固定安装的水平仪。The Christmas tree cap feeding tool also includes a level fixedly installed on the cantilever.
实施时,优选在相邻两个悬臂之间的位置固定安装有一横梁,所述横梁上固定安装有所述水平仪。During implementation, preferably, a crossbeam is fixedly installed between two adjacent cantilevers, and the level is fixedly installed on the crossbeam.
水平仪在工具下放过程中起着对整个系统调平的作用。The spirit level plays a role in leveling the entire system during the lowering of the tool.
所述悬臂的数量为两对,每根所述悬臂上邻近所述导向漏斗的位置与所述导向漏斗之间的外侧面固定连接有一块加强筋块,所述加强筋块上设置有吊孔并使得该加强筋块构成吊耳。The number of the cantilever is two pairs, each of the cantilever is fixedly connected with a reinforcement block on the outer surface between the position adjacent to the guide funnel and the guide funnel, and the reinforcement block is provided with a hanging hole And make this reinforcing rib block constitute lifting lug.
这样一来,在操作的时候可以根据水平仪表盘上的球的偏离位置,来起吊和下放对应的悬臂进行调整,直到将工具调整水平为止,从而最终确保采油树帽与采油树之间精准对接安装。In this way, during operation, according to the deviation position of the ball on the horizontal instrument panel, the corresponding cantilever can be lifted and lowered for adjustment until the tool is adjusted horizontally, so as to finally ensure the precise docking between the Christmas tree cap and the Christmas tree Install.
靠近所述中心安装筒的相邻的两块悬臂之间固定连接有整体呈横向的承载板。An overall transverse bearing plate is fixedly connected between two adjacent cantilevers close to the central mounting cylinder.
以上承载板的设置不仅能够起到增强整个导向架结构强度的作用;承载板还便于供人体站立,从而便于人员将钻杆与工具之间对准并快速连接。The setting of the above bearing plate can not only enhance the structural strength of the whole guide frame; the bearing plate is also convenient for the human body to stand, so that it is convenient for personnel to align and quickly connect the drill pipe and the tool.
实施时,承载板采用金属网格板。During implementation, the bearing plate adopts metal grid plate.
实施时,还包括插装在所述承载主体内的矛杆,所述矛杆的下段通过圆锥型面限位于所述承载主体内,所述矛杆的下端密封插装并与所述中心套筒的连通。During implementation, it also includes a lance inserted into the bearing body, the lower section of the lance is limited in the bearing body by a conical surface, and the lower end of the lance is sealed and inserted into the center sleeve. cylinder connection.
设置以上矛杆结构后,即可在采油树帽回收之前,对采油树帽以下进行压力检测,具体检测步骤如下:After the above spear structure is set, the pressure test can be carried out below the tree cap before the tree cap is recovered. The specific detection steps are as follows:
1)连接管线到TC CONECTOR BORES TEST检测口,打开检测针型阀,关闭放空针型阀;1) Connect the pipeline to the detection port of TC CONECTOR BORES TEST, open the detection needle valve, and close the vent needle valve;
2)关闭TCT阀进行压力测试,确认TCRT活塞与TC矛杆之间的接口的密封性,测试压力7500psi,保压15min,之后降压到200psi;2) Close the TCT valve to conduct a pressure test, confirm the tightness of the interface between the TCRT piston and the TC spear, test the pressure at 7500psi, keep the pressure for 15min, and then reduce the pressure to 200psi;
3)打开TCT针型阀5min,检测采油树树帽清蜡阀和采油树清蜡阀的压力泄漏情况;3) Open the TCT needle valve for 5 minutes to detect the pressure leakage of the Christmas tree cap wax removal valve and the Christmas tree wax removal valve;
4)放空TC CONNECTOR BORES TEST,关闭阀门来检查采油树帽的泄漏,之后打开阀门放空并做好记录(错误信息也需要记录);4) Vent the TC CONNECTOR BORES TEST, close the valve to check the leakage of the tree cap, then open the valve to vent and make a record (error information also needs to be recorded);
5)放空所有压力之后,ROV打开TCV。5) After venting all pressure, the ROV opens the TCV.
以上为采油树帽送入工具的优选实施例:More than the preferred embodiment of the Christmas tree cap into the tool:
本技术方案的采油树帽送入工具是用液压来驱动机械锁紧机构的。在承载主体的上端面有四个液压接头,分别起着锁定、解锁、断开及测试的作用。The Christmas tree cap feeding tool of the technical proposal uses hydraulic pressure to drive the mechanical locking mechanism. There are four hydraulic joints on the upper end of the bearing body, which play the roles of locking, unlocking, disconnecting and testing respectively.
采油树帽安装主要步骤:采油树帽连接到工具上并下放→采油树帽与采油树连接→采油树帽及采油树清蜡阀测试→工具与采油树帽断开及回收。The main steps of installing the Christmas tree cap: connecting the Christmas tree cap to the tool and lowering it → connecting the Christmas tree cap with the Christmas tree → testing the Christmas tree cap and the wax removal valve of the Christmas tree → disconnecting and recovering the tool from the Christmas tree cap.
采油树帽回收主要步骤:工具与钻杆连接并下放→工具与采油树帽连接→采油树帽以下压力检测→采油树帽与采油树断开并回收。The main steps of recovering the Christmas tree cap are: connecting the tool with the drill pipe and lowering it → connecting the tool with the Christmas tree cap → detecting the pressure below the Christmas tree cap → disconnecting the Christmas tree cap from the Christmas tree and recovering.
以上仅是本发明优选的实施方式,需指出的是,对于本领域技术人员在不脱离本技术方案的前提下,作出的若干变形和改进的技术方案应同样视为落入本权利要求书要求保护的范围。The above are only preferred embodiments of the present invention, and it should be pointed out that for those skilled in the art without departing from the technical solution, some modifications and improved technical solutions should also be regarded as falling into the requirements of the claims. scope of protection.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310759403.3A CN116677335B (en) | 2023-06-26 | 2023-06-26 | Oil extraction tree cap delivery tool |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310759403.3A CN116677335B (en) | 2023-06-26 | 2023-06-26 | Oil extraction tree cap delivery tool |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116677335A true CN116677335A (en) | 2023-09-01 |
| CN116677335B CN116677335B (en) | 2026-06-02 |
Family
ID=87790827
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310759403.3A Active CN116677335B (en) | 2023-06-26 | 2023-06-26 | Oil extraction tree cap delivery tool |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116677335B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118110446A (en) * | 2024-04-28 | 2024-05-31 | 东营千禧龙科工贸有限公司 | Installation and recovery tool for underwater Christmas tree |
Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1437562A (en) * | 1973-05-08 | 1976-05-26 | Vetco Offshore Ind Inc | Orienting tubing hanger apparatus through which side pocket mandrels can pass |
| GB1455051A (en) * | 1973-05-07 | 1976-11-10 | Rucker Co | Casing hanger assembly and operating tools therefor |
| US20080230229A1 (en) * | 2007-03-23 | 2008-09-25 | Shaw Gary A | Method of Running a Tubing Hanger and Internal Tree Cap Simultaneously |
| CN101424177A (en) * | 2007-11-02 | 2009-05-06 | 中国海洋石油总公司 | Down-in type marginal oil field underwater drilling basal disc for drilling ship and manufacture and installation method |
| CN204344031U (en) * | 2014-12-29 | 2015-05-20 | 中国石油大学(华东) | Subsea production tree hydraulic pressure inner blocking type lifting device |
| CN205669385U (en) * | 2016-06-20 | 2016-11-02 | 重庆前卫海洋石油工程设备有限责任公司 | Boll-weevil hanger promptly reclaims instrument |
| CN106401515A (en) * | 2016-05-31 | 2017-02-15 | 美钻能源科技(上海)有限公司 | Underwater horizontal type Christmas tree fetching and transporting tool |
| CN107420058A (en) * | 2016-05-23 | 2017-12-01 | 美钻能源科技(上海)有限公司 | Subsea production tree tubing hanger center plug running tool |
| CN107939328A (en) * | 2017-11-29 | 2018-04-20 | 重庆前卫海洋石油工程设备有限责任公司 | Underwater production tree cup running tool |
| CN112324371A (en) * | 2020-12-09 | 2021-02-05 | 重庆前卫科技集团有限公司 | Subsea tree tubing hanger fed into recovery tool |
| CN114622858A (en) * | 2020-12-11 | 2022-06-14 | 重庆前卫科技集团有限公司 | Mechanical recovery tool for tubing hanger of underwater Christmas tree |
| CN220185070U (en) * | 2023-06-26 | 2023-12-15 | 中国海洋石油集团有限公司 | A kind of Christmas tree cap feeding tool |
-
2023
- 2023-06-26 CN CN202310759403.3A patent/CN116677335B/en active Active
Patent Citations (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| GB1455051A (en) * | 1973-05-07 | 1976-11-10 | Rucker Co | Casing hanger assembly and operating tools therefor |
| GB1437562A (en) * | 1973-05-08 | 1976-05-26 | Vetco Offshore Ind Inc | Orienting tubing hanger apparatus through which side pocket mandrels can pass |
| US20080230229A1 (en) * | 2007-03-23 | 2008-09-25 | Shaw Gary A | Method of Running a Tubing Hanger and Internal Tree Cap Simultaneously |
| CN101424177A (en) * | 2007-11-02 | 2009-05-06 | 中国海洋石油总公司 | Down-in type marginal oil field underwater drilling basal disc for drilling ship and manufacture and installation method |
| CN204344031U (en) * | 2014-12-29 | 2015-05-20 | 中国石油大学(华东) | Subsea production tree hydraulic pressure inner blocking type lifting device |
| CN107420058A (en) * | 2016-05-23 | 2017-12-01 | 美钻能源科技(上海)有限公司 | Subsea production tree tubing hanger center plug running tool |
| CN106401515A (en) * | 2016-05-31 | 2017-02-15 | 美钻能源科技(上海)有限公司 | Underwater horizontal type Christmas tree fetching and transporting tool |
| CN205669385U (en) * | 2016-06-20 | 2016-11-02 | 重庆前卫海洋石油工程设备有限责任公司 | Boll-weevil hanger promptly reclaims instrument |
| CN107939328A (en) * | 2017-11-29 | 2018-04-20 | 重庆前卫海洋石油工程设备有限责任公司 | Underwater production tree cup running tool |
| CN112324371A (en) * | 2020-12-09 | 2021-02-05 | 重庆前卫科技集团有限公司 | Subsea tree tubing hanger fed into recovery tool |
| CN114622858A (en) * | 2020-12-11 | 2022-06-14 | 重庆前卫科技集团有限公司 | Mechanical recovery tool for tubing hanger of underwater Christmas tree |
| CN220185070U (en) * | 2023-06-26 | 2023-12-15 | 中国海洋石油集团有限公司 | A kind of Christmas tree cap feeding tool |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118110446A (en) * | 2024-04-28 | 2024-05-31 | 东营千禧龙科工贸有限公司 | Installation and recovery tool for underwater Christmas tree |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116677335B (en) | 2026-06-02 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN115162999B (en) | Large-diameter continuous gas production pipe column throwing construction method | |
| CN105927175B (en) | Lock claw suspension type pressurization coring apparatus | |
| CN209817989U (en) | Remote plugging connector for wellhead | |
| CN114622858B (en) | Mechanical recovery tool for tubing hanger of underwater christmas tree | |
| CN220185070U (en) | A kind of Christmas tree cap feeding tool | |
| CN109488239B (en) | One-way delivery tool and method for casing hanger and seal assembly for underwater wellhead | |
| CN107747481A (en) | A kind of mechanical subsea production tree fetches and delivers instrument | |
| CN205669385U (en) | Boll-weevil hanger promptly reclaims instrument | |
| CN107013176B (en) | Underwater well head connector | |
| CN114459785A (en) | Integrated testing device for deepwater drilling and completion system and using method thereof | |
| CN217358897U (en) | Assembly and check assembly for Christmas tree isolation sleeve | |
| CN110017109A (en) | A kind of long-range hydraulically-controlled type boll-weevil hanger tripping in recycling tool | |
| CN121273256A (en) | Integrated underwater low-pressure wellhead installation tieback tool | |
| CN103291254B (en) | Horizontal sleeve type connector for deep water manifold | |
| CN220203844U (en) | Light installation and recovery tool for underwater Christmas tree | |
| CN220267638U (en) | Hydraulic control underwater oil pipe hanger sending and taking tool | |
| CN103266860B (en) | Lock-ring installation pressure test tool | |
| CN202031521U (en) | Wellhead tieback connector | |
| CN115095303B (en) | Underground liquid control device and using method thereof | |
| CN117759195A (en) | A BTR controlled pressure drilling assembly structure under the tension ring of a semi-submersible drilling platform | |
| CN109826587B (en) | Large-drift-diameter water-proof oil extraction packer and operation method thereof | |
| CN212407967U (en) | Pile top plugging device for end face sealing of steel pipe pile | |
| CN223459352U (en) | Speed pipe string well completion device | |
| CN113464081A (en) | Coal bed gas micro-strip pressure well repairing process | |
| CN111894556A (en) | Wellhead pressure testing device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |