CN116677210A CN202310548985.0A CN202310548985A CN116677210A CN 116677210 A CN116677210 A CN 116677210A CN 202310548985 A CN202310548985 A CN 202310548985A CN 116677210 A CN116677210 A CN 116677210A
Authority
CN
China
Prior art keywords
support frame
truss
construction
section truss
end section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310548985.0A
Other languages
Chinese (zh)
Inventor
于送洋
郭得旺
姚盼盼
任强
李泉
赵力
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinggong Lvzhu Technology Group Co ltd
Original Assignee
Jinggong Lvzhu Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinggong Lvzhu Technology Group Co ltd filed Critical Jinggong Lvzhu Technology Group Co ltd
Priority to CN202310548985.0A priority Critical patent/CN116677210A/en
Publication of CN116677210A publication Critical patent/CN116677210A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E04G21/18—Adjusting tools; Templates
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E04G21/18—Adjusting tools; Templates
    • E04G21/1841—Means for positioning building parts or elements
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G25/00—Shores or struts; Chocks
    • E04G25/04—Shores or struts; Chocks telescopic

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明公开一种应用于装配式钢结构楼板施工的支撑架的安装工艺,包括以下步骤,A、施工准备;首先查表确定支撑架的数量;而后在工厂中制造支撑架,并进行质量验收;B、现场调节并固定支撑架的适用长度;根据两钢框架梁之间的跨度,调节并固定支撑架长度;C、连接挂件与支撑架相连接;在支撑架两端分别设置连接挂件;D、在钢框架梁上布置连接挂件;将连接挂件搭在钢框架梁的上翼缘;E、焊接连接挂件与钢框架梁。该支撑架具有可伸缩,免落地的特点,因此其施工工艺具有安装、拆卸快速的特点。

The invention discloses an installation process of a support frame applied to the construction of a prefabricated steel structure floor slab, comprising the following steps: A. Construction preparation; first, check the table to determine the number of support frames; then manufacture the support frame in a factory, and conduct quality inspection ; B. adjust and fix the applicable length of the support frame on site; adjust and fix the length of the support frame according to the span between the two steel frame beams; D. Arrange the connecting pendant on the steel frame beam; put the connecting pendant on the upper flange of the steel frame beam; E. Weld the connecting pendant and the steel frame beam. The support frame has the characteristics of being scalable and free from landing, so its construction technology has the characteristics of quick installation and disassembly.

Description

一种应用于装配式钢结构楼板施工的支撑架的安装工艺An installation process of a support frame applied to the construction of a prefabricated steel structure floor

技术领域technical field

本发明涉及一般的建筑结构连接领域,特别涉及一种应用于装配式钢结构楼板施工的支撑架的安装工艺。The invention relates to the field of general building structure connection, in particular to an installation process of a support frame applied to the construction of an assembled steel structure floor.

背景技术Background technique

多层钢结构建筑房屋的楼板施工由底层开始逐层向上施工,每层楼板混凝土浇筑前,施工现场采用钢管脚手架结合临时模板或永久性模板进行支撑。落地钢管脚手架的临时支撑的搭设周期长、搭设工序繁琐,而且搭设工序受限于下层楼板的混凝土浇筑养护完成的时间,制约了钢结构建筑的施工效率;当楼层层高较高时,落地临时支撑搭设费用和风险都将大大增加。The floor construction of a multi-storey steel structure building starts from the bottom layer and goes up layer by layer. Before the concrete pouring of each floor, the construction site uses steel pipe scaffolding combined with temporary formwork or permanent formwork for support. The temporary support of floor-to-ceiling steel pipe scaffolding has a long erection period and cumbersome erection process, and the erection process is limited by the time for the concrete pouring and maintenance of the lower floor to be completed, which restricts the construction efficiency of the steel structure building; Support erection costs and risks will be greatly increased.

如申请号为201610698234.7的一种桁架式模板支架体系的快速拆装方,本发明先制作桁架弦杆、组合端板、型钢连接件和钢梁;组合端板上开有螺栓孔,型钢连接件包括相互固定的横板、竖板和中间板,横板和竖板上分别开有连接孔;桁架弦杆通过焊接与组合端板固定成整体,组合端板通过快拆螺栓连接到型钢连接件上,型钢连接件通过安装螺栓安装在钢梁上;安装时,将型钢连接件安装在钢梁上,然后吊装钢梁,就位后再将组合端板连同桁架弦杆一起安装在型钢连接件上。该种施工方法中,支架体系与钢梁通过螺栓连接,需要在钢梁上开设孔洞,会影响钢梁的强度。For example, the application number is 201610698234.7 for a quick disassembly and assembly method of a truss-type formwork support system. The present invention first makes truss chords, combined end plates, section steel connectors and steel beams; the combination end plates are provided with bolt holes and section steel connectors It includes horizontal plates, vertical plates and middle plates fixed to each other, and connecting holes are opened on the horizontal plates and vertical plates respectively; the truss chord is fixed with the combined end plate by welding, and the combined end plate is connected to the steel connector by quick release bolts Above, the steel connectors are installed on the steel beams through the installation bolts; when installing, install the steel connectors on the steel beams, then hoist the steel beams, and then install the combined end plates together with the truss chords on the steel connectors superior. In this construction method, the support system and the steel beam are connected by bolts, and holes need to be opened on the steel beam, which will affect the strength of the steel beam.

鉴于上述问题,本发明以另一种设计思路设计出一种应用于装配式钢结构楼板施工的支撑架的安装工艺,本案由此产生。In view of the above problems, the present invention uses another design idea to design a support frame installation process applied to the construction of fabricated steel structure floors, and this case arises from this.

发明内容Contents of the invention

本发明提供一种应用于装配式钢结构楼板施工的支撑架的安装工艺,该支撑架具有可伸缩,免落地的特点,因此其施工工艺具有安装、拆卸快速的特点;具体地,本发明是通过以下技术方案实现:The invention provides an installation process of a support frame applied to the construction of a prefabricated steel structure floor. The support frame has the characteristics of being scalable and free from landing, so its construction process has the characteristics of fast installation and disassembly; specifically, the present invention is Achieved through the following technical solutions:

一种应用于装配式钢结构楼板施工的支撑架的安装工艺,包括以下步骤,A、施工准备;首先查表确定支撑架的数量;而后在工厂中制造支撑架,并进行质量验收;B、现场调节并固定支撑架的适用长度;根据两钢框架梁之间的跨度,调节并固定支撑架长度;C、连接挂件与支撑架相连接;在支撑架两端分别设置连接挂件;D、在钢框架梁上布置连接挂件;将连接挂件搭在钢框架梁的上翼缘;E、焊接连接挂件与钢框架梁。An installation process for a support frame applied to the construction of a prefabricated steel structure floor slab, comprising the following steps, A, construction preparation; first look up the table to determine the quantity of the support frame; then manufacture the support frame in the factory, and carry out quality inspection; B, Adjust and fix the applicable length of the support frame on site; adjust and fix the length of the support frame according to the span between the two steel frame beams; C. The connecting pendant is connected with the support frame; the connecting pendant is respectively installed at both ends of the support frame; D. The connecting pendant is arranged on the steel frame beam; the connecting pendant is placed on the upper flange of the steel frame beam; E, the connecting pendant and the steel frame beam are welded.

上述施工方法中,不会破坏钢梁结构的强度。采用焊接的方式,连接更为稳固。In the above construction method, the strength of the steel beam structure will not be damaged. The connection is more stable by welding.

进一步,另一种方案中或者步骤C放置于步骤E之前。Further, in another scheme or step C is placed before step E.

进一步,支撑架包括中间段桁架和端部段桁架,中间段桁架的两端分别与端部段桁架连接,连接挂件安装在端部段桁架上,用于与楼板连接;中间段桁架包括上弦杆、下弦杆和拉杆,拉杆连接上弦杆和下弦杆,上弦杆和下弦杆中皆设置有凹槽;端部段桁架包括上弦杆、下弦杆和拉杆,拉杆连接上弦杆和下弦杆;端部段桁架的上下弦杆分别装配在中间段桁架的上下弦杆凹槽中,端部段桁架可相对中间段桁架移动。Further, the supporting frame includes a middle section truss and an end section truss, the two ends of the middle section truss are respectively connected with the end section truss, and the connecting pendant is installed on the end section truss for connecting with the floor; the middle section truss includes the upper chord , the lower chord and the tie rod, the tie rod connects the upper chord and the lower chord, grooves are arranged in the upper chord and the lower chord; the end section truss includes the upper chord, the lower chord and the tie rod, the tie rod connects the upper chord and the lower chord; the end section The upper and lower chords of the truss are respectively assembled in the grooves of the upper and lower chords of the middle truss, and the end trusses can move relative to the middle truss.

该支撑桁架由三段组合而成,中间段桁架与端部段桁架的连接长度可调节,以适应不同的楼板跨度。支撑桁架两端通过螺杆支撑在钢梁上翼缘,并进行可靠连接。支撑桁架上铺设临时模板或者永久性模板,对钢筋混凝土楼板施工阶段提供可靠的临时支撑系统。免落地的可伸缩临时支撑系统,适用与钢结构建筑的不同楼板类型,为楼板下部留有较大自由空间,便于多工种统筹施工,加快施工进度。The supporting truss is composed of three sections, and the connection length of the middle section truss and the end section truss can be adjusted to adapt to different floor spans. Both ends of the supporting truss are supported on the upper flange of the steel beam by screws and are reliably connected. Temporary formwork or permanent formwork is laid on the support truss to provide a reliable temporary support system for the construction phase of the reinforced concrete floor. The retractable temporary support system free from landing is suitable for different types of floor slabs of steel structure buildings, leaving a large free space for the lower part of the floor slab, which is convenient for multi-type construction and speeds up the construction progress.

进一步,连接挂件包括螺杆,螺杆包括第一杆段和第二杆段,两段杆段垂直连接。Further, the connecting hanger includes a screw rod, the screw rod includes a first rod segment and a second rod segment, and the two rod segments are vertically connected.

进一步,中间段桁架中,在上弦杆和下弦杆中,沿着梁的轴线设置有若干定位孔;端部段桁架中,在上弦杆和下弦杆中,沿着梁的轴线设置有若干定位孔;定位销或定位螺栓穿过两桁架的定位孔,用于实现中间段桁架与端部段桁架的连接。Further, in the middle section truss, several positioning holes are arranged along the axis of the beam in the upper chord and the lower chord; in the end section truss, several positioning holes are arranged in the upper chord and the lower chord along the axis of the beam ; Locating pins or locating bolts pass through the locating holes of the two trusses to realize the connection between the middle truss and the end truss.

根据楼板跨度确定可伸缩的适用范围、确定长度调节的模数,通过在桁架弦梁侧面不同位置间隔50mm均匀布置开孔位置,实现调节模数;同时端部采用长圆孔形式设置,使得调节支撑能覆盖可调范围的任意间距。调节完成后,确定固定方式,采用销对穿两段上、下弦定位孔。According to the span of the floor, determine the scope of application of the telescopic, determine the modulus of length adjustment, and adjust the modulus by uniformly arranging the hole positions at different positions on the side of the truss chord beam at intervals of 50mm; at the same time, the ends are set in the form of oblong holes to adjust the support Any spacing that can cover the adjustable range. After the adjustment is completed, determine the fixing method, and use pins to pass through the two sections of upper and lower string positioning holes.

进一步,步骤B中,利用定位销或定位螺栓穿过定位孔固定连接中间段桁架和端部段桁架,实现现场调节并固定支撑架的适用长度。Further, in step B, the middle section truss and the end section trusses are fixedly connected through the positioning holes by using positioning pins or positioning bolts, so as to realize on-site adjustment and fix the applicable length of the support frame.

进一步,步骤C中,螺杆的第一杆段穿过端部段桁架中通孔,调节螺杆的第二杆段相对上弦杆的高度,通过螺母将螺杆与上弦杆锁紧固定。Further, in step C, the first rod section of the screw passes through the through hole in the truss of the end section, the height of the second rod section of the screw relative to the upper chord is adjusted, and the screw and the upper chord are locked and fixed by a nut.

采用螺杆预安装在桁架支撑两端,现场安装时,整个桁架支撑可以借助螺杆直接挂在钢梁上翼缘,然后可以方便地进行可靠的焊接固定。The screw rods are pre-installed at both ends of the truss support. When installed on site, the entire truss support can be directly hung on the upper flange of the steel beam by means of the screw rods, and then can be easily and reliably welded and fixed.

利用了钢梁上翼缘良好的可焊性,安全可靠、安装效率高,同时可以通过调节螺杆的长度,实现楼板的不同标高的设计施工要求。Utilizing the good weldability of the upper flange of the steel beam, it is safe and reliable, and the installation efficiency is high. At the same time, the design and construction requirements of different elevations of the floor can be realized by adjusting the length of the screw.

进一步,步骤D中,螺杆的第二杆段搭在楼层层板中的钢框架梁的上翼板上。Further, in step D, the second rod section of the screw rod rides on the upper flange of the steel frame beam in the floor slab.

进一步,从钢框架梁上拆卸支撑架的步骤为,拧松螺杆上的螺母,将端部段桁架与螺杆分离。Further, the step of disassembling the supporting frame from the steel frame beam is to loosen the nuts on the screw rods, and separate the end section truss from the screw rods.

本方案中的支撑架,其特点是临时支撑重量轻、可伸缩调节长度、利用钢梁上翼缘作为支撑点实现了免落地的功能,为楼板施工阶段提供可靠的临时支撑,解决了钢结构建筑中落地脚手架支撑的施工效率与钢结构不匹配的问题,可大范围推广使用。新型免落地可伸缩临时支撑可以适用于钢结构建筑中的钢筋桁架楼承楼、叠合板、压型钢板、全现浇楼板等楼板结构形式。The support frame in this scheme is characterized by light weight of temporary support, scalable and adjustable length, using the upper flange of the steel beam as a support point to realize the function of avoiding landing, providing reliable temporary support for the construction stage of the floor slab, and solving the problem of steel structure buildings. The construction efficiency of floor-to-ceiling scaffolding does not match the steel structure, which can be widely used. The new type of floor-free retractable temporary support can be applied to steel structure buildings such as reinforced truss floors, laminated slabs, profiled steel plates, and fully cast-in-place slabs.

附图说明Description of drawings

图1为本发明提供的一种支撑架实施例的立体图;Fig. 1 is the perspective view of a kind of support frame embodiment provided by the present invention;

图2为本发明提供的一种支撑架实施例的主视图;Fig. 2 is the front view of a kind of support frame embodiment provided by the present invention;

图3为本发明提供的一种中间段桁架实施例的主视图;Fig. 3 is a front view of an embodiment of an intermediate section truss provided by the present invention;

图4为本发明提供的一种中间段桁架实施例的侧视图;Fig. 4 is a side view of an embodiment of a mid-section truss provided by the present invention;

图5为本发明提供的一种端部段桁架实施例的主视图;Fig. 5 is a front view of an embodiment of an end section truss provided by the present invention;

图6为本发明提供的一种端部段桁架实施例的立体图;Fig. 6 is a perspective view of an embodiment of an end section truss provided by the present invention;

图7为本发明提供的一种端部段桁架与中间段桁架装配的实施例的示意图;Fig. 7 is a schematic diagram of an embodiment of the assembly of an end section truss and a middle section truss provided by the present invention;

图8为图7的局部放大图;Figure 8 is a partially enlarged view of Figure 7;

图9为本发明提供的一种连接挂件安装示意图;Fig. 9 is a schematic diagram of the installation of a connection pendant provided by the present invention;

图10为本发明提供的一种加强件实施例的立体图;Fig. 10 is a perspective view of an embodiment of a reinforcement provided by the present invention;

图11为本发明提供的一种连接挂件与钢框架梁安装示意图;Figure 11 is a schematic diagram of the installation of a connecting pendant and a steel frame beam provided by the present invention;

图12为本发明提供的一种支撑架与钢框架梁安装示意图;Figure 12 is a schematic diagram of the installation of a support frame and a steel frame beam provided by the present invention;

图13为图12的局部放大图。FIG. 13 is a partially enlarged view of FIG. 12 .

其中:1.中间段桁架;11.上弦杆;12.下弦杆;13.拉杆;14.凹槽;15.定位孔;16.定位孔;2.端部段桁架;21.上弦杆;22.下弦杆;23.拉杆;25.定位孔;26.定位孔;27.通孔;28.加强件;3.连接挂件;31.螺杆;311.第一杆段;312.第二杆段;32.螺母;4.定位销;5.钢框架梁。Among them: 1. Intermediate truss; 11. Upper chord; 12. Lower chord; 13. Tie rod; 14. Groove; 15. Positioning hole; 16. Positioning hole; 2. End truss; 21. Upper chord; 22 .Bottom chord; 23. Tie rod; 25. Positioning hole; 26. Positioning hole; 27. Through hole; 28. Reinforcement; 3. Connecting pendant; 31. Screw; ; 32. Nut; 4. Locating pin; 5. Steel frame beam.

具体实施方式Detailed ways

下面将参照附图更详细地描述本发明的优选实施方式。虽然附图中显示了本发明的优选实施方式,然而应该理解,可以以各种形式实现本发明而不应被这里阐述的实施方式所限制。相反,提供这些实施方式是为了使本发明更加透彻和完整,并且能够将本发明的范围完整的传达给本领域的技术人员。Preferred embodiments of the present invention will be described in more detail below with reference to the accompanying drawings. Although preferred embodiments of the invention are shown in the drawings, it should be understood that the invention may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that the present invention will be thorough and complete, and will fully convey the scope of the present invention to those skilled in the art.

在下文的描述中,出于说明各种发明的实施方式的目的阐述了某些具体细节以提供对各种发明实施方式的透彻理解。但是,相关领域技术人员将认识到可在无这些具体细节中的一个或多个细节的情况来实践实施方式。在其他情形下,与本公开相关联的熟知的装置、结构和技术可能并未详细地示出或描述,从而避免不必要地混淆实施方式的描述。In the following description, for the purposes of illustrating various embodiments of the invention, certain specific details are set forth in order to provide a thorough understanding of the various embodiments of the invention. However, one skilled in the relevant art will recognize that the embodiments may be practiced without one or more of these specific details. In other instances, well-known devices, structures and techniques associated with the present disclosure may not have been shown or described in detail, so as not to unnecessarily obscure the description of the embodiments.

除非语境有其他需要,在整个说明书和权利要求中,词语“包括”和其变型,诸如“包含”和“具有”应被理解为开放的、包含的含义,即应解释为“包括,但不限于”。Unless the context requires otherwise, throughout the specification and claims, the word "comprise" and variations thereof, such as "comprising" and "having" should be read in an open, inclusive sense, i.e., should be interpreted as "comprising, but not limited to".

在整个说明书中对“一个实施方式”或“一些实施方式”的提及表示结合实施方式所描述的特定特点、结构或特征包括于至少一个实施方式中。另外,特定特点、结构或特征可在一个或多个实施方式中以任何方式组合。Reference throughout this specification to "one embodiment" or "some embodiments" means that a particular feature, structure, or characteristic described in connection with the embodiments is included in at least one of the embodiments. In addition, particular features, structures or characteristics may be combined in any manner in one or more embodiments.

此外,说明书和权利要求中所用的第一、第二等术语,仅仅出于描述清楚起见来区分各个对象,而并不限定其所描述的对象的大小或其他顺序等。In addition, terms such as first and second used in the specification and claims are only used to distinguish various objects for the sake of clarity of description, and do not limit the size or other order of the objects described therein.

如图1、图2所示,一种应用于装配式钢结构楼板施工的免落地可伸缩支撑架,包括设置在中间的中间段桁架1和设置在两端的端部段桁架2,中间段桁架1的两端分别与端部段桁架2连接,端部段桁架2可相对中间段桁架1移动,移动后的端部段桁架2再与中间段桁架1固定,从而调整整个支撑架的整体长度。As shown in Figure 1 and Figure 2, a floor-to-ceiling scalable support frame applied to the construction of prefabricated steel structure slabs, including the middle section truss 1 arranged in the middle and the end section truss 2 arranged at both ends, the middle section truss The two ends of 1 are respectively connected with the end truss 2, the end truss 2 can move relative to the middle truss 1, and the moved end truss 2 is then fixed with the middle truss 1, thereby adjusting the overall length of the entire support frame .

一、中间段桁架1。1. Middle section truss 1.

如图3、图4所示,中间段桁架1为双榀桁架,其包括上弦杆11、下弦杆12和拉杆13;在上弦杆11和下弦杆12中,沿着梁的轴线分别设置有一条凹槽14,凹槽14用于装配端部段桁架2;上弦杆11长度长于下弦杆12的长度,上弦杆11和下弦杆12相平行设置,上弦杆11和下弦杆12的凹槽14相对,拉杆13以波浪形的方式设置在上弦杆11和下弦杆12之间,用于连接两者,拉杆13设置有两组,两组拉杆13相平行分设在梁的两侧,凹槽14处于两组拉杆13之间,用于容纳端部段桁架2。其中上弦杆11采用冷弯内卷边槽钢制成,下弦杆12采用冷弯深槽C型钢制成,拉杆13采用圆钢制成。As shown in Fig. 3 and Fig. 4, the middle truss 1 is a double truss, which includes an upper chord 11, a lower chord 12 and a tie rod 13; in the upper chord 11 and the lower chord 12, a Groove 14, the groove 14 is used to assemble the end section truss 2; the length of the upper chord 11 is longer than the length of the lower chord 12, the upper chord 11 and the lower chord 12 are arranged in parallel, and the grooves 14 of the upper chord 11 and the lower chord 12 are opposite , the tie rods 13 are arranged between the upper chord 11 and the lower chord 12 in a wavy manner, and are used to connect the two. Between the two sets of tie rods 13 is used to accommodate the end section trusses 2 . Wherein the upper chord 11 is made of cold-formed inner crimped channel steel, the lower chord 12 is made of cold-formed deep groove C-shaped steel, and the tie rod 13 is made of round steel.

在上弦杆11中,沿着梁的轴线设置有若干定位孔15;在下弦杆12中,设置有一个定位孔16。In the upper chord 11, several positioning holes 15 are arranged along the axis of the beam; in the lower chord 12, one positioning hole 16 is arranged.

定位孔15为长圆孔形,定位孔16为圆孔形。The positioning hole 15 is in the shape of an oblong hole, and the positioning hole 16 is in the shape of a circular hole.

二、端部段桁架2。Second, the end section truss 2.

如图5、图6所示,所述端部段桁架2为单榀桁架,包括上弦杆21、下弦杆22和拉杆23,上弦杆21长度长于下弦杆22的长度,上弦杆21和下弦杆22相平行设置,拉杆23以波浪形的方式设置在上弦杆21和下弦杆22之间,用于连接两者,拉杆23设置有一组。上弦杆21采用方钢管制成,下弦杆22采用扁钢制成,拉杆23采用圆钢制成。As shown in Figures 5 and 6, the end section truss 2 is a single truss, comprising an upper chord 21, a lower chord 22 and a tie rod 23, the length of the upper chord 21 is longer than the length of the lower chord 22, and the upper chord 21 and the lower chord 22 are arranged in parallel, and the tie rods 23 are arranged between the upper chord 21 and the lower chord 22 in a wave-shaped manner for connecting the two, and one set of tie rods 23 is provided. Upper chord 21 adopts square steel pipe to make, lower chord 22 adopts flat steel to make, and pull bar 23 adopts round steel to make.

在上弦杆21中,设置有一个定位孔25;在下弦杆22中,沿着梁的轴线设置有若干定位孔26。In the upper chord 21, a positioning hole 25 is arranged; in the lower chord 22, several positioning holes 26 are arranged along the axis of the beam.

定位孔26为长圆孔形,定位孔25为圆孔形。The positioning hole 26 is in the shape of an oblong hole, and the positioning hole 25 is in the shape of a circular hole.

另一实施例中,下弦杆22的端部弯折与上弦杆21相连接,拉杆23设置在上弦杆21和下弦杆22之间,用于连接两者。In another embodiment, the end of the lower chord 22 is bent and connected to the upper chord 21 , and the tie rod 23 is arranged between the upper chord 21 and the lower chord 22 for connecting the two.

如图7、图8所示,端部段桁架2与中间段桁架1相装配,端部段桁架2的上弦杆21装套在中间段桁架1上弦杆11的凹槽14中,端部段桁架2的下弦杆22装套在中间段桁架1下弦杆12的凹槽14中,根据横跨长度的需要,调整端部段桁架2与中间段桁架1重叠的长度,而后将两上弦杆中的定位孔相对齐,两下弦杆中的定位孔相对齐,定位销4或定位螺栓穿过对齐的定位孔,固定连接端部段桁架2与中间段桁架1,保证使用时支撑架的整体长度固定。As shown in Figure 7 and Figure 8, the end section truss 2 is assembled with the middle section truss 1, the upper chord 21 of the end section truss 2 is set in the groove 14 of the middle section truss 1 upper chord 11, and the end section The lower chord 22 of the truss 2 is set in the groove 14 of the lower chord 12 of the middle truss 1. According to the requirement of the span length, adjust the overlapping length of the end truss 2 and the middle truss 1, and then place the two upper chords The positioning holes in the two lower chords are aligned, the positioning pin 4 or the positioning bolt passes through the aligned positioning holes, and the end section truss 2 and the middle section truss 1 are fixedly connected to ensure the overall length of the support frame during use. fixed.

三、连接挂件3。3. Connect the pendant 3.

如图9所示,端部段桁架2中上弦杆21的端部设置有连接挂件3,用于与楼层层板中的钢框架梁5相连接。连接挂件3包括7字型螺杆31,7字型螺杆31包括两段杆段,分别为第一杆段311和第二杆段312,两段杆段垂直连接。连接挂件3与端部段桁架2的连接方式如下所述:As shown in FIG. 9 , the end of the top chord 21 in the end section truss 2 is provided with a connecting hanger 3 for connecting with the steel frame beam 5 in the floor slab. The connecting hanger 3 includes a 7-shaped screw rod 31, and the 7-shaped screw rod 31 includes two sections, respectively a first section 311 and a second section 312, and the two sections are vertically connected. The connection mode between the connecting pendant 3 and the end section truss 2 is as follows:

如图9、图10所示,在端部段桁架2中上弦杆21的端部焊接套设有加强件28,用于增加上弦杆21端部的厚度,加强端部强度,加强件28可以为钢板;同时在端部处设置有上下贯穿的通孔27,通孔27与上弦杆21的轴线相垂直,通孔27同样贯穿加强件28,7字型螺杆31的第一杆段311穿过通孔27,通过分设于上弦杆21的上下两侧的两颗螺母32,将7字型螺杆31与上弦杆21相锁紧固定。可以通过调节螺母32,从而调节7字型螺杆31中第二杆段312相对上弦杆21的高度,从而满足楼板的不同标高的设计施工要求。As shown in Fig. 9 and Fig. 10, in the end section truss 2, the end of the upper chord 21 is welded with a reinforcement 28, which is used to increase the thickness of the end of the upper chord 21 and strengthen the strength of the end. The reinforcement 28 can be It is a steel plate; at the same time, a through hole 27 penetrating up and down is provided at the end, the through hole 27 is perpendicular to the axis of the upper chord 21, the through hole 27 also runs through the reinforcement 28, and the first rod section 311 of the 7-shaped screw 31 passes through The 7-shaped screw rod 31 and the upper chord 21 are locked and fixed through the through hole 27 and two nuts 32 respectively arranged on the upper and lower sides of the upper chord 21 . The height of the second section 312 of the 7-shaped screw 31 relative to the upper chord 21 can be adjusted by adjusting the nut 32, so as to meet the design and construction requirements of different elevations of the floor.

7字型螺杆31连接后,7字型螺杆31的第二杆段312与上弦杆21的轴线相平行。After the 7-shaped screw 31 is connected, the second segment 312 of the 7-shaped screw 31 is parallel to the axis of the upper chord 21 .

如图11、图12、图13所示,使用时,根据两钢框架梁5之间的横跨长度需要,调整并固定支撑架的整体长度,将7字型螺杆31的第二杆段312搭在楼层层板中的钢框架梁5的上翼板上,而后焊接固定7字型螺杆31与钢框架梁5。拆卸时,则仅需要将螺母32取下,从而将7字型螺杆31与端部段桁架2分离,则整个支撑架可取下,而7字型螺杆31则与钢框架梁5连接在一块。As shown in Fig. 11, Fig. 12 and Fig. 13, during use, according to the span length requirements between the two steel frame beams 5, the overall length of the support frame is adjusted and fixed, and the second pole section 312 of the 7-shaped screw rod 31 Take the upper wing plate of the steel frame beam 5 in the floor deck, and then weld and fix the 7-shaped screw rod 31 and the steel frame beam 5. During disassembly, only the nut 32 needs to be removed, thereby separating the 7-shaped screw rod 31 from the end section truss 2, and then the entire support frame can be removed, while the 7-shaped screw rod 31 is connected with the steel frame beam 5.

四、支撑架的施工安装工艺。Fourth, the construction and installation process of the support frame.

(一)(one)

步骤A、施工准备。Step A, construction preparation.

首先查表确定支撑架的数量;而后在工厂中制造支撑架,并进行质量验收。First check the table to determine the number of support frames; then manufacture the support frames in the factory and conduct quality inspection.

步骤B、现场调节并固定支撑架的适用长度。Step B, adjust and fix the applicable length of the support frame on site.

根据两钢框架梁5之间的跨度,调节支撑架长度,而后用定位销4固定连接中间段桁架1和端部段桁架2。According to the span between the two steel frame beams 5, the length of the support frame is adjusted, and then the positioning pin 4 is used to fix and connect the middle section truss 1 and the end section truss 2.

步骤C、支撑架与7字型螺杆31连接,并调节7字型螺杆31高度。Step C, the support frame is connected with the 7-shaped screw 31, and the height of the 7-shaped screw 31 is adjusted.

在端部段桁架2的端部安装7字型螺杆31,调节7字型螺杆31相对于上弦杆21的高度,而后通过螺母32锁紧固定。A 7-shaped screw 31 is installed at the end of the end section truss 2 , the height of the 7-shaped screw 31 relative to the upper chord 21 is adjusted, and then locked and fixed by a nut 32 .

步骤D、在钢框架梁5上布置7字型螺杆31。Step D, arranging a 7-shaped screw rod 31 on the steel frame beam 5 .

支撑架上的7字型螺杆31的第二杆段312搭在楼层层板中的钢框架梁5的上翼板上,此时支撑架挂在两钢框架梁5之间。The second bar section 312 of the 7-shaped screw rod 31 on the support frame rides on the upper wing plate of the steel frame beam 5 in the floor deck, and the support frame is hung between the two steel frame beams 5 at this moment.

步骤E、焊接7字型螺杆31与钢框架梁5。Step E, welding the 7-shaped screw rod 31 and the steel frame beam 5 .

将7字型螺杆31的第二杆段312与钢框架梁5的上翼板焊接一块。The second section 312 of the 7-shaped screw 31 is welded together with the upper wing plate of the steel frame beam 5 .

步骤F、楼板制作。Step F, making the floor slab.

在支撑架上布置木档,铺设模板;而后绑扎楼板钢筋;浇筑楼板混凝土并养护。Arrange wooden stalls on the support frame and lay formwork; then bind the floor reinforcement; pour the floor concrete and maintain it.

步骤G、拆除支撑架。Step G, remove the support frame.

拧松7字型螺杆31上的螺母32,将端部段桁架2与调节7字型螺杆31分离,7字型螺杆31仍旧与钢框架梁5连接,但支撑架从钢框架梁5上拆离。Loosen the nut 32 on the 7-shaped screw rod 31, separate the end section truss 2 from the adjustment 7-shaped screw rod 31, the 7-shaped screw rod 31 is still connected with the steel frame beam 5, but the support frame is removed from the steel frame beam 5 Leave.

(二)(two)

或者将步骤C放置在步骤E之后,即先将7字型螺杆31与钢框架梁5焊接,再将7字型螺杆31与支撑架连接。Alternatively, step C is placed after step E, that is, the 7-shaped screw rod 31 is welded to the steel frame beam 5 first, and then the 7-shaped screw rod 31 is connected to the support frame.

具体步骤如下所述:The specific steps are as follows:

步骤A、施工准备。Step A, construction preparation.

首先查表确定支撑架的数量;而后在工厂中制造支撑架,并进行质量验收。First check the table to determine the number of support frames; then manufacture the support frames in the factory and conduct quality inspection.

步骤B、现场调节并固定支撑架的适用长度。Step B, adjust and fix the applicable length of the support frame on site.

根据两钢框架梁5之间的跨度,调节支撑架长度,而后用定位销4固定连接中间段桁架1和端部段桁架2。According to the span between the two steel frame beams 5, the length of the support frame is adjusted, and then the positioning pin 4 is used to fix and connect the middle section truss 1 and the end section truss 2.

步骤D、在钢框架梁5上布置7字型螺杆31。Step D, arranging a 7-shaped screw rod 31 on the steel frame beam 5 .

支撑架上的7字型螺杆31的第二杆段312搭在楼层层板中的钢框架梁5的上翼板上。The second rod section 312 of the 7-shaped screw rod 31 on the support frame rides on the upper wing plate of the steel frame beam 5 in the floor board.

步骤E、焊接7字型螺杆31与钢框架梁5。Step E, welding the 7-shaped screw rod 31 and the steel frame beam 5 .

将7字型螺杆31的第二杆段312与钢框架梁5的上翼板焊接一块。The second section 312 of the 7-shaped screw 31 is welded together with the upper wing plate of the steel frame beam 5 .

步骤C、支撑架与7字型螺杆31连接,并调节7字型螺杆31高度。。Step C, the support frame is connected with the 7-shaped screw 31, and the height of the 7-shaped screw 31 is adjusted. .

在端部段桁架2的端部安装7字型螺杆31,调节7字型螺杆31相对于上弦杆21的高度,而后通过螺母32锁紧固定。A 7-shaped screw 31 is installed at the end of the end section truss 2 , the height of the 7-shaped screw 31 relative to the upper chord 21 is adjusted, and then locked and fixed by a nut 32 .

步骤F、楼板制作。Step F, making the floor slab.

在支撑架上布置木档,铺设模板;而后绑扎楼板钢筋;浇筑楼板混凝土并养护。Arrange wooden stalls on the support frame and lay formwork; then bind the floor reinforcement; pour the floor concrete and maintain it.

步骤G、拆除支撑架。Step G, remove the support frame.

拧松7字型螺杆31上的螺母32,将端部段桁架2与调节7字型螺杆31分离,7字型螺杆31仍旧与钢框架梁5连接,但支撑架从钢框架梁5上拆离。Loosen the nut 32 on the 7-shaped screw rod 31, separate the end section truss 2 from the adjustment 7-shaped screw rod 31, the 7-shaped screw rod 31 is still connected with the steel frame beam 5, but the support frame is removed from the steel frame beam 5 Leave.

本发明说明书未作特别说明的,均为本领域的常规技术。Unless otherwise specified in the description of the present invention, all are conventional techniques in the art.

以上是本发明优选实施方式,在本发明构思前提下所做出若干其他简单替换和改动,都应当视为属于本发明的保护范畴。The above is the preferred implementation mode of the present invention, and several other simple replacements and changes made under the premise of the concept of the present invention should be regarded as belonging to the protection scope of the present invention.

Claims (9)

1. The utility model provides a be applied to mounting process of support frame of assembled steel construction floor construction which characterized in that: comprises the steps of,
A. preparing construction;
firstly, looking up a table to determine the number of the supporting frames; then manufacturing a supporting frame in a factory, and carrying out quality inspection and acceptance;
B. adjusting and fixing the applicable length of the support frame on site;
adjusting and fixing the length of the support frame according to the span between the two steel frame beams;
C. the connecting hanging piece is connected with the supporting frame;
connecting hanging pieces are respectively arranged at two ends of the supporting frame;
D. arranging connection hanging pieces on the steel frame beams;
the connecting hanging pieces are put on the upper flanges of the steel frame beams;
E. and welding and connecting the hanging pieces and the steel frame beam.
2. The mounting process of the support frame applied to the construction of the assembled steel structure floor slab according to claim 1, wherein the mounting process comprises the following steps of: or step C is placed before step E.
3. The mounting process of the support frame applied to the construction of the assembled steel structure floor slab according to claim 1 or 2, wherein the mounting process comprises the following steps of: the support frame comprises a middle section truss and an end section truss, wherein two ends of the middle section truss are respectively connected with the end section truss, and the connecting hanging piece is arranged on the end section truss and used for being connected with a floor slab; the middle-section truss comprises an upper chord, a lower chord and a pull rod, the pull rod is connected with the upper chord and the lower chord, and grooves are formed in the upper chord and the lower chord; the end section truss comprises an upper chord, a lower chord and a pull rod, and the pull rod is connected with the upper chord and the lower chord; the upper chord member and the lower chord member of the end section truss are respectively assembled in the upper chord member groove and the lower chord member groove of the middle section truss, and the end section truss can move relative to the middle section truss.
4. A process for installing a support frame for use in fabricated steel structure floor construction according to claim 3, wherein: the connecting hanging piece comprises a screw rod, the screw rod comprises a first rod section and a second rod section, and the two rod sections are vertically connected.
5. A process for installing a support frame for use in fabricated steel structure floor construction according to claim 3, wherein: in the middle section truss, a plurality of positioning holes are arranged in the upper chord member and the lower chord member along the axis of the beam; in the end section truss, a plurality of positioning holes are arranged in the upper chord member and the lower chord member along the axis of the beam; the locating pins or the locating bolts penetrate through the locating holes of the two trusses and are used for connecting the middle section truss and the end section truss.
6. The mounting process of the support frame applied to the construction of the assembled steel structure floor slab, which is characterized in that: in the step B, the middle section truss and the end section truss are fixedly connected through the positioning holes by using the positioning pins or the positioning bolts, so that the on-site adjustment is realized, and the applicable length of the support frame is fixed.
7. The mounting process of the support frame applied to the construction of the assembled steel structure floor slab, which is characterized in that: in the step C, the first rod section of the screw rod penetrates through the through hole in the truss of the end section, the height of the second rod section of the screw rod relative to the upper chord member is adjusted, and the screw rod and the upper chord member are locked and fixed through the nut.
8. A process for installing a support frame for use in fabricated steel structure floor construction according to claim 3, wherein: in step D, the second leg of the screw is lapped over the upper wing plate of the steel frame beam in the storey deck.
9. The mounting process of the support frame applied to the construction of the assembled steel structure floor slab, which is characterized in that: the step of detaching the support frame from the steel frame beam is to unscrew nuts on the screw rods and separate the end section truss from the screw rods.
CN202310548985.0A 2023-05-16 2023-05-16 An installation process of a support frame applied to the construction of a prefabricated steel structure floor Pending CN116677210A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310548985.0A CN116677210A (en) 2023-05-16 2023-05-16 An installation process of a support frame applied to the construction of a prefabricated steel structure floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310548985.0A CN116677210A (en) 2023-05-16 2023-05-16 An installation process of a support frame applied to the construction of a prefabricated steel structure floor

Publications (1)

Publication Number Publication Date
CN116677210A true CN116677210A (en) 2023-09-01

Family

ID=87786322

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310548985.0A Pending CN116677210A (en) 2023-05-16 2023-05-16 An installation process of a support frame applied to the construction of a prefabricated steel structure floor

Country Status (1)

Country Link
CN (1) CN116677210A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203905469U (en) * 2014-06-23 2014-10-29 贵州平川塑业建材科技有限公司 Beam clamp
CN207032861U (en) * 2017-08-11 2018-02-23 安徽富煌建筑设计研究有限公司 A kind of assembled steel pipe truss mould plate supporting member
CN108643429A (en) * 2018-05-23 2018-10-12 北京工业大学 A kind of height-adjustable assembled laminated floor slab
CN114439219A (en) * 2022-01-06 2022-05-06 渝建建筑工业集团有限公司 Telescopic floor slab supporting truss

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203905469U (en) * 2014-06-23 2014-10-29 贵州平川塑业建材科技有限公司 Beam clamp
CN207032861U (en) * 2017-08-11 2018-02-23 安徽富煌建筑设计研究有限公司 A kind of assembled steel pipe truss mould plate supporting member
CN108643429A (en) * 2018-05-23 2018-10-12 北京工业大学 A kind of height-adjustable assembled laminated floor slab
CN114439219A (en) * 2022-01-06 2022-05-06 渝建建筑工业集团有限公司 Telescopic floor slab supporting truss

Similar Documents

Publication Publication Date Title
CN203768811U (en) Embedded steel anchor beam combined pylon anchoring structure
CN107327068B (en) Steel structure truss string system roof ceiling structure and construction method thereof
CN103352564A (en) Horizontally-structured framework system and construction method
CN112575948A (en) Truss string beam and cantilever truss combined roof truss and construction method
CN115748976A (en) Cable-through type ridge rod cable dome and modular assembly ring truss structure and construction method thereof
CN116837967A (en) Construction method of large-span cable-stayed truss structure
CN113944309A (en) Cold-formed steel support beam framework and construction method thereof
CN217028088U (en) Cantilever tripod template support
CN108999313A (en) Light steel grating concrete folding shear wall
CN108265626A (en) Reinforcing steel bar-steel plate skeleton combined bridge deck and its construction method
CN103741854A (en) Pre-stressed composite space truss and construction method thereof
CN112922237A (en) Take telescopic assembled reinforced concrete post and girder steel connected node
CN206859477U (en) Lattice two-way beam composite floor
CN107217772B (en) Composite Floor Slab with Lattice Two-way Beam and Its Construction Method
CN210316454U (en) Large-span roof overhanging support system
CN206015882U (en) The steel structure of housing system that a kind of lateral resisting and antigravity separate
CN220059037U (en) Floor-free telescopic support frame applied to construction of assembled steel structure floor slab
CN115506566A (en) High-rise building component support system that encorbelments
CN117758926B (en) Prestressed fish belly type UHPC roof truss structure and construction method thereof
CN113668688B (en) Three-layer overhanging steel structure with quick construction and land saving and construction method thereof
CN109184032B (en) Assembled shear wall vertical connection structure convenient to install and installation method
CN106869390A (en) A kind of Hyperbolic vaulted roof plate girder construction of string formula
CN112227689A (en) Corner cut steel pipe reinforcement type assembled outer frame-free construction protection platform and manufacturing method
CN218667155U (en) Supporting platform structure
CN115262754B (en) Rigid-connected joints of bolts on outer reinforcement rings of H-shaped steel beams of prefabricated steel tube concrete columns

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20230901

RJ01 Rejection of invention patent application after publication