CN116639606A - A parallel connection form and installation method of double jib frames of a tower crane - Google Patents

A parallel connection form and installation method of double jib frames of a tower crane Download PDF

Info

Publication number
CN116639606A
CN116639606A CN202310649142.XA CN202310649142A CN116639606A CN 116639606 A CN116639606 A CN 116639606A CN 202310649142 A CN202310649142 A CN 202310649142A CN 116639606 A CN116639606 A CN 116639606A
Authority
CN
China
Prior art keywords
section
lower connecting
jib
boom
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310649142.XA
Other languages
Chinese (zh)
Inventor
郑怀鹏
安晓楠
米成宏
赵治森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuzhou Construction Machinery Group Co Ltd XCMG
First Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
Xuzhou Construction Machinery Group Co Ltd XCMG
First Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xuzhou Construction Machinery Group Co Ltd XCMG, First Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd filed Critical Xuzhou Construction Machinery Group Co Ltd XCMG
Priority to CN202310649142.XA priority Critical patent/CN116639606A/en
Publication of CN116639606A publication Critical patent/CN116639606A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • B66C23/64Jibs
    • B66C23/70Jibs constructed of sections adapted to be assembled to form jibs or various lengths
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention provides a connection form and an installation method for parallel connection of double-arm frames of a tower crane, and belongs to the technical field of arm frame connection; the problems of high processing and transportation difficulty, complex installation procedure, high potential safety hazard and inclination of the arm support to one side after the installation is completed are solved; the technical proposal is as follows: an upper connecting lug seat I and a lower connecting lug plate I are arranged on the left side arm section, an upper connecting lug seat II and a lower connecting lug plate II are arranged on the right side arm section, and the lower connecting lug plate I and the lower connecting lug plate II are connected through a lower connecting rod; the installation method comprises the following steps: s1, connecting the upper parts of the left side arm section and the right side arm section in parallel; s2, assembling the left side arm section and the right side arm section on the ground; s3, mounting the left and right side arm sections on the main body arm frame; s4: the invention has the beneficial effects that the lifting equipment is evacuated and installed, and the lifting equipment is provided with the following beneficial effects: the processing and transportation difficulty is small, the installation procedure is simple, the condition of skimming to one side can not occur after the arm support is installed, and the quality of products is improved.

Description

一种塔机双臂架并联的连接形式及安装方法A parallel connection form and installation method of double jib frames of a tower crane

技术领域technical field

本发明涉及臂架连接及安装技术领域,尤其涉及一种塔机双臂架并联的连接形式及安装方法。The invention relates to the technical field of jib connection and installation, in particular to a connection form and installation method of parallel connection of double jibs of a tower crane.

背景技术Background technique

塔式起重机是建筑、风电及核电建设中常用的吊装设备;随着施工项目的大型化、模块化和集约化发展,塔式起重机超大型化已成为发展趋势;超大型塔机具有作业高度高、吊载重量大、作业幅度长等特点,同样的,超大型塔机体积也更加庞大,为满足相应的起重性能,超大型塔机需采用大截面臂架。考虑到原材料采购、加工制造、运输安装、使用维护、场地存放等各方面的难度和成本,左右双臂架形式已成为发展趋势,双臂架并非孤立作业,而是通过一定的连接结构有机结合形成一个整体。Tower cranes are commonly used hoisting equipment in construction, wind power and nuclear power construction; with the development of large-scale, modular and intensive construction projects, super-large tower cranes have become a development trend; super-large tower cranes have a high operating height , large hoisting weight, and long operating range. Similarly, super large tower cranes are also larger in size. In order to meet the corresponding lifting performance, super large tower cranes need to use large cross-section jibs. Considering the difficulty and cost of raw material procurement, processing and manufacturing, transportation and installation, use and maintenance, site storage, etc., the form of left and right double booms has become a development trend. The double booms do not operate in isolation, but are organically combined through a certain connection structure form a whole.

如图6和图7,传统的塔机双臂连接形式为采用在前后臂架端部之间增加整体连接节,以此来增加臂架整体的长度和稳定性,有效防止臂架左右偏载时产生纵向和侧向错位,从而实现左右臂架的并联;但随着起重性能的增加,臂架截面需增大,连接前后臂架的整体连接节宽度和高度随之增大,导致加工制造和运输安装难度大幅增加,同时这种“分段式”连接方式也会导致臂架稳定性不强。As shown in Figure 6 and Figure 7, the traditional double-arm connection form of tower cranes is to increase the overall connection joint between the ends of the front and rear booms, so as to increase the overall length and stability of the boom, and effectively prevent the left and right side loads of the boom When the vertical and lateral dislocation occurs, so as to realize the parallel connection of the left and right booms; but with the increase of lifting performance, the section of the boom needs to be increased, and the width and height of the overall connecting joint connecting the front and rear booms will increase accordingly, resulting in processing The difficulty of manufacturing, transportation and installation is greatly increased. At the same time, this "segmented" connection method will also lead to weak stability of the boom.

另外,传统的塔机双臂在安装过程中,不能先将左右侧臂节在地面全部安装完成后,再通过起重设备安装在主体臂架上,因为额外增加的多个整体连接节,使整个臂节重量大大增加,目前国内现有起重设备无法吊起,传统的安装方法是:先通过起重设备将第一节臂吊起,并安装在主体臂架上,再吊起第一个整体连接节安装在第一节臂的端部,再吊起第二节臂架与第一个整体连接节连接,再吊起下一个整体连接节安装在第二节臂架端部,依次类推,直接将第N节臂安装完成,这种在主体臂架上一节一节加长的安装方式,吊装程序复杂,且安装效率低,同时由于吊装总时间很长,大大增加了安装过程的安全隐患;另外,由于臂架本身体积就比较大,因此臂架在生产加工过程中,每节臂与整体连接节之间难免会出现尺寸误差,在多个节臂连接完成后,经常会出现臂架一侧臂节的中心相对于另一侧臂节的中心产生偏斜的状况,特别是第一节臂和第二节臂连接如果出现误差,那么向一侧撇或倾斜的情况会更加严重,这种情况会导致臂架整体稳定性差,严重时会导致生产质量不过关;因此亟需一种新的塔机双臂架连接形式,以解决上述问题。In addition, during the installation process of the double arms of the traditional tower crane, the left and right side arm sections cannot be installed on the ground first, and then installed on the main arm frame through the lifting equipment, because the additional integral connection sections make the The weight of the entire boom section is greatly increased. At present, the existing domestic lifting equipment cannot be lifted. The traditional installation method is: first lift the first section of the boom with the lifting equipment, and install it on the main jib, and then lift the first The first integral joint is installed at the end of the first boom, then the second boom is lifted to connect with the first integral joint, and the next integral joint is hoisted and installed at the end of the second boom. By analogy, the installation of the Nth jib can be completed directly. This installation method of lengthening each section on the main jib has complicated hoisting procedures and low installation efficiency. At the same time, the total time of hoisting is very long, which greatly increases the installation process Potential safety hazard; in addition, due to the relatively large volume of the boom itself, it is inevitable that there will be dimensional errors between each section of the boom and the overall connecting section during the production and processing of the boom. The center of the jib section on one side of the boom is skewed relative to the center of the other jib section, especially if there is an error in the connection between the first section jib and the second section jib, then the situation of skimming or tilting to one side will be more serious Seriously, this situation will lead to poor overall stability of the jib, and in severe cases will lead to poor production quality; therefore, there is an urgent need for a new tower crane double-boom connection form to solve the above problems.

发明内容Contents of the invention

本发明的目的在于提供一种塔机双臂架并联的连接形式及安装方法,用以解决加工及运输难度大、安装程序复杂、安全隐患高和安装完成后臂架向一侧倾斜的问题。The purpose of the present invention is to provide a parallel connection form and installation method of double jib frames of a tower crane, which are used to solve the problems of difficult processing and transportation, complicated installation procedures, high potential safety hazards and the jib frames tilting to one side after installation.

为了实现上述发明目的,本发明采用技术方案具体为:一种塔机双臂架并联的连接形式,包括左侧臂节和右侧臂节,左侧臂节和右侧臂节结构均由上片结构、斜腹杆、下弦箱体组成,上片结构由两个上弦杆和水平腹杆组成,斜腹杆为管材或角钢拼接方形结构,下弦箱体由钢板片装焊接组成箱体结构,它们最终共同组成倒三角截面的臂节结构,所述左侧臂节的一侧上端等距设置有多个上部连接耳座一,在所述右侧臂节的一侧上端等距设置有多个上部连接耳座二,所述上部连接耳座一与上部连接耳座二相对设置,并且通过销轴一连接,所述左侧臂节的下端一侧等距设置有多个下部连接耳板一,所述右侧臂节的下端一侧等距设置有多个下部连接耳板二,所述下部连接耳板一与下部连接耳板二之间通过下部连接杆连接。In order to achieve the purpose of the above invention, the technical solution adopted by the present invention is specifically: a parallel connection form of double jib frames of tower cranes, including a left jib section and a right jib section, the structures of the left jib section and the right jib section are composed of the upper The upper structure is composed of two upper chords and horizontal webs. The oblique webs are square structures spliced by pipes or angle steel. The lower chord box is composed of steel plates welded to form a box structure. They finally form an arm section structure with an inverted triangular section. The upper end of one side of the left arm section is equidistantly provided with a plurality of upper connecting lugs one, and the upper end of one side of the right arm section is equidistantly arranged with multiple Two upper connecting ear seats, the upper connecting ear seat one and the upper connecting ear seat two are arranged oppositely, and are connected by pin one, and a plurality of lower connecting ear plates are equidistantly arranged on one side of the lower end of the left arm section 1. A plurality of lower connecting ear plates 2 are equidistantly arranged on one side of the lower end of the right arm section, and the lower connecting ear plates 1 and 2 are connected by a lower connecting rod.

进一步地,多个所述上部连接耳座一和多个下部连接耳板一均沿左侧臂节长度方向分布设置,多个所述上部连接耳座二和多个下部连接耳板二均沿右侧臂节长度方向分布设置,这样可以使左侧臂架和右侧臂架均匀紧密的连接在一起,增加臂架的稳定性。Further, the plurality of upper connecting lugs 1 and the plurality of lower connecting lugs 1 are distributed along the length direction of the left arm section, and the plurality of upper connecting lugs 2 and the plurality of lower connecting lugs 2 are arranged along the The length direction of the right jib section is distributed, so that the left jib and the right jib can be evenly and tightly connected together, increasing the stability of the jib.

进一步地,所述下部连接杆包括下部连接杆一和下部连接杆二,所述下部连接杆一与左侧臂节或右侧臂节垂直设置,所述下部连接杆二分别左侧臂节、右侧臂节之间的夹角小于度,下部连接杆的连接形式和连接角度不限,只要是能加强左侧臂节和右侧臂节的连接强度和连接稳定性的连接方式均可。Further, the lower connecting rod includes a lower connecting rod 1 and a lower connecting rod 2, the lower connecting rod 1 is vertically arranged with the left arm section or the right arm section, and the lower connecting rod 2 is respectively the left arm section, The included angle between the right jib sections is less than 10°, and the connection form and connection angle of the lower connecting rod are not limited, as long as it can strengthen the connection strength and connection stability of the left and right jib sections.

进一步地,所述下部连接杆与下部连接耳一或下部连接耳二之间通过销轴二连接,这中装配式的连接,安装起来更加方便,有利于提高安装效率。Further, the lower connecting rod is connected with the lower connecting ear 1 or the lower connecting ear 2 through the pin shaft 2, and the assembled connection is more convenient to install, which is beneficial to improve the installation efficiency.

进一步地,所述下部连接杆采用圆杆、矩形杆或方杆,下部连接杆的形状不限。Further, the lower connecting rod adopts a round rod, a rectangular rod or a square rod, and the shape of the lower connecting rod is not limited.

进一步地,所述上部连接耳座一和下部连接耳板一均通过不可拆卸方式与左侧臂节连接,所述上部连接耳座二和下部连接耳板二均与右侧臂节固定连接。Further, the upper connecting ear seat 1 and the lower connecting ear plate 1 are both non-detachably connected to the left arm section, and the upper connecting ear seat 2 and the lower connecting ear plate 2 are both fixedly connected to the right arm section.

进一步地,所述上部连接耳座一、上部连接耳座二、下部连接耳板一和下部连接耳板二上均焊接有加强板,加强板的设置,有利于提高连接强度。Further, reinforcement plates are welded on the upper connection ear seat 1, the upper connection ear seat 2, the lower connection ear plate 1 and the lower connection ear plate 2, and the setting of the reinforcement plate is beneficial to improve the connection strength.

为了更好地实现上述发明目的,本发明还提供了一种塔机双臂架并联的连接形式的安装方法,具体包括以下步骤:In order to better achieve the above-mentioned purpose of the invention, the present invention also provides a method for installing the connection form of the double boom frame of the tower crane in parallel, which specifically includes the following steps:

S1:在地面将左侧臂节和右侧臂节按安装距离尺寸并列放置,然后将上部连接耳座一与上部连接耳座二之间的销轴孔对齐,通过销轴一将上部连接耳座一与上部连接耳座二连接,安装完毕后即实现左侧臂节和右侧臂节上部的可靠并联;S1: Place the left arm section and the right arm section side by side on the ground according to the installation distance, then align the pin holes between the upper connecting ear seat 1 and the upper connecting ear seat 2, and connect the upper connecting ear Seat 1 is connected to the upper connecting lug seat 2. After installation, the reliable parallel connection of the upper part of the left boom section and the right boom section can be realized;

S2:将下部连接杆一、下部连接杆二依次按顺序分别与左侧臂节和右侧臂节下部的连接耳板通过销轴二进行连接,下部连接杆一和下部连接杆二安装完毕后即实现左侧臂节和右侧臂节下部的可靠并联,至此,左侧臂节和右侧臂节在地面组装完成;S2: Connect the lower connecting rod 1 and the lower connecting rod 2 with the connecting lug plates on the lower part of the left and right boom sections in sequence respectively through the pin shaft 2. After the lower connecting rod 1 and the lower connecting rod 2 are installed That is to realize the reliable parallel connection of the lower part of the left arm section and the right arm section, so far, the left arm section and the right arm section are assembled on the ground;

S3、使用起重设备起吊已组装好的左、右侧臂节至与主体臂架相同高度,将左、右侧臂节销轴连接孔与主体臂架上已安装的臂节销轴孔对齐,然后安装臂节连接销轴,至此左侧臂节和右侧臂节在主体臂架上安装完成;S3. Use lifting equipment to lift the assembled left and right jib sections to the same height as the main boom section, and align the left and right jib section pin connection holes with the installed jib section pin holes on the main jib section , and then install the connecting pin of the boom section, so far the installation of the left boom section and the right boom section on the main boom frame is completed;

S4:撤离起重设备,安装完成。S4: Evacuate the lifting equipment, and the installation is completed.

与现有技术相比,本发明的有益效果为:Compared with prior art, the beneficial effect of the present invention is:

1、采用原有的整体连接节会随着臂架体积的增大而增大,这样会导致加工和运输困难,本发明通过设置上部连接耳座一、上部连接耳座二、下部连接耳板一、下部连接耳板二和下部连接杆,由于这些部件都是直接焊接上的,与臂架体积大小没关系,因此就不会不出现加工困难的情况,另外下部连接杆形状规整,体积更小,加工简单且运输也更加方便。1. The use of the original integral joint will increase with the increase in the volume of the boom, which will lead to difficulties in processing and transportation. The present invention sets the upper connecting ear seat 1, the upper connecting ear seat 2, and the lower connecting ear plate 1. The lower connecting ear plate 2 and the lower connecting rod, since these parts are directly welded, it has nothing to do with the size of the arm frame, so there will be difficulties in processing. In addition, the shape of the lower connecting rod is regular and the volume is smaller , easy to process and more convenient to transport.

2、上部连接耳座一、上部连接耳座二、下部连接耳板一和下部连接耳板二均匀等距的沿臂架的长度方向设置,这样使左侧臂节和右侧臂节连接更加紧密和稳定。2. The upper connecting ear seat 1, the upper connecting ear seat 2, the lower connecting ear plate 1 and the lower connecting ear plate 2 are evenly and equidistantly arranged along the length direction of the boom frame, so that the connection between the left arm section and the right arm section is more convenient. Tight and stable.

3、由于不需要整体连接节,采用本发明的连接方式以后,臂架的具体长度的设置更好控制,臂架长度根据需要也更加精确,有利于节约成本,提高产品质量。3. Since there is no need for integral connection joints, after adopting the connection method of the present invention, the setting of the specific length of the boom is better controlled, and the length of the boom is more accurate according to needs, which is beneficial to saving costs and improving product quality.

4、采用本发明的连接方式以后,由于左、右侧臂节不再是一段一段的吊起,再通过整体连接节连接加长,而是在地面整体安装完成后,直接整体吊起与主题臂架连接,这样使得操作过程简单,安装方便,有利于减少安装时间,提高安装效率,由于吊装时间减少了,也大大降低装配的安全隐患。4. After adopting the connection method of the present invention, since the left and right arm sections are no longer hoisted section by section, they are then connected and lengthened through the integral connection section, but after the overall installation on the ground is completed, they are directly hoisted integrally with the theme arm The frame connection makes the operation process simple and the installation is convenient, which is beneficial to reduce the installation time and improve the installation efficiency. Since the hoisting time is reduced, the safety hazard of assembly is also greatly reduced.

5、采用本发明的连接方式,连接完成之后,不会因为加工误差而导致臂架向一侧撇或倾斜的情况,有利于提高产品质量。5. With the connection method of the present invention, after the connection is completed, the boom will not be tilted or tilted to one side due to processing errors, which is conducive to improving product quality.

附图说明Description of drawings

附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the description, and are used together with the embodiments of the present invention to explain the present invention, and do not constitute a limitation to the present invention.

图1为本发明的主视示意图。Fig. 1 is a schematic front view of the present invention.

图2为发明的侧视示意图。Figure 2 is a schematic side view of the invention.

图3为本发明A方向视图。Fig. 3 is a view from direction A of the present invention.

图4为本发明B方向视图。Fig. 4 is a B-direction view of the present invention.

图5为本发明臂架并联与局部放大示意图。Fig. 5 is a schematic diagram of parallel connection and partial enlargement of booms of the present invention.

图6为本发明现有技术中双臂并联平面侧视图。Fig. 6 is a plane side view of the double-arm parallel connection in the prior art of the present invention.

图7为本发明现有技术中双臂并联立体示意图。Fig. 7 is a three-dimensional schematic diagram of parallel connection of two arms in the prior art of the present invention.

其中,附图标记为:1、整体连接节1;2、右侧臂节;3、左侧臂节;4、上部连接耳座一;5、上部连接耳座二;6、下部连接杆一;7、下部连接杆二;8、下部连接耳板一;9、下部连接耳板二;10、上片结构;11、斜腹杆;12、下弦箱体;13、上弦杆;水平腹杆。Wherein, the reference signs are: 1. Overall connecting section 1; 2. Right arm section; 3. Left arm section; 4. Upper connecting ear seat 1; 5. Upper connecting ear seat 2; 6. Lower connecting rod 1 ;7. The second connecting rod at the lower part; 8. The first connecting ear plate at the lower part; 9. The second connecting ear plate at the lower part; 10. The upper piece structure; .

具体实施方式结Detailed implementation

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。当然,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. Of course, the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

参照附图1至附图7,With reference to accompanying drawing 1 to accompanying drawing 7,

本实施例提供一种塔机双臂架并联的连接形式,包括左侧臂节3和右侧臂节2,左侧臂节3和右侧臂节2长度一致,左侧臂节3的右侧上端等距设置有多个上部连接耳座一4,多个上部连接耳座一4沿左侧臂节长度方向分布设置,右侧臂节2的左侧上端等距设置有多个上部连接耳座二5,多个下部连接耳板一8也是沿左侧臂节3长度方向分布设置,上部连接耳座一4与上部连接耳座二5左右对应,并且通过销轴一连接,左侧臂节3的右侧下端等距设置有多个下部连接耳板一8,右侧臂节2的左侧下端等距设置有多个下部连接耳板二8,下部连接耳板一8与下部连接耳板二9之间通过下部连接杆连接,多个上部连接耳座二5和多个下部连接耳板二9也是均沿右侧臂节2长度方向分布设置。This embodiment provides a parallel connection form of tower crane double jib frames, including left jib section 3 and right jib section 2, the length of left jib section 3 and right jib section 2 is the same, and the right jib section of left jib section 3 The upper end of the side is equidistantly provided with a plurality of upper connecting lugs-4, and the plurality of upper connecting lugs-4 are distributed along the length direction of the left arm section, and the left upper end of the right arm section 2 is equidistantly provided with a plurality of upper connecting lugs. Ear seat two 5, a plurality of lower connecting ear plates one 8 are also arranged along the length direction of the left arm section 3, the upper connecting ear seat one 4 corresponds to the upper connecting ear seat two 5, and is connected by pin one, the left side The right lower end of the arm section 3 is equidistantly provided with a plurality of lower connecting ear plates 1 8, and the left lower end of the right arm section 2 is equidistantly provided with a plurality of lower connecting ear plates 2 8, and the lower connecting ear plate 1 8 is connected to the lower The connecting lugs 2 9 are connected by the lower connecting rods, and a plurality of upper connecting lugs 2 5 and a plurality of lower connecting lugs 2 9 are also distributed along the length direction of the right arm section 2 .

下部连接杆包括下部连接杆一6和下部连接杆二7,下部连接杆一6与左侧臂节3或右侧臂节2垂直,下部连接杆二与7左侧臂节3或者右侧臂节2之间的夹角小于90度,这样的设置,使下部连接杆一6、下部连接杆二7和左侧臂节3或右侧臂节2之间形成三角形结构,增强该连接形式的稳定性。The lower connecting rod comprises a lower connecting rod one 6 and a lower connecting rod two 7, the lower connecting rod one 6 is perpendicular to the left arm section 3 or the right arm section 2, and the lower connecting rod two is connected to the left arm section 3 or the right arm section 7. The included angle between the sections 2 is less than 90 degrees. This arrangement makes a triangular structure formed between the lower connecting rod 1 6, the lower connecting rod 2 7 and the left arm section 3 or the right arm section 2, which strengthens the connection form. stability.

下部连接杆与下部连接耳板一8或下部连接耳板二9之间通过销轴二连接,也可以采用其他可靠的形式连接;下部连接杆可以是圆杆、矩形杆或方杆,但不限于这几种形状,凡是可以起到相同作用的杆、板、筒或柱均在本发明的范围之内;上部连接耳座一4和下部连接耳板一8均通过焊接或者其他可靠方式与左侧臂节3固定连接,上部连接耳座二5和下部连接耳板二9均通过焊接或者其他可靠方式与右侧臂节2固定连接;上部连接耳座一4、上部连接耳座二5、下部连接耳板一6和下部连接耳板二7上均焊接有加强板,有利于增强连接刚性。The lower connecting rod is connected with the lower connecting ear plate one 8 or the lower connecting ear plate two 9 through the pin shaft two, and other reliable forms can also be used to connect; the lower connecting rod can be a round rod, a rectangular rod or a square rod, but not Limited to these several shapes, every rod, plate, cylinder or post that can play the same role is all within the scope of the present invention; the upper connection ear seat-4 and the lower connection ear plate-8 are all connected to each other by welding or other reliable means. The left arm section 3 is fixedly connected, the upper connecting ear seat 2 5 and the lower connecting ear plate 2 9 are fixedly connected to the right arm section 2 by welding or other reliable means; the upper connecting ear seat 1 4 and the upper connecting ear seat 2 5 1. Both the lower connecting lug plate 1 6 and the lower connecting lug plate 2 7 are welded with reinforcing plates, which is conducive to enhancing the connection rigidity.

当随着起重性能的增加,臂架截面需增大时,并不会对上部连接耳座一4、上部连接耳座二5、下部连接耳板一8、下部连接耳板二9和下部连接杆的体积产生较大影响,只需要增强相应结构的强度即可,且加工简单,运输起来更加方便,同时由于左侧臂节3和右侧臂节2连接更加均匀,受力点更广,从而使得该连接方式更加稳定和牢固;在安装该臂架结构时,直接将左侧臂节3和右侧臂节2吊起,工人直接可以对左侧臂节3和右侧臂节2整体进行安装,不需要再安顺序一节一节的吊起和连接,这样有利于提高安装效率,效率提高以后,由于臂架吊在空中的时间更短,从而有利于减小车间内的安全隐患;且该连接方式在臂架连接完成后,可以有效避免传统臂架出现向一侧倾斜或倾斜的情况,有利于提高生产质量,增强臂架的稳定性。When the jib section needs to increase with the increase of lifting performance, it will not be necessary to connect the upper connecting lug 4, the upper connecting lug 2 5, the lower connecting lug 1 8, the lower connecting lug 2 9 and the lower The volume of the connecting rod has a great influence, and it only needs to increase the strength of the corresponding structure, and the processing is simple, and the transportation is more convenient. At the same time, because the left arm section 3 and the right arm section 2 are more evenly connected, the force point is wider , so that the connection method is more stable and firm; when installing the jib structure, the left jib section 3 and the right jib section 2 are lifted directly, and the workers can directly fix the left jib section 3 and the right jib section 2 The overall installation does not need to be hoisted and connected one by one in the installation sequence, which is conducive to improving the installation efficiency. After the efficiency is improved, because the jib hangs in the air for a shorter time, it is beneficial to reduce the safety in the workshop. Hidden dangers; and this connection method can effectively prevent the traditional boom from tilting or tilting to one side after the boom is connected, which is conducive to improving production quality and enhancing the stability of the boom.

为了更好地实现上述发明目的,本实施例还提供了一种塔机双臂架并联连接形式的安装方法,具体包括以下步骤:In order to better achieve the purpose of the above invention, this embodiment also provides an installation method in the form of parallel connection of the double jib frame of the tower crane, which specifically includes the following steps:

S1:在地面将左侧臂节和右侧臂节按安装距离尺寸并列放置,然后将上部连接耳座一与上部连接耳座二之间的销轴孔对齐,通过销轴一将上部连接耳座一与上部连接耳座二连接,安装完毕后即实现左侧臂节和右侧臂节上部的可靠并联;S1: Place the left arm section and the right arm section side by side on the ground according to the installation distance, then align the pin holes between the upper connecting ear seat 1 and the upper connecting ear seat 2, and connect the upper connecting ear Seat 1 is connected to the upper connecting lug seat 2. After installation, the reliable parallel connection of the upper part of the left boom section and the right boom section can be realized;

S2:将下部连接杆一、下部连接杆二依次按顺序分别与左侧臂节和右侧臂节下部的连接耳板通过销轴二进行连接,下部连接杆一和下部连接杆二安装完毕后即实现左侧臂节和右侧臂节下部的可靠并联,至此,左侧臂节和右侧臂节在地面组装完成;S2: Connect the lower connecting rod 1 and the lower connecting rod 2 with the connecting lug plates on the lower part of the left and right boom sections in sequence respectively through the pin shaft 2. After the lower connecting rod 1 and the lower connecting rod 2 are installed That is to realize the reliable parallel connection of the lower part of the left arm section and the right arm section, so far, the left arm section and the right arm section are assembled on the ground;

S3、使用起重设备起吊已组装好的左、右侧臂节至与主体臂架相同高度,将左、右侧臂节销轴连接孔与主体臂架上已安装的臂节销轴孔对齐,然后安装臂节连接销轴,至此左侧臂节和右侧臂节在主体臂架上安装完成;S3. Use lifting equipment to lift the assembled left and right jib sections to the same height as the main boom section, and align the left and right jib section pin connection holes with the installed jib section pin holes on the main jib section , and then install the connecting pin of the boom section, so far the installation of the left boom section and the right boom section on the main boom frame is completed;

S4:撤离起重设备,安装完成。S4: Evacuate the lifting equipment, and the installation is completed.

以上所述仅为本发明的较佳实施例,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection of the present invention. within range.

Claims (8)

1.一种塔机双臂架并联的连接形式,包括左侧臂节(3)和右侧臂节(2),左侧臂节(3)和右侧臂节(2)结构均由上片结构(10)、斜腹杆(11)、下弦箱体(12)组成,上片结构(10)由两个上弦杆(13)和水平腹杆(14)组成,斜腹杆(11)为管材或角钢拼接方形结构,下弦箱体(12)由钢板片装焊接组成箱体结构,它们最终共同组成倒三角截面的臂节结构,其特征在于,所述左侧臂节(3)的一侧上端等距设置有多个上部连接耳座一(4),在所述右侧臂节(2)的一侧上端等距设置有多个上部连接耳座二(5),所述上部连接耳座一(4)与上部连接耳座二(5)相对设置,并且通过销轴一连接,所述左侧臂节(3)的下端一侧等距设置有多个下部连接耳板一(8),所述右侧臂节(2)的下端一侧等距设置有多个下部连接耳板二(9),所述下部连接耳板一(8)与下部连接耳板二(9)之间通过下部连接杆连接。1. A parallel connection form of double jib frames of a tower crane, comprising a left jib section (3) and a right jib section (2), the left jib section (3) and the right jib section (2) are constructed by The upper structure (10) consists of two upper chords (13) and the horizontal web (14), and the diagonal rod (11) It is a square structure spliced by pipes or angle steel. The lower chord box (12) is assembled and welded by steel plates to form a box structure. They finally form a jib section structure with an inverted triangular section. It is characterized in that the left jib section (3) One upper end of one side is equidistantly provided with a plurality of upper connecting ear seats one (4), and one upper end of one side of the right arm section (2) is equidistantly provided with a plurality of upper connecting ear seats two (5). Connecting ear seat 1 (4) is arranged opposite to the upper connecting ear seat 2 (5), and is connected by pin shaft 1. A plurality of lower connecting ear plates 1 are equidistantly arranged on the side of the lower end of the left arm section (3) (8), the lower end side of the right arm section (2) is equidistantly provided with a plurality of lower connecting ear plates (9), the lower connecting ear plate one (8) and the lower connecting ear plate two (9) ) are connected by the lower connecting rod. 2.根据权利要求1所述的一种塔机双臂架并联的连接形式,其特征在于,多个所述上部连接耳座一(4)和多个下部连接耳板一(8)均沿左侧臂节(3)长度方向分布设置,多个所述上部连接耳座二(5)和多个下部连接耳板二(9)均沿右侧臂节(2)长度方向分布设置。2. The parallel connection form of a double jib frame of a tower crane according to claim 1, characterized in that, a plurality of said upper connection lugs one (4) and a plurality of lower connection lugs one (8) are all along the The left arm section (3) is distributed in the length direction, and the plurality of upper connecting lug seats two (5) and the plurality of lower connecting lug plates two (9) are distributed along the right arm section (2) in the length direction. 3.根据权利要求2所述的一种塔机双臂架并联的连接形式,其特征在于,所述下部连接杆包括下部连接杆一(6)和下部连接杆二(7),所述下部连接杆一(6)与左侧臂节(3)或右侧臂节(2)垂直设置,所述下部连接杆二(7)分别左侧臂节(3)、右侧臂节(2)之间的夹角小于90度。3. The connection form of parallel connection of double jib frames of a tower crane according to claim 2, characterized in that, the lower connecting rod comprises a lower connecting rod one (6) and a lower connecting rod two (7), and the lower connecting rod The first connecting rod (6) is vertically arranged with the left boom section (3) or the right boom section (2), and the lower connecting rod two (7) are respectively the left boom section (3) and the right boom section (2) The angle between them is less than 90 degrees. 4.根据权利要3所述的一种塔机双臂架并联的连接形式,其特征在于,所述下部连接杆与下部连接耳一(8)或下部连接耳二(9)之间通过销轴二连接。4. The parallel connection form of a tower crane double jib frame according to claim 3, characterized in that, the connection between the lower connecting rod and the first lower connecting ear (8) or the second lower connecting ear (9) is through a pin Axis two connection. 5.根据权利要4所述的一种塔机双臂架并联的连接形式,其特征在于,所述下部连接杆采用圆杆、矩形杆或方杆。5. A parallel connection form of tower crane double jib frames according to claim 4, characterized in that, the lower connecting rod is a round rod, a rectangular rod or a square rod. 6.根据权利要求1-5任一项所述的一种塔机双臂架并联的连接形式,其特征在于,所述上部连接耳座一(4)和下部连接耳板一(8)均通过不可拆卸方式与左侧臂节(3)连接,所述上部连接耳座二(5)和下部连接耳板二(9)均与右侧臂节(2)固定连接。6. The parallel connection form of a double boom frame of a tower crane according to any one of claims 1-5, characterized in that, the upper connecting lug seat one (4) and the lower connecting lug plate one (8) are both It is connected with the left arm section (3) in a non-detachable manner, and the upper connecting lug seat two (5) and the lower connecting ear plate two (9) are both fixedly connected with the right arm section (2). 7.根据权利要求6所述的一种塔机双臂架并联的连接形式,其特征在于,所述上部连接耳座一(4)、上部连接耳座二(5)、下部连接耳板一(8)和下部连接耳板二(9)上均焊接有加强板。7. The connection form of parallel connection of double jib frames of a tower crane according to claim 6, characterized in that, the upper connecting ear seat one (4), the upper connecting ear seat two (5), the lower connecting ear plate one (8) and the bottom connecting ear plate two (9) are all welded with reinforcement plates. 8.一种塔机双臂架并联的连接形式的安装方法,其特征在于,包括以下步骤:8. An installation method of a parallel connection form of a tower crane double jib frame, characterized in that, comprising the following steps: S1:在地面将左侧臂节(3)和右侧臂节(2)按安装距离尺寸并列放置,然后将上部连接耳座一(4)与上部连接耳座二(5)之间的销轴孔对齐,通过销轴一将上部连接耳座一(4)与上部连接耳座二(5)连接,安装完毕后即实现左侧臂节(3)和右侧臂节(2)上部的可靠并联;S1: Place the left boom section (3) and right boom section (2) side by side on the ground according to the installation distance, and then place the pin between the upper connecting lug one (4) and the upper connecting lug two (5) Align the shaft holes, and connect the upper connecting ear seat one (4) with the upper connecting ear seat two (5) through the pin shaft one. After installation, the upper part of the left arm section (3) and the right arm section (2) Reliable parallel connection; S2:将下部连接杆一(6)、下部连接杆二(7)依次按顺序分别与左侧臂节(3)和右侧臂节(2)下部的连接耳板通过销轴二进行连接,下部连接杆一(6)和下部连接杆二(7)安装完毕后即实现左侧臂节(3)和右侧臂节(2)下部的可靠并联,至此,左侧臂节(3)和右侧臂节(2)在地面组装完成;S2: Connect the lower connecting rod 1 (6) and the lower connecting rod 2 (7) to the connecting lugs on the lower parts of the left arm section (3) and the right arm section (2) in sequence respectively through the pin shaft 2, After the first lower connecting rod (6) and the second lower connecting rod (7) are installed, the reliable parallel connection of the lower parts of the left boom section (3) and the right boom section (2) will be realized. So far, the left boom section (3) and the The right jib section (2) is assembled on the ground; S3、使用起重设备起吊已组装好的左、右侧臂节至与主体臂架相同高度,将左侧臂节(3)与右侧臂节(2)销轴连接孔与主体臂架上已安装的臂节销轴孔对齐,然后安装臂节连接销轴,至此左侧臂节(3)和右侧臂节(2)在主体臂架上安装完成;S3. Use lifting equipment to lift the assembled left and right boom sections to the same height as the main boom section, and connect the pin shaft connection holes of the left boom section (3) and right boom section (2) to the main boom section Align the installed boom section pin holes, and then install the boom section connection pin, so far the left boom section (3) and right boom section (2) are installed on the main boom; S4:撤离起重设备,安装完成。S4: Evacuate the lifting equipment, and the installation is completed.
CN202310649142.XA 2023-06-01 2023-06-01 A parallel connection form and installation method of double jib frames of a tower crane Pending CN116639606A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310649142.XA CN116639606A (en) 2023-06-01 2023-06-01 A parallel connection form and installation method of double jib frames of a tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310649142.XA CN116639606A (en) 2023-06-01 2023-06-01 A parallel connection form and installation method of double jib frames of a tower crane

Publications (1)

Publication Number Publication Date
CN116639606A true CN116639606A (en) 2023-08-25

Family

ID=87643250

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310649142.XA Pending CN116639606A (en) 2023-06-01 2023-06-01 A parallel connection form and installation method of double jib frames of a tower crane

Country Status (1)

Country Link
CN (1) CN116639606A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119706642A (en) * 2024-12-23 2025-03-28 徐州建机工程机械有限公司 Novel installation method of upper-lower split inverted triangle double-arm parallel arm support

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102275839A (en) * 2011-06-10 2011-12-14 长沙中联重工科技发展股份有限公司 Tower crane climb scaffold and tower crane with same
CN202897878U (en) * 2012-11-22 2013-04-24 中联重科股份有限公司 Fabricated jib sections, jibs, jibs and tower cranes
CN203486802U (en) * 2013-06-27 2014-03-19 中联重科股份有限公司 Balance arm and tower crane
CN106892365A (en) * 2017-04-20 2017-06-27 沈阳建筑大学 A kind of parallel flat-top tower crane of both arms
CN108313895A (en) * 2018-03-29 2018-07-24 徐工集团工程机械股份有限公司 A kind of reinforced combined type arm support
CN214693011U (en) * 2020-11-30 2021-11-12 广东安久重科装备有限公司 Square arm
CN216105727U (en) * 2021-04-19 2022-03-22 徐工集团工程机械股份有限公司建设机械分公司 Arm support device and hoisting equipment
CN114772478A (en) * 2022-03-15 2022-07-22 浙江三一装备有限公司 Truss arm section, truss arm and operation machine
CN115303963A (en) * 2022-06-29 2022-11-08 抚顺永茂建筑机械有限公司 Combined arm support of tower crane
CN218174487U (en) * 2022-06-29 2022-12-30 抚顺永茂建筑机械有限公司 Combined arm support of tower crane

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102275839A (en) * 2011-06-10 2011-12-14 长沙中联重工科技发展股份有限公司 Tower crane climb scaffold and tower crane with same
CN202897878U (en) * 2012-11-22 2013-04-24 中联重科股份有限公司 Fabricated jib sections, jibs, jibs and tower cranes
CN203486802U (en) * 2013-06-27 2014-03-19 中联重科股份有限公司 Balance arm and tower crane
CN106892365A (en) * 2017-04-20 2017-06-27 沈阳建筑大学 A kind of parallel flat-top tower crane of both arms
CN108313895A (en) * 2018-03-29 2018-07-24 徐工集团工程机械股份有限公司 A kind of reinforced combined type arm support
CN214693011U (en) * 2020-11-30 2021-11-12 广东安久重科装备有限公司 Square arm
CN216105727U (en) * 2021-04-19 2022-03-22 徐工集团工程机械股份有限公司建设机械分公司 Arm support device and hoisting equipment
CN114772478A (en) * 2022-03-15 2022-07-22 浙江三一装备有限公司 Truss arm section, truss arm and operation machine
CN115303963A (en) * 2022-06-29 2022-11-08 抚顺永茂建筑机械有限公司 Combined arm support of tower crane
CN218174487U (en) * 2022-06-29 2022-12-30 抚顺永茂建筑机械有限公司 Combined arm support of tower crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN119706642A (en) * 2024-12-23 2025-03-28 徐州建机工程机械有限公司 Novel installation method of upper-lower split inverted triangle double-arm parallel arm support

Similar Documents

Publication Publication Date Title
CN110182682A (en) A kind of suspender for the lifting of big segment steel truss girder
CN103193165A (en) Upper support of tower crane and tower crane
CN115432596A (en) Foldable tower crane standard section
CN116639606A (en) A parallel connection form and installation method of double jib frames of a tower crane
WO2023040383A1 (en) Standard knot device and tower crane
CN205312931U (en) Modular cantilever crane and hoisting equipment
CN116534741A (en) A tower crane jib structure and its assembly method
CN214994605U (en) Modularization steel structure spare
CN220265061U (en) Arm support structure for mast crane
CN215479346U (en) Boom section splicing unit, boom section and tower crane
CN108328492A (en) A kind of superpower boom system of multi-arm frame with mapping function
CN218912360U (en) Basement reinforced structure
CN216336290U (en) Tower crane base conversion equipment
CN218560940U (en) A tower crane jib structure
CN209974169U (en) Swing arm tower machine beam climbing device
CN115523096A (en) Split type reverse balance flange
CN221876288U (en) Steel reinforcement cage gallows
CN222118730U (en) Standard knot for large-scale tower crane
CN206476671U (en) Attachment device of tower crane
CN219409036U (en) A New Underframe Structure of Tower Crane
CN223032926U (en) Tower crane attaches wall structure
CN217921192U (en) Frame and crane
CN111852166A (en) A D-shaped inner tube chimney support device
CN112125122A (en) Hoisting method of wind power generation equipment
CN116621058A (en) Balance arm of tower crane and its installation method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination