CN116607947A - Method for installing tunnel vault settlement monitoring points - Google Patents
Method for installing tunnel vault settlement monitoring points Download PDFInfo
- Publication number
- CN116607947A CN116607947A CN202310299500.9A CN202310299500A CN116607947A CN 116607947 A CN116607947 A CN 116607947A CN 202310299500 A CN202310299500 A CN 202310299500A CN 116607947 A CN116607947 A CN 116607947A
- Authority
- CN
- China
- Prior art keywords
- telescopic rod
- connector
- vault
- tray
- jacking
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/003—Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
技术领域technical field
本发明涉及盾构隧道监测技术领域,尤其涉及一种隧道拱顶沉降监测点的安装方法。The invention relates to the technical field of shield tunnel monitoring, in particular to a method for installing tunnel vault settlement monitoring points.
背景技术Background technique
在地铁隧道施工过程中,盾构法施工越来越普及,其具有对地表影响小、施工速度快、效率高等特点,但在盾构机推进过程中会引起周围环境产生形变,近年来由于隧道施工引起的地面塌陷事故常有发生,对生命和财产构成了巨大的威胁,因此掌握并监测施工过程中产生的形变,对安全施工有着重要意义。In the construction process of subway tunnels, shield tunneling construction is becoming more and more popular. It has the characteristics of small impact on the ground surface, fast construction speed, and high efficiency. However, the surrounding environment will be deformed during the advancement of the shield machine. Ground subsidence accidents caused by construction often occur, posing a huge threat to life and property. Therefore, mastering and monitoring the deformation during construction is of great significance to safe construction.
隧道拱顶沉降监测是隧道施工及运营过程中常规监测项目,最常采用电子水准法进行测量,其原理是在拱顶管片位置安装挂钩,将塔尺悬挂在挂勾上,用水准仪进行测量,该方法测量效率高、数据准确,但在拱顶管片处安装挂钩时存在诸多难题,包括:Tunnel vault settlement monitoring is a routine monitoring item during tunnel construction and operation. The electronic level method is most commonly used for measurement. The principle is to install a hook at the position of the vault segment, hang the tower ruler on the hook, and measure with a level , this method has high measurement efficiency and accurate data, but there are many difficulties in installing the hook at the vault segment, including:
1、挂钩安装时存在较大的安全隐患;目前挂钩是监测人员攀爬至盾构机及台车顶部进行安装,由于区间隧道内施工环境较差,盾构机尺寸较大,未设置扶梯,攀爬较为困难,且盾构机及台车上部安装泥浆管和机械构件,增加了安装作业难度。1. There are great potential safety hazards in the installation of the hook; at present, the monitoring personnel climb to the top of the shield machine and the trolley for installation of the hook. Due to the poor construction environment in the section tunnel, the size of the shield machine is large, and there is no escalator. Climbing is more difficult, and mud pipes and mechanical components are installed on the upper part of the shield machine and trolley, which increases the difficulty of installation work.
2、耗费较大的人员时间和精力,且存在无法保证监测数据连续性的隐患;由于监测人员需时刻关注盾构机及台车的推进位置,避免超过监测断面而无法布设拱顶监测点,耗费大量的人员时间和精力,若监测点未及时布设将无法实时监测,更不能及时掌握区间在施工过程中的变形情况。2. It takes a lot of time and energy for personnel, and there is a hidden danger that the continuity of monitoring data cannot be guaranteed; because monitoring personnel need to pay attention to the advancing position of the shield machine and the trolley at all times, to avoid exceeding the monitoring section and unable to arrange vault monitoring points, It consumes a lot of time and energy of personnel. If the monitoring points are not arranged in time, it will not be possible to monitor in real time, let alone grasp the deformation of the section during the construction process in time.
挂钩安装麻烦,效率低,且存在管片破损的问题;传统安装方法是在拱顶用电钻打孔后安装带挂钩膨胀螺栓,操作较为繁琐,且需破坏管片。The installation of the hook is cumbersome, the efficiency is low, and there is a problem of segment damage; the traditional installation method is to install the expansion bolt with hook after drilling the vault with an electric drill. The operation is cumbersome and the segment needs to be damaged.
发明内容Contents of the invention
本发明的目的是针对现有技术中存在的技术缺陷,而提供一种隧道拱顶沉降监测点的安装方法。The purpose of the present invention is to provide a method for installing tunnel vault settlement monitoring points aiming at the technical defects existing in the prior art.
为实现本发明的目的所采用的技术方案是:The technical scheme adopted for realizing the purpose of the present invention is:
一种隧道拱顶沉降监测点的安装方法,采用一种安装装置,包括:伸缩杆、顶托和托盘连接件,所述顶托设置在伸缩杆的顶端,并与伸缩杆螺纹连接,用于与托盘连接件连接;所述顶托与托盘连接件嵌入式连接,用于通过举起伸缩杆将托盘连接件托举至拱顶管片处;A method for installing a tunnel vault settlement monitoring point, using an installation device, including: a telescopic rod, a jacking bracket and a tray connector, the jacking bracket is arranged on the top of the telescopic rod, and is threadedly connected with the telescopic rod for It is connected with the pallet connector; the jacking is embedded with the pallet connector, and is used to lift the pallet connector to the vault segment by lifting the telescopic rod;
隧道拱顶沉降监测点的安装方法的步骤如下:The steps of the installation method of the tunnel vault settlement monitoring point are as follows:
步骤1,根据设计要求的监测断面的拱顶管片中心找到盾构隧道拱顶沉降监测点的安装位置;Step 1. Find the installation position of the vault settlement monitoring point of the shield tunnel according to the vault segment center of the monitoring section required by the design;
步骤2,将顶托与伸缩杆进行螺纹连接,并将螺纹挂钩与托盘连接件进行螺纹连接;Step 2, thread the jacking bracket with the telescopic rod, and thread the threaded hook with the pallet connector;
步骤3,使顶托与托盘连接件的托槽嵌入式安装,并在托盘连接件的表面涂抹胶粘材料;Step 3, make the bracket of the jacking bracket and the tray connecting part embedded and installed, and apply adhesive material on the surface of the tray connecting part;
步骤4,举起伸缩杆使托盘连接件与拱顶管片通过胶粘材料粘合;Step 4, lifting the telescopic rod to bond the tray connector and the vault segment through the adhesive material;
步骤5,在托盘连接件与拱顶管片粘合牢固后,撤回伸缩杆;Step 5, after the tray connector is firmly bonded to the vault segment, withdraw the telescopic rod;
步骤6,按照步骤1~5重复安装其他检测端面的拱顶监测点。Step 6: Repeat steps 1 to 5 to install other vault monitoring points on the detection end face.
在上述技术方案中,所述顶托的底部设置螺纹连接杆,用于实现与伸缩杆的螺纹连接。In the above technical solution, a threaded connecting rod is provided at the bottom of the jacking bracket for realizing the threaded connection with the telescopic rod.
在上述技术方案中,所述托盘连接件上设置有托槽和螺栓孔。In the above technical solution, the tray connector is provided with brackets and bolt holes.
在上述技术方案中,所述顶托嵌入式安装在托槽内,用于使伸缩杆与托盘连接件固定连接。In the above technical solution, the jacking bracket is embedded and installed in the bracket, and is used for fixedly connecting the telescopic rod with the tray connector.
在上述技术方案中,在托盘连接件的螺栓孔内安装有螺纹挂钩。In the above technical solution, a threaded hook is installed in the bolt hole of the pallet connector.
在上述技术方案中,所述托盘连接件的厚度为1.0cm。In the above technical solution, the thickness of the tray connector is 1.0 cm.
在上述技术方案中,所述螺栓孔的深度为5mm。In the above technical solution, the depth of the bolt hole is 5mm.
在上述技术方案中,所述托盘连接件的表面涂抹有胶粘材料。In the above technical solution, the surface of the tray connector is coated with an adhesive material.
在上述技术方案中,所述托盘连接件的托槽的内部尺寸与顶托的尺寸相同。In the above technical solution, the inner dimension of the bracket of the tray connector is the same as that of the jacking bracket.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1、本发明盾构隧道拱顶沉降监测点的安装装置的托盘连接件,搭配伸缩杆和螺纹挂钩有效解决了监测人员攀爬至盾构机及台车顶部进行监测点安装时所面临的安全隐患。1. The tray connector of the installation device for the vault settlement monitoring point of the shield tunnel of the present invention is matched with the telescopic rod and the threaded hook to effectively solve the safety problems faced by the monitoring personnel when climbing to the top of the shield machine and the trolley for the installation of the monitoring point. Hidden danger.
2、本发明的盾构隧道拱顶沉降监测点的安装装置为粘贴式安装结构,解决了传统钻孔安装方法不可避免的破坏管片的问题。2. The installation device of the vault settlement monitoring point of the shield tunnel of the present invention is an adhesive installation structure, which solves the problem of unavoidable damage to the segment in the traditional drilling installation method.
3、基于本发明的盾构隧道拱顶沉降监测点的安装装置安装方法安装拱顶监测点的效率较高,省时省力,无需人员时刻关注盾构机及台车位置,应用其可随时布设拱顶监测点,有效的保证了监测数据的连续性,该发明各结构制作工艺成熟,操作简单,便于携带,可回收利用,可控性和实用性较强。3. The installation method of the installation method of the shield tunnel vault settlement monitoring point based on the present invention has high efficiency for installing the vault monitoring point, saves time and effort, and does not require personnel to always pay attention to the position of the shield machine and the trolley, and can be deployed at any time by using it The vault monitoring point effectively guarantees the continuity of the monitoring data. The manufacturing process of each structure of the invention is mature, easy to operate, easy to carry, recyclable, and strong in controllability and practicability.
附图说明Description of drawings
图1所示为本发明的盾构隧道拱顶沉降监测点的安装装置结构示意图。Fig. 1 is a schematic structural diagram of the installation device of the vault settlement monitoring point of the shield tunnel according to the present invention.
图2所示为本发明的托盘连接件的空间结构示意图。FIG. 2 is a schematic diagram of the spatial structure of the tray connector of the present invention.
图中:0-拱顶管片,1-伸缩杆,2-顶托,2-1-螺纹连接杆,3-托盘连接件,3-1-托槽,3-2-螺栓孔,3-3-螺纹挂钩。In the figure: 0-arch segment, 1-telescopic rod, 2-jack, 2-1-threaded connecting rod, 3-tray connector, 3-1-bracket, 3-2-bolt hole, 3- 3-Threaded hook.
具体实施方式Detailed ways
以下结合具体实施例对本发明作进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。The present invention will be described in further detail below in conjunction with specific examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
一种盾构隧道拱顶沉降监测点的安装装置,参见图1,所述安装装置包括:伸缩杆1、顶托2和托盘连接件3,所述顶托2设置在伸缩杆1的顶端,并与伸缩杆1螺纹连接,用于与托盘连接件3连接;所述顶托2与托盘连接件3嵌入式连接,用于通过举起伸缩杆1将托盘连接件3托举至拱顶管片0处,使托盘连接件3与拱顶管片0固定连接。An installation device for a vault settlement monitoring point of a shield tunnel, referring to Fig. 1, the installation device includes: a telescopic rod 1, a jacking bracket 2 and a tray connector 3, the jacking bracket 2 is arranged on the top of the telescopic rod 1, And threaded with the telescopic rod 1 for connecting with the tray connector 3; the jacking 2 is embedded with the tray connector 3 for lifting the pallet connector 3 to the vault tube by lifting the telescopic rod 1 At the position of sheet 0, the tray connector 3 is fixedly connected with the vault segment 0.
进一步的,所述顶托2的底部设置螺纹连接杆2-1,用于实现与伸缩杆1的螺纹连接。Further, the bottom of the jacking bracket 2 is provided with a threaded connecting rod 2 - 1 for realizing the threaded connection with the telescopic rod 1 .
进一步的,参见图2,所述托盘连接件3由托槽3-1、螺栓孔3-2和螺纹挂钩3-3组成,所述顶托2嵌入式安装在托槽3-1内,用于使伸缩杆1与托盘连接件3固定连接;所述螺纹挂钩3-3螺纹安装在螺栓孔3-2内。其中,所述托盘连接件3的厚度为1.0cm,所述螺栓孔3-2的深度为5mm,能够避免螺纹挂钩3-3不能穿透托盘连接件3的上表面。Further, referring to Fig. 2, the tray connector 3 is composed of a bracket 3-1, a bolt hole 3-2 and a threaded hook 3-3, the jacking bracket 2 is embedded in the bracket 3-1, and To make the telescopic rod 1 fixedly connected with the tray connector 3; the threaded hook 3-3 is threadedly installed in the bolt hole 3-2. Wherein, the thickness of the pallet connector 3 is 1.0 cm, and the depth of the bolt hole 3-2 is 5 mm, which can prevent the threaded hook 3-3 from penetrating the upper surface of the pallet connector 3 .
进一步的,所述托盘连接件3的表面涂抹有胶粘材料,用于实现托盘连接件3与拱顶管片0固定连接。Further, the surface of the tray connector 3 is coated with an adhesive material for realizing the fixed connection between the tray connector 3 and the dome segment 0 .
进一步的,所述托盘连接件3的托槽3-1的内部尺寸与顶托2的尺寸相同,防止托槽3-1与顶托2连接不牢固,托盘连接件3掉落,且保证托盘连接件3与拱顶管片0固定连接时,托盘连接件3受力均匀,使托盘连接件3表面的胶粘材料与拱顶管片0充分贴合。Further, the internal size of the bracket 3-1 of the tray connector 3 is the same as that of the jacking bracket 2, preventing the bracket 3-1 from being firmly connected with the jacking bracket 2, causing the tray connector 3 to fall, and ensuring that the tray When the connecting piece 3 is fixedly connected to the dome segment 0, the tray connecting piece 3 is evenly stressed, so that the adhesive material on the surface of the tray connecting piece 3 is fully attached to the dome segment 0.
采用上述安装装置进行隧道拱顶沉降监测点安装的方法具体如下。The method for installing the tunnel vault settlement monitoring point by using the above-mentioned installation device is as follows.
步骤1,根据设计要求的监测断面的拱顶管片0中心找到盾构隧道拱顶沉降监测点的安装位置;Step 1, find the installation position of the vault settlement monitoring point of the shield tunnel according to the vault segment 0 center of the monitoring section required by the design;
步骤2,将顶托2与伸缩杆1进行螺纹连接,并将螺纹挂钩3-3与托盘连接件3进行螺纹连接;Step 2, thread the jacking 2 with the telescopic rod 1, and thread the threaded hook 3-3 with the tray connector 3;
步骤3,使顶托2与托盘连接件3的托槽3-1嵌入式安装,并在托盘连接件3的表面涂抹胶粘材料。Step 3, make the jacking bracket 2 and the bracket groove 3-1 of the pallet connector 3 be installed embeddedly, and apply adhesive material on the surface of the pallet connector 3 .
步骤4,举起伸缩杆1使托盘连接件3与拱顶管片0通过胶粘材料粘合;Step 4, lift the telescopic rod 1 to make the tray connector 3 and the dome segment 0 adhere to each other through an adhesive material;
步骤5,在托盘连接件3与拱顶管片0粘合牢固后,撤回伸缩杆1;Step 5, after the tray connector 3 is firmly bonded to the dome segment 0, the telescopic rod 1 is withdrawn;
步骤6,按照步骤1~5重复安装其他检测端面的拱顶监测点。Step 6: Repeat steps 1 to 5 to install other vault monitoring points on the detection end face.
以上对本发明做了示例性的描述,应该说明的是,在不脱离本发明的核心的情况下,任何简单的变形、修改或者其他本领域技术人员能够不花费创造性劳动的等同替换均落入本发明的保护范围。The present invention has been described as an example above, and it should be noted that, without departing from the core of the present invention, any simple deformation, modification or other equivalent replacements that can be made by those skilled in the art without creative labor all fall within the scope of this invention. protection scope of the invention.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310299500.9A CN116607947A (en) | 2023-03-24 | 2023-03-24 | Method for installing tunnel vault settlement monitoring points |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310299500.9A CN116607947A (en) | 2023-03-24 | 2023-03-24 | Method for installing tunnel vault settlement monitoring points |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN116607947A true CN116607947A (en) | 2023-08-18 |
Family
ID=87682482
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310299500.9A Pending CN116607947A (en) | 2023-03-24 | 2023-03-24 | Method for installing tunnel vault settlement monitoring points |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116607947A (en) |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000130068A (en) * | 1998-10-29 | 2000-05-09 | Okumura Corp | Land subsidence measurement device and ground subsidence measurement method |
| JP2001324437A (en) * | 2000-05-16 | 2001-11-22 | Selco Co Ltd | Sludge accumulation monitoring method and apparatus |
| CN204177316U (en) * | 2014-11-11 | 2015-02-25 | 重庆大学 | A kind of multi-functional tunnel monitoring utility appliance |
| CN204851268U (en) * | 2015-07-27 | 2015-12-09 | 重庆大学 | Efficient tunnel vault monitoring point erection equipment |
| CN205120118U (en) * | 2015-11-22 | 2016-03-30 | 中交第一公路工程局有限公司 | Sticky formula corrugated steel pipe is contained top settling amount measurement station and is laid device |
| CN205940542U (en) * | 2016-08-25 | 2017-02-08 | 西安建筑科技大学 | Tunnel vault settlement measurement station cabling device exempts from to drill |
| CN206208251U (en) * | 2016-12-07 | 2017-05-31 | 重庆科技学院 | The quick arrangement apparatus of tunnel vault settlement monitoring point |
| CN115218864A (en) * | 2022-07-19 | 2022-10-21 | 中交第二公路工程局有限公司 | Tunnel primary branch vault settlement monitoring ATR measuring point automatic tracking method free of buried measuring points |
| CN220248087U (en) * | 2023-03-24 | 2023-12-26 | 中交天津港湾工程研究院有限公司 | Installation device for shield tunnel vault settlement monitoring points |
-
2023
- 2023-03-24 CN CN202310299500.9A patent/CN116607947A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000130068A (en) * | 1998-10-29 | 2000-05-09 | Okumura Corp | Land subsidence measurement device and ground subsidence measurement method |
| JP2001324437A (en) * | 2000-05-16 | 2001-11-22 | Selco Co Ltd | Sludge accumulation monitoring method and apparatus |
| CN204177316U (en) * | 2014-11-11 | 2015-02-25 | 重庆大学 | A kind of multi-functional tunnel monitoring utility appliance |
| CN204851268U (en) * | 2015-07-27 | 2015-12-09 | 重庆大学 | Efficient tunnel vault monitoring point erection equipment |
| CN205120118U (en) * | 2015-11-22 | 2016-03-30 | 中交第一公路工程局有限公司 | Sticky formula corrugated steel pipe is contained top settling amount measurement station and is laid device |
| CN205940542U (en) * | 2016-08-25 | 2017-02-08 | 西安建筑科技大学 | Tunnel vault settlement measurement station cabling device exempts from to drill |
| CN206208251U (en) * | 2016-12-07 | 2017-05-31 | 重庆科技学院 | The quick arrangement apparatus of tunnel vault settlement monitoring point |
| CN115218864A (en) * | 2022-07-19 | 2022-10-21 | 中交第二公路工程局有限公司 | Tunnel primary branch vault settlement monitoring ATR measuring point automatic tracking method free of buried measuring points |
| CN220248087U (en) * | 2023-03-24 | 2023-12-26 | 中交天津港湾工程研究院有限公司 | Installation device for shield tunnel vault settlement monitoring points |
Non-Patent Citations (3)
| Title |
|---|
| 徐力: "《展示空间设计》", vol. 1, 31 October 2014, 河北美术出版社, pages: 136 - 142 * |
| 白涛等: "《工业机械装调》", vol. 1, 31 October 2021, 山东科学技术出版社, pages: 280 - 289 * |
| 郑宁涛;: "城市轨道交通盾构工程施工监测与结果分析", 河北企业, no. 03, 10 March 2017 (2017-03-10) * |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109991656A (en) | Recyclable device is installed in a kind of microseismic sensors hole based on hot melt adhesive | |
| CN104457687B (en) | Laser Measuring ramp and tilt measurement thereof | |
| CN219034705U (en) | A construction drilling detection device | |
| CN220248087U (en) | Installation device for shield tunnel vault settlement monitoring points | |
| CN111608587A (en) | Construction system and construction method for hard rock drilling of occlusal piles in foundation pit in restricted height area | |
| CN1057973C (en) | Four-bar frame self-lifting type door-base crane | |
| CN116607947A (en) | Method for installing tunnel vault settlement monitoring points | |
| CN103277104B (en) | Hanging equipment and method in sinking platform well | |
| CN108677991B (en) | A suction-type combined foundation structure and construction method suitable for easily liquefied strata | |
| CN203308466U (en) | In-well hanging equipment of sinking platform | |
| CN206959741U (en) | A kind of colliery strata movement monitoring roof separation indicator | |
| CN211924165U (en) | Assembled steel sleeve structure for shield launching and receiving | |
| CN103241683B (en) | Under a kind of ocean pipeline balance weight production line, the rail mounted of pipe lifts pipe device | |
| CN111811491A (en) | Forced centering device capable of free lifting, recycling and integrated operation | |
| CN207760881U (en) | Piping lane internal model lift adjustment support device | |
| CN203499575U (en) | Hydraulic lifting derrick for petroleum drilling machine | |
| CN110186417A (en) | A kind of corner monitoring device for push pipe electric power tunnel | |
| CN211772443U (en) | Foundation slip casting device for civil engineering | |
| CN114812498A (en) | Roadbed filling settlement observation rod height-connection anti-rolling structure and method | |
| CN217233542U (en) | An underground piston filling device | |
| CN107842322B (en) | Water centering device for large-caliber riser | |
| CN217949178U (en) | Pipe orifice protection device for inclinometer in foundation pit intelligent monitoring | |
| LU506351B1 (en) | Distributed monitoring method for stress and deformation of foundation pit supporting anchor rods | |
| CN220186718U (en) | A lighting device for underground engineering | |
| CN221856695U (en) | A device for increasing oil and gas production in oil fields |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |