CN116607427A CN202310718714.5A CN202310718714A CN116607427A CN 116607427 A CN116607427 A CN 116607427A CN 202310718714 A CN202310718714 A CN 202310718714A CN 116607427 A CN116607427 A CN 116607427A
Authority
CN
China
Prior art keywords
construction
concrete
hollow
pier
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310718714.5A
Other languages
Chinese (zh)
Inventor
袁伟明
徐志祥
张光亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Branch Cccc No3 Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Original Assignee
Ningbo Branch Cccc No3 Harbor Engineering Co ltd
CCCC Third Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Branch Cccc No3 Harbor Engineering Co ltd, CCCC Third Harbor Engineering Co Ltd filed Critical Ningbo Branch Cccc No3 Harbor Engineering Co ltd
Priority to CN202310718714.5A priority Critical patent/CN116607427A/en
Publication of CN116607427A publication Critical patent/CN116607427A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00—Structural or constructional details of bridges
    • E01D19/02—Piers; Abutments ; Protecting same against drifting ice

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及桥梁墩身施工技术领域,且公开了一种用于空心墩墩顶实心段施工的外置吊架,包括外侧模,所述外侧模由多个对拉螺杆固定在空心段混凝土外侧,所述外侧模上方设置有多根悬吊梁,每根所述悬吊梁上设置有两个钢吊杆,所述钢吊杆下端设置有底模承重梁,所述底模承重梁上设置有多根底模分配梁,所述底模分配梁上设置有底模面板。还公开了一种用于空心墩墩顶实心段施工的外置吊架的施工方法,包括:步骤S1,安装外置吊架;步骤S2,安装完成所述外置吊架后,在所述外置吊架内的所述底模面板和空心段混凝土上进行第一层浇筑混凝土。本发明吊架结构体系简单,可重复周转使用,施工工效快,安全风险低。

The invention relates to the technical field of bridge pier body construction, and discloses an external hanger for the construction of a solid section at the top of a hollow pier, including an outer formwork, and the outer formwork is fixed on the outside of the hollow section concrete by a plurality of tensioning screws , a plurality of suspension beams are arranged above the outer formwork, two steel suspenders are arranged on each of the suspension beams, the lower end of the steel suspenders is provided with a load-bearing beam of the bottom mold, and the load-bearing beam of the bottom mold A plurality of bottom mold distribution beams are arranged, and a bottom mold panel is arranged on the bottom mold distribution beams. Also disclosed is a construction method for an external hanger used for the construction of the solid section of the top of a hollow pier, including: step S1, installing the external hanger; step S2, after the installation of the external hanger is completed, the The first layer of concrete is poured on the bottom form panel and the hollow section concrete in the external hanger. The hanger of the present invention has a simple structural system, can be used repeatedly, has fast construction efficiency, and has low safety risks.

Description

一种用于空心墩墩顶实心段施工的外置吊架及施工方法An external hanger for the construction of the solid section of the top of the hollow pier and its construction method

技术领域technical field

本发明涉及桥梁墩身施工技术领域,具体为一种用于空心墩墩顶实心段施工的外置吊架及施工方法。The invention relates to the technical field of bridge pier body construction, in particular to an external hanger and a construction method for the construction of a solid section at the top of a hollow pier.

背景技术Background technique

在桥梁领域里,空心薄壁墩因其具有结构整体刚度大、自重轻、截面模量大、整体稳定性好和节省坛工材料等特点而被广泛采用,常见于墩身高度≥15m的桥墩地段。对于我国高速铁路的桥梁高墩设计,空心薄壁墩已作为一种通用的下部结构,它的使用有效地推动了我国铁路桥梁设计向标准化方向发展也极大地减轻了工程设计人员的工作量。而空心薄壁墩墩顶实心段的封顶施工具有安全风险高、施工难度大施工周期长和经济成本投入高等问题,施工工艺的选择和施工质量的好坏将直接影响到墩身施工的整体质量,是整个墩身施工的关键环节。In the field of bridges, hollow thin-walled piers are widely used because of their high overall structural rigidity, light weight, large section modulus, good overall stability, and material saving. lot. For the design of high-speed railway bridge piers in my country, hollow thin-walled piers have been used as a general substructure. Its use has effectively promoted the standardization of railway bridge design in my country and greatly reduced the workload of engineering designers. However, the capping construction of the solid section of the hollow thin-walled pier has high safety risks, high construction difficulty, long construction period, and high economic cost investment. The selection of construction technology and the quality of construction will directly affect the overall quality of pier body construction. , is the key link of the whole pier body construction.

常见的混凝土预制盖板法、内腔搭设满堂支架法和预埋钢筋法,在技术难度、经济成本和安全风险方面均存在不同的缺陷,因此,需要一种用于空心墩墩顶实心段施工的外置吊架及施工方法。The common concrete prefabricated cover slab method, the method of erecting full-wall brackets in the inner cavity and the method of pre-embedded steel bars all have different defects in terms of technical difficulty, economic cost and safety risk. The external hanger and construction method.

发明内容Contents of the invention

本发明的目的在于克服现有的缺陷而提供的一种用于空心墩墩顶实心段施工的外置吊架及施工方法,吊架结构体系简单,可重复周转使用,施工工效快,安全风险低。The purpose of the present invention is to overcome the existing defects and provide an external hanger and construction method for the construction of the solid section of the top of the hollow pier. The hanger has a simple structure system, can be used repeatedly, and has fast construction efficiency and safety risks. Low.

实现上述目的的技术方案是:The technical scheme for realizing the above-mentioned purpose is:

本发明之一的一种用于空心墩墩顶实心段施工的外置吊架,包括外侧模,所述外侧模由多个对拉螺杆固定在空心段混凝土外侧,所述外侧模上方设置有多根悬吊梁,每根所述悬吊梁上设置有两个钢吊杆,所述钢吊杆下端设置有底模承重梁,所述底模承重梁上设置有多根底模分配梁,所述底模分配梁上设置有底模面板。One of the present inventions is an external hanger for the construction of the solid section of the top of the hollow pier, comprising an outer formwork, the outer formwork is fixed on the outside of the hollow section concrete by a plurality of tensioning screws, and the outer formwork is provided with a A plurality of suspension beams, each of the suspension beams is provided with two steel suspenders, the lower end of the steel suspenders is provided with a bottom mold load-bearing beam, and the bottom mold load-bearing beam is provided with a plurality of bottom mold distribution beams, A bottom mold panel is arranged on the bottom mold distribution beam.

优选的,所述外侧模厚度为6mm,高度为6m,所述对拉螺杆采用φ25精轧螺纹钢,所述对拉螺杆竖向设置有3排,每排设置有7根,所述外侧模下端由2排的所述对拉螺杆穿过所述空心段混凝土将所述外侧模固定在所述空心段混凝土上,所述外侧模上端由1排的所述对拉螺杆对所述外侧模紧固。Preferably, the thickness of the outer die is 6mm, and the height is 6m. The paired pull screw adopts φ25 finish-rolled rebar, and the paired pull screw is vertically arranged in 3 rows, and each row is provided with 7 pieces. The outer die The lower end of the outer mold is fixed on the hollow section concrete by 2 rows of the paired pull screws through the hollow section concrete, and the upper end of the outer mold is fixed to the outer mold by 1 row of the pair drawn screws. fasten.

优选的,所述悬吊梁采用双拼14工钢,所述外侧模上等距离设置有6根所述悬吊梁。Preferably, the suspension beams are made of Shuangpin 14 industrial steel, and 6 suspension beams are equidistantly arranged on the outer formwork.

优选的,所述钢吊杆采用φ25精轧螺纹钢,所述钢吊杆外侧套接有PVC(硬聚氯乙烯)管。Preferably, the steel suspender is made of φ25 finish-rolled rebar, and the outer side of the steel suspender is sleeved with a PVC (hard polyvinyl chloride) pipe.

优选的,所述底模承重梁采用双拼12工钢,所述底模承重梁由螺母固定在所述钢吊杆上。Preferably, the load-bearing beam of the bottom form is made of Shuangpin 12 industrial steel, and the load-bearing beam of the bottom form is fixed on the steel suspender by nuts.

优选的,所述底模分配梁采用10槽钢,所述底模分配梁设置有7根,间距为20cm。Preferably, the distribution beam of the bottom form is made of 10 channel steel, and there are seven distribution beams of the bottom form with a distance of 20 cm.

优选的,所述底模面板采用18mm厚的竹胶板,所述底模面板与所述空心段混凝土接触处设置有玻璃胶。Preferably, the bottom form panel is made of 18mm thick bamboo plywood, and the contact between the bottom form panel and the concrete of the hollow section is provided with glass glue.

优选的,还包括多个限位器,多个所述限位器分别设置在每个所述悬吊梁两端的所述外侧模内侧。Preferably, a plurality of stoppers are further included, and the plurality of stoppers are respectively arranged on the inside of the outer mold at both ends of each of the suspension beams.

本发明之二的一种用于空心墩墩顶实心段施工的外置吊架的施工方法,包括:The second aspect of the present invention relates to a construction method for an external hanger used for the construction of the solid section of the top of a hollow pier, comprising:

步骤S1,安装外置吊架;Step S1, installing an external hanger;

步骤S2,安装完成所述外置吊架后,在所述外置吊架内的所述底模面板和空心段混凝土上进行第一层浇筑混凝土;Step S2, after the external hanger is installed, the first layer of concrete is poured on the bottom form panel and hollow section concrete in the external hanger;

步骤S3,待第一层浇筑的混凝土达到设计强度,对第一层浇筑的混凝土凿毛后,在第一层浇筑的混凝土上浇筑第二层混凝土;Step S3, after the concrete poured in the first layer reaches the design strength, after roughening the concrete poured in the first layer, pour a second layer of concrete on the concrete poured in the first layer;

步骤S4,待第二层浇筑的混凝土达到设计强度后,利用墩内爬梯拆除墩内的所述外置吊架。Step S4, after the concrete poured on the second layer reaches the design strength, the external hanger in the pier is removed by using the ladder inside the pier.

优选的,所述步骤S1包括:Preferably, said step S1 includes:

步骤S11,安装所述外侧模,所述对拉螺杆穿过所述空心段混凝土预留孔将所述外侧模固定在所述空心段混凝土外侧;Step S11, installing the outer formwork, and fixing the outer formwork on the outer side of the hollow section concrete by passing through the hole reserved in the concrete of the hollow section by the pair of pulling screws;

步骤S12,将所述悬吊梁固定在所述外侧模上,并将所述限位器安装在所述外侧模内侧,对所述悬吊梁进行限位;Step S12, fixing the suspension beam on the outer mold, and installing the limiter on the inner side of the outer mold to limit the suspension beam;

步骤S13,将所述钢吊杆上端固定在所述悬吊梁上;Step S13, fixing the upper end of the steel suspender on the suspension beam;

步骤S14,将所述底模承重梁通过螺母固定在所述钢吊杆下端;Step S14, fixing the load-bearing beam of the bottom form to the lower end of the steel suspender through nuts;

步骤S15,将所述底模分配梁固定在所述底模承重梁上;Step S15, fixing the distribution beam of the bottom mold on the load-bearing beam of the bottom mold;

步骤S16,将所述底模面板铺设在所述底模分配梁上,完成所述外置吊架安装。Step S16, laying the bottom form panel on the bottom form distribution beam to complete the installation of the external hanger.

本发明的有益效果是:本发明通过对拉螺杆将外侧模固定在空心段混凝土上,并在外侧模在上设置悬吊梁,悬吊梁上设置钢吊杆,再在钢吊杆下端固定底模承重梁,底模承重梁上设置底模分配梁,最后在底模分配梁上铺设底模面板,在空心段混凝土和底模面板上浇筑第一层混凝土,利用已经浇筑的第一层混凝土作为底模进行第二次浇筑,提高了施工的安全性;且钢吊杆外侧套接有PVC管,可以防止焊渣对钢吊杆损伤,底模面板与空心段混凝土接触处采用玻璃胶进行封堵,确保了混凝土浇筑时不漏浆;该吊架结构体系简单、技术可行,可重复周转使用,施工工效快,安全风险低。The beneficial effects of the present invention are: the present invention fixes the outer formwork on the concrete of the hollow section through the pull screw rod, and sets a suspension beam on the outer formwork, sets a steel suspension rod on the suspension beam, and then fixes it at the lower end of the steel suspension rod The load-bearing beam of the bottom form, the distribution beam of the bottom form is set on the load-bearing beam of the bottom form, and finally the bottom form panel is laid on the distribution beam of the bottom form, the first layer of concrete is poured on the hollow section concrete and the bottom form panel, and the first layer that has been poured is used Concrete is used as the bottom form for the second pouring, which improves the safety of construction; and the outer side of the steel suspender is sleeved with a PVC pipe, which can prevent welding slag from damaging the steel suspender, and the contact between the bottom form panel and the hollow section concrete is made of glass glue Blocking is carried out to ensure that no grout leaks during concrete pouring; the hanger has a simple structural system, technical feasibility, repeated turnover, fast construction efficiency, and low safety risks.

附图说明Description of drawings

图1是本发明一种用于空心墩墩顶实心段施工的外置吊架的侧视图;Fig. 1 is a side view of an external hanger used for the construction of the solid section of the hollow pier pier top according to the present invention;

图2是本发明一种用于空心墩墩顶实心段施工的外置吊架的俯视图;Fig. 2 is a top view of an external hanger used for the construction of the solid section of the top of the hollow pier according to the present invention;

图3是本发明一种用于空心墩墩顶实心段施工的外置吊架的施工方法的流程图;Fig. 3 is a kind of flow chart of the construction method of the external hanger that is used for the solid section construction of hollow pier pier top according to the present invention;

图4是本发明中安装外置吊架的流程图。Fig. 4 is a flowchart of installing an external hanger in the present invention.

图中:1、外侧模;2、对拉螺杆;3、悬吊梁;4、限位器;5、钢吊杆;6、底模承重梁;7、底模分配梁;8、底模面板;9、空心段混凝土。In the figure: 1. Outer mold; 2. Pull screw; 3. Suspension beam; 4. Limiter; 5. Steel suspender; 6. Bearing beam of bottom mold; 7. Distribution beam of bottom mold; Panel; 9. Concrete in the hollow section.

具体实施方式Detailed ways

下面将结合附图对本发明的技术方案进行清楚、完整地描述。在本发明的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相正对地重要性。The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, or in a specific orientation. construction and operation, therefore, should not be construed as limiting the invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and should not be construed as indicating or implying relative importance.

下面将结合附图对本发明作进一步说明。The present invention will be further described below in conjunction with accompanying drawing.

如图1-2所示,一种用于空心墩墩顶实心段施工的外置吊架,包括外侧模1,外侧模1由多个对拉螺杆2固定在空心段混凝土9外侧,外侧模1上方设置有多根悬吊梁3,每根悬吊梁3上设置有两个钢吊杆5,钢吊杆5下端设置有底模承重梁6,底模承重梁6上设置有多根底模分配梁7,底模分配梁7上设置有底模面板8。As shown in Figure 1-2, an external hanger for the construction of the solid section of the top of a hollow pier includes an outer formwork 1, which is fixed on the outside of the hollow section concrete 9 by a plurality of tension screws 2, and the outer formwork 1 is provided with a plurality of suspension beams 3, and each suspension beam 3 is provided with two steel suspenders 5, and the lower end of the steel suspenders 5 is provided with a bottom mold load-bearing beam 6, and a bottom mold load-bearing beam 6 is provided with a plurality of bases. The mold distribution beam 7 is provided with a bottom mold panel 8 on the bottom mold distribution beam 7 .

一种用于空心墩墩顶实心段施工的外置吊架,还包括多个限位器4,多个限位器4分别设置在悬吊梁3两端的外侧模1内侧。An external hanger used for the construction of the solid section of the top of the hollow pier, further comprising a plurality of stoppers 4, which are respectively arranged inside the outer mold 1 at both ends of the suspension beam 3.

实施例中,外侧模1厚度为6mm,高度为6m,对拉螺杆2采用φ25精轧螺纹钢,对拉螺杆2竖向设置有3排,每排设置有7根,外侧模1下端2m高由2排的对拉螺杆2穿过空心段混凝土9将外侧模1固定在空心段混凝土9上,外侧模1上端4m高由1排的对拉螺杆2对外侧模1进行紧固,通过对拉螺杆2将外侧模1紧紧抱箍在空心段混凝土9上。In the embodiment, the outer mold 1 has a thickness of 6mm and a height of 6m. The pull screw 2 is made of φ25 finish-rolled rebar. The pull screw 2 is vertically arranged in 3 rows, and each row is provided with 7 pieces. The lower end of the outer mold 1 is 2m high. The outer formwork 1 is fixed on the hollow section concrete 9 by 2 rows of opposite pull screws 2 passing through the hollow section concrete 9, the upper end of the outer form 1 is 4m high, and the outer form 1 is fastened by one row of opposite pull screws 2, and the outer formwork 1 is fastened by Pull the screw rod 2 to tightly hug the outer mold 1 on the hollow section concrete 9 .

实施例中,悬吊梁3采用双拼14工钢,外侧模1上等距离设置有6根悬吊梁3,并通过限位器4对悬吊梁3进行限位,限位器4是悬吊梁3数量的两倍。In the embodiment, the suspension beam 3 is made of double 14 industrial steel, six suspension beams 3 are equidistantly arranged on the outer mold 1, and the suspension beam 3 is limited by the stopper 4, the stopper 4 is Suspension beam 3 quantity twice.

实施例中,钢吊杆5采用φ25精轧螺纹钢,钢吊杆5外侧套接有PVC管,防止焊渣对钢吊杆5损伤。In the embodiment, the steel suspender 5 is made of φ25 fine-rolled rebar, and the outer side of the steel suspender 5 is sleeved with a PVC pipe to prevent damage to the steel suspender 5 by welding slag.

实施例中,底模承重梁6采用双拼12工钢,底模承重梁6与悬吊梁3一一对应设置,底模承重梁6由螺母固定在钢吊杆5上。In the embodiment, the load-bearing beam 6 of the bottom form is made of double-strand 12 industrial steel, the load-bearing beam 6 of the bottom form is arranged in one-to-one correspondence with the suspension beam 3, and the load-bearing beam 6 of the bottom form is fixed on the steel suspender 5 by nuts.

实施例中,底模分配梁7采用10槽钢,底模分配梁7设置有7根,间距为20cm,水平方向上,底模分配梁7与底模承重梁6垂直安装。In the embodiment, the bottom mold distribution beam 7 adopts 10 channel steel, and there are seven bottom mold distribution beams 7 with a spacing of 20 cm. In the horizontal direction, the bottom mold distribution beam 7 and the bottom mold load-bearing beam 6 are installed vertically.

实施例中,底模面板8采用18mm厚的竹胶板,底模面板8与空心段混凝土9接触处设置有玻璃胶,确保浇筑的混凝土不泄露。In the embodiment, the bottom form panel 8 adopts 18mm thick bamboo plywood, and glass glue is arranged at the contact between the bottom form panel 8 and the hollow section concrete 9 to ensure that the poured concrete does not leak.

一种用于空心墩墩顶实心段施工的外置吊架的施工方法,包括:A construction method for an external hanger used for the construction of a solid section at the top of a hollow pier, comprising:

步骤S1,安装外置吊架;具体安装步骤如下。Step S1, install the external hanger; the specific installation steps are as follows.

步骤S11,安装外侧模1,对拉螺杆2穿过空心段混凝土9预留孔将外侧模1固定在空心段混凝土9外侧。Step S11 , installing the outer formwork 1 , and fixing the outer formwork 1 on the outside of the hollow section concrete 9 through the holes reserved by the hollow section concrete 9 through the pull screw 2 .

步骤S12,将悬吊梁3固定在外侧模1上,并将限位器4安装在外侧模1内侧,对悬吊梁3进行限位。Step S12 , fixing the suspension beam 3 on the outer mold 1 , and installing the limiter 4 inside the outer mold 1 to limit the suspension beam 3 .

步骤S13,将钢吊杆5上端固定在悬吊梁3上。Step S13 , fixing the upper end of the steel suspension rod 5 on the suspension beam 3 .

步骤S14,将底模承重梁6通过螺母固定在钢吊杆5下端。Step S14, fixing the load-bearing beam 6 of the bottom form to the lower end of the steel suspender 5 through nuts.

步骤S15,将底模分配梁7固定在底模承重梁6上。Step S15, fixing the distribution beam 7 of the bottom form on the bearing beam 6 of the bottom form.

步骤S16,将底模面板8铺设在底模分配梁7上,完成外置吊架安装。Step S16, laying the bottom form panel 8 on the bottom form distribution beam 7 to complete the installation of the external hanger.

步骤S2,安装完成外置吊架后,在外置吊架内的底模面板8和空心段混凝土9上进行第一层浇筑混凝土。Step S2, after the external hanger is installed, the first layer of concrete is poured on the bottom form panel 8 and the hollow section concrete 9 inside the external hanger.

步骤S3,待第一层浇筑的混凝土达到设计强度,对第一层浇筑的混凝土凿毛后,在第一层浇筑的混凝土上浇筑第二层混凝土。Step S3, after the concrete poured in the first layer reaches the design strength, after roughening the concrete poured in the first layer, a second layer of concrete is poured on the concrete poured in the first layer.

步骤S4,待第二层浇筑的混凝土达到设计强度后,利用墩内爬梯拆除墩内的外置吊架,其拆除步骤与安装步骤相反。Step S4, after the concrete poured on the second layer reaches the design strength, the external hanger in the pier is removed by using the ladder inside the pier, and the removal step is opposite to the installation step.

以上各实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围。The above embodiments are only used to illustrate the technical solutions of the present invention, and are not intended to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still be applied to the foregoing embodiments The technical solutions described in the examples are modified, or some or all of the technical features are equivalently replaced; and these modifications or replacements do not make the essence of the corresponding technical solutions depart from the scope of the technical solutions of the embodiments of the present invention.

Claims (10)

1.一种用于空心墩墩顶实心段施工的外置吊架,其特征在于,包括外侧模(1),所述外侧模(1)由多个对拉螺杆(2)固定在空心段混凝土(9)外侧,所述外侧模(1)上方设置有多根悬吊梁(3),每根所述悬吊梁(3)上设置有两个钢吊杆(5),所述钢吊杆(5)下端设置有底模承重梁(6),所述底模承重梁(6)上设置有多根底模分配梁(7),所述底模分配梁(7)上设置有底模面板(8)。1. An external hanger for the construction of the solid section of the top of the hollow pier is characterized in that it comprises an outer mold (1), and the outer mold (1) is fixed on the hollow section by a plurality of pull screws (2) On the outside of the concrete (9), a plurality of suspension beams (3) are arranged above the outer formwork (1), and two steel suspension rods (5) are arranged on each suspension beam (3). The lower end of the suspender (5) is provided with a bottom mold load-bearing beam (6), and a plurality of bottom mold distribution beams (7) are arranged on the bottom mold load-bearing beam (6), and a bottom mold distribution beam (7) is provided with a bottom mold distribution beam (7). Formwork panels (8). 2.根据权利要求1所述的一种用于空心墩墩顶实心段施工的外置吊架,其特征在于,所述外侧模(1)厚度为6mm,高度为6m,所述对拉螺杆(2)采用φ25精轧螺纹钢,所述对拉螺杆(2)竖向设置有3排,每排设置有7根,所述外侧模(1)下端由2排的所述对拉螺杆(2)穿过所述空心段混凝土(9)将所述外侧模(1)固定在所述空心段混凝土(9)上,所述外侧模(1)上端由1排的所述对拉螺杆(2)对所述外侧模(1)紧固。2. A kind of external hanger that is used for the construction of the solid section of the top of the hollow pier according to claim 1, characterized in that, the thickness of the outer formwork (1) is 6mm, and the height is 6m. (2) adopt φ 25 fine-rolled threaded steel, described pull screw rod (2) is vertically provided with 3 rows, and each row is provided with 7, and described outer mold (1) lower end is formed by 2 rows of described pull screw rods ( 2) passing through the hollow section concrete (9) and fixing the outer formwork (1) on the hollow section concrete (9), the upper end of the outer formwork (1) is formed by a row of the paired pull screws ( 2) Fasten the outer mold (1). 3.根据权利要求1所述的一种用于空心墩墩顶实心段施工的外置吊架,其特征在于,所述悬吊梁(3)采用双拼14工钢,所述外侧模(1)上等距离设置有6根所述悬吊梁(3)。3. a kind of external hanger that is used for the solid section construction of hollow pier pier top according to claim 1, it is characterized in that, described suspension beam (3) adopts double 14 industrial steel, and described outer formwork ( 1) 6 said suspension beams (3) are equidistantly arranged on the top. 4.根据权利要求1所述的一种用于空心墩墩顶实心段施工的外置吊架,其特征在于,所述钢吊杆(5)采用φ25精轧螺纹钢,所述钢吊杆(5)外侧套接有PVC管。4. The external hanger for the construction of the solid section of the top of a hollow pier according to claim 1, wherein the steel hanger (5) adopts φ25 finish-rolled rebar, and the steel hanger (5) PVC pipe is socketed on the outside. 5.根据权利要求3所述的一种用于空心墩墩顶实心段施工的外置吊架,其特征在于,所述底模承重梁(6)采用双拼12工钢,所述底模承重梁(6)由螺母固定在所述钢吊杆(5)上。5. A kind of external hanger that is used for the construction of the solid section of the top of the hollow pier according to claim 3, it is characterized in that, the load-bearing beam (6) of the bottom mold adopts double 12 industrial steel, and the bottom mold The load-bearing beam (6) is fixed on the steel suspender (5) by nuts. 6.根据权利要求1所述的一种用于空心墩墩顶实心段施工的外置吊架,其特征在于,所述底模分配梁(7)采用10槽钢,所述底模分配梁(7)设置有7根,间距为20cm。6. a kind of external hanger that is used for the solid section construction of hollow pier pier top according to claim 1, is characterized in that, described bottom mold distribution beam (7) adopts 10 channel steel, and described bottom mold distribution beam (7) There are 7 pieces with a distance of 20cm. 7.根据权利要求1所述的一种用于空心墩墩顶实心段施工的外置吊架,其特征在于,所述底模面板(8)采用18mm厚的竹胶板,所述底模面板(8)与所述空心段混凝土(9)接触处设置有玻璃胶。7. a kind of external hanger that is used for the construction of hollow pier pier top solid section according to claim 1, is characterized in that, described bottom form panel (8) adopts the thick bamboo plywood of 18mm, and described bottom form Glass glue is provided at the contact between the panel (8) and the concrete (9) of the hollow section. 8.根据权利要求1所述的一种用于空心墩墩顶实心段施工的外置吊架,其特征在于,还包括多个限位器(4),多个所述限位器(4)分别设置在每个所述悬吊梁(3)两端的所述外侧模(1)内侧。8. The external hanger for the construction of the solid section of the top of the hollow pier according to claim 1, characterized in that it also includes a plurality of stoppers (4), and a plurality of stoppers (4) ) are respectively arranged on the inside of the outer formwork (1) at both ends of each of the suspension beams (3). 9.基于权利要求1所述的一种用于空心墩墩顶实心段施工的外置吊架的施工方法,其特征在于,包括:9. A kind of construction method for the external hanger that is used for the solid section construction of hollow pier pier top based on claim 1, it is characterized in that, comprises: 步骤S1,安装外置吊架;Step S1, installing an external hanger; 步骤S2,安装完成所述外置吊架后,在所述外置吊架内的所述底模面板(8)和空心段混凝土(9)上进行第一层浇筑混凝土;Step S2, after the external hanger is installed, the first layer of concrete is poured on the bottom form panel (8) and hollow section concrete (9) in the external hanger; 步骤S3,待第一层浇筑的混凝土达到设计强度,对第一层浇筑的混凝土凿毛后,在第一层浇筑的混凝土上浇筑第二层混凝土;Step S3, after the concrete poured in the first layer reaches the design strength, after roughening the concrete poured in the first layer, pour a second layer of concrete on the concrete poured in the first layer; 步骤S4,待第二层浇筑的混凝土达到设计强度后,利用墩内爬梯拆除墩内的所述外置吊架。Step S4, after the concrete poured on the second layer reaches the design strength, the external hanger in the pier is removed by using the ladder inside the pier. 10.根据权利要求9所述的一种用于空心墩墩顶实心段施工的外置吊架的施工方法,其特征在于,所述步骤S1包括:10. A construction method for an external hanger used for the construction of a solid section at the top of a hollow pier according to claim 9, wherein the step S1 comprises: 步骤S11,安装所述外侧模(1),所述对拉螺杆(2)穿过所述空心段混凝土(9)预留孔将所述外侧模(1)固定在所述空心段混凝土(9)外侧;Step S11, installing the outer formwork (1), and fixing the outer formwork (1) to the hollow section concrete (9) through the hole reserved in the hollow section concrete (9) by the pull screw (2) ) outside; 步骤S12,将所述悬吊梁(3)固定在所述外侧模(1)上,并将所述限位器(4)安装在所述外侧模(1)内侧,对所述悬吊梁(3)进行限位;Step S12, fixing the suspension beam (3) on the outer formwork (1), and installing the stopper (4) on the inner side of the outer formwork (1), and fixing the suspension beam (3) (3) limit the position; 步骤S13,将所述钢吊杆(5)上端固定在所述悬吊梁(3)上;Step S13, fixing the upper end of the steel suspension rod (5) on the suspension beam (3); 步骤S14,将所述底模承重梁(6)通过螺母固定在所述钢吊杆(5)下端;Step S14, fixing the load-bearing beam (6) of the bottom mold on the lower end of the steel suspender (5) through nuts; 步骤S15,将所述底模分配梁(7)固定在所述底模承重梁(6)上;Step S15, fixing the distribution beam (7) of the bottom mold on the load-bearing beam (6) of the bottom mold; 步骤S16,将所述底模面板(8)铺设在所述底模分配梁(7)上,完成所述外置吊架安装。Step S16, laying the bottom form panel (8) on the bottom form distribution beam (7) to complete the installation of the external hanger.
CN202310718714.5A 2023-06-16 2023-06-16 External hanging bracket for hollow pier top solid section construction and construction method Pending CN116607427A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310718714.5A CN116607427A (en) 2023-06-16 2023-06-16 External hanging bracket for hollow pier top solid section construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310718714.5A CN116607427A (en) 2023-06-16 2023-06-16 External hanging bracket for hollow pier top solid section construction and construction method

Publications (1)

Publication Number Publication Date
CN116607427A true CN116607427A (en) 2023-08-18

Family

ID=87685432

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310718714.5A Pending CN116607427A (en) 2023-06-16 2023-06-16 External hanging bracket for hollow pier top solid section construction and construction method

Country Status (1)

Country Link
CN (1) CN116607427A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116927097A (en) * 2023-08-29 2023-10-24 中铁十一局集团第五工程有限公司 Sealing construction method for hollow pier top of high pier of bridge

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469735A (en) * 2013-09-26 2013-12-25 中南大学 Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN218757026U (en) * 2022-11-18 2023-03-28 中铁一局集团有限公司 Hollow pier top and bottom die device
CN115852832A (en) * 2022-11-18 2023-03-28 中铁一局集团有限公司 Hollow pier top suspension type construction method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103469735A (en) * 2013-09-26 2013-12-25 中南大学 Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN218757026U (en) * 2022-11-18 2023-03-28 中铁一局集团有限公司 Hollow pier top and bottom die device
CN115852832A (en) * 2022-11-18 2023-03-28 中铁一局集团有限公司 Hollow pier top suspension type construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116927097A (en) * 2023-08-29 2023-10-24 中铁十一局集团第五工程有限公司 Sealing construction method for hollow pier top of high pier of bridge

Similar Documents

Publication Publication Date Title
WO2021212921A1 (en) Construction system for widened section of half-through arch bridge
CN101694110B (en) Beam-column joint connection structure and its construction method
WO2023240812A1 (en) Overall construction platform structure and method for adding core tube wall body in air
CN217104743U (en) Lower beam support of large-inclination-angle tower column
CN216616848U (en) Beam plate post-cast strip supporting and mold sealing structure
CN103469735A (en) Method for mounting curve ultrahigh hollow column plate type pier top solid section template
CN111335611B (en) Large-span cantilever member construction system and construction method thereof
CN209958213U (en) Bent cap construction support of column pier
CN208039060U (en) A kind of steel box arch rib bowstring arch bridge binder steel skeleton external wrapping concrete hangs die body system
CN116556204A (en) A construction method of V-shaped pier prestressed rods
CN108867885B (en) Damping energy consumption assembly node of prefabricated column and integrated prefabricated beam slab and construction method thereof
CN110359548A (en) A kind of steel truss suspension hybrid system and construction method
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN110847598B (en) A thin-walled hollow pier diaphragm bottom template and construction method
CN114398706A (en) Temperature equivalent simulation method and lower cross beam construction method
CN211368420U (en) Main tower lower beam diagonal bracing system
CN211395387U (en) Cast-in-place pi type platform roof beam construction support
CN112008856A (en) Be applied to bed-jig of prefabricated case roof beam framework of steel reinforcement shaping and bellows installation
CN217998620U (en) Hollow slab column structure
CN110670873A (en) A kind of support system and construction method of steel formwork for ultra-high-section concrete column
CN206267520U (en) A kind of self-supporting post-cast strip is poured with hanging mould
CN210857488U (en) Steel truss hangs hybrid system
CN110524691B (en) External formwork system and construction method of immersed tunnel
CN111877126A (en) Arch bridge arch ring installation method
CN105970831A (en) Bottom plate jacking system for jacking closure section of continuous rigid frame bridge and construction method of bottom plate jacking system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination