CN116584274A - Sponge urban green belt and drainage system - Google Patents

Sponge urban green belt and drainage system Download PDF

Info

Publication number
CN116584274A
CN116584274A CN202310713157.8A CN202310713157A CN116584274A CN 116584274 A CN116584274 A CN 116584274A CN 202310713157 A CN202310713157 A CN 202310713157A CN 116584274 A CN116584274 A CN 116584274A
Authority
CN
China
Prior art keywords
planting
reservoir
water
baffle
drainage ditch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310713157.8A
Other languages
Chinese (zh)
Other versions
CN116584274B (en
Inventor
吕方勇
吴月虎
孙华其
李鑫
周甜甜
孙波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Dajiangdong City Facilities And Maintenance Co ltd
Original Assignee
Hangzhou Dajiangdong City Facilities And Maintenance Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Dajiangdong City Facilities And Maintenance Co ltd filed Critical Hangzhou Dajiangdong City Facilities And Maintenance Co ltd
Priority to CN202310713157.8A priority Critical patent/CN116584274B/en
Publication of CN116584274A publication Critical patent/CN116584274A/en
Application granted granted Critical
Publication of CN116584274B publication Critical patent/CN116584274B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/02Receptacles, e.g. flower-pots or boxes; Glasses for cultivating flowers
    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G27/00Self-acting watering devices, e.g. for flower-pots
    • A01G27/04Self-acting watering devices, e.g. for flower-pots using wicks or the like
    • A01G27/06Self-acting watering devices, e.g. for flower-pots using wicks or the like having a water reservoir, the main part thereof being located wholly around or directly beside the growth substrate
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/108Rainwater harvesting

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Water Supply & Treatment (AREA)
  • Road Paving Structures (AREA)

Abstract

本申请涉及城市建设领域,特别是一种海绵城市绿化带及排水系统,该海绵城市绿化带包括:种植带,种植带包括固定在路面上的混凝土层、铺设在混凝土层上用于种植绿植的种植层;蓄水池,开设于路面以下且位于种植带下方;地下管道,固定设置在蓄水池下方并与下水道连通;种植带内固定设有连接管和吸水棉,连接管和吸水棉的下端延伸至蓄水池,连接管的上端向上延伸至种植层以上,吸水棉的上端向上延伸至种植层内,蓄水池与地下管道之间连通有排水管,排水管内设有阀门蓄水池与种植带之间设置连接管和吸水棉,在多雨季节时便于将多余的雨水储存到蓄水池内,在少雨季节时便于直接利用蓄水池内的水,提高绿化带对水资源利用的弹性。

The application relates to the field of urban construction, in particular to a sponge city green belt and a drainage system. The sponge city green belt includes: a planting belt, the planting belt includes a concrete layer fixed on the road surface, and is laid on the concrete layer for planting green plants. The planting layer; the reservoir, set up below the road surface and below the planting belt; the underground pipeline, fixedly arranged under the reservoir and connected with the sewer; the planting belt is fixed with connecting pipes and absorbent cotton, and the connecting pipe and absorbent cotton The lower end of the pipe extends to the reservoir, the upper end of the connecting pipe extends upwards above the planting layer, and the upper end of the absorbent cotton extends upwards into the planting layer. There is a drain pipe connected between the reservoir and the underground pipeline, and a valve is provided in the drain pipe to store water. Connecting pipes and water-absorbing cotton are set between the pond and the planting belt, so that excess rainwater can be stored in the reservoir in rainy seasons, and the water in the reservoir can be directly used in rainy seasons, improving the flexibility of green belts in utilizing water resources .

Description

一种海绵城市绿化带及排水系统A kind of sponge city green belt and drainage system

技术领域technical field

本申请涉及城市建设领域,尤其是涉及一种海绵城市绿化带及排水系统。The application relates to the field of urban construction, in particular to a sponge city green belt and drainage system.

背景技术Background technique

海绵城市是指城市能够像海绵一样,在适应环境变化和应对自然灾害等方面具有良好的"弹性",下雨时吸水、蓄水、渗水、净水,需要时将蓄存的水释放并加以利用。Sponge city refers to a city that can be like a sponge and has good "elasticity" in adapting to environmental changes and responding to natural disasters. When it rains, it absorbs, stores, infiltrates, and purifies water. use.

绿化带是海绵城市建设的重要组成部分,但现有的绿化带在多雨季节时虽能起到较好的吸水、蓄水作用,减少城市内涝的情况发生,但在少雨季节时,绿化带中的水资源难以被快速、有效的利用,绿化带对于水资源利用的弹性较差。The green belt is an important part of the sponge city construction. However, although the existing green belt can absorb and store water well in the rainy season and reduce the occurrence of urban waterlogging, in the rainy season, the green belt in the It is difficult to use the water resources quickly and effectively, and the green belts are less flexible for the use of water resources.

发明内容Contents of the invention

为了解决绿化带对于水资源利用的弹性差的问题,本申请提供一种海绵城市绿化带及排水系统。In order to solve the problem of poor flexibility of green belts for water resource utilization, the present application provides a sponge city green belt and drainage system.

本申请提供的一种海绵城市绿化带采用如下的技术方案:A kind of sponge city green belt provided by the application adopts the following technical scheme:

一种海绵城市绿化带,包括:种植带,种植带包括固定在路面上的混凝土层、铺设在混凝土层上用于种植绿植的种植层;蓄水池,开设于路面以下且位于种植带下方;地下管道,固定设置在蓄水池下方并与下水道连通;种植带内固定设有连接管和吸水棉,连接管和吸水棉的下端延伸至蓄水池,连接管的上端向上延伸至种植层以上,吸水棉的上端向上延伸至种植层,蓄水池与地下管道之间连通有排水管,排水管内设有阀门。A sponge city green belt, comprising: a planting belt, the planting belt includes a concrete layer fixed on the road surface, and a planting layer laid on the concrete layer for planting green plants; a water storage pool is opened below the road surface and below the planting belt The underground pipeline is fixedly arranged under the reservoir and communicates with the sewer; the planting belt is fixed with a connecting pipe and absorbent cotton, the lower ends of the connecting pipe and absorbent cotton extend to the reservoir, and the upper end of the connecting pipe extends upward to the planting layer Above, the upper end of the water-absorbing cotton extends upward to the planting layer, and a drainage pipe is connected between the reservoir and the underground pipeline, and a valve is arranged in the drainage pipe.

通过采用上述技术方案,在多雨季节时种植带中的种植能够吸收雨水,减少平时的浇灌用水;种植带中雨水过多时,雨水通过能够连接管流入到蓄水池内进行储存备用;蓄水池中的水储存过多时,可以打开阀门并通过排水管将蓄水池内的水排入到地下管道,再通过下水道排向湖泊、河流等,保证雨水充分利用的同时减少内涝的情况出现;在少雨季节时种植带中的种植层通过吸水棉吸收蓄水池内的备用水,也能减少平时的浇灌用水,蓄水池内的备用水可通过连接管直接被抽取利用,提高绿化带对水资源的弹性利用。By adopting the above-mentioned technical scheme, the planting in the planting belt can absorb rainwater during the rainy season and reduce the usual irrigation water; when there is too much rain in the planting belt, the rainwater can flow into the storage tank through the connecting pipe for storage and standby; When there is too much water stored, the valve can be opened and the water in the reservoir can be discharged into the underground pipe through the drainage pipe, and then discharged to the lake, river, etc. through the sewer, so as to ensure the full use of rainwater and reduce the occurrence of waterlogging; in the rainy season The planting layer in the planting belt absorbs the spare water in the reservoir through absorbent cotton, which can also reduce the usual irrigation water. The spare water in the reservoir can be directly extracted and utilized through the connecting pipe, improving the flexible utilization of water resources in the green belt .

进一步可优选的,混凝土层内开设有开口向上的种植槽,种植层设置于种植槽内。Further preferably, a planting trough with an upward opening is opened in the concrete layer, and the planting layer is arranged in the planting trough.

通过采用上述技术方案,设置种植槽并使种植层顶面低于种植槽的槽口,在多雨季节时避免种植层中的土壤随雨水满出种植槽流到绿化带外侧,影响路面上的行人和车辆行驶。By adopting the above technical scheme, the planting trough is set and the top surface of the planting layer is lower than the notch of the planting trough, so as to prevent the soil in the planting layer from flowing out of the planting trough to the outside of the green belt with the rainwater in the rainy season, affecting pedestrians on the road and vehicle driving.

进一步可优选的,连接管顶端可拆卸地连接有井盖。Further preferably, a manhole cover is detachably connected to the top of the connecting pipe.

通过采用上述技术方案,井盖安装在连接管上能够减少土壤进入连接管,造成堵塞,也能消除人坠落的隐患;井盖从连接管上拆卸下后,可将抽水机等的水管通过连接管伸入到蓄水池内,便于直接抽水利用。By adopting the above technical scheme, the installation of the well cover on the connecting pipe can reduce the soil from entering the connecting pipe and cause blockage, and can also eliminate the hidden danger of people falling; after the well cover is removed from the connecting pipe, the water pipes of the pump can be inserted into Into the reservoir, it is convenient for direct pumping and utilization.

本申请提供的一种排水系统采用如下的技术方案:A drainage system provided by the application adopts the following technical scheme:

一种排水系统,包括开设于路面以下的排水沟以及如上所述的海绵城市绿化带,混凝土层底部铰接有挡板,挡板与混凝土层之间固定连接有旋转阻尼,挡板位于排水沟和蓄水池之间,通过挡板旋转能够阻隔或连通排水沟和蓄水池。A drainage system, including a drainage ditch opened below the road surface and the above-mentioned sponge city green belt, a baffle plate is hinged at the bottom of the concrete layer, and a rotation damping is fixedly connected between the baffle plate and the concrete layer, and the baffle plate is located between the drainage ditch and the concrete layer. Between the cisterns, the baffles can be rotated to block or communicate with the drainage ditches and the cisterns.

通过采用上述技术方案,排水沟内的水流会对挡板施加压力,当压力能够克服蓄水池内的水对挡板的压力以及旋转阻尼的弹力时,排水沟内的水会推动挡板旋转,此时说明排水沟内的水流过大,路面上有出现内涝的趋势,此时在水流压力作用下推动挡板旋转并使排水沟与蓄水池连通,使排水沟内的水部分流进蓄水池内,通过蓄水池分担排水沟的排水压力,保障排水系统的排水功能。By adopting the above technical solution, the water flow in the gutter will exert pressure on the baffle, and when the pressure can overcome the pressure of the water in the reservoir on the baffle and the elastic force of the rotation damping, the water in the gutter will push the baffle to rotate, At this time, it shows that the water flow in the drainage ditch is too large, and there is a tendency of waterlogging on the road surface. At this time, under the action of water flow pressure, the baffle is pushed to rotate and the drainage ditch is connected with the reservoir, so that the water in the drainage ditch flows into the storage tank. In the pool, the drainage pressure of the drainage ditch is shared by the reservoir to ensure the drainage function of the drainage system.

进一步可优选的,挡板内贯通开设有安装槽,安装槽内转动设有内板,通过内板旋转能够阻隔或连通排水沟和蓄水池。Further preferably, an installation groove is opened through the baffle plate, and an inner plate is rotated in the installation groove, and the rotation of the inner plate can block or communicate with the drainage ditch and the reservoir.

通过采用上述技术方案,排水沟内进行正常排水时,正常流量的水流对内板施加压力,克服蓄水池内的水对内板的压力并推动内板转动,使排水沟与蓄水池连通,从而使排水沟内的水部分流进蓄水池内当作备用,当排水沟内的水对内板的压力不足以克服蓄水池内的水对内板的压力,并推动内板旋转时,内板阻隔排水沟和蓄水池,使排水沟内的水不再能流到蓄水池内,使蓄水池具有一定的溢满余量,以备分担内涝时排水沟的排水压力。By adopting the above technical scheme, when normal drainage is carried out in the drainage ditch, the normal flow of water exerts pressure on the inner plate, overcomes the pressure of the water in the reservoir on the inner panel and pushes the inner panel to rotate, so that the drainage ditch communicates with the reservoir, So that the water in the drainage ditch flows into the reservoir as a backup, when the pressure of the water in the drainage ditch on the inner plate is not enough to overcome the pressure of the water in the reservoir on the inner plate and push the inner plate to rotate, the inner The board blocks the drainage ditch and the storage tank, so that the water in the drainage ditch can no longer flow into the storage tank, so that the storage tank has a certain overflow margin to prepare for sharing the drainage pressure of the drainage ditch during waterlogging.

进一步可优选的,安装槽内固定设有限位条,限位条用于阻挡内板向排水沟一侧转动。Further preferably, a limit bar is fixed in the installation groove, and the limit bar is used to prevent the inner plate from turning to the side of the drainage ditch.

通过采用上述技术方案,设置限位板防止内板向排水沟一侧转动,当排水沟内没有水流时,即使蓄水池内的水对内板施加压力,内板也不会旋转,避免蓄水池内的水流向排水沟内造成水资源流失。By adopting the above technical scheme, the limit plate is set to prevent the inner plate from rotating to the side of the drainage ditch. When there is no water flow in the drainage ditch, even if the water in the reservoir exerts pressure on the inner plate, the inner plate will not rotate, avoiding water storage The water in the pool flows into the drain to cause water loss.

进一步可优选的,排水沟底部连通设有竖直槽,地下管道与竖直槽相连通,竖直槽内上下滑动设有升降板,升降板底部与竖直槽底壁之间固定连接有弹性件,通过升降板升降滑动将竖直槽与地下管道之间阻隔或连通,升降板上开设有卡口,挡板上固定设有卡条,在挡板阻隔排水沟和蓄水池时,卡条能够卡接于卡口。Further preferably, the bottom of the drainage ditch is connected with a vertical groove, the underground pipe is connected with the vertical groove, and a lifting plate is provided for sliding up and down in the vertical groove, and the fixed connection between the bottom of the lifting plate and the bottom wall of the vertical groove is elastic. The vertical groove and the underground pipeline are blocked or connected through the lifting and sliding of the lifting plate. The strip can be snapped into the bayonet socket.

通过采用上述技术方案,在排水沟内的水流推动挡板旋转时,卡条从卡口中脱出,升降板在弹性件作用下向下滑动,使竖直槽与地下管道连通,此时排水沟内的水通过竖直槽能够直接流到地下管道中进行排水,进一步分担了排水沟的排水压力,保障排水效果。By adopting the above-mentioned technical scheme, when the water flow in the drainage ditch pushes the baffle to rotate, the clamping bar comes out from the bayonet, and the lifting plate slides downward under the action of the elastic member, so that the vertical groove is connected with the underground pipeline. At this time, the drainage ditch The water inside can directly flow into the underground pipeline for drainage through the vertical groove, further sharing the drainage pressure of the drainage ditch and ensuring the drainage effect.

进一步可优选的,升降板顶端固定设有挂钩。Further preferably, a hook is fixedly provided at the top of the lifting plate.

通过采用上述技术方案,可人为手动或采用工具勾住挂钩向上拉动升降板,在拉动升降板过程中需推动挡板旋转避免卡条阻碍升降板上升,在升降板上升到位后松开挡板,此时挡板上的卡条重新卡入卡口中,完成复位,操作简单,方便快捷。By adopting the above technical scheme, the lifting plate can be pulled up by hooking the hook manually or using a tool. During the process of pulling the lifting plate, the baffle plate needs to be pushed to rotate to avoid the clamp bar from hindering the lifting plate from rising. At this time, the clip on the baffle is inserted into the bayonet again to complete the reset, and the operation is simple, convenient and quick.

进一步可优选的,排水沟顶部可拆卸地安装有格板。Further preferably, a grid plate is detachably installed on the top of the gutter.

通过采用上述技术方案,格板能够减少杂物垃圾进入排水沟内造成堵塞的情况,并且格板可拆卸安装,也便于清理处掉入到排水沟的内垃圾。By adopting the above technical solution, the grille can reduce the situation that sundries and garbage enter the drainage ditch and cause blockage, and the grille can be disassembled and installed, and it is also convenient to clean up the garbage falling into the drainage ditch.

进一步可优选的,格板呈L型。Further preferably, the grid is L-shaped.

通过采用上述技术方案,人为采用工具对升降板复位时,工具穿过升降板勾住挂钩,而L型的设置使工具有更大的操作空间,并且也便于推动挡板,防止挡板上的卡条阻碍复位。By adopting the above-mentioned technical scheme, when artificially using a tool to reset the lifting plate, the tool passes through the lifting plate to hook the hook, and the L-shaped setting makes the tool have a larger operating space, and it is also convenient to push the baffle to prevent Bars prevent reset.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

1.在本申请中,蓄水池与种植带之间设置连接管和吸水棉,在多雨季节时便于将多余的雨水储存到蓄水池内,在少雨季节时便于直接利用蓄水池内的水,提高绿化带对水资源利用的弹性,并且蓄水池与地下管道之间通过排水管和阀门连接,减少绿化带内涝的情况出现;1. In this application, connecting pipes and absorbent cotton are arranged between the reservoir and the planting belt, so that excess rainwater can be stored in the reservoir during the rainy season, and the water in the reservoir can be directly used during the rainy season. Improve the flexibility of the green belt for water resource utilization, and connect the reservoir and the underground pipeline through drainage pipes and valves to reduce the occurrence of waterlogging in the green belt;

2.在本申请进一步设置中,在排水系统中,在排水沟的水流压力作用下推动挡板旋转并使排水沟与蓄水池连通,使排水沟内的水部分流进蓄水池内,通过蓄水池分担排水沟的排水压力,保障排水系统的排水功能;2. In the further setting of this application, in the drainage system, under the action of the water flow pressure of the drainage ditch, the baffle is pushed to rotate and the drainage ditch is connected with the reservoir, so that the water in the drainage ditch flows into the reservoir, and passes through The reservoir shares the drainage pressure of the drainage ditch to ensure the drainage function of the drainage system;

3.在本申请进一步设置中,在排水沟内的水流推动挡板旋转时,卡条从卡口中脱出,升降板在弹性件作用下向下滑动,使竖直槽与地下管道连通,此时排水沟内的水通过竖直槽能够直接流到地下管道中进行排水,进一步分担了排水沟的排水压力,保障排水效果。3. In the further setting of this application, when the water flow in the drainage ditch pushes the baffle to rotate, the clamping bar comes out of the bayonet, and the lifting plate slides down under the action of the elastic member, so that the vertical groove communicates with the underground pipeline. At the same time, the water in the drainage ditch can directly flow into the underground pipeline for drainage through the vertical groove, which further shares the drainage pressure of the drainage ditch and ensures the drainage effect.

附图说明Description of drawings

图1是一种海绵城市绿化带的剖面图;Fig. 1 is a sectional view of a kind of sponge city green belt;

图2是一种排水系统的剖面图;Fig. 2 is a sectional view of a drainage system;

图3是图2中A的放大示意图;Fig. 3 is the enlarged schematic diagram of A in Fig. 2;

图4是图2中挡板旋转的状态示意图;Fig. 4 is a schematic diagram of the state of baffle rotation in Fig. 2;

图5是图2中内板旋转的状态示意图。Fig. 5 is a schematic diagram of the rotating state of the inner plate in Fig. 2 .

附图标记说明:1、种植带;11、混凝土层;111、种植槽;12、种植层;13、连接管;14、吸水棉;15、井盖;2、蓄水池;21、排水管;22、阀门;3、地下管道;4、排水沟;5、格板;6、挡板;61、安装槽;62、内板;63、限位条;64、卡条;8、竖直槽;9、升降板;91、卡口;92、挂钩;10、弹性件。Explanation of reference signs: 1, planting belt; 11, concrete layer; 111, planting tank; 12, planting layer; 13, connecting pipe; 14, absorbent cotton; 15, manhole cover; 2, reservoir; 21, drainage pipe; 22. Valve; 3. Underground pipeline; 4. Drainage ditch; 5. Grating; 6. Baffle; 61. Installation groove; 62. Inner plate; 63. Limiting strip; 64. Clamping strip; 8. Vertical groove ; 9, lifting plate; 91, bayonet; 92, hook; 10, elastic member.

具体实施方式Detailed ways

以下结合附图1-附图5对本申请作进一步详细说明。The present application will be further described in detail in conjunction with accompanying drawings 1 to 5 below.

本申请公开一种海绵城市绿化带,具体公开如下实施例:The application discloses a kind of sponge city green belt, and specifically discloses the following embodiments:

如附图1所示,该海绵城市绿化带包括从上至下依次设置的种植带1、蓄水池2和地下管道3,其中,种植带1设置在路面以上,蓄水池2和地下管道3均设置在路面以下,且地下管道3与地底的下水道(未图示)连通。本实施例中,地下管道3前后两端均可与下水道连通。As shown in Figure 1, the sponge city green belt includes a planting belt 1, a reservoir 2 and an underground pipeline 3 arranged sequentially from top to bottom, wherein the planting belt 1 is arranged above the road surface, and the reservoir 2 and the underground pipeline 3 are all arranged below the road surface, and the underground pipeline 3 communicates with the underground sewer (not shown). In this embodiment, the front and rear ends of the underground pipeline 3 can communicate with the sewer.

具体地,对于种植带1,其包括固定在路面上的混凝土层11、铺设在混凝土层11上用于种植绿植的种植层12,在种植带1内固定设有连接管13和吸水棉14,连接管13和吸水棉14均竖直设置,且连接管13和吸水棉14的下端延伸至蓄水池2内,连接管13的上端向上延伸至种植层12以上,吸水棉14的上端向上延伸至种植层12。Specifically, for the planting belt 1, it includes a concrete layer 11 fixed on the road surface, a planting layer 12 laid on the concrete layer 11 for planting green plants, and a connecting pipe 13 and absorbent cotton 14 are fixed in the planting belt 1 , the connecting pipe 13 and the water-absorbing cotton 14 are all vertically arranged, and the lower ends of the connecting pipe 13 and the water-absorbing cotton 14 extend into the reservoir 2, the upper end of the connecting pipe 13 extends upwards above the planting layer 12, and the upper end of the water-absorbing cotton 14 goes upwards Extend to planting layer 12.

一般的,种植层12包括土壤层、砂石层等,根据种植的绿植种类选择合适的种植层12。在多雨季节,种植层12中的土壤会吸收雨水用于绿植生长,从而减少平时的浇灌用水,节约水资源;若种植层12中的雨水过多溢出种植层12,则水会通过连接管13流至蓄水池2中进行储存备用,从而充分利用雨水资源;在少雨季节时,种植层12通过吸水棉14吸收蓄水池2中的水,也能减少浇灌用水。本实施例中,连接管13上端与种植层12上端平齐,能够起到一定的隐藏作用并且美观,吸水棉14的上端也与种植层12上端平齐,在吸水棉14将蓄水池2中的水吸收转移到种植层12中的过程中,能够向种植层12不同的深度位置均转移一定的水分,使水分在种植层12中的分布尽量均匀。Generally, the planting layer 12 includes a soil layer, a sandstone layer, etc., and an appropriate planting layer 12 is selected according to the types of green plants to be planted. In the rainy season, the soil in the planting layer 12 can absorb rainwater for the growth of green plants, thereby reducing the usual irrigation water and saving water resources; if too much rainwater in the planting layer 12 overflows the planting layer 12, the water will pass through the connecting pipe 13 flows into the storage tank 2 for storage and backup, thereby making full use of rainwater resources; during the rainy season, the planting layer 12 absorbs the water in the storage tank 2 through the absorbent cotton 14, which can also reduce irrigation water. In this embodiment, the upper end of the connecting pipe 13 is flush with the upper end of the planting layer 12, which can play a certain hidden role and is beautiful. The upper end of the water-absorbing cotton 14 is also flush with the upper end of the planting layer 12. In the process of absorbing and transferring the water in the planting layer 12, a certain amount of water can be transferred to different depth positions of the planting layer 12, so that the distribution of the water in the planting layer 12 is as uniform as possible.

在需直接用水时,如马路的清洗、消防用水等,可将抽水机的水管通过连接管13伸入到蓄水池2中直接进行抽取使用,方便快捷,从而提高绿化带水资源利用的弹性。When direct water is needed, such as road cleaning, fire-fighting water, etc., the water pipe of the water pump can be stretched into the reservoir 2 through the connecting pipe 13 to directly extract and use, which is convenient and quick, thereby improving the flexibility of water resource utilization in green belts.

在蓄水池2与地下管道3之间连接有排水管21,排水管21内设有阀门22,当蓄水池2内的水过多时,打开阀门22即可将蓄水池2内的水排入到地下管道3中,再排入到下水道中。本实施例中,阀门22可采用压力阀,即蓄水池2中达到一定水位后,压力阀承受的水压达到最大阈值,此时压力阀打开,直至压力阀承受的水压达到最小阈值,再关闭压力阀。设置合理的压力阀阈值范围,能够避免蓄水池2内的水过满,造成雨水无法通过连接管13进入到蓄水池2中,也能够保证蓄水池2内有备用水量,以备直接取用。A drainpipe 21 is connected between the reservoir 2 and the underground pipeline 3, and a valve 22 is arranged in the drainpipe 21. When the water in the reservoir 2 is too much, the water in the reservoir 2 can be discharged by opening the valve 22. into the underground pipe 3, and then into the sewer. In this embodiment, the valve 22 can be a pressure valve, that is, after a certain water level is reached in the reservoir 2, the water pressure on the pressure valve reaches the maximum threshold, and the pressure valve is opened until the water pressure on the pressure valve reaches the minimum threshold. Close the pressure valve again. Setting a reasonable pressure valve threshold range can prevent the water in the reservoir 2 from being too full, causing rainwater to fail to enter the reservoir 2 through the connecting pipe 13, and also ensure that there is a spare water volume in the reservoir 2 for direct use. access.

混凝土层11内开设有开口向上的种植槽111,种植层12铺设在种植槽111中,并且种植层12设置在种植槽111内,即种植层12的顶面应低于种植槽111的槽口,在雨水满出种植层12时避免雨水带动种植层12中的砂石、土壤等从种植槽111中流出,并流到路面上,影响行人和车辆行驶。The concrete layer 11 is provided with a planting groove 111 with an upward opening, the planting layer 12 is laid in the planting groove 111, and the planting layer 12 is arranged in the planting groove 111, that is, the top surface of the planting layer 12 should be lower than the notch of the planting groove 111 , when the rainwater is full of the planting layer 12, avoid rainwater from driving the gravel and soil in the planting layer 12 to flow out from the planting groove 111, and flow to the road surface, affecting pedestrians and vehicles.

另外,连接管13顶端可拆卸地连接有井盖15,在平常使用时,井盖15与连接管13顶端固定连接,井盖15上仅开设出能够供雨水通过的孔。井盖15的设置能够避免大量的土壤或砂石掉落到连接管13中,造成连接管13堵塞,另外井盖15也能防止人坠落,保证安全性。在需要将蓄水池2内的水抽出使用时,拆下井盖15,便于向连接管13内插入水管进行抽水,方便快捷,安全可靠。In addition, a manhole cover 15 is detachably connected to the top of the connecting pipe 13. In normal use, the manhole cover 15 is fixedly connected to the top of the connecting pipe 13, and the manhole cover 15 is only provided with holes for rainwater to pass through. The setting of the well cover 15 can prevent a large amount of soil or gravel from falling into the connecting pipe 13, causing the connecting pipe 13 to be blocked. In addition, the well cover 15 can also prevent people from falling to ensure safety. When the water in the reservoir 2 needs to be drawn out for use, the well cover 15 is removed to facilitate the insertion of a water pipe into the connecting pipe 13 for pumping, which is convenient, quick, safe and reliable.

本申请还公开一种排水系统,具体公开如下实施例:The application also discloses a drainage system, specifically the following embodiments are disclosed:

如附图2、附图3所示,该排水系统包括开设于路面以下的排水沟4以及上述的海绵城市绿化带,在混凝土层11底部铰接有挡板6,挡板6与混凝土层11之间固定连接有旋转阻尼(未图示),挡板6位于排水沟4和蓄水池2之间,通过挡板6旋转能够阻隔或连通排水沟4和蓄水池2。具体地,在混凝土层11左右两侧均设置有排水沟4,排水沟4与蓄水池2之间均设置有挡板6,挡板6顶部通过铰接轴与混凝土层11转动连接,且挡板6前后两端与混凝土层11之间连接旋转阻尼,本实施例中,旋转阻尼采用扭转弹簧。As shown in accompanying drawing 2, accompanying drawing 3, this drainage system comprises opening the gutter 4 below the road surface and the above-mentioned sponge city green belt, is hinged with baffle plate 6 at the bottom of concrete layer 11, between baffle plate 6 and concrete layer 11 Rotational damping (not shown) is fixedly connected between them, and the baffle 6 is located between the drainage ditch 4 and the reservoir 2, and the rotation of the baffle 6 can block or connect the drainage ditch 4 and the reservoir 2. Specifically, drainage ditches 4 are arranged on the left and right sides of the concrete layer 11, and baffles 6 are arranged between the drainage ditch 4 and the reservoir 2. Rotational damping is connected between the front and rear ends of the plate 6 and the concrete layer 11. In this embodiment, torsion springs are used for the rotational damping.

排水沟4中的水沿前后方向流动且流向湖泊、河流等,排水沟4中的水主要来源于路面上的积水,若排水沟4中的水流较大时,说明路面上的积水过多,可能出现或即将出现内涝情况,此时在排水沟4的水压作用下会推动挡板6旋转并连通排水沟4和蓄水池2,使排水沟4内的水流入到蓄水池2中。The water in the drainage ditch 4 flows along the front and back directions and flows to lakes, rivers, etc. The water in the drainage ditch 4 mainly comes from the accumulated water on the road surface. If the water flow in the drainage ditch 4 is large, it means that the accumulated water on the road surface is too Many, waterlogging may occur or is about to occur. At this time, under the water pressure of the drainage ditch 4, the baffle plate 6 will be pushed to rotate and connect the drainage ditch 4 and the reservoir 2, so that the water in the drainage ditch 4 will flow into the reservoir 2 in.

具体地,排水沟4内的水对挡板6施加压力并使挡板6有向蓄水池2一侧转动的趋势,而蓄水池2内的水以及旋转阻尼对挡板6具有反作用力,当排水沟4内的水对挡板6的压力能够克服蓄水池2内水对挡板6的压力以及旋转阻尼的弹力,并使挡板6旋转时,说明路面上有出现内涝的趋势,从而该排水系统能够根据路面上的积水量或排水沟4内的水流大小来自动连通排水沟4和蓄水池2,分担排水沟4的排水压力,挡板6旋转后的状态如附图4所示。Specifically, the water in the gutter 4 exerts pressure on the baffle plate 6 and makes the baffle plate 6 have a tendency to rotate to the side of the reservoir 2, while the water in the reservoir 2 and the rotation damping have a reaction force on the baffle plate 6 , when the pressure of the water in the drainage ditch 4 on the baffle 6 can overcome the pressure of the water in the reservoir 2 on the baffle 6 and the elastic force of the rotation damping, and make the baffle 6 rotate, it means that there is a tendency of waterlogging on the road surface , so that the drainage system can automatically connect the drainage ditch 4 and the reservoir 2 according to the amount of accumulated water on the road surface or the size of the water flow in the drainage ditch 4, and share the drainage pressure of the drainage ditch 4. The state after the baffle plate 6 rotates is as attached Figure 4 shows.

需要说明的是,实际上,排水沟4内的水推动挡板6转动还需克服挡板6的重力,而重力相对于旋转阻尼和蓄水池2内水的反作用力较小,可忽略不计。It should be noted that, in fact, the water in the drainage ditch 4 needs to overcome the gravity of the baffle 6 to push the baffle 6 to rotate, and the gravity is negligible relative to the rotation damping and the reaction force of the water in the reservoir 2 .

另外,设置旋转阻尼限制了排水沟4内的水推动挡板6旋转的最小压力,即蓄水池2内的水对挡板6的反作用力为零时,排水沟4内的水对挡板6的压力仅需克服旋转阻尼即可推动挡板6旋转。In addition, setting the rotation damping limits the minimum pressure that the water in the gutter 4 can push the baffle 6 to rotate, that is, when the reaction force of the water in the reservoir 2 to the baffle 6 is zero, the water in the gutter 4 will push the baffle 6 to zero. The pressure of 6 only needs to overcome the rotation damping to push the baffle plate 6 to rotate.

而当排水沟4的内水流较小,无法推动挡板6旋转,使得排水沟4内的水直接排向湖泊、河流,使得水资源无法得到有效利用。在进一步设置中,挡板6内贯通开设有安装槽61,安装槽61内转动设有内板62,通过所述内板62旋转能够阻隔或连通排水沟4和蓄水池2,另外在安装槽61内固定设有限位条63,限位条63用于阻挡内板62向排水沟4一侧转动,其中限位条63与挡板6可一体成型。And when the water flow in the drain ditch 4 is small, the baffle plate 6 cannot be pushed to rotate, so that the water in the drain ditch 4 is directly discharged to lakes and rivers, so that water resources cannot be effectively utilized. In a further setting, an installation groove 61 is opened through the baffle plate 6, and an inner plate 62 is rotated in the installation groove 61, and the rotation of the inner plate 62 can block or communicate with the drainage ditch 4 and the reservoir 2. A limit bar 63 is fixed inside the groove 61, and the limit bar 63 is used to prevent the inner panel 62 from rotating toward the side of the drainage ditch 4, wherein the limit bar 63 and the baffle plate 6 can be integrally formed.

具体地,以左侧的排水沟4与蓄水池2之间的挡板6为例进行说明,在该挡板6中,安装槽61左右贯通设置,内板62顶部与安装槽61的顶壁转动连接,限位条63则设置在安装槽61的底壁上,在其他实施例中,也可在安装槽61的上下前后壁上均设置限位条63。排水沟4内进行正常排水时,即排水沟4内的水对挡板6的压力不足以推动挡板6转动,但内板62上未设置旋转阻尼,使得排水沟4内的水对内板62的压力仅需克服蓄水池2内的水对内板62的反作用力,即可推动内板62向蓄水池2一侧转动,从而使排水沟4内的水流部分流入到蓄水池2内,以作备用。Specifically, take the baffle plate 6 between the drainage ditch 4 on the left side and the reservoir 2 as an example for illustration. The walls are rotatably connected, and the limiting strip 63 is arranged on the bottom wall of the installation groove 61 . In other embodiments, the limiting strip 63 can also be arranged on the upper, lower, front and rear walls of the installation groove 61 . When normal drainage is carried out in the drainage ditch 4, that is, the pressure of the water in the drainage ditch 4 on the baffle plate 6 is not enough to push the baffle plate 6 to rotate, but no rotation damping is set on the inner plate 62, so that the water in the drainage ditch 4 has an impact on the inner plate. The pressure of 62 only needs to overcome the reaction force of the water in the reservoir 2 to the inner plate 62, and the inner panel 62 can be pushed to rotate toward the reservoir 2, so that the water flow in the drainage ditch 4 flows into the reservoir 2 for backup.

当蓄水池2内的水压与排水沟4内的水压相平衡时,内板62复位并关闭安装槽61,此时排水沟4内的水不再流到蓄水池2内,避免将蓄水池2蓄满,使蓄水池2具有一定的溢满余量,以备分担内涝时排水沟4的排水压力,内板62的转动装填如附图5所示。When the water pressure in the water storage tank 2 was balanced with the water pressure in the drainage ditch 4, the inner plate 62 reset and closed the installation groove 61. At this time, the water in the drainage ditch 4 no longer flows into the storage tank 2, avoiding Reservoir 2 is fully stored, so that reservoir 2 has a certain overflow margin, in order to share the drainage pressure of drainage ditch 4 when waterlogging, the rotation loading of inner plate 62 is as shown in accompanying drawing 5.

需要说明的是,蓄水池2内的水对内板62以及挡板6的反作用压力有最大值,即蓄水池2内的水位达到排水管21中的阀门22的最大阈值时,蓄水池2内的水对内板62以及挡板6的反作用压力最大,当排水沟4内的水通过推动内板62或挡板6旋转继续向蓄水池2内进水时,阀门22会打开,使蓄水池2内的水保持动态平衡。It should be noted that the reaction pressure of the water in the reservoir 2 to the inner plate 62 and the baffle 6 has a maximum value, that is, when the water level in the reservoir 2 reaches the maximum threshold of the valve 22 in the drain pipe 21, the water will be stored The reaction pressure of the water in the pool 2 to the inner plate 62 and the baffle 6 is the largest. When the water in the drainage ditch 4 continues to enter the reservoir 2 by pushing the inner plate 62 or the baffle 6 to rotate, the valve 22 will open , so that the water in the reservoir 2 maintains a dynamic balance.

具体地,当排水沟4内的水压仅推动内板62转动,并使蓄水池2内的水位达到阀门22所设的最大阈值时,蓄水池2内的水对内板62以及挡板的反作用力最大。排水沟4内的水位在持续上涨过程中,在排水沟4内的水压不足以推动挡板6旋转之前,排水沟4内的水会推动内板62旋转,使排水沟4内的水流进蓄水池2内,而此时阀门22也打开将蓄水池2内的水排出,使蓄水池2内的水保持动态平衡;当排水沟4内的水位上涨到足以推动挡板6旋转时,挡板6旋转,从而使排水沟4内的水以更大流量流进蓄水池2,此时蓄水池2内的水在阀门22的作用下仍保持动态平衡,而阀门22的流量也相应增大。在具体设置中,阀门22的最大流量有限,因此阀门22也设置多个,来应对内涝情况。Specifically, when the water pressure in the drainage ditch 4 only pushes the inner plate 62 to rotate, and makes the water level in the reservoir 2 reach the maximum threshold set by the valve 22, the water in the reservoir 2 will press against the inner panel 62 and the barrier. The reaction force of the plate is the largest. When the water level in the drainage ditch 4 continues to rise, before the water pressure in the drainage ditch 4 is not enough to push the baffle plate 6 to rotate, the water in the drainage ditch 4 will push the inner plate 62 to rotate, so that the water in the drainage ditch 4 will flow into the In the reservoir 2, at this time, the valve 22 is also opened to discharge the water in the reservoir 2, so that the water in the reservoir 2 maintains a dynamic balance; when the water level in the drain 4 rises enough to push the baffle plate 6 to rotate , the baffle plate 6 rotates, so that the water in the gutter 4 flows into the reservoir 2 with a larger flow rate. At this time, the water in the reservoir 2 still maintains a dynamic balance under the action of the valve 22, and the The flow rate also increases accordingly. In the specific setting, the maximum flow rate of the valve 22 is limited, so multiple valves 22 are also provided to deal with waterlogging.

在进一步设置中,如附图2、附图3所示,排水沟4底部连通设置竖直槽8,地下管道3与竖直槽8相连通,竖直槽8内上下滑动设有升降板9,升降板9底部与竖直槽8底壁之间固定连接有弹性件10,通过升降板9的升降滑动将竖直槽8与地下管道3之间阻隔或连通。另外,升降板9上开设有卡口91,挡板6上固定设有卡条64,在挡板6阻隔排水沟4和蓄水池2时,卡条64能够卡接于卡口91,在升降板9的顶端固定设有挂钩92,其中卡条64与挡板6可一体成型。In further setting, as shown in accompanying drawing 2 and accompanying drawing 3, the bottom of drainage ditch 4 is connected with vertical groove 8, and underground pipeline 3 is connected with vertical groove 8, and vertical groove 8 is provided with lifting plate 9 sliding up and down. , between the bottom of the lifting plate 9 and the bottom wall of the vertical groove 8, an elastic member 10 is fixedly connected, and the vertical groove 8 is blocked or communicated with the underground pipeline 3 by the lifting and sliding of the lifting plate 9. In addition, a bayonet 91 is provided on the lifting plate 9, and a clip 64 is fixed on the baffle 6. When the baffle 6 blocks the drainage ditch 4 and the reservoir 2, the clip 64 can be snapped into the bayonet 91. A hook 92 is fixed on the top of the lifting plate 9 , wherein the clamping strip 64 and the baffle plate 6 can be integrally formed.

具体地,以左侧的排水沟4、挡板6及升降板9为例进行说明,竖直槽8竖直开设且竖直槽8与蓄水池2不直接连通,竖直槽8右侧底部与地下管道3连通。在挡板6阻隔排水沟4和蓄水池2时,卡条64卡入卡口91中,此时升降板9处于上极限位置并且将竖直槽8和地下管道3阻隔,当排水沟4内的水压推动挡板6旋转时,卡条64从卡口91中脱出,升降板9在弹性件10作用下向下滑动,使排水沟4与地下管道3之间通过竖直槽8连通,从而排水沟4内的水能够通过竖直槽8直接排入到地下管道3内,进一步分担了排水沟4的排水压力。Specifically, taking the drain ditch 4 on the left, the baffle plate 6 and the lifting plate 9 as an example for illustration, the vertical groove 8 is vertically opened and the vertical groove 8 is not directly connected with the reservoir 2, and the right side of the vertical groove 8 The bottom communicates with the underground pipeline 3. When the baffle plate 6 blocks the drainage ditch 4 and the reservoir 2, the clamping strip 64 snaps into the bayonet 91. At this time, the lifting plate 9 is in the upper limit position and blocks the vertical groove 8 and the underground pipeline 3. When the drainage ditch 4 When the internal water pressure pushes the baffle plate 6 to rotate, the clip 64 comes out from the bayonet 91, and the lifting plate 9 slides downward under the action of the elastic member 10, so that the drainage ditch 4 and the underground pipe 3 are communicated through the vertical groove 8 , so that the water in the drainage ditch 4 can be directly discharged into the underground pipeline 3 through the vertical groove 8, further sharing the drainage pressure of the drainage ditch 4.

本实施例中,弹性件10采用弹簧,在升降板9升降过程中,弹簧始终处于拉伸状态,从而对升降板9始终具有向下拉动的拉力,在卡条64与卡口91脱离后能够快速带动升降板9下滑。In this embodiment, the elastic member 10 adopts a spring. During the lifting process of the lifting plate 9, the spring is always in a stretched state, so that the lifting plate 9 always has a pulling force to pull it downward. Drive lifting plate 9 to slide fast.

另外,升降板9顶部固定设置挂钩92,在内涝情况结束后,可人工手动或采用工具伸入到竖直槽8中勾住挂钩92,将升降板9向上拉动复位。需要注意的是,在内涝情况结束后,挡板6会重新阻隔排水沟4和蓄水池2,此时卡条64会限制升降板9的复位,需要人工略微推动挡板6,避免卡条64干涉升降板9复位,升降板9复位后也能减少地下管道3中的气味通过竖直槽8和排水沟4传出。In addition, the top of the lifting plate 9 is fixedly provided with a hook 92. After the waterlogging situation is over, the hook 92 can be inserted into the vertical groove 8 manually or with a tool, and the lifting plate 9 is pulled upwards to reset. It should be noted that after the waterlogging situation is over, the baffle 6 will block the drainage ditch 4 and the reservoir 2 again. At this time, the bar 64 will restrict the reset of the lifting plate 9, and the baffle 6 needs to be manually pushed slightly to avoid the bar 64 interfering lifting plate 9 resets, after lifting plate 9 resets, also can reduce the smell in the underground pipeline 3 to pass through vertical groove 8 and gutter 4 and transmit.

排水沟4顶部可拆卸地安装有格板5,格板5整体呈L型。具体地,格板5采用水泥格板5,在自身重力作用下安装在排水沟4顶部即可,方便快捷。格板5整体呈L型状,其中开设出来的L型栅栏便于穿设工具,也给复位升降板9时提供更大的工具操作空间。A grid plate 5 is detachably installed on the top of the drainage ditch 4, and the grid plate 5 is L-shaped as a whole. Specifically, the grating 5 adopts the cement grating 5, and it only needs to be installed on the top of the drainage ditch 4 under the action of its own gravity, which is convenient and quick. The grid plate 5 is L-shaped as a whole, and the L-shaped fence provided therein is convenient for passing tools, and also provides a larger tool operation space when the lifting plate 9 is reset.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.

Claims (10)

1.一种海绵城市绿化带,其特征在于,包括:种植带(1),所述种植带(1)包括固定在路面上的混凝土层(11)、铺设在所述混凝土层(11)上用于种植绿植的种植层(12);蓄水池(2),开设于路面以下且位于所述种植带(1)下方;地下管道(3),固定设置在所述蓄水池(2)下方并与下水道连通;所述种植带(1)内固定设有连接管(13)和吸水棉(14),所述连接管(13)和所述吸水棉(14)的下端延伸至所述蓄水池(2),所述连接管(13)的上端向上延伸至所述种植层(12)以上,所述吸水棉(14)的上端向上延伸至所述种植层(12),所述蓄水池(2)与所述地下管道(3)之间连通有排水管(21),所述排水管(21)内设有阀门(22)。1. A sponge city green belt, characterized in that it comprises: a planting belt (1), the planting belt (1) comprising a concrete layer (11) fixed on the road surface, laid on the concrete layer (11) A planting layer (12) for planting green plants; a reservoir (2), which is opened below the road surface and below the planting belt (1); an underground pipeline (3), fixedly arranged in the reservoir (2) ) and connected with the sewer; the planting belt (1) is fixed with a connecting pipe (13) and absorbent cotton (14), and the lower ends of the connecting pipe (13) and the absorbent cotton (14) extend to the In the water storage tank (2), the upper end of the connecting pipe (13) extends upwards above the planting layer (12), and the upper end of the absorbent cotton (14) extends upwards to the planting layer (12), so A drainpipe (21) is connected between the reservoir (2) and the underground pipeline (3), and a valve (22) is arranged in the drainpipe (21). 2.根据权利要求1所述的海绵城市绿化带,其特征在于,所述混凝土层(11)内开设有开口向上的种植槽(111),所述种植层(12)设置于所述种植槽(111)内。2. The sponge city green belt according to claim 1, characterized in that, the concrete layer (11) is provided with a planting trough (111) with an upward opening, and the planting layer (12) is set in the planting trough (111) inside. 3.根据权利要求1所述的海绵城市绿化带,其特征在于,所述连接管(13)顶端可拆卸地连接有井盖(15)。3. The sponge city green belt according to claim 1, characterized in that, a well cover (15) is detachably connected to the top of the connecting pipe (13). 4.一种排水系统,其特征在于,包括开设于路面以下的排水沟(4)以及如权利要求1至3任一项所述的海绵城市绿化带,所述混凝土层(11)底部铰接有挡板(6),所述挡板(6)与所述混凝土层(11)之间固定连接有旋转阻尼,所述挡板(6)位于所述排水沟(4)和所述蓄水池(2)之间,通过所述挡板(6)旋转能够阻隔或连通所述排水沟(4)和所述蓄水池(2)。4. A drainage system, characterized in that it includes a drainage ditch (4) opened below the road surface and the sponge city green belt according to any one of claims 1 to 3, the bottom of the concrete layer (11) is hinged with The baffle (6), the rotation damping is fixedly connected between the baffle (6) and the concrete layer (11), the baffle (6) is located between the drainage ditch (4) and the reservoir (2), through the rotation of the baffle (6), the drainage ditch (4) and the water storage tank (2) can be blocked or connected. 5.根据权利要求4所述的排水系统,其特征在于,所述挡板(6)内贯通开设有安装槽(61),所述安装槽(61)内转动设有内板(62),通过所述内板(62)旋转能够阻隔或连通所述排水沟(4)和所述蓄水池(2)。5. The drainage system according to claim 4, characterized in that, an installation groove (61) is opened through the inside of the baffle plate (6), and an inner plate (62) is rotated inside the installation groove (61), The rotation of the inner plate (62) can block or connect the drainage ditch (4) and the reservoir (2). 6.根据权利要求5所述的排水系统,其特征在于,所述安装槽(61)内固定设有限位条(63),所述限位条(63)用于阻挡所述内板(62)向所述排水沟(4)一侧转动。6. The drainage system according to claim 5, characterized in that, a limit strip (63) is fixed inside the installation groove (61), and the limit strip (63) is used to block the inner plate (62 ) to the side of the drainage ditch (4). 7.根据权利要求5所述的排水系统,其特征在于,所述排水沟(4)底部连通设有竖直槽(8),所述地下管道(3)与所述竖直槽(8)相连通,所述竖直槽(8)内上下滑动设有升降板(9),所述升降板(9)底部与所述竖直槽(8)底壁之间固定连接有弹性件(10),通过所述升降板(9)升降滑动将所述竖直槽(8)与所述地下管道(3)之间阻隔或连通,所述升降板(9)上开设有卡口(91),所述挡板(6)上固定设有卡条(64),在所述挡板(6)阻隔所述排水沟(4)和所述蓄水池(2)时,所述卡条(64)能够卡接于所述卡口(91)。7. The drainage system according to claim 5, characterized in that, the bottom of the drainage ditch (4) is connected with a vertical groove (8), and the underground pipe (3) is connected to the vertical groove (8) connected, the vertical slot (8) is provided with a lifting plate (9) sliding up and down, and an elastic member (10) is fixedly connected between the bottom of the lifting plate (9) and the bottom wall of the vertical slot (8). ), through the lifting and sliding of the lifting plate (9) to block or communicate between the vertical groove (8) and the underground pipeline (3), the lifting plate (9) is provided with a bayonet (91) , the baffle (6) is fixed with a clip (64), when the baffle (6) blocks the drain (4) and the reservoir (2), the clip ( 64) can be clamped to the bayonet (91). 8.根据权利要求7所述的排水系统,其特征在于,所述升降板(9)顶端固定设有挂钩(92)。8. The drainage system according to claim 7, characterized in that a hook (92) is fixed on the top of the lifting plate (9). 9.根据权利要求4所述的排水系统,其特征在于,所述排水沟(4)顶部可拆卸地安装有格板(5)。9. The drainage system according to claim 4, characterized in that, a grille (5) is detachably installed on the top of the drainage ditch (4). 10.根据权利要求9所述的排水系统,其特征在于,所述格板(5)呈L型。10. The drainage system according to claim 9, characterized in that, the grille (5) is L-shaped.
CN202310713157.8A 2023-06-15 2023-06-15 A sponge city green belt and drainage system Active CN116584274B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310713157.8A CN116584274B (en) 2023-06-15 2023-06-15 A sponge city green belt and drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310713157.8A CN116584274B (en) 2023-06-15 2023-06-15 A sponge city green belt and drainage system

Publications (2)

Publication Number Publication Date
CN116584274A true CN116584274A (en) 2023-08-15
CN116584274B CN116584274B (en) 2025-06-06

Family

ID=87590067

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310713157.8A Active CN116584274B (en) 2023-06-15 2023-06-15 A sponge city green belt and drainage system

Country Status (1)

Country Link
CN (1) CN116584274B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8416858D0 (en) * 1984-07-03 1984-08-08 Selflevel Covers Ag Drain constructions
KR200411498Y1 (en) * 2005-12-28 2006-03-15 박옥교 Vertical drainage system with adjustable water pressure for each basin
CA2521441A1 (en) * 2005-09-09 2007-03-09 Masilamany Subramaniam A new sub-surface irrigation unit (or system) for potted plants
JP2010037863A (en) * 2008-08-07 2010-02-18 Public Works Research Institute Planting penetration trench
CN109235182A (en) * 2018-09-28 2019-01-18 浙江广安建设有限公司 A kind of sponge-type road pavement structure
CN211745621U (en) * 2020-03-13 2020-10-27 深圳市工大国际工程设计有限公司 Retaining tree pool
CN212200661U (en) * 2020-05-07 2020-12-22 广东中帆建设有限公司 Irrigation system is collected to town road rainwater
CN218912003U (en) * 2022-04-27 2023-04-25 昆明理工大学设计研究院有限公司 Roof structure is planted with environmental protection to sponge city

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB8416858D0 (en) * 1984-07-03 1984-08-08 Selflevel Covers Ag Drain constructions
CA2521441A1 (en) * 2005-09-09 2007-03-09 Masilamany Subramaniam A new sub-surface irrigation unit (or system) for potted plants
KR200411498Y1 (en) * 2005-12-28 2006-03-15 박옥교 Vertical drainage system with adjustable water pressure for each basin
JP2010037863A (en) * 2008-08-07 2010-02-18 Public Works Research Institute Planting penetration trench
CN109235182A (en) * 2018-09-28 2019-01-18 浙江广安建设有限公司 A kind of sponge-type road pavement structure
CN211745621U (en) * 2020-03-13 2020-10-27 深圳市工大国际工程设计有限公司 Retaining tree pool
CN212200661U (en) * 2020-05-07 2020-12-22 广东中帆建设有限公司 Irrigation system is collected to town road rainwater
CN218912003U (en) * 2022-04-27 2023-04-25 昆明理工大学设计研究院有限公司 Roof structure is planted with environmental protection to sponge city

Also Published As

Publication number Publication date
CN116584274B (en) 2025-06-06

Similar Documents

Publication Publication Date Title
CN208763143U (en) Sponge Urban Underground drainage system
CN205421504U (en) Abandon STREAMING inlet for stom water
CN205024981U (en) Light -duty rainwater in environmental protection roof is collected and is utilized device
CN106638917B (en) Split type rainwater recycling, storing and adjusting system and construction method thereof
JP2010090605A (en) Rainwater utilization system
CN209353440U (en) Road rainwater storage and drainage system for sponge city
CN203741704U (en) Rainwater collecting and recycling system for overpass
CN106930397B (en) A kind of biological delaying basin that initial rainwater can be persistently handled within the dry spell
CN203238699U (en) Hydraulic automatic rainwater recovery device
CN217517764U (en) Sponge urban water system for building district
CN215562405U (en) Novel urban river course rubber dam
CN210636250U (en) Novel sponge urban road
CN213296596U (en) City greenery patches plant is detained and is taken view structure
CN116584274A (en) Sponge urban green belt and drainage system
KR20120073896A (en) Variable rain storage tank
CN210887104U (en) A slope protection for rainwater interception, purification and rapid discharge
CN109610265B (en) Bury municipal square rainwater collection system
CN102106245B (en) An automatic greening watering device for rainwater wastewater
CN207794243U (en) Sunk type greenery patches reverse osmosis layer automatic flushing device in a kind of sponge city
CN113187078B (en) A rainwater treatment device
CN211210721U (en) Green roof integrated system based on rainwater is accumulated and is utilized
CN212742842U (en) Urban drainage system
CN210827760U (en) Ecological pavement with municipal administration reposition of redundant personnel water guide function
CN209585244U (en) A civil engineering road drainage device
CN201883411U (en) Initial rainwater draining device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant