CN116537565A - Outer wall construction equipment for building construction and operation method - Google Patents

Outer wall construction equipment for building construction and operation method Download PDF

Info

Publication number
CN116537565A
CN116537565A CN202310673561.7A CN202310673561A CN116537565A CN 116537565 A CN116537565 A CN 116537565A CN 202310673561 A CN202310673561 A CN 202310673561A CN 116537565 A CN116537565 A CN 116537565A
Authority
CN
China
Prior art keywords
frame
sliding
wall
limiting
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310673561.7A
Other languages
Chinese (zh)
Other versions
CN116537565B (en
Inventor
周凌峰
郭涛
赵家贵
李秉坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202310673561.7A priority Critical patent/CN116537565B/en
Publication of CN116537565A publication Critical patent/CN116537565A/en
Application granted granted Critical
Publication of CN116537565B publication Critical patent/CN116537565B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E04G21/162—Handles to carry construction blocks
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14—Conveying or assembling building elements
    • E04G21/16—Tools or apparatus
    • E04G21/18—Adjusting tools; Templates
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32—Safety or protective measures for persons during the construction of buildings
    • E04G21/3204—Safety or protective measures for persons during the construction of buildings against falling down
    • E—FIXED CONSTRUCTIONS
    • E04—BUILDING
    • E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/32—Safety or protective measures for persons during the construction of buildings
    • E04G21/3261—Safety-nets; Safety mattresses; Arrangements on buildings for connecting safety-lines
    • E04G21/3266—Safety nets

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an outer wall construction device for building construction and an operation method thereof, comprising a construction body, wherein the construction body consists of a lower base, a supporting vertical rod and an upper cover plate, the upper surface of the lower base is fixedly connected with two sliding rails, the surfaces of the two sliding rails are respectively and slidably connected with a sliding frame, the opposite surfaces of the two sliding frames are fixedly connected with a protective frame, and a limiting assembly capable of limiting the sliding frame to move is arranged in the sliding frame. This building trade is with climbing frame of being convenient for adjust sets up the protection frame in the inside of construction body, utilizes actuating mechanism can drive the protection frame and reciprocates in the inside of construction body, when the protection frame obstructs the construction to can finely tune the protection frame, simultaneously, constructor stands and construct in the protection frame, utilizes the protection frame that can reciprocate, can make constructor arrive the inside optional position of construction body fast, has avoided the multilayer scaffold board that needs to set up, thereby has improved installation effectiveness.

Description

Outer wall construction equipment for building construction and operation method
Technical Field
The invention relates to the technical field of building exterior wall construction, in particular to exterior wall construction equipment for building construction and an operation method.
Background
The outer wall construction equipment generally adopts a climbing frame and hanging basket equipment, wherein the climbing frame is novel equipment different from the traditional scaffold, and the climbing frame automatically ascends along a building wall body by adding a power climbing system and equipment without repeated disassembly. The hanging basket device generally adopts a movable platform which is arranged on the top of a structure and lifts the construction platform to a set height.
The present frame of climbing is in order to make things convenient for constructor's construction when the installation, so can build multilayer scaffold board, but installation multilayer scaffold board is too consuming time, and scaffold board is fixed, in the work progress, sometimes scaffold board obstructs the construction to be inconvenient for finely tune scaffold board. The hanging basket device is high in convenience in construction, local height fine adjustment can be performed at the same time, but safety accidents are easy to occur in frequent start-stop operation of the hanging basket device.
Disclosure of Invention
The invention aims to provide external wall construction equipment for building construction, which solves the problem that safety accidents are easy to occur due to the fact that climbing frames cannot be subjected to high fine adjustment construction and hanging basket equipment is frequently started and stopped, and solves the problem that the climbing frames shake.
In order to achieve the above purpose, the present invention provides the following technical solutions: the utility model provides an outer wall construction equipment that construction was used, includes the construction body, the construction body comprises lower base, support montant and upper cover plate, and the upper surface fixedly connected with slide rail of lower base, the quantity of slide rail is two, and the equal sliding connection in surface of two slide rails has the slip frame, and the relative face fixedly connected with protection frame of two slip frames, the inside of slip frame are provided with the spacing subassembly that can restrict the slip frame and remove, and the upper surface of upper cover plate is provided with the actuating mechanism that can order about the protection frame to remove.
Preferably, the spacing subassembly includes flexible frame, and the mounting groove that supplies flexible frame activity is seted up to the inner wall of slip frame, and the inner wall sliding connection of flexible frame has the stopper, and the spacing groove with stopper looks adaptation has been seted up to one side of slide rail, and the inside of flexible frame is provided with the compression spring that can order about the stopper to insert spacing inslot wall, and the upper surface of stopper and the interior roof in spacing groove all set up to the slope.
Preferably, a locking bolt is connected to one side of the sliding frame in a threaded manner, and the threaded end of the locking bolt extends to the inside of the mounting groove and is connected with one end of the telescopic frame in a rotating manner.
Preferably, the driving mechanism comprises a connecting shaft which is rotationally connected with the upper cover plate, the two ends of the connecting shaft are fixedly connected with a winding roller, the middle part of the connecting shaft is fixedly connected with a first straight gear, the surface of the winding roller is wound with a steel rope, the other end of the steel rope is fixedly connected with the upper surface of the sliding frame, the upper surface of the upper cover plate is fixedly connected with a motor, and the output end of the motor is fixedly connected with a second straight gear.
Preferably, the first straight gear is meshed with the second straight gear for transmission.
Preferably, the surface of the protection frame is provided with a protection net, and the upper surface of the sliding rail is fixedly connected with the lower surface of the upper cover plate.
Preferably, the lifting ring is arranged on the upper cover plate, the winch is arranged at the top of the structure, the rope is wound on the winch, the free end of the rope is arranged on the lifting ring, the connecting structure is arranged on one side of the lower base, opposite to the outer wall, the embedded bars are embedded in the outer wall, and the connecting structure and the embedded bars are adapted to be installed and suitable for preventing the outer wall construction equipment from shaking.
Preferably, the connection structure is including installing the connector on lower base, and the notch has been laid to one side of connecting the head, and the notch department is installed and is kept off the piece, keeps off the piece and connect the head slip and rotate relatively, has laid on the connecting the head and dodges the groove, and dodges to install the stopper on the connecting the head of groove bottom, and the stopper is suitable for limiting and keeps off the outer angle of rotating of piece.
Preferably, the external climbing system comprises a lifting ring arranged on the upper cover plate and a winch arranged on the top of the structure, wherein a rope is wound on the winch, the free end of the rope is arranged on the lifting ring, a connecting structure is arranged on one side of the lower base, opposite to the outer wall, of the lower base, embedded bars are embedded in the outer wall, the embedded bars are arranged in reserved holes of the split bolts of the outer wall, and the connecting structure and the embedded bars are adapted to be arranged to prevent the outer wall construction equipment from shaking.
Preferably, the connection structure is including installing the connector on lower base, the notch has been laid to one side of connecting the head and the slope guide surface has been laid at the top of connecting the head, the notch department is installed and is kept off the piece, keep off the piece and connect the head and slide and rotate relatively, lay the guide way on the piece, guide way internally mounted has spring and slider, the slider rotates through pivot and connects the head and installs the torsional spring between installation and slider and the connecting the head, it dodges the groove to have laid on the connecting the head, dodges groove internally mounted has guide structure, arc portion of exerting pressure is installed to the lateral wall of keeping off the piece, after guide structure and arc portion of exerting pressure butt, keep off the piece and connect the head outward and move and compress spring relatively, and dodge and be provided with spacing portion on the connecting the head of groove bottom, spacing portion is suitable for limiting the piece outward turning angle, spacing position dodges the inboard top of groove.
Advantageous effects
The invention provides an outer wall construction device for building construction, which has the following beneficial effects:
1. this outer wall construction equipment that construction was used sets up the protection frame in the inside of construction body, utilize actuating mechanism can drive the protection frame and reciprocate in the inside of construction body, when the protection frame hinders the construction, thereby can finely tune the protection frame, simultaneously, constructor stands and construct in the protection frame, utilize the protection frame that can reciprocate, can make constructor arrive the inside optional position of construction body fast, the multilayer scaffold board of having avoided having set up, thereby installation effectiveness has been improved, simultaneously relative hanging flower basket equipment can effectively reduce hanging flower basket equipment and open and stop the frequency, with the action that the high frequency opened and stopped peels off to equipment itself, even the security of construction also can be ensured to the lifting system inefficacy in equipment.
2. This outer wall construction equipment that construction was used, when the protective frame rose, the upper surface that can drive the stopper contacted with the interior roof of spacing groove, because the upper surface of stopper and the interior roof of spacing groove all set up to slope, thereby can make the stopper atress shrink in the flexible frame, when actuating mechanism breaks down and lead to the protective frame to descend, compression spring can drive the stopper to insert in the spacing groove, make the lower surface of stopper and the interior bottom overlap joint of spacing groove, thereby can avoid the protective frame to continue to descend, and then can protect constructor, simultaneously, rotate the locking bolt and drive flexible frame and remove, drive the stopper and break away from the spacing groove, thereby can make actuating mechanism drive the protective frame avoid the stop of stopper at the in-process that descends.
3. This outer wall construction equipment that construction was used installs rings at the top of upper cover plate, and hoist engine through the structure top can realize the hoist and mount of whole equipment, utilizes the pre-set embedded bar adaptation on connection structure and the outer wall simultaneously, prevents shaking through connection structure and embedded bar adaptation and accomplishes quick connection, opens the adaptation state of connection structure and embedded bar manually, and then the lifting motion of unblock hoist engine.
Drawings
FIG. 1 is a schematic perspective view of an embodiment of the present invention;
FIG. 2 is a schematic view of a front cross-sectional structure of a sliding rail according to the present invention;
FIG. 3 is a schematic view of the front cross-section of the telescopic frame of the present invention;
FIG. 4 is a schematic perspective view of another embodiment of the present invention;
FIG. 5 is a diagram showing the connection relationship among the connection structure, the lower base and the embedded bars;
FIG. 6 is a diagram showing a locking state of the embedded bars and the connecting structure of the present invention;
fig. 7 is a schematic structural view of a stopper of the present invention.
In the figure: the construction device comprises a construction body 1, a lower base 2, a supporting vertical rod 3, an upper cover plate 4, a sliding rail 5, a sliding frame 6, a protection frame 7, a telescopic frame 8, a limiting block 9, a compression spring 10, a locking bolt 11, a connecting shaft 12, a winding roller 13, a first straight gear 14, a steel rope 15, a motor 16 and a second straight gear 17.
Detailed Description
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1-3, the present invention provides a technical solution: the utility model provides an outer wall construction equipment that construction was used, including construction body 1, construction body 1 comprises lower base 2, support montant 3 and upper cover plate 4, construction body 1 is connected with outside climbing system, the upper surface fixedly connected with slide rail 5 of lower base 2, the upper surface of slide rail 5 and the lower fixed surface of upper cover plate 4 are connected, the quantity of slide rail 5 is two, the equal sliding connection in surface of two slide rails 5 has sliding frame 6, the relative face fixedly connected with guard frame 7 of two sliding frame 6, the surface of guard frame 7 is provided with the protection network, constructor stands and can carry out the construction in guard frame 7.
The inside of slip frame 6 is provided with the spacing subassembly that can restrict slip frame 6 and remove, and spacing subassembly is including flexible frame 8, and the mounting groove that supplies flexible frame 8 activity is seted up to the inner wall of slip frame 6, and the inner wall sliding connection of flexible frame 8 has stopper 9, and the spacing groove with stopper 9 looks adaptation has been seted up to one side of slide rail 5, and the inside of flexible frame 8 is provided with the compression spring 10 that can order about stopper 9 to insert spacing inslot wall, and the upper surface of stopper 9 and the interior roof of spacing groove all set up to the slope.
One side threaded connection of slip frame 6 has locking bolt 11, and locking bolt 11's screw thread end extends to the inside of mounting groove to rotate with the one end of flexible frame 8 and be connected, rotate locking bolt 11 and drive flexible frame 8 and remove, order about stopper 9 to break away from the spacing groove, thereby can make actuating mechanism drive protection frame 7 avoid stopper 9's of stopper in the decline in-process.
The upper surface of upper cover plate 4 is provided with the actuating mechanism that can order about guard frame 7 to remove, actuating mechanism includes the connecting axle 12 of being connected with upper cover plate 4 rotation, the equal fixedly connected with wind-up roll 13 in both ends of connecting axle 12, the middle part fixedly connected with first straight gear 14 of connecting axle 12, the surface winding of wind-up roll 13 has steel cable 15, the other end and the upper surface fixed connection of sliding frame 6 of steel cable 15, the upper surface fixed connection of upper cover plate 4 has motor 16, the output fixedly connected with second straight gear 17 of motor 16, first straight gear 14 and second straight gear 17 meshing transmission.
The driving motor 16 drives the second spur gear 17 to rotate, and the first spur gear 14 and the second spur gear 17 are meshed for transmission, so that the connecting shaft 12 can be driven to rotate, the winding roller 13 is driven to wind and unwind the steel rope 15, and the steel rope 15 can be used for pulling the protective frame 7 to ascend and descend.
The inside at construction body 1 sets up protection frame 7, utilizes actuating mechanism can drive protection frame 7 at the inside reciprocates of construction body 1, when protection frame 7 hinders the construction to can finely tune protection frame 7, simultaneously, constructor stands and construct in protection frame 7, utilize protection frame 7 that can reciprocate, can make constructor arrive the inside optional position of construction body 1 fast, avoided the multilayer scaffold board that needs to set up, thereby improved installation effectiveness.
When the protection frame 7 rises, the upper surface of the limiting block 9 can be driven to contact with the inner top wall of the limiting groove, and as the upper surface of the limiting block 9 and the inner top wall of the limiting groove are both set to be inclined, the limiting block 9 can be driven to be stressed and contracted into the telescopic frame 8, when the driving mechanism breaks down to cause the protection frame 7 to descend, the compression spring 10 can drive the limiting block 9 to be inserted into the limiting groove, the lower surface of the limiting block 9 is enabled to be overlapped with the inner bottom wall of the limiting groove, and accordingly the protection frame 7 can be prevented from continuing to descend, and constructors can be protected.
Working principle: when using this building trade to climb frame with being convenient for adjust, at first utilize outside climbing system to remove construction body 1 to the construction height, when the height of needs regulation protection frame 7, driving motor 16 drives second spur gear 17 and rotates, utilize first spur gear 14 and second spur gear 17 meshing transmission, thereby can drive connecting axle 12 and rotate, order about wind-up roll 13 to carry out rolling and expansion to steel cable 15, thereby usable steel cable 15 pulls protection frame 7 and rise, simultaneously, when protection frame 7 rises, can drive the upper surface of stopper 9 and the interior roof contact of spacing groove, because the upper surface of stopper 9 and the interior roof of spacing groove all set up to the slope type, thereby can order about stopper 9 atress shrink into in the flexible frame 8, when actuating mechanism breaks down and lead to protection frame 7 to descend, compression spring 10 can order about stopper 9 to insert in the spacing groove, make the lower surface of stopper 9 and the interior bottom wall in spacing groove, thereby can avoid protection frame 7 to continue to descend, and can drive the protection bolt to drive the protection personnel when needs protection frame 7 to descend, simultaneously, the upper surface of stopper 9 moves 8 and the spacing groove, thereby can avoid in the protection frame 7 to drive the locking mechanism to descend in the limit process.
The following modifications were made on the basis of the above embodiments: as shown in fig. 4 to 6, a lifting ring 41 is installed on the upper cover plate 4, a hoist 42 is installed at the top of the structure, a rope 43 is wound on the hoist 42, the free end of the rope 43 is installed on the lifting ring 41, a connecting structure is arranged on one side of the lower base 2 opposite to the outer wall, embedded bars 44 are embedded on the outer wall, the embedded bars 44 are installed in reserved holes of split bolts of the outer wall, and the connecting structure and the embedded bars 44 are adapted and installed to prevent shaking of construction equipment of the outer wall. The lower base 2 is provided with the balance travelling wheel 30, the construction body 1 can be formed by matching with a connecting structure through the balance travelling wheel 30, and self-locking is formed after the construction body is connected with the embedded bars 44 through the connecting structure, so that the structural stability of the construction body 1 can be ensured even if the winch 42 fails.
The connecting structure comprises a connector 21 arranged on a lower base 2, a notch 22 is arranged on one side of the connector 21, a slope guide surface 29 is arranged at the top of the connector 21, a baffle 23 is arranged at the notch 22, the baffle 23 slides and rotates relative to the connector 21, a guide groove 26 is arranged on the baffle 23, a spring 27 and a sliding block 28 are arranged in the guide groove 26, the sliding block 28 is rotatably arranged on the connector 21 through a rotating shaft, a torsion spring 29 is arranged between the sliding block 28 and the connector 21, a avoiding groove 24 is arranged on the connector 23, a guide structure is arranged in the avoiding groove 24, an arc pressing part is arranged on the side wall of the baffle 23, after the guide structure is abutted with the arc pressing part, the baffle 23 moves outwards relative to the connector 21 and compresses the spring 27, a limiting part 25 is arranged on the connector 21 at the bottom of the avoiding groove 24, the limiting part 25 is suitable for limiting the outward rotation angle of the baffle 23, and the limiting part 25 is positioned at the top of the inner side of the avoiding groove 24. When the connection structure approaches to one side of the embedded bar 44, the blocking piece 23 is pressed inwards to enter when the embedded bar 44 moves towards the notch 22, so that the blocking piece 23 is rotated inwards, after the blocking piece 23 is rotated to the position of the notch attached to the avoidance groove 24, the blocking piece 23 is required to be rotated outwards simultaneously along with the continuous entering trend of the embedded bar 44, and when the end part of the blocking piece 23 passes through the embedded bar 44, the locking fixation of the structure is completed under the action of the spring 27 and the sliding block 28. When the equipment is lifted, only the blocking piece 23 is required to be manually opened (linear motion along the joint direction with the limiting part 25), then the construction body 1 is lifted through a rope by the winch 42, the connector 21 is firstly far away from the embedded steel bar 44 in the lifting process, after the equipment is lifted to a proper height, the embedded steel bar 44 acts on the slope guide surface 29 to cause the lower base 2 to be far away from the outer wall structure, then the embedded steel bar 44 acts on the top of the blocking piece 23 to rotate towards the inside of the notch 22, after the embedded steel bar 44 passes through the top of the blocking piece 23, the lower end of the corresponding blocking piece 23 is pressurized again, so that the blocking piece 23 is inwards rotated, the continuous pressurization of the blocking piece 23 can be realized in the inwards rotation process, after the guide structure is abutted with the arc-shaped pressurizing part, the blocking piece 23 moves outwards relative to the connecting head 21 and compresses the spring 27, after the bottom of the blocking piece 23 passes through the highest point of the top of the embedded steel bar 44, the blocking piece 23 can reset under the action of the spring 27 and then complete the automatic locking of the embedded steel bar 44 and the connector 21, and when the locking is completed, the inner wall of the blocking piece 23 and the connector 21 can form a blocking state, and the problem of shaking of the construction is solved, and the problem of the high-level operation is solved at present.
Although embodiments of the present invention have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides an outer wall construction equipment that construction was used, includes construction body (1), its characterized in that: the construction body (1) comprises a lower base (2), a supporting vertical rod (3) and an upper cover plate (4), wherein the upper surface of the lower base (2) is fixedly connected with sliding rails (5), the number of the sliding rails (5) is two, the surfaces of the two sliding rails (5) are respectively and slidably connected with a sliding frame (6), the opposite surfaces of the two sliding frames (6) are fixedly connected with a protection frame (7), a limiting component capable of limiting the sliding frame (6) to move is arranged in the sliding frame (6), and a driving mechanism capable of driving the protection frame (7) to move is arranged on the upper surface of the upper cover plate (4).
2. An exterior wall construction apparatus for building construction according to claim 1, wherein: limiting component includes flexible frame (8), and the mounting groove that supplies flexible frame (8) activity is seted up to the inner wall of sliding frame (6), and the inner wall sliding connection of flexible frame (8) has stopper (9), and the spacing groove with stopper (9) looks adaptation has been seted up to one side of slide rail (5), and the inside of flexible frame (8) is provided with compression spring (10) that can order about stopper (9) to insert spacing inslot wall, and the upper surface of stopper (9) and the interior roof of spacing groove all set up to the slope.
3. An exterior wall construction apparatus for building construction according to claim 2, wherein: one side of the sliding frame (6) is connected with a locking bolt (11) in a threaded mode, and the threaded end of the locking bolt (11) extends to the inside of the mounting groove and is connected with one end of the telescopic frame (8) in a rotating mode.
4. An exterior wall construction apparatus for building construction according to claim 1, wherein: the driving mechanism comprises a connecting shaft (12) rotationally connected with the upper cover plate (4), two ends of the connecting shaft (12) are fixedly connected with a wind-up roller (13), a first straight gear (14) is fixedly connected with the middle of the connecting shaft (12), a steel rope (15) is wound on the surface of the wind-up roller (13), the other end of the steel rope (15) is fixedly connected with the upper surface of the sliding frame (6), a motor (16) is fixedly connected with the upper surface of the upper cover plate (4), and a second straight gear (17) is fixedly connected with the output end of the motor (16).
5. An exterior wall construction apparatus for building construction according to claim 4, wherein: the first straight gear (14) is meshed with the second straight gear (17) for transmission.
6. An exterior wall construction apparatus for building construction according to claim 1, wherein: the surface of the protection frame (7) is provided with a protection net, and the upper surface of the sliding rail (5) is fixedly connected with the lower surface of the upper cover plate (4).
7. A method of operating an exterior wall construction apparatus for building construction according to any one of claims 1 to 6, wherein:
firstly, the construction body (1) is moved to the construction height by utilizing an external climbing system, when the height of the protective frame (7) needs to be adjusted, the driving motor (16) drives the second spur gear (17) to rotate, the first spur gear (14) and the second spur gear (17) are utilized to be meshed for transmission, so that the connecting shaft (12) can be driven to rotate, the winding roller (13) is driven to wind and unwind the steel rope (15), the protective frame (7) can be pulled to ascend by utilizing the steel rope (15), meanwhile, when the protective frame (7) ascends, the upper surface of the limiting block (9) can be driven to contact with the inner top wall of the limiting groove, and as the upper surface of the limiting block (9) and the inner top wall of the limiting groove are both set to be slope-shaped, the limiting block (9) can be driven to retract into the telescopic frame (8), and when the driving mechanism breaks down, the limiting block (9) can be driven to be inserted into the limiting groove, so that the lower surface of the limiting block (9) is enabled to be lapped with the inner bottom wall of the limiting groove, and thus the protective frame (7) can be prevented from being lowered, and further, a person can be protected;
when the protective frame (7) is required to descend, the locking bolt (11) is rotated to drive the telescopic frame (8) to move, and the limiting block (9) is driven to be separated from the limiting groove, so that the driving mechanism can avoid blocking of the limiting block (9) in the process of driving the protective frame (7) to descend.
8. An exterior wall construction apparatus for building construction according to any one of claims 1 to 6, wherein: the outside climbing system comprises a lifting ring (41) arranged on the upper cover plate (4) and a winch (42) arranged on the top of the structure, a rope (43) is wound on the winch (42) and the free end of the rope (43) is arranged on the lifting ring (41), a connecting structure is arranged on one side of the lower base (2) opposite to the outer wall, an embedded steel bar (44) is embedded in the outer wall, the embedded steel bar (44) is arranged in a reserved hole of the split bolt of the outer wall, and the connecting structure and the embedded steel bar (44) are adapted to be installed and suitable for preventing the outer wall construction equipment from shaking.
9. An exterior wall construction apparatus for building construction according to claim 8, wherein: the connecting structure comprises a connector (21) arranged on a lower base (2), a notch (22) is arranged on one side of the connector (21) and a slope guide surface (29) is arranged at the top of the connector (21), a blocking piece (23) is arranged at the notch (22), the blocking piece (23) slides and rotates relative to the connector (21), a guide groove (26) is arranged on the blocking piece (23), a spring (27) and a sliding block (28) are arranged in the guide groove (26), the sliding block (28) is rotatably arranged with the connector (21) through a rotating shaft, a torsion spring (29) is arranged between the sliding block (28) and the connector (21), a avoiding groove (24) is arranged on the connector (23), a guide structure is arranged in the avoiding groove (24), an arc pressing part is arranged on the side wall of the blocking piece (23), after the guide structure is abutted with the arc pressing part, the blocking piece (23) moves outwards relative to the connector (21) and compresses the spring (27), a limiting part (25) is arranged on the connector (21) at the bottom of the avoiding groove (24), and the limiting part (25) is suitable for limiting the angle of the inner side of the blocking piece (23) to be located at the outer limiting groove (24).
CN202310673561.7A 2023-06-08 2023-06-08 Outer wall construction equipment for building construction and operation method Active CN116537565B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310673561.7A CN116537565B (en) 2023-06-08 2023-06-08 Outer wall construction equipment for building construction and operation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310673561.7A CN116537565B (en) 2023-06-08 2023-06-08 Outer wall construction equipment for building construction and operation method

Publications (2)

Publication Number Publication Date
CN116537565A true CN116537565A (en) 2023-08-04
CN116537565B CN116537565B (en) 2026-02-24

Family

ID=87447246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310673561.7A Active CN116537565B (en) 2023-06-08 2023-06-08 Outer wall construction equipment for building construction and operation method

Country Status (1)

Country Link
CN (1) CN116537565B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117188676A (en) * 2023-08-15 2023-12-08 中国十七冶集团有限公司 A combined steel truss floor decking system and construction technology

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111827654A (en) * 2020-08-13 2020-10-27 中铝南铝(福建)铝结构技术开发有限公司 An attached lifting protection platform
CN111891902A (en) * 2020-07-23 2020-11-06 中铁建大桥工程局集团第六工程有限公司 Safety object hanging device for subway construction
CN212893799U (en) * 2020-07-29 2021-04-06 常德华俊机械设备制造有限公司 Hydraulic lifting mechanism of engineering machinery
CN213710312U (en) * 2020-09-18 2021-07-16 韩荀 Support for building engineering
CN215889302U (en) * 2021-08-19 2022-02-22 中铁十二局集团建筑安装工程有限公司 Auxiliary safety hanging basket for house construction
CN217079625U (en) * 2022-03-01 2022-07-29 龙海建筑科技有限公司 Anti-swing quick fixing device for curtain wall construction hanging basket for aerial work
CN218403300U (en) * 2022-11-01 2023-01-31 深圳福高科技有限公司 Hoist and mount chain with locking structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111891902A (en) * 2020-07-23 2020-11-06 中铁建大桥工程局集团第六工程有限公司 Safety object hanging device for subway construction
CN212893799U (en) * 2020-07-29 2021-04-06 常德华俊机械设备制造有限公司 Hydraulic lifting mechanism of engineering machinery
CN111827654A (en) * 2020-08-13 2020-10-27 中铝南铝(福建)铝结构技术开发有限公司 An attached lifting protection platform
CN213710312U (en) * 2020-09-18 2021-07-16 韩荀 Support for building engineering
CN215889302U (en) * 2021-08-19 2022-02-22 中铁十二局集团建筑安装工程有限公司 Auxiliary safety hanging basket for house construction
CN217079625U (en) * 2022-03-01 2022-07-29 龙海建筑科技有限公司 Anti-swing quick fixing device for curtain wall construction hanging basket for aerial work
CN218403300U (en) * 2022-11-01 2023-01-31 深圳福高科技有限公司 Hoist and mount chain with locking structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117188676A (en) * 2023-08-15 2023-12-08 中国十七冶集团有限公司 A combined steel truss floor decking system and construction technology

Also Published As

Publication number Publication date
CN116537565B (en) 2026-02-24

Similar Documents

Publication Publication Date Title
CN210508329U (en) Splicing type indoor and outdoor extensible building scaffold
CN112900825B (en) A hoistway self-climbing operation platform
CN112079264A (en) Loading and unloading device for production of environment-friendly building materials and using method thereof
CN116513977A (en) Hydropower station maintenance vertical lifting device and application method thereof
CN110626967B (en) Crane with overload locking device
CN116537565B (en) Outer wall construction equipment for building construction and operation method
CN221253681U (en) Double-beam lifting equipment
CN110395639B (en) Civil engineering construction is with safe type elevating gear
CN219885608U (en) Hoisting platform in elevator well
CN220165711U (en) Elevator convenient to it is fixed
CN219930735U (en) Bridge construction platform
CN213834447U (en) A safety lifting device for electric construction
CN217897244U (en) Spider people safety device is used in curtain cleaning maintenance
CN217708785U (en) Lifting platform for aerial work
CN212639769U (en) Crane for maintenance of ships in floating dock
CN114604807A (en) Safe lifting device for electric power construction
CN210176288U (en) Well hoisting frame structure
CN113845037A (en) Electric hoist bridge crane
CN218810110U (en) Building construction hoisting device
CN219885562U (en) Material lifting device with stable structure
CN223804759U (en) A safety protection device for lifting machinery
CN219771592U (en) Vertical lifting device for overhauling hydropower station
CN210065083U (en) Lifting device
CN217680385U (en) Building external climbing type building construction operation platform
CN218205575U (en) Construction platform with protection function

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant