CN116479782A CN202310674062.XA CN202310674062A CN116479782A CN 116479782 A CN116479782 A CN 116479782A CN 202310674062 A CN202310674062 A CN 202310674062A CN 116479782 A CN116479782 A CN 116479782A
Authority
CN
China
Prior art keywords
steel
support
sliding support
span
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310674062.XA
Other languages
Chinese (zh)
Other versions
CN116479782B (en
Inventor
王安文
尚莉莉
黄飞
黄振威
于策
李晔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202310674062.XA priority Critical patent/CN116479782B/en
Publication of CN116479782A publication Critical patent/CN116479782A/en
Application granted granted Critical
Publication of CN116479782B publication Critical patent/CN116479782B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种跨河钢结构桥钢梁侧位提升水平横移安装方法,在水中沿桥位搭设两组钢梁拼装支架,每组钢梁拼装支架分为落梁支架和滑移支架,滑移支架的高度高于落梁支架;在滑移支架上设置滑移轨道、滑车及提升千斤顶,跨中段钢梁运至栈桥上,先通过提升千斤顶将钢梁提升至高于落梁支架,并通过滑车携带钢梁滑移到指定位置,再将钢梁放置到落梁支架上,然后拆除滑移支架上的滑车及滑移轨道,去掉滑移支架高于落梁支架的部分,作为边跨段钢梁的落梁支架,在岸边用吊机吊装边跨段钢梁。本发明无需搭设水中吊车站位平台及大型起吊设备,施工成本低,安全性高。

The invention relates to a method for side-lifting and horizontally moving steel girders of a steel structure bridge across a river. Two groups of steel girder assembly brackets are erected along the bridge position in water. Each group of steel girder assembly brackets is divided into a drop beam bracket and a sliding bracket. Place it on the falling beam support, then remove the pulley and sliding track on the sliding support, remove the part of the sliding support higher than the falling beam support, and use it as the falling beam support of the side-span steel beam, and use a crane to lift the side-span steel beam on the shore. The present invention does not need to set up an underwater crane station platform and large-scale lifting equipment, and has low construction cost and high safety.

Description

一种跨河钢结构桥钢梁侧位提升水平横移安装方法An installation method for lateral lifting and horizontal moving of steel girders of steel structure bridges across rivers

技术领域technical field

本发明属于桥梁施工技术领域,涉及一种跨河钢结构桥的钢梁安装施工,具体涉及一种钢梁侧位提升水平横移安装方法。The invention belongs to the technical field of bridge construction, and relates to a steel girder installation and construction of a steel structure bridge across a river, in particular to a steel girder lateral lifting and horizontal moving installation method.

背景技术Background technique

如图1所示,跨河钢结构桥的钢梁安装施工时,为提高施工效率,通常将整跨钢梁分为3个大节段,包括一个跨中段101和两个边跨段102,并在水中搭设两个钢梁拼装支架103,将跨中段101搭设到两支架上,将两个边跨段搭设到两岸桥墩100和靠近桥墩的支架103上,然后在支架上进行跨中段和边跨段焊接,完成钢梁安装。As shown in Figure 1, in order to improve the construction efficiency, the steel girders of the cross-river steel structure bridge are generally divided into three large sections, including a mid-span section 101 and two side-span sections 102, and two steel girder assembly supports 103 are erected in the water, and the mid-span section 101 is erected on the two supports, and the two side-span sections are erected on the pier 100 on both banks and the support 103 near the pier. Beam installation.

目前在钢梁安装施工时,两个边跨段通常在岸边采用汽车吊起吊架设,而跨中段因为离岸边较远,需要在水中搭设运梁栈桥104,还需要在水中搭设吊车站位平台或安装水中塔吊,运梁车将跨中段运至栈桥上,水上吊机起吊到两支架上。水中吊车平台及塔吊搭设成本较高,而且大型吊机在水上作业安全性较低。At present, during the installation and construction of steel girders, the two side spans are usually hoisted by trucks on the shore, and the middle span is far away from the shore, so it is necessary to build a girder transport trestle 104 in the water, and also need to set up a crane station platform in the water or install an underwater tower crane. The erection cost of crane platforms and tower cranes in water is relatively high, and the safety of large cranes in water operations is relatively low.

发明内容Contents of the invention

本发明的目的是针对上述问题,提供一种跨河钢结构桥钢梁侧位提升水平横移安装方法,主要解决跨中段的安装难题,以降低施工成本并提高施工安全性。The purpose of the present invention is to solve the above problems and provide a side-lifting and horizontal-moving installation method for steel girders of steel structure bridges across rivers, which mainly solves the installation problem in the middle section of the span, so as to reduce construction costs and improve construction safety.

本发明的技术方案如下:Technical scheme of the present invention is as follows:

一种跨河钢结构桥钢梁侧位提升水平横移安装方法,所述钢结构桥的钢梁分为一个跨中段和两个边跨段,其特征在于,包括以下步骤:A method for side-lifting and horizontally moving a steel girder of a steel structure bridge across a river, wherein the steel girder of the steel structure bridge is divided into a mid-span section and two side-span sections, characterized in that it comprises the following steps:

(1)在水中桥位一侧搭设栈桥,形成运梁通道;(1) Set up a trestle on one side of the bridge in the water to form a beam transportation channel;

(2)在水中沿桥位搭设两组钢梁拼装支架,每组钢梁拼装支架分为落梁支架和滑移支架,包括3排横桥向设置的钢管桩,相邻钢管桩间通过平联和斜撑连接,其中较靠近跨中的一排钢管桩为落梁支架钢管桩,落梁支架钢管桩上搭设承重梁,形成所述落梁支架,落梁支架的高度与钢梁的拼装高度一致,较靠近岸边的一排钢管桩及中间一排钢管桩为滑移支架钢管桩,滑移支架钢管桩的高度高于落梁支架钢管桩的高度,两排滑移支架钢管桩上分别搭设轨道梁,轨道梁上铺设滑轨,形成所述滑移支架,滑移支架的轨道梁一端延伸到所述栈桥上方;(2) Set up two sets of steel girder assembly supports along the bridge in the water. Each set of steel girder assembly supports is divided into drop beam support and sliding support, including 3 rows of steel pipe piles arranged in the direction of the bridge. Sliding support steel pipe piles, the height of the sliding support steel pipe piles is higher than the height of the falling beam support steel pipe piles, track beams are respectively erected on the two rows of sliding support steel pipe piles, slide rails are laid on the track beams to form the sliding support, and one end of the track beam of the sliding support extends above the trestle;

每组钢梁拼装支架的滑移支架上分别设置一沿两滑轨滑行的滑车,每个滑车上竖向设置一穿心千斤顶,所述千斤顶穿设一吊杆;两滑轨上分别设置一顶推油缸,所述顶推油缸一端通过夹轨器与滑轨连接,另一端通过销轴与滑车连接;A tackle that slides along the two slide rails is respectively arranged on the sliding support of each group of steel beam assembly supports, and a center-through jack is vertically arranged on each tackle, and a suspender is installed on the jack; a jacking cylinder is respectively arranged on the two slide rails, and one end of the jacking cylinder is connected with the slide rail through a rail clamp, and the other end is connected with the tackle through a pin;

(3)通过运梁车将跨中段钢梁运至栈桥上,两滑移支架上的顶推油缸牵引滑车移动到栈桥上方,将两吊杆下端分别与钢梁两端连接,启动千斤顶通过吊杆将钢梁提升至高于落梁支架,然后启动顶推油缸推动滑车沿滑轨移动到钢梁安装位置上方,再控制千斤顶将钢梁两端下落至两落梁支架上;(3) Transport the steel girder in the middle of the span to the trestle by the beam transporter, move the jacking cylinder traction block on the two sliding supports to the top of the trestle, connect the lower ends of the two suspenders to the two ends of the steel girder respectively, start the jack to lift the steel girder above the drop beam support through the suspender, then start the jacking cylinder to push the block to move along the slide rail to the top of the steel beam installation position, and then control the jack to drop the two ends of the steel beam to the two drop beam supports;

(4)顶推油缸牵引滑车返回栈桥上方,重复步骤(3),将跨中段每片钢梁提吊到落梁支架上;(4) Push the oil cylinder traction block back to the top of the trestle, repeat step (3), and lift each steel beam in the middle section of the span to the drop beam support;

(5)拆除滑移支架上的滑车及滑轨,并去除滑移支架钢管桩高于落梁支架的部分,在降低高度后的滑移支架钢管桩上搭设承重梁,作为边跨段钢梁落梁支架,在两岸用汽车吊吊装边跨段钢梁。(5) Remove the trolley and slide rail on the sliding support, and remove the part of the steel pipe pile of the sliding support that is higher than the falling beam support, and set up a load-bearing beam on the steel pipe pile of the sliding support after the height has been lowered, as the falling beam support of the steel beam of the side span section, and hoist the steel beam of the side span section with a truck crane on both sides of the bank.

本发明对现有的钢梁拼装支架进行了改进,设置为滑移支架和落梁支架两部分,在滑移支架上设置滑车,采用千斤顶提升钢梁,并通过滑移的方法移动、架设钢梁,无需搭设水中吊车站位平台及塔吊,有效解决了水中钢梁吊装难题,且成本低,安全性高。The present invention improves the existing steel girder assembling bracket, and sets it into two parts: a sliding bracket and a falling beam bracket. A pulley is arranged on the sliding bracket, a jack is used to lift the steel beam, and the steel beam is moved and erected by a sliding method. There is no need to set up an underwater crane station platform and a tower crane, which effectively solves the problem of hoisting the steel beam in the water, and has low cost and high safety.

附图说明Description of drawings

图1是跨河钢梁分段安装结构示意图;Figure 1 is a schematic diagram of the segmental installation structure of the cross-river steel beam;

图2是本发明的支架顺桥向结构示意图;Fig. 2 is a schematic structural view of the bracket of the present invention along the bridge direction;

图3是本发明的支架平面结构示意图;Fig. 3 is a schematic view of the planar structure of the bracket of the present invention;

图4是本发明的支架横桥向结构示意图;Fig. 4 is a structural schematic diagram of the horizontal bridge of the bracket of the present invention;

图5是支架上滑车的顺桥向结构示意图;Fig. 5 is a structural schematic diagram along the bridge of the tackle on the support;

图6是支架上滑车的平面结构示意图;Fig. 6 is the plane structural representation of tackle on the support;

图7是支架上滑车的横桥向结构示意图;Fig. 7 is the transverse bridge direction structure schematic diagram of tackle on support;

图8是本发明提吊并滑移钢梁的顺桥向状态示意图;Fig. 8 is a schematic diagram of the bridge-direction state of lifting and sliding steel girders according to the present invention;

图9是本发明提吊并滑移钢梁的横桥向状态示意图;Fig. 9 is a schematic diagram of the state of the horizontal bridge of the present invention lifting and sliding the steel girder;

图10是所有跨中段钢梁安装到位的横桥向状态示意图;Figure 10 is a schematic diagram of the state of the transverse bridge with all steel girders in the middle of the span installed in place;

图11是边跨段钢梁的安装状态示意图。Fig. 11 is a schematic diagram of the installation state of the steel girder of the side span section.

具体实施方式Detailed ways

本发明的具体施工方法如下:Concrete construction method of the present invention is as follows:

(1)按图1所示的钢梁分段方式,将整跨钢梁分为3个大节段,包括一个跨中段101和两个边跨段102,在水中桥位一侧搭设栈桥104,作为运梁通道。该步骤与常规施工方法相同。(1) According to the steel girder segmentation method shown in Figure 1, the entire span steel girder is divided into three large segments, including a mid-span section 101 and two side-span sections 102, and a trestle 104 is built on one side of the bridge in the water as a beam transportation channel. This step is the same as the conventional construction method.

(2)如图2、图3、图4所示,在水中沿桥位搭设两组钢梁拼装支架,两组钢梁拼装支架的间距根据钢梁跨中段的长度适当设置。与传统的钢梁拼装支架不同,本发明将每组钢梁拼装支架分为落梁支架1和滑移支架2两部分,包括横桥向设置的3排钢管桩,相邻钢管桩间通过平联和斜撑连接,其中较靠近跨中的一排钢管桩为落梁支架钢管桩11,落梁支架钢管桩上搭设承重梁12,形成所述落梁支架1,落梁支架的高度与钢梁的拼装高度一致,较靠近岸边的一排钢管桩及中间一排钢管桩为滑移支架钢管桩21,滑移支架钢管桩21高度高于落梁支架钢管桩11高度,两排滑移支架钢管桩上分别搭设轨道梁22道梁上铺设滑轨23,形成所述滑移支架2,滑移支架的轨道梁22一端延伸到所述栈桥104上方,便于从栈桥上提吊钢梁,轨道梁22前端与滑移支架钢管桩21间可焊接斜撑杆24,避免轨道梁在承重时下挠;(2) As shown in Figure 2, Figure 3, and Figure 4, two sets of steel girder assembly supports are erected along the bridge position in the water, and the distance between the two sets of steel girder assembly supports is appropriately set according to the length of the middle section of the steel beam. Different from the traditional steel beam assembly support, the present invention divides each group of steel beam assembly support into two parts: drop beam support 1 and sliding support 2, including 3 rows of steel pipe piles arranged in the direction of the bridge. A row of steel pipe piles is the steel pipe pile 21 of the sliding support. The height of the steel pipe pile 21 of the sliding support is higher than that of the steel pipe pile 11 of the falling beam support. On the two rows of steel pipe piles of the sliding support, track beams 22 are respectively laid on the beams. scratch;

参见图5、图6、图7所示,每组钢梁拼装支架的滑移支架2上分别设置一沿两滑轨滑行的滑车3,每个滑车3上竖向设置一穿心千斤顶4,所述千斤顶4穿设一吊杆5;两滑轨上分别设置一顶推油缸6,所述顶推油缸6一端通过夹轨器7与滑轨23连接,另一端通过销轴与滑车连接;顶推油缸6可推动或牵引滑车沿滑轨移动,油缸顶推时,夹轨器7与滑轨夹紧,每顶推一个行程,油缸回油,夹轨器7沿滑轨移动一个行程后重新夹紧滑轨,油缸开始下一行程,如此循环,直至将滑车顶推会牵引到指定位置。Referring to Fig. 5, Fig. 6, shown in Fig. 7, a tackle 3 sliding along two slide rails is respectively arranged on the sliding support 2 of each group of steel beam assembly supports, and a center-through jack 4 is vertically arranged on each tackle 3, and a suspension rod 5 is installed on the jack 4; a jacking cylinder 6 is respectively arranged on the two slide rails, and one end of the jacking cylinder 6 is connected with the slide rail 23 through a rail clamp 7, and the other end is connected with the tackle through a pin; the jacking cylinder 6 can push or pull the tackle along When the slide rail moves and the oil cylinder pushes, the rail clamp 7 clamps the slide rail. Every time a stroke is pushed, the oil cylinder returns oil. The rail clamp 7 moves along the slide rail for one stroke and then re-clamps the slide rail. The oil cylinder starts the next stroke, and so on, until the pulley is pushed to the designated position.

如图5、图6、图7所示,作为本发明的一种具体实施方式,所述滑车3包括两个顺桥向设置的纵梁31,每根纵梁底部设两个分别沿两滑轨滑行的滑轮32,两纵梁上焊接两横梁33,所述千斤顶4设置在较靠近跨中的横梁33上。As shown in Fig. 5, Fig. 6 and Fig. 7, as a specific embodiment of the present invention, the tackle 3 includes two longitudinal beams 31 arranged along the bridge direction, two pulleys 32 respectively sliding along the two slide rails are arranged at the bottom of each longitudinal beam, two crossbeams 33 are welded on the two longitudinal beams, and the jack 4 is arranged on the crossbeam 33 closer to the middle of the span.

本发明具体实施时,所述滑移支架上的轨道梁22可采用双拼工字钢,所述滑轨23沿横桥向焊接在轨道梁上翼缘板顶面;由于千斤顶设置在滑车一侧,为避免千斤顶提升钢梁时滑车因受力不均而侧翻,可在滑车的每根纵梁朝向边跨端的底部分别设置L型限位杆34,所述限位杆34上端与底部纵梁31焊接,限位杆34下端延伸到轨道梁22的上翼缘板下方,L型限位杆下端起挂钩作用,当滑车提吊钢梁时,限位杆下端卡在轨道梁上翼缘板底面,能防止滑车侧翻。During the specific implementation of the present invention, the track beam 22 on the sliding support can adopt double I-beams, and the slide rail 23 is welded to the upper flange plate top surface of the track beam along the transverse bridge direction; since the jack is arranged on one side of the tackle, in order to prevent the jack from lifting the steel girder and the tackle rolls over due to uneven force, an L-shaped stop bar 34 can be respectively set at the bottom of each longitudinal beam of the tackle towards the side span end, and the upper end of the stop bar 34 is welded with the bottom longitudinal beam 31, and the lower end of the stop bar 34 Extending to below the upper flange plate of track beam 22, the lower end of the L-shaped stop bar plays the role of a hook. When the tackle lifts the steel beam, the lower end of the stop bar is stuck on the bottom surface of the upper flange plate of the track beam, which can prevent the tackle from rolling over.

进一步,如图5中所示,可在所述限位杆34延伸到轨道梁22上翼缘板下方的部位顶面设置导向轮35,当滑车沿导轨滑行时,导向轮35可沿轨道梁下翼缘板滑动,减小限位杆与轨道梁上翼缘板底面的摩擦力。Further, as shown in Figure 5, guide wheel 35 can be set on the top surface of the position where the limit rod 34 extends to the bottom of the upper flange plate of the track beam 22. When the tackle slides along the guide rail, the guide wheel 35 can slide along the lower flange plate of the track beam to reduce the friction between the limit bar and the bottom surface of the upper flange plate of the track beam.

(3)如图8及图9所示,并参见图2到图4,通过运梁车将跨中段钢梁101运至栈桥104上,两滑移支架上的顶推油缸牵引滑车3移动到栈桥上方,将两吊杆5下端分别与一片跨中段钢梁101两端连接,启动千斤顶4提升吊杆5,将钢梁101提升至高于落梁支架1,然后启动顶推油缸6推动滑车3沿滑轨移动到钢梁安装位置上方,再控制千斤顶将钢梁两端下落至两落梁支架1上,完成一片跨中段钢梁架设。(3) As shown in Fig. 8 and Fig. 9, and referring to Fig. 2 to Fig. 4, the mid-span steel girder 101 is transported to the trestle 104 by the girder truck, and the push cylinder traction block 3 on the two sliding supports is moved to the top of the trestle, the lower ends of the two suspenders 5 are respectively connected to the two ends of a piece of mid-span steel girder 101, the jack 4 is activated to lift the suspender 5, the steel girder 101 is lifted to be higher than the drop beam support 1, and then the push cylinder 6 is activated to push the block 3 to move to the steel girder along the slide rail. Above the installation position of the beam, control the jack to drop the two ends of the steel beam onto the two drop beam supports 1 to complete the erection of a steel beam in the middle section of the span.

(4)如图10所示,顶推油缸牵引滑车返回栈桥上方,重复步骤(3),将每片跨中段钢梁101依次提吊到落梁支架1上。(4) As shown in Figure 10, push the oil cylinder to pull the block back to the top of the trestle, repeat step (3), and lift each steel beam 101 in the middle of the span to the drop beam support 1 in turn.

(5)如图11所示,所有跨中段钢梁吊装到位后,拆除滑移支架上的滑车及滑轨,并去除滑移支架钢管桩21高于落梁支架钢管桩11的部分,在降低高度后的滑移支架钢管桩21上搭设承重梁,作为边跨段落梁支架,在两岸用汽车吊吊装边跨段钢梁102。(5) As shown in Figure 11, after all the mid-span steel beams are hoisted in place, remove the block and slide rail on the sliding support, and remove the part of the steel pipe pile 21 of the sliding support higher than the steel pipe pile 11 of the falling beam support, and set up a load-bearing beam on the steel pipe pile 21 of the sliding support after the height has been reduced, as the beam support of the side span section, and hoist the steel beam 102 of the side span section on both banks with a truck crane.

本发明具体实施时,所述滑移支架钢管桩21可采用整根钢管桩,在拆除滑移支架上的滑车及轨道梁后,可直接将滑移支架钢管桩高于落梁支架钢管桩的部分割除,在降低高度后的钢管桩桩搭设承重梁,用于架设边跨段钢梁。During the specific implementation of the present invention, the steel pipe pile 21 of the sliding support can adopt the whole steel pipe pile. After removing the pulley and track beam on the sliding support, the part of the steel pipe pile of the sliding support higher than the steel pipe pile of the falling beam support can be directly cut off, and the steel pipe pile after the height has been lowered can be erected with a load-bearing beam for erecting the steel beam of the side span section.

如图2中所示,为提高钢管桩的重复使用率,所述滑移支架钢管桩21也可采用组合结构,包括上下两个节段,下节段211的高度与落梁支架钢管桩11的高度相等,上节段212与下节段间通过法兰213连接,在拆除滑移支架上的滑车及轨道梁后,将每排滑移支架钢管桩的上节段拆下,在下节段上搭设承重梁,用于支撑边跨段钢梁架设。As shown in Figure 2, in order to improve the reuse rate of steel pipe piles, the sliding stent steel pipe pipe pile 21 can also use a combined structure, including the upper and lower segments. The height of the next section 211 is equal to the height of the steel pipe pipe pipe 11 in the lower beam bracket. The upper section of the steel pipe pipe pile of the migration rack is removed, and a load beam is set up in the next section to support the sideline sidelines.

Claims (5)

1.一种跨河钢结构桥钢梁侧位提升水平横移安装方法,所述钢结构桥的钢梁分为一个跨中段和两个边跨段,其特征在于,包括以下步骤:1. a steel girder side lifting horizontal sway installation method of a steel structure bridge across a river, the steel girder of the steel structure bridge is divided into a mid-span section and two side span sections, it is characterized in that, comprising the following steps: (1)在水中桥位一侧搭设栈桥,形成运梁通道;(1) Set up a trestle on one side of the bridge in the water to form a beam transportation channel; (2)在水中沿桥位搭设两组钢梁拼装支架,每组钢梁拼装支架分为落梁支架和滑移支架,包括3排横桥向设置的钢管桩,相邻钢管桩间通过平联和斜撑连接,其中较靠近跨中的一排钢管桩为落梁支架钢管桩,落梁支架钢管桩上搭设承重梁,形成所述落梁支架,落梁支架的高度与钢梁的拼装高度一致,较靠近岸边的一排钢管桩及中间一排钢管桩为滑移支架钢管桩,滑移支架钢管桩的高度高于落梁支架钢管桩的高度,两排滑移支架钢管桩上分别搭设轨道梁,轨道梁上铺设滑轨,形成所述滑移支架,滑移支架的轨道梁一端延伸到所述栈桥上方;(2) Set up two sets of steel girder assembly supports along the bridge in the water. Each set of steel girder assembly supports is divided into drop beam support and sliding support, including 3 rows of steel pipe piles arranged in the direction of the bridge. Sliding support steel pipe piles, the height of the sliding support steel pipe piles is higher than the height of the falling beam support steel pipe piles, track beams are respectively erected on the two rows of sliding support steel pipe piles, slide rails are laid on the track beams to form the sliding support, and one end of the track beam of the sliding support extends above the trestle; 每组钢梁拼装支架的滑移支架上分别设置一沿两滑轨滑行的滑车,每个滑车上竖向设置一穿心千斤顶,所述千斤顶穿设一吊杆;两滑轨上分别设置一顶推油缸,所述顶推油缸一端通过夹轨器与滑轨连接,另一端通过销轴与滑车连接;A tackle that slides along the two slide rails is respectively arranged on the sliding support of each group of steel beam assembly supports, and a center-through jack is vertically arranged on each tackle, and a suspender is installed on the jack; a jacking cylinder is respectively arranged on the two slide rails, and one end of the jacking cylinder is connected with the slide rail through a rail clamp, and the other end is connected with the tackle through a pin; (3)通过运梁车将跨中段钢梁运至栈桥上,两滑移支架上的顶推油缸牵引滑车移动到栈桥上方,将两吊杆下端分别与钢梁两端连接,启动千斤顶通过吊杆将钢梁提升至高于落梁支架,然后启动顶推油缸推动滑车沿滑轨移动到钢梁安装位置上方,再控制千斤顶将钢梁两端下落至两落梁支架上;(3) Transport the steel girder in the middle of the span to the trestle by the beam transporter, move the jacking cylinder traction block on the two sliding supports to the top of the trestle, connect the lower ends of the two suspenders to the two ends of the steel girder respectively, start the jack to lift the steel girder above the drop beam support through the suspender, then start the jacking cylinder to push the block to move along the slide rail to the top of the steel beam installation position, and then control the jack to drop the two ends of the steel beam to the two drop beam supports; (4)顶推油缸牵引滑车返回栈桥上方,重复步骤(3),将跨中段每片钢梁提吊到落梁支架上;(4) Push the oil cylinder traction block back to the top of the trestle, repeat step (3), and lift each steel beam in the middle section of the span to the drop beam support; (5)拆除滑移支架上的滑车及滑轨,并去除滑移支架钢管桩高于落梁支架的部分,在降低高度后的滑移支架钢管桩上搭设承重梁,作为边跨段钢梁落梁支架,在两岸用汽车吊吊装边跨段钢梁。(5) Remove the trolley and slide rail on the sliding support, and remove the part of the steel pipe pile of the sliding support that is higher than the falling beam support, and set up a load-bearing beam on the steel pipe pile of the sliding support after the height has been lowered, as the falling beam support of the steel beam of the side span section, and hoist the steel beam of the side span section with a truck crane on both sides of the bank. 2.根据权利要求1所述的跨河钢结构桥钢梁侧位提升水平横移安装方法,其特征在于:所述滑车包括两个顺桥向设置的纵梁,每根纵梁底部设两个分别沿两滑轨滑行的滑轮,两纵梁上焊接两横梁,所述千斤顶设置在较靠近跨中的横梁上。2. The installation method for laterally lifting and horizontally moving steel girders of cross-river steel structure bridges according to claim 1, characterized in that: the pulley includes two longitudinal girders arranged along the bridge direction, two pulleys respectively sliding along two slide rails are arranged at the bottom of each longitudinal girder, two cross girders are welded on the two girders, and the jack is arranged on the cross girder closer to the mid-span. 3.根据权利要求2所述的跨河钢结构桥钢梁侧位提升水平横移安装方法,其特征在于:所述滑移支架上的轨道梁采用双拼工字钢,所述滑轨沿横桥向焊接在轨道梁上翼缘板顶面;滑车的每根纵梁朝向边跨端的底部分别设有L型限位杆,所述限位杆上端与底部纵梁焊接,限位杆下端延伸到轨道梁的上翼缘板下方。3. The installation method of cross-river steel structure bridge steel girder according to claim 2, wherein the side elevation and horizontal movement of the steel girder is characterized in that: the track beam on the sliding support adopts double I-beams, and the slide rail is welded to the top surface of the upper flange plate of the track beam along the transverse bridge direction; each longitudinal beam of the tackle is respectively provided with an L-shaped stop bar at the bottom of the side span end, the upper end of the stop bar is welded to the bottom longitudinal beam, and the lower end of the stop bar extends below the upper flange plate of the track beam. 4.根据权利要求3所述的跨河钢结构桥钢梁侧位提升水平横移安装方法,其特征在于:所述限位杆延伸到轨道梁上翼缘板下方的部位顶面设有导向轮。4. The installation method for side elevation and horizontal movement of steel girders of steel structure bridges across rivers according to claim 3, characterized in that guide wheels are provided on the top surface of the position where the limit rod extends below the upper flange plate of the track beam. 5.根据权利要求1所述的跨河钢结构桥钢梁侧位提升水平横移安装方法,其特征在于:所述滑移支架钢管桩包括上下两个节段,下节段的高度与落梁支架钢管桩的高度相等,上节段与下节段间通过法兰连接;完成所有跨中段钢梁吊装后,拆除滑移支架上的滑车及滑轨,将每排滑移支架钢管桩的上节段拆下,在下节段上搭设承重梁,用于支撑边跨段钢梁。5. The installation method according to claim 1, wherein the steel girder of a cross-river steel structure bridge is lifted horizontally and horizontally, wherein the steel pipe pile of the sliding support includes two sections, the upper and lower sections, the height of the lower section is equal to the height of the steel pipe pile of the falling beam support, and the upper section and the lower section are connected by flanges; after the hoisting of all steel beams in the middle section of the span is completed, the pulley and the slide rail on the sliding support are removed, and the upper section of the steel pipe pile of each row of sliding support is removed, and a load-bearing beam is set up on the lower section to support the side span section steel beams.
CN202310674062.XA 2023-06-08 2023-06-08 A method for lateral lifting and horizontal lateral movement installation of steel beams for cross-river steel structure bridges Active CN116479782B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310674062.XA CN116479782B (en) 2023-06-08 2023-06-08 A method for lateral lifting and horizontal lateral movement installation of steel beams for cross-river steel structure bridges

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310674062.XA CN116479782B (en) 2023-06-08 2023-06-08 A method for lateral lifting and horizontal lateral movement installation of steel beams for cross-river steel structure bridges

Publications (2)

Publication Number Publication Date
CN116479782A true CN116479782A (en) 2023-07-25
CN116479782B CN116479782B (en) 2026-01-30

Family

ID=87215918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310674062.XA Active CN116479782B (en) 2023-06-08 2023-06-08 A method for lateral lifting and horizontal lateral movement installation of steel beams for cross-river steel structure bridges

Country Status (1)

Country Link
CN (1) CN116479782B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118065260A (en) * 2024-02-26 2024-05-24 中铁十九局集团有限公司 Sliding and pushing system for lifting trestle with large span navigation hole

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1837485A (en) * 2006-04-19 2006-09-27 中国建筑第二工程局 Space-precasting translation-emplacing method for bridge construction
KR101005111B1 (en) * 2010-07-15 2010-12-30 (주)동명기술공단종합건축사사무소 Girder installation device and girder installation method using the same
CN106192755A (en) * 2015-04-29 2016-12-07 江苏沪宁钢机股份有限公司 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN115652815A (en) * 2022-10-30 2023-01-31 安徽省公路桥梁工程有限公司 The construction method of the whole section of steel box girder sliding in place through the short support
CN115710864A (en) * 2022-11-29 2023-02-24 石家庄铁道大学 Construction method for erecting continuous steel truss girder on water

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1837485A (en) * 2006-04-19 2006-09-27 中国建筑第二工程局 Space-precasting translation-emplacing method for bridge construction
KR101005111B1 (en) * 2010-07-15 2010-12-30 (주)동명기술공단종합건축사사무소 Girder installation device and girder installation method using the same
CN106192755A (en) * 2015-04-29 2016-12-07 江苏沪宁钢机股份有限公司 A kind of fish-bellied type shaped form cross a river double width steel box-girder steel bridge construction method of installation
CN115652815A (en) * 2022-10-30 2023-01-31 安徽省公路桥梁工程有限公司 The construction method of the whole section of steel box girder sliding in place through the short support
CN115710864A (en) * 2022-11-29 2023-02-24 石家庄铁道大学 Construction method for erecting continuous steel truss girder on water

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118065260A (en) * 2024-02-26 2024-05-24 中铁十九局集团有限公司 Sliding and pushing system for lifting trestle with large span navigation hole

Also Published As

Publication number Publication date
CN116479782B (en) 2026-01-30

Similar Documents

Publication Publication Date Title
CN113026563B (en) Suspension bridge high-low displacement girder trestle girder hoisting facility and construction method thereof
CN109958066A (en) Steel box girder jacking construction limit guide device and limit construction method
CN111851313A (en) Integrated machine for piling and bridging construction and its construction method
CN101736703B (en) 3000t special bridge girder erection machine for integrally erecting 120m-span double-layer four-line steel beam bridge for highway and railway
CN110344334B (en) Construction method of two-span continuous steel-concrete composite bridge using back-cable bridge erecting machine
CN110258352A (en) Construction method of steel-concrete composite bridge with two spans
CN216474531U (en) Water steel box girder lifting, sliding and installing system with existing bridge penetrating downwards
CN115182265A (en) Integrated bridge girder erection machine used under working condition of dry splicing segment bent cap and construction method
CN117328355B (en) Large-span upper-bearing arch bridge girder hoisting construction method
CN208009277U (en) A kind of short sliding installation system of land-based area large-tonnage steel box beam
CN113774813A (en) Traction deviation rectifying equipment convenient for installing large-section steel truss box girder
CN113279335A (en) Device and method for mounting large-tonnage and wide-width steel box girder across mountain ridge
CN112144401B (en) Bridge girder erection machine over-span method based on curve track and large longitudinal slope environment
CN116479782B (en) A method for lateral lifting and horizontal lateral movement installation of steel beams for cross-river steel structure bridges
CN108004930A (en) The construction method of vertical shift bowstring arch bridge
CN106400700A (en) Double-line cantilever type bridge formation machine
CN216892057U (en) Large-span steel-concrete composite beam bridge steel box girder section floats and holds in palm top and pushes away construction system
CN102041781A (en) Enclosed lake beam type steel bridge installation method based on portal crane
CN111851314A (en) A kind of steel cushion beam lifting equipment and using method thereof
CN219157437U (en) Railway bridge old-moving and new-changing section-by-section transverse traction device
CN119195004A (en) A prefabricated box girder installation construction structure and construction method under low clearance high-voltage line
CN112030777A (en) A down-type mobile formwork support bracket spanning transfer construction method
CN219384698U (en) Novel movable operation platform for bridge reinforcement and maintenance
CN214831989U (en) Device for mounting large-tonnage and wide-width steel box girder across mountain ridge
CN116062436A (en) A method for lateral movement of a mobile pedestal between high and low orbits

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant