CN116479776A - Suspended formwork support and construction method for concrete rigid frame bridge in water area - Google Patents
Suspended formwork support and construction method for concrete rigid frame bridge in water area Download PDFInfo
- Publication number
- CN116479776A CN116479776A CN202310528625.4A CN202310528625A CN116479776A CN 116479776 A CN116479776 A CN 116479776A CN 202310528625 A CN202310528625 A CN 202310528625A CN 116479776 A CN116479776 A CN 116479776A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- box girder
- pipe column
- suspension
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本发明涉及桥梁工程建设技术领域,尤其涉及一种水域混凝土刚构桥悬吊式模板支架及其施工方法。The invention relates to the technical field of bridge engineering construction, in particular to a suspended formwork support for a concrete rigid frame bridge in a water area and a construction method thereof.
背景技术Background technique
混凝土刚构桥是上部桥跨结构和墩台整体刚性连接的一种桥梁结构形式。由于混凝土刚构桥无需设置支座,因此无需考虑水位变动、潮汐、浪溅等对支座造成的影响,在水位较高的海域桥梁、公园亲水栈道等结构中经常采用小跨径的混凝土刚构桥结构形式。常规的水域混凝土刚构桥上部结构施工通常采用的做法是打设钢管桩,搭设贝雷梁支架及型钢分配梁作为上部结构的底模及浇筑平台,但这种做法存在如下技术问题:Concrete rigid frame bridge is a form of bridge structure in which the upper span structure and the piers are rigidly connected as a whole. Since concrete rigid-frame bridges do not need supports, there is no need to consider the impact of water level changes, tides, and wave splashes on the supports. Small-span concrete rigid-frame bridge structures are often used in structures such as bridges in sea areas with high water levels and hydrophilic planks in parks. Conventional water area concrete rigid frame bridge superstructure construction usually adopts the method of laying steel pipe piles, erecting Bailey beam brackets and steel distribution beams as the bottom formwork and pouring platform of the superstructure, but this method has the following technical problems:
1.钢管桩打设、贝雷梁架设及拆除过程繁琐,施工不方便且施工工期长;1. The installation of steel pipe piles, the erection and removal of Bailey beams are cumbersome, and the construction is inconvenient and the construction period is long;
2.箱梁浇筑完后,支架拆除困难且极易损坏,模板周转利用率低;2. After the box girder is poured, it is difficult to remove the support and is easily damaged, and the turnover rate of the formwork is low;
3.打设钢管桩并搭设贝雷梁支架用钢量大,且箱梁浇筑完后箱梁正下方的钢管桩无法拔出,只能割除水上部分,造成材料的浪费,经济性差。3. A large amount of steel is used to set up the steel pipe piles and erect the Bailey beam support, and the steel pipe piles directly below the box girder cannot be pulled out after the box girder is poured, and only the part above the water can only be cut off, resulting in waste of materials and poor economic efficiency.
4.结构安拆现场焊接量较大,工人施工危险性较高。4. There is a large amount of welding on site for structural installation and dismantling, and workers are more dangerous in construction.
针对现有方法存在的上述不足,亟需提出有效的解决方案。In view of the above-mentioned shortcomings existing in the existing methods, it is urgent to propose effective solutions.
发明内容Contents of the invention
本发明旨在解决现有技术的不足,而提供一种水域混凝土刚构桥悬吊式模板支架及其施工方法。The invention aims to solve the deficiencies of the prior art, and provides a suspended formwork support for a concrete rigid frame bridge in a water area and a construction method thereof.
本发明为实现上述目的,采用以下技术方案:一种水域混凝土刚构桥悬吊式模板支架,包括若干钢管柱,钢管柱设于桥梁墩柱顶部,桥梁墩柱顶部设有现浇箱梁,现浇箱梁底部设有箱梁底模,箱梁底模顶部两端设有压重块,压重块位于现浇箱梁左右两侧,箱梁底模底部设有若干悬吊架,悬吊架顶部前后两端连接有护栏,护栏位于现浇箱梁前后两侧,钢管柱和悬吊架通过拉索连接,前后侧相邻的钢管柱之间连接有横向支撑。In order to achieve the above object, the present invention adopts the following technical solutions: a suspended formwork support for a concrete rigid frame bridge in a water area, including several steel pipe columns, the steel pipe columns are arranged on the top of the bridge pier column, the top of the bridge pier column is provided with a cast-in-place box girder, the bottom of the cast-in-place box girder is provided with a bottom mold of the box girder, the top two ends of the bottom mold of the box girder are provided with weight blocks, the weight blocks are located on the left and right sides of the cast-in-place box girder, the bottom of the box girder bottom formwork is provided with several suspension frames, and the front and rear ends of the top of the suspension frame are connected with guardrails. The steel pipe columns adjacent to the front and rear sides are connected by horizontal supports.
进一步的,钢管柱包括第一钢管柱,第一钢管柱设于现浇箱梁内部,第一钢管柱与现浇箱梁高度一致,第一钢管柱和桥梁墩柱通过预埋件连接,第一钢管柱顶部连接有第二钢管柱,第一钢管柱和第二钢管柱通过法兰连接;第二钢管柱上部左右两侧连接有若干第一耳板,钢管柱和拉索通过第一耳板连接;第二钢管柱上部前后两侧均连接有两个第二耳板,第二钢管柱和横向支撑通过第二耳板连接。Further, the steel pipe column includes a first steel pipe column, the first steel pipe column is arranged inside the cast-in-situ box girder, the height of the first steel pipe column is the same as that of the cast-in-situ box girder, the first steel pipe column and the bridge pier column are connected through embedded parts, the top of the first steel pipe column is connected with a second steel pipe column, and the first steel pipe column and the second steel pipe column are connected through flanges; the upper left and right sides of the second steel pipe column are connected with a plurality of first ear plates, and the steel pipe column and the cables are connected through the first ear plate;
进一步的,悬吊架包括若干横梁,横梁顶部连接有吊耳,悬吊架和拉索通过吊耳连接,相邻横梁之间连接有若干纵梁,横梁和纵梁之间连接与斜杆,靠近桥梁墩柱的横梁通过抱箍与桥梁墩柱连接,抱箍与桥梁墩柱之间设有橡胶垫,外侧的纵梁通过第一连接臂和第二连接臂连接,第一连接臂和第二连接臂分别通过连接法兰连接,第一连接臂位置与桥梁墩柱对应。Further, the suspension frame includes several beams, the top of the beams is connected with lifting lugs, the suspension frame and the cables are connected through the lifting lugs, a number of longitudinal beams are connected between adjacent beams, the beams and the longitudinal beams are connected with oblique rods, the beams close to the bridge pier columns are connected to the bridge pier columns through hoops, rubber pads are arranged between the hoops and the bridge pier columns, the outer longitudinal beams are connected through the first connecting arm and the second connecting arm, the first connecting arm and the second connecting arm are respectively connected through connecting flanges, and the position of the first connecting arm corresponds to the bridge pier column.
进一步的,拉索下部外侧穿设有套管,套管位于现浇箱梁内部。Further, a casing is pierced outside the lower part of the cable, and the casing is located inside the cast-in-place box girder.
进一步的,横向支撑包括两个水平撑,两个水平撑之间连接有剪刀撑,水平撑与剪刀撑均与第二耳板连接。Further, the lateral support includes two horizontal braces, a scissor brace is connected between the two horizontal braces, and both the horizontal brace and the scissor brace are connected to the second ear plate.
进一步的,现浇箱梁内部上下两侧均设有若干箱梁横向主筋和若干箱梁纵向主筋,现浇箱梁被第一钢管柱截断的箱梁横向主筋和箱梁纵向主筋末端与第一钢管柱焊接连接,第一钢管柱内部以及套管内部设有后浇混凝土。Further, several box girder transverse main reinforcements and several box girder longitudinal main reinforcements are arranged on the upper and lower sides of the cast-in-place box girder, the end of the box girder transverse main reinforcement and the box girder longitudinal main reinforcement cut off by the first steel pipe column of the cast-in-place box girder are welded and connected to the first steel pipe column, and post-cast concrete is provided inside the first steel pipe column and inside the casing.
进一步的,悬吊架为桁架结构,悬吊架纵向长度为单跨跨径的二分之一,横向宽度大于现浇箱梁宽度。Further, the suspension frame is a truss structure, the vertical length of the suspension frame is half of the span of a single span, and the transverse width is greater than the width of the cast-in-place box girder.
进一步的,横梁为沿桥梁横向设置的闭口箱型钢结构梁,纵梁为沿桥梁纵向设置的闭口箱型钢结构梁,抱箍为凹型钢结构,凹面与桥梁墩柱直径相同。Further, the beam is a closed box-shaped steel structure beam arranged along the transverse direction of the bridge, the longitudinal beam is a closed box-shaped steel structure beam arranged along the longitudinal direction of the bridge, the hoop is a concave-shaped steel structure, and the concave surface is the same as the diameter of the bridge pier column.
进一步的,横梁及纵梁所产生的浮力大于结构自身重量,悬吊架拆除后可浮于水面。Furthermore, the buoyancy generated by the beams and longitudinal beams is greater than the weight of the structure itself, so it can float on the water surface after the suspension frame is removed.
一种水域混凝土刚构桥悬吊式模板支架的施工方法,包括以下步骤:A construction method for a suspended formwork support of a concrete rigid frame bridge in a water area, comprising the following steps:
S1.搭设栈桥及平台,施工桥梁桩基、桥梁墩柱,浇筑桥梁墩柱时在其顶面提前预埋连接第一钢管柱的预埋件,预埋件设置在墩柱主筋内部;S1. Set up trestles and platforms, construct bridge pile foundations and bridge pier columns, and pre-embed the embedded parts connecting the first steel pipe column on the top surface of the bridge pier columns when pouring them, and the embedded parts are arranged inside the main reinforcement of the pier columns;
S2.在工厂提前预制好钢管柱、悬吊架、拉索、横向支撑、压重块、箱梁底模,并运至现场;S2. Prefabricate steel pipe columns, suspension frames, cables, lateral supports, weight blocks, and box girder bottom molds in advance in the factory, and transport them to the site;
S3.依次安装第一钢管柱、第二钢管柱以及横向支撑;S3. Installing the first steel pipe column, the second steel pipe column and the lateral support in sequence;
S4.安装悬吊架以及拉索,形成稳定的悬吊结构,悬吊架通过抱箍与桥梁墩柱顶紧,拉索安装时在穿过现浇箱梁部分提前安装套管;S4. Install the suspension frame and the cable to form a stable suspension structure. The suspension frame is tightened with the bridge pier column through the hoop. When the cable is installed, install the casing in advance when passing through the cast-in-place box girder;
S5.连接第一连接臂以及第二连接臂,使整联混凝土刚构桥悬吊架形成整体,在悬吊架外侧设置护栏并在悬吊架上安装箱梁底模;S5. Connect the first connecting arm and the second connecting arm, so that the suspension frame of the integrated concrete rigid frame bridge forms a whole, set a guardrail outside the suspension frame and install a box girder bottom form on the suspension frame;
S6.在箱梁底模平台上绑扎钢筋,对于被第一钢管柱截断的箱梁横向主筋以及箱梁纵向主筋,将钢筋末端弯钩与第一钢管柱外壁焊接;S6. Bind the reinforcing bars on the bottom formwork platform of the box girder, and weld the end hooks of the reinforcing bars to the outer wall of the first steel tube column for the transverse main bars of the box girder and the longitudinal main bars of the box girder cut off by the first steel tube column;
S7.浇筑现浇箱梁混凝土,浇筑时同步均匀的在两端悬吊架增加压重块;S7. Pouring the cast-in-place box girder concrete, adding weight blocks to the suspension frames at both ends synchronously and evenly during pouring;
S8.待现浇箱梁混凝土达到设计强度后,卸载压重块,解除第一连接臂以及第二连接臂之间的连接;S8. After the concrete of the cast-in-place box girder reaches the design strength, unload the ballast, and release the connection between the first connecting arm and the second connecting arm;
S9.依次解除每个悬吊架的拉索与第一耳板间的连接,将悬吊架整体下放直至浮于水面,再将悬吊架从桥梁侧面沿水面拖出;S9. Release the connection between the drag cables of each suspension frame and the first ear plate in turn, lower the suspension frame as a whole until it floats on the water surface, and then drag the suspension frame out from the side of the bridge along the water surface;
S10.拆除第二钢管柱及横向支撑,浇筑第一钢管柱内部以及套管内部后浇混凝土;S10. Remove the second steel pipe column and the lateral support, pour concrete inside the first steel pipe column and inside the casing;
S11.施工桥面铺装及附属设施,完成一联混凝土刚构桥施工;S11. Construction bridge deck pavement and ancillary facilities, complete the construction of a concrete rigid frame bridge;
S12.将拆除的钢管柱、悬吊架、拉索、横向支撑、箱梁底模安装到第二联混凝土刚构桥,重复以上步骤,进行下一联混凝土刚构桥施工。S12. Install the dismantled steel pipe column, suspension frame, stay cable, lateral support, and box girder bottom formwork to the second concrete rigid frame bridge, repeat the above steps, and proceed to the construction of the next concrete rigid frame bridge.
本发明的有益效果是:本发明结构结构简单,无需打设钢管桩或其他复杂结构,安拆方便快捷,构件间均采用铰接或螺栓连接方式,现场焊接量小,水面作业少,施工周期短,工人施工安全性高;支架为悬吊式结构,用钢量小,且除第一钢管柱以外,其余部分均可重复利用,不影响悬臂下方道路的交通通行;适用性广,支架周转利用率高,经济性好。The beneficial effects of the present invention are: the structure of the present invention is simple, no steel pipe piles or other complicated structures are required, the installation and disassembly are convenient and fast, the components are all connected by hinges or bolts, the amount of welding on site is small, the water surface operations are less, the construction period is short, and the construction safety of workers is high;
附图说明Description of drawings
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为本发明的断面图;Fig. 2 is a sectional view of the present invention;
图3为本发明中悬吊架的平面图;Fig. 3 is the plan view of suspension frame among the present invention;
图4为本发明中钢管柱的结构示意图;Fig. 4 is the structural representation of steel pipe column in the present invention;
图5为本发明中钢管柱、桥梁墩柱和现浇箱梁的纵向连接图;Fig. 5 is the longitudinal connection diagram of steel pipe column, bridge pier column and cast-in-place box girder among the present invention;
图6为本发明中钢管柱、桥梁墩柱和现浇箱梁的横向连接图;Fig. 6 is the horizontal connection diagram of steel pipe column, bridge pier column and cast-in-place box girder in the present invention;
图中:11-钢管柱;111-第一钢管柱;112-第二钢管柱;1121-第一耳板;1122-第二耳板;113-预埋件;114-法兰;12-悬吊架;121-横梁;1211-吊耳;122-纵梁;123-斜杆;124-抱箍;125-橡胶垫;126-第一连接臂;127-第二连接臂;13-拉索;14-横向支撑;141-水平撑;142-剪刀撑;15-压重块;16-箱梁底模;17-桥梁墩柱;171-墩柱主筋;18-现浇箱梁;181-后浇混凝土;182-箱梁横向主筋;183-箱梁纵向主筋;19-水面;20-护栏;In the figure: 11-steel pipe column; 111-first steel pipe column; 112-second steel pipe column; 1121-first ear plate; 1122-second ear plate; 113-embedded parts; 114-flange; ;13-cable; 14-horizontal support; 141-horizontal support; 142-scissors support; 15-weight block; 16-bottom formwork of box girder;
以下将结合本发明的实施例参照附图进行详细叙述。The following will be described in detail in conjunction with the embodiments of the present invention with reference to the accompanying drawings.
具体实施方式Detailed ways
下面结合实施例对本发明作进一步说明:The present invention will be further described below in conjunction with embodiment:
如图1~图6所示,一种水域混凝土刚构桥悬吊式模板支架,包括包括若干钢管柱11,钢管柱11设于桥梁墩柱17顶部,桥梁墩柱17顶部设有现浇箱梁18,现浇箱梁18底部设有箱梁底模16,箱梁底模16顶部两端设有压重块15,压重块15位于现浇箱梁18左右两侧,箱梁底模16底部设有若干悬吊架12,悬吊架12顶部前后两端连接有护栏20,护栏20位于现浇箱梁18前后两侧,钢管柱11和悬吊架12通过拉索13连接,前后侧相邻的钢管柱11之间连接有横向支撑14。钢管柱11包括第一钢管柱111,第一钢管柱111设于现浇箱梁18内部,第一钢管柱111浇筑在现浇箱梁18内部后不再拆除。第一钢管柱111与现浇箱梁18高度一致,第一钢管柱111和桥梁墩柱17通过预埋件113连接,第一钢管柱111顶部连接有第二钢管柱112,第二钢管柱112在现浇箱梁18浇筑完成后可拆除重复利用。第一钢管柱111和第二钢管柱112通过法兰114连接;第二钢管柱112上部左右两侧连接有若干第一耳板1121,钢管柱11和拉索13通过第一耳板1121连接;第二钢管柱112上部前后两侧均连接有两个第二耳板1122,第二钢管柱112和横向支撑14通过第二耳板1122连接。As shown in Figures 1 to 6, a suspended formwork support for a concrete rigid frame bridge in a water area includes several steel pipe columns 11. The steel pipe columns 11 are arranged at the top of the bridge pier column 17, and the top of the bridge pier column 17 is provided with a cast-in-place box girder 18. Both ends are connected with guardrails 20, guardrails 20 are located at the front and rear sides of cast-in-place box girder 18, steel pipe columns 11 and suspension frames 12 are connected by cables 13, and transverse supports 14 are connected between adjacent steel pipe columns 11 at the front and rear sides. The steel pipe column 11 includes a first steel pipe column 111 arranged inside the cast-in-place box girder 18 . The first steel pipe column 111 has the same height as the cast-in-place box girder 18. The first steel pipe column 111 and the bridge pier column 17 are connected by embedded parts 113. The top of the first steel pipe column 111 is connected to the second steel pipe column 112. The second steel pipe column 112 can be dismantled and reused after the cast-in-place box girder 18 is poured. The first steel pipe column 111 and the second steel pipe column 112 are connected by a flange 114; the upper left and right sides of the second steel pipe column 112 are connected with a plurality of first ear plates 1121, and the steel pipe column 11 and the cable 13 are connected through the first ear plates 1121;
悬吊架12包括若干横梁121,横梁121数量应根据现浇箱梁18跨径以及荷载大小确定且不少于两个,横梁121顶部连接有吊耳1211,悬吊架12和拉索13通过吊耳1211连接,相邻横梁121之间连接有若干纵梁122,纵梁122数量应根据现浇箱梁18宽度以及荷载大小确定,横梁121和纵梁122之间连接与斜杆123,以增强悬吊架12的整体稳定性。靠近桥梁墩柱17的横梁121通过抱箍124与桥梁墩柱17连接,抱箍124与桥梁墩柱17之间设有橡胶垫125,外侧的纵梁12通过第一连接臂126和第二连接臂127连接,第一连接臂126和第二连接臂127分别通过连接法兰连接,第一连接臂126位置与桥梁墩柱17对应。悬吊架12为桁架结构,悬吊架12纵向长度为单跨跨径的二分之一,横向宽度大于现浇箱梁18宽度。横梁121为沿桥梁横向设置的闭口箱型钢结构梁,纵梁122为沿桥梁纵向设置的闭口箱型钢结构梁,抱箍124为凹型钢结构,凹面与桥梁墩柱17直径相同。横梁121及纵梁122所产生的浮力大于结构自身重量,悬吊架12拆除后可浮于水面19。悬吊架12用于承受箱梁底模16以及现浇箱梁18浇筑时的所有荷载。Suspension frame 12 includes several crossbeams 121, the number of crossbeams 121 should be determined according to the span of cast-in-place box girder 18 and the load size and not less than two, the top of crossbeam 121 is connected with lifting lug 1211, suspension frame 12 and drag cable 13 are connected through lifting lug 1211, there are several longitudinal beams 122 connected between adjacent crossbeams 121, the number of longitudinal beams 122 should be determined according to the width of cast-in-place box girder 18 and the load size, crossbeam 121 and longitudinal beam 122 It is connected with the diagonal rod 123 to enhance the overall stability of the suspension frame 12 . The crossbeam 121 close to the bridge pier 17 is connected to the bridge pier 17 through a hoop 124. A rubber pad 125 is provided between the hoop 124 and the bridge pier 17. The outer longitudinal beam 12 is connected through a first connecting arm 126 and a second connecting arm 127. The first connecting arm 126 and the second connecting arm 127 are respectively connected by connecting flanges. The position of the first connecting arm 126 corresponds to the bridge pier 17. The suspension frame 12 is a truss structure, the longitudinal length of the suspension frame 12 is 1/2 of the span of a single span, and the transverse width is greater than the width of the cast-in-place box girder 18 . The crossbeam 121 is a closed box-shaped steel structure beam arranged laterally along the bridge, the longitudinal beam 122 is a closed box-shaped steel structure beam arranged longitudinally along the bridge, and the hoop 124 is a concave steel structure, and the concave surface is the same diameter as the bridge pier column 17. The buoyancy force produced by the beam 121 and the longitudinal beam 122 is greater than the weight of the structure itself, and the suspension frame 12 can float on the water surface 19 after being removed. The hanger 12 is used to bear all the loads when the box girder bottom form 16 and the cast-in-place box girder 18 are poured.
拉索13下部外侧穿设有套管131,套管131位于现浇箱梁18内部,套管131避免拉索13与现浇箱梁18浇筑在一起而无法拆除。拉索13将悬吊架12上的荷载有效的传递至钢管柱11上。横向支撑14包括两个水平撑141,两个水平撑141之间连接有剪刀撑142,水平撑141与剪刀撑142均与第二耳板1122连接,横向支撑14增强钢管柱11横向的整体稳定性。现浇箱梁18内部上下两侧均设有若干箱梁横向主筋182和若干箱梁纵向主筋183,现浇箱梁18被第一钢管柱111截断的箱梁横向主筋182和箱梁纵向主筋183末端与第一钢管柱111焊接连接,第一钢管柱111内部以及套管131内部设有后浇混凝土181。The outer side of the lower part of the drag cable 13 is pierced with a casing 131 , and the casing 131 is located inside the cast-in-place box girder 18 . The stay cable 13 effectively transmits the load on the suspension frame 12 to the steel pipe column 11 . The lateral support 14 includes two horizontal supports 141, and a scissors support 142 is connected between the two horizontal supports 141. The horizontal support 141 and the scissors support 142 are both connected to the second lug plate 1122. The lateral support 14 enhances the overall stability of the steel pipe column 11 in the lateral direction. The upper and lower sides of the cast-in-place box girder 18 are provided with several transverse main ribs 182 and longitudinal main ribs 183 of the box girder. The ends of the transverse main ribs 182 and longitudinal main ribs 183 of the cast-in-place box girder 18 cut off by the first steel pipe column 111 are welded and connected to the first steel pipe column 111 . Post-cast concrete 181 is provided inside the first steel pipe column 111 and inside the casing 131 .
一种水域混凝土刚构桥悬吊式模板支架的施工方法,包括以下步骤:A construction method for a suspended formwork support of a concrete rigid frame bridge in a water area, comprising the following steps:
S1.搭设栈桥及平台,施工桥梁桩基、桥梁墩柱17,浇筑桥梁墩柱17时在其顶面提前预埋连接第一钢管柱111的预埋件113,预埋件113设置在墩柱主筋171内部;S1. Set up trestles and platforms, construct bridge pile foundations and bridge pier columns 17, pre-embed the embedded parts 113 connected to the first steel pipe column 111 on the top surface of the bridge pier columns 17 when pouring them, and the embedded parts 113 are arranged inside the main ribs 171 of the pier columns;
S2.在工厂提前预制好钢管柱11、悬吊架12、拉索13、横向支撑14、压重块15、箱梁底模16,并运至现场;S2. Steel pipe column 11, suspension frame 12, cable 13, lateral support 14, weight block 15, box girder bottom form 16 are prefabricated in the factory in advance, and transported to the site;
S3.依次安装第一钢管柱111、第二钢管柱112以及横向支撑14;S3. Install the first steel pipe column 111, the second steel pipe column 112 and the lateral support 14 in sequence;
S4.安装悬吊架12以及拉索13,形成稳定的悬吊结构,悬吊架12通过抱箍124与桥梁墩柱17顶紧,拉索13安装时在穿过现浇箱梁18部分提前安装套管131;S4. Install the suspension frame 12 and the dragline 13 to form a stable suspension structure. The suspension frame 12 is tightened with the bridge pier column 17 through the hoop 124. When the dragline 13 is installed, the casing 131 is installed in advance through the cast-in-place box girder 18 part;
S5.连接第一连接臂126以及第二连接臂127,使整联混凝土刚构桥悬吊架12形成整体,在悬吊架12外侧设置护栏20并在悬吊架12上安装箱梁底模16;S5. Connect the first connecting arm 126 and the second connecting arm 127, so that the suspension frame 12 of the integrated concrete rigid frame bridge is formed as a whole, and the guardrail 20 is set on the outside of the suspension frame 12 and the box girder bottom form 16 is installed on the suspension frame 12;
S6.在箱梁底模16平台上绑扎钢筋,对于被第一钢管柱111截断的箱梁横向主筋182以及箱梁纵向主筋183,将钢筋末端弯钩与第一钢管柱111外壁焊接;S6. Bind the reinforcing bars on the bottom formwork 16 platform of the box girder. For the transverse main bars 182 of the box girder and the longitudinal main bars 183 of the box girder cut off by the first steel tube column 111, the end crotch of the reinforcing bar is welded to the outer wall of the first steel tube column 111;
S7.浇筑现浇箱梁18混凝土,浇筑时同步均匀的在两端悬吊架12增加压重块15;S7. Pouring the concrete of the cast-in-place box girder 18, and adding the ballast 15 to the suspension frames 12 at both ends synchronously and evenly during pouring;
S8.待现浇箱梁18混凝土达到设计强度后,卸载压重块15,解除第一连接臂126以及第二连接臂127之间的连接;S8. After the concrete of the cast-in-place box girder 18 reaches the design strength, the ballast 15 is unloaded, and the connection between the first connecting arm 126 and the second connecting arm 127 is released;
S9.依次解除每个悬吊架12的拉索13与第一耳板间1121的连接,将悬吊架12整体下放直至浮于水面19,再将悬吊架12从桥梁侧面沿水面19拖出;S9. Release the connection between the stay cables 13 of each suspension frame 12 and the first ear plate 1121 in turn, lower the suspension frame 12 as a whole until it floats on the water surface 19, and then drag the suspension frame 12 out from the side of the bridge along the water surface 19;
S10.拆除第二钢管柱112及横向支撑14,浇筑第一钢管柱111内部以及套管131内部后浇混凝土181;S10. Remove the second steel pipe column 112 and the lateral support 14, pour concrete 181 inside the first steel pipe column 111 and inside the casing 131;
S11.施工桥面铺装及附属设施,完成一联混凝土刚构桥施工;S11. Construction bridge deck pavement and ancillary facilities, complete the construction of a concrete rigid frame bridge;
S12.将拆除的钢管柱11、悬吊架12、拉索13、横向支撑14、箱梁底模16安装到第二联混凝土刚构桥,重复以上步骤,进行下一联混凝土刚构桥施工。S12. Install the dismantled steel pipe columns 11, suspension frames 12, cables 13, lateral supports 14, and box girder bottom formwork 16 to the second concrete rigid frame bridge, repeat the above steps, and proceed to the construction of the next concrete rigid frame bridge.
上面对本发明进行了示例性描述,显然本发明具体实现并不受上述方式的限制,只要采用了本发明的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本发明的保护范围之内。The present invention has been exemplarily described above, and it is obvious that the specific implementation of the present invention is not limited by the above-mentioned method, as long as various improvements of the method concept and technical solutions of the present invention are adopted, or directly applied to other occasions without improvement, all within the protection scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310528625.4A CN116479776B (en) | 2023-05-11 | 2023-05-11 | Suspension type formwork support for water area concrete rigid frame bridge and construction method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310528625.4A CN116479776B (en) | 2023-05-11 | 2023-05-11 | Suspension type formwork support for water area concrete rigid frame bridge and construction method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116479776A true CN116479776A (en) | 2023-07-25 |
| CN116479776B CN116479776B (en) | 2026-01-23 |
Family
ID=87219521
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310528625.4A Active CN116479776B (en) | 2023-05-11 | 2023-05-11 | Suspension type formwork support for water area concrete rigid frame bridge and construction method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116479776B (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117230731A (en) * | 2023-11-10 | 2023-12-15 | 中建七局交通建设有限公司 | A support system and construction method for cast-in-place continuous box beams |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104314013A (en) * | 2014-10-14 | 2015-01-28 | 中铁大桥局集团有限公司 | Double suspension arm construction method of ultra-asymmetry combined beam |
| CN207314139U (en) * | 2017-08-24 | 2018-05-04 | 河南省公路工程局集团有限公司 | Concrete continuous girder bridge guardrail suspends steel form in midair |
| CN109537617A (en) * | 2018-12-03 | 2019-03-29 | 中铁十二局集团有限公司 | A kind of construction method pouring hanging cushion cap using suspension type bed die bracket |
| JP2020128679A (en) * | 2019-02-12 | 2020-08-27 | ヒロセ株式会社 | Construction method for simple temporary bridge |
| CN212426772U (en) * | 2020-05-11 | 2021-01-29 | 中交二公局第五工程有限公司 | Suspended bracket system for cast-in-place bridge deck of steel plate composite beam |
| CN113106837A (en) * | 2021-04-02 | 2021-07-13 | 长安大学 | Combined box girder wing plate hanging and pouring device capable of adjusting inhaul cable system and construction method |
-
2023
- 2023-05-11 CN CN202310528625.4A patent/CN116479776B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104314013A (en) * | 2014-10-14 | 2015-01-28 | 中铁大桥局集团有限公司 | Double suspension arm construction method of ultra-asymmetry combined beam |
| CN207314139U (en) * | 2017-08-24 | 2018-05-04 | 河南省公路工程局集团有限公司 | Concrete continuous girder bridge guardrail suspends steel form in midair |
| CN109537617A (en) * | 2018-12-03 | 2019-03-29 | 中铁十二局集团有限公司 | A kind of construction method pouring hanging cushion cap using suspension type bed die bracket |
| JP2020128679A (en) * | 2019-02-12 | 2020-08-27 | ヒロセ株式会社 | Construction method for simple temporary bridge |
| CN212426772U (en) * | 2020-05-11 | 2021-01-29 | 中交二公局第五工程有限公司 | Suspended bracket system for cast-in-place bridge deck of steel plate composite beam |
| CN113106837A (en) * | 2021-04-02 | 2021-07-13 | 长安大学 | Combined box girder wing plate hanging and pouring device capable of adjusting inhaul cable system and construction method |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117230731A (en) * | 2023-11-10 | 2023-12-15 | 中建七局交通建设有限公司 | A support system and construction method for cast-in-place continuous box beams |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116479776B (en) | 2026-01-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102953342B (en) | Assembling and lifting method of half-span skeleton of tied arch bridge | |
| CN110387822B (en) | Cast-in-situ bent cap assembly type steel pipe support and construction method thereof | |
| CN109695206B (en) | Method for dismantling superstructure of cable-stayed bridge of water-borne lean cable system | |
| CN104452597B (en) | Pier prestressed cap beam with extra length Construction Supporting System in water | |
| CN103866693B (en) | A kind of mounting method of steel concrete bowstring arch bridge arch rib | |
| CN103924505A (en) | Prefabricated steel-concrete combination T beam with corrugated steel web and construction method | |
| CN106012960B (en) | A kind of assembled long piled wharf superstructure system and its construction method | |
| CN205662832U (en) | Under hold formula beiLei beam steel suspension bridge | |
| CN106320192B (en) | A kind of beam section replacing and reinforcing method for large span concrete continuous beam bridge | |
| CN104452598B (en) | The construction method of pier prestressed cap beam with extra length Construction Supporting System in water | |
| CN110409319A (en) | A kind of cast-in-place floorings bracket of large span steel reinforced concrete combination beam and construction method | |
| CN116005605A (en) | A prefabricated component support system and setting method for berthing at a wharf | |
| CN110468743B (en) | A mobile hanger and construction method for the renovation of old bridge pier caps | |
| CN116397555A (en) | A construction method for cast-in-place box girders of cable-stayed bridges | |
| CN111851307A (en) | Construction method of large-span prefabricated corrugated web composite box girder transport frame | |
| CN115387239A (en) | Formwork structure for side-span cast-in-place section and closure section of rigid frame bridge and construction method of formwork structure | |
| CN102535344A (en) | Concrete transportation method for bridge body of high-pier bridge in gully region | |
| CN112267369A (en) | Non-span upright post steel trestle structure, pushing installation device and construction method | |
| CN116479776B (en) | Suspension type formwork support for water area concrete rigid frame bridge and construction method thereof | |
| CN111827239A (en) | Construction method of assembled berthing pier | |
| CN110820519A (en) | An arch bridge between tunnels that is convenient for rapid construction and construction method thereof | |
| CN214573397U (en) | Side span cast-in-situ construction control support device | |
| CN214168790U (en) | Concrete-filled steel tube assembled truss composite beam construction system | |
| CN115432552A (en) | A hanger and a construction method for a prefabricated high-pile wharf using the hanger | |
| CN109594581A (en) | Cross a river segment pipe structure and its installation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |