CN116429051A - Building parallelism detection device for constructional engineering - Google Patents

Building parallelism detection device for constructional engineering Download PDF

Info

Publication number
CN116429051A
CN116429051A CN202310588566.XA CN202310588566A CN116429051A CN 116429051 A CN116429051 A CN 116429051A CN 202310588566 A CN202310588566 A CN 202310588566A CN 116429051 A CN116429051 A CN 116429051A
Authority
CN
China
Prior art keywords
sliding
frame
rod
parallelism
rotating frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202310588566.XA
Other languages
Chinese (zh)
Inventor
肖聪
邱林生
肖连贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huichang County Dongxing Lifting Installation Engineering Co ltd
Original Assignee
Huichang County Dongxing Lifting Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huichang County Dongxing Lifting Installation Engineering Co ltd filed Critical Huichang County Dongxing Lifting Installation Engineering Co ltd
Priority to CN202310588566.XA priority Critical patent/CN116429051A/en
Publication of CN116429051A publication Critical patent/CN116429051A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/22Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring angles or tapers; for testing the alignment of axes
    • G01B21/24Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring angles or tapers; for testing the alignment of axes for testing alignment of axes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The invention relates to the technical field of building equipment, in particular to a device for detecting the parallelism of a building for building engineering. The invention provides a building parallelism detection device capable of accurately detecting the parallelism of a wall body in a large range. The building parallelism detection device for the building engineering comprises a placing rack and a lifting frame, wherein the lifting frame is connected inside the placing rack in a sliding mode; the motor is arranged at the lower part of the placing frame; the inside rotation type of rack is connected with the threaded rod, and the threaded rod bottom is connected with the output shaft top of motor, and the threaded rod is connected with the crane screw thread. According to the invention, the sponge wiper is driven by the first rotating frame to move upwards and the parallelism measuring instrument is driven by the first rotating frame to clean impurities on the surface of the wall body, so that the impurities can be prevented from affecting the accuracy of detection of the parallelism measuring instrument, and the parallelism measuring instrument can detect the vertical parallelism of the wall body in a large range in the upward moving process, so that the detection effect is good.

Description

Building parallelism detection device for constructional engineering
Technical Field
The invention relates to the technical field of building equipment, in particular to a device for detecting the parallelism of a building for building engineering.
Background
In the construction engineering, after the construction is finished, the parallelism of the building is generally required to be detected, so that the support stability of the building is ensured, and the building is convenient to accurately construct later.
Patent publication number is CN115060146A discloses a building parallelism detection device for building engineering, including the support base that is used for supporting, the interior terminal surface symmetry rotation joint of support base has the connection lead screw that is used for the transmission, and is located the side terminal surface end department fixed mounting of connection lead screw has the profile of tooth band pulley, two sets of carry out the meshing through the profile of tooth belt between the profile of tooth band pulley and connect, be located one of them a set of the rear end face of connection lead screw is fixed and is provided with servo motor. But this patent removes to through even the contact plate and contacts with the wall body, receives pressure through pressure sensor and detects the depth of parallelism of wall body afterwards, can only detect the local depth of parallelism of wall body, can't detect on a large scale the vertical depth of parallelism of wall body to directly detect the wall body, influence testing result by the impurity on the wall body easily, lead to testing result inaccurate.
In view of the above, it is necessary to develop a device for detecting parallelism of a building for construction engineering, which can accurately detect the parallelism of a wall in a large range.
Disclosure of Invention
Aiming at the defects of the prior art that the parallelism of the wall body can only be detected locally and the detection result is easily influenced by impurities on the wall body, the invention provides the building parallelism detection device for the construction engineering, which can accurately detect the parallelism of the wall body in a large range.
In order to achieve the above object, the present invention is realized by the following scheme: the utility model provides a building parallelism detection device for building engineering, includes:
the lifting frame is connected inside the placing frame in a sliding manner;
the motor is arranged at the lower part of the placing frame;
the bottom of the threaded rod is connected with the top of an output shaft of the motor, and the threaded rod is in threaded connection with the lifting frame;
the front upper side of the lifting frame is rotatably connected with the first rotating frame;
the first screw rod is rotatably connected with the inside of the first rotating frame;
the right side of the first screw rod is connected with an annular latch;
the first rotating frame is internally connected with a first sliding frame in a sliding manner, and the first sliding frame is in threaded connection with the first screw rod;
the first sliding frame is provided with a wiping mechanism for cleaning impurities on the wall body;
and a prompting mechanism for detecting the parallelism of the wall body is arranged between the first rotating frame and the first sliding frame.
Further, the wiping mechanism comprises:
the left upper part of the first sliding frame is rotatably connected with the second rotating frame;
the telescopic rod is connected to the left side of the second rotating frame, and a spring is connected to the inside of the telescopic rod;
the left side of the telescopic rod is connected with a sponge wiper for wiping impurities on the wall;
the torsion spring is sleeved on the front side of the second rotating frame, and two ends of the torsion spring are respectively connected with the first sliding frame and the second rotating frame;
the front side of the second rotating frame is connected with the third rotating frame;
the sliding block is connected to the left front side of the first sliding frame in a sliding manner;
the first connecting rod is rotatably connected between the upper part of the sliding block and the left front side of the third rotating frame.
Further, the prompt mechanism comprises:
the parallelism measuring instrument is arranged at the left front side of the first sliding frame and used for detecting the parallelism of the wall body, and a spring is connected inside the parallelism measuring instrument;
the sliding block moves downwards to be in contact with the second sliding frame, and is used for positioning the second sliding frame;
the left side of the parallelism measuring instrument is connected with a fixed rod, and the right side of the fixed rod is connected with the second sliding frame in a sliding manner;
the first compression spring is connected between the right side of the top of the fixed rod and the left side of the second sliding frame;
the left side and the right side of the inside of the second sliding frame are respectively connected with an adjusting rod in a threaded manner;
the contact switch is connected to the right front side of the fixed rod and is positioned between the adjusting rods;
the electromagnet is arranged at the upper part in the first rotating frame and is electrically connected with the contact switch;
the upper part in the first rotating frame is connected with the sliding block in a sliding way;
the left upper part of the first sliding frame is rotatably connected with a warning lamp for reminding whether the wall body is qualified or not, and the contact switch is electrically connected with the warning lamp;
the second connecting rod is rotationally connected between the warning lamp and the sliding block;
and a second compression spring is connected between the left side of the sliding block and the first sliding frame.
Further, still including the adjustment mechanism who is used for adjusting the horizontality of rack, adjustment mechanism is including:
the front lower side of the rack is provided with a level;
the left side and the right side of the lower part of the placing rack are connected with a second screw rod in a threaded manner, and the second screw rod is used for adjusting the horizontal state of the placing rack;
and the bottom of each second screw rod is rotationally connected with a rubber pad.
Further, still include the marking mechanism that is used for carrying out the mark to wall body slope department, marking mechanism is including:
the right rear side of the warning lamp is connected with a rotating rod;
the lower part of the rotating rod is rotatably connected with the third connecting rod;
the upper part of the first sliding frame is connected with a first fixed pipe;
the right side of the inner part of the first fixed pipe is connected with a piston rod in a sliding manner, and the right side of the piston rod is connected with the left side of the third connecting rod in a rotating manner;
the left side of the parallelism measuring instrument is connected with the fixed block;
the upper part in the fixed block is provided with a second fixed pipe;
a hose is communicated between the right side of the top of the second fixed pipe and the left side of the first fixed pipe, and penetrates through the left part of the first sliding frame;
the sliding tube is connected inside the second fixed tube in a sliding manner;
the marking pen is connected with the inside of the sliding tube in a sliding manner and is used for marking the inclined position of the wall body;
and the right side of the marker pen and the interior of the sliding tube are connected with the third telescopic spring.
Further, still including the chucking mechanism that is used for carrying out the screens to first rotating turret, chucking mechanism is including:
the right front side of the upper part in the lifting frame is connected with a guide block, the guide block is made of rubber, and the front side of the guide block is an inclined plane;
the right side of the first rotating frame is rotationally connected with an annular rod, and the rear side of the annular rod is contacted with the guide block;
the sliding latch is connected to the right side of the inner part of the first rotating frame in a sliding way, penetrates through the first rotating frame and is connected with the annular rod, and the inner part of the sliding latch is meshed with the annular latch.
Further, still including being used for carrying out the supporting mechanism who supports to first rotating frame, supporting mechanism is including:
the upper part in the placing frame is provided with a chute which is U-shaped, and the chute is internally connected with a limiting rod for supporting the first rotating frame in a sliding manner, and the limiting rod is U-shaped;
and a fourth compression spring is connected between the rear part of the limiting rod and the placement frame.
Further, the left front side of the bottom of the limiting rod is an inclined plane.
The invention has at least one of the following advantages: according to the invention, the sponge wiper is driven by the first rotating frame to move upwards and the parallelism measuring instrument is moved upwards, so that the sponge wiper can clean impurities on the surface of the wall body, the impurities can be prevented from affecting the accuracy of detection of the parallelism measuring instrument, and the parallelism measuring instrument can perform large-scale detection on the vertical parallelism of the wall body in the upward moving process, and the detection effect is good; the second screw rod is rotated, so that the horizontal state of the placing rack can be adjusted, and the detection accuracy of the parallelism measuring instrument can be improved; the air in the first fixed pipe is pushed into the second fixed pipe, so that the marking pen is pushed to move, the marking pen marks the wall, and the wall can be conveniently renovated by staff; the annular rod is limited through the guide block, so that the sliding latch can be positioned, loosening of the sliding latch is avoided, and the first screw rod can be loosened to influence the measurement accuracy of the parallelism measuring instrument; under the reset effect of fourth compression spring, drive the gag lever post and move forward for the gag lever post supports first rotating frame, so, can improve the stability of first rotating frame, and then improve parallelism measuring instrument measuring accuracy.
Drawings
Fig. 1 is a schematic perspective view of the present invention.
Fig. 2 is a schematic perspective view of a first part of the present invention.
Fig. 3 is a schematic perspective view of a second part of the present invention.
Fig. 4 is a schematic perspective view of a first screw and annular latch according to the present invention.
Fig. 5 is a schematic perspective view of a wiping mechanism according to the present invention.
Fig. 6 is a schematic perspective view of a first part of the prompting mechanism of the present invention.
Fig. 7 is a schematic perspective view of a second part of the prompting mechanism of the present invention.
Fig. 8 is a schematic perspective view of a third part of the prompting mechanism of the present invention.
Fig. 9 is a schematic perspective view of an adjusting mechanism of the present invention.
Fig. 10 is a schematic perspective view of a first part of the marking mechanism of the present invention.
Fig. 11 is a schematic perspective view of a second part of the marking mechanism of the present invention.
Fig. 12 is a schematic perspective view of a third part of the marking mechanism of the present invention.
Fig. 13 is a schematic perspective view of a first part of the clamping mechanism of the present invention.
Fig. 14 is a schematic perspective view of a second part of the clamping mechanism of the present invention.
Fig. 15 is a schematic perspective view of a third part of the clamping mechanism of the present invention.
Fig. 16 is a schematic perspective view of a first part of the supporting mechanism of the present invention.
Fig. 17 is a schematic perspective view of a second part of the supporting mechanism of the present invention.
Meaning of reference numerals in the drawings: 1: placing rack, 2: lifting frame, 3: a motor, 31: threaded rod, 4: first rotating frame, 5: first lead screw, 6: annular latch, 7: first carriage, 8: wiping mechanism, 81: second turret, 82: telescoping rod, 83: sponge wipe, 84: torsion spring, 85: third turret, 86: first connecting rod, 87: sliding block, 9: prompt mechanism, 91: parallelism measuring instrument, 92: second carriage, 93: fixing rod, 94: first compression spring, 95: contact switch, 96: adjusting lever, 97: electromagnet, 98: slider, 99: second connecting rod, 910: second compression spring, 911: warning light, 10: adjustment mechanism, 101: level gauge, 102: rubber pad, 103: second screw rod, 11: marking mechanism, 111: rotating rod, 112: third connecting rod, 113: first stationary tube, 114: piston rod, 115: hose, 116: fixed block, 117: second stationary tube, 118: slide tube, 119: marker pen, 1110: third extension spring, 12: clamping mechanism, 121: guide block, 122: annular rod, 123: sliding latch, 13: support mechanism, 131: limit lever, 132: chute, 133: and a fourth compression spring.
Detailed Description
The invention will be further described with reference to the accompanying drawings and detailed description below:
example 1
1-8, a building parallelism detecting device for constructional engineering comprises a placing frame 1, a lifting frame 2, a motor 3, a threaded rod 31, a first rotating frame 4, a first screw rod 5, annular clamping teeth 6, a first sliding frame 7, a wiping mechanism 8 and a prompting mechanism 9, wherein the lifting frame 2 is connected inside the placing frame 1 in a sliding manner, the motor 3 is arranged at the lower part of the placing frame 1, the threaded rod 31 is connected inside the placing frame 1 in a rotating manner, the bottom of the threaded rod 31 is connected with the top of an output shaft of the motor 3 through a coupling, the threaded rod 31 is connected with the lifting frame 2 in a threaded manner, the upper front side of the lifting frame 2 is connected with the first rotating frame 4 in a rotating manner, the first screw rod 5 is connected on the right side of the first screw rod 5 in a rotating manner, the first sliding frame 7 is connected inside the first rotating frame 4 in a sliding manner, the first sliding frame 7 is connected with the first screw rod 5 in a threaded manner, the first sliding frame 7 is provided with a wiping mechanism 8, the wiping mechanism 8 is used for cleaning impurities on a wall body, a prompting mechanism 9 is arranged between the first rotating frame 4 and the first sliding frame 7, the prompting mechanism 9 is used for detecting the parallelism of the wall body, the wiping mechanism 8 comprises a second rotating frame 81, a telescopic rod 82, a sponge wiper 83, a torsion spring 84, a third rotating frame 85, a first connecting rod 86 and a sliding block 87, the upper left part of the first sliding frame 7 is rotationally connected with the second rotating frame 81, the left side of the second rotating frame 81 is fixedly connected with a telescopic rod 82, the inside of the telescopic rod 82 is connected with a spring, the left side of the telescopic rod 82 is fixedly connected with the sponge wiper 83, the sponge wiper 83 is used for wiping impurities on the wall body, the front side of the second rotating frame 81 is sleeved with the torsion spring 84, two ends of the torsion spring 84 are respectively connected with the first sliding frame 7 and the second rotating frame 81, the front side of the second rotating frame 81 is fixedly connected with a third rotating frame 85, the left front side of the first rotating frame 7 is connected with a sliding block 87 in a sliding manner, a first connecting rod 86 is rotatably connected between the upper part of the sliding block 87 and the left front side of the third rotating frame 85 through a pin shaft, the prompting mechanism 9 comprises a parallelism measuring instrument 91, a second sliding frame 92, a fixed rod 93, a first compression spring 94, a contact switch 95, an adjusting rod 96, an electromagnet 97, a sliding block 98, a second connecting rod 99, a second compression spring 910 and a warning lamp 911, the left front side of the first sliding frame 7 is provided with the parallelism measuring instrument 91, the parallelism measuring instrument 91 is used for detecting the parallelism of a wall body, the inside of the parallelism measuring instrument 91 is connected with a spring, the left front side of the first sliding frame 7 is connected with the second sliding frame 92, the left side of the parallelism measuring instrument 91 is fixedly connected with the fixed rod 93, the right side of the fixed rod 93 is connected with the second sliding frame 92 in a sliding mode, a first compression spring 94 is connected between the right side of the top of the fixed rod 93 and the left side of the second sliding frame 92, adjusting rods 96 are connected on the left side and the right side of the inside of the second sliding frame 92 in a threaded mode, a contact switch 95 is fixedly connected on the right front side of the fixed rod 93, the contact switch 95 is located between the two adjusting rods 96, an electromagnet 97 is mounted on the upper portion in the first sliding frame 4, the electromagnet 97 is electrically connected with the contact switch 95, a sliding block 98 is slidingly connected on the upper portion in the first sliding frame 4, a warning lamp 911 is rotatably connected on the upper left portion of the first sliding frame 7, the warning lamp 911 is used for reminding whether a wall body is qualified or not, the contact switch 95 is electrically connected with the warning lamp 911, a second connecting rod 99 is rotatably connected between the warning lamp 911 and the sliding block 98 through a pin shaft, and a second compression spring 910 is connected between the left side of the sliding block 98 and the first sliding frame 7.
When in use, the placing rack 1 is placed in front of a wall to be detected, then the first rotating rack 4 is rotated, so that the first rotating rack 4 rotates to be parallel to the ground, larger damping exists between the first rotating rack 4 and the lifting rack 2, therefore, the first rotating rack 4 cannot randomly rotate downwards to reset, then the first screw rod 5 is rotated, the first screw rod 5 drives the annular latch 6 to rotate, then drives the first sliding rack 7 to move leftwards, the first sliding rack 7 drives the second rotating rack 81, the telescopic rod 82, the sponge wiper 83, the torsion spring 84, the third rotating rack 85, the first connecting rod 86 and the sliding block 87 to move leftwards, further drives the parallelism measuring instrument 91 to move leftwards, the sponge wiper 83 and the parallelism measuring instrument 91 are in contact with the wall, the first sliding rack 7 continues to move leftwards, so that the parallelism measuring instrument 91 and the telescopic rod 82 are compressed, springs in the parallelism measuring instrument 91 and the telescopic rod 82 are compressed, so that the parallelism measuring instrument 91 displays a pressure value when being compressed, the parallelism measuring instrument 91 is compressed to drive the fixed rod 93 to move to the right, the fixed rod 93 drives the second sliding frame 92 to move to the right, the first compression spring 94 is compressed, then a worker zeroes the value of the parallelism measuring instrument 91, then the worker adjusts the position of the adjusting rod 96 according to the requirement, the movable range of the fixed rod 93 can be adjusted and set, then the motor 3 is started, the output shaft of the motor 3 rotates with the threaded rod 31, the lifting frame 2 is driven to move upwards, the lifting frame 2 drives the first rotating frame 4 to move upwards, the sponge wiper 83 is driven to move upwards and the parallelism measuring instrument 91 can clean impurities on a wall body, the accuracy of the parallelism measuring instrument 91 is prevented from being influenced, under the action of friction force between the sponge wiper 83 and the wall body, the sponge wiper 83 drives the telescopic rod 82 and the second rotating frame 81 to rotate downwards, the torsion spring 84 deforms, the second rotating frame 81 drives the third rotating frame 85 to rotate, and then the sliding block 87 is pushed by the first connecting rod 86 to move downwards to contact with the second sliding frame 92, so that the second sliding frame 92 can be positioned, the second sliding frame 92 is prevented from continuously moving along with the expansion and contraction of the parallelism measuring instrument 91, the measuring accuracy of the parallelism measuring instrument 91 is influenced, then the parallelism measuring instrument 91 moves upwards along with the parallelism measuring instrument 91, the parallelism measuring instrument 91 can detect the parallelism of the wall body, if the wall body inclines, the parallelism measuring instrument 91 can stretch or be extruded and contracted along with the inclination of the wall body under the action of the spring in the parallelism measuring instrument 91, the parallelism measuring instrument 91 can always contact with the wall body, the parallelism measuring instrument 91 displays the measured value, when the parallelism measuring instrument 91 is extruded and elongated, the fixing rod 93 is driven to move left and right, the contact switch 95 is contacted with the adjusting rods 96, the contact switch 95 is contacted with any adjusting rod 96 to control the electromagnet 97 to be electrified, the warning lamp 911 is controlled to be lightened, the electromagnet 97 adsorbs the sliding block 98, the second compression spring 910 is stretched, the sliding block 98 is driven to rotate through the second connecting rod 99, the warning lamp 911 is driven to rotate and erect, the operator is conveniently reminded that the detected wall parallelism is unqualified, if the parallelism measuring instrument 91 moves upwards, the fixing rod 93 drives the contact switch 95 to move a distance which is not contacted with the adjusting rods 96, the warning lamp 911 is not lightened all the time, the detected wall parallelism is qualified, after the detection is finished, the staff controls the output shaft of the motor 3 to rotate reversely, and then drives the threaded rod 31 to rotate reversely, the threaded rod 31 drives the lifting frame 2 to move downwards for resetting, and then drives the first rotating frame 4, the first sliding frame 7, the sponge wiper 83 and the parallelism measuring instrument 91 to move downwards for resetting, the torsion spring 84 is reset, the second rotating frame 81, the telescopic rod 82, the sponge wiper 83 and the third rotating frame 85 are driven to rotate reversely for resetting, and then the sliding block 87 is pulled by the first connecting rod 86 to move upwards for resetting, so that the sliding block 87 does not press the second sliding frame 92 any more, then the first lead screw 5 is rotated reversely, the first lead screw 5 drives the first sliding frame 7 to move rightwards for resetting, the parallelism measuring instrument 91 and the spring in the telescopic rod 82 are reset, the parallelism measuring instrument 91 and the telescopic rod 82 are driven to extend for resetting, the fixed rod 93 and the contact switch 95 are driven to reset, the first compression spring 94 is reset, the second sliding frame 92 is driven to move leftwards for resetting, the warning lamp 911 and the electromagnet 97 is powered off, the second compression spring 910 is reset, and the sliding block 98 is driven to move leftwards for resetting, and then the second connecting rod 99 is driven to rotate reversely, and then the first sliding frame 7 is driven by the second sliding frame 3 to move downwards for resetting, and the parallelism measuring instrument 91 is prevented from being damaged, and the parallelism measuring instrument is replaced by the first sliding frame 1 is moved by the telescopic rod and the telescopic rod is moved.
Example 2
On the basis of embodiment 1, please refer to fig. 1 and 9, further include an adjusting mechanism 10, the adjusting mechanism 10 is used for adjusting the horizontal state of the rack 1, the adjusting mechanism 10 includes a level 101, a rubber pad 102 and a second screw 103, the level 101 is installed on the front lower side of the rack 1, two second screw 103 are connected with the left side and the right side of the lower portion of the rack 1 in a threaded manner, the second screw 103 is used for adjusting the horizontal state of the rack 1, and the bottom of each second screw 103 is connected with the rubber pad 102 in a rotating manner. When placing rack 1 in the wall body front side, the staff can learn whether rack 1 is in the horizontality through looking over spirit level 101, if bubble in the spirit level 101 deviates from the center, the staff can rotate second lead screw 103, second lead screw 103 drives corresponding rubber pad 102 and moves down, and then can prop up rack 1 to can adjust rack 1's horizontality, improve parallelism measuring apparatu 91's detection precision, after the adjustment finishes, stop rotating second lead screw 103, after the detection finishes, reverse second lead screw 103 again, drive rubber pad 102 and upwards move and reset alright.
Referring to fig. 1, fig. 2, fig. 10, fig. 11 and fig. 12, the wall body tilting part marking device further comprises a marking mechanism 11, the marking mechanism 11 is used for marking the wall body tilting part, the marking mechanism 11 comprises a rotating rod 111, a third connecting rod 112, a first fixing tube 113, a piston rod 114, a hose 115, a fixing block 116, a second fixing tube 117, a sliding tube 118, a marking pen 119 and a third telescopic spring 1110, the right rear side of a warning lamp 911 is fixedly connected with the rotating rod 111, the lower part of the rotating rod 111 is rotationally connected with the third connecting rod 112 through a pin shaft, the upper part of the first sliding frame 7 is fixedly connected with the first fixing tube 113, the right side inside the first fixing tube 113 is slidingly connected with the piston rod 114, the right side of the piston rod 114 is rotationally connected with the left side of the third connecting rod 112 through a pin shaft, the left side of the parallelism measuring instrument 91 is fixedly connected with the fixing block 116, the upper part inside of the fixing block 116 is provided with the second fixing tube 117, the hose 115 is communicated with the left side between the right side of the top of the second fixing tube 117 and the left side of the first fixing tube 113, the hose 115 passes through the left part of the first sliding frame 7, the second fixing tube 117 is internally slidingly connected with the sliding tube 117, the sliding tube 118 is slidingly connected with the third connecting rod 112, and the marking pen 119 is slidingly connected with the marking the right side of the wall body tilting part is marked with the marking spring 119. When the warning lamp 911 rotates, the rotating rod 111 is driven to rotate, the piston rod 114 is pushed to move leftwards through the third connecting rod 112, air in the first fixed pipe 113 can be pushed into the second fixed pipe 117 through the hose 115, the sliding pipe 118 is pushed to move, the marking pen 119 is driven to move leftwards to be in contact with a wall body, the third telescopic spring 1110 is stretched, the marking pen 119 marks the inclined position of the wall body, a worker can easily know that the wall body starts to incline from where, accordingly, the worker can conveniently repair the wall body, when the warning lamp 911 reversely resets, the rotating rod 111 is driven to reversely rotate, the piston rod 114 is pulled to move rightwards through the third connecting rod 112 to reset, the air in the second fixed pipe 117 is pumped back into the first fixed pipe 113 through the hose 115, and the third telescopic spring 1110 resets, so that the marking pen 119 is driven to move rightwards to reset.
Referring to fig. 1, 13, 14 and 15, the lifting frame further comprises a clamping mechanism 12, the clamping mechanism 12 is used for clamping the first rotating frame 4, the clamping mechanism 12 comprises a guide block 121, an annular rod 122 and a sliding latch 123, the guide block 121 is fixedly connected to the right front side of the inner upper portion of the lifting frame 2, the guide block 121 is made of rubber, the front side of the guide block 121 is an inclined surface, the annular rod 122 is rotatably connected to the right side of the first rotating frame 4, the rear side of the annular rod 122 is in contact with the guide block 121, the sliding latch 123 is slidably connected to the right side of the inner portion of the first rotating frame 4, the sliding latch 123 penetrates through the first rotating frame 4 and is fixedly connected with the annular rod 122, and the inner portion of the sliding latch 123 is meshed with the annular latch 6. When the first rotating frame 4 rotates to a horizontal state, the annular rod 122 and the sliding latch 123 are driven to rotate downwards, as the front side of the guide block 121 is an inclined surface, and the guide block 121 is made of rubber, under the guiding action of the guide block 121, the annular rod 122 is limited and clamped, the annular rod 122 is further positioned on the sliding latch 123, the first screw rod 5 is prevented from loosening, the first sliding frame 7 can be clamped, the stability of the first sliding frame 7 is improved, the detection accuracy is further improved, when the first screw rod 5 needs to be regulated, the annular rod 122 is manually and slightly rotated forwards by a worker, the sliding latch 123 is disengaged from the annular latch 6, and after the rotation regulation is completed, the annular rod 122 is pressed to drive the sliding latch 123 to be meshed with the annular latch 6 again.
Referring to fig. 1, 16 and 17, the device further comprises a supporting mechanism 13, the supporting mechanism 13 is used for supporting the first rotating frame 4, the supporting mechanism 13 comprises a limiting rod 131 and a fourth compression spring 133, a chute 132 is formed in the upper portion of the placing frame 1, the chute 132 is in a U shape, the limiting rod 131 is connected in the chute 132 in a sliding manner, the limiting rod 131 is used for supporting the first rotating frame 4, the limiting rod 131 is in a U shape, the left front side of the bottom of the limiting rod 131 is an inclined plane, and the fourth compression spring 133 is connected between the rear portion of the limiting rod 131 and the placing frame 1. When the first rotating frame 4 rotates upwards, because the left front side of the bottom of the limiting rod 131 is an inclined surface, the limiting rod 131 is extruded by the first rotating frame 4 to move backwards, the fourth compression spring 133 is stretched, when the first rotating frame 4 rotates upwards to cross the limiting rod 131, the fourth compression spring 133 resets, the limiting rod 131 is driven to move forwards to reset, the limiting rod 131 is used for positioning the first rotating frame 4, so that the stability of the first rotating frame 4 can be further improved, the accuracy of the parallelism measuring instrument 91 measurement can be further improved, the limiting rod 131 is manually pushed backwards when the first rotating frame 4 needs to be retracted, the limiting rod 131 is not limited to the first rotating frame 4 any more, and then the first rotating frame 4 is rotated downwards to reset.
It should be understood that this example is only illustrative of the invention and is not intended to limit the scope of the invention. Further, it is understood that various changes and modifications may be made by those skilled in the art after reading the teachings of the present invention, and such equivalents are intended to fall within the scope of the claims appended hereto.

Claims (8)

1. The utility model provides a building parallelism detection device for building engineering which characterized in that includes:
the lifting device comprises a placing rack (1) and a lifting rack (2), wherein the lifting rack (2) is connected inside the placing rack (1) in a sliding manner;
a motor (3), wherein the motor (3) is arranged at the lower part of the placing rack (1);
the device comprises a threaded rod (31), wherein the threaded rod (31) is rotatably connected inside the placing frame (1), the bottom of the threaded rod (31) is connected with the top of an output shaft of the motor (3), and the threaded rod (31) is in threaded connection with the lifting frame (2);
the front upper side of the lifting frame (2) is rotatably connected with the first rotating frame (4);
the first screw rod (5) is rotatably connected with the first screw rod (5) inside the first rotating frame (4);
the right side of the first screw rod (5) is connected with the annular latch (6);
the first sliding frame (7), the first sliding frame (7) is connected inside the first rotating frame (4) in a sliding way, and the first sliding frame (7) is connected with the first screw rod (5) in a threaded way;
the first sliding frame (7) is provided with a wiping mechanism (8) for cleaning impurities on the wall;
the prompting mechanism (9) is arranged between the first rotating frame (4) and the first sliding frame (7), and the prompting mechanism (9) is used for detecting the parallelism of the wall body.
2. A building parallelism detecting apparatus for construction according to claim 1, wherein the wiping mechanism (8) comprises:
the second rotating frame (81) is rotatably connected with the left upper part of the first sliding frame (7); the telescopic rod (82) is connected with the left side of the second rotating frame (81), and the telescopic rod (82) is internally connected with a spring;
the left side of the telescopic rod (82) is connected with a sponge wiper (83) for wiping impurities on the wall;
the torsion spring (84) is sleeved on the front side of the second rotating frame (81), and two ends of the torsion spring (84) are respectively connected with the first sliding frame (7) and the second rotating frame (81);
the front side of the second rotating frame (81) is connected with the third rotating frame (85);
the sliding block (87), the sliding block (87) is connected to the left front side of the first sliding frame (7) in a sliding manner;
the first connecting rod (86) is rotatably connected between the upper part of the sliding block (87) and the left front side of the third rotating frame (85).
3. A building parallelism detection apparatus for construction according to claim 2, wherein the prompting means (9) comprises:
the parallelism measuring instrument (91), the parallelism measuring instrument (91) used for detecting the parallelism of the wall body is arranged on the left front side of the first sliding frame (7), and a spring is connected inside the parallelism measuring instrument (91);
the second sliding frame (92), the left front side of the first sliding frame (7) is connected with the second sliding frame (92) in a sliding way, and the sliding block (87) moves downwards to be in contact with the second sliding frame (92) for positioning the second sliding frame (92);
the left side of the parallelism measuring instrument (91) is connected with a fixed rod (93), and the right side of the fixed rod (93) is connected with a second sliding frame (92) in a sliding manner;
the first compression spring (94) is connected between the right side of the top of the fixed rod (93) and the left side of the second sliding frame (92);
the left side and the right side of the inside of the second sliding frame (92) are connected with the adjusting rod (96) in a threaded manner; the contact switch (95) is connected with the right front side of the fixed rod (93), and the contact switch (95) is positioned between the adjusting rods (96);
the electromagnet (97) is arranged at the upper part in the first rotating frame (4), and the electromagnet (97) is electrically connected with the contact switch (95);
a sliding block (98), wherein the sliding block (98) is connected to the upper part in the first rotating frame (4) in a sliding way;
the left upper part of the first sliding frame (7) is rotatably connected with a warning lamp (911) for reminding whether the wall is qualified or not, and the contact switch (95) is electrically connected with the warning lamp (911);
the second connecting rod (99) is rotatably connected between the warning lamp (911) and the sliding block (98);
and a second compression spring (910) is connected between the left side of the sliding block (98) and the first sliding frame (7).
4. A building parallelism detecting apparatus for construction work as claimed in claim 3, further comprising an adjusting mechanism (10) for adjusting the horizontal state of the rack (1), the adjusting mechanism (10) comprising:
the level gauge (101) is arranged at the front lower side of the placement frame (1);
the left side and the right side of the lower part of the placing frame (1) are connected with a second screw rod (103) in a threaded manner, and the second screw rod (103) is used for adjusting the horizontal state of the placing frame (1);
the rubber pads (102) are rotatably connected with the bottoms of the second screw rods (103).
5. A building parallelism detecting apparatus for construction engineering according to claim 4, further comprising a marking mechanism (11) for marking a wall inclination, wherein the marking mechanism (11) comprises:
the right rear side of the warning lamp (911) is connected with the rotating rod (111);
the lower part of the rotating rod (111) is rotatably connected with the third connecting rod (112);
the upper part of the first sliding frame (7) is connected with a first fixed pipe (113);
the right side of the inside of the first fixed pipe (113) is connected with the piston rod (114) in a sliding way, and the right side of the piston rod (114) is rotationally connected with the left side of the third connecting rod (112);
a fixed block (116), the left side of the parallelism measuring instrument (91) is connected with the fixed block (116);
a second fixing tube (117), wherein the second fixing tube (117) is arranged at the upper part in the fixing block (116);
a hose (115) is communicated between the right side of the top of the second fixed pipe (117) and the left side of the first fixed pipe (113), and the hose (115) passes through the left part of the first sliding frame (7);
a sliding tube (118), wherein the sliding tube (118) is connected inside the second fixed tube (117) in a sliding manner;
the marking pen (119), the sliding tube (118) is connected with the marking pen (119) for marking the inclined position of the wall body in a sliding manner;
and the third telescopic spring (1110) is connected with the right side of the marker pen (119) and the inside of the sliding tube (118).
6. A building parallelism detecting apparatus for construction work as set forth in claim 5, further comprising a chucking mechanism (12) for chucking the first rotating frame (4), the chucking mechanism (12) comprising:
the right front side of the inner upper part of the lifting frame (2) is connected with a guide block (121), the guide block (121) is made of rubber, and the front side of the guide block (121) is an inclined plane;
the annular rod (122) is rotationally connected to the right side of the first rotating frame (4), and the rear side of the annular rod (122) is in contact with the guide block (121);
the sliding latch (123), the inside right side slip of first rotating frame (4) is connected with sliding latch (123), and sliding latch (123) pass first rotating frame (4) and are connected with annular pole (122), and sliding latch (123) inside and annular latch (6) meshing.
7. A building parallelism detecting apparatus for construction work as set forth in claim 6, further comprising a supporting mechanism (13) for supporting the first rotating frame (4), the supporting mechanism (13) comprising:
the upper part in the placement frame (1) is provided with a chute (132), the chute (132) is U-shaped, the chute (132) is internally connected with a limiting rod (131) for supporting the first rotating frame (4) in a sliding manner, and the limiting rod (131) is U-shaped;
and a fourth compression spring (133) is connected between the rear part of the limiting rod (131) and the placement frame (1).
8. The device for detecting parallelism of a building for construction according to claim 7, wherein the left front side of the bottom of the stopper rod (131) is an inclined surface.
CN202310588566.XA 2023-05-24 2023-05-24 Building parallelism detection device for constructional engineering Withdrawn CN116429051A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310588566.XA CN116429051A (en) 2023-05-24 2023-05-24 Building parallelism detection device for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310588566.XA CN116429051A (en) 2023-05-24 2023-05-24 Building parallelism detection device for constructional engineering

Publications (1)

Publication Number Publication Date
CN116429051A true CN116429051A (en) 2023-07-14

Family

ID=87092892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310588566.XA Withdrawn CN116429051A (en) 2023-05-24 2023-05-24 Building parallelism detection device for constructional engineering

Country Status (1)

Country Link
CN (1) CN116429051A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116907314A (en) * 2023-09-11 2023-10-20 山西建筑工程集团有限公司 Detection device for detecting radian deviation of arc-shaped wall
CN117308883A (en) * 2023-11-29 2023-12-29 山东博蓝建筑工程有限公司 Building wall inclination measuring instrument
CN118455150A (en) * 2024-07-09 2024-08-09 内蒙古垣桓建筑工程有限公司 Construction surface cleaning device for engineering construction
CN118816833A (en) * 2024-09-13 2024-10-22 江苏省建设集团有限公司 A verticality detection device for construction engineering quality detection

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116907314A (en) * 2023-09-11 2023-10-20 山西建筑工程集团有限公司 Detection device for detecting radian deviation of arc-shaped wall
CN116907314B (en) * 2023-09-11 2023-11-17 山西建筑工程集团有限公司 Be used for detecting arc wall body radian deviation detection device
CN117308883A (en) * 2023-11-29 2023-12-29 山东博蓝建筑工程有限公司 Building wall inclination measuring instrument
CN117308883B (en) * 2023-11-29 2024-02-09 山东博蓝建筑工程有限公司 Building wall inclination measuring instrument
CN118455150A (en) * 2024-07-09 2024-08-09 内蒙古垣桓建筑工程有限公司 Construction surface cleaning device for engineering construction
CN118455150B (en) * 2024-07-09 2024-10-25 建泰建设有限公司 Construction surface cleaning device for engineering construction
CN118816833A (en) * 2024-09-13 2024-10-22 江苏省建设集团有限公司 A verticality detection device for construction engineering quality detection
CN118816833B (en) * 2024-09-13 2025-02-25 江苏省建设集团有限公司 A verticality detection device for construction engineering quality detection

Similar Documents

Publication Publication Date Title
CN116429051A (en) Building parallelism detection device for constructional engineering
CN114354381A (en) Cable bending resistance detection device and use method thereof
CN117968578A (en) Building parallelism detection device for constructional engineering and detection method thereof
CN214372431U (en) Building wall inclination detection device
CN111707181B (en) A continuous pipe wall thickness measuring device
CN212843466U (en) Bearing ring size detection equipment
CN220230382U (en) A building wall thickness detection device
CN220239675U (en) Bicycle frame rear triangle correction equipment
CN118463783A (en) Multi-angle building wall flatness measuring device convenient to store
CN217663439U (en) Burette support
CN211976356U (en) A total station support structure
CN221037288U (en) Three-coordinate dimension inspection equipment for automobile electrical accessories
CN110530748B (en) Test bench limit for height is convenient for adjust operation type sclerometer
CN114739253A (en) Displacement table displacement stroke precision detection device
CN119394184B (en) An auxiliary fixture for image measuring instrument used for parts inspection
CN220854552U (en) Calibrating device for scraper fineness gauge
CN218329731U (en) Underwater slope type detection device
CN219999446U (en) Machine vision angle test experimental device
CN106441004A (en) Multi-purpose integral adjustable tapered roller bearing axial error tester
CN223091738U (en) Hardness detection device for seamless steel tube
CN221528297U (en) Device for testing surface wear resistance of building interior decoration board
CN221223785U (en) Highway slope detection device
CN220366193U (en) Gantry one-key flash tester
CN210603150U (en) Detection apparatus for flatness detector
CN223784162U (en) A CCD motion detection module

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20230714

WW01 Invention patent application withdrawn after publication