CN116425059A - A four-section tower crane attachment frame and its installation method - Google Patents
A four-section tower crane attachment frame and its installation method Download PDFInfo
- Publication number
- CN116425059A CN116425059A CN202310083034.0A CN202310083034A CN116425059A CN 116425059 A CN116425059 A CN 116425059A CN 202310083034 A CN202310083034 A CN 202310083034A CN 116425059 A CN116425059 A CN 116425059A
- Authority
- CN
- China
- Prior art keywords
- frame
- half frame
- tower body
- attachment frame
- tower crane
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/62—Constructional features or details
- B66C23/72—Counterweights or supports for balancing lifting couples
- B66C23/78—Supports, e.g. outriggers, for mobile cranes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Structural Engineering (AREA)
- Transportation (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种四段式塔机附着框及其安装方法,属于工程机械技术领域。The invention relates to a four-section tower crane attachment frame and an installation method thereof, belonging to the technical field of engineering machinery.
背景技术Background technique
随塔机使用高度的增加,塔身整体受力也逐渐加大,当超过独立高度时,需对塔身进行附着支撑,以承担塔机的扭矩、弯矩及水平剪力,附着装置是保证塔机稳定、确保塔机安全的关键结构。当塔机附着高度达300余米,同时附着框整体重量达30t时,附着框各部件需保证安装便捷、安全、可靠。With the increase of the height of the tower crane, the overall force of the tower body is also gradually increased. When the independent height is exceeded, the tower body needs to be attached and supported to bear the torque, bending moment and horizontal shear force of the tower crane. The attachment device is the guarantee The key structure for the stability of the tower crane and the safety of the tower crane. When the attachment height of the tower crane reaches more than 300 meters and the overall weight of the attachment frame reaches 30t, the components of the attachment frame must be installed conveniently, safely and reliably.
在现有的技术方案中,附着框可分为左右两个半框,对于截面6.5米塔身,附着框截面超过9.5m,分成两个半框仍无法满足运输要求。附着框各部分需单独吊装至塔身再进行装配连接,在高空中安装抱箍、销轴、连接梁等较为困难,安装方式较为复杂;且塔身受力时易发生较大的扭转变形,对塔身自身的强度、刚度要求较高,无法满足超大截面塔机的使用要求。In the existing technical scheme, the attachment frame can be divided into two half frames on the left and right. For the tower body with a section of 6.5 meters, the cross section of the attachment frame exceeds 9.5 m, and the two half frames still cannot meet the transportation requirements. Each part of the attachment frame needs to be hoisted to the tower body separately for assembly and connection. It is difficult to install hoops, pin shafts, connecting beams, etc. in the sky, and the installation method is relatively complicated; and the tower body is prone to large torsional deformation when it is stressed. The strength and rigidity requirements of the tower itself are relatively high, which cannot meet the use requirements of super-large cross-section tower cranes.
发明内容Contents of the invention
本发明的目的在于提供一种四段式塔机附着框及其安装方法,解决现有技术中安装困难、对塔身强度刚度要求高等问题。The purpose of the present invention is to provide a four-section tower crane attachment frame and its installation method, which solves the problems of difficult installation and high requirements on tower body strength and rigidity in the prior art.
为实现以上目的,本发明是采用下述技术方案实现的:To achieve the above object, the present invention is achieved by adopting the following technical solutions:
第一方面,本发明提供了一种四段式塔机附着框,包括第一半框、第二半框和两个连接梁,两个连接梁通过紧固机构将第一半框和第二半框连接在一起,在第一半框、第二半框与塔身主弦的连接处设有抱箍,抱箍分别连接所述第一半框、第二半框与所述塔身主弦,使塔身主弦和四段式塔机附着框连接为整体;还包括对角斜撑杆,连接附着框对角处的两个抱箍。In the first aspect, the present invention provides a four-section tower crane attachment frame, which includes a first half frame, a second half frame and two connecting beams, and the two connecting beams connect the first half frame and the second half frame through a fastening mechanism. The half frames are connected together, and hoops are provided at the joints of the first half frame, the second half frame and the main chord of the tower body, and the hoops are respectively connected to the first half frame, the second half frame and the main chord of the tower body. The chord connects the main chord of the tower body and the attachment frame of the four-section tower crane as a whole; it also includes diagonal braces to connect the two hoops at the opposite corners of the attachment frame.
结合第一方面,进一步的,所述紧固机构包括高强螺栓和法兰,连接梁和第一半框/第二半框的两端都固定有法兰,通过高强螺栓将连接梁和第一半框、第二半框的四个连接处的法兰分别连接在一起,实现四段式塔机附着框的组装。In combination with the first aspect, further, the fastening mechanism includes high-strength bolts and flanges, flanges are fixed at both ends of the connecting beam and the first half-frame/second half-frame, and the connecting beam and the first half-frame are connected by high-strength bolts The flanges at the four joints of the half frame and the second half frame are respectively connected together to realize the assembly of the attachment frame of the four-section tower crane.
结合第一方面,进一步的,所述抱箍和所述第一半框、第二半框将塔身主弦包围在中间。With reference to the first aspect, further, the hoop, the first half frame, and the second half frame surround the main chord of the tower body in the middle.
结合第一方面,进一步的,所述抱箍和所述第一半框/第二半框之间通过销轴连接。With reference to the first aspect, further, the hoop is connected to the first half frame/second half frame through pin shafts.
结合第一方面,进一步的,所述抱箍和塔身主弦之间通过楔块连接。With reference to the first aspect, further, the hoop is connected to the main chord of the tower body through a wedge.
结合第一方面,进一步的,所述第一半框和第二半框上设有销轴托架,用于在吊装时放置销轴。With reference to the first aspect, further, the first half-frame and the second half-frame are provided with pin brackets for placing pins during hoisting.
结合第一方面,进一步的,在所述第一半框和第二半框上设有可调式挂耳,用于连接塔身,实现附着框在塔身高度方向的调节。In combination with the first aspect, further, adjustable hanging lugs are provided on the first half frame and the second half frame for connecting the tower body, so as to realize the adjustment of the attachment frame in the height direction of the tower body.
第二方面,本发明还提供了一种第一方面任一项所述附着框的安装方法,包括:In the second aspect, the present invention also provides a method for installing the attachment frame according to any one of the first aspect, including:
将销轴放置在第一半框的销轴托架上,将第一半框和两个抱箍进行部分连接后同时吊装至待安装位置;Place the pin on the pin bracket of the first half frame, partially connect the first half frame and the two hoops and hoist them to the position to be installed at the same time;
将销轴放置在第二半框的销轴托架上,将第二半框和两个抱箍进行部分连接后同时吊装至待安装位置;Place the pin shaft on the pin shaft bracket of the second half frame, partially connect the second half frame with the two hoops and hoist them to the position to be installed at the same time;
将两个连接梁吊装至待安装位置;Hoist the two connecting beams to the location to be installed;
通过销轴和抱箍将第一半框、第二半框分别和塔身主弦连接,通过两个连接梁将第一半框和第二半框进行连接,将对角斜撑杆固定在附着框对角处的两个抱箍上,完成安装。The first half frame and the second half frame are respectively connected to the main chord of the tower body through pins and hoops, the first half frame and the second half frame are connected through two connecting beams, and the diagonal braces are fixed on Attach to the two hoops at opposite corners of the frame to complete the installation.
与现有技术相比,本发明所达到的有益效果是:Compared with the prior art, the beneficial effects achieved by the present invention are:
本发明提供的一种四段式塔机附着框及其安装方法,通过销轴、抱箍将附着框和塔身主弦联接为整体,减少附着框集中力对塔身腹杆的影响,从而降低对塔身强度、刚度的要求,提升适用范围;将两个半框和抱箍集成化安装,安装时同时吊装一个半框和两个抱箍,减少吊装次数,节省安装时间,降低安装复杂度;采用四段式装配设计,最大尺寸满足运输要求;设有抱箍和对角斜撑杆,将各塔身主弦和附着框联接为整体,极大地减少附着框集中力对塔身腹杆的影响,改善塔身受力;The invention provides a four-section tower crane attachment frame and its installation method. The attachment frame and the main chord of the tower body are connected as a whole through pin shafts and hoops, so as to reduce the influence of the concentrated force of the attachment frame on the tower body web, thereby Reduce the requirements on the strength and rigidity of the tower body, and improve the scope of application; integrate the two half-frames and hoops, and hoist one half-frame and two hoops at the same time during installation, reducing the number of hoistings, saving installation time, and reducing installation complexity It adopts a four-stage assembly design, and the maximum size meets the transportation requirements; it is equipped with hoops and diagonal braces to connect the main chords of each tower body and the attachment frame as a whole, which greatly reduces the concentrated force of the attachment frame on the tower body. The impact of the pole, improve the force of the tower body;
设置了销轴托架,销轴可随半框同时吊装,进一步减少了吊装次数,设置了可调式挂耳,通过可调式挂耳与塔身踏步连接,使附着框在塔身高度方向可以调节,满足多种工况使用需求;在抱箍和塔身主弦之间通过楔块楔紧,有效弥补塔身主弦和抱箍之间的间隙。The pin bracket is set, and the pin shaft can be hoisted together with the half frame, which further reduces the number of hoisting. Adjustable hanging lugs are set, and the adjustable hanging lugs are connected with the steps of the tower body, so that the attached frame can be adjusted in the height direction of the tower body , to meet the needs of a variety of working conditions; wedges are used to tighten between the hoop and the main chord of the tower body, effectively filling the gap between the main chord of the tower body and the hoop.
附图说明Description of drawings
图1是本发明实施例提供的一种四段式塔机附着框的结构示意图;Fig. 1 is a schematic structural view of a four-section tower crane attachment frame provided by an embodiment of the present invention;
图2是本发明实施例提供的一种四段式塔机附着框在安装时的示意图;Fig. 2 is a schematic diagram of a four-section tower crane attachment frame provided by an embodiment of the present invention during installation;
图3是本发明实施例提供的一种四段式塔机附着框安装方法的流程图。Fig. 3 is a flowchart of a four-section tower crane attachment frame installation method provided by an embodiment of the present invention.
图中:1、可调式挂耳;2、楔块;3、抱箍;4、高强螺栓;5、连接梁;6、第一半框;7、第二半框。In the figure: 1. Adjustable hanging lugs; 2. Wedges; 3. Hoops; 4. High-strength bolts; 5. Connecting beams; 6. First half frame; 7. Second half frame.
具体实施方式Detailed ways
下面结合附图对本发明作进一步描述,以下实施例仅用于更加清楚地说明本发明的技术方案,而不能以此来限制本发明的保护范围。The present invention will be further described below in conjunction with the accompanying drawings. The following examples are only used to illustrate the technical solution of the present invention more clearly, but not to limit the protection scope of the present invention.
实施例1Example 1
如图1所示,本发明实施例提供的一种四段式塔机附着框,采用分体式设计,分为第一半框6、第二半框7和两个连接梁5共四段,中间采用法兰及高强螺栓4连接;在附着框四角与塔身主弦连接处设有抱箍3,抱箍3与附着框采用销轴连接,抱箍3与塔身主弦之间通过楔块2楔紧,使四角的塔身主弦与附着框通过抱箍3联接为整体,一减少附着框集中力对塔身腹杆的影响;在第一半框6和第二半框7的上方设置有可调式挂耳1,通过可调式挂耳1与塔身踏步连接,使附着框在塔身高度方向可以调节,满足多种工况使用需求。As shown in Figure 1, a four-section tower crane attachment frame provided by the embodiment of the present invention adopts a split design and is divided into four sections, a
如图2所示,为减少附着框各部件吊装次数,节省安装时间,综合考虑吊装时重心位置,将第一半框6、第二半框7和抱箍3集成化安装,安装时同时吊装一个半框和两个抱箍3。为方便安装销轴安装,在附着框设置销轴托架,销轴可随附着框同时吊装。同时为方便抱箍3与塔身主弦的安装,在抱箍3两个方向各设置两组楔块2,通过两个方向同时调整楔块2保证主弦与附着框联接可靠,避免因制造误差导致主弦与抱箍3之间无法楔紧,影响使用安全性。As shown in Figure 2, in order to reduce the number of hoisting of each component of the attachment frame and save installation time, the
本发明提供的超大截面的附着框,其优点如下:The attachment frame with super large section provided by the present invention has the following advantages:
此附着框首次采用三段装配式设计,最大尺寸不超过3.2米,满足运输要求;This attachment frame adopts a three-section assembly design for the first time, and the maximum size does not exceed 3.2 meters, which meets the transportation requirements;
此附着框设有抱箍3及对角斜撑杆,将各主弦与附着框联接为整体,极大减少附着框集中力对塔身腹杆的影响,改善塔身受力;The attachment frame is equipped with
附着框上部设置可调式挂耳1,通过可调式挂耳1与塔身踏步连接,使附着框在塔身高度方向可以调节,满足多种工况使用需求;The upper part of the attachment frame is equipped with adjustable hanging lugs 1, which are connected to the tower body steps through the adjustable hanging lugs 1, so that the attachment frame can be adjusted in the height direction of the tower body to meet the needs of various working conditions;
附着半框可与抱箍3同时吊装,减少吊装次数,节省安装时间;The attached half frame can be hoisted together with the
附着框设置销轴托架,销轴可随附着框同时吊装。The attachment frame is provided with a pin bracket, and the pin shaft can be hoisted simultaneously with the attachment frame.
实施例2Example 2
如图3所示,本发明实施例提供的一种实施例1所述附着框的安装方法,包括:As shown in Fig. 3, a method for installing the attachment frame described in Embodiment 1 provided by the embodiment of the present invention includes:
将销轴放置在第一半框6的销轴托架上,将第一半框6和两个抱箍3进行部分连接后同时吊装至待安装位置;Place the pin shaft on the pin shaft bracket of the
将销轴放置在第二半框7的销轴托架上,将第二半框7和两个抱箍3进行部分连接后同时吊装至待安装位置;Place the pin shaft on the pin shaft bracket of the
将两个连接梁5吊装至待安装位置;Hoisting the two connecting
通过销轴和抱箍3将第一半框6、第二半框7分别和塔身主弦连接,通过两个连接梁5将第一半框6和第二半框7进行连接,将对角斜撑杆固定在附着框对角处的两个抱箍3上,完成安装。The
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明技术原理的前提下,还可以做出若干改进和变形,这些改进和变形也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that for those of ordinary skill in the art, without departing from the technical principle of the present invention, some improvements and modifications can also be made. It should also be regarded as the protection scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310083034.0A CN116425059A (en) | 2023-02-08 | 2023-02-08 | A four-section tower crane attachment frame and its installation method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310083034.0A CN116425059A (en) | 2023-02-08 | 2023-02-08 | A four-section tower crane attachment frame and its installation method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN116425059A true CN116425059A (en) | 2023-07-14 |
Family
ID=87093209
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310083034.0A Pending CN116425059A (en) | 2023-02-08 | 2023-02-08 | A four-section tower crane attachment frame and its installation method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116425059A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118125327A (en) * | 2024-03-13 | 2024-06-04 | 中交第二航务工程局有限公司 | A tower crane attachment device installation identification method and system |
| CN119706641A (en) * | 2024-12-23 | 2025-03-28 | 徐州建机工程机械有限公司 | Large standard knot attaching frame and square installation method |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200394923Y1 (en) * | 2005-06-08 | 2005-09-07 | 한국타워크레인주식회사 | device of fixing tower crane |
| KR20170001502A (en) * | 2015-06-26 | 2017-01-04 | (주)다올산업 | Fixing member for tower crane |
| CN215479338U (en) * | 2021-06-04 | 2022-01-11 | 中联重科股份有限公司 | Tower crane attachment frame and tower crane |
| CN216272820U (en) * | 2021-11-24 | 2022-04-12 | 徐州建机工程机械有限公司 | Large-scale tower machine adheres to frame mounting structure |
| CN216549344U (en) * | 2021-11-22 | 2022-05-17 | 徐州建机工程机械有限公司 | Tower crane super-large section attachment frame |
| CN216945941U (en) * | 2021-12-31 | 2022-07-12 | 马尼托瓦克起重设备(中国)有限公司 | Tower crane adheres to frame |
-
2023
- 2023-02-08 CN CN202310083034.0A patent/CN116425059A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR200394923Y1 (en) * | 2005-06-08 | 2005-09-07 | 한국타워크레인주식회사 | device of fixing tower crane |
| KR20170001502A (en) * | 2015-06-26 | 2017-01-04 | (주)다올산업 | Fixing member for tower crane |
| CN215479338U (en) * | 2021-06-04 | 2022-01-11 | 中联重科股份有限公司 | Tower crane attachment frame and tower crane |
| CN216549344U (en) * | 2021-11-22 | 2022-05-17 | 徐州建机工程机械有限公司 | Tower crane super-large section attachment frame |
| CN216272820U (en) * | 2021-11-24 | 2022-04-12 | 徐州建机工程机械有限公司 | Large-scale tower machine adheres to frame mounting structure |
| CN216945941U (en) * | 2021-12-31 | 2022-07-12 | 马尼托瓦克起重设备(中国)有限公司 | Tower crane adheres to frame |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118125327A (en) * | 2024-03-13 | 2024-06-04 | 中交第二航务工程局有限公司 | A tower crane attachment device installation identification method and system |
| CN119706641A (en) * | 2024-12-23 | 2025-03-28 | 徐州建机工程机械有限公司 | Large standard knot attaching frame and square installation method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102079489A (en) | Suspended-rising support system of tower crane | |
| CN107100187A (en) | Tower crane steel girder erection structure and installation method | |
| CN218708829U (en) | Detachable support bed-jig hoisting device of steel construction roof | |
| CN101503908B (en) | Construction method for spacing suspension cable structural template support platform | |
| CN102491193B (en) | Crane Superlift and All Terrain Cranes | |
| CN102491194B (en) | Crane Superlift and All Terrain Cranes | |
| CN111362155A (en) | Tower Crane Attachment Device | |
| CN216549344U (en) | Tower crane super-large section attachment frame | |
| CN203173749U (en) | Assembled integral type vertical self-jacking device of hydraulic double-type crane tower | |
| CN212198259U (en) | Tower Crane Attachment Device | |
| CN216272820U (en) | Large-scale tower machine adheres to frame mounting structure | |
| CN106276630A (en) | A kind of internal-climbing tower crane supporting construction of band shearing frame | |
| CN116513982A (en) | Jacking cross beam for synchronous jacking of four-side eight oil cylinders and use method | |
| CN118851000A (en) | A novel inner and outer tower connection frame and installation method thereof | |
| CN212128871U (en) | Urban wisdom expressway bent cap wet joint rapid Assembly operation platform | |
| CN117345007B (en) | A method for constructing temporary supports for large-span steel structure roofs | |
| CN221216811U (en) | Prefabricated box girder protection hanger | |
| CN103601081B (en) | Support system is climbed in tower crane | |
| CN216945936U (en) | Tower crane attaches wall self-adaptation connecting device | |
| CN102071794B (en) | Unit member attached with elevating scaffold horizontal support truss standard section | |
| CN115535878A (en) | Construction method for converting in-situ of large movable arm tower crane of super high-rise building from external hanging into internal climbing | |
| CN110116966A (en) | A kind of movable arm tower crane climbs boom device and its application method | |
| CN110436333A (en) | Auxiliary force application structure and construction method for steel structure hoisting | |
| CN116591060A (en) | Non-axial force closure method for cable-stayed bridge midspan | |
| CN111908334A (en) | Method for assembling and disassembling portal crane and auxiliary support structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230714 |
|
| RJ01 | Rejection of invention patent application after publication |