CN116409703A - A safe erection spreader for high pier columns and large-span prestressed beams and its application method - Google Patents

A safe erection spreader for high pier columns and large-span prestressed beams and its application method Download PDF

Info

Publication number
CN116409703A
CN116409703A CN202310469387.4A CN202310469387A CN116409703A CN 116409703 A CN116409703 A CN 116409703A CN 202310469387 A CN202310469387 A CN 202310469387A CN 116409703 A CN116409703 A CN 116409703A
Authority
CN
China
Prior art keywords
base
span prestressed
support seat
pier columns
hoisting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310469387.4A
Other languages
Chinese (zh)
Inventor
魏启彬
储志超
孙俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN202310469387.4A priority Critical patent/CN116409703A/en
Publication of CN116409703A publication Critical patent/CN116409703A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B66—HOISTING; LIFTING; HAULING
    • B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C15/00—Safety gear

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种高墩柱大跨径预应力梁安全架设吊具及使用方法,属于混凝土预制梁吊装技术领域,所述吊具顶部与吊装设备相连接,包括桁架,位于桁架底部、沿长度方向设置的多个底座,以及安装于底座下端的支撑座;所述底座内部设有驱动机构,所述支撑座两侧下端相对设置有两个夹爪,两个所述夹爪对应夹持在混凝土预制梁上部两侧翼缘的下表面。本发明采用先通过吊装设备与吊具的配合完成对混凝土预制梁的抓取和吊装,再将托架置于混凝土预制梁底部以强化吊装强度,摆脱了传统吊装方式需要大型起重机械配合作业的限制,降低了不必要的人力物力支出。

Figure 202310469387

The invention discloses a hanger for the safe erection of a large-span prestressed beam with a high pier column and a method for using it, belonging to the technical field of concrete prefabricated beam hoisting. A plurality of bases arranged in the length direction, and a support seat installed at the lower end of the base; a drive mechanism is provided inside the base, and two jaws are arranged oppositely at the lower ends of both sides of the support base, and the two jaws are correspondingly clamped The lower surface of the flanges on both sides of the upper part of the concrete prefabricated beam. The invention uses the cooperation of the hoisting equipment and the hoisting tool to complete the grabbing and hoisting of the concrete prefabricated beam, and then places the bracket on the bottom of the concrete prefabricated beam to strengthen the hoisting strength. Limitation, reducing unnecessary human and material resources expenditure.

Figure 202310469387

Description

一种高墩柱大跨径预应力梁安全架设吊具及使用方法A safe erection spreader for high pier columns and large-span prestressed beams and its use method

技术领域technical field

本发明属于混凝土预制梁吊装技术领域,具体涉及一种高墩柱大跨径预应力梁安全架设吊具及使用方法。The invention belongs to the technical field of concrete prefabricated beam hoisting, and in particular relates to a hoisting tool for the safe erection of high pier columns and large-span prestressed beams and a method of use.

背景技术Background technique

混凝土预制梁是桥梁工程中梁的一种,内部为空心状,上部两侧有翼缘,类似箱子,因而得名。在混凝土预制梁吊装时,由于混凝土预制梁体积较大不易固定,都是通过吊装设备进行提升。早期,大多采用钢丝绳进行捆绑后再利用吊装设备进行提升,但这种吊装方式的前提是混凝土预制梁与地面之间需存在足以使钢丝绳穿过的空隙,否则对混凝土预制梁进行捆绑非常难以实现,且由于在吊运过程中混凝土预制梁会不可避免地产生晃动,钢丝绳与混凝土预制梁之间互相挤压、滑动、错位,而钢丝绳与混凝土预制梁之间的接触面积小,压力过于集中,极易造成对混凝土预制梁的损伤或磨断钢丝绳的绳股,进而带来安全隐患。目前,主要是采用吊具代替钢丝绳,再通过吊装设备进行提升吊装原理相同,吊装前,需要先将吊具的一部分置于混凝土预制梁底部,从而进一步将混凝土预制梁托起以实现吊装,这种吊装方式看似简单,但实际就将吊具置于混凝土预制梁底部这一操作便十分费力,通常需要其他大型起重机械配合作业才能完成,增加了不必要的人力物力支出。Concrete prefabricated beam is a kind of beam in bridge engineering. It is hollow inside and has flanges on both sides of the upper part, which is similar to a box, hence the name. When the concrete prefabricated beams are hoisted, because the concrete prefabricated beams are large and difficult to fix, they are all lifted by hoisting equipment. In the early days, steel wire ropes were mostly used for binding and then lifted by hoisting equipment. However, the premise of this hoisting method is that there must be a gap between the concrete precast beam and the ground that is sufficient for the steel wire rope to pass through, otherwise it is very difficult to bind the concrete precast beam. , and because the concrete prefabricated beam will inevitably shake during the lifting process, the steel wire rope and the concrete prefabricated beam will squeeze, slide, and dislocate each other, and the contact area between the steel wire rope and the concrete prefabricated beam is small, and the pressure is too concentrated. It is very easy to cause damage to the concrete prefabricated beam or to wear off the strands of the steel wire rope, thereby bringing potential safety hazards. At present, the hoisting equipment is mainly used to replace the steel wire rope, and then the hoisting equipment is used to lift and hoist. This hoisting method seems simple, but the actual operation of placing the spreader at the bottom of the concrete precast beam is very laborious. It usually requires the cooperation of other large lifting machines to complete the operation, which increases unnecessary manpower and material resources.

发明内容Contents of the invention

为了解决上述技术问题,发明人经过实践和总结得出本发明的技术方案,本发明公开了一种高墩柱大跨径预应力梁安全架设吊具,所述吊具顶部与吊装设备相连接,包括桁架,位于桁架底部、沿长度方向设置的多个底座,以及安装于底座下端的支撑座;In order to solve the above technical problems, the inventor obtained the technical solution of the present invention through practice and summarization. The present invention discloses a safe erection sling for high pier columns and large-span prestressed beams. The top of the sling is connected to the hoisting equipment , including a truss, a plurality of bases arranged along the length direction at the bottom of the truss, and a support seat installed at the lower end of the base;

所述底座内部设有驱动机构,所述支撑座两侧下端相对设置有两个夹爪,两个所述夹爪对应夹持在混凝土预制梁上部两侧翼缘的下表面。A drive mechanism is provided inside the base, and two jaws are oppositely arranged on the lower ends of both sides of the support base, and the two jaws are correspondingly clamped on the lower surfaces of the flanges on both sides of the upper part of the concrete prefabricated beam.

进一步优选地,所述底座底部开设有与支撑座相配合的滑槽,且底座上还开设有与滑槽交叉连通的通孔,所述支撑座滑动安装在滑槽内,所述通孔内安装有限位杆。Further preferably, the bottom of the base is provided with a chute matching the support seat, and the base is also provided with a through hole intersecting with the chute, the support seat is slidably installed in the chute, and the through hole Install the limit rod.

进一步优选地,所述支撑座顶部开设有与通孔连通的防护通槽,且支撑座顶部开设有连接孔。Further preferably, the top of the support seat is provided with a protective through groove communicating with the through hole, and the top of the support seat is provided with a connecting hole.

进一步优选地,所述驱动机构包括安装在桁架底部的驱动电机,以及连接在驱动电机输出端上的螺杆,所述螺杆与支撑座顶部的螺纹孔对应配合。Further preferably, the driving mechanism includes a driving motor installed at the bottom of the truss, and a screw connected to the output end of the driving motor, and the screw is matched with a threaded hole on the top of the supporting base.

进一步优选地,每个所述夹爪与底座之间通过连杆连接,所述夹爪上开设有与连杆相配合的弧形滑槽,所述连杆一端与底座连接,另一端滑动连接在弧形滑槽内。Further preferably, each of the jaws is connected to the base through a connecting rod, and an arc-shaped chute matching the connecting rod is provided on the jaws, one end of the connecting rod is connected to the base, and the other end is slidably connected In the curved chute.

进一步优选地,所述夹爪下端设有托架,所述托架与混凝土预制梁底部相配合。Further preferably, a bracket is provided at the lower end of the jaw, and the bracket matches with the bottom of the concrete prefabricated beam.

进一步优选地,所述托架与夹爪之间设有锁紧机构,所述锁紧机构包括开设于夹爪底部的第一通槽,开设于托架顶部两侧的第二通槽,依次穿过第一通槽和第二通槽的锁紧件,以及固定螺母。Further preferably, a locking mechanism is provided between the bracket and the jaws, the locking mechanism includes a first through slot opened at the bottom of the jaw, second through slots opened on both sides of the top of the bracket, and in turn The locking piece passing through the first through slot and the second through slot, and the fixing nut.

进一步优选地,所述支撑座底部设有橡胶缓存块。Further preferably, a rubber buffer block is provided at the bottom of the support base.

本发明还公开了一种高墩柱大跨径预应力梁安全架设吊具的使用方法,包括以下步骤:The invention also discloses a method for using a hanger for safe erection of a large-span prestressed beam with a high pier column, which includes the following steps:

S1、先利用吊装设备将桁架吊起一定高度,再通过驱动电机带动支撑座顶部在滑槽内向下滑动,使得两侧的夹爪转动张开;S1. First use the hoisting equipment to lift the truss to a certain height, and then drive the top of the support base to slide down in the chute through the drive motor, so that the jaws on both sides rotate and open;

S2、由吊装设备将桁架向下移动,直至支撑座底部的橡胶缓存块碰到混凝土预制梁的上表面中央,随后通过驱动电机带动支撑座顶部在滑槽内向上滑动,使得两侧的夹爪转动夹持在混凝土预制梁上部两侧翼缘的下表面,完成对混凝土预制梁的抓取和吊装;S2. The hoisting equipment moves the truss down until the rubber buffer block at the bottom of the support seat touches the center of the upper surface of the prefabricated concrete beam, and then drives the top of the support seat to slide upward in the chute through the drive motor, so that the grippers on both sides Rotate and clamp the lower surface of the flanges on both sides of the upper part of the concrete precast beam to complete the grabbing and hoisting of the concrete precast beam;

S3、再利用吊装设备将桁架吊起一定高度,然后人工将托架置于混凝土预制梁底部,并通过锁紧机构固定起来,最后利用吊装设备进行远距离或高度提升。S3. Use hoisting equipment to hoist the truss to a certain height, then manually place the bracket on the bottom of the concrete prefabricated beam, and fix it through the locking mechanism, and finally use the hoisting equipment to carry out long-distance or height elevation.

与现有技术相比,本发明可以获得以下技术效果:Compared with the prior art, the present invention can obtain the following technical effects:

本发明采用先通过吊装设备与吊具的配合完成对混凝土预制梁的抓取和吊装,再将托架置于混凝土预制梁底部以强化吊装强度,摆脱了传统吊装方式需要大型起重机械配合作业的限制,降低了不必要的人力物力支出;并且,整体上不会对混凝土预制梁的产生损伤,消除了安全隐患。The invention uses the cooperation of the hoisting equipment and the hoisting tool to complete the grabbing and hoisting of the concrete prefabricated beam, and then places the bracket on the bottom of the concrete prefabricated beam to strengthen the hoisting strength. The restriction reduces unnecessary manpower and material resources expenditure; and, on the whole, it will not cause damage to the concrete prefabricated beams, eliminating potential safety hazards.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, for those of ordinary skill in the art, In other words, other drawings can also be obtained from these drawings on the premise of not paying creative work.

图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2为本发明的侧视图;Fig. 2 is a side view of the present invention;

图3为本发明的剖视图;Fig. 3 is a sectional view of the present invention;

图4为本发明中支撑座的结构示意图。Fig. 4 is a schematic structural view of the support seat in the present invention.

具体实施方式Detailed ways

为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

下面结合附图及具体实施例对本发明的应用原理作进一步描述。The application principle of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.

实施例Example

如图1-4所示,一种高墩柱大跨径预应力梁安全架设吊具,由桁架1、两个底座2、两个支撑座4组成;底座设置于桁架1的底部沿长度方向,两个支撑座4则分别安装在底座2的下端。As shown in Figure 1-4, a safe erection spreader for high pier columns and large-span prestressed beams consists of a truss 1, two bases 2, and two support bases 4; the base is arranged at the bottom of the truss 1 along the length direction , and the two supporting bases 4 are installed on the lower end of the base 2 respectively.

底座2内部设有驱动机构3,由安装在桁架1底部的驱动电机31以及连接在驱动电机31输出端上的螺杆32组成,螺杆32与支撑座4顶部的螺纹孔42对应配合,同时底座2的底部开设有与支撑座4相配合的滑槽21,并且底座2上还开设有与滑槽21交叉连通的通孔22,支撑座4滑动安装在滑槽21内,通孔22内则安装有限位杆23;支撑座4两侧下端相对设置有两个夹爪5,分别对应夹持在混凝土预制梁7上部两侧翼缘的下表面,每个夹爪5与底座2之间通过连杆6连接,夹爪5上开设有与连杆6相配合的弧形滑槽,连杆6一端与底座2铰接,另一端滑动铰接在弧形滑槽内。There is a drive mechanism 3 inside the base 2, which is composed of a drive motor 31 installed at the bottom of the truss 1 and a screw 32 connected to the output end of the drive motor 31. The screw 32 is matched with the threaded hole 42 on the top of the support base 4. The bottom of the base is provided with a chute 21 matched with the support seat 4, and the base 2 is also provided with a through hole 22 intersecting with the chute 21, the support seat 4 is slidably installed in the chute 21, and the through hole 22 is installed Limiting rod 23; the lower ends of both sides of the support seat 4 are oppositely provided with two jaws 5, which are respectively clamped on the lower surface of the flanges on both sides of the upper part of the concrete prefabricated beam 7, and each jaw 5 is connected to the base 2 through a connecting rod 6 connection, the jaw 5 is provided with an arc-shaped chute matching the connecting rod 6, one end of the connecting rod 6 is hinged with the base 2, and the other end is slidably hinged in the arc-shaped chute.

夹爪5下端还设有托架8,该托架8与混凝土预制梁7底部相配合,托架8与夹爪5之间通过锁紧机构9连接固定,锁紧机构9由开设于夹爪5底部的第一通槽、开设于托架8顶部两侧的第二通槽、依次穿过第一通槽和第二通槽的锁紧件91、固定螺母92组成,锁紧件91一端卡接在第二通槽81下表面,另一端通过固定螺母92与夹爪5连接。The lower end of the jaw 5 is also provided with a bracket 8, which matches the bottom of the concrete prefabricated beam 7, and the bracket 8 and the jaw 5 are connected and fixed by a locking mechanism 9, which is set on the jaw 5, the first through slot at the bottom, the second through slot opened on both sides of the top of the bracket 8, the locking piece 91 passing through the first through slot and the second through slot in turn, and the fixing nut 92, one end of the locking piece 91 It is clamped on the lower surface of the second through slot 81 , and the other end is connected with the jaw 5 through a fixing nut 92 .

支撑座4顶部开设有与通孔22连通的防护通槽41,在螺杆32发生断裂时,可通过限位杆23与防护通槽41的位置连接关系,起到一定的保护作用,防止支撑座4掉落;同时,支撑座4顶部开设有连接孔42,支撑座4的底部设有橡胶缓存块43,通过橡胶弹性起到缓冲作用,以削弱支撑座4在进行吊装的过程中出现碰撞产生撞击影响。The top of the support seat 4 is provided with a protective channel 41 communicating with the through hole 22. When the screw rod 32 breaks, the position connection relationship between the limit rod 23 and the protective channel 41 can be used to play a certain protective role and prevent the support seat from being damaged. 4 falls; meanwhile, the top of the support base 4 is provided with a connection hole 42, and the bottom of the support base 4 is provided with a rubber buffer block 43, which acts as a buffer through the rubber elasticity to weaken the impact of the support base 4 during hoisting. impact impact.

先通过吊装设备与吊具的配合完成对混凝土预制梁7的抓取和吊装,再将托架8置于混凝土预制梁7底部以强化吊装强度,摆脱了传统吊装方式需要其他大型起重机械配合作业才能完成的工作内容,降低了不必要的人力物力支出;整体上不会对混凝土预制梁7的产生损伤,消除了安全隐患。First, the grasping and hoisting of the precast concrete beam 7 is completed through the cooperation of the hoisting equipment and the hoisting tool, and then the bracket 8 is placed on the bottom of the precast concrete beam 7 to strengthen the hoisting strength, which eliminates the need for other large-scale hoisting machinery to cooperate with traditional hoisting methods The work content can only be completed by the operation, which reduces unnecessary expenditure on manpower and material resources; on the whole, the concrete prefabricated beam 7 will not be damaged, and the potential safety hazard is eliminated.

一种高墩柱大跨径预应力梁安全架设吊具的使用方法,具体步骤如下:A method for using a spreader for safe erection of a large-span prestressed beam with a high pier column, the specific steps are as follows:

S1、先利用吊装设备将桁架1吊起一定高度,再通过驱动电机31带动支撑座4顶部在滑槽21内向下滑动,使得两侧的夹爪5转动张开;S1. First use the hoisting equipment to hoist the truss 1 to a certain height, and then drive the top of the support seat 4 to slide downward in the chute 21 through the driving motor 31, so that the jaws 5 on both sides rotate and open;

S2、由吊装设备将桁架1向下移动,直至支撑座4底部的橡胶缓存块43碰到混凝土预制梁7的上表面中央,随后通过驱动电机31带动支撑座4顶部在滑槽21内向上滑动,使得两侧的夹爪5转动夹持在混凝土预制梁7上部两侧翼缘的下表面,完成对混凝土预制梁7的抓取和吊装;S2. Use the hoisting equipment to move the truss 1 downward until the rubber buffer block 43 at the bottom of the support base 4 touches the center of the upper surface of the concrete prefabricated beam 7, and then the drive motor 31 drives the top of the support base 4 to slide upward in the chute 21 , so that the clamping claws 5 on both sides are rotated and clamped on the lower surface of the flanges on both sides of the upper part of the concrete precast beam 7, and the grasping and hoisting of the concrete precast beam 7 are completed;

S3、再利用吊装设备将桁架1吊起一定高度,然后人工将托架8置于混凝土预制梁7底部,并通过锁紧机构9固定起来,最后利用吊装设备进行远距离或高度提升。S3. Use hoisting equipment to hoist the truss 1 to a certain height, then manually place the bracket 8 on the bottom of the concrete prefabricated beam 7, and fix it through the locking mechanism 9, and finally use the hoisting equipment to carry out long-distance or height elevation.

Claims (9)

1.一种高墩柱大跨径预应力梁安全架设吊具,所述吊具顶部与吊装设备相连接,其特征在于:包括桁架(1),位于桁架(1)底部、沿长度方向设置的多个底座(2),以及安装于底座(2)下端的支撑座(4);1. A safe erection sling for high pier columns and large-span prestressed beams, the top of the sling is connected to the hoisting equipment, and is characterized in that: it comprises a truss (1), which is positioned at the bottom of the truss (1) and arranged along the length direction A plurality of bases (2), and a support seat (4) installed at the lower end of the base (2); 所述底座(2)内部设有驱动机构(3),所述支撑座(4)两侧下端相对设置有两个夹爪(5),两个所述夹爪(5)对应夹持在混凝土预制梁(7)上部两侧翼缘的下表面。The base (2) is provided with a driving mechanism (3) inside, and the lower ends of both sides of the support seat (4) are oppositely provided with two jaws (5), and the two jaws (5) are correspondingly clamped on the concrete The lower surface of the flanges on both sides of the upper part of the prefabricated beam (7). 2.根据权利要求1所述的一种高墩柱大跨径预应力梁安全架设吊具,其特征在于:所述底座(2)底部开设有与支撑座(4)相配合的滑槽(21),且底座(2)上还开设有与滑槽(21)交叉连通的通孔(22),所述支撑座(4)滑动安装在滑槽(21)内,所述通孔(22)内安装有限位杆(23)。2. A safe erection spreader for high pier columns and large-span prestressed beams according to claim 1, characterized in that: the bottom of the base (2) is provided with a chute ( 21), and the base (2) is also provided with a through hole (22) cross-communicating with the chute (21), the support seat (4) is slidably installed in the chute (21), and the through hole (22) ) Limit rod (23) is installed in. 3.根据权利要求2所述的一种高墩柱大跨径预应力梁安全架设吊具,其特征在于:所述支撑座(4)顶部开设有与通孔(22)连通的防护通槽(41),且支撑座(4)顶部开设有连接孔(42)。3. A hoist for safe erection of high-pier columns and large-span prestressed beams according to claim 2, characterized in that: the top of the support seat (4) is provided with a protective through-slot communicating with the through-hole (22) (41), and the top of the support seat (4) is provided with a connecting hole (42). 4.根据权利要求3所述的一种高墩柱大跨径预应力梁安全架设吊具,其特征在于:所述驱动机构(3)包括安装在桁架(1)底部的驱动电机(31),以及连接在驱动电机(31)输出端上的螺杆(32),所述螺杆(32)与支撑座(4)顶部的螺纹孔(42)对应配合。4. A safe erection hanger for high pier columns and large span prestressed beams according to claim 3, characterized in that: the driving mechanism (3) includes a driving motor (31) installed at the bottom of the truss (1) , and the screw rod (32) connected to the output end of the driving motor (31), the screw rod (32) is correspondingly matched with the threaded hole (42) on the top of the support base (4). 5.根据权利要求1所述的一种高墩柱大跨径预应力梁安全架设吊具,其特征在于:每个所述夹爪(5)与底座(2)之间通过连杆(6)连接,所述夹爪(5)上开设有与连杆(6)相配合的弧形滑槽,所述连杆(6)一端与底座(2)连接,另一端滑动连接在弧形滑槽内。5. A safe erection hanger for high pier columns and large span prestressed beams according to claim 1, characterized in that: each said jaw (5) and the base (2) are connected by a connecting rod (6 ) connection, the jaw (5) is provided with an arc-shaped chute matching the connecting rod (6), one end of the connecting rod (6) is connected to the base (2), and the other end is slidably connected to the arc-shaped sliding in the slot. 6.根据权利要求5所述的一种高墩柱大跨径预应力梁安全架设吊具,其特征在于:所述夹爪(5)下端设有托架(8),所述托架(8)与混凝土预制梁(7)底部相配合。6. A safe erection spreader for high pier columns and large-span prestressed beams according to claim 5, characterized in that: the lower end of the jaws (5) is provided with a bracket (8), and the bracket ( 8) Cooperate with the bottom of the concrete prefabricated beam (7). 7.根据权利要求6所述的一种高墩柱大跨径预应力梁安全架设吊具,其特征在于:所述托架(8)与夹爪(5)之间设有锁紧机构(9),所述锁紧机构(9)包括开设于夹爪(5)底部的第一通槽,开设于托架(8)顶部两侧的第二通槽,依次穿过第一通槽和第二通槽的锁紧件(91),以及固定螺母(92)。7. A safe erection spreader for high pier columns and large-span prestressed beams according to claim 6, characterized in that: a locking mechanism ( 9), the locking mechanism (9) includes a first through slot opened at the bottom of the jaw (5), a second through slot opened on both sides of the top of the bracket (8), passing through the first through slot and the The locking piece (91) of the second through groove, and the fixing nut (92). 8.根据权利要求1所述的一种高墩柱大跨径预应力梁安全架设吊具,其特征在于:所述支撑座(4)底部设有橡胶缓存块(43)。8. The safe erection spreader for high pier columns and large-span prestressed beams according to claim 1, characterized in that: the bottom of the support seat (4) is provided with a rubber buffer block (43). 9.一种根据权利要求1所述的高墩柱大跨径预应力梁安全架设吊具的使用方法,其特征在于,包括以下步骤:9. A method for using a safe erection spreader for high pier columns and large-span prestressed beams according to claim 1, characterized in that it comprises the following steps: S1、先利用吊装设备将桁架(1)吊起一定高度,再通过驱动电机(31)带动支撑座(4)顶部在滑槽(21)内向下滑动,使得两侧的夹爪(5)转动张开;S1. First use the hoisting equipment to lift the truss (1) to a certain height, and then drive the top of the support seat (4) to slide down in the chute (21) through the drive motor (31), so that the jaws (5) on both sides rotate open; S2、由吊装设备将桁架(1)向下移动,直至支撑座(4)底部的橡胶缓存块(43)碰到混凝土预制梁(7)的上表面中央,随后通过驱动电机(31)带动支撑座(4)顶部在滑槽(21)内向上滑动,使得两侧的夹爪(5)转动夹持在混凝土预制梁(7)上部两侧翼缘的下表面,完成对混凝土预制梁(7)的抓取和吊装;S3、再利用吊装设备将桁架(1)吊起一定高度,然后人工将托架(8)置于混凝土预制梁(7)底部,并通过锁紧机构(9)固定起来,最后利用吊装设备进行远距离或高度提升。S2. Use the hoisting equipment to move the truss (1) downward until the rubber buffer block (43) at the bottom of the support seat (4) touches the center of the upper surface of the concrete prefabricated beam (7), and then the drive motor (31) drives the support The top of the seat (4) slides upwards in the chute (21), so that the jaws (5) on both sides are rotated and clamped on the lower surface of the flanges on both sides of the upper part of the concrete prefabricated beam (7), and the prefabricated concrete beam (7) is completed. Grabbing and hoisting; S3, using hoisting equipment to hoist the truss (1) to a certain height, then manually place the bracket (8) on the bottom of the concrete prefabricated beam (7), and fix it through the locking mechanism (9) , and finally use hoisting equipment for long-distance or high-level lifting.
CN202310469387.4A 2023-04-27 2023-04-27 A safe erection spreader for high pier columns and large-span prestressed beams and its application method Pending CN116409703A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310469387.4A CN116409703A (en) 2023-04-27 2023-04-27 A safe erection spreader for high pier columns and large-span prestressed beams and its application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310469387.4A CN116409703A (en) 2023-04-27 2023-04-27 A safe erection spreader for high pier columns and large-span prestressed beams and its application method

Publications (1)

Publication Number Publication Date
CN116409703A true CN116409703A (en) 2023-07-11

Family

ID=87052914

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310469387.4A Pending CN116409703A (en) 2023-04-27 2023-04-27 A safe erection spreader for high pier columns and large-span prestressed beams and its application method

Country Status (1)

Country Link
CN (1) CN116409703A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118997512A (en) * 2024-10-18 2024-11-22 中铁十七局集团第六工程有限公司 Temporary supporting structure for mounting precast beams and conveying device thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07330278A (en) * 1994-06-03 1995-12-19 Mitsubishi Heavy Ind Ltd Automatic lifting equipment
CN108394806A (en) * 2018-01-24 2018-08-14 倪惠芳 Hoisting structure suitable for aerospace equipment
CN212712361U (en) * 2020-06-11 2021-03-16 南江东科钢模板有限责任公司 Anti-skidding lifting appliance for hoisting bridge box girder
CN217516501U (en) * 2022-03-28 2022-09-30 中交第四公路工程局有限公司 Hoist pulls input device for prefabricated box girder

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07330278A (en) * 1994-06-03 1995-12-19 Mitsubishi Heavy Ind Ltd Automatic lifting equipment
CN108394806A (en) * 2018-01-24 2018-08-14 倪惠芳 Hoisting structure suitable for aerospace equipment
CN212712361U (en) * 2020-06-11 2021-03-16 南江东科钢模板有限责任公司 Anti-skidding lifting appliance for hoisting bridge box girder
CN217516501U (en) * 2022-03-28 2022-09-30 中交第四公路工程局有限公司 Hoist pulls input device for prefabricated box girder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN118997512A (en) * 2024-10-18 2024-11-22 中铁十七局集团第六工程有限公司 Temporary supporting structure for mounting precast beams and conveying device thereof

Similar Documents

Publication Publication Date Title
CN207878295U (en) Suspension bridge cable changing device
CN101798869A (en) Method for automatically centering and inversely installing vertical shaft pipelines
CN110029598B (en) Deformation control method for removing midspan closure section of continuous box girder bridge
CN110217684A (en) A tool for hoisting reinforcement of the bottom web of a box girder
CN201598093U (en) Hoisting fixture for large-sized sectional box-type beam
CN108374351A (en) A kind of simple hoisting apparatus and method for removing box beam beret slice
CN217780518U (en) Clamping device for hoisting assembly type concrete prefabricated part
CN219009694U (en) Hoisting device for box culvert
CN209584872U (en) The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device
CN219652500U (en) Steel beam hoisting tool
CN219384698U (en) Novel movable operation platform for bridge reinforcement and maintenance
CN217203666U (en) Steel hoop hoisting support for bridge reinforcement
CN111252683A (en) Bridge deck crane and application method thereof applied to bridge dismantling
CN218027247U (en) Bridge pier column removes mobile device fast
CN111453600A (en) A kind of prefabricated bridge pier column lifting device and lifting method
CN215885996U (en) F-shaped prefabricated T-beam template hoisting device
CN115354575A (en) Multifunctional bridge floor crane for middle cable plane cable-stayed bridge
CN216474518U (en) Innovative prestressed T-beam hogging moment stretching operation frame
CN212175497U (en) Large-span steel-concrete composite bridge large-segment steel truss girder assembly system
CN207265540U (en) A kind of tangent tower overhead line lifter
CN201605579U (en) Tubular pile trade steel cage hoist device
CN223737520U (en) Conveying equipment for road construction cement piers
CN107237264A (en) A kind of the second stage of prestress wire tensioning support of Precast T-Beam and method
CN209053444U (en) Steel construction purlin hoisting device
CN209868519U (en) Driving maintenance auxiliary device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20230711