CN116409703A - A safe erection spreader for high pier columns and large-span prestressed beams and its application method - Google Patents
A safe erection spreader for high pier columns and large-span prestressed beams and its application method Download PDFInfo
- Publication number
- CN116409703A CN116409703A CN202310469387.4A CN202310469387A CN116409703A CN 116409703 A CN116409703 A CN 116409703A CN 202310469387 A CN202310469387 A CN 202310469387A CN 116409703 A CN116409703 A CN 116409703A
- Authority
- CN
- China
- Prior art keywords
- base
- span prestressed
- support seat
- pier columns
- hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C15/00—Safety gear
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
本发明公开了一种高墩柱大跨径预应力梁安全架设吊具及使用方法,属于混凝土预制梁吊装技术领域,所述吊具顶部与吊装设备相连接,包括桁架,位于桁架底部、沿长度方向设置的多个底座,以及安装于底座下端的支撑座;所述底座内部设有驱动机构,所述支撑座两侧下端相对设置有两个夹爪,两个所述夹爪对应夹持在混凝土预制梁上部两侧翼缘的下表面。本发明采用先通过吊装设备与吊具的配合完成对混凝土预制梁的抓取和吊装,再将托架置于混凝土预制梁底部以强化吊装强度,摆脱了传统吊装方式需要大型起重机械配合作业的限制,降低了不必要的人力物力支出。
The invention discloses a hanger for the safe erection of a large-span prestressed beam with a high pier column and a method for using it, belonging to the technical field of concrete prefabricated beam hoisting. A plurality of bases arranged in the length direction, and a support seat installed at the lower end of the base; a drive mechanism is provided inside the base, and two jaws are arranged oppositely at the lower ends of both sides of the support base, and the two jaws are correspondingly clamped The lower surface of the flanges on both sides of the upper part of the concrete prefabricated beam. The invention uses the cooperation of the hoisting equipment and the hoisting tool to complete the grabbing and hoisting of the concrete prefabricated beam, and then places the bracket on the bottom of the concrete prefabricated beam to strengthen the hoisting strength. Limitation, reducing unnecessary human and material resources expenditure.
Description
技术领域technical field
本发明属于混凝土预制梁吊装技术领域,具体涉及一种高墩柱大跨径预应力梁安全架设吊具及使用方法。The invention belongs to the technical field of concrete prefabricated beam hoisting, and in particular relates to a hoisting tool for the safe erection of high pier columns and large-span prestressed beams and a method of use.
背景技术Background technique
混凝土预制梁是桥梁工程中梁的一种,内部为空心状,上部两侧有翼缘,类似箱子,因而得名。在混凝土预制梁吊装时,由于混凝土预制梁体积较大不易固定,都是通过吊装设备进行提升。早期,大多采用钢丝绳进行捆绑后再利用吊装设备进行提升,但这种吊装方式的前提是混凝土预制梁与地面之间需存在足以使钢丝绳穿过的空隙,否则对混凝土预制梁进行捆绑非常难以实现,且由于在吊运过程中混凝土预制梁会不可避免地产生晃动,钢丝绳与混凝土预制梁之间互相挤压、滑动、错位,而钢丝绳与混凝土预制梁之间的接触面积小,压力过于集中,极易造成对混凝土预制梁的损伤或磨断钢丝绳的绳股,进而带来安全隐患。目前,主要是采用吊具代替钢丝绳,再通过吊装设备进行提升吊装原理相同,吊装前,需要先将吊具的一部分置于混凝土预制梁底部,从而进一步将混凝土预制梁托起以实现吊装,这种吊装方式看似简单,但实际就将吊具置于混凝土预制梁底部这一操作便十分费力,通常需要其他大型起重机械配合作业才能完成,增加了不必要的人力物力支出。Concrete prefabricated beam is a kind of beam in bridge engineering. It is hollow inside and has flanges on both sides of the upper part, which is similar to a box, hence the name. When the concrete prefabricated beams are hoisted, because the concrete prefabricated beams are large and difficult to fix, they are all lifted by hoisting equipment. In the early days, steel wire ropes were mostly used for binding and then lifted by hoisting equipment. However, the premise of this hoisting method is that there must be a gap between the concrete precast beam and the ground that is sufficient for the steel wire rope to pass through, otherwise it is very difficult to bind the concrete precast beam. , and because the concrete prefabricated beam will inevitably shake during the lifting process, the steel wire rope and the concrete prefabricated beam will squeeze, slide, and dislocate each other, and the contact area between the steel wire rope and the concrete prefabricated beam is small, and the pressure is too concentrated. It is very easy to cause damage to the concrete prefabricated beam or to wear off the strands of the steel wire rope, thereby bringing potential safety hazards. At present, the hoisting equipment is mainly used to replace the steel wire rope, and then the hoisting equipment is used to lift and hoist. This hoisting method seems simple, but the actual operation of placing the spreader at the bottom of the concrete precast beam is very laborious. It usually requires the cooperation of other large lifting machines to complete the operation, which increases unnecessary manpower and material resources.
发明内容Contents of the invention
为了解决上述技术问题,发明人经过实践和总结得出本发明的技术方案,本发明公开了一种高墩柱大跨径预应力梁安全架设吊具,所述吊具顶部与吊装设备相连接,包括桁架,位于桁架底部、沿长度方向设置的多个底座,以及安装于底座下端的支撑座;In order to solve the above technical problems, the inventor obtained the technical solution of the present invention through practice and summarization. The present invention discloses a safe erection sling for high pier columns and large-span prestressed beams. The top of the sling is connected to the hoisting equipment , including a truss, a plurality of bases arranged along the length direction at the bottom of the truss, and a support seat installed at the lower end of the base;
所述底座内部设有驱动机构,所述支撑座两侧下端相对设置有两个夹爪,两个所述夹爪对应夹持在混凝土预制梁上部两侧翼缘的下表面。A drive mechanism is provided inside the base, and two jaws are oppositely arranged on the lower ends of both sides of the support base, and the two jaws are correspondingly clamped on the lower surfaces of the flanges on both sides of the upper part of the concrete prefabricated beam.
进一步优选地,所述底座底部开设有与支撑座相配合的滑槽,且底座上还开设有与滑槽交叉连通的通孔,所述支撑座滑动安装在滑槽内,所述通孔内安装有限位杆。Further preferably, the bottom of the base is provided with a chute matching the support seat, and the base is also provided with a through hole intersecting with the chute, the support seat is slidably installed in the chute, and the through hole Install the limit rod.
进一步优选地,所述支撑座顶部开设有与通孔连通的防护通槽,且支撑座顶部开设有连接孔。Further preferably, the top of the support seat is provided with a protective through groove communicating with the through hole, and the top of the support seat is provided with a connecting hole.
进一步优选地,所述驱动机构包括安装在桁架底部的驱动电机,以及连接在驱动电机输出端上的螺杆,所述螺杆与支撑座顶部的螺纹孔对应配合。Further preferably, the driving mechanism includes a driving motor installed at the bottom of the truss, and a screw connected to the output end of the driving motor, and the screw is matched with a threaded hole on the top of the supporting base.
进一步优选地,每个所述夹爪与底座之间通过连杆连接,所述夹爪上开设有与连杆相配合的弧形滑槽,所述连杆一端与底座连接,另一端滑动连接在弧形滑槽内。Further preferably, each of the jaws is connected to the base through a connecting rod, and an arc-shaped chute matching the connecting rod is provided on the jaws, one end of the connecting rod is connected to the base, and the other end is slidably connected In the curved chute.
进一步优选地,所述夹爪下端设有托架,所述托架与混凝土预制梁底部相配合。Further preferably, a bracket is provided at the lower end of the jaw, and the bracket matches with the bottom of the concrete prefabricated beam.
进一步优选地,所述托架与夹爪之间设有锁紧机构,所述锁紧机构包括开设于夹爪底部的第一通槽,开设于托架顶部两侧的第二通槽,依次穿过第一通槽和第二通槽的锁紧件,以及固定螺母。Further preferably, a locking mechanism is provided between the bracket and the jaws, the locking mechanism includes a first through slot opened at the bottom of the jaw, second through slots opened on both sides of the top of the bracket, and in turn The locking piece passing through the first through slot and the second through slot, and the fixing nut.
进一步优选地,所述支撑座底部设有橡胶缓存块。Further preferably, a rubber buffer block is provided at the bottom of the support base.
本发明还公开了一种高墩柱大跨径预应力梁安全架设吊具的使用方法,包括以下步骤:The invention also discloses a method for using a hanger for safe erection of a large-span prestressed beam with a high pier column, which includes the following steps:
S1、先利用吊装设备将桁架吊起一定高度,再通过驱动电机带动支撑座顶部在滑槽内向下滑动,使得两侧的夹爪转动张开;S1. First use the hoisting equipment to lift the truss to a certain height, and then drive the top of the support base to slide down in the chute through the drive motor, so that the jaws on both sides rotate and open;
S2、由吊装设备将桁架向下移动,直至支撑座底部的橡胶缓存块碰到混凝土预制梁的上表面中央,随后通过驱动电机带动支撑座顶部在滑槽内向上滑动,使得两侧的夹爪转动夹持在混凝土预制梁上部两侧翼缘的下表面,完成对混凝土预制梁的抓取和吊装;S2. The hoisting equipment moves the truss down until the rubber buffer block at the bottom of the support seat touches the center of the upper surface of the prefabricated concrete beam, and then drives the top of the support seat to slide upward in the chute through the drive motor, so that the grippers on both sides Rotate and clamp the lower surface of the flanges on both sides of the upper part of the concrete precast beam to complete the grabbing and hoisting of the concrete precast beam;
S3、再利用吊装设备将桁架吊起一定高度,然后人工将托架置于混凝土预制梁底部,并通过锁紧机构固定起来,最后利用吊装设备进行远距离或高度提升。S3. Use hoisting equipment to hoist the truss to a certain height, then manually place the bracket on the bottom of the concrete prefabricated beam, and fix it through the locking mechanism, and finally use the hoisting equipment to carry out long-distance or height elevation.
与现有技术相比,本发明可以获得以下技术效果:Compared with the prior art, the present invention can obtain the following technical effects:
本发明采用先通过吊装设备与吊具的配合完成对混凝土预制梁的抓取和吊装,再将托架置于混凝土预制梁底部以强化吊装强度,摆脱了传统吊装方式需要大型起重机械配合作业的限制,降低了不必要的人力物力支出;并且,整体上不会对混凝土预制梁的产生损伤,消除了安全隐患。The invention uses the cooperation of the hoisting equipment and the hoisting tool to complete the grabbing and hoisting of the concrete prefabricated beam, and then places the bracket on the bottom of the concrete prefabricated beam to strengthen the hoisting strength. The restriction reduces unnecessary manpower and material resources expenditure; and, on the whole, it will not cause damage to the concrete prefabricated beams, eliminating potential safety hazards.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, for those of ordinary skill in the art, In other words, other drawings can also be obtained from these drawings on the premise of not paying creative work.
图1为本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2为本发明的侧视图;Fig. 2 is a side view of the present invention;
图3为本发明的剖视图;Fig. 3 is a sectional view of the present invention;
图4为本发明中支撑座的结构示意图。Fig. 4 is a schematic structural view of the support seat in the present invention.
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
下面结合附图及具体实施例对本发明的应用原理作进一步描述。The application principle of the present invention will be further described below in conjunction with the accompanying drawings and specific embodiments.
实施例Example
如图1-4所示,一种高墩柱大跨径预应力梁安全架设吊具,由桁架1、两个底座2、两个支撑座4组成;底座设置于桁架1的底部沿长度方向,两个支撑座4则分别安装在底座2的下端。As shown in Figure 1-4, a safe erection spreader for high pier columns and large-span prestressed beams consists of a
底座2内部设有驱动机构3,由安装在桁架1底部的驱动电机31以及连接在驱动电机31输出端上的螺杆32组成,螺杆32与支撑座4顶部的螺纹孔42对应配合,同时底座2的底部开设有与支撑座4相配合的滑槽21,并且底座2上还开设有与滑槽21交叉连通的通孔22,支撑座4滑动安装在滑槽21内,通孔22内则安装有限位杆23;支撑座4两侧下端相对设置有两个夹爪5,分别对应夹持在混凝土预制梁7上部两侧翼缘的下表面,每个夹爪5与底座2之间通过连杆6连接,夹爪5上开设有与连杆6相配合的弧形滑槽,连杆6一端与底座2铰接,另一端滑动铰接在弧形滑槽内。There is a drive mechanism 3 inside the
夹爪5下端还设有托架8,该托架8与混凝土预制梁7底部相配合,托架8与夹爪5之间通过锁紧机构9连接固定,锁紧机构9由开设于夹爪5底部的第一通槽、开设于托架8顶部两侧的第二通槽、依次穿过第一通槽和第二通槽的锁紧件91、固定螺母92组成,锁紧件91一端卡接在第二通槽81下表面,另一端通过固定螺母92与夹爪5连接。The lower end of the
支撑座4顶部开设有与通孔22连通的防护通槽41,在螺杆32发生断裂时,可通过限位杆23与防护通槽41的位置连接关系,起到一定的保护作用,防止支撑座4掉落;同时,支撑座4顶部开设有连接孔42,支撑座4的底部设有橡胶缓存块43,通过橡胶弹性起到缓冲作用,以削弱支撑座4在进行吊装的过程中出现碰撞产生撞击影响。The top of the
先通过吊装设备与吊具的配合完成对混凝土预制梁7的抓取和吊装,再将托架8置于混凝土预制梁7底部以强化吊装强度,摆脱了传统吊装方式需要其他大型起重机械配合作业才能完成的工作内容,降低了不必要的人力物力支出;整体上不会对混凝土预制梁7的产生损伤,消除了安全隐患。First, the grasping and hoisting of the
一种高墩柱大跨径预应力梁安全架设吊具的使用方法,具体步骤如下:A method for using a spreader for safe erection of a large-span prestressed beam with a high pier column, the specific steps are as follows:
S1、先利用吊装设备将桁架1吊起一定高度,再通过驱动电机31带动支撑座4顶部在滑槽21内向下滑动,使得两侧的夹爪5转动张开;S1. First use the hoisting equipment to hoist the
S2、由吊装设备将桁架1向下移动,直至支撑座4底部的橡胶缓存块43碰到混凝土预制梁7的上表面中央,随后通过驱动电机31带动支撑座4顶部在滑槽21内向上滑动,使得两侧的夹爪5转动夹持在混凝土预制梁7上部两侧翼缘的下表面,完成对混凝土预制梁7的抓取和吊装;S2. Use the hoisting equipment to move the
S3、再利用吊装设备将桁架1吊起一定高度,然后人工将托架8置于混凝土预制梁7底部,并通过锁紧机构9固定起来,最后利用吊装设备进行远距离或高度提升。S3. Use hoisting equipment to hoist the
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310469387.4A CN116409703A (en) | 2023-04-27 | 2023-04-27 | A safe erection spreader for high pier columns and large-span prestressed beams and its application method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310469387.4A CN116409703A (en) | 2023-04-27 | 2023-04-27 | A safe erection spreader for high pier columns and large-span prestressed beams and its application method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN116409703A true CN116409703A (en) | 2023-07-11 |
Family
ID=87052914
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310469387.4A Pending CN116409703A (en) | 2023-04-27 | 2023-04-27 | A safe erection spreader for high pier columns and large-span prestressed beams and its application method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116409703A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118997512A (en) * | 2024-10-18 | 2024-11-22 | 中铁十七局集团第六工程有限公司 | Temporary supporting structure for mounting precast beams and conveying device thereof |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07330278A (en) * | 1994-06-03 | 1995-12-19 | Mitsubishi Heavy Ind Ltd | Automatic lifting equipment |
| CN108394806A (en) * | 2018-01-24 | 2018-08-14 | 倪惠芳 | Hoisting structure suitable for aerospace equipment |
| CN212712361U (en) * | 2020-06-11 | 2021-03-16 | 南江东科钢模板有限责任公司 | Anti-skidding lifting appliance for hoisting bridge box girder |
| CN217516501U (en) * | 2022-03-28 | 2022-09-30 | 中交第四公路工程局有限公司 | Hoist pulls input device for prefabricated box girder |
-
2023
- 2023-04-27 CN CN202310469387.4A patent/CN116409703A/en active Pending
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH07330278A (en) * | 1994-06-03 | 1995-12-19 | Mitsubishi Heavy Ind Ltd | Automatic lifting equipment |
| CN108394806A (en) * | 2018-01-24 | 2018-08-14 | 倪惠芳 | Hoisting structure suitable for aerospace equipment |
| CN212712361U (en) * | 2020-06-11 | 2021-03-16 | 南江东科钢模板有限责任公司 | Anti-skidding lifting appliance for hoisting bridge box girder |
| CN217516501U (en) * | 2022-03-28 | 2022-09-30 | 中交第四公路工程局有限公司 | Hoist pulls input device for prefabricated box girder |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118997512A (en) * | 2024-10-18 | 2024-11-22 | 中铁十七局集团第六工程有限公司 | Temporary supporting structure for mounting precast beams and conveying device thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207878295U (en) | Suspension bridge cable changing device | |
| CN101798869A (en) | Method for automatically centering and inversely installing vertical shaft pipelines | |
| CN110029598B (en) | Deformation control method for removing midspan closure section of continuous box girder bridge | |
| CN110217684A (en) | A tool for hoisting reinforcement of the bottom web of a box girder | |
| CN201598093U (en) | Hoisting fixture for large-sized sectional box-type beam | |
| CN108374351A (en) | A kind of simple hoisting apparatus and method for removing box beam beret slice | |
| CN217780518U (en) | Clamping device for hoisting assembly type concrete prefabricated part | |
| CN219009694U (en) | Hoisting device for box culvert | |
| CN209584872U (en) | The double interim rope self-balancings of pin ear formula pull formula suspension bridge sling replacing underpinning device | |
| CN219652500U (en) | Steel beam hoisting tool | |
| CN219384698U (en) | Novel movable operation platform for bridge reinforcement and maintenance | |
| CN217203666U (en) | Steel hoop hoisting support for bridge reinforcement | |
| CN111252683A (en) | Bridge deck crane and application method thereof applied to bridge dismantling | |
| CN218027247U (en) | Bridge pier column removes mobile device fast | |
| CN111453600A (en) | A kind of prefabricated bridge pier column lifting device and lifting method | |
| CN215885996U (en) | F-shaped prefabricated T-beam template hoisting device | |
| CN115354575A (en) | Multifunctional bridge floor crane for middle cable plane cable-stayed bridge | |
| CN216474518U (en) | Innovative prestressed T-beam hogging moment stretching operation frame | |
| CN212175497U (en) | Large-span steel-concrete composite bridge large-segment steel truss girder assembly system | |
| CN207265540U (en) | A kind of tangent tower overhead line lifter | |
| CN201605579U (en) | Tubular pile trade steel cage hoist device | |
| CN223737520U (en) | Conveying equipment for road construction cement piers | |
| CN107237264A (en) | A kind of the second stage of prestress wire tensioning support of Precast T-Beam and method | |
| CN209053444U (en) | Steel construction purlin hoisting device | |
| CN209868519U (en) | Driving maintenance auxiliary device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230711 |