CN116336048A - A buckle and grounding trunk without opening device and installation method - Google Patents

A buckle and grounding trunk without opening device and installation method Download PDF

Info

Publication number
CN116336048A
CN116336048A CN202310306881.9A CN202310306881A CN116336048A CN 116336048 A CN116336048 A CN 116336048A CN 202310306881 A CN202310306881 A CN 202310306881A CN 116336048 A CN116336048 A CN 116336048A
Authority
CN
China
Prior art keywords
buckle
grounding
flat iron
installation
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310306881.9A
Other languages
Chinese (zh)
Inventor
任建峰
王民强
李军利
王义飞
谢宗坤
代颖博
康帆
李亦兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SCEGC No 6 Construction Engineering Group Co Ltd
Original Assignee
SCEGC No 6 Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SCEGC No 6 Construction Engineering Group Co Ltd filed Critical SCEGC No 6 Construction Engineering Group Co Ltd
Priority to CN202310306881.9A priority Critical patent/CN116336048A/en
Publication of CN116336048A publication Critical patent/CN116336048A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01RELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
    • H01R4/00Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation
    • H01R4/58Electrically-conductive connections between two or more conductive members in direct contact, i.e. touching one another; Means for effecting or maintaining such contact; Electrically-conductive connections having two or more spaced connecting locations for conductors and using contact members penetrating insulation characterised by the form or material of the contacting members
    • H01R4/66Connections with the terrestrial mass, e.g. earth plate, earth pin
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B13/00Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose
    • F16B13/04Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front
    • F16B13/06Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve
    • F16B13/063Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve by the use of an expander
    • F16B13/066Dowels or other devices fastened in walls or the like by inserting them in holes made therein for that purpose with parts gripping in the hole or behind the reverse side of the wall after inserting from the front combined with expanding sleeve by the use of an expander fastened by extracting a separate expander-part, actuated by the screw, nail or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B2/00Friction-grip releasable fastenings
    • F16B2/20Clips, i.e. with gripping action effected solely by the inherent resistance to deformation of the material of the fastening
    • F16B2/22Clips, i.e. with gripping action effected solely by the inherent resistance to deformation of the material of the fastening of resilient material, e.g. rubbery material
    • F16B2/24Clips, i.e. with gripping action effected solely by the inherent resistance to deformation of the material of the fastening of resilient material, e.g. rubbery material of metal
    • F16B2/241Clips, i.e. with gripping action effected solely by the inherent resistance to deformation of the material of the fastening of resilient material, e.g. rubbery material of metal of sheet metal
    • F16B2/245Clips, i.e. with gripping action effected solely by the inherent resistance to deformation of the material of the fastening of resilient material, e.g. rubbery material of metal of sheet metal external, i.e. with contracting action
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a buckle, a hole-free device of a grounding trunk and an installation method, relates to the technical field of grounding trunk installation, and is suitable for indoor open-application grounding engineering of the grounding trunk of all building engineering. The buckle is of an integrated groove structure and comprises a horizontal part, two sides of the horizontal part are connected with symmetrical outward expansion parts which are folded obliquely upwards, the outward expansion parts are connected with clamping groove parts in the vertical direction, the clamping groove parts are connected with inwards bent groove parts, and one side of the clamping groove parts are provided with turning parts; the center of the horizontal part is provided with a through hole. The grounding trunk line tapping-free device well solves the defects of complicated working procedures, long time, high labor and cost and the like in the traditional construction, and has the characteristics of good appearance quality, convenience and rapidness in installation, high quality, safety, environmental protection, material saving and consumption reduction.

Description

一种卡扣及接地干线无开孔装置及安装方法A buckle and grounding trunk without opening device and installation method

技术领域technical field

本发明涉及接地干线安装技术领域,特别涉及一种卡扣及接地干线无开孔装置及安装方法,适用于所有建筑工程接地干线室内明敷接地工程。The invention relates to the technical field of grounding main line installation, in particular to a clasp and grounding main line without opening device and installation method, which are suitable for indoor surface laying grounding projects of all construction engineering grounding main lines.

背景技术Background technique

传统接地干线室内明敷施工时,先在墙体预埋支持件,待水泥沙浆凝固后,用螺丝将支架与扁铁进行连接固定。这种做法仍存在较多的问题,如施工工艺繁琐、钻孔处横截面变小、扁铁标高取决于支架埋设工艺、统一标高难度较大、观感质量不佳等问题。When the traditional grounding main line is laid indoors, the supporting parts are pre-embedded in the wall, and after the cement mortar is solidified, the brackets are connected and fixed with flat irons with screws. There are still many problems in this method, such as cumbersome construction technology, smaller cross-section at the drilled hole, flat iron elevation depends on the support embedding process, difficulty in unifying the elevation, and poor visual quality.

室内接地扁铁在墙面明敷时,根据设计图要求在墙面弹线确定L型支架标高,定位支架间距位置后,在墙体开洞将预制的燕尾L型支架埋入孔中,用水泥沙浆固定,待凝固后使用。扁铁驾于L型支架,定位钻孔用螺丝固定。整个施工过程繁琐、周期长,耗费人力、物力较大,且螺孔处横截面变小,影响导电效果。When the indoor grounding flat iron is laid on the wall surface, according to the requirements of the design drawing, the height of the L-shaped bracket is determined by springing the wire on the wall. The cement mortar is fixed and used after it has solidified. The flat iron is driven on the L-shaped bracket, and the positioning drilling holes are fixed with screws. The entire construction process is cumbersome, long-term, labor-intensive, and materially resource-intensive, and the cross-section of the screw hole becomes smaller, which affects the conductive effect.

发明内容Contents of the invention

有鉴于此,为解决安装繁琐、破坏扁铁导电效果的问题,本发明提供一种卡扣及接地干线无开孔装置及安装方法,该卡扣安装方便快捷、节省施工工序、节省施工时间的方法,该装置具有“无开孔”“半卡抱式”、“方便安装”、“节省工序”确保载流量等创新点。In view of this, in order to solve the problem of cumbersome installation and damage to the conductive effect of flat iron, the present invention provides a buckle and grounding trunk without opening device and installation method. The buckle is convenient and quick to install, saves construction procedures and saves construction time method, the device has innovative points such as "no opening", "semi-clamping type", "convenient installation", and "saving process" to ensure the carrying capacity.

为了实现上述发明目的,本发明提供以下技术方案:In order to achieve the above-mentioned purpose of the invention, the present invention provides the following technical solutions:

一种卡扣,所述卡扣呈一体槽式结构,包括水平部,所述水平部两侧连接对称的向斜上方折起的外扩部,所述外扩部连接竖直方向的卡槽部,所述卡槽部连接内弯的凹槽部,所述一边凹槽部有翻弯部,另一边没有;所述水平部中心设有通孔。A buckle, the buckle has an integrated groove structure, including a horizontal part, the two sides of the horizontal part are connected with a symmetrical outward expansion part folded upward obliquely, and the outward expansion part is connected with a vertical card slot part, the groove part is connected to the inwardly bent groove part, the groove part on one side has a turning part, and the other side does not; the center of the horizontal part is provided with a through hole.

本发明还具有以下附加技术特征:The present invention also has the following additional technical features:

优选的,所述卡扣的投影长度为40*46*26mm,所述卡槽部的长度为5mm。Preferably, the projected length of the buckle is 40*46*26mm, and the length of the groove is 5mm.

优选的,所述卡扣的材料为镀锌钢板。Preferably, the buckle is made of galvanized steel plate.

优选的,所述镀锌钢板的厚度为1-3mm。Preferably, the thickness of the galvanized steel sheet is 1-3 mm.

优选的,所述镀锌钢板的厚度为3mm。Preferably, the thickness of the galvanized steel sheet is 3 mm.

本发明还公开一种接地干线无开孔装置,包括上述的卡扣、接地扁铁、橡胶垫片和膨胀螺栓。The invention also discloses a device without openings for a grounding main line, which includes the above buckle, a grounding flat iron, a rubber gasket and an expansion bolt.

优选的,所述接地扁铁尺寸为40*40mm(长*宽)。Preferably, the size of the ground flat iron is 40*40mm (length*width).

本发明还提供上述的接地干线无开孔装置安装方法,先在墙面定点处安装好所述的膨胀螺栓,所述膨胀螺栓穿过卡扣的通孔将卡扣固定于墙面,将所述的接地扁铁用力推进所述卡槽部即可。The present invention also provides the above-mentioned installation method of the device without openings for the ground trunk line. Firstly, the expansion bolt is installed at a fixed point on the wall, and the expansion bolt passes through the through hole of the buckle to fix the buckle on the wall. The above ground flat iron can be firmly pushed into the groove.

优选的,包括以下步骤:Preferably, the following steps are included:

a)根据设计方案绘制出安装装置的CAD图纸,计算出相应位置尺寸,进而得出各个部分的尺寸图;a) Draw the CAD drawing of the installation device according to the design plan, calculate the corresponding position size, and then get the size drawing of each part;

b)确定接地扁铁安装高度,弹线标记;b) Determine the installation height of the ground flat iron, and mark the spring line;

c)确定卡扣安装间距,定位“+”标记;c) Determine the buckle installation spacing and locate the "+" mark;

d)用电锤在墙面“+”字线上打孔,安装膨胀螺栓;d) Drill holes on the "+" line on the wall with an electric hammer, and install expansion bolts;

e)水平面安装时,膨胀螺栓安装好后将卡扣垂直安装在膨胀螺栓上,拧紧螺母;垂直面安装时,膨胀螺栓安装好后将卡扣水平安装在膨胀螺栓上,拧紧螺母;e) When installing on a horizontal plane, install the buckle vertically on the expansion bolt after the expansion bolt is installed, and tighten the nut; when installing on a vertical plane, install the buckle horizontally on the expansion bolt after the expansion bolt is installed, and tighten the nut;

f)水平面安装时,将预先调直的扁铁,双手水平握紧宽边与墙面平行放入卡扣下边凹槽,用力一推,扁铁会死死卡入卡扣上下凹槽;垂直面安装时,将预先调直的扁铁,双手垂直握紧宽边与墙面平行放入卡扣左边凹槽,用力一推,扁铁会死死卡入卡扣上下凹槽。f) When installing on a horizontal surface, put the pre-aligned flat iron with both hands horizontally and hold the wide side parallel to the wall and put it into the lower groove of the buckle. Push hard, and the flat iron will firmly snap into the upper and lower grooves of the buckle; vertically When installing on the surface, put the flat iron that has been straightened in advance, hold the wide side vertically with both hands and parallel to the wall, and put it into the left groove of the buckle, push it hard, and the flat iron will firmly snap into the upper and lower grooves of the buckle.

优选的,还包括将橡胶垫片垫于接地扁铁与卡槽部之间的步骤。Preferably, it also includes the step of placing a rubber gasket between the ground flat iron and the groove part.

具体的,本发明的接地干线无开孔装置是利用BIM技术优化接地干线支持件排布,设计出“无开孔”“半卡抱式”件加工尺寸,在工厂进行开模、冲压加工,然后现场进行安装。Specifically, the non-opening device for the grounding main line of the present invention uses BIM technology to optimize the arrangement of the supporting parts of the grounding main line, and designs the processing dimensions of "no opening" and "semi-clamping" parts, and performs mold opening and stamping processing in the factory. Then install it on site.

本发明和现有技术相比,其优点在于:Compared with the prior art, the present invention has the advantages of:

1.本发明的接地干线无开孔装置较好的解决了传统施工工序繁琐、时间长、人工和费用成本较高等缺点,具有观感质量佳、安装方便快捷质量高、安全环保,节材降耗的特点。1. The non-opening device for the grounding main line of the present invention better solves the shortcomings of traditional construction procedures such as cumbersome, long time, high labor and cost costs, and has the advantages of good appearance quality, convenient and fast installation, high quality, safety and environmental protection, material saving and consumption reduction specialty.

2.本发明的接地干线卡扣支持件(简称“卡扣”)不需要在墙体预埋支架,通过膨胀螺丝固定好卡扣,扁铁安装只需一放一推即可安全高效完成,扁铁安装标高统一易控制,节省施工序,节省施工费用,节省施工时间,大大提高施工效率。2. The buckle support for the grounding main line of the present invention ("buckle" for short) does not need to pre-embed a bracket on the wall, and the buckle is fixed by expansion screws. The installation of the flat iron can be completed safely and efficiently with just one push and one push. The installation elevation of the flat iron is uniform and easy to control, saving construction procedures, saving construction costs, saving construction time, and greatly improving construction efficiency.

3.接地干线卡扣采用工厂开模,按设计尺寸要求流水式生产加工,产品一次成型,施工时直接使用,节省人工的特点。3. The buckle of the grounding main line adopts factory mold opening, and is produced and processed according to the design size requirements. The product is formed at one time and can be used directly during construction, saving labor.

附图说明Description of drawings

本发明的上述和/或附加的方面和优点从结合下面附图对实施例的描述中将变得明显和容易理解,其中:The above and/or additional aspects and advantages of the present invention will become apparent and understandable from the description of the embodiments in conjunction with the following drawings, wherein:

图1是本发明实施例的卡扣结构示意图;Fig. 1 is a schematic diagram of a buckle structure of an embodiment of the present invention;

图2是本发明实施例的接地干线无开孔装置安装结构示意图;Fig. 2 is a schematic diagram of the installation structure of the grounding trunk without opening device according to the embodiment of the present invention;

图3是本发明实施例的接地干线无开孔装置安装工序图;Fig. 3 is a diagram of the installation process of the grounding trunk without opening device according to the embodiment of the present invention;

图4是本发明实施例的接地干线无开孔装置的橡胶垫片的结构示意图。Fig. 4 is a schematic structural view of the rubber gasket of the grounding trunk without opening device according to the embodiment of the present invention.

附图标记说明:Explanation of reference signs:

卡扣1;水平部2;外扩部3;卡槽部4;凹槽部5;翻弯部6;接地扁铁7;膨胀螺栓8;橡胶垫片9;通孔10。Buckle 1; horizontal part 2; outward expansion part 3; slot part 4; groove part 5; bending part 6; ground flat iron 7; expansion bolt 8; rubber gasket 9; through hole 10.

具体实施方式Detailed ways

以下公开本发明的一些实施例,本领域技术人员可以根据本文内容,适当改进工艺参数实现。特别需要指出的是,所有类似的替换和改动对本领域技术人员来说是显而易见的,它们都被视为包括在本发明。本发明的方法及应用已经通过较佳实施例进行了描述,相关人员明显能在不脱离本发明内容、精神和范围内对本文所述的方法和应用进行改动或适当变更与组合,来实现和应用本发明技术。Some embodiments of the present invention are disclosed below, and those skilled in the art can implement them by appropriately improving process parameters according to the contents herein. In particular, it should be pointed out that all similar replacements and modifications are obvious to those skilled in the art, and they are all considered to be included in the present invention. The method and application of the present invention have been described through preferred embodiments, and the relevant personnel can obviously make changes or appropriate changes and combinations to the method and application described herein without departing from the content, spirit and scope of the present invention to realize and Apply the technology of the present invention.

实施例1一种卡扣1,所述卡扣1呈一体槽式结构,包括水平部2,所述水平部2两侧连接对称的向斜上方折起的外扩部3,所述外扩部3连接竖直方向的卡槽部4,所述卡槽部4连接内弯的凹槽部5,所述一边凹槽部5有翻弯部6,另一边没有;所述水平部2中心设有通孔10。具体的,所述卡扣的投影长度为40*46*26mm,所述卡槽部的长度为5mm。Embodiment 1 A buckle 1, the buckle 1 is an integrated groove structure, including a horizontal part 2, the two sides of the horizontal part 2 are connected with a symmetrical outward expansion part 3 folded upward obliquely, the outward expansion The part 3 is connected with the draw-in groove part 4 in the vertical direction, and the draw-in groove part 4 is connected with the inwardly bent groove part 5, and the groove part 5 on one side has a turning part 6, and the other side does not; the center of the horizontal part 2 Through holes 10 are provided. Specifically, the projected length of the buckle is 40*46*26mm, and the length of the groove is 5mm.

具体的,在使用过程中,卡扣1通过上下卡槽部4,卡紧接地扁铁7不松动,因此需要具有足够机械强度支撑住接地扁铁7,保证在同一个水平面,安装方便。这样就对卡扣加工工艺要求较高,对材料本身的弹性和强度也有一定要求。初始制作时,人工采用1-3mm厚度钢带按照设计图现场加工,经过半手工加工的成品,无论是质量、工艺、强度均不高,测试后达不到设计要求的效果。非手工加工可以完成,经过考察市场后,最终采用机械开模冲压一次成型。材料选用3mm厚度的镀锌钢板,经过开料、开孔、两次冲压流水式工艺程序,经过反复测试、调整模具、再测试,最终完成设计要求的合格产品。本实施例制备的卡扣较好的解决了传统施工工序繁琐、时间长、人工和费用成本较高等缺点,具有观感质量佳、安装方便快捷质量高、安全环保,节材降耗的特点。Specifically, during use, the buckle 1 clamps the ground flat iron 7 through the upper and lower grooves 4 without loosening, so it needs to have sufficient mechanical strength to support the ground flat iron 7 to ensure that it is on the same horizontal plane and is easy to install. In this way, the requirements for the buckle processing technology are relatively high, and there are also certain requirements for the elasticity and strength of the material itself. During the initial production, steel strips with a thickness of 1-3mm were manually processed on-site according to the design drawings. The finished products after semi-manual processing were not high in quality, craftsmanship, and strength, and could not meet the design requirements after testing. Non-manual processing can be completed. After inspecting the market, it is finally formed by mechanical mold opening and stamping. The material is galvanized steel plate with a thickness of 3mm. After cutting, opening, two times of stamping flow-through process, repeated testing, adjustment of molds, and retesting, the qualified product required by the design is finally completed. The buckle prepared in this example better solves the shortcomings of traditional construction procedures such as cumbersome, long time, and high labor and cost costs. It has the characteristics of good appearance quality, convenient and fast installation, high quality, safety and environmental protection, and material saving and consumption reduction.

实施例2接地干线无开孔装置安装方法Embodiment 2 Installation method of grounding main line without opening device

一、材料:1. Materials:

镀锌钢板(40*46*26mm)、接地扁铁40*40、卡槽、橡胶垫片、M8的膨胀螺丝。Galvanized steel plate (40*46*26mm), ground flat iron 40*40, card slot, rubber gasket, M8 expansion screw.

二、工具:2. Tools:

台钻、冲击钻、红外标线仪、角磨机、开口搬手、卷尺、记号笔、抹布。Bench drill, impact drill, infrared marker, angle grinder, open wrench, tape measure, marker pen, rag.

三、工艺安装程序如下:3. The process installation procedure is as follows:

1、如图3所示,根据设计方案绘制出安装装置的CAD图纸,计算出相应位置尺寸。进而得出各个部分的尺寸图。1. As shown in Figure 3, draw the CAD drawing of the installation device according to the design plan, and calculate the corresponding position size. Then draw the size chart of each part.

2、根据CAD图纸进行BIM建模。2. Carry out BIM modeling according to CAD drawings.

3、确定接地扁铁7安装高度,弹线标记;3. Determine the installation height of the ground flat iron 7, and mark the elastic wire;

4、确定卡扣1安装间距,定位“+”标记;4. Determine the installation distance of buckle 1 and locate the "+" mark;

5、用电锤在墙面“+”字线上打孔,安装膨胀螺栓8。5. Use an electric hammer to drill holes on the "+" line on the wall, and install expansion bolts 8.

6、水平面安装时,膨胀螺栓8安装好后将卡扣1垂直安装在膨胀螺栓8上,拧紧螺母。垂直面安装时,膨胀螺栓8安装好后将卡扣水平安装在膨胀螺栓8上,拧紧螺母。6. When installing on a horizontal plane, install the buckle 1 vertically on the expansion bolt 8 after the expansion bolt 8 is installed, and tighten the nut. When installing on a vertical surface, after the expansion bolt 8 is installed, install the buckle horizontally on the expansion bolt 8, and tighten the nut.

7、水平面安装时,将预先调直的接地扁铁7,双手水平握紧宽边与墙面平行放入卡扣1下边凹槽部5,用力一推,接地扁铁会死死卡入卡扣1上下凹槽。7. When installing on a horizontal surface, put the pre-adjusted ground flat iron 7, hold the wide side parallel to the wall with both hands and put it into the groove 5 under the buckle 1, push it hard, and the ground flat iron will be firmly stuck into the card Buckle 1 upper and lower grooves.

8、垂直面安装时,将预先调直的扁铁,双手垂直握紧宽边与墙面平行放入卡扣1左边凹槽部5,用力一推,接地扁铁7会死死卡入卡扣1上下凹槽部5。8. When installing on a vertical surface, put the pre-aligned flat iron with both hands vertically and hold the wide side parallel to the wall and put it into the left groove 5 of the buckle 1, push it hard, and the ground flat iron 7 will be firmly stuck into the card Buckle 1 upper and lower grooves 5.

9、安装好后将现场清理干净并将剩余材料、垃圾装好带走。9. After installation, clean up the site and pack the remaining materials and garbage away.

四、控制要点:Fourth, control points:

卡扣1两边凹槽,一边有翻弯,一边没有。水平安装时,可选择将有翻弯一边靠上(或靠下)垂直安装。垂直安装时,可选择将有翻弯一边靠右(或靠左)水平直安装,安装方法可根据现场及操作者施工方便选择。There are grooves on both sides of the buckle 1, one side is bent, and the other side is not. When installing horizontally, you can choose to install vertically with the bent side up (or down). When installing vertically, you can choose to install it horizontally and straight with the bent side to the right (or left). The installation method can be selected according to the convenience of the site and the operator.

五、质量要求:5. Quality requirements:

膨胀螺丝与卡扣安装牢固,膨胀螺栓安装高度一致,扁铁要求卡入卡扣上下凹槽。The expansion screw and buckle are firmly installed, the installation height of the expansion bolt is consistent, and the flat iron is required to be snapped into the upper and lower grooves of the buckle.

本发明的接地干线无开孔装置安装方法不破坏扁铁导电横截面、施工方便。经过反复尝试试验失败,最终确定采用镀锌钢板设计成40*46*26mm卡槽式支卡扣1,卡扣1与墙体接触面中心位置留有孔洞,施工时根据设计图纸要求在墙面弹线定位、卡扣1通过膨胀螺栓8固定在墙面。接地扁铁7安装不需要钻孔,将扁铁放入卡扣1下边凹槽部4,用力一推扁铁会死死卡入卡扣上下凹槽中。拆卸时,接地扁铁7向外上斜用力一拉就可轻松拆下。扁铁安装、拆卸全程无螺丝,不需要借助任何工具,大大提高施工效率。The installation method of the non-opening device for the grounding main line of the present invention does not destroy the conductive cross section of the flat iron, and is convenient for construction. After repeated attempts and failed tests, it was finally decided to use galvanized steel to design a 40*46*26mm slot-type support buckle 1. There is a hole in the center of the contact surface between the buckle 1 and the wall. Elastic wire positioning, buckle 1 is fixed on the wall by expansion bolt 8. The installation of the ground flat iron 7 does not require drilling, and the flat iron is put into the lower groove part 4 of the buckle 1, and the flat iron will firmly snap into the upper and lower grooves of the buckle once the flat iron is pushed hard. During disassembly, the ground flat iron 7 can be easily removed by pulling it upwards obliquely. There are no screws in the installation and disassembly of the flat iron, and no tools are needed, which greatly improves the construction efficiency.

以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above is only a preferred embodiment of the present invention, it should be pointed out that, for those of ordinary skill in the art, without departing from the principle of the present invention, some improvements and modifications can also be made, and these improvements and modifications can also be made. It should be regarded as the protection scope of the present invention.

Claims (9)

1.一种卡扣,其特征在于,所述卡扣呈一体槽式结构,包括水平部,所述水平部两侧连接对称的向斜上方折起的外扩部,所述外扩部连接竖直方向的卡槽部,所述卡槽部连接内弯的凹槽部,所述凹槽部一边有翻弯,一边没有;所述水平部中心设有通孔。1. A buckle, characterized in that, the buckle is an integrated groove structure, including a horizontal part, the two sides of the horizontal part are connected to a symmetrical outwardly expanded part that is folded obliquely upward, and the outwardly expanded part is connected to The vertical groove part is connected to the inwardly bent groove part, and one side of the groove part has a bend, and the other side does not; the center of the horizontal part is provided with a through hole. 2.根据权利要求1所述的卡扣,其特征在于,所述卡扣的投影长度为40*46*26mm,所述卡槽部的长度为5mm。2 . The buckle according to claim 1 , wherein the projected length of the buckle is 40*46*26 mm, and the length of the groove is 5 mm. 3 . 3.根据权利要求1所述的卡扣,其特征在于,所述卡扣的材料为镀锌钢板。3. The buckle according to claim 1, characterized in that, the material of the buckle is galvanized steel plate. 4.根据权利要求3所述的卡扣,其特征在于,所述镀锌钢板的厚度为3mm。4. The buckle according to claim 3, wherein the thickness of the galvanized steel plate is 3mm. 5.一种接地干线无开孔装置,其特征在于,包括权利要求1-4任一项所述的卡扣,还包括接地扁铁和膨胀螺栓,所述接地扁铁卡于所述卡扣内,所述膨胀螺栓将所述卡扣固定在墙面。5. A grounding trunk without opening device, characterized in that it includes the buckle described in any one of claims 1-4, and also includes a grounding flat iron and expansion bolts, and the grounding flat iron is stuck on the buckle Inside, the expansion bolts fix the buckle on the wall. 6.根据权利要求5所述的接地干线无开孔装置,其特征在于,所述接地扁铁尺寸为40*40mm。6. The grounding trunk without opening device according to claim 5, characterized in that the size of the grounding flat iron is 40*40mm. 7.权利要求5-6任意项所述的接地干线无开孔装置安装方法,其特征在于,先在墙面定点处安装好所述的膨胀螺栓,所述膨胀螺栓穿过卡扣的通孔将卡扣固定于墙面,将所述的接地扁铁用力推进所述卡槽部即可。7. The installation method of the grounding main line non-opening device described in any of claims 5-6, characterized in that the expansion bolts are first installed at fixed points on the wall, and the expansion bolts pass through the through holes of the buckle Fix the buckle on the wall, and forcefully push the ground flat iron into the slot. 8.根据权利要求7所述的接地干线无开孔装置安装方法,其特征在于,包括以下步骤:8. The installation method of the grounding main line without opening device according to claim 7, characterized in that it comprises the following steps: a)根据设计方案绘制出安装装置的CAD图纸,计算出相应位置尺寸,进而得出各个部分的尺寸图;a) Draw the CAD drawing of the installation device according to the design plan, calculate the corresponding position size, and then get the size drawing of each part; b)确定接地扁铁安装高度,弹线标记;b) Determine the installation height of the ground flat iron, and mark the spring line; c)确定卡扣安装间距,定位“+”标记;c) Determine the buckle installation spacing and locate the "+" mark; d)用电锤在墙面“+”字线上打孔,安装膨胀螺栓;d) Drill holes on the "+" line on the wall with an electric hammer, and install expansion bolts; e)水平面安装时,膨胀螺栓安装好后将卡扣垂直安装在膨胀螺栓上,拧紧螺母;垂直面安装时,膨胀螺栓安装好后将卡扣水平安装在膨胀螺栓上,拧紧螺母;e) When installing on a horizontal plane, install the buckle vertically on the expansion bolt after the expansion bolt is installed, and tighten the nut; when installing on a vertical plane, install the buckle horizontally on the expansion bolt after the expansion bolt is installed, and tighten the nut; f)水平面安装时,将预先调直的扁铁,双手水平握紧宽边与墙面平行放入卡扣下边凹槽,用力一推,扁铁会死死卡入卡扣上下凹槽;垂直面安装时,将预先调直的扁铁,双手垂直握紧宽边与墙面平行放入卡扣左边凹槽,用力一推,扁铁会死死卡入卡扣上下凹槽。f) When installing on a horizontal surface, put the pre-aligned flat iron with both hands horizontally and hold the wide side parallel to the wall and put it into the lower groove of the buckle. Push hard, and the flat iron will firmly snap into the upper and lower grooves of the buckle; vertically When installing on the surface, put the flat iron that has been straightened in advance, hold the wide side vertically with both hands and parallel to the wall, and put it into the left groove of the buckle, push it hard, and the flat iron will firmly snap into the upper and lower grooves of the buckle. 9.根据权利要求7所述的接地干线无开孔装置安装方法,其特征在于,还包括将橡胶垫片垫于接地扁铁与卡槽部之间的步骤。9. The installation method of the grounding main line without opening device according to claim 7, further comprising the step of placing a rubber gasket between the grounding flat iron and the groove part.
CN202310306881.9A 2023-03-27 2023-03-27 A buckle and grounding trunk without opening device and installation method Pending CN116336048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310306881.9A CN116336048A (en) 2023-03-27 2023-03-27 A buckle and grounding trunk without opening device and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310306881.9A CN116336048A (en) 2023-03-27 2023-03-27 A buckle and grounding trunk without opening device and installation method

Publications (1)

Publication Number Publication Date
CN116336048A true CN116336048A (en) 2023-06-27

Family

ID=86875841

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310306881.9A Pending CN116336048A (en) 2023-03-27 2023-03-27 A buckle and grounding trunk without opening device and installation method

Country Status (1)

Country Link
CN (1) CN116336048A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10119038C1 (en) * 2001-04-18 2002-06-06 Friedrich Knapp Two-part fitment, for building in earthquake threatened areas, has plate-shaped halves with bent and cropped ends with slots for fixing screws with locking flap on one fitment folding round axis to enclose screw head on other fitment half
CN103363480A (en) * 2012-03-26 2013-10-23 海洋王照明科技股份有限公司 Fastener connecting device
CN203834777U (en) * 2014-03-07 2014-09-17 嘉兴美尔凯特卫厨科技有限公司 Suspended ceiling structure
CN105863207A (en) * 2016-06-15 2016-08-17 南宁职业技术学院 Timber veneer finish clamp type assembling component and mounting method
CN215442888U (en) * 2021-03-19 2022-01-07 南宁职业技术学院 Detachable facing brick installation component and facing brick
CN217631008U (en) * 2022-06-28 2022-10-21 河源市美嘉美科技有限公司 Wall brick mounting structure
CN220368151U (en) * 2023-03-27 2024-01-19 陕西建工第六建设集团有限公司 Buckle and grounding trunk line non-perforating device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10119038C1 (en) * 2001-04-18 2002-06-06 Friedrich Knapp Two-part fitment, for building in earthquake threatened areas, has plate-shaped halves with bent and cropped ends with slots for fixing screws with locking flap on one fitment folding round axis to enclose screw head on other fitment half
CN103363480A (en) * 2012-03-26 2013-10-23 海洋王照明科技股份有限公司 Fastener connecting device
CN203834777U (en) * 2014-03-07 2014-09-17 嘉兴美尔凯特卫厨科技有限公司 Suspended ceiling structure
CN105863207A (en) * 2016-06-15 2016-08-17 南宁职业技术学院 Timber veneer finish clamp type assembling component and mounting method
CN215442888U (en) * 2021-03-19 2022-01-07 南宁职业技术学院 Detachable facing brick installation component and facing brick
CN217631008U (en) * 2022-06-28 2022-10-21 河源市美嘉美科技有限公司 Wall brick mounting structure
CN220368151U (en) * 2023-03-27 2024-01-19 陕西建工第六建设集团有限公司 Buckle and grounding trunk line non-perforating device

Similar Documents

Publication Publication Date Title
CN205369958U (en) A support frame for prefabricating wallboard installation
CN116336048A (en) A buckle and grounding trunk without opening device and installation method
CN220368151U (en) Buckle and grounding trunk line non-perforating device
CN108661315A (en) A kind of the construction curved adjustable fastener of square column template list and construction
CN210067488U (en) Outdoor curtain wall unwrapping wire appurtenance
CN118601255B (en) A method for installing arc stone wall at deformation joint
CN106758663B (en) Buried rubber fastening band installs positioning construction method in one kind
CN202240989U (en) Fixture tool for fixing section bar during section bar installation
CN206633231U (en) Anti-skidding slot device is opened in a kind of stair step
CN108035542A (en) Wall pre-embedded alignment device and its routing method
CN104354187B (en) LED display face shield processing tool and processing method
CN204781859U (en) Main joist interval adjustment anchor clamps
CN208056321U (en) Wall pre-embedded alignment device
CN203640244U (en) Wall internal corner painting control tool
CN108532944B (en) Cast-in-situ stair step pedal surface adjusting slide block device
CN203722148U (en) Auxiliary tool for manufacturing cable head
CN115434465A (en) Glass curtain wall mounting construction method
CN222381183U (en) Pre-buried line box of bare concrete
CN207772114U (en) Solid brick cutting equipment capable of controlling cutting angle
CN223609514U (en) Profile steel bracket
CN204235623U (en) LED display face shield processing tool
CN207484919U (en) A kind of patch floor tile ash-scraper
CN204781857U (en) Pendant bonding anchor clamps
CN201180375Y (en) Mortar plastering strip for brick laying
CN219654315U (en) Adjusting filler wall bar planting point positioner

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20230627