CN116332016A - Hoisting device - Google Patents

Hoisting device Download PDF

Info

Publication number
CN116332016A
CN116332016A CN202310524705.2A CN202310524705A CN116332016A CN 116332016 A CN116332016 A CN 116332016A CN 202310524705 A CN202310524705 A CN 202310524705A CN 116332016 A CN116332016 A CN 116332016A
Authority
CN
China
Prior art keywords
pressing
sling
clamping
hoisted
lifting device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310524705.2A
Other languages
Chinese (zh)
Inventor
刘爱辉
万金义
寇志刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Nuclear Industry Maintenance Co Ltd
Original Assignee
China Nuclear Industry Maintenance Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry Maintenance Co Ltd filed Critical China Nuclear Industry Maintenance Co Ltd
Priority to CN202310524705.2A priority Critical patent/CN116332016A/en
Publication of CN116332016A publication Critical patent/CN116332016A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/12Slings comprising chains, wires, ropes, or bands; Nets
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C1/00Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
    • B66C1/10Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
    • B66C1/42Gripping members engaging only the external or internal surfaces of the articles
    • B66C1/44Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/08Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention discloses a hoisting device, relates to the technical field of hoisting equipment, and mainly aims to improve leveling precision of an object to be hoisted and improve maintenance efficiency of the object to be hoisted. The main technical scheme of the invention is as follows: the hoisting device comprises at least two slings, wherein the length of each sling is adjustable, and one end of each sling is used for being connected with hoisting equipment; the lifting appliance comprises at least two lifting appliances, wherein each lifting appliance comprises a lifting appliance body and a limiting part arranged on the lifting appliance body, the lifting appliance body or the limiting part is connected with the other end of the lifting rope, the lifting appliance body is used for connecting an object to be lifted, and the limiting part is used for limiting the motion of the object to be lifted relative to the lifting appliance body.

Description

吊装装置hoisting device

技术领域technical field

本发明涉及吊装设备技术领域,具体而言,涉及一种吊装装置。The invention relates to the technical field of hoisting equipment, in particular to a hoisting device.

背景技术Background technique

在石油化工和电站等各个行业中气动阀有着较为广泛的应用,其中不乏有许多大型气动执行机构在预防维护中需要进行解体拆装,特别在电厂检修施工过程中,大型的阀门执行机构需要定期进行解体检查,此时便需要将执行机构从阀门本体上吊卸至检修场地,完成检修后需要将执行机构吊装至阀门本体。在阀门执行机构的整个吊卸或吊装过程中,通过将阀门的连接轴插入阀门执行机构的连接槽,以完成执行机构与阀门阀芯的安装。Pneumatic valves are widely used in various industries such as petrochemical industry and power station. Among them, many large pneumatic actuators need to be disassembled and disassembled in preventive maintenance. Especially in the process of maintenance and construction of power plants, large valve actuators need to be regularly For disassembly inspection, the actuator needs to be hoisted and unloaded from the valve body to the maintenance site. After the maintenance is completed, the actuator needs to be hoisted to the valve body. During the entire process of unloading or hoisting of the valve actuator, the installation of the actuator and the valve core is completed by inserting the connecting shaft of the valve into the connecting groove of the valve actuator.

传统的阀门执行机构吊卸和吊装作业,通常采用多台手拉葫芦来执行机构调平,调平后同时动作所有手拉葫芦进行执行机构的提升和安装,多台手拉葫芦同时动作难度较大,因此这种施工方式对人力和工作时间的需求较大,且手拉葫芦调平精度较低。Traditional valve actuator hoisting and hoisting operations usually use multiple chain hoists to implement the leveling of the actuator. After leveling, all the chain hoists are operated at the same time to lift and install the actuator. It is difficult for multiple chain hoists to move at the same time. Large, so this construction method requires a lot of manpower and working time, and the leveling accuracy of the chain hoist is low.

发明内容Contents of the invention

有鉴于此,本发明实施例提供一种吊装装置,主要目的是提高待吊装物的调平精度,以及提高待吊装物的检修效率。In view of this, an embodiment of the present invention provides a hoisting device, the main purpose of which is to improve the leveling accuracy of the object to be hoisted and to improve the efficiency of inspection of the object to be hoisted.

为达到上述目的,本发明主要提供如下技术方案:In order to achieve the above object, the present invention mainly provides the following technical solutions:

第一方面,本发明实施例提供了一种吊装装置,包括:In a first aspect, an embodiment of the present invention provides a hoisting device, including:

至少两根吊索,所述吊索的长度可调节,所述吊索的一端用于与起重设备连接;at least two slings, the length of the slings is adjustable, and one end of the slings is used to connect with the lifting equipment;

至少两个吊具,所述吊具包括吊具本体和设置于所述吊具本体上的限位部,所述吊具本体或所述限位部与所述吊索的另一端连接,所述吊具本体用于连接待吊装物,所述限位部用于限制所述待吊装物相对于所述吊具本体运动。At least two slings, the sling includes a sling body and a limiting portion arranged on the sling body, the sling body or the limiting portion is connected to the other end of the sling, the The sling body is used to connect the object to be hoisted, and the limiting part is used to restrict the movement of the object to be sling relative to the sling body.

进一步地,所述吊具本体包括相对的第一夹持件和第二夹持件,所述第一夹持件和所述第二夹持件可拆卸地连接以夹持所述待吊装物;Further, the spreader body includes a first clamping piece and a second clamping piece opposite to each other, and the first clamping piece and the second clamping piece are detachably connected to clamp the object to be hoisted ;

所述吊索起吊时,所述第一夹持件位于所述待吊装物的顶部;所述第二夹持件位于所述待吊装物的底部;When the sling is hoisted, the first clamping part is located at the top of the object to be hoisted; the second clamping part is located at the bottom of the object to be hoisted;

所述第一夹持件和所述第二夹持件包括朝向所述待吊装物的夹持面,至少所述第二夹持件的夹持面上设置有第一弹性垫,所述夹持面用于通过所述第三弹性垫夹持所述待吊装物。The first clamping piece and the second clamping piece include a clamping surface facing the object to be hoisted, at least a first elastic pad is provided on the clamping surface of the second clamping piece, and the clamping The holding surface is used for clamping the object to be hoisted by the third elastic pad.

进一步地,所述吊索的数量为至少四根;Further, the number of the slings is at least four;

所述限位部包括两个第一压紧件,所述第一压紧件包括压紧面,两个所述第一压紧件对应地转动连接于所述第二夹持件的两端;The limiting part includes two first pressing pieces, the first pressing pieces include pressing surfaces, and the two first pressing pieces are correspondingly rotatably connected to both ends of the second clamping piece ;

至少两根所述吊索对应地与一个所述吊具的两个所述第一压紧件可拆卸地转动连接,至少另外两根所述吊索对应地与另一个所述吊具的两个所述第一压紧件可拆卸地转动连接;At least two of the slings are correspondingly detachably connected to the two first pressing parts of one of the slings, and at least two other slings are correspondingly connected to the two first pressing parts of the other sling. The first pressing member is detachably rotationally connected;

两个所述第一压紧件用于随所述吊索的起吊而相互靠拢,以使两个所述第一压紧件的压紧面相对并压紧所述待吊装物。The two first pressing parts are used to move closer to each other when the sling is hoisted, so that the pressing surfaces of the two first pressing parts face each other and compress the object to be hoisted.

进一步地,所述压紧面为倾斜面;所述吊索起吊时,所述压紧面朝向所述第二夹持件倾斜。Further, the pressing surface is an inclined surface; when the sling is hoisted, the pressing surface is inclined toward the second clamping member.

进一步地,所述第一压紧件包括相连接的第一压紧臂和第二压紧臂,所述第一压紧臂和所述第二压紧臂相对设置;Further, the first pressing member includes a connected first pressing arm and a second pressing arm, and the first pressing arm and the second pressing arm are arranged opposite to each other;

所述压紧面包括第一压紧面和第二压紧面,所述第一压紧面设置于所述第一压紧臂上,所述第二压紧面设置于所述第二压紧臂上;The pressing surface includes a first pressing surface and a second pressing surface, the first pressing surface is arranged on the first pressing arm, and the second pressing surface is arranged on the second pressing arm. tight arm;

所述吊索起吊时,所述第一夹持件位于所述第一压紧臂和所述第二压紧臂之间;When the sling is hoisted, the first clamping member is located between the first pressing arm and the second pressing arm;

所述第一压紧面和所述第二压紧面上均设置有第二弹性垫,所述第一压紧面和所述第二压紧面分别用于通过所述第二弹性垫压紧所述待吊装件。Both the first pressing surface and the second pressing surface are provided with a second elastic pad, and the first pressing surface and the second pressing surface are respectively used to press the second elastic pad. Tighten the parts to be hoisted.

进一步地,所述第一夹持件包括相背离的夹持侧和非夹持侧,所述夹持侧朝向所述待吊装件;Further, the first clamping part includes a clamping side and a non-clamping side facing away from each other, and the clamping side faces the part to be hoisted;

所述限位部还包括第二压紧件,所述第二压紧件包括压紧端;The limiting part also includes a second pressing part, and the second pressing part includes a pressing end;

所述第一夹持件的顶部开设有贯通所述夹持侧和所述非夹持侧的安装孔,所述第二压紧件的压紧端穿过所述安装孔而置于所述夹持侧,所述压紧端用于压紧所述待吊装件;所述第二压紧件伸入所述夹持侧的长度可调节。The top of the first clamping member is provided with an installation hole passing through the clamping side and the non-clamping side, and the pressing end of the second pressing member passes through the installation hole and is placed on the On the clamping side, the pressing end is used to compress the piece to be hoisted; the length of the second pressing piece protruding into the clamping side can be adjusted.

进一步地,所述安装孔为第一螺纹孔;Further, the mounting hole is a first threaded hole;

所述第二压紧件上设置有外螺纹,所述第二压紧件螺纹连接于所述安装孔内;The second pressing member is provided with external threads, and the second pressing member is screwed into the installation hole;

所述第二压紧件包括与所述压紧端相背离的调节端,所述调节端位于所述非夹持侧,所述调节端用于接受外力以使所述第二压紧件相对于所述安装孔转动,以调节所述第二压紧件伸入所述夹持侧的长度;The second pressing member includes an adjustment end away from the pressing end, the adjusting end is located on the non-clamping side, and the adjusting end is used to receive an external force so that the second pressing member is opposite to each other. Rotate in the mounting hole to adjust the length of the second pressing member protruding into the clamping side;

所述压紧端包括第三压紧面,所述第三压紧面上设置有第三弹性垫,所述第三压紧面用于通过所述第三弹性垫压紧所述待吊装件。The pressing end includes a third pressing surface, and a third elastic pad is arranged on the third pressing surface, and the third pressing surface is used to press the part to be hoisted by the third elastic pad .

进一步地,所述吊索包括吊绳、吊扣和调节件,所述吊绳通过所述调节件与所述吊扣连接,所述调节件的长度可调节;Further, the sling includes a sling, a sling and an adjustment piece, the sling is connected to the sling through the adjustment piece, and the length of the adjustment piece is adjustable;

所述吊绳用于与所述起重设备连接,所述吊扣与所述吊具本体或所述限位部连接。The sling is used to connect with the lifting device, and the sling is connected to the sling body or the limiting part.

进一步地,所述调节件包括第一螺杆、连接件和第二螺杆,所述连接件的两端分别对应地开设有第二螺纹孔和第三螺纹孔;Further, the adjusting member includes a first screw, a connecting member and a second screw, and the two ends of the connecting member are correspondingly provided with a second threaded hole and a third threaded hole;

所述第一螺杆的一端与所述第二螺纹孔螺纹连接,所述第一螺杆的另一端与所述吊绳连接;One end of the first screw is threadedly connected to the second threaded hole, and the other end of the first screw is connected to the hanging rope;

所述第二螺杆的一端与所述第三螺纹孔螺纹连接,所述第二螺杆的另一端与所述吊扣连接;One end of the second screw is threadedly connected to the third threaded hole, and the other end of the second screw is connected to the suspension buckle;

所述第一螺杆与所述第二螺纹孔的连接螺纹和所述第二螺杆与所述第三螺纹孔的连接螺纹的方向相反。The connecting threads of the first screw rod and the second threaded hole are in opposite directions to the connecting threads of the second screw rod and the third threaded hole.

进一步地,所述的吊装装置还包括:Further, the lifting device also includes:

吊环,所述吊环与所述吊索连接,所述吊索用于通过所述吊环与起重设备连接。A suspension ring, the suspension ring is connected to the sling, and the sling is used to be connected to the lifting device through the suspension ring.

借由上述技术方案,本发明至少具有以下有益效果:By virtue of the above technical solution, the present invention has at least the following beneficial effects:

本发明实施例提供的吊装装置,通过将吊索设置为长度可调节吊索,且至少两个吊具可以连接待吊装物如阀门执行机构的两端,在吊卸和吊装时,可以调节至少两根吊索的长度,以将阀门执行机构调节至水平,调整后再进行阀门执行机构的提升和安装,阀门执行机构的调平精度较高,且操作简单方便,减少了人力,提高了阀门执行机构的检修效率。而且,通过设置限位部,且该限位部可以限制阀门执行机构相对于吊具本体运动,以使得阀门执行机构稳固地连接在吊具本体上,避免阀门执行机构脱离吊具本体,从而保证了阀门执行机构的顺利起吊。In the hoisting device provided by the embodiment of the present invention, by setting the sling as an adjustable length sling, and at least two slings can be connected to the two ends of the object to be hoisted, such as a valve actuator, during hoisting and hoisting, at least The length of the two slings is used to adjust the valve actuator to the level. After adjustment, the valve actuator can be lifted and installed. The leveling accuracy of the valve actuator is high, and the operation is simple and convenient, which reduces manpower and improves the valve. The maintenance efficiency of the actuator. Moreover, by setting the limit part, and the limit part can limit the movement of the valve actuator relative to the spreader body, so that the valve actuator is firmly connected to the spreader body, preventing the valve actuator from detaching from the spreader body, thereby ensuring The smooth lifting of the valve actuator is ensured.

附图说明Description of drawings

图1为本发明实施例提供的一种吊装装置的爆炸示意图;Fig. 1 is the explosion schematic diagram of a kind of hoisting device provided by the embodiment of the present invention;

图2为本发明实施例提供的一种吊装装置的结构示意图;Fig. 2 is a schematic structural diagram of a hoisting device provided by an embodiment of the present invention;

图3为图2中A处的放大示意图;Fig. 3 is the enlarged schematic diagram of place A in Fig. 2;

图4为图2中B处的放大示意图。FIG. 4 is an enlarged schematic view of point B in FIG. 2 .

具体实施方式Detailed ways

为使本发明的目的、技术方案和优点更加清楚,下面将结合本发明的优选实施例中的附图,对本发明实施例中的技术方案进行更加详细的描述。In order to make the purpose, technical solutions and advantages of the present invention clearer, the technical solutions in the embodiments of the present invention will be described in more detail below with reference to the drawings in the preferred embodiments of the present invention.

如图1和图2所示,本发明实施例提供了一种吊装装置,可以用于气动阀门执行机构等机构的安装调平,可以配合起重机等起重设备或其它设备使用,该吊装装置包括:至少两根吊索1,吊索1的长度可调节,吊索1的一端用于与起重设备连接;至少两个吊具2,吊具2包括吊具本体和设置于吊具本体上的限位部,吊具本体或限位部与吊索1的另一端连接,吊具本体用于连接待吊装物100,具体地,该待吊装物100可以为阀门执行机构;限位部用于限制待吊装物100相对于吊具本体运动。As shown in Figure 1 and Figure 2, the embodiment of the present invention provides a hoisting device, which can be used for installation and leveling of pneumatic valve actuators and other mechanisms, and can be used in conjunction with lifting equipment such as cranes or other equipment. The hoisting device includes : at least two slings 1, the length of sling 1 can be adjusted, and one end of sling 1 is used to connect with lifting equipment; at least two slings 2, sling 2 includes the sling body and is arranged on the sling body The limit part, the spreader body or the limit part is connected with the other end of the sling 1, the spreader body is used to connect the object to be hoisted 100, specifically, the object to be hoisted 100 can be a valve actuator; the limit part is used To limit the movement of the object to be hoisted 100 relative to the spreader body.

可以理解,至少一根吊索1与至少一个吊具2连接,至少另一根吊索1与至少另一个吊具2连接,在吊装时,至少两个吊具2可以安装在待吊装物100如阀门执行机构的两端,起吊后,可以根据水平测量工具如水平尺等测量阀门执行机构的水平度,同时调整吊索1的长度,直至阀门执行机构的水平达到要求值,即可将阀门执行机构移动至安装位置,即可进行阀门执行机构与阀门阀芯300的安装作业。It can be understood that at least one sling 1 is connected to at least one sling 2, and at least another sling 1 is connected to at least another sling 2. During hoisting, at least two slings 2 can be installed on the object 100 to be hoisted. For example, after the two ends of the valve actuator are hoisted, the levelness of the valve actuator can be measured according to a level measuring tool such as a spirit level, and the length of the sling 1 can be adjusted at the same time until the level of the valve actuator reaches the required value. After the actuator is moved to the installation position, the valve actuator and the valve core 300 can be installed.

其中,吊索1可以与吊具2的吊具本体连接,可以实现阀门执行机构的起吊,例如,吊具本体可以为环状结构,吊索1与吊具本体连接,而限位部可以包括围绕吊具本体周向间隔排布,且与吊具本体转动连接的多个夹爪,在起吊前,阀门执行机构套接在吊具本体内,多个夹爪可以从远离阀门执行机构的方向朝向执行机构转动,直至转动至阀门执行机构并压紧阀门执行机构,以限制阀门执行机构相对于吊具本体运动。Wherein, the sling 1 can be connected with the sling body of the sling 2 to realize the lifting of the valve actuator. For example, the sling body can be a ring structure, the sling 1 can be connected with the sling body, and the limiting part can include A plurality of jaws arranged at intervals around the spreader body and rotatably connected with the spreader body. Before hoisting, the valve actuator is sleeved in the spreader body, and the multiple jaws can be moved from the direction away from the valve actuator. Turn toward the actuator until it reaches the valve actuator and compresses the valve actuator to limit movement of the valve actuator relative to the spreader body.

本发明实施例提供的吊装装置,通过将吊索1设置为长度可调节吊索1,且至少两个吊具2可以连接待吊装物100如阀门执行机构的两端,在吊卸和吊装时,可以调节至少两根吊索1的长度,以将阀门执行机构调节至水平,调整后再进行阀门执行机构的提升和安装,阀门执行机构的调平精度较高,且操作简单方便,减少了人力,提高了阀门执行机构的检修效率。而且,通过设置限位部,且该限位部可以限制阀门执行机构相对于吊具本体运动,以使得阀门执行机构稳固地连接在吊具本体上,避免阀门执行机构脱离吊具本体,从而保证了阀门执行机构的顺利起吊。In the hoisting device provided by the embodiment of the present invention, by setting the sling 1 as a length-adjustable sling 1, and at least two slings 2 can connect the two ends of the object 100 to be hoisted, such as a valve actuator, during hoisting and hoisting , the length of at least two slings 1 can be adjusted to adjust the valve actuator to the level, and then the valve actuator can be lifted and installed after adjustment. Manpower, improve the maintenance efficiency of the valve actuator. Moreover, by setting the limit part, and the limit part can limit the movement of the valve actuator relative to the spreader body, so that the valve actuator is firmly connected to the spreader body, preventing the valve actuator from detaching from the spreader body, thereby ensuring The smooth lifting of the valve actuator is ensured.

本发明实施例中,参见图1和图2,吊具本体可以包括相对的第一夹持件21和第二夹持件22,第一夹持件21和第二夹持件22可拆卸地连接以夹持待吊装物100;吊索1起吊时,第一夹持件21位于待吊装物100的顶部;第二夹持件22位于待吊装物100的底部。In the embodiment of the present invention, referring to Fig. 1 and Fig. 2, the spreader body may include opposite first clamping parts 21 and second clamping parts 22, the first clamping part 21 and the second clamping part 22 are detachable connected to clamp the object to be hoisted 100; when the sling 1 is hoisted, the first clamping part 21 is located at the top of the object to be hoisted 100; the second clamping part 22 is located at the bottom of the object to be hoisted 100.

上述实施例中,通过将吊具本体设置为可拆卸连接的第一夹持件21和第二夹持件22,这样在安装阀门执行机构时,可以先将第一夹持件21和第二夹持件22放置在阀门执行机构的两侧,再将第一夹持件21和第二夹持件22对接,即可实现阀门执行机构与吊具本体的安装;拆卸阀门执行机构时,只需将第一夹持件21和第二夹持件22拆卸分离,即可实现阀门执行机构与吊具本体的分离,二者的拆装更方便快捷,进一步提高了阀门执行机构的检修效率。In the above-mentioned embodiment, by setting the hanger body as the first clamping piece 21 and the second clamping piece 22 which are detachably connected, when installing the valve actuator, the first clamping piece 21 and the second clamping piece 21 can be installed first. The clamping parts 22 are placed on both sides of the valve actuator, and then the first clamping part 21 and the second clamping part 22 are docked to realize the installation of the valve actuator and the spreader body; when disassembling the valve actuator, only The first clamping part 21 and the second clamping part 22 need to be disassembled and separated to realize the separation of the valve actuator from the spreader body. The disassembly and assembly of the two is more convenient and fast, and the maintenance efficiency of the valve actuator is further improved.

其中,第一夹持件21和第二夹持件22的可拆卸连接方式可以有多种,例如二者采用螺栓连接。Wherein, the detachable connection manners of the first clamping part 21 and the second clamping part 22 may be various, for example, the two are connected by bolts.

当然,第一夹持件21和第二夹持件22的一端可以转动连接,另一端可以为采用螺栓连接等方式进行的可拆卸连接。使用时,可以拆卸第一夹持件21和第二夹持件22的另一端,并转动第一夹持件21,将待吊装物安装在二者之间,安装完毕后再反向转动第一夹持件21,并将第一夹持件21和第二夹持件22的另一端连接,即可实现吊具本体与待吊装物的安装,使用方便。Certainly, one end of the first clamping part 21 and the second clamping part 22 may be connected in rotation, and the other end may be detachably connected by means of bolt connection or the like. When in use, the other end of the first clamping part 21 and the second clamping part 22 can be disassembled, and the first clamping part 21 can be rotated to install the object to be hoisted between the two. One clamping part 21, and connecting the other end of the first clamping part 21 and the second clamping part 22, the installation of the spreader body and the object to be hoisted can be realized, which is convenient to use.

需要说明的是,第一夹持件21和第二夹持件22中至少第二夹持件22的内壁面可以与待吊装物100的轮廓形状相适配,对于与阀门执行机构的圆柱体状类似的待吊装物100,至少第二夹持件22的内壁面可以为圆弧面,这样阀门执行机构能够在重力作用下与吊具本体更稳固地贴合,避免阀门执行机构脱离吊具本体,保证阀门执行机构的顺利吊装。It should be noted that, among the first clamping piece 21 and the second clamping piece 22, at least the inner wall surface of the second clamping piece 22 can be adapted to the contour shape of the object to be hoisted 100, and for the cylinder of the valve actuator For objects to be hoisted 100 similar in shape, at least the inner wall surface of the second clamping part 22 can be a circular arc surface, so that the valve actuator can fit more firmly with the spreader body under the action of gravity, and prevent the valve actuator from detaching from the spreader. The main body ensures the smooth lifting of the valve actuator.

本发明实施例中,参见图1,第一夹持件21和第二夹持件22可以包括朝向待吊装物100的夹持面221,至少第二夹持件22的夹持面221上设置有第一弹性垫221,该夹持面221用于通过第一弹性垫221夹持待吊装物100。In the embodiment of the present invention, referring to FIG. 1, the first clamping part 21 and the second clamping part 22 may include a clamping surface 221 facing the object to be hoisted 100, and at least the clamping surface 221 of the second clamping part 22 is provided There is a first elastic pad 221 , and the clamping surface 221 is used for clamping the object 100 to be hoisted by the first elastic pad 221 .

上述实施例中,至少第二夹持件22的夹持面221通过第一弹性垫221夹持待吊装物100,一方面,第一弹性垫222可以增大吊具本体与阀门执行机构之间的摩擦力,从而更好地使得阀门执行机构与吊具本体稳固贴合;另一方面,第一弹性垫222可以对阀门执行机构受到的外力进行缓冲,从而对阀门执行机构起到保护作用,避免阀门执行机构损坏。具体地,第一弹性垫222可以为橡胶垫。In the above embodiment, at least the clamping surface 221 of the second clamping member 22 clamps the object to be hoisted 100 through the first elastic pad 221. On the one hand, the first elastic pad 222 can increase the gap between the hanger body and the valve actuator. The frictional force, so that the valve actuator can be firmly attached to the spreader body; on the other hand, the first elastic pad 222 can buffer the external force of the valve actuator, thereby protecting the valve actuator. Avoid damage to the valve actuator. Specifically, the first elastic pad 222 may be a rubber pad.

本发明实施例中,参见图1和图2,吊索1的数量可以为至少四根;限位部可以包括两个第一压紧件23,第一压紧件23包括压紧面,两个第一压紧件23对应地转动连接于第二夹持件22的两端;至少两根吊索1对应地与一个吊具2的两个第一压紧件23可拆卸地转动连接,至少另外两根吊索1对应地与另一个吊具2的两个第一压紧件23可拆卸地转动连接;两个第一压紧件23用于随吊索1的起吊而相互靠拢,以使两个第一压紧件23的压紧面相对并压紧待吊装件。In the embodiment of the present invention, referring to Fig. 1 and Fig. 2, the number of slings 1 may be at least four; A first pressing part 23 is correspondingly rotatably connected to the two ends of the second clamping part 22; at least two slings 1 are correspondingly detachably connected with two first pressing parts 23 of a sling 2, At least two other slings 1 are correspondingly detachably connected with two first pressing parts 23 of another sling 2; Make the pressing surfaces of the two first pressing parts 23 face each other and press the part to be hoisted.

上述实施例中,两根吊索1的另一端与吊具2的两个第一压紧件23转动连接,吊索1在起吊时,两个吊索1受到起重设备200的拉力而相互靠近,以拉动两个第一压紧件23相互靠拢,从而使得两个第一压紧件23的压紧面相对并压紧阀门执行机构,这种情况下,两个第一压紧件23可以通过各自的压紧面在阀门执行机构的左右方向向阀门执行机构施加夹紧力,以使得阀门执行机构在重力作用下与吊具本体更加稳固地贴合,从而更好地避免阀门执行机构脱离吊具本体,进而更好地保证阀门执行机构的顺利吊装。In the above embodiment, the other ends of the two slings 1 are rotatably connected to the two first pressing parts 23 of the sling 2, and when the slings 1 are hoisted, the two slings 1 are pulled by the lifting device 200 to move against each other. close to pull the two first pressing parts 23 close to each other, so that the pressing surfaces of the two first pressing parts 23 are opposite and press the valve actuator. In this case, the two first pressing parts 23 The clamping force can be applied to the valve actuator in the left and right directions of the valve actuator through their respective pressing surfaces, so that the valve actuator can be more firmly attached to the spreader body under the action of gravity, so as to better avoid the valve actuator It is separated from the spreader body to better ensure the smooth lifting of the valve actuator.

上述实施例中,第一压紧件23与吊索1可拆卸地连接,可以实现在安装吊具2和阀门执行机构前,先将第一压紧件23与吊索1拆卸分离,从而避免吊索1对吊具2与阀门执行机构的安装造成影响,待第一压紧件23与吊索1安装完毕后,再将吊索1与第一压紧件23组装连接,以实现阀门执行机构的起吊,使用更方便。In the above embodiment, the first pressing part 23 is detachably connected to the sling 1, so that the first pressing part 23 can be disassembled and separated from the sling 1 before installing the sling 2 and the valve actuator, so as to avoid The sling 1 affects the installation of the spreader 2 and the valve actuator. After the installation of the first pressing part 23 and the sling 1 is completed, the sling 1 and the first pressing part 23 are assembled and connected to realize valve actuation. The lifting mechanism is more convenient to use.

上述实施例中,两个第一压紧件23可以随着吊索1的起吊而自动夹紧阀门执行机构,以对阀门执行机构起到限位作用;相应地,又可以在吊索1非起吊时立刻放开阀门执行机构,以解除对阀门执行机构的限位,整个过程中操作人员无需对第一压紧件23进行任何操作,使用方便快捷,进一步提高了阀门执行机构的检修效率。In the above embodiment, the two first pressing parts 23 can automatically clamp the valve actuator when the sling 1 is hoisted, so as to limit the position of the valve actuator; Release the valve actuator immediately when lifting to remove the limit to the valve actuator. During the whole process, the operator does not need to perform any operation on the first pressing member 23, which is convenient and quick to use, and further improves the maintenance efficiency of the valve actuator.

本发明实施例中,参见图2和图4,第一压紧件23的压紧面为倾斜面;吊索1起吊时,压紧面朝向第二夹持件22倾斜。In the embodiment of the present invention, referring to FIG. 2 and FIG. 4 , the pressing surface of the first pressing member 23 is an inclined surface; when the sling 1 is hoisted, the pressing surface is inclined toward the second clamping member 22 .

上述实施例中,吊索1起吊时,压紧面朝向第二夹持件22倾斜,这样两个第一压紧件23的压紧面在压紧阀门执行机构时,不仅能够向阀门执行机构施加左右方向的夹紧力,还能够向阀门执行机构施加向下的夹紧力,从而使得阀门执行机构能够在重力作用下与第二夹持件22更加稳固地贴合,进一步避免阀门执行机构脱离吊具本体,进一步地保证了阀门执行机构的顺利吊装。In the above embodiment, when the sling 1 is hoisted, the pressing surface is inclined towards the second clamping member 22, so that the pressing surfaces of the two first pressing members 23 can not only move toward the valve actuator when pressing the valve actuator. Applying a clamping force in the left and right directions can also apply a downward clamping force to the valve actuator, so that the valve actuator can fit more firmly with the second clamping member 22 under the action of gravity, further preventing the valve actuator from Separated from the spreader body, it further ensures the smooth lifting of the valve actuator.

需要说明的是,压紧面可以与待吊装物100的轮廓形状相适配,对于与阀门执行机构的圆柱体状类似的待吊装物100,压紧面可以为圆弧面,以便于第一压紧面2311通过压紧面向待吊装物100施加夹紧力。It should be noted that the pressing surface can be adapted to the contour shape of the object to be hoisted 100, and for the object to be hoisted 100 similar to the cylindrical shape of the valve actuator, the pressing surface can be a circular arc surface, so that the first The pressing surface 2311 exerts a clamping force on the object to be hoisted 100 through the pressing surface.

本发明实施例中,参见图1、图2和图4,第一压紧件23可以包括相连接的第一压紧臂231和第二压紧臂232,第一压紧臂231和第二压紧臂232相对设置;压紧面可以包括第一压紧面2311和第二压紧面2321,第一压紧面2311设置于第一压紧臂231上,第二压紧面2321设置于第二压紧臂232上;吊索1起吊时,第一夹持件21位于第一压紧臂231和所述第二压紧臂232之间。In the embodiment of the present invention, referring to FIG. 1 , FIG. 2 and FIG. 4 , the first pressing member 23 may include a first pressing arm 231 and a second pressing arm 232 connected, and the first pressing arm 231 and the second pressing arm 231 The pressing arm 232 is arranged oppositely; the pressing surface may include a first pressing surface 2311 and a second pressing surface 2321, the first pressing surface 2311 is arranged on the first pressing arm 231, and the second pressing surface 2321 is arranged on On the second pressing arm 232 ; when the sling 1 is hoisted, the first clamping member 21 is located between the first pressing arm 231 and the second pressing arm 232 .

上述实施例中,吊索1起吊时,第一夹持件21位于第一压紧臂231和所述第二压紧臂232之间,即,第一压紧面2311和第二压紧面2321可以分别在吊具本体的两侧向阀门执行机构施加夹紧力,这样可以更好地避免阀门执行机构相对于吊具本体发生轴向窜动,进一步避免了阀门执行机构脱离吊具本体,进一步地保证了阀门执行机构的顺利吊装。In the above embodiment, when the sling 1 is hoisted, the first clamping member 21 is located between the first pressing arm 231 and the second pressing arm 232, that is, the first pressing surface 2311 and the second pressing surface 2321 can apply clamping force to the valve actuator on both sides of the spreader body, which can better prevent the valve actuator from moving axially relative to the spreader body, and further prevent the valve actuator from detaching from the spreader body. It further ensures the smooth hoisting of the valve actuator.

本发明实施例中,参见图1、图2和图4,第一压紧面2311和第二压紧面2321上均可以设置有第二弹性垫24,第一压紧面2311和第二压紧面2321分别用于通过第二弹性垫24压紧待吊装件。一方面,第二弹性垫24可以增大各个压紧面与阀门执行机构之间的摩擦力,从而更好地使得阀门执行机构与吊具本体稳固贴合;另一方面,第二弹性垫24可以对阀门执行机构受到的外力进行缓冲,从而对阀门执行机构起到保护作用,避免阀门执行机构损坏。具体地,第二弹性垫24可以为橡胶垫。In the embodiment of the present invention, referring to FIG. 1 , FIG. 2 and FIG. 4 , the first pressing surface 2311 and the second pressing surface 2321 can be provided with a second elastic pad 24 , and the first pressing surface 2311 and the second pressing surface The tight surfaces 2321 are respectively used to press the parts to be hoisted by the second elastic pads 24 . On the one hand, the second elastic pad 24 can increase the friction between each pressing surface and the valve actuator, so that the valve actuator and the hanger body can be firmly attached; on the other hand, the second elastic pad 24 It can buffer the external force received by the valve actuator, so as to protect the valve actuator and avoid damage to the valve actuator. Specifically, the second elastic pad 24 may be a rubber pad.

本发明实施例中,参见图1和图2,第一夹持件21可以包括相背离的夹持侧和非夹持侧,夹持侧朝向待吊装件;限位部还可以包括第二压紧件25,该第二压紧件25包括压紧端251;第一夹持件21的顶部开设有贯通夹持侧和非夹持侧的安装孔211,第二压紧件25的压紧端251穿过安装孔211而置于夹持侧,压紧端251用于压紧待吊装物100;第二压紧件25伸入夹持侧的长度可调节。In the embodiment of the present invention, referring to Fig. 1 and Fig. 2, the first clamping part 21 may include a clamping side and a non-clamping side facing away from each other, and the clamping side faces the part to be hoisted; Compression piece 25, this second compression piece 25 comprises compression end 251; The top of first clamping piece 21 is provided with the installation hole 211 that passes through clamping side and non-clamping side, and the compression of second clamping piece 25 The end 251 passes through the installation hole 211 and is placed on the clamping side, and the pressing end 251 is used to compress the object 100 to be hoisted; the length of the second pressing member 25 protruding into the clamping side can be adjusted.

上述实施例中,通过设置第二压紧件25,且第二压紧件25能够在第一夹持件21的夹持侧压紧阀门执行机构,即,吊索1在起吊时,第二压紧件25可以对阀门执行机构施加向下的力,这样可以避免阀门执行机构单边意外受到向上的力时而发生翘起,从而避免阀门执行机构从吊具本体中滑落,进一步地保证了阀门执行机构的顺利吊装。In the above embodiment, by setting the second pressing part 25, and the second pressing part 25 can press the valve actuator on the clamping side of the first clamping part 21, that is, when the sling 1 is hoisted, the second The pressing part 25 can exert a downward force on the valve actuator, which can prevent the valve actuator from being tilted when one side is accidentally subjected to an upward force, thereby preventing the valve actuator from slipping from the spreader body, and further ensuring the safety of the valve. Smooth lifting of the actuator.

上述实施例中,第二压紧件25伸入夹持侧的长度可调节,这样不仅可以调节第二压紧件25对待吊装物100的压紧力大小,还可以使得该吊装装置适用于多种尺寸的待吊装物100,从而提高该吊装装置的通用性。In the above-mentioned embodiment, the length of the second pressing member 25 extending into the clamping side can be adjusted, so that not only the pressing force of the second pressing member 25 on the object 100 to be suspended can be adjusted, but also the lifting device can be used for multiple applications. different sizes of objects to be hoisted 100, thereby improving the versatility of the hoisting device.

本发明实施例中,参见图1和图2,前述的安装孔211可以为第一螺纹孔;第二压紧件25上设置有外螺纹,第二压紧件25螺纹连接于安装孔211内;第二压紧件25包括与压紧端251相背离的调节端252,调节端252位于非夹持侧,所述调节端252用于接受外力以使第二压紧件25相对于安装孔211转动,以调节第二压紧件25伸入夹持侧的长度。In the embodiment of the present invention, referring to Fig. 1 and Fig. 2, the aforementioned mounting hole 211 may be a first threaded hole; the second pressing member 25 is provided with external threads, and the second pressing member 25 is threadedly connected in the mounting hole 211 ; The second pressing part 25 includes an adjustment end 252 that is away from the pressing end 251, and the adjustment end 252 is located on the non-clamping side. 211 to adjust the length of the second pressing member 25 protruding into the clamping side.

上述实施例中,当需要调节第二压紧件25对待吊装物100的压紧力大小,或者为了适应待吊装物100的尺寸时,操作人员可以旋拧调节端252,以使得第二压紧件25相对于安装孔211转动,从而改变第二压紧件25伸入夹持侧的长度,结构简单,使用可靠且方便。In the above embodiment, when it is necessary to adjust the pressing force of the second pressing member 25 to the object to be hoisted 100, or to adapt to the size of the object to be hoisted 100, the operator can screw the adjustment end 252, so that the second pressing The member 25 rotates relative to the mounting hole 211, thereby changing the length of the second pressing member 25 protruding into the clamping side. The structure is simple, and the use is reliable and convenient.

具体地,第二压紧件25可以包括螺杆253、顶盘和握持件,螺杆253连接在顶盘和握持件之间,螺杆2253上设置有前述的外螺纹,顶盘形成压紧端251,握持件形成调节端252。Specifically, the second pressing member 25 may include a screw rod 253, a top plate and a holding member, the screw rod 253 is connected between the top plate and the holding member, the screw rod 2253 is provided with the aforementioned external threads, and the top plate forms a pressing end 251 , the handle forms an adjustment end 252 .

本发明实施例中,参见图1,第二压紧件25的压紧端251可以包括第三压紧面,该第三压紧面上设置有第三弹性垫26,第三压紧面用于通过所述第三弹性垫26压紧所述待吊装件。In the embodiment of the present invention, referring to FIG. 1, the pressing end 251 of the second pressing member 25 may include a third pressing surface, and a third elastic pad 26 is arranged on the third pressing surface, and the third pressing surface is used for Then press the part to be hoisted by the third elastic pad 26 .

上述实施例中,通过设置第三弹性垫26,一方面,第三弹性垫26可以增大第三压紧面与阀门执行机构之间的摩擦力,从而更好地使得阀门执行机构与吊具本体稳固贴合;另一方面,第三弹性垫26可以对阀门执行机构受到的外力进行缓冲,从而对阀门执行机构起到保护作用,避免阀门执行机构损坏。具体地,第三弹性垫26可以为橡胶垫。In the above embodiment, by setting the third elastic pad 26, on the one hand, the third elastic pad 26 can increase the friction between the third pressing surface and the valve actuator, so as to better make the valve actuator and the hanger The body fits firmly; on the other hand, the third elastic pad 26 can buffer the external force received by the valve actuator, so as to protect the valve actuator and avoid damage to the valve actuator. Specifically, the third elastic pad 26 may be a rubber pad.

本发明实施例中,参见图1和图2,吊索1可以包括吊绳11、吊扣12和调节件13,吊绳11通过调节件13与吊扣12连接,调节件13的长度可调节;吊绳11用于与起重设备200连接,吊扣12与吊具本体或限位部连接。其中,调节件13的长度可调节,从而使得吊索1的长度可调节。In the embodiment of the present invention, referring to Fig. 1 and Fig. 2, the sling 1 may include a suspension rope 11, a suspension buckle 12 and an adjustment member 13, the suspension rope 11 is connected with the suspension buckle 12 through the adjustment member 13, and the length of the adjustment member 13 is adjustable; The rope 11 is used to connect with the lifting device 200, and the hoisting buckle 12 is connected with the spreader body or the limit part. Wherein, the length of the adjusting member 13 can be adjusted, so that the length of the sling 1 can be adjusted.

可以理解的是,吊扣12的数量可以为两个,一个吊扣12与吊绳11的端部连接,以使得吊绳11通过吊扣12与起重设备200连接,而调节件13通过另一个吊扣12与第一压紧件23可拆卸地转动连接。It can be understood that the number of hanging buckles 12 can be two, one hanging buckle 12 is connected with the end of the hanging rope 11, so that the hanging rope 11 is connected with the lifting device 200 through the hanging buckle 12, and the adjusting member 13 is connected with the other hanging buckle 12 It is detachably connected in rotation with the first pressing member 23 .

本发明实施例中,参见图2和图3,调节件13可以包括第一螺杆131、连接件132和第二螺杆133,连接件132的两端分别对应地开设有第二螺纹孔和第三螺纹孔;第一螺杆131的一端与第二螺纹孔螺纹连接,第一螺杆131的另一端与第一吊绳11连接;第二螺杆133的一端与第三螺纹孔螺纹连接,第二螺杆133的另一端与吊扣12连接;第一螺杆131与第二螺纹孔的连接螺纹和第二螺杆133与第三螺纹孔的连接螺纹的方向相反。In the embodiment of the present invention, referring to FIG. 2 and FIG. 3 , the adjusting member 13 may include a first screw 131, a connecting member 132 and a second screw 133, and the two ends of the connecting member 132 are respectively provided with a second threaded hole and a third threaded hole. Threaded hole; one end of the first screw rod 131 is threadedly connected with the second threaded hole, and the other end of the first screw rod 131 is connected with the first hanging rope 11; one end of the second screw rod 133 is threadedly connected with the third threaded hole, and the second screw rod 133 The other end of the second screw rod 133 is connected to the hanging buckle 12; the direction of the connecting thread of the first screw rod 131 and the second threaded hole is opposite to that of the connecting thread of the second screw rod 133 and the third threaded hole.

上述实施例中,当需要调节吊索1的长度时,可以旋拧连接件132,即可改变调节件13的长度,从而改变吊索1的长度,结构简单,使用可靠且方便。In the above embodiment, when the length of the sling 1 needs to be adjusted, the connecting member 132 can be screwed to change the length of the adjusting member 13, thereby changing the length of the sling 1. The structure is simple, reliable and convenient to use.

本发明实施例中,参见图1和图2,该吊装装置还可以包括吊环3,该吊环3与吊索1连接,吊索1用于通过吊环3与起重设备200连接。具体地,吊环3可以通过第一吊扣14与第一吊绳11连接,吊环3可以用于与起重设备200的吊钩连接,以使得起重设备200启动时,可以通过吊索1将吊具2和待吊装物100起吊。In the embodiment of the present invention, referring to FIG. 1 and FIG. 2 , the hoisting device may further include a hoisting ring 3 connected to a sling 1 , and the sling 1 is used to connect to a lifting device 200 through the hoisting ring 3 . Specifically, the lifting ring 3 can be connected with the first lifting rope 11 through the first hanging buckle 14, and the lifting ring 3 can be used to connect with the hook of the lifting device 200, so that when the lifting device 200 is started, the lifting device 200 can be lifted by the lifting rope 1. Tool 2 and object 100 to be hoisted are hoisted.

下面以待吊装物100为阀门执行机构为例,对该吊装装置的使用方法进行说明。首先将第一夹持件21和第二夹持件22对接安装于阀门执行机构的两端;然后旋紧第一压紧件23的调节端252以压紧阀门执行机构;确认吊索1上的调节件13连接牢固无卡涩;再分别将至少四根吊索1对应地与至少两个吊具2的四个第一压紧件23相连接;启动起重设备200将阀门执行机构起吊,起吊后可以根据水平测量工具如水平尺测量阀门执行机构的水平度,同时调节各个吊索1的长度,直至阀门执行机构的水平度达到要求值,实现对阀门执行机构的调平;将阀门执行机构移动至安装位置,起重设备200下降即可对阀门执行机构和阀门阀芯300进行安装。The method of using the hoisting device will be described below by taking the object to be hoisted 100 as a valve actuator as an example. First, the first clamping piece 21 and the second clamping piece 22 are docked and installed at both ends of the valve actuator; then the adjusting end 252 of the first pressing piece 23 is tightened to compress the valve actuator; The adjustment parts 13 are firmly connected without jamming; then at least four slings 1 are respectively connected to the four first pressing parts 23 of at least two slings 2; the lifting device 200 is started to lift the valve actuator , after hoisting, the levelness of the valve actuator can be measured according to a horizontal measuring tool such as a spirit level, and the length of each sling 1 can be adjusted at the same time until the levelness of the valve actuator reaches the required value, so as to realize the leveling of the valve actuator; The actuator moves to the installation position, and the lifting device 200 descends to install the valve actuator and the valve core 300 .

当然,在拆卸阀门执行机构时,也可以采用上述吊装装置与阀门执行机构的安装步骤,并通过调节各个吊索1的长度,使得各个吊索1均被拉紧后,再启动起重设备200进行起吊,以保证阀门执行机构的水平。Of course, when the valve actuator is disassembled, the installation steps of the lifting device and the valve actuator described above can also be adopted, and the length of each sling 1 can be adjusted so that each sling 1 is tightened, and then the lifting device 200 can be started. Carry out lifting to ensure the level of the valve actuator.

最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: it can still be Modifications are made to the technical solutions described in the foregoing embodiments, or equivalent replacements are made to some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the various embodiments of the present invention.

Claims (10)

1.一种吊装装置,其特征在于,包括:1. A hoisting device, characterized in that, comprising: 至少两根吊索,所述吊索的长度可调节,所述吊索的一端用于与起重设备连接;at least two slings, the length of the slings is adjustable, and one end of the slings is used to connect with the lifting equipment; 至少两个吊具,所述吊具包括吊具本体和设置于所述吊具本体上的限位部,所述吊具本体或所述限位部与所述吊索的另一端连接,所述吊具本体用于连接待吊装物,所述限位部用于限制所述待吊装物相对于所述吊具本体运动。At least two slings, the sling includes a sling body and a limiting portion arranged on the sling body, the sling body or the limiting portion is connected to the other end of the sling, the The sling body is used to connect the object to be hoisted, and the limiting part is used to restrict the movement of the object to be sling relative to the sling body. 2.根据权利要求1所述的吊装装置,其特征在于,2. The lifting device according to claim 1, characterized in that, 所述吊具本体包括相对的第一夹持件和第二夹持件,所述第一夹持件和所述第二夹持件可拆卸地连接以夹持所述待吊装物;The spreader body includes a first clamping part and a second clamping part opposite to each other, and the first clamping part and the second clamping part are detachably connected to clamp the object to be hoisted; 所述吊索起吊时,所述第一夹持件位于所述待吊装物的顶部;所述第二夹持件位于所述待吊装物的底部;When the sling is hoisted, the first clamping part is located at the top of the object to be hoisted; the second clamping part is located at the bottom of the object to be hoisted; 所述第一夹持件和所述第二夹持件包括朝向所述待吊装物的夹持面,至少所述第二夹持件的夹持面上设置有第一弹性垫,所述夹持面用于通过所述第三弹性垫夹持所述待吊装物。The first clamping piece and the second clamping piece include a clamping surface facing the object to be hoisted, at least a first elastic pad is provided on the clamping surface of the second clamping piece, and the clamping The holding surface is used for clamping the object to be hoisted by the third elastic pad. 3.根据权利要求2所述的吊装装置,其特征在于,3. The lifting device according to claim 2, characterized in that, 所述吊索的数量为至少四根;the number of said slings is at least four; 所述限位部包括两个第一压紧件,所述第一压紧件包括压紧面,两个所述第一压紧件对应地转动连接于所述第二夹持件的两端;The limiting part includes two first pressing pieces, the first pressing pieces include pressing surfaces, and the two first pressing pieces are correspondingly rotatably connected to both ends of the second clamping piece ; 至少两根所述吊索对应地与一个所述吊具的两个所述第一压紧件可拆卸地转动连接,至少另外两根所述吊索对应地与另一个所述吊具的两个所述第一压紧件可拆卸地转动连接;At least two of the slings are correspondingly detachably connected to the two first pressing parts of one of the slings, and at least two other slings are correspondingly connected to the two first pressing parts of the other sling. The first pressing member is detachably rotationally connected; 两个所述第一压紧件用于随所述吊索的起吊而相互靠拢,以使两个所述第一压紧件的压紧面相对并压紧所述待吊装物。The two first pressing parts are used to move closer to each other when the sling is hoisted, so that the pressing surfaces of the two first pressing parts face each other and compress the object to be hoisted. 4.根据权利要求3所述的吊装装置,其特征在于,4. The lifting device according to claim 3, characterized in that, 所述压紧面为倾斜面;所述吊索起吊时,所述压紧面朝向所述第二夹持件倾斜。The pressing surface is an inclined surface; when the sling is hoisted, the pressing surface is inclined toward the second clamping member. 5.根据权利要求3所述的吊装装置,其特征在于,5. The lifting device according to claim 3, characterized in that, 所述第一压紧件包括相连接的第一压紧臂和第二压紧臂,所述第一压紧臂和所述第二压紧臂相对设置;The first pressing member includes a connected first pressing arm and a second pressing arm, and the first pressing arm and the second pressing arm are oppositely arranged; 所述压紧面包括第一压紧面和第二压紧面,所述第一压紧面设置于所述第一压紧臂上,所述第二压紧面设置于所述第二压紧臂上;The pressing surface includes a first pressing surface and a second pressing surface, the first pressing surface is arranged on the first pressing arm, and the second pressing surface is arranged on the second pressing arm. tight arm; 所述吊索起吊时,所述第一夹持件位于所述第一压紧臂和所述第二压紧臂之间;When the sling is hoisted, the first clamping member is located between the first pressing arm and the second pressing arm; 所述第一压紧面和所述第二压紧面上均设置有第二弹性垫,所述第一压紧面和所述第二压紧面分别用于通过所述第二弹性垫压紧所述待吊装件。Both the first pressing surface and the second pressing surface are provided with a second elastic pad, and the first pressing surface and the second pressing surface are respectively used to press the second elastic pad. Tighten the parts to be hoisted. 6.根据权利要求2所述的吊装装置,其特征在于,6. The lifting device according to claim 2, characterized in that, 所述第一夹持件包括相背离的夹持侧和非夹持侧,所述夹持侧朝向所述待吊装件;The first clamping part includes a clamping side and a non-clamping side facing away from each other, and the clamping side faces the part to be hoisted; 所述限位部还包括第二压紧件,所述第二压紧件包括压紧端;The limiting part also includes a second pressing part, and the second pressing part includes a pressing end; 所述第一夹持件的顶部开设有贯通所述夹持侧和所述非夹持侧的安装孔,所述第二压紧件的压紧端穿过所述安装孔而置于所述夹持侧,所述压紧端用于压紧所述待吊装件;所述第二压紧件伸入所述夹持侧的长度可调节。The top of the first clamping member is provided with an installation hole passing through the clamping side and the non-clamping side, and the pressing end of the second pressing member passes through the installation hole and is placed on the On the clamping side, the pressing end is used to compress the piece to be hoisted; the length of the second pressing piece protruding into the clamping side can be adjusted. 7.根据权利要求6所述的吊装装置,其特征在于,7. The lifting device according to claim 6, characterized in that, 所述安装孔为第一螺纹孔;The mounting hole is a first threaded hole; 所述第二压紧件上设置有外螺纹,所述第二压紧件螺纹连接于所述安装孔内;The second pressing member is provided with external threads, and the second pressing member is screwed into the installation hole; 所述第二压紧件包括与所述压紧端相背离的调节端,所述调节端位于所述非夹持侧,所述调节端用于接受外力以使所述第二压紧件相对于所述安装孔转动,以调节所述第二压紧件伸入所述夹持侧的长度;The second pressing member includes an adjustment end away from the pressing end, the adjusting end is located on the non-clamping side, and the adjusting end is used to receive an external force so that the second pressing member is opposite to each other. Rotate in the mounting hole to adjust the length of the second pressing member protruding into the clamping side; 所述压紧端包括第三压紧面,所述第三压紧面上设置有第三弹性垫,所述第三压紧面用于通过所述第三弹性垫压紧所述待吊装件。The pressing end includes a third pressing surface, and a third elastic pad is arranged on the third pressing surface, and the third pressing surface is used to press the part to be hoisted by the third elastic pad . 8.根据权利要求1所述的吊装装置,其特征在于,8. The lifting device according to claim 1, characterized in that, 所述吊索包括吊绳、吊扣和调节件,所述吊绳通过所述调节件与所述吊扣连接,所述调节件的长度可调节;The sling includes a sling, a sling and an adjustment piece, the sling is connected to the sling through the adjustment piece, and the length of the adjustment piece is adjustable; 所述吊绳用于与所述起重设备连接,所述吊扣与所述吊具本体或所述限位部连接。The sling is used to connect with the lifting device, and the sling is connected to the sling body or the limiting part. 9.根据权利要求8所述的吊装装置,其特征在于,9. The lifting device according to claim 8, characterized in that, 所述调节件包括第一螺杆、连接件和第二螺杆,所述连接件的两端分别对应地开设有第二螺纹孔和第三螺纹孔;The adjusting member includes a first screw, a connecting member and a second screw, and the two ends of the connecting member are correspondingly provided with a second threaded hole and a third threaded hole; 所述第一螺杆的一端与所述第二螺纹孔螺纹连接,所述第一螺杆的另一端与所述吊绳连接;One end of the first screw is threadedly connected to the second threaded hole, and the other end of the first screw is connected to the hanging rope; 所述第二螺杆的一端与所述第三螺纹孔螺纹连接,所述第二螺杆的另一端与所述吊扣连接;One end of the second screw is threadedly connected to the third threaded hole, and the other end of the second screw is connected to the suspension buckle; 所述第一螺杆与所述第二螺纹孔的连接螺纹和所述第二螺杆与所述第三螺纹孔的连接螺纹的方向相反。The connecting threads of the first screw rod and the second threaded hole are in opposite directions to the connecting threads of the second screw rod and the third threaded hole. 10.根据权利要求1所述的吊装装置,其特征在于,还包括:10. The lifting device according to claim 1, further comprising: 吊环,所述吊环与所述吊索连接,所述吊索用于通过所述吊环与起重设备连接。A suspension ring, the suspension ring is connected to the sling, and the sling is used to be connected to the lifting device through the suspension ring.
CN202310524705.2A 2023-05-09 2023-05-09 Hoisting device Pending CN116332016A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310524705.2A CN116332016A (en) 2023-05-09 2023-05-09 Hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310524705.2A CN116332016A (en) 2023-05-09 2023-05-09 Hoisting device

Publications (1)

Publication Number Publication Date
CN116332016A true CN116332016A (en) 2023-06-27

Family

ID=86884291

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310524705.2A Pending CN116332016A (en) 2023-05-09 2023-05-09 Hoisting device

Country Status (1)

Country Link
CN (1) CN116332016A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103359603A (en) * 2013-07-11 2013-10-23 扬州金鑫管业有限公司 Pipeline clamping tool
CN208516760U (en) * 2018-07-15 2019-02-19 长沙市官山量具有限公司 A kind of boom hoisting of cast iron surface plate
CN210944545U (en) * 2019-09-23 2020-07-07 张锡林 Industrial machinery steel stone tongs
CN218024935U (en) * 2022-11-10 2022-12-13 河南省晟源起重机械有限公司 Pipe fitting lifting appliance of crane

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103359603A (en) * 2013-07-11 2013-10-23 扬州金鑫管业有限公司 Pipeline clamping tool
CN208516760U (en) * 2018-07-15 2019-02-19 长沙市官山量具有限公司 A kind of boom hoisting of cast iron surface plate
CN210944545U (en) * 2019-09-23 2020-07-07 张锡林 Industrial machinery steel stone tongs
CN218024935U (en) * 2022-11-10 2022-12-13 河南省晟源起重机械有限公司 Pipe fitting lifting appliance of crane

Similar Documents

Publication Publication Date Title
CN110342393B (en) Steel plate hoisting clamp in steel structure assembly
CN102807151B (en) Handheld boom lifting appliance
CN2897963Y (en) Clamp
CN105958351A (en) Working method for reducing power outage time of transformer substation bus
CN209468033U (en) A kind of mechanical suspender of internal force pressurization principle
CN215516350U (en) Hoisting clamp with good stability
CN209478211U (en) A kind of gravity elastic clamp
CN112320562B (en) A kind of spreader belt pressing mechanism and spreader suitable for lifting large cylinders
CN105236261B (en) A kind of cylindrical clamping suspender
CN210682955U (en) Hoisting clamp for crane
CN204702407U (en) For lifting the hanger of steel plate
CN215160278U (en) Steel plate clamp capable of hoisting steel plates with various sizes and thicknesses
CN109694001A (en) A kind of mechanical suspender of internal force pressurization principle
CN207390818U (en) The adjustable hoisting appliance of nuclear power large-size cylinder body
CN218841475U (en) An axle material lifting device
CN205953350U (en) Double shear sword formula hoist
CN211004214U (en) Automatic change mechanical hoist
CN204369459U (en) Electrodynamic type engine cylinder-body milling end face hanging apparatus
CN111994788A (en) Device and method for clamping graphite electrode joint
CN218595905U (en) Anchor clamps overhead hoist and equipment
CN102616650B (en) Lifting appliance
CN105819328A (en) Claw-type lifting device
CN107740443B (en) Installation device and installation method of prefabricated ring beam and well seat of municipal road inspection well
CN223522175U (en) Novel cylindrical object lifting device
CN210689157U (en) An automatic pressing and adjusting nut device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination