CN116291585B - Single-point multi-pile dual high-pressure jet grouting system and method - Google Patents
Single-point multi-pile dual high-pressure jet grouting system and method Download PDFInfo
- Publication number
- CN116291585B CN116291585B CN202310339754.9A CN202310339754A CN116291585B CN 116291585 B CN116291585 B CN 116291585B CN 202310339754 A CN202310339754 A CN 202310339754A CN 116291585 B CN116291585 B CN 116291585B
- Authority
- CN
- China
- Prior art keywords
- grouting
- pressure
- drilling
- drill bit
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/04—Directional drilling
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- Civil Engineering (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
The application discloses a single-point multi-pile double high-pressure injection grouting system and a method, wherein the system comprises a drill bit, a drill rod, a grouting pipe, a horizontal directional drilling machine and a grouting pump, the drill bit is arranged at the front end of the drill rod, one end of the grouting pipe is connected with the tail end of the drill rod, the other end of the grouting pipe is fixedly arranged on the horizontal directional drilling machine, the grouting pump is connected with the grouting pipe, a high-pressure cement slurry channel and a high-pressure water-air channel are arranged in the drill rod, the drill bit comprises a main body rod part fixedly connected with the drill rod and a guide plate connected with the main body rod part, the guide plate comprises a plurality of rolling blades and spurs, the rolling blades and the spurs are arranged on the periphery of the guide plate, and a vibration motor for driving the rolling blades and the spurs to vibrate is arranged at the position, close to the guide plate, of the main body rod part. The application has the beneficial effects that the novel drill bit is newly formulated, so that the novel drill bit can realize non-excavation drilling according to a preset design track, and can finish high-pressure injection grouting work, light disturbance, low pollution and real-time monitoring functions are realized in the grouting work, and finally, a high-quality grouting reinforcement body is formed.
Description
[ Field of technology ]
The application relates to the technical field of civil engineering, in particular to an integrated trenchless low-disturbance single-point multi-pile dual high-pressure jet grouting system and method.
[ Background Art ]
Due to the shortage of urban space on the ground at the present stage, underground urban space is greatly developed as a future trend. Today urban underground pipe networks and tunnel networks are increasingly densified. Soil layer looseness is caused by underground pipeline construction and shield construction, and serious accidents such as collapse and cracking of superstructure, tunnels, pavement and the like are further caused. Therefore, the specified area of the urban underground complex space needs to be reinforced so as to reduce the disturbance of the existing basement, tunnel and urban main building caused by the later underground construction. Thereby developing a good foundation for the future deeper underground space.
The traditional ground pre-grouting and tracking grouting generally adopts a ground straight hole mode, is influenced by the positions of ground buildings and underground pipelines, often causes difficult hole distribution, has construction blind spots, simultaneously occupies ground roads, brings inconvenience to normal life of traffic and surrounding residents, has the problems of narrow construction space, limited reinforcement range, adverse engineering progress control due to cross operation and the like due to synchronous grouting and advanced grouting of an underground shield, and can only excavate a vertical shaft on the ground and then perform horizontal grouting if horizontal grouting is performed on a certain area under the ground due to the complexity of an underground pipe network.
The current grouting technology mainly comprises low-pressure penetration grouting, medium-pressure compaction grouting, higher-pressure splitting grouting and high-pressure injection grouting. The high-pressure injection grouting utilizes high pressure to remove part or all of the cut soil body, and the slurry is uniformly stirred with the soil body within the cutting range to form a high-strength structural body, and the reinforcing uniformity is best.
[ Invention ]
The application discloses a single-point multi-pile double high-pressure injection grouting system and a method, which can solve the problems that grouting is blocked by ground buildings and underground pipelines and high-quality grouting reinforcement, thereby effectively solving at least one technical problem related to the background technology.
In order to achieve the above purpose, the technical scheme of the application is as follows:
The single-point multi-pile dual high-pressure injection grouting system comprises a drill bit, a drill rod, a grouting pipe, a horizontal directional drilling machine and a grouting pump, wherein the drill bit is arranged at the front end of the drill rod, one end of the grouting pipe is connected with the tail end of the drill rod, the other end of the grouting pipe is fixedly arranged on the horizontal directional drilling machine, the grouting pump is connected with the grouting pipe, a high-pressure cement slurry channel and a high-pressure water-air channel are arranged in the drill rod, a slurry suction pipe is fixedly arranged on the outer side surface of the drill rod, the drill bit comprises a main body rod part fixedly connected with the drill rod and a guide plate connected with the main body rod part, the main body rod part is provided with a high-pressure water-air nozzle communicated with the high-pressure water-air channel, a high-pressure nozzle communicated with the high-pressure cement slurry channel and a low-pressure nozzle communicated with the high-pressure water-air channel, the guide plate comprises a plurality of hob pieces and a thorn arranged at the periphery of the hob pieces and a thorn, and the main body rod part is provided with a vibration driving blade and a thorn.
Optionally, the grouting device further comprises a stirring barrel connected with the grouting pump.
Optionally, the number of the pulp sucking pipes is multiple, and the pulp sucking pipes are uniformly arranged along the circumferential direction of the drill rod.
Optionally, the slurry suction pipe is fixed to the outer side surface of the drill pipe through a slurry suction pipe fixer.
Optionally, the main body rod part is also provided with a ground pressure detection hole.
Optionally, the hob pieces and the spurs are staggered.
The application also discloses an integrated trenchless low-disturbance single-point multi-pile dual high-pressure injection grouting method based on the system, which comprises the following steps:
step one, drilling a drill bit to a starting point of a grouting area according to a preset track in a drilling point working pit;
step two, adjusting the drilling direction, drilling towards a first grouting area, and stopping at a grouting end point;
Step three, dragging the drill rod back, wherein the drill rod drives the drill bit to rotate so as to perform high-pressure jet grouting, meanwhile, the ground pressure detection hole monitors the slurry pressure in the hole in real time, and if the slurry pressure is larger than the original ground stress at the position, the step four is executed;
Step four, starting a slurry suction pipe to work, sucking out slurry, and reducing the slurry pressure until the original ground stress is reduced;
step five, after the drill rod is dragged back to the starting point of the grouting area, adjusting the drilling direction, drilling towards the second grouting area, stopping at the grouting end point, and then executing the step three and the step four;
And step six, after the grouting work of the grouting area is completed, dragging the drill rod and the drill bit back to the ground until the drill bit is separated from the soil body.
Optionally, during drilling, the slurry sprayed from the guide plate and the low pressure nozzle in the front end of the drill bit cuts soil, and when the hard stratum or the stratum with underground obstacle is encountered, the rock-soil body is damaged by the rolling blade and the bursting blade on the guide plate through vibration, so that the drilling is completed.
Optionally, before the first step, the method further includes:
on-site investigation is carried out to determine the conditions of the topography, the underground tunnel, the pipeline and the ground structures of the construction site;
Track design, namely designing a preset track during drilling according to the result of site investigation and the expected grouting design requirement;
checking construction equipment, and detecting whether each construction equipment is normal;
and preparing a drilling point work pit, and digging out the drilling point work pit.
The beneficial effects of the application are as follows:
1. The path during grouting drilling can be formulated at will according to the requirement, so that the construction can bypass urban dense areas and established tunnels, has enough operation space, does not occupy roads, does not influence the life of residents in the construction process, and can be suitable for complex scenes of underground tunnels and pipe networks;
2. the non-excavation drilling is adopted, soil body is not required to be excavated during drilling, the engineering quantity is small, the manufacturing cost is reduced, and low carbon is realized;
3. drilling according to a preset track and high-pressure injection grouting are integrated, grouting work can be started after a grouting point is reached only by once drilling, and construction time and construction difficulty are greatly reduced;
4. The single-point multi-pile construction is adopted, and the position and the direction of an inflection point are controlled when the single-point multi-pile construction drills according to a preset track, so that pile forming construction of different pore-forming sections can be realized by utilizing the same soil-entering section, the position of a drilling machine does not need to be frequently replaced in a pile section of an area, and frequent drilling construction can be reduced by utilizing the same soil-entering section;
5. The horizontal directional drilling machine is adopted, so that the drilling angle of 0-90 degrees can be realized, the larger the drilling angle is, the less drill pipes are consumed in the path, and the drilling can be performed in the middle of the ground surface building;
6. in the grouting working process, the stress in the underground grouting hole can be almost in an original state through the grouting pipe, so that the micro-disturbance to the surrounding soil environment is realized, and the surrounding underground tunnels, pipelines, ground structures and the like which are sensitive to sedimentation and the surrounding are protected;
7. a plurality of rolling blades and burs are arranged on a guide plate at the front end of the drill bit, and when encountering hard stratum or stratum with underground barriers in the drilling process, the rolling blades and burs can damage a rock-soil body through high-frequency vibration, so that smooth drilling is completed. The method can be applied to a wider stratum range.
[ Description of the drawings ]
For a clearer description of the technical solutions of the embodiments of the present application, the drawings that are needed in the description of the embodiments will be briefly introduced below, it being obvious that the drawings in the description below are only some embodiments of the present application, and that other drawings can be obtained according to these drawings without inventive effort for a person skilled in the art, wherein:
FIG. 1 is a schematic illustration of trenchless grouting of a single point multi-pile dual high pressure jet grouting system provided by an embodiment of the present application;
Fig. 2 is a schematic diagram of an assembly structure of a drill rod and a drill bit according to an embodiment of the present application;
fig. 3 is a schematic structural view of a drilling machine lifting platform of a horizontal directional drilling machine according to an embodiment of the present application;
FIG. 4 is a schematic view of drilling at different drilling angles according to an embodiment of the present application;
FIG. 5 is a schematic diagram of a cross-sectional structure of a drill rod according to an embodiment of the present application;
FIG. 6 is a construction schematic diagram of soil micro-disturbance provided by an embodiment of the application;
FIG. 7 is a schematic view of a drill bit according to an embodiment of the present application;
FIG. 8 is a schematic cross-sectional view of a slurry suction pipe and a drill pipe after assembly according to an embodiment of the present application;
FIG. 9 is a simplified illustration of a single point multi-pile construction provided by an embodiment of the present application;
Fig. 10 is a schematic structural diagram of a composite pile according to an embodiment of the present application.
[ Detailed description ] of the invention
The technical solutions of the embodiments of the present application will be clearly and completely described in the following in conjunction with the embodiments of the present application, and it is obvious that the described embodiments are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
It should be noted that all directional indicators (such as up, down, left, right, front, and rear are used in the embodiments of the present application) are merely for explaining the relative positional relationship, movement conditions, and the like between the components in a certain specific posture (as shown in the drawings), and if the specific posture is changed, the directional indicators are changed accordingly.
Furthermore, descriptions such as those referred to as "first," "second," and the like, are provided for descriptive purposes only and are not to be construed as indicating or implying a relative importance or implying an order of magnitude of the indicated technical features in the present disclosure. Thus, a feature defining "a first" or "a second" may explicitly or implicitly include at least one such feature. In the description of the present application, the meaning of "plurality" means at least two, for example, two, three, etc., unless specifically defined otherwise.
In the present application, unless explicitly specified and limited otherwise, the terms "connected," "fixed," and the like are to be construed broadly, and for example, "fixed" may be fixedly connected, detachably connected, or integrally formed, mechanically connected, electrically connected, directly connected, indirectly connected via an intervening medium, or in communication between two elements or in an interaction relationship between two elements, unless otherwise explicitly specified. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art according to the specific circumstances.
In addition, the technical solutions of the embodiments of the present application may be combined with each other, but it is necessary to be based on the fact that those skilled in the art can implement the technical solutions, and when the technical solutions are contradictory or cannot be implemented, the combination of the technical solutions should be considered as not existing, and not falling within the scope of protection claimed by the present application.
Referring to fig. 1 and 2, the present application provides a single-point multi-pile dual high-pressure injection grouting system, which comprises a drill bit 1, a drill rod 2, a grouting pipe 3, a horizontal directional drilling machine 4 and a grouting pump 5. The drill bit 1 is mounted at the front end of the drill rod 2, and the drill bit 1 comprises a main body rod part 11 fixedly connected with the drill rod 2 and a guide plate 12 connected with the main body rod part 11.
One end of the grouting pipe 3 is connected with the tail end of the drill rod 2, and the other end of the grouting pipe is fixedly arranged on the horizontal directional drilling machine 4.
Referring to fig. 3 again, the horizontal directional drilling machine 4 is provided with a drilling machine lifting table 41 and a hydraulic driver 42 for driving the drilling machine lifting table 41 to rotate, so that the horizontal directional drilling machine 4 can achieve a drilling angle of 0-90 degrees, and the larger the drilling angle is, the less drill pipes are consumed in a path, and the drilling can be performed in the middle of a ground surface building, and the concrete is shown in fig. 4. If a building is arranged around the drilling point, the large-angle drilling can more complete the construction requirement, and the small-angle drilling needs to find out the space for construction operation. When the drilling angle is 30 degrees, the construction cannot be performed due to the influence of the building, the construction can be performed only to a more distant place, and when the drilling angle is 45 degrees, the construction can be performed in the space between two buildings.
The grouting pump 5 is connected to the grouting pipe 3 so that the grouting pump 5 can input cement slurry into the grouting pipe 3 to form high-pressure cement slurry.
Referring to fig. 5 again, a high-pressure cement slurry channel 21 and a high-pressure water-air channel 22 are provided in the drill rod 2, a high-pressure water-air nozzle 111 communicating with the high-pressure water-air channel 22, a high-pressure nozzle 112 communicating with the high-pressure cement slurry channel 21, and a low-pressure nozzle 113 communicating with the high-pressure water-air channel 22 are provided in the main rod 11, so that high-pressure water or high-pressure air can be ejected through the high-pressure water-air nozzle 111, high-pressure cement slurry can be ejected through the high-pressure nozzle 112, and higher-pressure or low-pressure water can be ejected through the low-pressure nozzle 113.
The main body rod 11 is also provided with a ground pressure detection hole 13.
And a slurry suction pipe 6 is fixedly arranged on the outer side surface of the drill rod 2. The number of the pulp sucking pipes 6 is multiple, and the pulp sucking pipes 6 are uniformly arranged along the circumferential direction of the drill rod 2.
In some embodiments, the suction pipe 6 is secured to the outside surface of the drill pipe 2 by a suction pipe holder 7.
By providing the suction pipe 6 as shown in fig. 6, it is possible to realize a micro disturbance to the soil body during grouting, specifically, when the stress P > γh p detected by the ground pressure detection hole 13 is detected, the pressure in the underground hole is reduced by the suction pipe 6, and when the stress P < γh p detected by the ground pressure detection hole 13 is detected, the pressure in the underground hole is increased by a slurry blocking ring (not shown). P=γh p is achieved by the suction pipe 6 and the choke ring.
The slurry pressure in the underground hole is equal to the self-weight stress of the original soil body at the position by regulating and controlling the slurry suction pipe 6, namely the stress P=γH p monitored by the ground pressure detection hole 13, so that the micro disturbance to the surrounding soil body is realized.
When the in-hole stress P detected by the ground pressure detecting hole 13 is larger than gamma H p, the pulp sucking pipe 6 is controlled by the pulp sucking pump to perform pulp sucking operation, so that the pressure of pulp in the hole is reduced, and when the pressure P is reduced to be equal to gamma H p, pulp sucking is stopped. At this time, because the stress p=γh p detected by the ground pressure detecting hole 13, the stress condition of the soil around the pile body 10 is almost the same as that before construction, thereby realizing micro disturbance to the surrounding soil. Grouting work with strict requirements on stratum settlement, such as subway tunnels and the like sensitive to stratum settlement and the like, has important significance.
Referring to fig. 7 again, the guide plate 12 includes a plurality of hob 121 and a spike 122 disposed at a periphery thereof for breaking rock, and a vibration motor (not shown) for driving the hob 121 and the spike 122 to vibrate is disposed at a position of the main body rod 11 adjacent to the guide plate 12, and the vibration motor provides vibration to drive the hob 121 and the spike 122 to vibrate.
In some embodiments, the hob 121 and the spur 122 are staggered.
Through setting up hob 121 and spur 122, when meetting hard stratum or the stratum that has the underground obstacle in the drilling process, drilling rod 2 drive drill bit 1 is rotatory in order to produce mechanical pressure friction to the rock mass, the rethread vibration of vibrating motor's high frequency lets hob 121 and spur 122 destroy the rock mass, accomplishes smooth drilling. The high-frequency vibration of the vibration motor can be adjusted according to the drilling condition.
It should be noted that, by arranging the hob 121 between the spurs 122, the hob 121 will generate mechanical pressure friction to surrounding rock-soil body under the action of slight shock, the space in the middle of the hob 121 will block the soil body, and the mechanical pressure under vibration can better break the rock-soil body, so that the rock-breaking effect can be obviously improved by adopting the hob 121 and the spurs 122.
In order to further improve the rock breaking efficiency, at least two rows of the hob pieces 121 and the spurs 122 are provided along the advancing direction of the drill bit 1.
In addition, when the hob 121 and the stabs 122 break the rock, the high-pressure water-air nozzle 111 sprays high-pressure gas, and the gas forms ultra-high pressure in the local space to help break the rock. Meanwhile, the crushed rock scraps are taken away by continuously spraying higher-pressure water through the low-pressure nozzle 113, so that the crushed rock scraps can be greatly prevented from being further crushed when blocked at the front end, and the rock scraps are taken away by the higher-pressure water, so that the rock breaking effect can be greatly improved. Through the cooperation of the hob 121 and the spur 122, the high-pressure water-air nozzle 111 and the low-pressure nozzle 113, the broken rock mass is carried away by water flow under the multiple actions of mechanical friction, vibration and air pressure splitting, so that the rock breaking effect is remarkably improved.
In some embodiments, the vibration motor is a miniature high frequency vibration motor.
The system further comprises a stirring barrel 8 connected with the grouting pump 5, wherein the grouting pump 5 injects cement slurry in the stirring barrel 8 into the grouting pipe 3.
In order to make the connection between the drill bit 1 and the drill rod 2 more firm, the drill bit 1 and the drill rod 2 are fixedly connected through the fixing ring 9, so that the drill bit is not only firmly fixed, but also convenient to assemble and disassemble.
In some embodiments, as shown in fig. 8, the suction pipe 6 is mounted on the drill pipe 2 by the suction pipe holder 7 at the central portion of each section of the drill pipe 2.
The application also discloses an integrated trenchless low-disturbance single-point multi-pile dual high-pressure jet grouting method, which comprises the following steps:
Step one, referring to fig. 9, drilling a drill bit to a starting point O point of a grouting area according to a preset track in a drilling point work pit;
in fact, before step one, it further comprises:
The method comprises the steps of performing on-site investigation, and determining the conditions of the topography, the underground tunnel, the pipeline and the ground structures of a construction site, so that the construction site, the drilling point position and the like can be determined;
Track design, namely designing a preset track during drilling according to the result of site investigation and the expected grouting design requirement;
checking construction equipment, and detecting whether each construction equipment is normal;
drilling into the point work pit preparation, and digging out 2.0 x 1.5 x 2.0 meters of the drilling into point work pit.
Step two, adjusting the drilling direction, drilling towards the first grouting area A, and stopping at the grouting end point;
During the drilling process, the drill bit 1 cuts the soil body by the water sprayed from the guide plate 12 and the low-pressure nozzle 113 at the front end of the drill bit 1. When encountering hard stratum or stratum with underground obstacle, the hob 121 and the stab 122 can destroy the rock-soil body through the high-frequency vibration generated by the vibration motor, so as to finish smooth drilling.
Step three, pulling back the drill rod 2, wherein the drill rod 2 drives the drill bit 1 to rotate for high-pressure jet grouting, meanwhile, the ground pressure detection hole 13 monitors the slurry pressure in the hole in real time, and if the slurry pressure is larger than the original ground stress at the position, the step four is executed;
The horizontal directional drilling machine 4 is powered, and the drill rod 2 rotates and drags the drill bit 1 back, and the slurry is sprayed while rotating and dragging back, so that the grouting reinforcement body is formed. The high-pressure slurry and the high-pressure air are injected from different channels of the drill rod 2 at the drilling machine, the hollow part of the drill rod 2 is used as slurry and high-pressure air channels, and the slurry is ejected from the high-pressure nozzle 112 after reaching the drill bit 1. For high pressure air, when high pressure air is injected, i.e., the high pressure air encases the high pressure slurry injection, because upward injection creates an air pocket. Therefore, the grouting reinforcement is designed to be a semicircle (fan shape) formed by downward grouting at 0-180 degrees, grouting can be formed in any shape between 0-360 degrees by injecting grouting at high pressure for a single pipe at the moment when high-pressure air is not injected, and the pile diameter of the pile body formed by empirical grouting is lost by about 40 percent when high-pressure air is not injected.
Step four, starting a slurry suction pipe 6 to work, sucking out slurry, and reducing the slurry pressure until the original ground stress is reduced;
In the grouting process, the ground pressure detection hole 13 at the drill rod 2 monitors the slurry pressure in the hole in real time, if the slurry pressure is greater than the original ground stress, the slurry suction pipe 6 starts to work, sucks the slurry, reduces the slurry pressure in the hole, and returns the pressure to the original state. By stabilizing the pressure in the underground hole, the micro-disturbance to the surrounding soil environment is realized.
Step five, after the drill rod 2 is dragged back to the starting point O of the grouting area, adjusting the drilling direction, drilling towards the second grouting area B, stopping at the grouting end point, and then executing the step three and the step four;
It should be noted that, referring to the manner of step five, as shown in fig. 9 and 10, after the grouting operation of the second grouting area B is completed, grouting may be further performed on the third grouting area C, the fourth grouting area D, the fifth grouting area E, the sixth grouting area F and the seventh grouting area G, and after all grouting operations are completed, the composite pile is formed.
In general, the single-point multi-pile construction mode can realize pile construction of different hole forming sections by using the same soil entering section by controlling the position and the direction of the inflection point when the drill bit 1 drills according to a preset track. As shown in fig. 8. The main advantages are as follows:
1. in the regional pile section, the position of the drilling machine does not need to be frequently replaced, and frequent drilling construction can be reduced by means of the same soil entering section. The single-point multi-pile construction occupies small area and has less damage to the environment. Drilling and grouting are carried out on a platform. The drilling operation according to the preset track is greatly simplified, the equipment utilization rate is improved, the cost of drilling fluid is reduced, and the drilling time is effectively shortened.
2. Grouting work by spraying high-pressure cement slurry only is performed to form a pile with smaller diameter, and large-diameter pile body 10 can be formed by single-point multi-pile construction, as shown in fig. 10.
And step six, after the grouting work of the grouting area is completed, dragging the drill rod and the drill bit back to the ground until the drill bit is separated from the soil body, and then cleaning the drill bit 1 and the drill rod 2.
The beneficial effects of the application are as follows:
1. The path during grouting drilling can be formulated at will according to the requirement, so that the construction can bypass urban dense areas and established tunnels, has enough operation space, does not occupy roads, does not influence the life of residents in the construction process, and can be suitable for complex scenes of underground tunnels and pipe networks;
2. the non-excavation drilling is adopted, soil body is not required to be excavated during drilling, the engineering quantity is small, the manufacturing cost is reduced, and low carbon is realized;
3. drilling according to a preset track and high-pressure injection grouting are integrated, grouting work can be started after a grouting point is reached only by once drilling, and construction time and construction difficulty are greatly reduced;
4. The single-point multi-pile construction is adopted, and the position and the direction of an inflection point are controlled when the single-point multi-pile construction drills according to a preset track, so that pile forming construction of different pore-forming sections can be realized by utilizing the same soil-entering section, the position of a drilling machine does not need to be frequently replaced in a pile section of an area, and frequent drilling construction can be reduced by utilizing the same soil-entering section;
5. The horizontal directional drilling machine is adopted, so that the drilling angle of 0-90 degrees can be realized, the larger the drilling angle is, the less drill pipes are consumed in the path, and the drilling can be performed in the middle of the ground surface building;
6. in the grouting working process, the stress in the underground grouting hole can be almost in an original state through the grouting pipe, so that the micro-disturbance to the surrounding soil environment is realized, and the surrounding underground tunnels, pipelines, ground structures and the like which are sensitive to sedimentation and the surrounding are protected;
7. a plurality of rolling blades and burs are arranged on a guide plate at the front end of the drill bit, and when encountering hard stratum or stratum with underground barriers in the drilling process, the rolling blades and burs can damage a rock-soil body through high-frequency vibration, so that smooth drilling is completed. The method can be applied to a wider stratum range.
Although embodiments of the present application have been disclosed above, it is not limited to the details and embodiments shown and described, it is well suited to various fields of use for which the application would be readily apparent to those skilled in the art, and accordingly, the application is not limited to the specific details and illustrations shown and described herein, without departing from the general concepts defined in the claims and their equivalents.
Claims (6)
1. The integrated trenchless low-disturbance single-point multi-pile dual high-pressure injection grouting method based on the integrated trenchless low-disturbance single-point multi-pile dual high-pressure injection grouting system comprises a drill bit, a drill rod, a grouting pipe, a horizontal directional drilling machine and a grouting pump, wherein the drill bit is arranged at the front end of the drill rod, one end of the grouting pipe is connected with the tail end of the drill rod, the other end of the grouting pipe is fixedly arranged on the horizontal directional drilling machine, the grouting pump is connected with the grouting pipe, a high-pressure cement slurry channel and a high-pressure water-air channel are arranged in the drill rod, a grouting pipe is fixedly arranged on the outer side surface of the drill rod, the drill bit comprises a main body rod part fixedly connected with the drill rod and a guide plate connected with the main body rod part, the main body rod part is provided with a high-pressure water air nozzle communicated with the high-pressure water channel, the high-pressure nozzle communicated with the high-pressure cement slurry channel and a low-pressure nozzle communicated with the high-pressure water-air channel, the guide plate comprises a plurality of stabbing pieces arranged at the periphery of the guide plate and a plurality of stabbing pieces used for driving a rock blade and a rock-penetrating blade, and the vibration motor is arranged at the position of the stabbing motor, and the vibration method comprises the steps of the stabbing blade and the vibrating blade is characterized in that:
step one, drilling a drill bit to a starting point of a grouting area according to a preset track in a drilling point working pit;
step two, adjusting the drilling direction, drilling towards a first grouting area, and stopping at a grouting end point;
Step three, dragging the drill rod back, wherein the drill rod drives the drill bit to rotate so as to perform high-pressure jet grouting, meanwhile, the ground pressure detection hole monitors the slurry pressure in the hole in real time, and if the slurry pressure is larger than the original ground stress at the position, the step four is executed;
Step four, starting a slurry suction pipe to work, sucking out slurry, and reducing the slurry pressure until the original ground stress is reduced;
step five, after the drill rod is dragged back to the starting point of the grouting area, adjusting the drilling direction, drilling towards the second grouting area, stopping at the grouting end point, and then executing the step three and the step four;
And step six, after the grouting work of the grouting area is completed, dragging the drill rod and the drill bit back to the ground until the drill bit is separated from the soil body.
2. The method of claim 1, wherein during drilling, soil is cut by slurry ejected from a guide plate and a low pressure nozzle at the front end of the drill bit, and when a hard stratum or a stratum with an underground obstacle is encountered, rock and soil is broken by vibration of rolling blades and a burst on the guide plate, so that drilling is completed.
3. The method of claim 1, further comprising, prior to step one:
on-site investigation is carried out to determine the conditions of the topography, the underground tunnel, the pipeline and the ground structures of the construction site;
Track design, namely designing a preset track during drilling according to the result of site investigation and the expected grouting design requirement;
checking construction equipment, and detecting whether each construction equipment is normal;
and preparing a drilling point work pit, and digging out the drilling point work pit.
4. The method of claim 1, wherein in the fourth step, the number of the slurry sucking pipes is plural, and the plural slurry sucking pipes are uniformly arranged along the circumferential direction of the drill pipe.
5. The method of claim 4, wherein the suction pipe is secured to the outside surface of the drill pipe by a suction pipe holder.
6. The method of claim 2, wherein the hob pieces are staggered with respect to the spurs.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310339754.9A CN116291585B (en) | 2023-04-03 | 2023-04-03 | Single-point multi-pile dual high-pressure jet grouting system and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310339754.9A CN116291585B (en) | 2023-04-03 | 2023-04-03 | Single-point multi-pile dual high-pressure jet grouting system and method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116291585A CN116291585A (en) | 2023-06-23 |
| CN116291585B true CN116291585B (en) | 2025-07-11 |
Family
ID=86824044
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310339754.9A Active CN116291585B (en) | 2023-04-03 | 2023-04-03 | Single-point multi-pile dual high-pressure jet grouting system and method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116291585B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119321280B (en) * | 2024-08-20 | 2025-07-04 | 江苏建院营造股份有限公司 | Multiple high-pressure perturbation jet grouting equipment with limited micro-space |
| CN120777018B (en) * | 2025-09-12 | 2025-12-05 | 湖南大学 | A high-precision grooving system for directional drilling |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115613547A (en) * | 2022-12-20 | 2023-01-17 | 中铁二十二局集团轨道工程有限公司 | MJS all-dimensional high-pressure jet grouting device and construction method thereof |
Family Cites Families (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000073681A (en) * | 1998-06-19 | 2000-03-07 | Nishitetsu Kenki Kk | Excavation method and excavation device for branch excavation hole |
| CN102322058B (en) * | 2011-06-17 | 2013-09-25 | 北京荣创科宏岩土工程有限公司 | Construction process and equipment for downhole impacting high-pressure jet grouting pile |
| KR101677933B1 (en) * | 2014-07-17 | 2016-11-21 | 주식회사 성우지오텍 | Composition of the ground in soft ground reinforcement method |
| CN107119692A (en) * | 2017-05-03 | 2017-09-01 | 中交航局第工程有限公司 | A kind of Soft Deep Foundation Pit support construction process |
| CN108221966A (en) * | 2018-02-02 | 2018-06-29 | 中国十九冶集团有限公司 | Construction Method of Deep Pile Foundation in Mountainous Area Combining Manual Hole Digging and Impact Hole Forming |
| CN109826589A (en) * | 2018-12-29 | 2019-05-31 | 北京中岩大地科技股份有限公司 | A kind of confined space high-pressure mortar spraying method and system |
| CN212358286U (en) * | 2020-03-06 | 2021-01-15 | 珠海十字门中央商务区建设控股有限公司 | Double-pipe jet grouting system |
| CN113089655A (en) * | 2021-04-08 | 2021-07-09 | 启东建筑集团有限公司 | Construction method in three-pipe rotary spraying pile pit in flowing water environment |
-
2023
- 2023-04-03 CN CN202310339754.9A patent/CN116291585B/en active Active
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115613547A (en) * | 2022-12-20 | 2023-01-17 | 中铁二十二局集团轨道工程有限公司 | MJS all-dimensional high-pressure jet grouting device and construction method thereof |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116291585A (en) | 2023-06-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108643922B (en) | A comprehensive excavation method for large-diameter mud-water shield in highly permeable soil-rock composite strata | |
| CN102322058B (en) | Construction process and equipment for downhole impacting high-pressure jet grouting pile | |
| CN117703408B (en) | A construction method for shield continuous cutting through reinforced concrete ground-connected wall | |
| CN104612179B (en) | Through the construction method of the diaphram wall of super thick silty sand ground | |
| CN201395793Y (en) | Long spiral high-pressure spraying mud injecting stirring pile-forming device | |
| CN112796296A (en) | High-pressure rotary spraying combined PVC sleeve retaining wall earth surface reinforcing construction method | |
| CN111577136A (en) | A kind of integrated device and construction method of high-pressure rotary jet pile leading hole construction | |
| CN111335901A (en) | Construction method for auxiliary small-diameter open TBM tunneling of pipe shed at unfavorable geological tunnel section | |
| CN103277037A (en) | Pipe pile leading-hole construction method under boulder cluster geological condition | |
| CN106284295A (en) | Multichannel high-pressure vibro-grouting jet groutinl construction method | |
| CN110093934A (en) | The nothing for going along with sb. to guard him pile driving construction suitable for subway leads wall construction method of interlocking pile | |
| CN115853004A (en) | Construction method of high-pressure rotary grouting anti-seepage wall | |
| CN116291585A (en) | Single-point multi-pile double high-pressure jet grouting system and method | |
| CN112942399A (en) | Open caisson mechanical construction device and method for penetrating rock stratum | |
| CN103074887A (en) | Drilling/spraying integrated foundation treatment method and special drilling rig component | |
| CN119195781B (en) | Stratum abrupt change complex stratum jacking pipe jacking construction method | |
| CN109184743A (en) | Existing tunnel construction method is worn under circle boulder clay rock compound stratum slurry shield short distance | |
| CN111005379A (en) | Construction method for removing pile body of reinforced concrete cast-in-place pile | |
| CN104631479A (en) | Construction method of soil-changing and stirring waterproof curtain | |
| CN105019917A (en) | Impact drilling type advanced jet grouting pipe shed construction device and construction method | |
| CN108951623A (en) | A kind of three axis high-pressure rotary-spray two-way stirring pile construction methods | |
| JP5875849B2 (en) | Injection stirring ground improvement method | |
| CN118582218A (en) | Construction method for escaping the stuck pipe head of a long-distance jacking pipe in a gravel layer | |
| CN115853024B (en) | Anti-seepage wall structure and cofferdam anti-seepage construction method | |
| CN207959196U (en) | A kind of three axis high pressure spray of long spire stirs device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||