CN116290534A - An assembled steel structure enclosure composite roof panel system and construction method - Google Patents
An assembled steel structure enclosure composite roof panel system and construction method Download PDFInfo
- Publication number
- CN116290534A CN116290534A CN202310324796.5A CN202310324796A CN116290534A CN 116290534 A CN116290534 A CN 116290534A CN 202310324796 A CN202310324796 A CN 202310324796A CN 116290534 A CN116290534 A CN 116290534A
- Authority
- CN
- China
- Prior art keywords
- roof
- roof panel
- wall
- plate
- panel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/02—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
- E04B7/04—Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs supported by horizontal beams or the equivalent resting on the walls
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/20—Roofs consisting of self-supporting slabs, e.g. able to be loaded
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D13/00—Special arrangements or devices in connection with roof coverings; Protection against birds; Roof drainage ; Sky-lights
- E04D13/16—Insulating devices or arrangements in so far as the roof covering is concerned, e.g. characterised by the material or composition of the roof insulating material or its integration in the roof structure
- E04D13/1606—Insulation of the roof covering characterised by its integration in the roof structure
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04D—ROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
- E04D3/00—Roof covering by making use of flat or curved slabs or stiff sheets
- E04D3/35—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation
- E04D3/351—Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Roof Covering Using Slabs Or Stiff Sheets (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑结构工程技术领域,具体为一种装配式钢结构围护复合屋面板体系及施工方法。The invention relates to the technical field of building structure engineering, in particular to an assembled steel structure enclosure composite roof panel system and a construction method.
背景技术Background technique
装配式轻钢结构房屋是以薄壁型钢构件如龙骨、桁架作为梁、柱等的承重结构,用预制的墙板、楼层板和屋面板直接搭建而成,具有装配程度高、绿色环保等优点,主要应用于荷载相对较小的别墅、仓库、娱乐场所等低层或多层建筑中。传统轻钢房屋的屋顶结构如图1所示,先将C型钢檩条通过挂板架设在顶层的墙体上,檩条上铺设预制的屋面板,屋面板上依次进行保护层、防水层等处理,这种施工工艺不仅所用的连接构件多、现场操作工序繁杂,而且房顶设置有檩条降低了屋内的实际层高。The prefabricated light steel structure house is a load-bearing structure with thin-walled steel components such as keels and trusses as beams and columns. It is directly built with prefabricated wall panels, floor panels and roof panels. It has the advantages of high assembly level and environmental protection. , mainly used in low-rise or multi-storey buildings with relatively small loads such as villas, warehouses, and entertainment venues. The roof structure of a traditional light steel house is shown in Figure 1. First, the C-shaped steel purlins are erected on the top wall through the hanging boards, and the prefabricated roof panels are laid on the purlins, and the protective layer and waterproof layer are sequentially processed on the roof panels. This kind of construction technology not only uses many connecting components, but also has complicated on-site operation procedures, and the roof is provided with purlins to reduce the actual floor height in the house.
发明内容Contents of the invention
本发明的目的在于提供一种装配式钢结构围护复合屋面板体系及施工方法,支撑屋面板荷载的龙骨和填充真金板颗粒的保温层,两者结合在免拆模板上能够提高屋面板强度和房屋稳定性,具有良好的保温、防火性能,以解决上述背景技术中提出的问题。The purpose of the present invention is to provide an assembled steel structure envelope composite roof panel system and construction method, the keel supporting the roof panel load and the insulation layer filled with real gold plate particles, the combination of the two on the formwork without demolition can improve the roof panel Intensity and stability of the house, good thermal insulation and fire performance, to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:
一种装配式钢结构围护复合屋面板体系,包括墙板、楼层板和屋面板,所述墙板和楼层板相互拼接搭设成房屋主体,顶层的墙板上铺设屋面板,所述屋面板包括模板、龙骨和保温层,所述模板上设置保温层,保温层内均匀分布若干龙骨,龙骨底部固定在模板上;所述屋面板通过连接件与墙板连接。A prefabricated steel structure enclosure composite roof panel system, including wall panels, floor panels and roof panels, the wall panels and floor panels are spliced together to form the main body of the house, and roof panels are laid on the top wall panels, and the roof panels It includes formwork, keel and insulation layer. The formwork is provided with an insulation layer, and a number of keels are evenly distributed in the insulation layer, and the bottom of the keel is fixed on the formwork; the roof panel is connected to the wall panel through connectors.
更进一步地,所述模板为水泥压力板,保温层为真金板颗粒填充而成。Furthermore, the template is a cement pressure board, and the insulation layer is filled with real gold board particles.
更进一步地,所述龙骨包括钢筋桁架和矩形管,矩形管通过自攻螺钉固定在模板上,所述钢筋桁架焊接在矩形管上,钢筋桁架包括上悬钢筋、下悬钢筋和腹杆钢筋,一个上悬钢筋和两个下悬钢筋构成三角形,由腹杆钢筋焊接连成钢筋桁架。Furthermore, the keel includes a steel bar truss and a rectangular tube, the rectangular tube is fixed on the formwork by self-tapping screws, the steel bar truss is welded on the rectangular tube, the steel bar truss includes an upper hanging steel bar, a lower hanging steel bar and a web bar steel bar, One upper hanging steel bar and two lower hanging steel bars form a triangle, and the web steel bars are welded to form a steel bar truss.
更进一步地,所述连接件为挂件,挂件包括顶板、侧板、横撑和斜撑;所述顶板一端设有相垂直的侧板,侧板的下部垂直设置横撑,横撑在顶板的相对侧,所述斜撑在横撑的下部,斜撑的一端连接横撑,横撑另一端连接侧板;所述顶板和侧板固定在墙板上,横撑与屋面板连接。Furthermore, the connecting piece is a hanger, and the hanger includes a top plate, a side plate, a cross brace and a diagonal brace; one end of the top plate is provided with a vertical side plate, and the lower part of the side plate is vertically provided with a cross brace, and the cross brace is on the top of the top plate. On the opposite side, the diagonal brace is at the lower part of the cross brace, one end of the diagonal brace is connected to the cross brace, and the other end of the cross brace is connected to the side plate; the top plate and the side plate are fixed on the wallboard, and the cross brace is connected to the roof panel.
更进一步地,所述顶板的长度小于墙板的厚度,横撑到顶板的距离大于屋面板的厚度。Furthermore, the length of the top plate is smaller than the thickness of the wall plate, and the distance from the cross brace to the top plate is greater than the thickness of the roof plate.
更进一步地,相邻的所述龙骨之间连接有缀板,通过缀板将若干龙骨连接成整体。Furthermore, there are trim plates connected between adjacent keels, and several keels are connected into a whole through the trim plates.
本发明提供另一种技术方案:一种装配式钢结构围护复合屋面板体系的施工方法,包括平屋顶的搭建,其步骤如下:The present invention provides another technical solution: a construction method for an assembled steel structure enclosure composite roof panel system, including the construction of a flat roof, the steps of which are as follows:
S1:根据房屋的尺寸和房顶的荷载,计算屋面板的尺寸和屋面板内钢筋桁架的数量及规格,并在工厂内预制所需的屋面板;S1: According to the size of the house and the load of the roof, calculate the size of the roof panel and the number and specifications of the steel trusses in the roof panel, and prefabricate the required roof panel in the factory;
S2:现场施工时,将房屋顶层的四面墙板搭建好,在墙板的顶部安装顶导梁,顶导梁上部焊接固定连接板,连接板设置在墙体的端部和两块屋面板之间的位置;连接板向墙体内侧延伸;S2: During on-site construction, build the four wall panels on the top floor of the house, install the top guide beam on the top of the wall panel, weld and fix the connection plate on the top of the top guide beam, and set the connection plate between the end of the wall and the two roof panels The position between; the connecting plate extends to the inside of the wall;
S3:施工时先从房屋的一侧铺设屋面板,将屋面板架设在墙板上,并在连接板上打自攻螺钉固定屋顶板,通过连接板将屋顶板和墙体连接;S3: During construction, the roof panel is first laid from one side of the house, the roof panel is erected on the wall panel, and the roof panel is fixed with self-tapping screws on the connecting plate, and the roof panel and the wall are connected through the connecting plate;
S4:相邻的屋面板之间由子母扣相互搭接成一整体,最后在屋面板上铺设防水材料,搭建成平顶的屋顶。S4: Adjacent roof panels are overlapped with snap-in buckles to form a whole, and finally waterproof materials are laid on the roof panels to build a flat roof.
本发明还提供一种技术方案:一种装配式钢结构围护复合屋面板体系的施工方法,包括坡屋顶的搭建,其步骤如下:The present invention also provides a technical solution: a construction method for an assembled steel structure enclosure composite roof panel system, including the construction of a sloping roof, the steps of which are as follows:
S1:施工时,在顶层墙体的端部和两块屋面板之间的位置固定挂件;S1: During construction, fix the pendant at the end of the top wall and between the two roof panels;
S2:将挂件的顶板和侧板分别通过自攻螺钉与顶导梁连接,再将挂件与墙体连接在一起;S2: Connect the top plate and side plate of the pendant to the top guide beam through self-tapping screws, and then connect the pendant to the wall;
S3:从房屋的一侧向中间铺设屋面板,将屋面板架设在挂件上,使屋面板的上表面和墙板顶部持平;S3: Lay the roof panel from one side of the house to the middle, and erect the roof panel on the pendant, so that the upper surface of the roof panel is level with the top of the wall panel;
S4:在屋面板上铺设防水材料,将整体预制的屋架放置在墙板上,连接处焊接,完成坡屋顶的搭建。S4: Lay waterproof materials on the roof panels, place the integral prefabricated roof trusses on the wall panels, and weld the joints to complete the construction of the sloping roof.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1、本发明提供的一种装配式钢结构围护复合屋面板体系及施工方法,其体系结构是保温、抗压一体化的预制、复合屋面板,屋面板内的保温层填充真金板颗粒,真金板为难燃级别的新型保温材料,防火等级高、安全性好,起到支撑作用的龙骨由钢筋桁架和矩形管构成,钢筋桁架结构稳固,有效地提高屋顶面的强度,使屋面板具有良好的抗压、抗剪性能,从而使建成的房屋安全可靠。1. An assembled steel structure enclosure composite roof panel system and construction method provided by the present invention, its system structure is a prefabricated and composite roof panel integrated with heat preservation and compression resistance, and the insulation layer in the roof panel is filled with real gold plate particles , the real gold board is a new type of fire-resistant insulation material with high fire resistance and good safety. The supporting keel is composed of steel trusses and rectangular tubes. The steel truss structure is stable, which effectively improves the strength of the roof surface and makes the roof panel It has good compressive and shearing properties, so that the built houses are safe and reliable.
2、本发明提供的一种装配式钢结构围护复合屋面板体系及施工方法,其复合屋面板可批量工厂化生产,符合发展装配式建筑的产业要求;同时施工时装配简单方便,简化屋面板的安装、减少现场操作步骤,能有效节省人力物力。2. The present invention provides a prefabricated steel structure enclosure composite roof panel system and construction method. The composite roof panel can be mass-produced in a factory, which meets the industrial requirements for the development of prefabricated buildings; at the same time, the assembly is simple and convenient during construction, simplifying the construction of the roof. The installation of the panel and the reduction of on-site operation steps can effectively save manpower and material resources.
附图说明Description of drawings
图1是现有屋面板的结构示意图;Fig. 1 is the structural representation of existing roof panel;
图2是本发明屋面板的结构示意图;Fig. 2 is the structural representation of roof panel of the present invention;
图3是本发明屋面板的搭建示意图;Fig. 3 is a schematic diagram of building a roof panel of the present invention;
图4是本发明龙骨的结构示意图;Fig. 4 is the structural representation of keel of the present invention;
图5是本发明挂件的结构示意图;Fig. 5 is a schematic structural view of the pendant of the present invention;
图6是本发明屋面板另一搭建方式的结构示意图。Fig. 6 is a structural schematic diagram of another construction method of the roof panel of the present invention.
图中:1、墙板;2、檩条;3、屋面板;4、屋架;5、模板;6、保温层;7、钢筋桁架;8、矩形管;71、上悬钢筋;72、下悬钢筋;73、腹杆钢筋;9、挂件;91、顶板;92、侧板;93、横撑;94、斜撑;10、连接板。In the figure: 1. Wall panels; 2. Purlins; 3. Roof panels; 4. Roof trusses; 5. Formwork; 6. Insulation layer; 7. Rebar trusses; Reinforcement bar; 73, web bar reinforcement; 9, pendant; 91, top plate; 92, side plate; 93, cross brace; 94, diagonal brace; 10, connecting plate.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
请参阅图2-3,本发明实施例中提供一种装配式钢结构围护复合屋面板体系,包括墙板1、楼层板和屋面板3,墙板1设置在地基基础上,房屋为1-3层,墙板1和楼层板相互拼接搭设成房屋主体,顶层的墙板1上铺设屋面板3,屋面板3是复合预制板材,屋面板3包括模板5、龙骨和保温层6,在底面的模板5和龙骨形成的屋面板3空间内填充真金板颗粒形成的保温层6,保温层6内均匀分布若干龙骨,龙骨底部固定在模板5上;所述屋面板3通过连接件与墙板1连接,其中,模板5是水泥压力板,具有免拆模板的作用,并且可直接在水泥压力板上进行涂装,避免室内装修时再涂抹腻子找平,保温层6为真金板颗粒填充而成,真金板保温性能优异并且防火效果好,其防火等级可达难燃级,还具有质地轻、防水防潮等特点,是新型的环保保温材料;同时真金板和防水材料相容性好,能直接在其上表面铺设防水层,可节省涂敷水泥砂浆保护层的步骤。Please refer to Figures 2-3, an assembled steel structure enclosure composite roof panel system is provided in an embodiment of the present invention, including a
如图2所示,本发明实施例中的龙骨包括钢筋桁架7和矩形管8,矩形管8通过自攻螺钉固定在模板5上,自攻钉的钉帽沉入底板内,使水泥压力板的表面为平面,利于后期装修找平,钢筋桁架7焊接在矩形管8上,矩形管8为镀锌矩形管,矩形管8的宽度大于钢筋桁架7底边的宽度,两个龙骨之间连接有缀板,若干龙骨焊接连接成一个整体,增强屋面板的稳固性。As shown in Figure 2, the keel in the embodiment of the present invention includes a
如图4所示,本发明实施例中的钢筋桁架7为钢筋焊接成三角形的桁架结构,其包括上悬钢筋71、下悬钢筋72和腹杆钢筋73,一个上悬钢筋71和两个下悬钢筋72构成三角形,由腹杆钢筋73焊接连成钢筋桁架7,两个下悬钢筋72与矩形管8焊接连接,钢筋的直径为6mm-12mm,由于屋面板3内设置含有钢筋桁架7的龙骨,能够承载本身重量及其上部的荷载,可以取代传统工艺中用于支撑的檩条2。As shown in Figure 4, the
如图5所示,本发明实施例中的连接件为挂件9,挂件9包括顶板91、侧板92、横撑93和斜撑94;所述顶板91一端设有相垂直的侧板92,侧板92的下部垂直设置横撑93,横撑93在顶板91的相对侧,所述斜撑94在横撑93的下部,斜撑94的一端连接横撑93,横撑93另一端连接侧板92;所述顶板91和侧板92固定在墙板1上,横撑93与屋面板3连接,其中,顶板91的长度小于墙板1的厚度,横撑93到顶板91的距离大于屋面板3的厚度。As shown in Figure 5, the connector in the embodiment of the present invention is a
安装时,屋面板3可以直接搭接在墙体上,由连接板10固定,也可以通过挂件9与墙体连接,形成下沉式屋面板,连接板10为方形钢板,钢板上开有螺钉孔,钢板外侧与墙板1连接,内侧与屋面板3连接。如图5-6所示,在顶板91、侧板92的上部和横撑93上均开有螺钉孔,顶板91和侧板92分别通过自攻螺钉固定在墙体的顶部和墙体的侧壁上。在墙体的端部和两块屋面板3之间的位置设置挂件9,挂件9的横撑93上安装屋面板3,使屋面板3的上表面和墙板1顶部持平,起到支撑下沉式屋面板的作用,横,93上打自攻螺钉与墙体连接,通过挂板将墙体和屋面板3固定连接成整体,提高房屋的稳定性和牢固性能。During installation, the
为了进一步更好的解释说明本发明实施例,还提供一种装配式钢结构围护复合屋面板体系的施工方法,具体为平屋顶的搭建施工过程:In order to further and better explain the embodiment of the present invention, a construction method of the assembled steel structure enclosure composite roof panel system is also provided, specifically the construction process of the flat roof:
步骤一:根据房屋的尺寸和房顶的荷载,计算屋面板3的尺寸和屋面板3内钢筋桁架7的数量及规格,并在工厂内预制所需的屋面板3;Step 1: According to the size of the house and the load of the roof, calculate the size of the
步骤二:现场施工时,将房屋顶层的四面墙板1搭建好,在墙板1的顶部安装顶导梁,顶导梁上部焊接固定连接板10,连接板10设置在墙体1的端部和两块屋面板3之间的位置;连接板10向墙体1内侧延伸;Step 2: During on-site construction, build the four
步骤三:施工时先从房屋的一侧铺设屋面板3,将屋面板3架设在墙板1上,并在连接板10上打自攻螺钉固定屋顶板,通过连接板10将屋顶板和墙体1连接;Step 3: During construction, first lay the
步骤四:相邻的屋面板3之间由子母扣相互搭接成一整体,最后在屋面板3上铺设防水材料,从而搭建成平顶的屋顶。Step 4: The
进一步地,本发明实施例还提供一种坡屋顶的搭建方法,其步骤如下:Further, the embodiment of the present invention also provides a method for building a pitched roof, the steps of which are as follows:
步骤一:施工时,在顶层墙体1的端部和两块屋面板3之间的位置固定挂件9;Step 1: during construction, fix the
步骤二:将挂件9的顶板91和侧板92分别通过自攻螺钉与顶导梁连接,再将挂件9与墙体1连接在一起;Step 2: Connect the
步骤三:从房屋的一侧向中间铺设屋面板3,将屋面板3架设在挂件9上,使屋面板3的上表面和墙板顶部持平;Step 3: Lay the
步骤四:在屋面板3上铺设防水材料,将整体预制的屋架4放置在墙板上,连接处焊接,完成坡屋顶的搭建。Step 4: lay waterproof material on the
以上所述,仅为本发明较佳的具体实施方式,但本发明的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本发明披露的技术范围内,根据本发明的技术方案及其发明构思加以等同替换或改变,都应涵盖在本发明的保护范围之内。The above is only a preferred embodiment of the present invention, but the scope of protection of the present invention is not limited thereto. Anyone familiar with the technical field within the technical scope disclosed in the present invention, according to the technical solution of the present invention Any equivalent replacement or change of the inventive concepts thereof shall fall within the protection scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310324796.5A CN116290534A (en) | 2023-03-30 | 2023-03-30 | An assembled steel structure enclosure composite roof panel system and construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202310324796.5A CN116290534A (en) | 2023-03-30 | 2023-03-30 | An assembled steel structure enclosure composite roof panel system and construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN116290534A true CN116290534A (en) | 2023-06-23 |
Family
ID=86784946
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202310324796.5A Pending CN116290534A (en) | 2023-03-30 | 2023-03-30 | An assembled steel structure enclosure composite roof panel system and construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116290534A (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119956914A (en) * | 2025-04-10 | 2025-05-09 | 中铁五局集团成都工程有限责任公司 | A steel structure roof structure in high altitude area and construction method thereof |
Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102400509A (en) * | 2011-11-18 | 2012-04-04 | 孙有芳 | Prefabricated light steel composite floor slab |
| WO2016086481A1 (en) * | 2014-12-05 | 2016-06-09 | 北新集团建材股份有限公司 | House structure and construction method therefor |
| CN206128404U (en) * | 2016-08-30 | 2017-04-26 | 李予新 | Take whole composite roof board that keeps warm of eaves mouth |
| CN206859479U (en) * | 2017-05-11 | 2018-01-09 | 杭州泽通建筑节能新材料有限公司 | A kind of steel bar girder laminated floor slab |
| CN110629885A (en) * | 2019-10-21 | 2019-12-31 | 河北众鹏新材料科技有限公司 | A prefabricated light steel structure house |
| CN113323261A (en) * | 2021-07-14 | 2021-08-31 | 浙江亚厦装饰股份有限公司 | Assembly type suspension rod-free suspended ceiling structure and mounting method thereof |
| CN214461675U (en) * | 2020-11-26 | 2021-10-22 | 浙江亚厦装饰股份有限公司 | Furred ceiling top mounting structure |
| CN215367736U (en) * | 2021-01-13 | 2021-12-31 | 浙江绿筑集成科技有限公司 | Novel HPC shaped steel composite member's low multilayer assembled building structure |
| CN217268229U (en) * | 2022-03-29 | 2022-08-23 | 江苏三友建材科技有限公司 | Assembled heat preservation sound insulation composite floor |
-
2023
- 2023-03-30 CN CN202310324796.5A patent/CN116290534A/en active Pending
Patent Citations (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102400509A (en) * | 2011-11-18 | 2012-04-04 | 孙有芳 | Prefabricated light steel composite floor slab |
| WO2016086481A1 (en) * | 2014-12-05 | 2016-06-09 | 北新集团建材股份有限公司 | House structure and construction method therefor |
| CN206128404U (en) * | 2016-08-30 | 2017-04-26 | 李予新 | Take whole composite roof board that keeps warm of eaves mouth |
| CN206859479U (en) * | 2017-05-11 | 2018-01-09 | 杭州泽通建筑节能新材料有限公司 | A kind of steel bar girder laminated floor slab |
| CN110629885A (en) * | 2019-10-21 | 2019-12-31 | 河北众鹏新材料科技有限公司 | A prefabricated light steel structure house |
| CN214461675U (en) * | 2020-11-26 | 2021-10-22 | 浙江亚厦装饰股份有限公司 | Furred ceiling top mounting structure |
| CN215367736U (en) * | 2021-01-13 | 2021-12-31 | 浙江绿筑集成科技有限公司 | Novel HPC shaped steel composite member's low multilayer assembled building structure |
| CN113323261A (en) * | 2021-07-14 | 2021-08-31 | 浙江亚厦装饰股份有限公司 | Assembly type suspension rod-free suspended ceiling structure and mounting method thereof |
| CN217268229U (en) * | 2022-03-29 | 2022-08-23 | 江苏三友建材科技有限公司 | Assembled heat preservation sound insulation composite floor |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119956914A (en) * | 2025-04-10 | 2025-05-09 | 中铁五局集团成都工程有限责任公司 | A steel structure roof structure in high altitude area and construction method thereof |
| CN119956914B (en) * | 2025-04-10 | 2025-07-29 | 中铁五局集团成都工程有限责任公司 | Steel structure roof structure in high-altitude area and construction method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6651393B2 (en) | Construction system for manufactured housing units | |
| CN101265723B (en) | Architecture structure system assembled by composite building board and building method | |
| CN105421818B (en) | Built-in steel Standard house | |
| CN102587693A (en) | Two-storey modular villa building and construction method thereof | |
| CN103821229B (en) | Rapid assembly type integrated house and installation method | |
| CN104963408B (en) | A kind of building structure and its construction method | |
| CN107190884A (en) | A kind of new many high-rise hot-rolled steel section composite light-weight steel shear wall combined structure systems | |
| CN106703201A (en) | Fabricated integrated building and production method thereof | |
| CN110629885A (en) | A prefabricated light steel structure house | |
| CN203769069U (en) | Rapidly-assembled integrated house | |
| CN111088846B (en) | Recyclable assembled house and installation method | |
| CN205296893U (en) | Embedded steel construction assembly house | |
| CN219327204U (en) | Steel frame assembled light steel wire net rack mortar-perlite-polyphenyl enclosure wall | |
| CN116290534A (en) | An assembled steel structure enclosure composite roof panel system and construction method | |
| CN110397158A (en) | A kind of boxboard steel construction assembled architecture system | |
| US20040250482A1 (en) | Construction method and appartaus | |
| CN209308156U (en) | A recyclable prefabricated house | |
| CN110878599B (en) | Function differentiation type prefabricated assembly wall | |
| CN110748076B (en) | Prestressed steel pipe truss externally-hung wallboard and wall body manufactured and installed by using same | |
| CN209384432U (en) | A recyclable prefabricated gable wall and its connection structure | |
| CN209114648U (en) | A kind of assembling type outer wall structure | |
| CN111088858B (en) | Prefabricated gable capable of being recycled and connection structure thereof | |
| CN204456510U (en) | A kind of Anti-seismic body of wall for 500kV transformer station master control building | |
| CN204456995U (en) | High aititude, highlight lines earthquake region 500kV transformer station full assembling master control building | |
| CN201367643Y (en) | Building structure system assembled by compound building plates |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230623 |
|