CN116282681B - Water resource management equipment for building engineering - Google Patents

Water resource management equipment for building engineering Download PDF

Info

Publication number
CN116282681B
CN116282681B CN202310173694.8A CN202310173694A CN116282681B CN 116282681 B CN116282681 B CN 116282681B CN 202310173694 A CN202310173694 A CN 202310173694A CN 116282681 B CN116282681 B CN 116282681B
Authority
CN
China
Prior art keywords
water
water resource
storage tank
resource management
extraction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202310173694.8A
Other languages
Chinese (zh)
Other versions
CN116282681A (en
Inventor
刘嘉锋
刘春瑾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202310173694.8A priority Critical patent/CN116282681B/en
Publication of CN116282681A publication Critical patent/CN116282681A/en
Application granted granted Critical
Publication of CN116282681B publication Critical patent/CN116282681B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F9/00—Multistage treatment of water, waste water or sewage
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B05—SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05B—SPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B17/00—Apparatus for spraying or atomising liquids or other fluent materials, not covered by the preceding groups
    • B05B17/04—Apparatus for spraying or atomising liquids or other fluent materials, not covered by the preceding groups operating with special methods
    • B05B17/06—Apparatus for spraying or atomising liquids or other fluent materials, not covered by the preceding groups operating with special methods using ultrasonic or other kinds of vibrations
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/18—Water
    • G—PHYSICS
    • G01—MEASURING; TESTING
    • G01N—INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00—Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/18—Water
    • G01N33/186—Water using one or more living organisms, e.g. a fish
    • G01N33/1866—Water using one or more living organisms, e.g. a fish using microorganisms
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00—Treatment of water, waste water, or sewage
    • C02F1/001—Processes for the treatment of water whereby the filtration technique is of importance
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00—Treatment of water, waste water, or sewage
    • C02F1/28—Treatment of water, waste water, or sewage by sorption
    • C02F1/283—Treatment of water, waste water, or sewage by sorption using coal, charred products, or inorganic mixtures containing them
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00—Treatment of water, waste water, or sewage
    • C02F1/50—Treatment of water, waste water, or sewage by addition or application of a germicide or by oligodynamic treatment
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00—Apparatus for treatment of water, waste water or sewage
    • C02F2201/002—Construction details of the apparatus
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00—Apparatus for treatment of water, waste water or sewage
    • C02F2201/002—Construction details of the apparatus
    • C02F2201/004—Seals, connections
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2201/00—Apparatus for treatment of water, waste water or sewage
    • C02F2201/002—Construction details of the apparatus
    • C02F2201/005—Valves
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2209/00—Controlling or monitoring parameters in water treatment
    • C02F2209/40—Liquid flow rate
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2303/00—Specific treatment goals
    • C02F2303/14—Maintenance of water treatment installations
    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00—Water conservation; Efficient water supply; Efficient water use
    • Y02A20/152—Water filtration

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Biochemistry (AREA)
  • Analytical Chemistry (AREA)
  • Pathology (AREA)
  • Immunology (AREA)
  • Food Science & Technology (AREA)
  • Medicinal Chemistry (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Environmental & Geological Engineering (AREA)
  • Organic Chemistry (AREA)
  • Microbiology (AREA)
  • Water Treatment By Sorption (AREA)

Abstract

The application discloses a water resource management device for construction engineering, which comprises a water resource treatment mechanism, a water injection mechanism, a water resource treatment mechanism, a sample monitoring mechanism, a preliminary storage mechanism and a purification mechanism, wherein the water resource treatment mechanism is used for purifying construction sewage, the water injection mechanism is connected with the water resource treatment mechanism and is used for injecting sewage into the water resource treatment mechanism, the sample monitoring mechanism is connected with the water resource treatment mechanism and is used for extracting a small amount of sewage for sample monitoring, targeted sewage treatment is carried out, the preliminary storage mechanism is used for storing sewage or a purified water source, and the purification mechanism is used for accessing the water source treated in the preliminary storage mechanism for final filtration.

Description

Water resource management equipment for building engineering
Technical Field
The invention relates to the technical field of water resource purification, in particular to water resource management equipment for constructional engineering.
Background
The technology disclosed in the application number CN202121878202.8 is also a technology which is mature, and includes a bearing base, a hinge, a universal wheel, a collecting body, a collecting member, a support column, a connecting plate, a screw plate, a movable groove, a movable block, a screw motor, a threaded rod, a limiting plate, a connecting column, a filter tank, a liquid level sensor, a pump, a transmission pipe, a spraying body, a spraying opening and a placing member. The utility model belongs to the technical field of crushers, in particular to a rainwater accumulation device for water resource management, which effectively solves the defects of large multifunction, simplicity and crude structure of the rainwater accumulation device for water resource management in the current market, ensures the basic rainwater collection and filtration effect, can irrigate the rainwater, avoids waste, further improves the practicability of the whole device, and is a very excellent rainwater accumulation device for water resource management, but the water resource management equipment has the following defects in actual use:
In the construction environment based on the constructional engineering, water is indispensable, the quality of the water also is tested for the stability degree when the mixed cement concrete is used, and some sewage exists in some constructional engineering, so that the normal utilization rate of the water is ensured for better continuous management of water resources, and therefore, some sewage is also necessary to realize recycling and filtering continuously, and then the secondary utilization is realized.
Disclosure of Invention
The invention provides water resource management equipment for construction engineering, which can recover and filter engineering sewage and ensure the water source utilization rate.
The technical problem to be solved is that in the construction environment based on constructional engineering, water is indispensable, the quality of the water also is tested for the stability degree when the mixed cement concrete is used, and in some constructional engineering, some sewage is generated, so that the normal utilization rate of the water is ensured by continuously managing water resources better, and therefore, some sewage is also necessary to continuously realize recovery and filtration, and then the secondary utilization is realized.
In order to solve the technical problems, the invention adopts the following technical scheme:
the invention relates to a water resource management device for construction engineering, which comprises a water resource treatment mechanism, a water injection mechanism, a sample monitoring mechanism, a preliminary storage mechanism and a purification mechanism;
the water resource treatment mechanism comprises an extraction storage tank, a stirrer arranged in the extraction storage tank and a driving motor arranged on the extraction storage tank and used for driving the stirrer;
the water injection mechanism comprises a water injection vertical pipe, and the water injection vertical pipe is communicated with a water inlet of the extraction storage tank;
The sample monitoring mechanism comprises a microorganism monitoring sleeve pipe, a sampling monitoring chamber and a monitoring control box, wherein the microorganism monitoring sleeve pipe is communicated with the interior of the extraction storage tank through a communication conduit, the sampling monitoring chamber is arranged at the top end of the microorganism monitoring sleeve pipe, the monitoring control box is internally provided with a water quality spectrum analyzer, the microorganism monitoring sleeve pipe is connected with an L-shaped connecting pipe, the L-shaped connecting pipe is connected with a water resource management box, and a filter is arranged in the water resource management box;
The water outlet of the water resource management box is connected with a vertical guide pipe, an electromagnetic valve is arranged on the vertical guide pipe, the lower end of the vertical guide pipe is communicated with the water outlet at the bottom of the extraction storage tank, the upper end of the vertical guide pipe is connected with a filtering storage tank, two ends of the filtering storage tank are provided with protective top covers, a sealing electromagnetic valve is arranged on each protective top cover, and the vertical guide pipe is communicated with a water injection vertical pipe through a horizontal guide pipe;
the primary storage mechanism comprises a processing storage tank, a plurality of injection sleeves communicated with the interior of the processing storage tank are arranged on the processing storage tank, and three-way connecting pipes are arranged on the injection sleeves;
The purification mechanism comprises a reaction kettle for accessing a water source in the processing storage tank, and an active carbon filtering storage tank is sequentially arranged at the water outlet of the reaction kettle.
The invention relates to water resource management equipment for construction engineering, which is characterized in that a top cover is arranged at the top of a drawing storage tank, a mixing and stirring slot is formed in the middle of the top cover, a coupler is arranged in the mixing and stirring slot, and a driving motor is connected with the coupler.
The invention relates to water resource management equipment for construction engineering, which is characterized in that a connecting slot is formed in the side wall of the top end of a drawing storage tank, a water delivery flange pipe is connected to the connecting slot, a U-shaped access hose is connected to the water delivery flange pipe, and the U-shaped access hose is communicated with a water injection riser.
The invention relates to water resource management equipment for construction engineering, which is characterized in that two cavities are arranged in a processing storage tank.
The invention relates to water resource management equipment for construction engineering, which is characterized in that a liquid injection slot is formed in the middle of the top end of a reaction kettle, and an assembly cover is arranged at the position of the liquid injection slot.
The invention relates to water resource management equipment for construction engineering, which is characterized in that a filter element mounting frame is arranged on the side of a reaction kettle, and an active carbon filter storage tank is arranged on the filter element mounting frame.
The invention relates to water resource management equipment for construction engineering, which further comprises a water resource drawing box, wherein an ultrasonic atomizer is arranged in the water resource drawing box, the ultrasonic atomizer is connected with an atomizing nozzle arranged at the top of the water resource drawing box, and the water resource drawing box is communicated with a U-shaped access hose.
The invention relates to water resource management equipment for constructional engineering, which is further characterized in that one end of a U-shaped access hose is hermetically communicated with a water flow speed measuring pipe, the other end of the water flow speed measuring pipe is connected with a communicating pipe, and a monitoring meter is arranged on the water flow speed measuring pipe.
The invention relates to water resource management equipment for constructional engineering, which further comprises a placement frame, wherein a triangular bracket is arranged on the placement frame, a supporting gasket is arranged at the top end of the triangular bracket, a plurality of tightening holes are formed in the periphery of the supporting gasket, fastening screws are arranged in the tightening holes, tightening pins are arranged in the fastening screws, and an extraction storage tank is vertically arranged at the top of each tightening pin.
The invention relates to water resource management equipment for construction engineering, which is characterized in that a square bracket is arranged at the end part of a water resource management box, a transverse frame is arranged on the square bracket, a water capacity detector is arranged at the bottom of the transverse frame, and the water capacity detector is connected with the water resource management box through a transverse conduit.
Compared with the prior art, the invention has the following beneficial effects:
1. The sewage enters the water resource treatment mechanism through the water injection mechanism, is shunted to the sample monitoring mechanism through the water resource treatment mechanism for sewage analysis, and then flows back to the water resource treatment mechanism after being filtered by the water resource management box, aiming at the sewage analysis result, the sewage in the water resource treatment mechanism is purified in a targeted manner, the purified water source is filtered and stored through the filtering storage tank, and finally enters the primary storage mechanism for storage, and when the sewage treatment device is used, the water source is injected into the purification mechanism from the primary storage mechanism for purification, residual impurities and peculiar smell in the sewage are removed, and the water source is ensured to be clean;
2. according to the application, the water resource drawing box is arranged, a part of water source is firstly extracted and is preferentially used for atomizing operation of the atomizer, so that the outdoor construction environment filled with dust is greatly facilitated, and dust is restrained.
The invention is further described below with reference to the accompanying drawings.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a schematic diagram of a sample monitoring mechanism according to the present invention;
FIG. 3 is a schematic view of the installation preliminary storage mechanism of the present invention;
FIG. 4 is a schematic view showing the structure of a primary storage mechanism according to the present invention;
FIG. 5 is a schematic diagram of the purification mechanism of the present invention.
Reference numerals:
1. A water resource treatment mechanism; 11, a tripod; 12, supporting a gasket; 13, tightening holes, 14, tightening pins, 15, drawing a storage tank, 16, a top cover, 17, mixing and stirring grooves, 18, a coupler, 19, a driving motor, 2, a water injection mechanism, 21, a connecting groove, 22, a water delivery flange pipe, 23, a U-shaped access hose, 24, a water injection vertical pipe, 25, a water flow velocimeter, 3, a sample monitoring mechanism, 31, a communicating pipe, 32, a pipe, 33, a microorganism monitoring sleeve, 34, a sampling monitoring chamber, 35, a monitoring control box, 36, an L-shaped connecting pipe, 37, a water resource management box, 38, a square bracket, 39, a transverse frame, 391, a transverse pipe, 392, a water capacity detector, 393, a filtering storage tank, 394, a protective top cover, 395, a sealing electromagnetic valve, 4, a primary storage mechanism, 41, a mounting rack, 42, a processing storage tank, 43, a filling sleeve, 44, a three-way connecting pipe, 45, a trapezoidal bracket, 5, a purifying mechanism, 51, a reaction kettle, 52, a liquid injection groove, 53, an assembly cover, 54, a filter core, 55, an activated carbon filtering storage tank, 6, a vertical pipe, 7, a transverse frame, 391, a transverse frame, a 391, a transverse pipe, a water capacity detector, 393, a filtering storage tank, 394, a protective nozzle, a protective cover, 395, a sealing nozzle, a sealing frame, a sealing nozzle, an upper frame, a 9, an atomizer, a.
Detailed Description
As shown in fig. 1-5, the water resource management device for the construction engineering comprises a water resource treatment mechanism 1, a water injection mechanism 2, a sample monitoring mechanism 3, a primary storage mechanism 4 and a purification mechanism 5, wherein the water resource treatment mechanism 1 comprises an extraction storage tank 15, a top cover 16 is installed at the top of the extraction storage tank 15, a mixing stirring slot 17 is formed in the middle of the top cover 16, a coupler 18 is installed in the middle of the slot position of the mixing stirring slot 17, a driving motor 19 is fixedly installed at the top end of the coupler 18, a stirrer is arranged in the extraction storage tank 15, and the output end of the driving motor 19 is in transmission connection with the stirrer.
The water injection mechanism 2 comprises a connecting slot 21 formed in the side wall of the top end of the extraction storage tank 15, one end of the connecting slot 21 is connected with a water delivery flange pipe 22, the water delivery flange pipe 22 is connected with a U-shaped access hose 23 through a plurality of flange screws, the U-shaped access hose 23 is connected with a water injection vertical pipe 24, and sewage is injected into the extraction storage tank 15 from the water injection vertical pipe 24.
The sample monitoring mechanism 3 includes the intercommunication pipe 31 that is connected with extraction holding vessel 15 bottom side, the intercommunication pipe 31 is connected with pipe 32, the one end of pipe 32 is provided with microorganism monitoring sleeve 33, the top of microorganism monitoring sleeve 33 is equipped with sample monitoring room 34, sample monitoring room 34 top is through ring flange fixed mounting has monitoring control box 35, the inside fixed mounting of monitoring control box 35 has water quality spectrum analyzer for carry out the analysis to the inside sewage of extraction holding vessel 15, the inside sewage of extraction holding vessel 15 is a small amount through the intercommunication pipe 31 entering microorganism monitoring sleeve 33 in, carry out the analysis through water quality spectrum analyzer.
An L-shaped connecting pipe 36 is connected to the side wall of the bottom of the microorganism monitoring sleeve 33, an electromagnetic valve is installed on the L-shaped connecting pipe 36, one end of the L-shaped connecting pipe 36 is communicated with a water resource management box 37 in a sealing manner, and a filter is arranged in the water resource management box 37 and used for filtering polluted impurities in water. The water outlet of the water resource management box 37 is connected with a vertical conduit 6, an electromagnetic valve is arranged on the vertical conduit 6, the lower end of the vertical conduit 6 is communicated with the water outlet at the bottom of the extraction storage tank 15, and the vertical conduit 6 is communicated with a water injection vertical pipe 24 through a horizontal conduit 7. The solenoid valve is opened and water in the water resource management tank 37 flows back from the water injection riser 24 into the extraction storage pipe. And adding filtering materials and some disinfection raw materials into the extraction storage tank 15 according to the analysis result of the spectrum analyzer for sewage purification treatment.
The upper end of vertical pipe 6 is connected with and filters the storage tank 393, filters the storage tank 393 and filters the both ends of storage tank 393 and all be equipped with protective top cap 394, and sealed solenoid valve 395 is installed at protective top cap 394 top, and vertical pipe 6 is connected with the inlet end of filtering the storage tank 393. The water outlet end of the filter tank 393 is connected to the preliminary storage mechanism 4.
The preliminary storage mechanism 4 includes processing storage tank 42, processing storage tank 42 installs on setting up subaerial mounting bracket 41, wherein processing storage tank 42 inside can have two cavitys, one is used for storing sewage, one is used for storing purified water, processing storage tank 42 top is equipped with a plurality of injection sleeve with the inside intercommunication of processing storage tank 42, install tee bend takeover 44 on the injection sleeve, be used for to the water injection in processing storage tank 42 or draw water, one of them tee bend takeover 44 is connected to the play water end of filtering storage tank 393, be used for with the water injection in the filtering storage tank 393 in the processing storage tank 42 preliminary storage. Trapezoidal brackets 45 are mounted at both ends of the processing tank 42 for protecting the processing tank 42.
The purifying mechanism 5 comprises a reaction kettle 51, a liquid injection slot 52 is formed in the middle of the top end of the reaction kettle 51, an assembly cover 53 is arranged at the position of the liquid injection slot 52, a plurality of reaction kettle 51 filter core mounting frames 54 used for filtering are arranged on the side of the reaction kettle 51, a plurality of active carbon filter storage tanks 55 used for filtering are sequentially and transversely arranged on the filter core mounting frames 54, active carbon core materials used for filtering are filled in the active carbon filter storage tanks 55, water sources in the processing storage tanks 42 are injected into the reaction kettle 51 by connecting the reaction kettle 51 and a tee joint pipe 44, and when the purifying mechanism is used, water in the reaction kettle 51 is pumped out by a water pump, and the water sources are finally purified by the active carbon filter storage tanks 55. By using the activated carbon filtration reservoir 55 and the plurality of activated carbon cores, rapid removal of impurities from the water source is achieved.
The driving motor 19, the microorganism monitoring sleeve 33, the water quality spectrum analyzer and the water capacity detector 392 are all electrically connected with an external power supply through an external PLC controller.
Further, the water resource management device further comprises a water resource drawing box 8, a square groove 81 is formed in the middle of the side wall of the water resource drawing box 8, a protective net cover 82 is covered at the square groove 81, a protective base plate 83 is covered at the top of the water resource drawing box 8, an atomizing nozzle 84 for dust fall is arranged in the middle of the top of the protective base plate 83, an ultrasonic atomizer is connected to the bottom of the atomizing nozzle 84 through a sealing conduit 32, and the water resource drawing box 8 is communicated with the U-shaped access hose 23. When water is injected into the extraction storage tank 15, a part of water enters the water resource drawing tank 8 and is sprayed out through atomization treatment, so that real-time dust fall is performed.
One end of the U-shaped access hose 23 is hermetically communicated with a water flow speed measuring tube 25, the other end of the water flow speed measuring tube 25 is connected with a communicating conduit 31, and a monitoring meter is arranged on the water flow speed measuring tube 25 and used for monitoring the water flow speed and the water flow quantity in the U-shaped access hose 23, so that the control is convenient.
Specifically, set up on ground and place the frame 9, water resource draw-out box 8 is installed on placing the frame 9, places and installs the tripod 11 on the frame 9, and the top of tripod 11 is provided with support pad 12, and a plurality of tight trompils 13 of screwing up have been seted up around the support pad 12, are equipped with fastening screw in the tight trompil 13, are equipped with in the fastening screw and tighten pin 14, and the top of tightening pin 14 is vertical installs extraction holding vessel 15.
Square brackets 38 are arranged at two ends of the water resource management box 37, a transverse frame 39 is fixedly arranged on the square brackets 38 through assembly screws, a water capacity detector 392 is arranged at the bottom of the transverse frame 39, and the water capacity detector 392 is connected with the water resource management box 37 through a transverse conduit 391 and is used for detecting the water quantity in the water resource management box 37.
The operation flow is as follows:
firstly, an external water source to be treated or a water source to be treated stored in a processing storage tank 42 is injected into an extraction storage tank 15 through a water injection vertical pipe 24, a part of the water source passing through a U-shaped access hose 23 enters a water resource drawing tank 8, atomized water vapor generated by an ultrasonic atomizer is sprayed out through two atomizing nozzles 84, and dust adhesion caused under the influence of building environment is avoided.
Then, a part of the water source of the extraction storage tube flows into the microorganism monitoring sleeve 33, the water source is monitored by the water quality spectrum analyzer, imaging scanning is performed, and the monitored imaging is performed on the outer side wall of the monitoring control box through a series of inductions. The water source in the microorganism monitoring sleeve 33 is transferred to the water resource management box 37 for preliminary filtration under the pushing force of an external booster pump, the filtered water source flows back to the extraction storage tank 15 again, then according to the analysis result of the water quality spectrum analyzer, the filter material and a plurality of disinfection raw materials are added into the extraction storage tank 15, the driving motor 19 is started, the stirrer is driven to rotate, the sewage disinfection and filtration are achieved, the disinfected water source is monitored again through the water quality spectrum analyzer, and is injected into the filter storage tank 393 after being qualified, otherwise, the water source in the filter storage tank 393 is transferred to the processing storage tank 42 for storage, and when the water source is used, the water source can be used after being filtered finally through the purification mechanism 5.
The above examples are only illustrative of the preferred embodiments of the present invention and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art to the technical solution of the present invention should fall within the scope of protection defined by the claims of the present invention without departing from the spirit of the present invention.

Claims (8)

1.一种建筑工程的水资源管理设备,其特征在于:包括水资源处理机构(1)、水注入机构(2)、样本监测机构(3)、初步储存机构(4)以及净化机构(5);1. A water resource management device for a construction project, characterized in that it comprises a water resource treatment mechanism (1), a water injection mechanism (2), a sample monitoring mechanism (3), a preliminary storage mechanism (4) and a purification mechanism (5); 所述水资源处理机构(1)包括抽取储存罐(15)、设置在抽取储存罐(15)内的搅拌器以及安装在抽取储存罐(15)上用于驱动搅拌器的驱动电机(19);The water resource treatment mechanism (1) comprises an extraction storage tank (15), an agitator arranged in the extraction storage tank (15), and a drive motor (19) installed on the extraction storage tank (15) for driving the agitator; 所述水注入机构(2)包括注水立管(24),所述注水立管(24)与抽取储存罐(15)进水口连通;The water injection mechanism (2) comprises a water injection riser (24), and the water injection riser (24) is connected to the water inlet of the extraction storage tank (15); 所述样本监测机构(3)包括通过连通导管(31)与抽取储存罐(15)内部连通的微生物监测套管(33)、设置在微生物监测套管(33)顶端的取样监测室(34)以及安装在取样监测室(34)上的监测控制箱(35),所述监测控制箱(35)内设有水质量光谱分析仪,所述微生物监测套管(33)连接有L型接管(36),所述L型接管(36)与水资源管理箱(37)连接,所述水资源管理箱(37)内设有过滤器;The sample monitoring mechanism (3) comprises a microbial monitoring sleeve (33) connected to the inside of the extraction storage tank (15) through a connecting conduit (31), a sampling monitoring chamber (34) arranged at the top of the microbial monitoring sleeve (33), and a monitoring control box (35) installed on the sampling monitoring chamber (34), wherein a water quality spectrometer is arranged in the monitoring control box (35), the microbial monitoring sleeve (33) is connected to an L-shaped pipe (36), the L-shaped pipe (36) is connected to a water resource management box (37), and a filter is arranged in the water resource management box (37); 所述水资源管理箱(37)的出水口连接有竖向导管(6),所述竖向导管(6)上安装有电磁阀,所述竖向导管(6)下端与抽取储存罐(15)底部出水口连通,上端连接有过滤储罐(393),所述过滤储罐(393)两端设有防护顶盖(394),所述防护顶盖(394)上安装有密封电磁阀(395),所述竖向导管(6)通过水平导管(7)与注水立管(24)连通;The water outlet of the water resource management box (37) is connected to a vertical conduit (6), and a solenoid valve is installed on the vertical conduit (6). The lower end of the vertical conduit (6) is connected to the water outlet at the bottom of the extraction storage tank (15), and the upper end is connected to a filter storage tank (393). Both ends of the filter storage tank (393) are provided with protective top covers (394), and a sealing solenoid valve (395) is installed on the protective top cover (394). The vertical conduit (6) is connected to the water injection riser (24) through a horizontal conduit (7); 所述初步储存机构(4)包括加工储罐(42),所述加工储罐(42)上开设有多个与加工储罐(42)内部连通的注入套筒,所述注入套筒上安装有三通接管(44);The preliminary storage mechanism (4) comprises a processing storage tank (42), the processing storage tank (42) is provided with a plurality of injection sleeves which are in communication with the interior of the processing storage tank (42), and a three-way pipe (44) is installed on the injection sleeve; 所述净化机构(5)包括用于接入加工储罐(42)内水源的反应釜(51),所述反应釜(51)的出水口处依次设有活性炭过滤储罐(55);The purification mechanism (5) comprises a reaction kettle (51) for accessing the water source in the processing tank (42), and an activated carbon filtering tank (55) is arranged in sequence at the water outlet of the reaction kettle (51); 所述抽取储存罐(15)顶端侧壁上开设有连接开槽(21),所述连接开槽(21)上连接有输水法兰管(22),所述输水法兰管(22)连接有U型接入软管(23),所述U型接入软管(23)与注水立管(24)连通;A connecting groove (21) is provided on the top side wall of the extraction storage tank (15), a water delivery flange pipe (22) is connected to the connecting groove (21), a U-shaped access hose (23) is connected to the water delivery flange pipe (22), and the U-shaped access hose (23) is connected to the water injection riser (24); 还包括水资源汲取箱(8),所述水资源汲取箱(8)内设有超声波雾化机,所述超声波雾化机连接有设置在水资源汲取箱(8)顶部的雾化喷头(84),所述水资源汲取箱(8)与U型接入软管(23)连通。It also comprises a water resource extraction box (8), wherein an ultrasonic atomizer is arranged in the water resource extraction box (8), and the ultrasonic atomizer is connected to an atomizing nozzle (84) arranged on the top of the water resource extraction box (8), and the water resource extraction box (8) is connected to a U-shaped access hose (23). 2.根据权利要求1所述的一种建筑工程的水资源管理设备,其特征在于:所述抽取储存罐(15)顶部安装有顶盖(16),顶盖(16)中部开设有混合搅拌开槽(17),所述混合搅拌开槽(17)内安装有联轴器(18),所述驱动电机(19)与联轴器(18)连接。2. A water resource management device for a construction project according to claim 1, characterized in that: a top cover (16) is installed on the top of the extraction storage tank (15), a mixing groove (17) is opened in the middle of the top cover (16), a coupling (18) is installed in the mixing groove (17), and the drive motor (19) is connected to the coupling (18). 3.根据权利要求1所述的一种建筑工程的水资源管理设备,其特征在于:所述加工储罐(42)内部设有两个腔体。3. A water resource management device for construction projects according to claim 1, characterized in that two cavities are provided inside the processing storage tank (42). 4.根据权利要求1所述的一种建筑工程的水资源管理设备,其特征在于:所述反应釜(51)顶端中部开设有液体注入开槽(52),所述液体注入开槽(52)处安装有装配盖(53)。4. A water resource management device for construction projects according to claim 1, characterized in that: a liquid injection groove (52) is opened in the middle of the top of the reaction kettle (51), and an assembly cover (53) is installed at the liquid injection groove (52). 5.根据权利要求1所述的一种建筑工程的水资源管理设备,其特征在于:所述反应釜(51)的边侧布设有过滤芯安装架(54),所述活性炭过滤储罐(55)安装在过滤芯安装架(54)上。5. A water resource management device for a construction project according to claim 1, characterized in that a filter element mounting frame (54) is arranged on the side of the reactor (51), and the activated carbon filter storage tank (55) is installed on the filter element mounting frame (54). 6.根据权利要求1所述的一种建筑工程的水资源管理设备,其特征在于:所述U型接入软管(23)一端密封连通有水流测速管(25),所述水流测速管(25)另一端连接连通导管(31),所述水流测速管(25)上安装有监测表。6. A water resource management device for a construction project according to claim 1, characterized in that one end of the U-shaped access hose (23) is sealed and connected to a water flow velocity measuring tube (25), the other end of the water flow velocity measuring tube (25) is connected to a connecting conduit (31), and a monitoring meter is installed on the water flow velocity measuring tube (25). 7.根据权利要求1所述的一种建筑工程的水资源管理设备,其特征在于:还包括放置框架(9),所述放置框架(9)上安装三角支架(11),所述三角支架(11)的顶端设有支撑垫片(12),所述支撑垫片(12)的四周开设有若干上紧开孔(13),所述上紧开孔(13)内设有紧固螺钉,所述紧固螺钉内设有上紧销钉(14),所述上紧销钉(14)顶部竖直安装抽取储存罐(15)。7. A water resource management device for a construction project according to claim 1, characterized in that it also includes a placement frame (9), a triangular bracket (11) is installed on the placement frame (9), a support gasket (12) is provided at the top of the triangular bracket (11), a plurality of tightening openings (13) are opened around the support gasket (12), a tightening screw is provided in the tightening opening (13), a tightening pin (14) is provided in the tightening screw, and an extraction storage tank (15) is vertically installed on the top of the tightening pin (14). 8.根据权利要求1所述的一种建筑工程的水资源管理设备,其特征在于:所述水资源管理箱(37)端部安装有方形支架(38),所述方形支架(38)上安装有横向框架(39),所述横向框架(39)底部设有水容量检测器(392),所述水容量检测器(392)通过横向导管(391)与水资源管理箱(37)连接。8. A water resource management device for a construction project according to claim 1, characterized in that a square bracket (38) is installed at the end of the water resource management box (37), a transverse frame (39) is installed on the square bracket (38), a water capacity detector (392) is provided at the bottom of the transverse frame (39), and the water capacity detector (392) is connected to the water resource management box (37) through a transverse conduit (391).
CN202310173694.8A 2023-02-28 2023-02-28 Water resource management equipment for building engineering Active CN116282681B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310173694.8A CN116282681B (en) 2023-02-28 2023-02-28 Water resource management equipment for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310173694.8A CN116282681B (en) 2023-02-28 2023-02-28 Water resource management equipment for building engineering

Publications (2)

Publication Number Publication Date
CN116282681A CN116282681A (en) 2023-06-23
CN116282681B true CN116282681B (en) 2025-01-10

Family

ID=86802437

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310173694.8A Active CN116282681B (en) 2023-02-28 2023-02-28 Water resource management equipment for building engineering

Country Status (1)

Country Link
CN (1) CN116282681B (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN213446555U (en) * 2020-08-10 2021-06-15 浙江玉泉环境工程有限公司 Sewage treatment case that sewage treatment used
CN216584498U (en) * 2021-11-04 2022-05-24 舞钢市环能科技有限公司 Paper mill sewage treatment plant

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2139257C1 (en) * 1997-10-03 1999-10-10 Колесников Владимир Петрович Plant for biochemical purification of very concentrated sewage
JP2005199240A (en) * 2004-01-19 2005-07-28 Matsushita Electric Ind Co Ltd Wastewater management system, wastewater management method
CN212127857U (en) * 2019-12-09 2020-12-11 徐州创之社通用技术产业研究院有限公司 Building engineering's integration sewage purification treatment device
CN115417562B (en) * 2022-09-06 2023-06-30 山西一建集团有限公司 Device for recycling and purifying construction sewage

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN213446555U (en) * 2020-08-10 2021-06-15 浙江玉泉环境工程有限公司 Sewage treatment case that sewage treatment used
CN216584498U (en) * 2021-11-04 2022-05-24 舞钢市环能科技有限公司 Paper mill sewage treatment plant

Also Published As

Publication number Publication date
CN116282681A (en) 2023-06-23

Similar Documents

Publication Publication Date Title
CN212018862U (en) A belt cleaning device for laboratory chromatogram sample bottle
CN113899599B (en) Novel efficient atmospheric heavy metal sampling device and application method thereof
CN116282681A (en) Water resource management equipment for building engineering
CN209024368U (en) A kind of sewage disposal device being recycled to
CN207259232U (en) A kind of hydrolytic tank water dispensing apparatus
CN213374130U (en) Medicine mixing and spraying device
CN205307925U (en) Accelerator liquid filter
CN109320016A (en) A kind of environmental type trade effluent exhaust gas purifying treatment system
CN210171079U (en) Water-soluble dust collector
CN223866368U (en) Hazardous chemical substance waste liquid treatment device
CN211793407U (en) Automatic water jet equipment in municipal works greenbelt
CN215388906U (en) Feeding device for efficient composite carbon source medicament production
CN218394957U (en) Novel large-flow filter element cleaning equipment
CN222816728U (en) Water treatment stirring device convenient to dismantle and install
CN223719772U (en) Concrete curing box
CN221319359U (en) Chemical treatment device for landfill leachate
CN207330459U (en) A kind of sewage disposal chlorination equipment
CN119056856B (en) Pollution site normal position restoration integrated multiphase extraction equipment
CN222468250U (en) Ammonia nitrogen wastewater treatment device
CN222515426U (en) Water supply control device for high-rise building
CN220026463U (en) A kind of dust reduction equipment for civil construction
CN221656607U (en) Purifying component of biosafety cabinet
CN219915318U (en) Circulation water tank
CN220478501U (en) VOC atmospheric treatment liquid filter equipment
CN217434743U (en) Raw rubber plasticating device for rubber raw materials

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant