CN116242033A CN202111482695.8A CN202111482695A CN116242033A CN 116242033 A CN116242033 A CN 116242033A CN 202111482695 A CN202111482695 A CN 202111482695A CN 116242033 A CN116242033 A CN 116242033A
Authority
CN
China
Prior art keywords
module
gas
water heater
heat load
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202111482695.8A
Other languages
Chinese (zh)
Inventor
王世平
原世超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Fotile Kitchen Ware Co Ltd
Original Assignee
Ningbo Fotile Kitchen Ware Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo Fotile Kitchen Ware Co Ltd filed Critical Ningbo Fotile Kitchen Ware Co Ltd
Priority to CN202111482695.8A priority Critical patent/CN116242033A/en
Publication of CN116242033A publication Critical patent/CN116242033A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H9/00—Details
    • F24H9/20—Arrangement or mounting of control or safety devices
    • F24H9/2007—Arrangement or mounting of control or safety devices for water heaters
    • F24H9/2035—Arrangement or mounting of control or safety devices for water heaters using fluid fuel
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23L—SUPPLYING AIR OR NON-COMBUSTIBLE LIQUIDS OR GASES TO COMBUSTION APPARATUS IN GENERAL ; VALVES OR DAMPERS SPECIALLY ADAPTED FOR CONTROLLING AIR SUPPLY OR DRAUGHT IN COMBUSTION APPARATUS; INDUCING DRAUGHT IN COMBUSTION APPARATUS; TOPS FOR CHIMNEYS OR VENTILATING SHAFTS; TERMINALS FOR FLUES
    • F23L5/00—Blast-producing apparatus before the fire
    • F23L5/02—Arrangements of fans or blowers
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F23—COMBUSTION APPARATUS; COMBUSTION PROCESSES
    • F23N—REGULATING OR CONTROLLING COMBUSTION
    • F23N1/00—Regulating fuel supply
    • F23N1/02—Regulating fuel supply conjointly with air supply
    • F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24—HEATING; RANGES; VENTILATING
    • F24H—FLUID HEATERS, e.g. WATER OR AIR HEATERS, HAVING HEAT-GENERATING MEANS, e.g. HEAT PUMPS, IN GENERAL
    • F24H1/00—Water heaters, e.g. boilers, continuous-flow heaters or water-storage heaters
    • F24H1/10—Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium
    • F24H1/107—Continuous-flow heaters, i.e. heaters in which heat is generated only while the water is flowing, e.g. with direct contact of the water with the heating medium using fluid fuel

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Instantaneous Water Boilers, Portable Hot-Water Supply Apparatuses, And Control Of Portable Hot-Water Supply Apparatuses (AREA)

Abstract

The invention discloses a control method and a control system of a gas water heater and the gas water heater, wherein the gas water heater comprises a fan motor, a fan impeller and a booster pump impeller coaxial with the fan impeller, the fan motor drives the fan impeller to rotate, and the control method of the gas water heater comprises the following steps: s11, judging whether the actual heat load is smaller than the theoretical heat load, if so, executing the step S12; s12, controlling the fan impeller to be meshed with the booster pump impeller so that the fan impeller drives the booster pump impeller to rotate. According to the invention, the preset hot water meets the user requirement through the theoretical heat load, and the gas water heater is regulated through the actual heat load, so that the problem of unstable combustion of the gas water heater under different gas pressures can be solved, when the gas water heater cannot meet the requirement of heating hot water, the fan impeller drives the booster pump impeller to rotate, and the pressure is increased for the gas, so that the pressure deficiency of the gas is overcome, and the gas water heater can heat the hot water.

Description

燃气热水器控制方法、系统及燃气热水器Gas water heater control method, system and gas water heater

技术领域technical field

本发明涉及燃气热水器领域,特别涉及一种燃气热水器控制方法、系统及燃气热水器。The invention relates to the field of gas water heaters, in particular to a gas water heater control method and system and a gas water heater.

背景技术Background technique

在冬季使用燃气热水器时,由于自来水温度低,燃气热水器通常在大负荷状态运行。在用气高峰时段,或者一些燃气管网压力低的地区,燃气的压力不能满足热水器在大负荷状态下的运行需求,使得烧出的热水温度低,无法满足用户洗浴要求,给用户带来困扰,大大降低燃气热水器使用体验。现有技术中主要是通过调整风机的运行转速来保持合适的空燃比,从而解决热水器在不同压力下燃烧不稳定的问题,但对于燃气压力过低的情况,降低风机转速仍然无法满足加热热水的需求,因此,需要进一步解决燃气热水器在燃气压力低状态下无法烧热热水的弊端。When using gas water heaters in winter, due to the low temperature of tap water, gas water heaters usually operate under heavy load. During the peak hours of gas consumption, or in some areas where the pressure of the gas pipeline network is low, the pressure of the gas cannot meet the operating requirements of the water heater under heavy load, so that the temperature of the hot water burned is low and cannot meet the user's bathing requirements, bringing users Troubled, greatly reducing the experience of using gas water heaters. In the prior art, it is mainly by adjusting the operating speed of the fan to maintain an appropriate air-fuel ratio, so as to solve the problem of unstable combustion of the water heater under different pressures. However, for the case where the gas pressure is too low, reducing the fan speed still cannot meet the requirements of heating hot water. Therefore, it is necessary to further solve the disadvantage that the gas water heater cannot heat hot water under the condition of low gas pressure.

发明内容Contents of the invention

本发明要解决的技术问题是为了克服现有技术中燃气热水器在燃气压力低状态下无法烧热热水的缺陷,提供一种燃气热水器控制方法、系统及燃气热水器。The technical problem to be solved by the present invention is to provide a gas water heater control method and system and a gas water heater to overcome the defect that the gas water heater in the prior art cannot heat hot water when the gas pressure is low.

本发明是通过下述技术方案来解决上述技术问题:The present invention solves the above technical problems through the following technical solutions:

根据本发明的第一方面,提供一种燃气热水器控制方法,应用于燃气热水器,所述燃气热水器包括风机电机和风机叶轮,所述风机电机驱动所述风机叶轮转动,所述燃气热水器还包括与所述风机叶轮共轴的增压泵叶轮,所述燃气热水器控制方法包括以下步骤:According to the first aspect of the present invention, a gas water heater control method is provided, which is applied to a gas water heater. The gas water heater includes a fan motor and a fan impeller, and the fan motor drives the fan impeller to rotate. The gas water heater also includes a The booster pump impeller coaxial with the fan impeller, the gas water heater control method includes the following steps:

S11、判断实际热负荷是否小于理论热负荷,若是,执行步骤S12;S11. Determine whether the actual heat load is less than the theoretical heat load, and if so, perform step S12;

S12、控制所述风机叶轮与所述增压泵叶轮啮合以使所述风机叶轮带动所述增压泵叶轮转动。S12. Control the fan impeller to mesh with the booster pump impeller so that the fan impeller drives the booster pump impeller to rotate.

较佳地,步骤S12之后还包括:Preferably, after step S12, it also includes:

S13、判断所述实际热负荷是否小于所述理论热负荷,若是,执行步骤S14;S13. Judging whether the actual heat load is smaller than the theoretical heat load, if so, execute step S14;

S14、输出提示信息,所述提示信息用于表征燃气压力低并需要人工检修。S14. Output prompt information, the prompt information is used to indicate that the gas pressure is low and manual maintenance is required.

较佳地,若步骤S11中的判断条件为是,则先执行步骤S111,包括:Preferably, if the judgment condition in step S11 is yes, then step S111 is first performed, including:

S111、控制所述风机的转速降低至预设阈值;S111. Control the speed of the fan to decrease to a preset threshold;

S112、判断所述实际热负荷是否小于所述理论热负荷,若是,执行步骤S12。S112. Determine whether the actual heat load is smaller than the theoretical heat load, if yes, execute step S12.

较佳地,步骤S11之前包括:Preferably, before step S11 includes:

S101、获取所述燃气热水器的进水温度、水流量和实际出水温度;S101. Obtain the inlet water temperature, water flow rate and actual outlet water temperature of the gas water heater;

S102、根据所述进水温度、所述水流量和预设出水温度计算得到所述理论热负荷;S102. Calculate and obtain the theoretical heat load according to the inlet water temperature, the water flow rate, and the preset outlet water temperature;

S103、根据所述进水温度、所述水流量和所述实际出水温度计算得到所述实际热负荷。S103. Calculate and obtain the actual heat load according to the inlet water temperature, the water flow rate, and the actual outlet water temperature.

较佳地,若步骤S11中的判断条件为是,则先执行步骤S1101,包括:Preferably, if the judgment condition in step S11 is yes, then step S1101 is first performed, including:

S1101、判断所述实际热负荷是否为最大燃烧负荷,若是,执行步骤S111;若否,执行步骤S1102;S1101. Determine whether the actual heat load is the maximum combustion load, if yes, execute step S111; if not, execute step S1102;

S1102、增大所述实际热负荷至最大燃烧负荷,然后返回执行步骤S11。S1102. Increase the actual heat load to the maximum combustion load, and then return to step S11.

较佳地,若步骤S11中的判断条件为是,则先执行步骤S110,包括:Preferably, if the judgment condition in step S11 is yes, then step S110 is first performed, including:

S110、判断实际出水温度是否小于预设出水温度,若是,执行步骤S12;然后执行步骤S13';S110. Determine whether the actual outlet water temperature is lower than the preset outlet water temperature, if so, execute step S12; then execute step S13';

S13'、判断所述实际出水温度是否小于所述预设出水温度,若是,执行步骤S14;S13', judging whether the actual outlet water temperature is lower than the preset outlet water temperature, if so, execute step S14;

S14、输出提示信息,所述提示信息用于表征燃气压力低并需要人工检修。S14. Output prompt information, the prompt information is used to indicate that the gas pressure is low and manual maintenance is required.

较佳地,若步骤S110中的判断条件为是,则先执行步骤S111,包括:Preferably, if the judgment condition in step S110 is yes, then step S111 is first performed, including:

S111、控制所述风机的转速降低至预设阈值;S111. Control the speed of the fan to decrease to a preset threshold;

S112'、判断所述实际出水温度是否小于所述预设出水温度,若是,执行步骤S12。S112'. Determine whether the actual outlet water temperature is lower than the preset outlet water temperature, if yes, execute step S12.

根据本发明的第二方面,提供一种燃气热水器控制系统,应用于燃气热水器,所述燃气热水器包括风机电机和风机叶轮,所述风机电机驱动所述风机叶轮转动,所述燃气热水器还包括与所述风机叶轮共轴的增压泵叶轮,所述燃气热水器系统包括第一判断模块和啮合模块:According to the second aspect of the present invention, a gas water heater control system is provided, which is applied to a gas water heater. The gas water heater includes a fan motor and a fan impeller, and the fan motor drives the fan impeller to rotate. The gas water heater also includes a The booster pump impeller coaxial with the fan impeller, the gas water heater system includes a first judging module and an meshing module:

所述第一判断模块用于判断实际热负荷是否小于理论热负荷,若是,调用所述啮合模块;The first judging module is used to judge whether the actual heat load is less than the theoretical heat load, and if so, call the meshing module;

所述啮合模块用于控制所述风机叶轮与所述增压泵叶轮啮合以使所述风机叶轮带动所述增压泵叶轮转动。The engagement module is used to control the meshing of the fan impeller and the booster pump impeller so that the fan impeller drives the booster pump impeller to rotate.

较佳地,所述燃气热水器控制系统还包括第二判断模块和提示模块:Preferably, the gas water heater control system further includes a second judgment module and a prompt module:

所述第二判断模块用于判断所述实际热负荷是否小于所述理论热负荷,若是,调用提示模块;The second judging module is used to judge whether the actual heat load is less than the theoretical heat load, and if so, call the prompt module;

所述提示模块用于输出提示信息,所述提示信息用于表征燃气压力低并需要人工检修。The prompting module is used to output prompting information, and the prompting information is used to indicate that the gas pressure is low and manual maintenance is required.

较佳地,所述燃气热水器控制系统还包括降速模块和第三判断模块:Preferably, the gas water heater control system further includes a speed reduction module and a third judging module:

所述第一判断模块还用于判断结果为是时,调用所述降速模块;The first judging module is also used to call the deceleration module when the judging result is yes;

所述降速模块用于控制所述风机的转速至预设阈值;The speed reduction module is used to control the speed of the fan to a preset threshold;

所述第三判断模块用于判断所述实际热负荷是否小于所述理论热负荷,若是,调用所述啮合模块。The third judging module is used to judge whether the actual heat load is smaller than the theoretical heat load, and if so, invoke the meshing module.

较佳地,所述燃气热水器控制系统还包括获取模块、第一计算模块和第二计算模块:Preferably, the gas water heater control system further includes an acquisition module, a first calculation module and a second calculation module:

所述获取模块用于获取所述燃气热水器的进水温度、水流量和实际出水温度;The acquiring module is used to acquire the inlet water temperature, water flow rate and actual outlet water temperature of the gas water heater;

所述第一计算模块用于根据所述进水温度、所述水流量和预设出水温度计算得到所述理论热负荷;The first calculation module is used to calculate and obtain the theoretical heat load according to the inlet water temperature, the water flow rate and the preset outlet water temperature;

所述第二计算模块用于根据所述进水温度、所述水流量和所述实际出水温度计算得到所述实际热负荷。The second calculating module is used to calculate and obtain the actual heat load according to the inlet water temperature, the water flow rate and the actual outlet water temperature.

较佳地,其特征在于,所述燃气热水器控制系统还包括第四判断模块和负荷调节模块:Preferably, it is characterized in that the gas water heater control system also includes a fourth judgment module and a load regulation module:

所述第四判断模块用于判断所述实际热负荷是否为最大燃烧负荷,若是,调用所述降速模块,若否,调用所述负荷调节模块;The fourth judging module is used to judge whether the actual heat load is the maximum combustion load, if so, call the deceleration module, if not, call the load regulation module;

所述负荷调节模块用于增大所述实际热负荷至最大燃烧负荷,然后调用所述第一判断模块。The load adjustment module is used to increase the actual heat load to the maximum combustion load, and then invoke the first judgment module.

较佳地,所述燃气热水器控制系统还包括第五判断模块、第六判断模块和提示模块:Preferably, the gas water heater control system further includes a fifth judging module, a sixth judging module and a prompt module:

所述第一判断模块还用于判断结果为是时,调用所述第五判断模块;The first judging module is also used to call the fifth judging module when the judging result is yes;

所述第五判断模块用于判断实际出水温度是否小于预设出水温度,若是,调用所述啮合模块;The fifth judging module is used to judge whether the actual outlet water temperature is lower than the preset outlet water temperature, and if so, call the meshing module;

所述第六判断模块用于判断实际出水温度是否小于预设出水温度,若是,调用所述提示模块;The sixth judging module is used to judge whether the actual outlet water temperature is lower than the preset outlet water temperature, and if so, call the prompt module;

所述提示模块用于输出提示信息,所述提示信息用于表征燃气压力低并需要人工检修。The prompting module is used to output prompting information, and the prompting information is used to indicate that the gas pressure is low and manual maintenance is required.

较佳地,所述燃气热水器控制系统还包括降速模块和第七判断模块:Preferably, the gas water heater control system further includes a speed reduction module and a seventh judging module:

所述第五判断模块还用于判断结果为是时,调用所述降速模块;The fifth judging module is also used to call the deceleration module when the judging result is yes;

所述降速模块用于控制所述风机的转速至预设阈值;The speed reduction module is used to control the speed of the fan to a preset threshold;

所述第七判断模块用于判断实际出水温度是否小于预设出水温度,若是,调用所述啮合模块。The seventh judging module is used to judge whether the actual outlet water temperature is lower than the preset outlet water temperature, and if so, invoke the engagement module.

根据本发明的第三方面,提供一种燃气热水器,包括本发明的燃气热水器控制系统。According to a third aspect of the present invention, a gas water heater is provided, including the gas water heater control system of the present invention.

本发明的积极进步效果在于:The positive progress effect of the present invention is:

本发明通过理论热负荷来使预定输出的热水更加的符合用户需求,并通过实际热负荷来调节燃气热水器,可解决燃气热水器在不同燃气压力下燃烧不稳定的问题,燃气热水器在正常模式下只有风机叶轮转动,当燃气热水器在进入低气压模式时,先通过降低风机叶轮转速降低风量来保持合适的空燃比,提高燃烧效率,在仍然无法满足加热热水的需求下,本发明通过风机叶轮带动增压泵叶轮的转动,给燃气增加压力,以弥补燃气本身的压力不足,使得燃气热水器能够加热热水。同时本发明还可以根据实际出水温度来调节燃气热水器,可满足不同加热热水的需求,提高了用户体验。通过温度和负荷双重判断,避免燃气热水器误判断进入低气压逻辑。The invention uses the theoretical heat load to make the predetermined output hot water more in line with the needs of users, and adjusts the gas water heater through the actual heat load, which can solve the problem of unstable combustion of the gas water heater under different gas pressures. Only the fan impeller rotates. When the gas water heater enters the low-pressure mode, it firstly reduces the air volume by reducing the speed of the fan impeller to maintain a suitable air-fuel ratio and improve combustion efficiency. When the demand for heating hot water is still not met, the present invention uses the fan impeller It drives the rotation of the impeller of the booster pump to increase the pressure of the gas to make up for the lack of pressure of the gas itself, so that the gas water heater can heat hot water. At the same time, the present invention can also adjust the gas water heater according to the actual outlet water temperature, which can meet different demands for heating hot water and improve user experience. Through the dual judgment of temperature and load, the gas water heater is prevented from misjudging and entering the logic of low air pressure.

附图说明Description of drawings

图1为本发明实施例1的一种燃气热水器控制方法的流程示意图。Fig. 1 is a schematic flowchart of a gas water heater control method according to Embodiment 1 of the present invention.

图2为本发明实施例1的一种燃气热水器控制方法中的获取理论热负荷与实际热负荷的流程示意图。Fig. 2 is a schematic flowchart of obtaining theoretical heat load and actual heat load in a gas water heater control method according to Embodiment 1 of the present invention.

图3为本发明实施例1的一种燃气热水器控制方法中的燃气增压装置的结构示意图。Fig. 3 is a schematic structural diagram of a gas booster device in a gas water heater control method according to Embodiment 1 of the present invention.

图4为本发明实施例2的一种燃气热水器控制方法的流程示意图。Fig. 4 is a schematic flowchart of a gas water heater control method according to Embodiment 2 of the present invention.

图5为本发明实施例3的一种燃气热水器控制方法的流程示意图。Fig. 5 is a schematic flowchart of a gas water heater control method according to Embodiment 3 of the present invention.

图6为本发明实施例4的一种燃气热水器控制方法的流程示意图。Fig. 6 is a schematic flowchart of a gas water heater control method according to Embodiment 4 of the present invention.

图7为本发明实施例5的一种燃气热水器控制方法的流程示意图。Fig. 7 is a schematic flowchart of a gas water heater control method according to Embodiment 5 of the present invention.

图8为本发明实施例6的燃气热水器控制系统的结构示意图。Fig. 8 is a schematic structural diagram of a gas water heater control system according to Embodiment 6 of the present invention.

图9为本发明实施例7的一种燃气热水器的结构示意图。Fig. 9 is a schematic structural diagram of a gas water heater according to Embodiment 7 of the present invention.

具体实施方式Detailed ways

下面通过实施例的方式进一步说明本发明,但并不因此将本发明限制在所述的实施例范围之中。The present invention is further illustrated below by means of examples, but the present invention is not limited to the scope of the examples.

实施例1Example 1

本实施例提供了一种燃气热水器控制方法,参照图1,该燃气热水器控制方法包括以下步骤:This embodiment provides a gas water heater control method, referring to Figure 1, the gas water heater control method includes the following steps:

S11、判断实际热负荷是否小于理论热负荷,若是,执行步骤S12;若否,则热水器按当前状态运行,稳定输出热水。S11. Determine whether the actual heat load is smaller than the theoretical heat load, if yes, execute step S12; if not, the water heater operates in the current state, and outputs hot water stably.

其中,热负荷用于表征热水器加热热水的能力,作为可选的一种实施方式,热负荷可通过水流量和温度利用公式计算得到,假设热负荷为P,则计算热负荷的公式为:P=kqΔT,其中,k为常数,q为水流量,ΔT为水的温度差值的绝对值,比如16L的热水器可以每分钟将16L的水增加温度25度,则它的热负荷可以为16×25=400,热负荷越大,热水器加热热水越快,燃气压力越大。本实施例在判断实际热负荷是否小于理论热负荷之前,需要先获取热水器的理论热负荷与实际热负荷,具体地,如图2所示,包括以下步骤:Among them, the thermal load is used to characterize the ability of the water heater to heat hot water. As an optional implementation, the thermal load can be calculated by using the formula of water flow and temperature. Assuming that the thermal load is P, the formula for calculating the thermal load is: P=kqΔT, where k is a constant, q is the water flow, and ΔT is the absolute value of the temperature difference of the water. For example, a 16L water heater can increase the temperature of 16L of water by 25 degrees per minute, so its heat load can be 16 × 25 = 400, the greater the heat load, the faster the water heater heats hot water, and the greater the gas pressure. In this embodiment, before judging whether the actual heat load is less than the theoretical heat load, it is necessary to obtain the theoretical heat load and the actual heat load of the water heater. Specifically, as shown in FIG. 2 , the following steps are included:

S101、获取燃气热水器的进水温度、水流量和实际出水温度。S101. Obtain the inlet water temperature, water flow rate and actual outlet water temperature of the gas water heater.

其中,通过在出水管道设置温度传感器采集实施出水温度,在进水管道分别设置温度传感器和水流传感器采集进水温度和进水流量。作为可选的一种实施方式,可通过主动访问温度传感器和水流传感器的方式来获取进水温度、出水温度和进水流量的数据,也可由温度传感器和流量传感器主动上传进水温度、出水温度和进水流量的数据。Wherein, the water outlet temperature is collected by setting a temperature sensor in the water outlet pipe, and a temperature sensor and a water flow sensor are respectively arranged in the water inlet pipe to collect the water inlet temperature and the water flow rate. As an optional implementation, the data of inlet water temperature, outlet water temperature and inlet water flow can be obtained by actively accessing the temperature sensor and water flow sensor, or the temperature sensor and flow sensor can actively upload the inlet water temperature and outlet water temperature. and water flow data.

S102、根据进水温度、水流量和预设出水温度计算得到理论热负荷。S102. Calculate and obtain a theoretical heat load according to the inlet water temperature, the water flow rate, and the preset outlet water temperature.

其中,预设出水温度可以是热水器程序中的理论温度,也可以是用户通过热水器的控制面板自定义设定的温度,通常是一个范围值,比如设定温度在【40,50】之间。将进水温度、水流量和预设出水温度代入热负荷的计算公式中,可以得到理论热负荷P理论=kq(T理论-T0),其中,k为常数,q为进水流量,T理论为理论出水温度,T0为进水温度。Wherein, the preset outlet water temperature can be the theoretical temperature in the water heater program, or the temperature set by the user through the control panel of the water heater, usually a range value, for example, the set temperature is between [40, 50]. Substituting the inlet water temperature, water flow rate and preset outlet water temperature into the heat load calculation formula, the theoretical heat load P theory =kq(T theory -T 0 ), where k is a constant, q is the water inlet flow, and T Theory is the theoretical outlet water temperature, and T 0 is the inlet water temperature.

作为可选的一种实施方式,当冷水从进水管道进入燃气热水器后,通过控制燃气比例阀和风机转速使热水器向理论热负荷运行,从而使得出水管道输出的热水更加符合用户的需求。As an optional implementation, when the cold water enters the gas water heater from the water inlet pipe, the water heater runs to the theoretical heat load by controlling the gas proportional valve and the fan speed, so that the hot water output from the water outlet pipe is more in line with the user's needs.

S103、根据进水温度、水流量和实际出水温度计算得到实际热负荷。S103. Calculate and obtain an actual heat load according to the inlet water temperature, the water flow rate, and the actual outlet water temperature.

当热水从出水管道流出时,将进水温度、水流量和实际出水温度代入热负荷的计算公式中,可以得到实际热负荷P实际=kq(T实际-T0),其中,k为常数,q为进水流量,T实际为实际出水温度,T0为进水温度。When the hot water flows out from the outlet pipe, substituting the inlet water temperature, water flow rate and actual outlet water temperature into the calculation formula of the heat load, the actual heat load Pactual =kq( Tactual -T 0 ), where k is a constant , q is the water inlet flow, Tactual is the actual outlet water temperature, and T 0 is the inlet water temperature.

热水器正常工作状态下,水流量越小,热水升温越快,在实际应用中,将热水器的实际热负荷与理论热负荷的最低阈值进行对比,水流量减少,则用于比较的理论热负荷值上升。作为可选的一种实施方式,假设热水器的额定水流量为8L,设定温度在【40,50】之间,当进水管道的水流量为8L时,实际热负荷应不低于预设温度40°所对应的理论热负荷,当进水管道的水流量为6L时,实际热负荷应不低于预设温度42°所对应的理论热负荷,当然本实施例并不限于上述数值范围,可根据实际情况设置判定规则。Under the normal working condition of the water heater, the smaller the water flow rate, the faster the hot water temperature rises. In practical applications, the actual heat load of the water heater is compared with the minimum threshold of the theoretical heat load. If the water flow decreases, the theoretical heat load used for comparison value rises. As an optional implementation, assuming that the rated water flow of the water heater is 8L and the set temperature is between [40, 50], when the water flow of the water inlet pipe is 8L, the actual heat load should not be lower than the preset The theoretical heat load corresponding to the temperature of 40°, when the water flow rate of the water inlet pipe is 6L, the actual heat load should not be lower than the theoretical heat load corresponding to the preset temperature of 42°, of course, this embodiment is not limited to the above numerical range , you can set the judgment rules according to the actual situation.

按照上述的判定规则,当实际热负荷低于理论热负荷时,表征热水器无法满足用水需求。判断热水器为燃气压力不足,燃气热水器进入低气压工作状态;而当实际热负荷处于理论热负荷的范围时,热水器按当前状态运行,稳定输出热水。According to the above judgment rules, when the actual heat load is lower than the theoretical heat load, it means that the water heater cannot meet the water demand. It is judged that the gas pressure of the water heater is insufficient, and the gas water heater enters the low pressure working state; when the actual heat load is within the range of the theoretical heat load, the water heater operates according to the current state and outputs hot water stably.

S12、控制风机叶轮与增压泵叶轮啮合以使风机叶轮带动增压泵叶轮转动。S12. Control the meshing of the impeller of the fan and the impeller of the booster pump so that the impeller of the fan drives the impeller of the booster pump to rotate.

燃气压力不足时,可通过燃气增压装置增加燃气压力,该燃气增压装置的结构如图3所示,风机叶轮1和增压泵叶轮2设置在同一转动轴4上,控制风机叶轮1与增压泵叶轮2啮合,使风机叶轮1带动增压泵叶轮2转动,当增压泵叶轮2转动时,可给燃气增加压力,以弥补燃气压力不足。When the gas pressure is insufficient, the gas pressure can be increased through the gas booster device. The structure of the gas booster device is shown in Figure 3. The fan impeller 1 and the booster pump impeller 2 are arranged on the same rotating shaft 4, and the fan impeller 1 and The booster pump impeller 2 is meshed, so that the fan impeller 1 drives the booster pump impeller 2 to rotate. When the booster pump impeller 2 rotates, it can increase the pressure of the gas to make up for the lack of gas pressure.

转动轴4上还设置有离合器3,作为可选的一种实施方式,离合器3的工作方式为通电结合,在本实施例中,离合器3包括第一转轮5、第二转轮6、线圈7和弹簧8,其中,第一转轮5为与增压泵叶轮2共轴连接的动铁芯转轮,第二转轮6为与风机叶轮1共轴连接的动铁芯转轮。线圈7设置在第一转轮5的铁芯部位,线圈7与铁芯部分构成一个电磁铁,可通过控制给线圈7电流使第一转轮5产生磁性,从而与第二转轮6吸引啮合。弹簧8设置在第一转轮5和第二转轮6之间,作为可选的一种实施方式,弹簧8的一端固定连接在第一转轮5的触头部位。当然本实施例并不限于上述的离合器。A clutch 3 is also arranged on the rotating shaft 4. As an optional embodiment, the working mode of the clutch 3 is energized combination. In this embodiment, the clutch 3 includes a first runner 5, a second runner 6, a coil 7 and spring 8, wherein the first runner 5 is a moving iron core runner coaxially connected with the booster pump impeller 2, and the second runner 6 is a moving iron core runner coaxially connected with the fan impeller 1. The coil 7 is arranged on the iron core of the first runner 5, and the coil 7 and the iron core form an electromagnet, which can make the first runner 5 generate magnetism by controlling the current to the coil 7, thereby attracting and engaging with the second runner 6 . The spring 8 is arranged between the first rotating wheel 5 and the second rotating wheel 6 . As an optional embodiment, one end of the spring 8 is fixedly connected to the contact part of the first rotating wheel 5 . Of course, this embodiment is not limited to the above-mentioned clutch.

当热水器进入低气压状态,控制离合器3通电后,线圈7通电使第一转轮5的铁芯产生电磁力,第一转轮5克服弹簧7弹力向第二转轮6的方向移动,第一转轮5和第二转轮6吸引并通过齿轮啮合,此时,转动轴4为接合状态,风机叶轮1与增压泵叶轮2通过转动轴4连接,风机叶轮1转动时,转动轴4带动增压泵叶轮2转动,从而风机电机可同时驱动风机叶轮1和增压泵叶轮2转动,提高了燃气压力。When the water heater enters the state of low air pressure, after the control clutch 3 is energized, the coil 7 is energized to make the iron core of the first runner 5 generate electromagnetic force, and the first runner 5 overcomes the elastic force of the spring 7 and moves toward the second runner 6. The runner 5 and the second runner 6 are attracted and meshed through the gears. At this time, the rotating shaft 4 is engaged, and the fan impeller 1 and the booster pump impeller 2 are connected through the rotating shaft 4. When the fan impeller 1 rotates, the rotating shaft 4 drives The impeller 2 of the booster pump rotates, so that the fan motor can simultaneously drive the impeller 1 of the fan and the impeller 2 of the booster pump to rotate, thereby increasing the gas pressure.

S13、判断实际热负荷是否小于理论热负荷,若是,执行步骤S14;若否,则热水器按当前状态运行,稳定输出热水。S13. Determine whether the actual heat load is smaller than the theoretical heat load, if yes, execute step S14; if not, the water heater operates according to the current state, and outputs hot water stably.

需要说明的是,本实施例中S4的判断逻辑与S2一致,只是热水器进入的工作状态不一样,此时燃气热水器的工作状态为低气压状态,通过燃气增压泵增加燃气压力后,实际热负荷上升,再次对比实际热负荷与理论热负荷,当实际热负荷低于理论热负荷时,表征热水器仍然无法满足用水需求,则输出提示信息,提示信息用于表征燃气压力过低;而当实际热负荷处于理论热负荷的范围时,热水器按当前状态运行,稳定输出热水。It should be noted that the judgment logic of S4 in this embodiment is consistent with that of S2, except that the working state of the water heater is different. At this time, the working state of the gas water heater is a low pressure state. After the gas pressure is increased by the gas booster pump, the actual heat When the load rises, compare the actual heat load with the theoretical heat load again. When the actual heat load is lower than the theoretical heat load, it indicates that the water heater still cannot meet the water demand, and a prompt message is output. The prompt message is used to indicate that the gas pressure is too low; When the heat load is within the range of the theoretical heat load, the water heater operates according to the current state and outputs hot water stably.

S14、输出提示信息,所述提示信息用于表征燃气压力低并需要人工检修。S14. Output prompt information, the prompt information is used to indicate that the gas pressure is low and manual maintenance is required.

作为可选的一种实施方式,在燃气热水器上设置显示板,通过显示板输出燃气压力低的提示信息,从而通知人工检修燃气管道或燃气热水器等。As an optional implementation, a display board is provided on the gas water heater, and a prompt message of low gas pressure is output through the display board, so as to notify manual maintenance of the gas pipeline or the gas water heater.

本实施例通过理论热负荷来使预定输出的热水更加的符合用户需求,并通过实际热负荷来调节燃气热水器,可解决燃气热水器在不同燃气压力下燃烧不稳定的问题,燃气热水器在正常模式下只有风机叶轮转动,当燃气热水器在进入低气压模式时,通过风机叶轮带动增压泵叶轮的转动,给燃气增加压力,以弥补燃气本身的压力不足,使得燃气热水器能够加热热水。This embodiment uses the theoretical heat load to make the scheduled output of hot water more in line with user needs, and adjusts the gas water heater through the actual heat load, which can solve the problem of unstable combustion of the gas water heater under different gas pressures. The gas water heater is in normal mode. Only the impeller of the fan rotates. When the gas water heater enters the low pressure mode, the impeller of the booster pump is driven by the fan impeller to increase the pressure of the gas to make up for the lack of pressure of the gas itself, so that the gas water heater can heat hot water.

实施例2Example 2

如图4所示,本实施例的燃气热水器控制方法是对实施例1的进一步改进,热水器在进入低气压状态前,先进入过渡状态。当步骤S11中的判断条件为是时,先执行步骤S111。更具体地,包括以下步骤:As shown in Figure 4, the gas water heater control method of this embodiment is a further improvement on Embodiment 1, and the water heater first enters a transition state before entering a low pressure state. When the judgment condition in step S11 is yes, step S111 is executed first. More specifically, the following steps are included:

S111、控制风机的转速降低至预设阈值。S111. Control the speed of the fan to decrease to a preset threshold.

通过降低风机电机的运行转速,使风机叶轮的转速下降,减少风机带走热量,使热水器的实际热负荷逐渐贴近于理论热负荷。由于燃气热水器是按照一定比例的燃气混合一定比例的空气进行燃烧,作为可选的一种实施方式,预设阈值为风机叶轮最大转速的80%,即风机叶轮的转速最多可以降低至原转速的80%。燃气不足时,控制风机叶轮的转速下降减少风量,从而减少空气的比例,尽可能调整至合适的空燃比来符合燃烧要求,从而提高实际热负荷。By reducing the running speed of the fan motor, the speed of the fan impeller is reduced, reducing the heat taken away by the fan, and making the actual heat load of the water heater gradually approach the theoretical heat load. Since the gas water heater is combusted according to a certain proportion of gas mixed with a certain proportion of air, as an optional implementation, the preset threshold is 80% of the maximum speed of the fan impeller, that is, the speed of the fan impeller can be reduced to at most the original speed. 80%. When the gas is insufficient, control the speed of the fan impeller to reduce the air volume, thereby reducing the proportion of air, and adjust to an appropriate air-fuel ratio as much as possible to meet the combustion requirements, thereby increasing the actual heat load.

S112、判断实际热负荷是否小于理论热负荷,若是,执行步骤S12;若否,则热水器按当前状态运行,稳定输出热水。S112 . Determine whether the actual heat load is smaller than the theoretical heat load. If yes, perform step S12 ; if not, the water heater operates according to the current state, and outputs hot water stably.

此时燃气热水器的工作状态为过渡状态,通过控制风机叶轮的转速下降,实际热负荷上升,再次对比实际热负荷与理论热负荷,当实际热负荷低于理论热负荷时,表征热水器仍然无法满足用水需求,则判断为燃气压力不足,燃气热水器进入低气压工作状态;而当实际热负荷处于理论热负荷的范围时,热水器按当前状态运行,稳定输出热水。At this time, the working state of the gas water heater is in a transitional state. By controlling the speed of the fan impeller to drop, the actual heat load increases, and then compares the actual heat load with the theoretical heat load. When the actual heat load is lower than the theoretical heat load, the representative water heater still cannot meet the requirements. Water demand, it is judged that the gas pressure is insufficient, and the gas water heater enters the low pressure working state; when the actual heat load is within the range of the theoretical heat load, the water heater operates according to the current state, and outputs hot water stably.

在本实施例中,当实际热负荷低于理论热负荷时,先进入过渡状态,进一步避免了燃气热水器误进入低气压状态。通过降低风机叶轮的转速,减少风机带走热量,并调整合适的空燃比,提高燃烧效率;若降低后仍无法满足加热水需求,再进入低气压状态。另外,由于风机的运行转速下降,降低了噪音,提高了用户的体验。In this embodiment, when the actual heat load is lower than the theoretical heat load, it enters the transition state first, which further prevents the gas water heater from entering the low pressure state by mistake. By reducing the speed of the fan impeller, reduce the heat taken away by the fan, and adjust the appropriate air-fuel ratio to improve the combustion efficiency; if the demand for heating water cannot be met after the reduction, it will enter a low pressure state. In addition, since the operating speed of the fan decreases, noise is reduced and user experience is improved.

实施例3Example 3

如图5所示,本实施例是对实施例2的进一步改进,热水器在进入过渡状态前,判断燃气热水器是否为最大负荷燃烧运行,具体地,包括以下步骤:As shown in Figure 5, this embodiment is a further improvement on Embodiment 2. Before the water heater enters the transition state, it is judged whether the gas water heater is operating with maximum load combustion. Specifically, it includes the following steps:

S1101、判断实际热负荷是否为最大燃烧负荷,若是,执行步骤S111;若否,执行步骤S1102。S1101. Determine whether the actual heat load is the maximum combustion load, if yes, execute step S111; if not, execute step S1102.

其中,最大燃烧负荷用于表征燃气热水器在最大燃气压力下所计算得到的热负荷,监测当前热水器是不是以最大燃烧负荷在运行,如果当前燃气热水器已经是以最大燃烧负荷运行了,则说明燃气压力不足,燃气热水器进入过渡状态。如果监测到燃气热水器不是以最大燃烧负荷运行时,增大当前的实际热负荷至最大燃烧负荷。Among them, the maximum combustion load is used to represent the heat load calculated by the gas water heater under the maximum gas pressure, and to monitor whether the current water heater is operating at the maximum combustion load. If the current gas water heater is already operating at the maximum combustion load, it means that the gas Insufficient pressure, the gas water heater enters a transitional state. If it is detected that the gas water heater is not operating at the maximum combustion load, increase the current actual heat load to the maximum combustion load.

S1102、增大实际热负荷至最大燃烧负荷,然后返回执行步骤S11。S1102. Increase the actual heat load to the maximum combustion load, and then return to step S11.

如果燃气热水器不是以最大燃烧负荷运行,作为可选的一种实施方式,通过调整燃气比例阀至最大,使热水器能够达到当前的最大燃烧负荷。在将热水器的实际热负荷增大至最大燃烧负荷后,再次对比热水器的实际热负荷和理论热负荷。If the gas water heater is not running at the maximum combustion load, as an optional implementation, by adjusting the gas proportional valve to the maximum, the water heater can reach the current maximum combustion load. After increasing the actual heat load of the water heater to the maximum combustion load, compare the actual heat load and the theoretical heat load of the water heater again.

在本实施例中,燃气热水器进入过渡状态前进一步判断燃气是否以最大燃烧负荷运行,根据实际需求,当实际热负荷低于理论热负荷且热水器不是以最大燃烧负荷运行时,通过控制燃气热水器以当前最大燃烧负荷运行来满足加热水需求,同时避免燃气热水器误进入非正常的工作状态。In this embodiment, before the gas water heater enters the transition state, it is further judged whether the gas is running at the maximum combustion load. According to the actual demand, when the actual heat load is lower than the theoretical heat load and the water heater is not running at the maximum The current maximum combustion load runs to meet the heating water demand, and at the same time prevents the gas water heater from accidentally entering into an abnormal working state.

实施例4Example 4

本实施提供了另一种燃气热水器控制方法,如图6所示,该燃气热水器控制方法包括以下步骤:This implementation provides another gas water heater control method, as shown in Figure 6, the gas water heater control method includes the following steps:

S11、判断实际热负荷是否小于理论热负荷,若是,执行步骤S110;若否,则热水器按当前状态运行,稳定输出热水。S11. Determine whether the actual heat load is smaller than the theoretical heat load, if yes, perform step S110; if not, the water heater operates according to the current state, and outputs hot water stably.

其中,热负荷用于表征热水器加热热水的能力,作为可选的一种实施方式,热负荷可通过水流量和温度利用公式计算得到,假设热负荷为P,则计算热负荷的公式为:P=kqΔT,其中,k为常数,q为水流量,ΔT为水的温度差值的绝对值,比如16L的热水器可以每分钟将16L的水增加温度25度,则它的热负荷可以为16×25=400,热负荷越大,热水器加热热水越快,燃气压力越大。本实施例在判断实际热负荷是否小于理论热负荷之前,需要先获取热水器的理论热负荷与实际热负荷,具体地,如图2所示,包括以下步骤:Among them, the thermal load is used to characterize the ability of the water heater to heat hot water. As an optional implementation, the thermal load can be calculated by using the formula of water flow and temperature. Assuming that the thermal load is P, the formula for calculating the thermal load is: P=kqΔT, where k is a constant, q is the water flow, and ΔT is the absolute value of the temperature difference of the water. For example, a 16L water heater can increase the temperature of 16L of water by 25 degrees per minute, so its heat load can be 16 × 25 = 400, the greater the heat load, the faster the water heater heats hot water, and the greater the gas pressure. In this embodiment, before judging whether the actual heat load is less than the theoretical heat load, it is necessary to obtain the theoretical heat load and the actual heat load of the water heater. Specifically, as shown in FIG. 2 , the following steps are included:

S101、获取燃气热水器的进水温度、水流量和实际出水温度。S101. Obtain the inlet water temperature, water flow rate and actual outlet water temperature of the gas water heater.

其中,通过在出水管道设置温度传感器采集实施出水温度,在进水管道分别设置温度传感器和水流传感器采集进水温度和进水流量。作为可选的一种实施方式,可通过主动访问温度传感器和水流传感器的方式来获取进水温度、出水温度和进水流量的数据,也可由温度传感器和流量传感器主动上传进水温度、出水温度和进水流量的数据。Wherein, the water outlet temperature is collected by setting a temperature sensor in the water outlet pipe, and a temperature sensor and a water flow sensor are respectively arranged in the water inlet pipe to collect the water inlet temperature and the water flow rate. As an optional implementation, the data of inlet water temperature, outlet water temperature and inlet water flow can be obtained by actively accessing the temperature sensor and water flow sensor, or the temperature sensor and flow sensor can actively upload the inlet water temperature and outlet water temperature. and water flow data.

S102、根据进水温度、水流量和预设出水温度计算得到理论热负荷。S102. Calculate and obtain a theoretical heat load according to the inlet water temperature, the water flow rate, and the preset outlet water temperature.

其中,预设出水温度可以是热水器程序中的理论温度,也可以是用户通过热水器的控制面板自定义设定的温度,通常是一个范围值,比如设定温度在【40,50】之间。将进水温度、水流量和预设出水温度代入热负荷的计算公式中,可以得到理论热负荷P理论=kq(T理论-T0),其中,k为常数,q为进水流量,T理论为理论出水温度,T0为进水温度。Wherein, the preset outlet water temperature can be the theoretical temperature in the water heater program, or the temperature set by the user through the control panel of the water heater, usually a range value, for example, the set temperature is between [40, 50]. Substituting the inlet water temperature, water flow rate and preset outlet water temperature into the heat load calculation formula, the theoretical heat load P theory =kq(T theory -T 0 ), where k is a constant, q is the water inlet flow, and T Theory is the theoretical outlet water temperature, and T 0 is the inlet water temperature.

作为可选的一种实施方式,当冷水从进水管道进入燃气热水器后,通过控制燃气比例阀和风机转速使热水器向理论热负荷运行,从而使得出水管道输出的热水更加符合用户的需求。As an optional implementation, when the cold water enters the gas water heater from the water inlet pipe, the water heater runs to the theoretical heat load by controlling the gas proportional valve and the fan speed, so that the hot water output from the water outlet pipe is more in line with the user's needs.

S103、根据进水温度、水流量和实际出水温度计算得到实际热负荷。S103. Calculate and obtain an actual heat load according to the inlet water temperature, the water flow rate, and the actual outlet water temperature.

当热水从出水管道流出时,将进水温度、水流量和实际出水温度代入热负荷的计算公式中,可以得到实际热负荷P实际=kq(T实际-T0),其中,k为常数,q为进水流量,T实际为实际出水温度,T0为进水温度。When the hot water flows out from the outlet pipe, substituting the inlet water temperature, water flow rate and actual outlet water temperature into the calculation formula of the heat load, the actual heat load Pactual =kq( Tactual -T 0 ), where k is a constant , q is the water inlet flow, Tactual is the actual outlet water temperature, and T 0 is the inlet water temperature.

热水器正常工作状态下,水流量越小,热水升温越快,在实际应用中,将热水器的实际热负荷与理论热负荷的最低阈值进行对比,水流量减少,则用于比较的理论热负荷值上升。作为可选的一种实施方式,假设热水器的额定水流量为8L,设定温度在【40,50】之间,当进水管道的水流量为8L时,实际热负荷应不低于预设温度40°所对应的理论热负荷,当进水管道的水流量为6L时,实际热负荷应不低于预设温度42°所对应的理论热负荷,当然本实施例并不限于上述数值范围,可根据实际情况设置判定规则。Under the normal working condition of the water heater, the smaller the water flow rate, the faster the hot water temperature rises. In practical applications, the actual heat load of the water heater is compared with the minimum threshold of the theoretical heat load. If the water flow decreases, the theoretical heat load used for comparison value rises. As an optional implementation, assuming that the rated water flow of the water heater is 8L and the set temperature is between [40, 50], when the water flow of the water inlet pipe is 8L, the actual heat load should not be lower than the preset The theoretical heat load corresponding to the temperature of 40°, when the water flow rate of the water inlet pipe is 6L, the actual heat load should not be lower than the theoretical heat load corresponding to the preset temperature of 42°, of course, this embodiment is not limited to the above numerical range , you can set the judgment rules according to the actual situation.

按照上述的判定规则,当实际热负荷低于理论热负荷时,表征燃气不能满足热水器负荷运行需求,但在实际情况中,用户更多的是需要获取温度合适的热水,作为另一种可选的实施方式,可进一步判断实际出水温度是否能满足用户的热水需求。而当实际热负荷处于理论热负荷的范围时,热水器按当前状态运行,稳定输出热水。According to the above judgment rules, when the actual heat load is lower than the theoretical heat load, it indicates that the gas cannot meet the load operation requirements of the water heater. According to the selected implementation mode, it can be further judged whether the actual outlet water temperature can meet the hot water demand of the user. When the actual heat load is within the range of the theoretical heat load, the water heater operates according to the current state and outputs hot water stably.

S110、判断实际出水温度是否小于预设出水温度,若是,执行步骤S1101;若否,则热水器按当前状态运行,稳定输出热水。S110. Determine whether the actual outlet water temperature is lower than the preset outlet water temperature, if yes, perform step S1101; if not, the water heater operates according to the current state, and outputs hot water stably.

此时热水器的工作状态为正常工作状态,对比实际出水温度与预设出水温度的最低阈值,当实际出水温度低于预设出水温度的最低阈值时,表征实际出水温度无法满足用水需求,作为可选的一种实施方式,进一步判断燃气热水器是否为最大负荷燃烧运行。当实际出水温度处于预设出水温度的范围时,热水器按当前状态运行,稳定输出热水。At this time, the working state of the water heater is the normal working state. Compare the actual outlet water temperature with the preset minimum threshold of outlet water temperature. When the actual outlet water temperature is lower than the preset minimum outlet water temperature threshold, it indicates that the actual outlet water temperature cannot meet the water demand. In one embodiment selected, it is further judged whether the gas water heater is operating with maximum load combustion. When the actual outlet water temperature is within the range of the preset outlet water temperature, the water heater will run according to the current state and output hot water stably.

S1101、判断实际热负荷是否为最大燃烧负荷,若是,执行步骤S111;若否,执行步骤S1102。S1101. Determine whether the actual heat load is the maximum combustion load, if yes, execute step S111; if not, execute step S1102.

其中,最大燃烧负荷用于表征燃气热水器在最大燃气压力下所计算得到的热负荷,监测当前热水器是不是以最大燃烧负荷在运行,如果当前燃气热水器已经是以最大燃烧负荷运行了,则说明燃气压力不足,燃气热水器进入过渡状态,控制风机电机的运行转速下降,使风机叶轮的转速可降低至预设阈值。如果监测到燃气热水器不是以最大燃烧负荷运行时,增大当前的实际热负荷至最大燃烧负荷。Among them, the maximum combustion load is used to represent the heat load calculated by the gas water heater under the maximum gas pressure, and to monitor whether the current water heater is operating at the maximum combustion load. If the current gas water heater is already operating at the maximum combustion load, it means that the gas If the pressure is insufficient, the gas water heater enters a transitional state, and the operating speed of the fan motor is controlled to decrease, so that the speed of the fan impeller can be reduced to a preset threshold. If it is detected that the gas water heater is not operating at the maximum combustion load, increase the current actual heat load to the maximum combustion load.

S1102、增大实际热负荷至最大燃烧负荷,然后返回执行步骤S11。S1102. Increase the actual heat load to the maximum combustion load, and then return to step S11.

如果燃气热水器不是以最大燃烧负荷运行,作为可选的一种实施方式,通过调整燃气比例阀至最大,使热水器能够达到当前的最大燃烧负荷。在将热水器的实际热负荷增大至最大燃烧负荷后,再次对比热水器的实际热负荷和理论热负荷。If the gas water heater is not running at the maximum combustion load, as an optional implementation, by adjusting the gas proportional valve to the maximum, the water heater can reach the current maximum combustion load. After increasing the actual heat load of the water heater to the maximum combustion load, compare the actual heat load and the theoretical heat load of the water heater again.

S111、控制所述风机的转速降低至预设阈值。S111. Control the speed of the fan to decrease to a preset threshold.

如果当前燃气热水器已经是以最大燃烧负荷运行了,且热水温度无法满足用户需求,则进入过渡状态。通过降低风机电机的运行转速,使风机叶轮的转速下降,减少风机带走热量,使热水器的实际热负荷逐渐贴近于理论热负荷。由于燃气热水器是按照一定比例的燃气混合一定比例的空气进行燃烧,作为可选的一种实施方式,预设阈值为风机叶轮最大转速的80%,即风机叶轮的转速最多可以降低至原转速的80%。燃气不足时,控制风机叶轮的转速下降减少风量,从而减少空气的比例,尽可能调整至合适的空燃比来符合燃烧要求,从而提高实际热负荷。If the current gas water heater is already running at the maximum combustion load, and the hot water temperature cannot meet the user's needs, it will enter a transitional state. By reducing the running speed of the fan motor, the speed of the fan impeller is reduced, reducing the heat taken away by the fan, and making the actual heat load of the water heater gradually approach the theoretical heat load. Since the gas water heater is combusted according to a certain proportion of gas mixed with a certain proportion of air, as an optional implementation, the preset threshold is 80% of the maximum speed of the fan impeller, that is, the speed of the fan impeller can be reduced to at most the original speed. 80%. When the gas is insufficient, control the speed of the fan impeller to reduce the air volume, thereby reducing the proportion of air, and adjust to an appropriate air-fuel ratio as much as possible to meet the combustion requirements, thereby increasing the actual heat load.

S112'、判断所述实际出水温度是否小于所述预设出水温度,若是,执行步骤S12;若否,则热水器按当前状态运行,稳定输出热水。S112', judging whether the actual outlet water temperature is lower than the preset outlet water temperature, if yes, execute step S12; if not, the water heater operates according to the current state, and outputs hot water stably.

此时燃气热水器的工作状态为过渡状态,通过控制风机叶轮的转速下降,实际出水温度上升,再次对比实际出水温度和预设出水温度的最低阈值,当实际出水温度低于预设出水温度的最低阈值时,表征热水器仍然无法满足用水需求,燃气热水器进入低气压工作状态。当实际出水温度处于预设出水温度的范围时,热水器按当前状态运行,稳定输出热水。At this time, the working state of the gas water heater is a transitional state. By controlling the speed of the fan impeller to drop, the actual outlet water temperature rises. Compare the actual outlet water temperature with the minimum threshold of the preset outlet water temperature. When the actual outlet water temperature is lower than the preset minimum outlet water temperature When the threshold is reached, it indicates that the water heater still cannot meet the water demand, and the gas water heater enters a low pressure working state. When the actual outlet water temperature is within the range of the preset outlet water temperature, the water heater will run according to the current state and output hot water stably.

S12、控制所述风机叶轮与所述增压泵叶轮啮合以使所述风机叶轮带动所述增压泵叶轮转动。S12. Control the fan impeller to mesh with the booster pump impeller so that the fan impeller drives the booster pump impeller to rotate.

燃气压力不足时,可通过燃气增压装置增加燃气压力,该燃气增压装置的结构如图3所示,风机叶轮1和增压泵叶轮2设置在同一转动轴4上,控制风机叶轮1与增压泵叶轮2啮合,使风机叶轮1带动增压泵叶轮2转动,当增压泵叶轮2转动时,可给燃气增加压力,以弥补燃气压力不足。When the gas pressure is insufficient, the gas pressure can be increased through the gas booster device. The structure of the gas booster device is shown in Figure 3. The fan impeller 1 and the booster pump impeller 2 are arranged on the same rotating shaft 4, and the fan impeller 1 and The booster pump impeller 2 is meshed, so that the fan impeller 1 drives the booster pump impeller 2 to rotate. When the booster pump impeller 2 rotates, it can increase the pressure of the gas to make up for the lack of gas pressure.

转动轴4上还设置有离合器3,作为可选的一种实施方式,离合器3的工作方式为通电结合,在本实施例中,离合器3包括第一转轮5、第二转轮6、线圈7和弹簧8,其中,第一转轮5为与增压泵叶轮2共轴连接的动铁芯转轮,第二转轮6为与风机叶轮1共轴连接的动铁芯转轮。线圈7设置在第一转轮5的铁芯部位,线圈7与铁芯部分构成一个电磁铁,可通过控制给线圈7电流使第一转轮5产生磁性,从而与第二转轮6吸引啮合。弹簧8设置在第一转轮5和第二转轮6之间,作为可选的一种实施方式,弹簧8的一端固定连接在第一转轮5的触头部位。当然本实施例并不限于上述的离合器。A clutch 3 is also arranged on the rotating shaft 4. As an optional embodiment, the working mode of the clutch 3 is energized combination. In this embodiment, the clutch 3 includes a first runner 5, a second runner 6, a coil 7 and spring 8, wherein the first runner 5 is a moving iron core runner coaxially connected with the booster pump impeller 2, and the second runner 6 is a moving iron core runner coaxially connected with the fan impeller 1. The coil 7 is arranged on the iron core of the first runner 5, and the coil 7 and the iron core form an electromagnet, which can make the first runner 5 generate magnetism by controlling the current to the coil 7, thereby attracting and engaging with the second runner 6 . The spring 8 is arranged between the first rotating wheel 5 and the second rotating wheel 6 . As an optional embodiment, one end of the spring 8 is fixedly connected to the contact part of the first rotating wheel 5 . Of course, this embodiment is not limited to the above-mentioned clutch.

热水器正常状态,风机电机只驱动风机叶轮1转动,可将适量的空气混入燃气之中。当热水器进入低气压状态,控制离合器3通电后,线圈7通电使第一转轮5的铁芯产生电磁力,第一转轮5克服弹簧7弹力向第二转轮6的方向移动,第一转轮5和第二转轮6吸引并通过齿轮啮合,此时,转动轴4为接合状态,风机叶轮1与增压泵叶轮2通过转动轴4连接,风机叶轮1转动时,转动轴4带动增压泵叶轮2转动,从而风机电机可同时驱动风机叶轮1和增压泵叶轮2转动,从而提高了燃气压力。In the normal state of the water heater, the fan motor only drives the fan impeller 1 to rotate, so that an appropriate amount of air can be mixed into the gas. When the water heater enters the state of low air pressure, after the control clutch 3 is energized, the coil 7 is energized to make the iron core of the first runner 5 generate electromagnetic force, and the first runner 5 overcomes the elastic force of the spring 7 and moves toward the second runner 6. The runner 5 and the second runner 6 are attracted and meshed through the gears. At this time, the rotating shaft 4 is engaged, and the fan impeller 1 and the booster pump impeller 2 are connected through the rotating shaft 4. When the fan impeller 1 rotates, the rotating shaft 4 drives The impeller 2 of the booster pump rotates, so that the fan motor can simultaneously drive the impeller 1 of the fan and the impeller 2 of the booster pump to rotate, thereby increasing the gas pressure.

S13'、判断所述实际出水温度是否小于所述预设出水温度,若是,执行步骤S14;若否,则热水器按当前状态运行,稳定输出热水。S13', judging whether the actual outlet water temperature is lower than the preset outlet water temperature, if yes, execute step S14; if not, the water heater operates according to the current state, and outputs hot water stably.

此时燃气热水器的工作状态为低气压状态,通过燃气增压泵增加燃气压力后,实际出水温度上升,再次对比实际出水温度和预设出水温度的最低阈值,当实际出水温度低于预设出水温度的最低阈值时,则输出提示信息,提示信息用于表征燃气压力过低。当实际出水温度处于预设出水温度的范围时,热水器按当前状态运行,稳定输出热水。At this time, the working state of the gas water heater is a low pressure state. After increasing the gas pressure through the gas booster pump, the actual outlet water temperature rises. Compare the actual outlet water temperature with the minimum threshold of the preset outlet water temperature. When the temperature reaches the lowest threshold, a prompt message is output, and the prompt message is used to indicate that the gas pressure is too low. When the actual outlet water temperature is within the range of the preset outlet water temperature, the water heater will run according to the current state and output hot water stably.

S14、输出提示信息,所述提示信息用于表征燃气压力低并需要人工检修。S14. Output prompt information, the prompt information is used to indicate that the gas pressure is low and manual maintenance is required.

作为可选的一种实施方式,在燃气热水器上设置显示板,通过显示板输出燃气压力低的提示信息,从而通知人工检修燃气管道或燃气热水器等。As an optional implementation, a display board is provided on the gas water heater, and a prompt message of low gas pressure is output through the display board, so as to notify manual maintenance of the gas pipeline or the gas water heater.

本实施例在热负荷的判断条件下,增加了温度的判断条件,根据温度和热负荷双重判断,进一步避免热水器误进入非正常工作状态,同时,温度的判定方式也更加人性化,在冬季使用燃气热水器时,由于自来水温度低,燃气热水器通常在大负荷状态运行,而出水温度可以直接反映出热水是否满足用户的用水需求,提高了用户体验。In this embodiment, under the judgment condition of heat load, the judgment condition of temperature is added, and the double judgment of temperature and heat load is used to further prevent the water heater from entering the abnormal working state by mistake. When using a gas water heater, due to the low temperature of tap water, the gas water heater usually operates under heavy load, and the outlet water temperature can directly reflect whether the hot water meets the user's water demand, which improves the user experience.

实施例5Example 5

如图7所示,本实施例的燃气热水器控制方法是对上述方法的进一步优化,在步骤S11中的判断条件为是时,可同时执行步骤110开始的流程和步骤1101开始的流程。需要说明的是,在本实施例中,步骤1101'的判断逻辑和步骤1101的判断逻辑一致,因此实际使用时,只需要任选一次进行判断,而在后续的流程中,热水器同时反馈热负荷和水温动作,并控制热水器进入不同的工作状态,其具体实现方式均与上述方案一致,此处不再赘述。As shown in FIG. 7 , the gas water heater control method of this embodiment is a further optimization of the above method. When the judgment condition in step S11 is yes, the process starting from step 110 and the process starting from step 1101 can be executed simultaneously. It should be noted that, in this embodiment, the judgment logic of step 1101' is consistent with the judgment logic of step 1101, so in actual use, it is only necessary to make a judgment once, and in the subsequent process, the water heater feeds back the heat load at the same time and water temperature, and control the water heater to enter different working states. The specific implementation methods are consistent with the above-mentioned schemes, and will not be repeated here.

实施例6Example 6

本实施例提供一种燃气热水器控制系统,如图8所示,该燃气热水器控制系统包括获取模块21、第一判断模块22、啮合模块23、第二判断模块24、提示模块25、降速模块26、第三判断模块27、第一计算模块28、第二计算模块29、第四判断模块210、第五判断模块211、第六判断模块212、第七判断模块213和负荷调节模块214。This embodiment provides a gas water heater control system, as shown in Figure 8, the gas water heater control system includes an acquisition module 21, a first judgment module 22, an engagement module 23, a second judgment module 24, a prompt module 25, and a speed reduction module 26. The third judgment module 27 , the first calculation module 28 , the second calculation module 29 , the fourth judgment module 210 , the fifth judgment module 211 , the sixth judgment module 212 , the seventh judgment module 213 and the load adjustment module 214 .

需要说明的是,第一判断模块22、第二判断模块24和第三判断模块27中的判断逻辑是一样的,只是燃气热水器的工作状态不一样,实际为同一模块,为了方便说明,在此以第一、第二和第三进行区分。同理,第五判断模块211、第六判断模块212和第七判断模块213实际也为同一模块。It should be noted that the judgment logic in the first judging module 22, the second judging module 24 and the third judging module 27 are the same, but the working status of the gas water heater is different, and they are actually the same module. For the convenience of description, here Distinguish between first, second and third. Similarly, the fifth judging module 211 , the sixth judging module 212 and the seventh judging module 213 are actually the same module.

获取模块21用于获取燃气热水器的进水温度、水流量和实际出水温度。其中,通过在出水管道设置温度传感器采集实施出水温度,在进水管道分别设置温度传感器和水流传感器采集进水温度和进水流量。作为可选的一种实施方式,获取模块21可通过主动访问温度传感器和水流传感器的方式来获取进水温度、出水温度和进水流量的数据,也可由温度传感器和流量传感器主动上传进水温度、出水温度和进水流量的数据至。The acquiring module 21 is used to acquire the inlet water temperature, water flow rate and actual outlet water temperature of the gas water heater. Wherein, the water outlet temperature is collected by setting a temperature sensor in the water outlet pipe, and a temperature sensor and a water flow sensor are respectively arranged in the water inlet pipe to collect the water inlet temperature and the water flow rate. As an optional implementation, the acquisition module 21 can acquire the data of the inlet water temperature, outlet water temperature and inlet water flow by actively accessing the temperature sensor and the water flow sensor, or the temperature sensor and the flow sensor can actively upload the inlet water temperature. , Outlet water temperature and inflow flow data to.

第一计算模块28用于根据进水温度、水流量和预设出水温度计算得到理论热负荷。其中,预设出水温度可以是热水器程序中的理论温度,也可以是用户通过热水器的控制面板自定义设定的温度,通常是一个范围值,比如设定温度在【40,50】之间。第一计算模块28将进水温度、水流量和预设出水温度代入热负荷的计算公式中,可以得到理论热负荷P理论=kq(T理论-T0),其中,k为常数,q为进水流量,T理论为理论出水温度,T0为进水温度。The first calculating module 28 is used to calculate the theoretical heat load according to the inlet water temperature, the water flow rate and the preset outlet water temperature. Wherein, the preset outlet water temperature can be the theoretical temperature in the water heater program, or the temperature set by the user through the control panel of the water heater, usually a range value, for example, the set temperature is between [40, 50]. The first calculation module 28 substitutes the inlet water temperature, the water flow rate and the preset outlet water temperature into the calculation formula of the heat load, and can obtain the theoretical heat load P theory =kq(T theory -T 0 ), where k is a constant, and q is Inlet water flow, T theory is the theoretical outlet water temperature, and T 0 is the inlet water temperature.

作为可选的一种实施方式,当冷水从进水管道进入燃气热水器后,通过控制燃气比例阀和风机转速使热水器向理论热负荷运行,从而使得出水管道输出的热水更加符合用户的需求。As an optional implementation, when the cold water enters the gas water heater from the water inlet pipe, the water heater runs to the theoretical heat load by controlling the gas proportional valve and the fan speed, so that the hot water output from the water outlet pipe is more in line with the user's needs.

第二计算模块29用于根据进水温度、水流量和实际出水温度计算得到实际热负荷。当热水从出水管道流出时,第二计算模块29将进水温度、水流量和实际出水温度代入热负荷的计算公式中,可以得到实际热负荷P实际=kq(T实际-T0),其中,k为常数,q为进水流量,T实际为实际出水温度,T0为进水温度。The second calculation module 29 is used to calculate the actual heat load according to the inlet water temperature, the water flow rate and the actual outlet water temperature. When hot water flows out from the outlet pipe, the second calculation module 29 substitutes the inlet water temperature, water flow rate and actual outlet water temperature into the calculation formula of heat load, and the actual heat load Pactual =kq( Tactual -T 0 ), Among them, k is a constant, q is the water inlet flow rate, Tactual is the actual outlet water temperature, and T 0 is the inlet water temperature.

第一判断模块22用于热水器正常工作状态下,判断实际热负荷是否小于理论热负荷,若是,调用第四判断模块210;若否,则热水器按当前状态运行,稳定输出热水。热水器正常工作状态下,水流量越小,热水升温越快,在实际应用中,将热水器的实际热负荷与理论热负荷的最低阈值进行对比,水流量减少,则用于比较的理论热负荷值上升。作为可选的一种实施方式,假设热水器的额定水流量为8L,设定温度在【40,50】之间,当进水管道的水流量为8L时,实际热负荷应不低于预设温度40°所对应的理论热负荷,当进水管道的水流量为6L时,实际热负荷应不低于预设温度42°所对应的理论热负荷,当然本实施例并不限于上述数值范围,第一判断模块22可根据实际情况设置判定规则。The first judging module 22 is used to judge whether the actual heat load is less than the theoretical heat load in the normal working state of the water heater. If so, call the fourth judging module 210; Under the normal working condition of the water heater, the smaller the water flow rate, the faster the hot water temperature rises. In practical applications, the actual heat load of the water heater is compared with the minimum threshold of the theoretical heat load. If the water flow decreases, the theoretical heat load used for comparison value rises. As an optional implementation, assuming that the rated water flow of the water heater is 8L and the set temperature is between [40, 50], when the water flow of the water inlet pipe is 8L, the actual heat load should not be lower than the preset The theoretical heat load corresponding to the temperature of 40°, when the water flow rate of the water inlet pipe is 6L, the actual heat load should not be lower than the theoretical heat load corresponding to the preset temperature of 42°, of course, this embodiment is not limited to the above numerical range , the first judging module 22 can set judging rules according to the actual situation.

第四判断模块210用于判断实际热负荷是否为最大燃烧负荷,若是,燃气热水器进入过渡状态,调用降速模块26;若否,燃气热水器仍然是正常工作状态,调用负荷调节模块214。其中,最大燃烧负荷用于表征燃气热水器在最大燃气压力下所计算得到的热负荷,第四判断模块210监测当前热水器是不是以最大燃烧负荷在运行,如果当前燃气热水器已经是以最大燃烧负荷运行了,则说明燃气压力不足,燃气热水器进入过渡状态。The fourth judging module 210 is used to judge whether the actual heat load is the maximum combustion load. If so, the gas water heater enters a transitional state, and the speed reduction module 26 is invoked; Among them, the maximum combustion load is used to characterize the heat load calculated by the gas water heater under the maximum gas pressure. The fourth judgment module 210 monitors whether the current water heater is running at the maximum combustion load. If the current gas water heater is already running at the maximum combustion load , it means that the gas pressure is insufficient, and the gas water heater enters a transitional state.

负荷调节模块214用于增大实际热负荷至最大燃烧负荷,如果燃气热水器不是以最大燃烧负荷运行,作为可选的一种实施方式,通过调整燃气比例阀至最大,使热水器能够达到当前的最大燃烧负荷。在将热水器的实际热负荷增大至最大燃烧负荷后,调用第一判断模块22。并在正常工作状态下,第一判断模块22再次对比热水器的实际热负荷和理论热负荷。The load adjustment module 214 is used to increase the actual heat load to the maximum combustion load. If the gas water heater is not operating at the maximum combustion load, as an optional implementation, the water heater can reach the current maximum by adjusting the gas proportional valve to the maximum. combustion load. After the actual heat load of the water heater is increased to the maximum combustion load, the first judging module 22 is invoked. And in the normal working state, the first judging module 22 compares the actual heat load and the theoretical heat load of the water heater again.

降速模块26用于控制所述风机的转速降低至预设阈值。降速模块26通过降低风机电机的运行转速,使风机叶轮的转速下降,减少风机带走热量,使热水器的实际热负荷逐渐贴近于理论热负荷。由于燃气热水器是按照一定比例的燃气混合一定比例的空气进行燃烧,作为可选的一种实施方式,预设阈值为风机叶轮最大转速的80%,即风机叶轮的转速最多可以降低至原转速的80%。燃气不足时,降速模块26控制风机叶轮的转速下降减少风量,从而减少空气的比例,尽可能调整至合适的空燃比来符合燃烧要求,从而提高实际热负荷。The speed reduction module 26 is used to control the speed of the fan to decrease to a preset threshold. The speed reduction module 26 reduces the speed of the fan impeller by reducing the running speed of the fan motor, reducing the heat taken away by the fan, so that the actual heat load of the water heater gradually approaches the theoretical heat load. Since the gas water heater is combusted according to a certain proportion of gas mixed with a certain proportion of air, as an optional implementation, the preset threshold is 80% of the maximum speed of the fan impeller, that is, the speed of the fan impeller can be reduced to at most the original speed. 80%. When the gas is insufficient, the speed reduction module 26 controls the speed of the fan impeller to decrease to reduce the air volume, thereby reducing the proportion of air, and adjusting to an appropriate air-fuel ratio as much as possible to meet the combustion requirements, thereby increasing the actual heat load.

第三判断模块27用于热水器过渡状态下,判断实际热负荷是否小于理论热负荷,若是,调用啮合模块23;若否,则热水器按当前状态运行,稳定输出热水。此时燃气热水器的工作状态为过渡状态,通过降速模块26控制风机叶轮的转速下降,实际热负荷上升,第三判断模块27再次对比实际热负荷与理论热负荷,当实际热负荷低于理论热负荷时,表征热水器仍然无法满足用水需求,则判断为燃气压力不足,燃气热水器进入低气压工作状态;而当实际热负荷处于理论热负荷的范围时,热水器按当前状态运行,稳定输出热水。The third judging module 27 is used for judging whether the actual heat load is less than the theoretical heat load in the transitional state of the water heater. If yes, the engagement module 23 is invoked; At this time, the working state of the gas water heater is a transition state. The speed reduction module 26 controls the speed of the fan impeller to drop, and the actual heat load rises. The third judging module 27 compares the actual heat load with the theoretical heat load again. When the actual heat load is lower than the theoretical heat load When the heat load is on, if the water heater still cannot meet the water demand, it is judged that the gas pressure is insufficient, and the gas water heater enters the low pressure working state; when the actual heat load is within the range of the theoretical heat load, the water heater operates according to the current state and outputs hot water stably .

啮合模块23用于控制风机叶轮与增压泵叶轮啮合以使风机叶轮带动增压泵叶轮转动。燃气压力不足时,可通过燃气增压装置增加燃气压力,该燃气增压装置的结构如图3所示,风机叶轮1和增压泵叶轮2设置在同一转动轴4上,啮合模块23控制风机叶轮1与增压泵叶轮2啮合,使风机叶轮1带动增压泵叶轮2转动,当增压泵叶轮2转动时,可给燃气增加压力,以弥补燃气压力不足。The engagement module 23 is used to control the meshing between the impeller of the fan and the impeller of the booster pump so that the impeller of the fan drives the impeller of the booster pump to rotate. When the gas pressure is insufficient, the gas pressure can be increased through the gas booster device. The structure of the gas booster device is shown in FIG. The impeller 1 meshes with the booster pump impeller 2, so that the fan impeller 1 drives the booster pump impeller 2 to rotate. When the booster pump impeller 2 rotates, it can increase the pressure of the gas to make up for the lack of gas pressure.

转动轴4上还设置有离合器3,作为可选的一种实施方式,离合器3的工作方式为通电结合,在本实施例中,离合器3包括第一转轮5、第二转轮6、线圈7和弹簧8,其中,第一转轮5为与增压泵叶轮2共轴连接的动铁芯转轮,第二转轮6为与风机叶轮1共轴连接的动铁芯转轮。线圈7设置在第一转轮5的铁芯部位,线圈7与铁芯部分构成一个电磁铁,啮合模块23可通过控制给线圈7电流使第一转轮5产生磁性,从而与第二转轮6吸引啮合。弹簧8设置在第一转轮5和第二转轮6之间,作为可选的一种实施方式,弹簧8的一端固定连接在第一转轮5的触头部位。当然本实施例并不限于上述的离合器。A clutch 3 is also arranged on the rotating shaft 4. As an optional embodiment, the working mode of the clutch 3 is energized combination. In this embodiment, the clutch 3 includes a first runner 5, a second runner 6, a coil 7 and spring 8, wherein the first runner 5 is a moving iron core runner coaxially connected with the booster pump impeller 2, and the second runner 6 is a moving iron core runner coaxially connected with the fan impeller 1. The coil 7 is arranged on the iron core part of the first runner 5, and the coil 7 and the iron core part form an electromagnet, and the engagement module 23 can make the first runner 5 generate magnetism by controlling the current to the coil 7, so as to be compatible with the second runner 5. 6 Attractive engagement. The spring 8 is arranged between the first rotating wheel 5 and the second rotating wheel 6 . As an optional embodiment, one end of the spring 8 is fixedly connected to the contact part of the first rotating wheel 5 . Of course, this embodiment is not limited to the above-mentioned clutch.

当热水器进入低气压状态,啮合模块23控制离合器3通电后,线圈7通电使第一转轮5的铁芯产生电磁力,第一转轮5克服弹簧7弹力向第二转轮6的方向移动,第一转轮5和第二转轮6吸引并通过齿轮啮合,此时,转动轴4为接合状态,风机叶轮1与增压泵叶轮2通过转动轴4连接,风机叶轮1转动时,转动轴4带动增压泵叶轮2转动,从而风机电机可同时驱动风机叶轮1和增压泵叶轮2转动,提高了燃气压力。When the water heater enters the low air pressure state, after the engagement module 23 controls the clutch 3 to be energized, the coil 7 is energized to make the iron core of the first runner 5 generate electromagnetic force, and the first runner 5 overcomes the elastic force of the spring 7 and moves toward the second runner 6 , the first runner 5 and the second runner 6 are attracted and meshed through the gears. At this time, the rotating shaft 4 is engaged, and the fan impeller 1 and the booster pump impeller 2 are connected through the rotating shaft 4. When the fan impeller 1 rotates, it rotates The shaft 4 drives the impeller 2 of the booster pump to rotate, so that the fan motor can simultaneously drive the impeller 1 of the fan and the impeller 2 of the booster pump to rotate, thereby increasing the gas pressure.

第二判断模块24用于热水器低气压状态下,判断实际热负荷是否小于理论热负荷,若是,调用提示模块25;若否,则热水器按当前状态运行,稳定输出热水。此时燃气热水器的工作状态为低气压状态,啮合模块23通过燃气增压泵增加燃气压力后,实际热负荷上升,第二判断模块24再次对比实际热负荷与理论热负荷,当实际热负荷低于理论热负荷时,表征热水器仍然无法满足用水需求,则输出提示信息,提示信息用于表征燃气压力过低;而当实际热负荷处于理论热负荷的范围时,热水器按当前状态运行,稳定输出热水。The second judging module 24 is used to judge whether the actual heat load is less than the theoretical heat load when the water heater is in a low pressure state. If so, call the prompt module 25; At this time, the working state of the gas water heater is a low pressure state. After the engagement module 23 increases the gas pressure through the gas booster pump, the actual heat load rises. The second judging module 24 compares the actual heat load with the theoretical heat load again. When the actual heat load is low When the theoretical heat load indicates that the water heater still cannot meet the water demand, a prompt message will be output, which is used to indicate that the gas pressure is too low; when the actual heat load is within the range of the theoretical heat load, the water heater will run according to the current state and output stably hot water.

提示模块25用于输出提示信息,所述提示信息用于表征燃气压力低并需要人工检修。作为可选的一种实施方式,在燃气热水器上设置显示板,通过显示板输出燃气压力低的提示信息,从而通知人工检修燃气管道或燃气热水器等。The prompt module 25 is used to output prompt information, which is used to indicate that the gas pressure is low and manual maintenance is required. As an optional implementation, a display board is provided on the gas water heater, and a prompt message of low gas pressure is output through the display board, so as to notify manual maintenance of the gas pipeline or the gas water heater.

作为可选的另一种实施方式,第一判断模块22还用于判断条件为是的情况下,调用第五判断模块211。As another optional implementation manner, the first judging module 22 is further configured to call the fifth judging module 211 when the judging condition is yes.

第五判断模块211用于热水器正常状态下,判断实际出水温度是否小于预设出水温度,若是,调用第四判断模块210;若否,则热水器按当前状态运行,稳定输出热水。此时热水器的工作状态为正常工作状态,第五判断模块211对比实际出水温度与预设出水温度的最低阈值,当实际出水温度低于预设出水温度的最低阈值时,作为可选的一种实施方式,进一步判断燃气热水器是否为最大负荷燃烧运行。当实际出水温度处于预设出水温度的范围时,热水器按当前状态运行,稳定输出热水。The fifth judging module 211 is used to judge whether the actual outlet water temperature is lower than the preset outlet water temperature under the normal state of the water heater, and if so, call the fourth judging module 210; if not, the water heater operates according to the current state and outputs hot water stably. At this time, the working state of the water heater is the normal working state. The fifth judging module 211 compares the actual outlet water temperature with the preset minimum threshold of the outlet water temperature. When the actual outlet water temperature is lower than the preset minimum outlet water temperature threshold, an optional In an embodiment, it is further judged whether the gas water heater is operating with maximum load combustion. When the actual outlet water temperature is within the range of the preset outlet water temperature, the water heater will run according to the current state and output hot water stably.

第六判断模块212用于热水器过渡状态下,判断所述实际出水温度是否小于所述预设出水温度,若是,调用啮合模块23;若否,则热水器按当前状态运行,稳定输出热水。此时燃气热水器的工作状态为过渡状态,降速模块26通过控制风机叶轮的转速下降,实际出水温度上升,第六判断模块212再次对比实际出水温度和预设出水温度的最低阈值,当实际出水温度低于预设出水温度的最低阈值时,燃气热水器进入低气压工作状态。当实际出水温度处于预设出水温度的范围时,热水器按当前状态运行,稳定输出热水。The sixth judging module 212 is used for judging whether the actual outlet water temperature is lower than the preset outlet water temperature in the transitional state of the water heater, and if so, calls the engagement module 23; At this time, the working state of the gas water heater is a transition state. The speed reduction module 26 controls the speed of the fan impeller to decrease, and the actual outlet water temperature rises. When the temperature is lower than the minimum threshold of the preset outlet water temperature, the gas water heater enters the low pressure working state. When the actual outlet water temperature is within the range of the preset outlet water temperature, the water heater will run according to the current state and output hot water stably.

第七判断模块213用于热水器低气压状态下,判断所述实际出水温度是否小于所述预设出水温度,若是,调用提示模块25;若否,则热水器按当前状态运行,稳定输出热水。此时燃气热水器的工作状态为低气压状态,啮合模块23通过燃气增压泵增加燃气压力后,实际出水温度上升,第七判断模块213再次对比实际出水温度和预设出水温度的最低阈值,当实际出水温度低于预设出水温度的最低阈值时,则提示模块25输出提示信息,提示信息用于表征燃气压力过低。当实际出水温度处于预设出水温度的范围时,热水器按当前状态运行,稳定输出热水。The seventh judging module 213 is used to judge whether the actual outlet water temperature is lower than the preset outlet water temperature when the water heater is in a low pressure state, and if so, call the prompt module 25; At this time, the working state of the gas water heater is a low pressure state. After the engagement module 23 increases the gas pressure through the gas booster pump, the actual outlet water temperature rises. The seventh judging module 213 compares the actual outlet water temperature with the preset minimum threshold of the outlet water temperature again. When the actual outlet water temperature is lower than the preset minimum threshold of the outlet water temperature, the prompt module 25 outputs prompt information, and the prompt information is used to indicate that the gas pressure is too low. When the actual outlet water temperature is within the range of the preset outlet water temperature, the water heater will run according to the current state and output hot water stably.

实施例7Example 7

本实施例提供一种燃气热水器,包括实施例6的燃气热水器控制系统,如图9所示,该燃气热水器包括主控器31、风压传感器32、水流传感器33、进水温度传感器34、燃气比例阀35、出水温度传感器36、风机37、燃气增压泵38、燃烧器39和换热器310。This embodiment provides a gas water heater, including the gas water heater control system of Embodiment 6. As shown in FIG. Proportional valve 35, outlet water temperature sensor 36, fan 37, gas booster pump 38, burner 39 and heat exchanger 310.

具体地,主控器31分别与风压传感器32、水流传感器22、进水温度传感器34、燃气比例阀35、出水温度传感器36、风机37和燃气增压泵310电连接;进水温度传感器34和水流传感器33设置在燃气热水器的进水管道上,出水温度传感器36设置在燃气热水器的出水管道上。正常状态下,使用燃气热水器时,冷水从进水管道流入,水流传感器33检测到进水流量并发送给主控器31,进水温度传感器34检测到进水温度并发送给主控器31,主控器31根据进水流量、进水温度以及用户预设的出水温度计算出热水器的理论热负荷,并根据理论热负荷确定风机初始转速后启动风机37,同时打开燃气比例阀35。风机37和燃气比例阀35分别将空气和燃气送入燃烧器39内燃烧,燃烧器39产生的热量传递给换热器310,冷水经过换热器310后变成热水,热水从出水管道流出,出水温度传感器36检测到实际出水温度并发送给主控器31。Specifically, the main controller 31 is electrically connected to the wind pressure sensor 32, the water flow sensor 22, the water inlet temperature sensor 34, the gas proportional valve 35, the water outlet temperature sensor 36, the fan 37 and the gas booster pump 310; the water inlet temperature sensor 34 The water flow sensor 33 is arranged on the water inlet pipe of the gas water heater, and the outlet water temperature sensor 36 is arranged on the water outlet pipe of the gas water heater. Under normal conditions, when using a gas water heater, cold water flows in from the water inlet pipe, the water flow sensor 33 detects the water flow rate and sends it to the main controller 31, the water inlet temperature sensor 34 detects the water inlet temperature and sends it to the main controller 31, The main controller 31 calculates the theoretical heat load of the water heater according to the water inlet flow rate, the water inlet temperature, and the user-preset water outlet temperature, and determines the initial speed of the fan according to the theoretical heat load to start the fan 37 and open the gas proportional valve 35 at the same time. Fan 37 and gas proportional valve 35 respectively send air and gas into burner 39 for combustion, the heat generated by burner 39 is transferred to heat exchanger 310, cold water becomes hot water after passing through heat exchanger 310, and hot water flows from the outlet pipe Outflow, the outlet water temperature sensor 36 detects the actual outlet water temperature and sends it to the main controller 31.

主控器31根据进水流量、进水温度以及实际出水温度计算出热水器的实际热负荷,对比实际热负荷和理论热负荷,作为可选的另一种实施方式,主控器31对比实际出水温度和预设出水温度的最低阈值。当实际热负荷或实际出水温度满足热水需求后,稳定输出热水。如果不满足热水需求,若主控器31监测到燃气热水器非最大燃烧负荷燃烧运行,则主控器31控制燃气比例阀35增加燃气的供气量,从而提高燃气热水器的燃烧负荷。在控制燃气比例阀的过程中,主控器31继续判断实际热负荷是否达到理论热负荷或实际出水温度是否达到预设出水温度的最低阈值,当条件满足后,热水器稳定输出热水;若燃气热水器为最大燃烧负荷燃烧运行,即燃气比例阀35调整至最大开度,仍然无法满足热水需求,则判断为燃气管压力不足,主控器31控制风机37降低运行转速,从而减少风量。The main controller 31 calculates the actual heat load of the water heater according to the water inlet flow rate, the water inlet temperature and the actual water outlet temperature, and compares the actual heat load with the theoretical heat load. As another optional embodiment, the main controller 31 compares the actual water outlet temperature and preset the minimum threshold of outlet water temperature. When the actual heat load or the actual outlet water temperature meets the hot water demand, the hot water will be output stably. If the demand for hot water is not met, if the main controller 31 detects that the gas water heater is not burning at the maximum combustion load, the main controller 31 controls the gas proportional valve 35 to increase the gas supply, thereby increasing the combustion load of the gas water heater. During the process of controlling the gas proportional valve, the main controller 31 continues to judge whether the actual heat load reaches the theoretical heat load or whether the actual outlet water temperature reaches the minimum threshold of the preset outlet water temperature. When the conditions are met, the water heater outputs hot water stably; The water heater operates at the maximum combustion load, that is, the gas proportional valve 35 is adjusted to the maximum opening, but still cannot meet the hot water demand, then it is judged that the pressure of the gas pipe is insufficient, and the main controller 31 controls the fan 37 to reduce the operating speed, thereby reducing the air volume.

主控器31继续判断实际热负荷是否达到理论热负荷或实际出水温度是否达到预设出水温度的最低阈值,当条件满足后,热水器稳定输出热水。若风机37转速下降后,仍然无法满足热水需求,主控器31启动燃气增压泵38,给燃气增加压力,以弥补燃气压力不足。The main controller 31 continues to judge whether the actual heat load reaches the theoretical heat load or whether the actual outlet water temperature reaches the minimum threshold of the preset outlet water temperature. When the condition is met, the water heater outputs hot water stably. If the hot water demand cannot be met after the speed of the fan 37 drops, the main controller 31 starts the gas booster pump 38 to increase the pressure of the gas to make up for the lack of gas pressure.

若燃气增压泵38增大燃气压力后,若仍然无法满足热水需求,则通过显示板输出燃气压力低的提示信息,从而通知人工检修燃气管道或燃气热水器等,避免用户在用水过程中出现困扰。If the gas booster pump 38 increases the gas pressure, if still unable to meet the hot water demand, the display panel will output a low gas pressure prompt message, thereby notifying manual maintenance of gas pipelines or gas water heaters, etc. troubled.

在本实施中,燃气热水器多次反馈热负荷或温度,并在不同反馈下实行不同的处理方案,避免不必要的能耗,提高了用户体验。通过热水器的热负荷和温度判断供气压力是否充足,使低气压判断条件量化,程序运行准确度提高,避免燃气热水器误进入低气压状态,并在低气压状态下,降低了风量,提高了燃气动力,增大低气压状态下燃烧热负荷,有效提高低气压下用户洗浴舒适度。In this implementation, the gas water heater feeds back heat load or temperature multiple times, and implements different processing schemes under different feedbacks, avoiding unnecessary energy consumption and improving user experience. Judging whether the gas supply pressure is sufficient by the heat load and temperature of the water heater, quantifying the conditions for judging low air pressure, improving the accuracy of the program operation, preventing the gas water heater from entering the low air pressure state by mistake, and reducing the air volume in the low air pressure state, improving the gas consumption. Power, increase the combustion heat load under low pressure, effectively improve the user's bathing comfort under low pressure.

虽然以上描述了本发明的具体实施方式,但是本领域的技术人员应当理解,这仅是举例说明,本发明的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本发明的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更和修改均落入本发明的保护范围。Although the specific implementation of the present invention has been described above, those skilled in the art should understand that this is only an example, and the protection scope of the present invention is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principle and essence of the present invention, but these changes and modifications all fall within the protection scope of the present invention.

Claims (15)

1. The control method of the gas water heater is applied to the gas water heater, the gas water heater comprises a fan motor and a fan impeller, the fan motor drives the fan impeller to rotate, and the control method of the gas water heater is characterized by further comprising a booster pump impeller coaxial with the fan impeller, and comprises the following steps of:
s11, judging whether the actual heat load is smaller than the theoretical heat load, if so, executing the step S12;
s12, controlling the fan impeller to be meshed with the booster pump impeller so that the fan impeller drives the booster pump impeller to rotate.
2. The gas water heater control method according to claim 1, further comprising, after step S12:
s13, judging whether the actual heat load is smaller than the theoretical heat load, if so, executing the step S14;
s14, outputting prompt information, wherein the prompt information is used for representing that the gas pressure is low and manual overhaul is needed.
3. The gas water heater control method according to claim 1, wherein if the determination condition in step S11 is yes, step S111 is performed first, including:
s111, controlling the rotating speed of the fan to be reduced to a preset threshold value;
And S112, judging whether the actual heat load is smaller than the theoretical heat load, if so, executing the step S12.
4. The gas water heater control method according to claim 1, characterized by comprising, before step S11:
s101, acquiring the water inlet temperature, water flow and actual water outlet temperature of the gas water heater;
s102, calculating to obtain the theoretical heat load according to the water inlet temperature, the water flow and a preset water outlet temperature;
s103, calculating to obtain the actual heat load according to the water inlet temperature, the water flow and the actual water outlet temperature.
5. The gas water heater control method according to claim 3, wherein if the determination condition in step S11 is yes, step S1101 is executed first, comprising:
s1101, judging whether the actual heat load is the maximum combustion load, if so, executing step S111; if not, executing step S1102;
s1102, the actual heat load is increased to the maximum combustion load, and then the process returns to step S11.
6. The gas water heater control method according to claim 1, wherein if the determination condition in step S11 is yes, step S110 is performed first, comprising:
S110, judging whether the actual water outlet temperature is smaller than the preset water outlet temperature, if so, executing the step S12; then step S13' is performed;
s13', judging whether the actual water outlet temperature is smaller than the preset water outlet temperature, if so, executing the step S14;
s14, outputting prompt information, wherein the prompt information is used for representing that the gas pressure is low and manual overhaul is needed.
7. The gas water heater control method according to claim 6, wherein if the determination condition in step S110 is yes, step S111 is performed first, comprising:
s111, controlling the rotating speed of the fan to be reduced to a preset threshold value;
s112', judging whether the actual water outlet temperature is smaller than the preset water outlet temperature, if so, executing the step S12.
8. The utility model provides a gas heater control system, is applied to gas heater, gas heater includes fan motor and fan impeller, fan motor drive fan impeller rotates, its characterized in that, gas heater still include with the coaxial booster pump impeller of fan impeller, gas heater system includes first judgement module and meshing module:
the first judging module is used for judging whether the actual heat load is smaller than the theoretical heat load or not, and if yes, the meshing module is called;
The meshing module is used for controlling the fan impeller to mesh with the booster pump impeller so that the fan impeller drives the booster pump impeller to rotate.
9. The gas water heater control system of claim 8, further comprising a second determination module and a prompt module:
the second judging module is used for judging whether the actual heat load is smaller than the theoretical heat load or not, and if yes, a prompting module is called;
the prompt module is used for outputting prompt information, and the prompt information is used for representing that the gas pressure is low and manual overhaul is needed.
10. The gas water heater control system of claim 8, further comprising a speed reduction module and a third determination module:
the first judging module is also used for calling the speed reducing module when the judging result is yes;
the speed reducing module is used for controlling the rotating speed of the fan to reach a preset threshold value;
and the third judging module is used for judging whether the actual heat load is smaller than the theoretical heat load or not, and if yes, the meshing module is called.
11. The gas water heater control system of claim 8, further comprising an acquisition module, a first calculation module, and a second calculation module:
The acquisition module is used for acquiring the water inlet temperature, the water flow and the actual water outlet temperature of the gas water heater;
the first calculation module is used for calculating the theoretical heat load according to the water inlet temperature, the water flow and the preset water outlet temperature;
the second calculation module is used for calculating the actual heat load according to the water inlet temperature, the water flow and the actual water outlet temperature.
12. The gas water heater control system of claim 10, further comprising a fourth determination module and a load adjustment module:
the fourth judging module is used for judging whether the actual heat load is the maximum combustion load, if yes, the speed reducing module is called, and if not, the load adjusting module is called;
the load adjustment module is used for increasing the actual heat load to the maximum combustion load and then calling the first judgment module.
13. The gas water heater control system of claim 8, further comprising a fifth determination module, a sixth determination module, and a prompt module:
the first judging module is further used for calling the fifth judging module when the judging result is yes;
The fifth judging module is used for judging whether the actual water outlet temperature is smaller than the preset water outlet temperature, and if yes, the meshing module is called;
the sixth judging module is used for judging whether the actual water outlet temperature is smaller than the preset water outlet temperature, and if yes, the prompting module is called;
the prompt module is used for outputting prompt information, and the prompt information is used for representing that the gas pressure is low and manual overhaul is needed.
14. The gas water heater control system of claim 13, further comprising a speed reduction module and a seventh determination module:
the fifth judging module is further used for calling the speed reducing module when the judging result is yes;
the speed reducing module is used for controlling the rotating speed of the fan to reach a preset threshold value;
and the seventh judging module is used for judging whether the actual water outlet temperature is smaller than the preset water outlet temperature, and if yes, calling the meshing module.
15. A gas water heater comprising a gas water heater control system as claimed in any one of claims 7 to 14.
CN202111482695.8A 2021-12-07 2021-12-07 Gas water heater control method, system and gas water heater Withdrawn CN116242033A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111482695.8A CN116242033A (en) 2021-12-07 2021-12-07 Gas water heater control method, system and gas water heater

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111482695.8A CN116242033A (en) 2021-12-07 2021-12-07 Gas water heater control method, system and gas water heater

Publications (1)

Publication Number Publication Date
CN116242033A true CN116242033A (en) 2023-06-09

Family

ID=86622923

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111482695.8A Withdrawn CN116242033A (en) 2021-12-07 2021-12-07 Gas water heater control method, system and gas water heater

Country Status (1)

Country Link
CN (1) CN116242033A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117167984A (en) * 2023-09-27 2023-12-05 广东万和新电气股份有限公司 Gas water heater boost control method, gas water heater and storage medium

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117167984A (en) * 2023-09-27 2023-12-05 广东万和新电气股份有限公司 Gas water heater boost control method, gas water heater and storage medium

Similar Documents

Publication Publication Date Title
CN106440332B (en) Central gas water heater with memory alloy one-way valve
CN110186195B (en) Control method and control system of gas water heater
CN115654749B (en) Water pump control method for gas water heater
CN111503901B (en) Water quantity and power double-regulation electric water heater and control method thereof
CN110220313A (en) Gas water heater control method and gas water heater
CN206207717U (en) A kind of central fuel gas water heating device with memory alloy one-way valve
CN107238207A (en) Control method of gas water heater and gas water heater
CN110966770B (en) A control method of a pressurized gas water heater and a gas water heater
CN114636250B (en) Control method of hybrid energy gas water heater and gas water heater
CN106766186B (en) Hot water circulating device with straight-flow pump and control system thereof
CN108286788B (en) Control method of gas water heater with variable water production capacity and gas water heater
CN206300351U (en) A kind of hot water circulating device with straightway pump
CN114857783B (en) Control method capable of setting different power output of heating and bathroom and heating water heater
CN108759105B (en) A kind of electric water heater control method and water heater
CN116241491A (en) Gas booster device, gas water heater control method and system, and gas water heater
CN113669915A (en) Intelligent pressurization control method and system for gas water heater
CN106642716B (en) A gas water heater water proportional valve control method
CN114636248B (en) Gas water heater with anti-scalding function and control method thereof
CN202125993U (en) Comprehensive heating system for gas instant-heating type water heater of air source heat pump
CN111928489A (en) Self-adaptive method for temperature rise of gas water heater in circulating start-stop mode
CN211290527U (en) Wall-mounted furnace
CN115900088B (en) A gas water heater and its control method
CN202973355U (en) Household independent heating and domestic hot water supply control system
CN111426051A (en) A gas water heater with a flow limiting device and a control method thereof
CN113847742B (en) Control method for low-noise operation of water heater

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20230609