CN116180705A - A rammer and foundation dynamic compaction construction technology using the rammer - Google Patents

A rammer and foundation dynamic compaction construction technology using the rammer Download PDF

Info

Publication number
CN116180705A
CN116180705A CN202310257601.XA CN202310257601A CN116180705A CN 116180705 A CN116180705 A CN 116180705A CN 202310257601 A CN202310257601 A CN 202310257601A CN 116180705 A CN116180705 A CN 116180705A
Authority
CN
China
Prior art keywords
locking
plate
rammer
chassis
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202310257601.XA
Other languages
Chinese (zh)
Other versions
CN116180705B (en
Inventor
葛振坤
王飞
李春凯
潘纪超
赵建业
董皓卿
赵治彭
赵增坤
陈兴政
高兴光
吴广震
王强
王野
赵丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Jidong Construction Engineering Co ltd
Original Assignee
Hebei Jidong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Jidong Construction Engineering Co ltd filed Critical Hebei Jidong Construction Engineering Co ltd
Priority to CN202310257601.XA priority Critical patent/CN116180705B/en
Publication of CN116180705A publication Critical patent/CN116180705A/en
Application granted granted Critical
Publication of CN116180705B publication Critical patent/CN116180705B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/046Improving by compacting by tamping or vibrating, e.g. with auxiliary watering of the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D1/00Investigation of foundation soil in situ

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Soil Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Road Paving Machines (AREA)

Abstract

The utility model relates to a rammer and applied foundation dynamic compaction construction process of this rammer relates to the field of dynamic compaction equipment, and the rammer includes chassis and roof-plate, rotates on the chassis and is connected with the locking lever subassembly, the chassis has been placed near the one side of roof-plate and has been accepted the dish, the locking lever subassembly runs through accepting dish and roof, can dismantle on the locking lever subassembly and be connected with the mounting that supports tight roof and deviate from accepting the dish one side, accept the dish and deviate from the one side of chassis and pile up a plurality of hammer disks, every the hammer disk deviates from the mounting hole of rectangular shape has all been offered to the one side of chassis, fixedly connected with a plurality of locking plates on the locking lever subassembly, and a locking plate corresponds a mounting hole, and the locking plate is arranged in the mounting hole, and the arc wall has all been seted up to two rectangular lateral walls of mounting hole, rotates the locking lever subassembly, and the corresponding arc inslot is all inserted at the both ends of every locking plate. The application has the effect of improving the work efficiency of adjusting the weight of the rammer.

Description

一种夯锤及应用该夯锤的地基强夯施工工艺A rammer and foundation dynamic compaction construction technology using the rammer

技术领域technical field

本申请涉及强夯设备的领域,尤其是涉及一种夯锤及应用该夯锤的地基强夯施工工艺。The present application relates to the field of dynamic compaction equipment, in particular to a rammer and a foundation dynamic compaction construction process using the rammer.

背景技术Background technique

目前市场上使用的夯锤主要分有三种:铸造夯锤、灌装夯锤和片式组合夯锤。片式组合夯锤是将多个锤盘叠放,并用一根螺栓将所有锤盘连接固定,即螺栓从夯锤顶部直接穿到底部,这种方式通过调节锤盘的数量从而调节夯锤的重量。Currently, there are three main types of rammers used in the market: casting rammers, filling rammers and chip combination rammers. The chip combination rammer stacks multiple hammer discs and connects all the hammer discs with a bolt, that is, the bolts pass directly from the top of the rammer to the bottom. In this way, the number of hammer discs can be adjusted to adjust the weight.

然而当需要调整夯锤的重量时,工作人员必须将每个螺栓全部卸除后再进行添加锤盘或拆卸锤盘的作业,工作效率较低。However, when the weight of the rammer needs to be adjusted, the staff must remove all the bolts before adding the hammer plate or removing the hammer plate, and the work efficiency is low.

发明内容Contents of the invention

为了提高调整夯锤重量的工作效率,本申请提供一种夯锤及应用该夯锤的地基强夯施工工艺。In order to improve the working efficiency of adjusting the weight of the rammer, the present application provides a rammer and a foundation dynamic compaction construction process using the rammer.

第一方面,本申请提供的一种夯锤采用如下的技术方案:In the first aspect, a rammer provided by the application adopts the following technical solution:

一种夯锤,包括底盘和顶盘,底盘上转动连接有锁紧杆组件,所述底盘靠近顶盘的一面放置有承接盘,所述锁紧杆组件贯穿承接盘和顶板,锁紧杆组件上可拆卸连接有抵紧顶板背离承接盘一面的固定件,承接盘背离底盘的一面叠放有多个锤盘,每个所述锤盘背离底盘的一面均开设有长条形的安装孔,锁紧杆组件上固定连接有多个锁定板件,一个锁定板件对应一个安装孔,且锁定板件置于安装孔内,安装孔的两个长条侧壁均开设有弧形槽,转动锁紧杆组件,每个锁定板件的两端均插入相应的一弧形槽内。A tamper, comprising a chassis and a top plate, a locking rod assembly is rotatably connected to the chassis, a receiving plate is placed on the side of the chassis close to the top plate, the locking rod assembly runs through the receiving plate and the top plate, and the locking rod assembly The top plate is detachably connected with a fixing piece against the side of the top plate away from the receiving plate, and a plurality of hammer plates are stacked on the side of the receiving plate away from the chassis. A plurality of locking plates are fixedly connected to the locking rod assembly, one locking plate corresponds to one mounting hole, and the locking plate is placed in the mounting hole, the two long side walls of the mounting hole are provided with arc-shaped grooves, and the rotating As for the locking rod assembly, both ends of each locking plate are inserted into a corresponding arc-shaped groove.

通过采用上述技术方案,转动锁紧杆组件,锁紧杆组件转动带动锁定板件转动,锁定板组件的每一端均逐渐向靠近或远离相应弧形槽的方向运动。当锁定板件与弧形槽插接时,每个锁定板组件均将相应的锤盘锁紧。当锁定板件脱离弧形槽并完全置于安装孔内时,此时拆卸固定件,使顶板脱离锁紧杆组件,随后远离锁紧杆组件的方向移动锤盘,锤盘可脱离锁紧杆组件,此时便于增加或减少锤盘的数量。锤盘的锁定和拆卸方式较为简便,提高了调整夯锤重量的工作效率。By adopting the above technical solution, the locking rod assembly is rotated, and the rotation of the locking rod assembly drives the rotation of the locking plate, and each end of the locking plate assembly gradually moves toward or away from the corresponding arc-shaped groove. When the locking plate is plugged into the arc groove, each locking plate assembly locks the corresponding hammer plate. When the locking plate breaks away from the arc-shaped groove and is completely placed in the mounting hole, remove the fixing part at this time to separate the top plate from the locking lever assembly, and then move the hammer plate away from the locking lever assembly, and the hammer plate can be separated from the locking lever Assembly, at this time it is convenient to increase or decrease the number of hammer discs. The way of locking and dismounting the hammer plate is relatively simple, which improves the work efficiency of adjusting the weight of the rammer.

优选的,所述承接盘上安装有带动承接盘发生与锁紧杆组件反向转动的传动组件。Preferably, a transmission assembly is installed on the receiving plate to drive the receiving plate to rotate in the opposite direction to the locking lever assembly.

通过采用上述技术方案,当锁紧杆组件转动带动锁定板件逐渐向靠近弧形槽内的方向运动时,传动组件带动承接盘发生与锁紧杆组件反向的转动,便于锁定板件能够更加顺利的插入弧形槽内。By adopting the above technical scheme, when the rotation of the locking rod assembly drives the locking plate to gradually move towards the direction of the arc-shaped groove, the transmission assembly drives the receiving plate to rotate in the opposite direction to the locking rod assembly, so that the locking plate can be more Insert it into the arc groove smoothly.

优选的,所述承接盘靠近底盘的一面开设有承接槽,所述传动组件包括设置在承接槽内的从动齿轮和主动齿轮,所述主动齿轮安装在锁紧杆组件上,所述主动齿轮与从动齿轮啮合,从动齿轮与所述底盘转动连接,所述承接槽的侧壁固定连接有环形件,环形件的内侧壁固定连接有若干凸齿,所述从动齿轮与凸齿啮合。Preferably, a receiving groove is provided on the side of the receiving plate close to the chassis, the transmission assembly includes a driven gear and a driving gear arranged in the receiving groove, the driving gear is installed on the locking rod assembly, and the driving gear Mesh with the driven gear, the driven gear is connected to the chassis in rotation, the side wall of the receiving groove is fixedly connected with a ring piece, and the inner side wall of the ring piece is fixedly connected with a number of protruding teeth, and the driven gear meshes with the protruding teeth .

通过采用上述技术方案,锁紧杆组件转动带动主动齿轮转动,主动齿轮转动带动从动齿轮反向转动,从动齿轮转动通过凸齿带动承接盘与从动齿轮同向转动。如此锁紧杆组件转动时,传动组件可自动带动承接盘转动,操作简单便捷。By adopting the above technical solution, the rotation of the locking rod assembly drives the driving gear to rotate, the rotation of the driving gear drives the driven gear to rotate in reverse, and the rotation of the driven gear drives the receiving plate and the driven gear to rotate in the same direction through the convex teeth. In this way, when the locking rod assembly rotates, the transmission assembly can automatically drive the receiving plate to rotate, and the operation is simple and convenient.

优选的,所述锁紧杆组件与底盘螺纹连接。Preferably, the locking rod assembly is screwed to the chassis.

通过采用上述技术方案,锁紧杆组件转动从而带动锁定板件逐渐进入弧形槽内时,锁紧杆组件带动每个锁定板件逐渐向靠近底盘的方向运动,如此锁定板件在进入弧形槽的过程中,逐渐抵紧弧形槽的底壁,便于较好的锁紧每个锤盘。By adopting the above-mentioned technical solution, when the locking lever assembly rotates to drive the locking plate gradually into the arc groove, the locking lever assembly drives each locking plate to gradually move towards the chassis, so that the locking plate moves into the arc groove In the process of slotting, gradually press against the bottom wall of the arc-shaped slot, so as to better lock each hammer plate.

优选的,所述锁紧杆组件包括两端的固定杆和若干连接杆,每个连接杆的两端均固定连接有锁紧板,每个固定杆的一端也固定连接有锁紧板,相邻连接杆之间相邻的两个锁紧板可拆卸连接,每个固定杆上的锁紧板均与相邻连接杆上的其中一锁紧板可拆卸连接,相邻的两个锁紧板之间连接形成一个所述锁定板件。Preferably, the locking rod assembly includes fixed rods at both ends and several connecting rods, each connecting rod is fixedly connected with a locking plate at both ends, and one end of each fixed rod is also fixedly connected with a locking plate, adjacent The two adjacent locking plates between the connecting rods are detachably connected, and the locking plates on each fixed rod are detachably connected with one of the locking plates on the adjacent connecting rods, and the adjacent two locking plates The connection between them forms one said locking plate.

通过采用上述技术方案,相邻的锁紧板之间可拆卸连接,如此便于根据锤盘的数量,增减锁定板件的数量,控制每个锤盘均连接有将锤盘锁定的锁定板件即可。By adopting the above technical solution, adjacent locking plates can be detachably connected, so that it is convenient to increase or decrease the number of locking plates according to the number of hammer plates, and control each hammer plate to be connected with a locking plate for locking the hammer plate That's it.

优选的,所述顶盘、承接盘和每个锤盘上均开设有若干连孔,相邻的连孔之间对准,所述底盘靠近承接盘的一面开设有若干弧形孔,每个弧形孔均与相邻的连孔对准。Preferably, several connection holes are provided on the top plate, the receiving plate and each hammer plate, and the adjacent connecting holes are aligned, and a number of arc-shaped holes are opened on the side of the chassis close to the receiving plate, each The arc holes are all aligned with the adjacent connecting holes.

通过采用上述技术方案,相邻的连孔对准,且弧形孔与相邻的连孔对准,使夯锤竖向具有透气的功能,从而使夯锤下落锤击地面时,减少夯锤受气流的推动发生弹起或倾斜的情况发生。By adopting the above-mentioned technical scheme, the adjacent connection holes are aligned, and the arc-shaped holes are aligned with the adjacent connection holes, so that the rammer has the function of ventilation in the vertical direction, so that when the rammer falls and hits the ground, the vibration of the rammer is reduced. Propelled by the air flow to bounce or tilt occurs.

优选的,每个所述连孔内均滑动插接有连筒,每个弧形孔内均插接有传动筒,每个所述传动筒均与相邻的连筒对准,所述传动筒的外侧壁固定连接有滑环,所述弧形孔的两个侧壁均开设有滑槽,滑槽的下表壁逐渐向上倾斜,每个滑环的两侧分别与弧形孔内的一滑槽滑动插接。Preferably, a connecting cylinder is slidably inserted into each of the connecting holes, a transmission cylinder is inserted into each arc-shaped hole, and each of the transmission cylinders is aligned with the adjacent connecting cylinder. The outer wall of the cylinder is fixedly connected with a slip ring, and the two side walls of the arc-shaped hole are provided with chute, and the lower surface wall of the chute is gradually inclined upward, and the two sides of each slip ring are respectively connected with the arc-shaped hole. A chute for sliding insertion.

通过采用上述技术方案,转动锁紧杆组件时,锁紧杆组件通过传动组件带动承接盘转动,承接盘转动则推动传动筒沿弧形孔运动,在此过程中,滑槽的底壁推动滑环和传动筒逐渐上升。传动筒上升从而伸入相邻的连孔内,如此推动相邻连孔中的连筒上升。位于夯锤最上方连筒伸入夯锤,如此在夯锤上继续叠加锤盘时,连筒能够起到定位的效果。By adopting the above technical solution, when the locking rod assembly is rotated, the locking rod assembly drives the receiving plate to rotate through the transmission assembly, and the rotating of the receiving plate pushes the transmission cylinder to move along the arc-shaped hole. During this process, the bottom wall of the chute pushes the sliding The ring and the drive cylinder rise gradually. The transmission cylinder rises so as to extend into the adjacent connection hole, thus pushing the connection cylinder in the adjacent connection hole to rise. The connecting cylinder located at the top of the rammer extends into the rammer, so that when the hammer plate continues to be superimposed on the rammer, the connecting cylinder can play a positioning effect.

第二方面,本申请提供的一种应用该夯锤的地基强夯施工工艺采用如下的技术方案:In the second aspect, a foundation dynamic compaction construction process using the rammer provided by the present application adopts the following technical scheme:

一种应用该夯锤的地基强夯施工工艺,包括如下步骤:A foundation dynamic compaction construction technique using the rammer, comprising the following steps:

S1、清理并整平场地;S1. Clean up and level the site;

S2、做好控制桩;S2. Do a good job of controlling piles;

S3、夯机就位;S3, the rammer is in place;

S4、将夯锤平稳提起至夯点位置,测量夯前锤定高程;S4. Steadily lift the tamper to the position of the ramming point, and measure the height of the hammer before ramming;

S5、起吊夯锤至预设高度,夯锤自动脱钩下落夯击击点,测量锤顶高程,记录夯坑下沉量;S5. Lift the rammer to the preset height, the rammer is automatically unhooked and falls to the ramming impact point, the height of the hammer top is measured, and the sinking amount of the ramming pit is recorded;

S6、重复步骤S5;S6, repeat step S5;

S7、夯锤移位到下一个夯点,重复步骤S3-S5;S7, the rammer is shifted to the next tamping point, and steps S3-S5 are repeated;

S8、测量场地高程,放出满夯基准线;S8, measure the elevation of the site, and release the full ramming reference line;

S9、按照夯印搭接的原则逐点夯击,完成全部夯击数;S9. Ramping point by point according to the principle of stamping and overlapping, and completing all the number of ramming;

S10、逐排夯击,完成满夯,场地平整,测量场地高程。S10, tamping row by row to complete full tamping, the site is level, and the elevation of the site is measured.

通过采用上述技术方案,施工效率较高,强夯效果较好,且较为节约施工成本,施工工期较短。By adopting the above technical scheme, the construction efficiency is high, the dynamic compaction effect is good, and the construction cost is relatively saved, and the construction period is short.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

1.锤盘的锁定和拆卸方式较为简便,提高了调整夯锤重量的工作效率;1. The locking and dismounting method of the hammer plate is relatively simple, which improves the working efficiency of adjusting the weight of the rammer;

2.在拆装锤盘的过程中,连筒能够起到定位的效果;2. In the process of disassembling and assembling the hammer plate, the connecting cylinder can play the role of positioning;

3.强夯的施工效率较高,施工工期较短。3. The construction efficiency of dynamic compaction is high, and the construction period is short.

附图说明Description of drawings

图1是本申请实施例体现锁紧杆组件未锁紧锤盘的结构示意图。FIG. 1 is a schematic structural view of an embodiment of the present application showing that the locking rod assembly does not lock the hammer plate.

图2是本申请实施例体现锁紧杆组件锁紧锤盘的结构示意图。Fig. 2 is a schematic structural view of locking the hammer plate by the locking rod assembly according to the embodiment of the present application.

图3是本申请实施例体现传动组件的结构示意图。FIG. 3 is a schematic structural diagram of a transmission assembly embodied in an embodiment of the present application.

图4是本申请实施例体现锁紧杆组件锁紧锤盘时传动筒位置的结构示意图。Fig. 4 is a structural schematic diagram showing the position of the transmission cylinder when the locking lever assembly locks the hammer plate according to the embodiment of the present application.

图5是本申请实施例体现锁紧杆组件未锁紧锤盘时传动筒位置的结构示意图。Fig. 5 is a structural schematic diagram showing the position of the transmission cylinder when the locking lever assembly does not lock the hammer plate according to the embodiment of the present application.

附图标记说明:1、底盘;2、承接盘;21、承接槽;3、顶盘;4、锁紧杆组件;41、锁定板件;411、连接杆;412、锁紧板;42、固定杆;43、联动键;5、锤盘;51、安装孔;52、弧形槽;6、传动组件;61、从动齿轮;62、主动齿轮;621、插接通孔;622、联动槽;63、环形件;7、通气孔;71、连孔;72、弧形孔;721、滑槽;8、连筒;9、传动筒;91、滑环。Description of reference signs: 1, chassis; 2, receiving plate; 21, receiving groove; 3, top plate; 4, locking rod assembly; 41, locking plate; 411, connecting rod; 412, locking plate; 42, Fixed rod; 43, linkage key; 5, hammer plate; 51, mounting hole; 52, arc groove; 6, transmission assembly; 61, driven gear; 62, driving gear; 621, insertion hole; 622, linkage Groove; 63, ring piece; 7, ventilation hole; 71, connecting hole; 72, arc-shaped hole; 721, chute; 8, connecting cylinder; 9, transmission cylinder; 91, slip ring.

具体实施方式Detailed ways

以下结合附图1-图5对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-5.

本申请实施例公开一种夯锤。参照图1,夯锤包括由下至上依次设置的底盘1、承接盘2和顶盘3,底盘1的中部转动连接有竖直向上设置的锁紧杆组件4,锁紧杆组件4竖向贯穿承接盘2和顶盘3。锁紧杆组件4上可拆卸连接有固定件,固定件包括与锁紧杆组件4上端螺纹连接的螺母(图中未画出),螺母紧抵顶盘3的上表面。The embodiment of the present application discloses a rammer. Referring to Fig. 1, the tamper includes a chassis 1, a receiving pan 2 and a top pan 3 arranged sequentially from bottom to top. The middle part of the chassis 1 is rotatably connected with a locking rod assembly 4 arranged vertically upward, and the locking rod assembly 4 vertically penetrates Accept plate 2 and top plate 3. The locking rod assembly 4 is detachably connected with a fixing piece, and the fixing piece includes a nut (not shown) that is threadedly connected to the upper end of the locking rod assembly 4 , and the nut is tightly against the upper surface of the top plate 3 .

参照图1和图2,承接盘2放置在底盘1上,顶盘3与承接盘2之间设有多个锤盘5,每个锤盘5的上表面均开设有竖向贯通锤盘5的安装孔51,锁紧杆组件4与每个安装孔51插接从而将多个锤盘5竖向串联。Referring to Figures 1 and 2, the receiving plate 2 is placed on the chassis 1, and a plurality of hammer plates 5 are arranged between the top plate 3 and the receiving plate 2, and the upper surface of each hammer plate 5 is provided with a hammer plate 5 vertically penetrating through it. The locking rod assembly 4 is plugged into each mounting hole 51 so as to vertically connect multiple hammer plates 5 in series.

安装孔51为长条形孔,安装孔51的两个长条侧壁分别开设有弧形槽52,锁紧杆组件4包括多个锁定板件41,多个锁定板件41沿锁紧杆组件4的长度方向排列,一个锁定板件41对应一个安装孔51,且每个锁定板件41均插接在相应的安装孔51内。转动锁紧杆组件4,锁紧杆组件4转动带动每个锁定板件41转动,如此每个锁定板件41的两端分别转动进入每个安装孔51侧壁相应的弧形槽52内。即每个锁定板件41的一端均与相应的弧形槽52插接,此时锁紧杆组件4将每个锤盘5锁紧。The mounting hole 51 is a strip-shaped hole, and the two strip side walls of the mounting hole 51 are respectively provided with arc-shaped grooves 52. The locking rod assembly 4 includes a plurality of locking plates 41, and the plurality of locking plates 41 are arranged along the locking rod. The components 4 are arranged along the length direction, one locking plate 41 corresponds to one mounting hole 51 , and each locking plate 41 is plugged into the corresponding mounting hole 51 . Rotate the locking lever assembly 4, the locking lever assembly 4 rotates to drive each locking plate 41 to rotate, so that the two ends of each locking plate 41 respectively rotate into the corresponding arc groove 52 on the side wall of each mounting hole 51 . That is, one end of each locking plate 41 is plugged into the corresponding arc-shaped groove 52 , and at this time, the locking lever assembly 4 locks each hammer plate 5 .

锁紧杆组件4包括两端的固定杆42,还包括多个连接杆411,每个连接杆411的两端分别固定连接有锁紧板412,每个固定杆42的一端也固定连接有锁紧板412。每个连接杆411上的其中一锁紧板412均与相邻连接杆411上的其中一锁紧板412通过螺栓螺母固定连接,每个固定杆42上的锁紧板412均与相邻连接杆411上的其中一锁紧板412通过螺栓螺母固定连接。相邻的两个锁紧板412之间固定连接后形成一个锁定板件41。The locking rod assembly 4 includes fixed rods 42 at both ends, and also includes a plurality of connecting rods 411, the two ends of each connecting rod 411 are respectively fixedly connected with a locking plate 412, and one end of each fixed rod 42 is also fixedly connected with a locking plate 412. plate 412. One of the locking plates 412 on each connecting rod 411 is fixedly connected with one of the locking plates 412 on the adjacent connecting rod 411 through bolts and nuts, and the locking plate 412 on each fixed rod 42 is connected with the adjacent One of the locking plates 412 on the rod 411 is fixedly connected by bolts and nuts. Two adjacent locking plates 412 are fixedly connected to form a locking plate 41 .

当需要调节锤盘5的数量时,转动锁紧杆组件4上的螺母,使螺母逐渐脱离顶盘3并脱离锁紧杆组件4。随后向上移动顶盘3直至顶盘3脱离锁紧杆组件4,再旋转锁紧杆组件4,使锁紧杆组件4带动每个锁定板件41均脱离相应的弧形槽52并完全进入安装孔51内。此时可拉动最上端的锤盘5脱离夯锤从而减少锤盘5的数量,锤盘5的数量减少后,再根据拆卸锤盘5的数量从而拆卸最上端的连接杆411。同理,从夯锤的最上端增加锤盘5的数量,再根据增加锤盘5的数量从而安装连接杆411,使每个锤盘5都有相对应的锁定板件41。When the number of hammer plates 5 needs to be adjusted, the nut on the locking rod assembly 4 is rotated so that the nut is gradually separated from the top plate 3 and the locking rod assembly 4 . Then move the top plate 3 upwards until the top plate 3 breaks away from the locking lever assembly 4, and then rotate the locking lever assembly 4, so that the locking lever assembly 4 drives each locking plate 41 to break away from the corresponding arc groove 52 and fully enter the installation. Inside the hole 51. At this moment, the uppermost hammer disc 5 can be pulled away from the rammer to reduce the number of hammer discs 5. After the number of hammer discs 5 is reduced, the uppermost connecting rod 411 can be disassembled according to the number of hammer discs 5 to be removed. Similarly, increase the number of hammer plates 5 from the uppermost end of the rammer, and then install connecting rods 411 according to increasing the number of hammer plates 5 , so that each hammer plate 5 has a corresponding locking plate 41 .

锁紧杆组件4的下端与底盘1螺纹连接,当旋转锁紧杆组件4带动每个锁定板件41均逐渐插入相应的弧形槽52内的过程中,锁紧杆组件4逐渐向下移动。 此时每个锁定板件41均在插入弧形槽52内的过程中,逐渐抵紧弧形槽52的底壁。The lower end of the locking rod assembly 4 is threadedly connected with the chassis 1. When the rotating locking rod assembly 4 drives each locking plate 41 to be gradually inserted into the corresponding arc-shaped groove 52, the locking rod assembly 4 gradually moves downward. . At this time, each locking plate 41 is gradually pressed against the bottom wall of the arc-shaped slot 52 during the process of being inserted into the arc-shaped slot 52 .

参照图2和图3,为了便于锁定板件41能够较为顺利的转动并插入相应的弧形槽52内,承接盘2上连接有传动组件6,当锁紧杆组件4转动时,传动组件6带动承接盘2与锁紧杆组件4反向转动,如此便于锁定板件41插入相应的弧形槽52内并抵紧弧形槽52的底壁,减少锁定板件41伸入弧形槽52内的过程中通过摩擦力推动弧形槽52的底壁,致使锁定板件41不易进入弧形槽52内的情况发生。Referring to Figures 2 and 3, in order to facilitate the smooth rotation of the locking plate 41 and insert it into the corresponding arc-shaped groove 52, the receiving plate 2 is connected with a transmission assembly 6, when the locking lever assembly 4 rotates, the transmission assembly 6 Drive the receiving plate 2 and the locking rod assembly 4 to rotate in the opposite direction, so that the locking plate 41 is inserted into the corresponding arc groove 52 and pressed against the bottom wall of the arc groove 52, reducing the locking plate 41 extending into the arc groove 52 During the inner process, the bottom wall of the arc-shaped groove 52 is pushed by friction force, so that the locking plate 41 is not easy to enter into the arc-shaped groove 52 .

参照图1和图3,承接盘2的底面开设有承接槽21,承接槽21的侧壁固定连接有环形件63,传动组件6包括在环形件63内设置的三个从动齿轮61和一个主动齿轮62,锁紧杆组件4的侧壁上固定连接有两个联动键43,主动齿轮62的上表面开设有插接通孔621,插接通孔621的侧壁开设有联动槽622。锁紧杆组件4与插接通孔621插接,且每个联动键43均与相应的一个联动槽622插接。Referring to Fig. 1 and Fig. 3, the bottom surface of the receiving plate 2 is provided with a receiving groove 21, and the side wall of the receiving groove 21 is fixedly connected with a ring member 63, and the transmission assembly 6 includes three driven gears 61 and a The driving gear 62 is fixedly connected with two linkage keys 43 on the side wall of the locking rod assembly 4 , the upper surface of the driving gear 62 is provided with an insertion hole 621 , and the side wall of the insertion hole 621 is provided with a linkage groove 622 . The locking rod assembly 4 is inserted into the insertion hole 621 , and each linkage key 43 is inserted into a corresponding linkage groove 622 .

主动齿轮62位于三个从动齿轮61之间,且每个从动齿轮61均与底盘1的上表面转动连接,主动齿轮62与每个从动齿轮61均啮合。环形件63的内侧壁固定连接有若干凸齿,若干凸齿沿环形件63的内侧壁均布,每个从动齿轮61均与承接槽21上的凸齿啮合。The driving gear 62 is located between the three driven gears 61 , and each driven gear 61 is rotatably connected to the upper surface of the chassis 1 , and the driving gear 62 meshes with each driven gear 61 . A plurality of protruding teeth are fixedly connected to the inner wall of the ring member 63 , and the plurality of protruding teeth are uniformly distributed along the inner wall of the ring member 63 , and each driven gear 61 meshes with the protruding teeth on the receiving groove 21 .

参照图2和图3,转动锁紧杆组件4,锁紧杆组件4转动则通过联动键43带动主动齿轮62转动,主动齿轮62转动带动每个从动齿轮61转动,从动齿轮61与主动齿轮62的转向相反。从动齿轮61转动则通过凸齿带动承接盘2转动,承接盘2与从动齿轮61转向相同。承接盘2转动即可通过摩擦力带动每个锤盘5与承接盘2一同转动,如此锁定板件41即可与弧形槽52朝相向的方向运动,便于每个锁定板件41较为顺利的插入相应的弧形槽52内。Referring to Fig. 2 and Fig. 3, rotate the locking lever assembly 4, the locking lever assembly 4 rotates and then drives the driving gear 62 to rotate through the linkage key 43, and the driving gear 62 rotates to drive each driven gear 61 to rotate, and the driven gear 61 and the driving gear 61 rotate. The rotation of gear 62 is reversed. The driven gear 61 rotates and then drives the receiving disc 2 to rotate through the convex teeth, and the receiving disc 2 and the driven gear 61 turn to the same direction. The rotation of the receiving plate 2 can drive each hammer plate 5 to rotate together with the receiving plate 2 through friction, so that the locking plate 41 can move in the opposite direction with the arc groove 52, so that each locking plate 41 can move smoothly. Insert into the corresponding arc groove 52.

参照图1和图3,夯锤的顶面开设有若干竖向贯穿夯锤的通气孔7,每个通气孔7均包括在顶盘3、承接盘2和每个锤盘5的上表面开设的连孔71,还包括在底盘1的上表面开设的弧形孔72。Referring to Figure 1 and Figure 3, the top surface of the rammer is provided with a number of ventilation holes 7 vertically penetrating the rammer, and each ventilation hole 7 includes openings on the upper surface of the top plate 3, the receiving plate 2 and each hammer plate 5. The connecting hole 71 also includes an arc-shaped hole 72 opened on the upper surface of the chassis 1 .

每个连孔71内均竖向滑动连接有连筒8,竖向相邻的连筒8之间相互对准。弧形孔72内插接有传动筒9,每个传动筒9均与竖向相邻的连筒8对准。传动筒9的外侧壁固定连接有滑环91,每个弧形孔72的两个侧壁均开设有滑槽721,滑环91的两端分别与一滑槽721滑动插接。每个滑槽721的下表壁均逐渐向上倾斜。Each connecting hole 71 is vertically slidably connected with a connecting cylinder 8 , and vertically adjacent connecting cylinders 8 are aligned with each other. A transmission cylinder 9 is inserted into the arc-shaped hole 72 , and each transmission cylinder 9 is aligned with the vertically adjacent connecting cylinder 8 . A slip ring 91 is fixedly connected to the outer side wall of the transmission cylinder 9 , and two side walls of each arc-shaped hole 72 are provided with chute 721 , and two ends of the slip ring 91 are slidably inserted into a chute 721 respectively. The lower surface wall of each chute 721 is gradually inclined upward.

参照图2和图4,当每个锁定板件41与相应的弧形槽52插接时,此时滑环91位于滑槽721斜面的最低处。转动锁紧杆组件4时,锁紧杆组件4通过传动组件6带动承接盘2与锁紧杆组件4反向转动,此时滑槽721的斜面推动滑环91和传动筒9上升。如此传动筒9的上端插入相邻的连孔71内,传动筒9推动每个连筒8均上升。Referring to FIG. 2 and FIG. 4 , when each locking plate 41 is inserted into the corresponding arc-shaped groove 52 , the slip ring 91 is located at the lowest point of the slope of the slide groove 721 . When the locking rod assembly 4 is rotated, the locking rod assembly 4 drives the receiving plate 2 and the locking rod assembly 4 to reversely rotate through the transmission assembly 6, and the slope of the chute 721 pushes the slip ring 91 and the transmission cylinder 9 to rise. In this way, the upper end of the transmission cylinder 9 is inserted into the adjacent connection hole 71, and the transmission cylinder 9 pushes each connection cylinder 8 to rise.

参照图1和图5,即当锁定板件41脱离与相应的弧形槽52插接,每个连筒8的上端均插入上方相邻的连孔71内。位于夯锤最上方的连筒8上端凸出于夯锤,此时需要安装锤盘5时,凸出的连筒8便于起到定位的作用,利于将需要安装的锤盘5中的连孔71与相邻的连孔71对准。且转动锁紧杆组件4使得锤盘5被锁紧的过程中,每个锤盘5上的连筒8与上方相邻锤盘5中的连孔71插接,利于承接盘2较为顺利的带动每个锤盘5共同转动。Referring to FIG. 1 and FIG. 5 , that is, when the locking plate 41 is disengaged from the corresponding arc-shaped slot 52 , the upper end of each connecting cylinder 8 is inserted into the upper adjacent connecting hole 71 . The upper end of the connecting cylinder 8 located at the top of the rammer protrudes from the rammer. When the hammer plate 5 needs to be installed at this time, the protruding connecting cylinder 8 is convenient for positioning, which is beneficial to align the connecting holes in the hammer plate 5 to be installed. 71 is aligned with the adjacent connection hole 71. And during the process of rotating the locking lever assembly 4 so that the hammer plate 5 is locked, the connecting cylinder 8 on each hammer plate 5 is inserted into the connecting hole 71 in the upper adjacent hammer plate 5, which is beneficial to the smooth operation of the receiving plate 2. Drive each hammer disc 5 to rotate together.

本申请实施例还公开一种应用该夯锤的地基强夯施工工艺,包括如下步骤:The embodiment of the present application also discloses a foundation dynamic compaction construction process using the rammer, which includes the following steps:

S1、清理并整平场地:根据试夯的最佳参数及检测结果,采取适合的点夯、满夯施工工艺。S1. Clean up and level the site: According to the best parameters and test results of the test ramming, adopt suitable spot ramming and full ramming construction techniques.

S2、做好控制桩,将控制基准点设在固定不易改变的位置,用白灰标出每一夯击点的夯锤外围轮廓,并测量场地高程。S2. Prepare the control pile, set the control reference point at a fixed and difficult-to-change position, mark the outer contour of the rammer at each ramming point with white ash, and measure the elevation of the site.

S3、夯机就位。起吊吊钩至落锤高度,将吊钩牵引钢丝绳固定。锁定落距。S3, the rammer is in place. Lift the hook to the height of the falling weight, and fix the hook traction wire rope. Lock the drop distance.

S4、将夯锤平稳提起至夯点位置,测量夯前锤定高程。S4. Steadily lift the tamper to the position of the ramming point, and measure the height of the tamper before ramming.

S5、起吊夯锤至预设高度,夯锤自动脱钩下落夯击击点,若发现因坑底倾斜而造成夯锤歪斜时,应及时将坑底整平。测量锤顶高程,记录夯坑下沉量。S5. Lift the rammer to the preset height, and the rammer will automatically unhook and drop to the ramming impact point. If the rammer is found to be skewed due to the inclination of the pit bottom, the pit bottom should be leveled in time. Measure the height of the hammer top and record the sinking amount of the ramming pit.

S6、重复步骤S5,按试夯参数及控制标准(最后两击夯沉量≤100mm),完成一个夯点的夯击。S6, repeat step S5, complete the tamping of one tamping point according to the test tamping parameters and control standards (the tamping sinkage of the last two tampings is ≤ 100mm).

S7、夯锤移位到下一个夯点,重复步骤S3-S5,完成第一遍全部夯点的夯击,用推土机推平夯坑,用方格网测量场地高程,计算半边场地夯沉量。S7. The rammer is moved to the next ramming point, and steps S3-S5 are repeated to complete the ramming of all ramming points for the first time. Use a bulldozer to level the ramming pit, measure the elevation of the site with a grid, and calculate the ramming settlement of half the site .

S8、测量场地高程,放出满夯基准线。S8. Measure the elevation of the site and release the full ramming reference line.

S9、按照夯印搭接的原则逐点夯击,完成全部夯击数。S9. Ramping point by point according to the principle of tamping and overlapping, and completing all the number of tamping.

S10、逐排夯击,完成满夯,场地平整,测量场地高程。S10, tamping row by row to complete full tamping, the site is level, and the elevation of the site is measured.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.

Claims (8)

1.一种夯锤,包括底盘(1)和顶盘(3),底盘(1)上转动连接有锁紧杆组件(4),其特征在于,所述底盘(1)靠近顶盘(3)的一面放置有承接盘(2),所述锁紧杆组件(4)贯穿承接盘(2)和顶板,锁紧杆组件(4)上可拆卸连接有抵紧顶板背离承接盘(2)一面的固定件,承接盘(2)背离底盘(1)的一面叠放有多个锤盘(5),每个所述锤盘(5)背离底盘(1)的一面均开设有长条形的安装孔(51),锁紧杆组件(4)上固定连接有多个锁定板件(41),一个锁定板件(41)对应一个安装孔(51),且锁定板件(41)置于安装孔(51)内,安装孔(51)的两个长条侧壁均开设有弧形槽(52),转动锁紧杆组件(4),每个锁定板件(41)的两端均插入相应的一弧形槽(52)内。1. A tamper, comprising a chassis (1) and a top plate (3), the chassis (1) is rotatably connected with a locking lever assembly (4), characterized in that the chassis (1) is close to the top plate (3) ) is placed on one side of the receiving plate (2), the locking rod assembly (4) runs through the receiving plate (2) and the top plate, and the locking rod assembly (4) is detachably connected to the receiving plate (2) against the top plate As for the fixing part on one side, a plurality of hammer plates (5) are stacked on the side of the receiving plate (2) facing away from the chassis (1), and each of the hammer plates (5) is provided with a long bar on the side facing away from the chassis (1). There are multiple locking plates (41) fixedly connected to the locking lever assembly (4), one locking plate (41) corresponds to one mounting hole (51), and the locking plate (41) is set In the installation hole (51), the two long side walls of the installation hole (51) are provided with arc-shaped grooves (52), and the locking lever assembly (4) is rotated, and the two ends of each locking plate (41) All insert in the corresponding arc groove (52). 2.根据权利要求1所述的一种夯锤,其特征在于,所述承接盘(2)上安装有带动承接盘(2)发生与锁紧杆组件(4)反向转动的传动组件(6)。2. A rammer according to claim 1, characterized in that, the receiving plate (2) is equipped with a transmission assembly ( 6). 3.根据权利要求2所述的一种夯锤,其特征在于,所述承接盘(2)靠近底盘(1)的一面开设有承接槽(21),所述传动组件(6)包括设置在承接槽(21)内的从动齿轮(61)和主动齿轮(62),所述主动齿轮(62)安装在锁紧杆组件(4)上,所述主动齿轮(62)与从动齿轮(61)啮合,从动齿轮(61)与所述底盘(1)转动连接,所述承接槽(21)的侧壁固定连接有环形件(63),环形件(63)的内侧壁固定连接有若干凸齿,所述从动齿轮(61)与凸齿啮合。3. A rammer according to claim 2, characterized in that, a receiving groove (21) is opened on the side of the receiving plate (2) close to the chassis (1), and the transmission assembly (6) includes a Accept the driven gear (61) and the driving gear (62) in the slot (21), the driving gear (62) is installed on the locking lever assembly (4), the driving gear (62) and the driven gear ( 61) meshing, the driven gear (61) is rotationally connected with the chassis (1), the side wall of the receiving groove (21) is fixedly connected with a ring piece (63), and the inner side wall of the ring piece (63) is fixedly connected with a Several convex teeth, the driven gear (61) meshes with the convex teeth. 4.根据权利要求1-3任意一项所述的一种夯锤,其特征在于,所述锁紧杆组件(4)与底盘(1)螺纹连接。4. A rammer according to any one of claims 1-3, characterized in that, the locking rod assembly (4) is screwed to the chassis (1). 5.根据权利要求4所述的一种夯锤,其特征在于,所述锁紧杆组件(4)包括两端的固定杆(42)和若干连接杆(411),每个连接杆(411)的两端均固定连接有锁紧板(412),每个固定杆(42)的一端也固定连接有锁紧板(412),相邻连接杆(411)之间相邻的两个锁紧板(412)可拆卸连接,每个固定杆(42)上的锁紧板(412)均与相邻连接杆(411)上的其中一锁紧板(412)可拆卸连接,相邻的两个锁紧板(412)之间连接形成一个所述锁定板件(41)。5. A rammer according to claim 4, characterized in that, the locking rod assembly (4) includes fixed rods (42) at both ends and several connecting rods (411), each connecting rod (411) Both ends of each fixed rod (412) are fixedly connected with a locking plate (412), and one end of each fixed rod (42) is also fixedly connected with a locking plate (412), and two adjacent locking rods (411) between adjacent connecting rods (411) The plates (412) are detachably connected, and the locking plates (412) on each fixed rod (42) are all detachably connected to one of the locking plates (412) on the adjacent connecting rods (411), and the adjacent two Two locking plates (412) are connected to form one locking plate (41). 6.根据权利要求3所述的一种夯锤,其特征在于,所述顶盘(3)、承接盘(2)和每个锤盘(5)上均开设有若干连孔(71),相邻的连孔(71)之间对准,所述底盘(1)靠近承接盘(2)的一面开设有若干弧形孔(72),每个弧形孔(72)均与相邻的连孔(71)对准。6. A rammer according to claim 3, characterized in that, several connecting holes (71) are opened on the top plate (3), the receiving plate (2) and each hammer plate (5), The adjacent connecting holes (71) are aligned, and there are several arc-shaped holes (72) on the side of the chassis (1) close to the receiving plate (2), and each arc-shaped hole (72) is connected with the adjacent Align the holes (71). 7.根据权利要求6所述的一种夯锤,其特征在于,每个所述连孔(71)内均滑动插接有连筒(8),每个弧形孔(72)内均插接有传动筒(9),每个所述传动筒(9)均与相邻的连筒(8)对准,所述传动筒(9)的外侧壁固定连接有滑环(91),所述弧形孔(72)的两个侧壁均开设有滑槽(721),滑槽(721)的下表壁逐渐向上倾斜,每个滑环(91)的两侧分别与弧形孔(72)内的一滑槽(721)滑动插接。7. A rammer according to claim 6, characterized in that a connecting cylinder (8) is slidably inserted into each connecting hole (71), and a connecting cylinder (8) is inserted into each arc-shaped hole (72). A transmission cylinder (9) is connected, and each transmission cylinder (9) is aligned with the adjacent connecting cylinder (8). The outer wall of the transmission cylinder (9) is fixedly connected with a slip ring (91), so The two side walls of the arc-shaped hole (72) are provided with chute (721), the lower surface wall of the chute (721) is gradually inclined upward, and the two sides of each slip ring (91) are respectively connected with the arc-shaped hole ( 72) a chute (721) sliding plug in the interior. 8.一种引用权利要求1-7任意一项所述夯锤的地基强夯施工工艺,其特征在于,包括如下步骤:8. A foundation dynamic compaction construction technique for citing the rammer described in any one of claims 1-7, characterized in that, comprising the steps of: S1、清理并整平场地;S1. Clean up and level the site; S2、做好控制桩;S2. Do a good job of controlling piles; S3、夯机就位;S3, the rammer is in place; S4、将夯锤平稳提起至夯点位置,测量夯前锤定高程;S4. Steadily lift the tamper to the position of the ramming point, and measure the height of the hammer before ramming; S5、起吊夯锤至预设高度,夯锤自动脱钩下落夯击击点,测量锤顶高程,记录夯坑下沉量;S5. Lift the rammer to the preset height, the rammer is automatically unhooked and falls to the ramming impact point, the height of the hammer top is measured, and the sinking amount of the ramming pit is recorded; S6、重复步骤S5;S6, repeat step S5; S7、夯锤移位到下一个夯点,重复步骤S3-S5;S7, the rammer is shifted to the next tamping point, and steps S3-S5 are repeated; S8、测量场地高程,放出满夯基准线;S8, measure the elevation of the site, and release the full ramming reference line; S9、按照夯印搭接的原则逐点夯击,完成全部夯击数;S9. Ramping point by point according to the principle of stamping and overlapping, and completing all the number of ramming; S10、逐排夯击,完成满夯,场地平整,测量场地高程。S10, tamping row by row to complete full tamping, the site is level, and the elevation of the site is measured.
CN202310257601.XA 2023-03-16 2023-03-16 A rammer and a foundation strong tamping construction process using the rammer Active CN116180705B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310257601.XA CN116180705B (en) 2023-03-16 2023-03-16 A rammer and a foundation strong tamping construction process using the rammer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310257601.XA CN116180705B (en) 2023-03-16 2023-03-16 A rammer and a foundation strong tamping construction process using the rammer

Publications (2)

Publication Number Publication Date
CN116180705A true CN116180705A (en) 2023-05-30
CN116180705B CN116180705B (en) 2025-06-13

Family

ID=86448827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310257601.XA Active CN116180705B (en) 2023-03-16 2023-03-16 A rammer and a foundation strong tamping construction process using the rammer

Country Status (1)

Country Link
CN (1) CN116180705B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN121556431A (en) * 2026-01-22 2026-02-24 中交建筑集团东南建设有限公司 Dynamic compaction construction device and method for engineering foundation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204023545U (en) * 2014-06-19 2014-12-17 北汽福田汽车股份有限公司 Hammer ram and dynamic compaction machinery
CN204266188U (en) * 2014-12-04 2015-04-15 中北大学 A kind of Built-up rammer reducing positice ground effect
CN108914912A (en) * 2018-07-16 2018-11-30 中国能源建设集团安徽省电力设计院有限公司 A kind of Foundation Treatment engineering method of column-hammer forced tamping displacement
CN210766714U (en) * 2019-07-25 2020-06-16 湖北弘楚基业建设工程有限公司 Rammer of convenient transportation
CN214974421U (en) * 2020-12-14 2021-12-03 山东米科思机械设备有限公司 Impact crusher with plate hammer locking device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204023545U (en) * 2014-06-19 2014-12-17 北汽福田汽车股份有限公司 Hammer ram and dynamic compaction machinery
CN204266188U (en) * 2014-12-04 2015-04-15 中北大学 A kind of Built-up rammer reducing positice ground effect
CN108914912A (en) * 2018-07-16 2018-11-30 中国能源建设集团安徽省电力设计院有限公司 A kind of Foundation Treatment engineering method of column-hammer forced tamping displacement
CN210766714U (en) * 2019-07-25 2020-06-16 湖北弘楚基业建设工程有限公司 Rammer of convenient transportation
CN214974421U (en) * 2020-12-14 2021-12-03 山东米科思机械设备有限公司 Impact crusher with plate hammer locking device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN121556431A (en) * 2026-01-22 2026-02-24 中交建筑集团东南建设有限公司 Dynamic compaction construction device and method for engineering foundation

Also Published As

Publication number Publication date
CN116180705B (en) 2025-06-13

Similar Documents

Publication Publication Date Title
US6193442B1 (en) Method and device for raising and supporting a building foundation
CN111101500B (en) A construction site rammer
CN116180705A (en) A rammer and foundation dynamic compaction construction technology using the rammer
CN111576496B (en) A composite vibration isolation structure for a strong compaction area and a construction method thereof
CN115369851B (en) Building engineering foundation ramming device
US7044686B2 (en) Apparatus and method for supporting a structure with a pier
CN113373766B (en) A rolling type pavement compaction machine and compaction construction method for slope road
CN219410877U (en) Foundation pit supporting pile
CN111335367B (en) A kind of lead-hole implanted anti-pumice rock bolt with support plate and construction method
CN118422664B (en) A compacting device for road bridge head
CN220813892U (en) Larson steel sheet pile stake hole backfill device
CN117166308A (en) Earth and stone square foundation leveling device
CN213508397U (en) Foundation reinforcing device for building construction
CN212561631U (en) Compound vibration isolation structure of dynamic compaction region
CN210341940U (en) Steel sheet pile sinking construction device for foundation pit support
CN220620050U (en) A tamping device for underground foundation construction
CN219492205U (en) Hydraulic spiral drill bit
CN114855758A (en) A foundation tamping device for construction engineering
CN223241368U (en) In-site pile hole soil cleaning equipment for constructional engineering
JP3219579U (en) Construction structure of concrete fence
CN222120189U (en) Tamping device
CN220414265U (en) Assembled slot strutting arrangement
CN217710657U (en) Highway construction is with soft ground reinforcement equipment
CN218346193U (en) Enclosure structure of foundation pit occluded pile foundation
CN220724912U (en) Unable adjustment base for municipal administration construction road stake

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant