CN116122147A - Steel-concrete combined bridge - Google Patents

Steel-concrete combined bridge Download PDF

Info

Publication number
CN116122147A
CN116122147A CN202310090182.5A CN202310090182A CN116122147A CN 116122147 A CN116122147 A CN 116122147A CN 202310090182 A CN202310090182 A CN 202310090182A CN 116122147 A CN116122147 A CN 116122147A
Authority
CN
China
Prior art keywords
steel
bridge deck
bridge
prefabricated
wet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310090182.5A
Other languages
Chinese (zh)
Inventor
陈维
万家恺
刘宇闻
程小亮
张号军
王存
田知典
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wisdri Engineering and Research Incorporation Ltd
Wisdri Urban Construction Engineering Technology Co Ltd
Original Assignee
Wisdri Engineering and Research Incorporation Ltd
Wisdri Urban Construction Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wisdri Engineering and Research Incorporation Ltd, Wisdri Urban Construction Engineering Technology Co Ltd filed Critical Wisdri Engineering and Research Incorporation Ltd
Priority to CN202310090182.5A priority Critical patent/CN116122147A/en
Publication of CN116122147A publication Critical patent/CN116122147A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00—Structural or constructional details of bridges
    • E01D19/12—Grating or flooring for bridges; Fastening railway sleepers or tracks to bridges
    • E01D19/125—Grating or flooring for bridges
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D1/00—Bridges in general

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种钢混组合桥,包括钢梁和预制桥面板,预制桥面板铺设于钢梁上,相邻预制桥面板之间设有后浇湿接缝,预制桥面板通过剪力连接件与钢梁连接,预制桥面板和钢梁之间通过剪力连接件及各相邻预制桥面板之间的后浇湿接缝连接,钢梁内和预制桥面板内穿设有纵向预应力筋。本发明整体性能好,施工便利,节省用材,绿色环保,有显著经济效益,能有效提高组合桥整体性和耐久性。

Figure 202310090182

The invention discloses a steel-concrete composite bridge, which comprises steel girders and prefabricated bridge decks. The prefabricated bridge decks are laid on the steel beams. Post-cast wet joints are arranged between adjacent prefabricated bridge decks. The prefabricated bridge decks are connected by shear force. The prefabricated bridge deck and the steel girder are connected by shear connectors and the post-cast wet joints between adjacent prefabricated bridge decks, and longitudinal prestress is installed in the steel girder and the prefabricated bridge deck. ribs. The invention has good overall performance, convenient construction, material saving, environmental protection, significant economic benefits, and can effectively improve the integrity and durability of the composite bridge.

Figure 202310090182

Description

一种钢混组合桥A steel-concrete composite bridge

技术领域technical field

本发明涉及桥梁技术领域,具体涉及一种钢混组合桥。The invention relates to the technical field of bridges, in particular to a steel-concrete composite bridge.

背景技术Background technique

公路及市政道路中,跨越交叉路口及渠道河流时,常需设置桥梁跨越障碍物。而此类障碍物通常有通行需求或施工要求,不便于设置过多支架,对施工速度及便利性要求较高。此外,尤其是城市桥梁中,对结构景观需求愈发重视,轻盈简洁的结构形式更受欢迎。而且,障碍物通常为考虑降低对交通影响或通航防洪要求,跨径不宜过小。综上,混凝土桥梁结构在跨域障碍物时受限较多,美观性较差,支架模板多,施工较复杂,工期较长。In highways and municipal roads, when crossing intersections and canals and rivers, it is often necessary to set up bridges to cross obstacles. However, such obstacles usually have traffic requirements or construction requirements, and it is not convenient to install too many supports, which requires high construction speed and convenience. In addition, especially in urban bridges, more and more attention is paid to the demand for structural landscapes, and light and simple structural forms are more popular. Moreover, obstacles are usually considered to reduce the impact on traffic or the requirements for navigation and flood protection, and the span should not be too small. To sum up, the concrete bridge structure has more restrictions when crossing obstacles, poor aesthetics, more support formwork, more complicated construction, and a longer construction period.

工程中常采用钢结构桥梁跨越障碍物,而钢结构造价相对混凝土结构大幅提高,且存在疲劳问题。常规钢箱梁结构通常设置钢纤维混凝土,对结构受荷不利。若直接在钢箱梁结构表面进行沥青混凝土铺装,其结核性较差,维修养护频繁,也增加了工程成本。近年来,钢混组合桥受到了越来越多的重视,其结合了钢结构与混凝土结构的优点,造价提高较少,避免了大量的支架模板。但常规钢混组合桥的桥面板施工仍然存在较多不便性,预制桥面板与钢梁结合也存在较多问题,此外,钢混组合连续梁墩顶负弯矩区的混凝土桥面板受荷不利,容易出现病害。若改为简支梁结构,则对行车舒适性不利。Steel structure bridges are often used in projects to cross obstacles, but the cost of steel structures is significantly higher than that of concrete structures, and there are fatigue problems. Conventional steel box girder structures are usually set with steel fiber concrete, which is unfavorable to the structural load. If the asphalt concrete pavement is directly carried out on the surface of the steel box girder structure, its nodularity is poor, maintenance is frequent, and the project cost is also increased. In recent years, more and more attention has been paid to the steel-concrete composite bridge, which combines the advantages of steel structure and concrete structure, with less cost increase and avoiding a large number of support formwork. However, there are still many inconveniences in the deck construction of conventional steel-concrete composite bridges, and there are many problems in the combination of prefabricated bridge decks and steel beams. , prone to disease. If it is changed to a simply supported beam structure, it will be detrimental to driving comfort.

因此,有必要发明一种施工便利,整体性好,能有效提高负弯矩区混凝土抗裂性能的新技术,弥补以上缺陷。Therefore, it is necessary to invent a new technology that is convenient in construction, good in integrity, and can effectively improve the crack resistance of concrete in the negative moment area, so as to make up for the above defects.

发明内容Contents of the invention

本发明要解决的技术问题是,针对现有技术存在的上述缺陷,提供了一种钢混组合桥,整体性能好,施工便利,节省用材,绿色环保,有显著经济效益,能有效提高组合桥整体性和耐久性。The technical problem to be solved by the present invention is to provide a steel-concrete composite bridge with good overall performance, convenient construction, material saving, environmental protection, significant economic benefits, and can effectively improve the performance of the composite bridge. integrity and durability.

本发明为解决上述技术问题所采用的技术方案是:The technical scheme that the present invention adopts for solving the problems of the technologies described above is:

一种钢混组合桥,包括钢梁和预制桥面板,预制桥面板铺设于钢梁上,相邻预制桥面板之间设有后浇湿接缝,预制桥面板通过剪力连接件与钢梁连接,预制桥面板和钢梁之间通过剪力连接件及各相邻预制桥面板之间的后浇湿接缝连接,钢梁内和预制桥面板内穿设有纵向预应力筋。A steel-concrete composite bridge, including steel girders and prefabricated bridge decks, the prefabricated bridge decks are laid on the steel beams, post-cast wet joints are provided between adjacent prefabricated bridge decks, and the prefabricated bridge decks are connected to the steel girders through shear connectors Connection, the prefabricated bridge deck and the steel girder are connected through shear connectors and post-cast wet joints between adjacent prefabricated bridge decks, and longitudinal prestressed tendons are pierced in the steel girder and the prefabricated bridge deck.

按照上述技术方案,钢梁的各腹板上端沿顺桥向布置有腹板处顶板,钢梁的各橫隔板上端沿橫桥向布置有横隔板处顶板,腹板处顶板和横隔板处顶板纵横交错布置,腹板处顶板和横隔板处顶板上均间隔布置有剪力连接件。According to the above technical scheme, the upper end of each web of the steel girder is arranged with the top plate at the web along the direction of the bridge, and the upper end of each diaphragm of the steel girder is arranged with the top plate at the diaphragm along the direction of the bridge, and the top plate at the web and the diaphragm The roof at the slab is arranged in a criss-cross pattern, and the roof at the web and the roof at the diaphragm are evenly spaced with shear connectors.

按照上述技术方案,钢梁内的纵向预应力筋布置于钢梁内部下方,钢梁纵向预应力筋两侧结合横隔板设置张拉节点。According to the above technical scheme, the longitudinal prestressed tendons in the steel girder are arranged below the inside of the steel girder, and tension nodes are set on both sides of the longitudinal prestressed tendons of the steel girder combined with the diaphragm.

按照上述技术方案,各预制桥面板之间设有桥面板湿接缝,各桥面板湿接缝分别布置于相应的腹板处顶板和横隔板处顶板上。According to the above-mentioned technical scheme, wet joints of bridge decks are provided between the prefabricated bridge decks, and the wet joints of each bridge deck are respectively arranged on the top plate at the web and the top plate at the diaphragm.

按照上述技术方案,桥面板上沿湿接缝设有桥面板槽口和桥面板齿块。According to the above technical proposal, the bridge deck is provided with a bridge deck notch and a bridge deck tooth block along the wet joint.

按照上述技术方案,预制桥面板内置有钢筋网,预制桥面板内还设置有预应力钢束预留孔道,预应力钢束预留孔道用于穿梭桥面板纵向预应力筋。According to the above technical scheme, the prefabricated bridge deck is built with steel mesh, and the prefabricated bridge deck is also provided with prestressed steel tendon reserved channels, which are used to shuttle the longitudinal prestressed tendons of the bridge deck.

按照上述技术方案,桥面板伸入湿接缝处设有环形钢筋,环形钢筋与湿接缝方向垂直,湿接缝两侧桥面板的环形钢筋交叉设置,环形钢筋内穿有湿接缝连接钢筋。According to the above-mentioned technical scheme, there is a ring-shaped steel bar where the bridge deck extends into the wet joint. The ring-shaped steel bar is perpendicular to the direction of the wet joint. The ring-shaped steel bars on both sides of the wet joint are arranged crosswise. .

按照上述技术方案,湿接缝内预先设置钢筋网片,并在桥面板的环形钢筋内外设置湿接缝连接筋,湿接缝以钢梁纵横向交错布置的顶板作为底模,直接浇筑混凝土。According to the above technical scheme, the steel mesh is pre-set in the wet joints, and the wet joint connecting bars are set inside and outside the annular steel bars of the bridge deck. The wet joints are directly poured with concrete on the top plate with vertical and horizontal staggered steel beams as the bottom formwork.

按照上述技术方案,根据桥梁受力状况,选择合理预应力钢束线形及数量,钢梁内的钢梁纵向预应力筋控制为正弯矩,桥面板内的桥面板纵向预应力筋控制为负弯矩,通过张拉节点与结构整体受力。According to the above-mentioned technical scheme, according to the stress condition of the bridge, a reasonable line shape and quantity of prestressed steel strands are selected, the longitudinal prestressed tendons of the steel girder in the steel girder are controlled to be positive bending moment, and the longitudinal prestressed tendons of the bridge deck in the bridge deck are controlled to be negative Bending moment, through the tension nodes and the overall force of the structure.

本发明具有以下有益效果:The present invention has the following beneficial effects:

1.本发明通过剪力连接件及各相邻预制桥面板之间的后浇湿接缝将钢梁和预制桥面板连接,能够使钢混结构有效结合成整体,共同受力,通过纵向预应力筋改善混凝土抗裂性能及钢结构疲劳性能,此外,预制桥面板能提高施工质量,加快施工进度;本申请相对于现有技术中的钢混组合桥,避免了后浇桥面板的模板、支架、钢筋绑扎和养护工序,无多余材料,且能大大提高工作效率,降低施工难度。相比于常规预制桥面板,利用钢梁腹板、横隔板上面的顶板作为底模,设置后浇带,加强桥面板自身及与钢梁之间的结合,整体性能好;施工便利,节省用材,绿色环保,有显著经济效益,能有效提高组合桥整体性和耐久性。1. The present invention connects steel girders and prefabricated bridge decks through shear connectors and post-cast wet joints between adjacent prefabricated bridge decks. Stress tendons improve the crack resistance of concrete and the fatigue performance of steel structures. In addition, the prefabricated bridge deck can improve the construction quality and speed up the construction progress; compared with the steel-concrete composite bridge in the prior art, this application avoids the formwork and construction of the post-cast bridge deck. There is no redundant material in the bracket, steel bar binding and maintenance process, which can greatly improve work efficiency and reduce construction difficulty. Compared with the conventional prefabricated bridge deck, the steel girder web and the top plate above the diaphragm are used as the bottom formwork, and post-casting belts are set to strengthen the bridge deck itself and the combination with the steel girder. The overall performance is good; the construction is convenient and saves The materials used are green and environmentally friendly, and have significant economic benefits, which can effectively improve the integrity and durability of composite bridges.

2.正弯矩区的钢结构和预应力筋相结合,有效改善钢结构疲劳性能;负弯矩区的预制桥面板和预应力筋相结合,大幅提高混凝土结构抗裂性能;整体结构材料利用率高,能降低材料用量指标。2. The combination of steel structure and prestressed tendons in the positive bending moment area can effectively improve the fatigue performance of steel structures; the combination of prefabricated bridge deck and prestressed tendons in the negative bending moment area can greatly improve the crack resistance of concrete structures; the overall structural material utilization The high rate can reduce the material consumption index.

附图说明Description of drawings

图1是本发明实施例中钢混组合桥的主视图;Fig. 1 is the front view of steel-concrete composite bridge in the embodiment of the present invention;

图2是本发明实施例中钢混组合桥的平面图;Fig. 2 is the plan view of steel-concrete composite bridge in the embodiment of the present invention;

图3是本发明实施例中钢混组合桥中钢混结合部分平面图;Fig. 3 is the plan view of the steel-concrete combination part in the steel-concrete composite bridge in the embodiment of the present invention;

图4是图2的I-I剖视图;Fig. 4 is the I-I sectional view of Fig. 2;

图5是图2的II-II剖视图;Fig. 5 is II-II sectional view of Fig. 2;

图6是图2的III-III剖视图;Fig. 6 is the III-III sectional view of Fig. 2;

图7是图2的IV-IV剖视图;Fig. 7 is the IV-IV sectional view of Fig. 2;

图8是本发明实施例中预制桥面的平面图;Fig. 8 is the plan view of the prefabricated bridge deck in the embodiment of the present invention;

图9是图4的局部A视图;Fig. 9 is a partial A view of Fig. 4;

图中,1-钢梁,11-腹板,12-腹板处顶板,13-横隔板处顶板,14-普通横隔板,15-支座横隔板,16-钢梁支座,2-预制桥面板,21-湿接缝,22-桥面板槽口,23-桥面板齿块,24-桥面板钢筋网,25-湿接缝连接筋,26-湿接缝钢筋,3-剪力连接件,4-钢梁纵向预应力筋,5-桥面板纵向预应力筋,51-预应力筋预留孔道,6-预应力筋张拉节点。In the figure, 1-steel beam, 11-web, 12-roof at web, 13-roof at diaphragm, 14-ordinary diaphragm, 15-support diaphragm, 16-steel beam support, 2- prefabricated bridge deck, 21- wet joint, 22- bridge deck notch, 23- bridge deck tooth block, 24- bridge deck reinforcement mesh, 25- wet joint connecting bar, 26- wet joint reinforcement, 3- Shear connector, 4-longitudinal prestressed tendon of steel girder, 5-longitudinal prestressed tendon of bridge deck, 51-reserved channel for prestressed tendon, 6-tension node of prestressed tendon.

具体实施方式Detailed ways

下面结合附图和实施例对本发明进行详细说明。The present invention will be described in detail below in conjunction with the accompanying drawings and embodiments.

参照图1~图9所示,本发明提供的一个实施例中的一种钢混组合桥,包括钢梁1和预制桥面板2,预制桥面板2铺设于钢梁1上,相邻预制桥面板2之间设有后浇湿接缝21,预制桥面板2通过剪力连接件3与钢梁1连接,预制桥面板2和钢梁1之间通过剪力连接件3及各相邻预制桥面板2之间的后浇湿接缝21连接成整体;共同受力,在跨中正弯矩部分,钢梁1内下部设置纵向预应力筋;中支座负弯矩部分,预制桥面内设置纵向预应力筋,钢梁1内和预制桥面板2内分别穿设有钢梁纵向预应力筋和桥面板纵向预应力筋。Referring to Figures 1 to 9, a steel-concrete composite bridge in an embodiment provided by the present invention includes a steel girder 1 and a prefabricated bridge deck 2, the prefabricated bridge deck 2 is laid on the steel girder 1, and the adjacent prefabricated bridge There are post-wetting joints 21 between the panels 2, the prefabricated bridge deck 2 is connected to the steel girder 1 through the shear connector 3, and the prefabricated bridge deck 2 and the steel beam 1 are connected through the shear connector 3 and each adjacent prefabricated The post-poured wet joints 21 between the bridge decks 2 are connected as a whole; under the common force, longitudinal prestressed tendons are set on the inner and lower parts of the steel girder 1 in the positive bending moment part of the mid-span; Longitudinal prestressed tendons are arranged, and longitudinal prestressed tendons of the steel girder and bridge deck longitudinal prestressed tendons are respectively pierced in the steel girder 1 and the prefabricated bridge deck 2 .

进一步地,钢梁1沿橫桥向依次布置有多个腹板11,腹板11长度方向沿顺桥向设置,其中位于两边的腹板11为边腹板,位于中部的腹板11为中腹板,钢梁1沿顺桥向依次布置有多个横隔板,橫隔板的长度沿橫桥向设置,其中位于钢梁支座16上方的为支座橫隔板,其余为普通橫隔板,钢梁的各腹板11上端沿顺桥向布置有腹板处顶板12,钢梁的各橫隔板上端沿橫桥向布置有横隔板处顶板13,腹板处顶板12和横隔板处顶板13纵横交错布置,腹板处顶板12和横隔板处顶板13上均间隔布置有剪力连接件3。Further, the steel girder 1 is sequentially arranged with a plurality of webs 11 along the direction of the bridge, and the length direction of the webs 11 is arranged along the direction of the bridge, wherein the webs 11 located on both sides are side webs, and the webs 11 located in the middle are the middle webs The steel girder 1 is arranged in sequence along the direction of the bridge with a plurality of diaphragms, the length of the diaphragms is set along the direction of the bridge, among which the diaphragm above the steel beam support 16 is the diaphragm of the support, and the rest are ordinary diaphragms The upper end of each web 11 of the steel girder is arranged with a top plate 12 at the web along the direction of the bridge, and the upper end of each diaphragm of the steel girder is arranged with a top plate 13 at the transverse The top plates 13 at the bulkhead are arranged in a criss-cross pattern, and the top plates 12 at the web and the top plates 13 at the transverse bulkhead are evenly spaced with shear connectors 3 .

进一步地,钢梁纵向预应力筋布置于钢梁内部下方,钢梁纵向预应力筋两侧结合横隔板设置张拉节点。Further, the longitudinal prestressed tendons of the steel girder are arranged below the inside of the steel girder, and tension nodes are set on both sides of the longitudinal prestressed tendons of the steel girder combined with the diaphragm.

进一步地,钢梁设置边、中腹板,其上方设置顺桥向一定宽度的顶板,间隔一定范围布置剪力连接件3。钢梁设置普通横隔板14、支座横隔板15,其上方设置横桥向一定宽度的顶板,布置剪力连接件3。钢梁整体纵横向顶板交错布置,且不形成整体。Further, the steel girder is provided with side and middle webs, above which is provided a roof with a certain width along the bridge direction, and shear connectors 3 are arranged at intervals of a certain range. The steel girder is provided with an ordinary diaphragm 14 and a support diaphragm 15, above which a roof with a certain width of the transverse bridge is arranged, and a shear connector 3 is arranged. The steel beams are arranged vertically and horizontally across the roof staggered, and do not form a whole.

进一步地,各预制桥面板2之间设有桥面板湿接缝21,各桥面板湿接缝21分别布置于相应的腹板处顶板12和横隔板处顶板13上,形成纵向湿接缝和横向湿接缝。Further, bridge deck wet joints 21 are provided between the prefabricated bridge decks 2, and each bridge deck wet joint 21 is respectively arranged on the corresponding top plate 12 at the web and top plate 13 at the diaphragm, forming a longitudinal wet joint and transverse wet seams.

进一步地,桥面板上沿湿接缝设有桥面板槽口22和桥面板齿块23,桥面板上沿橫桥向间隔布置有多个桥面板槽口22,桥面板槽口22分别对应布置于相应腹板处顶板12的上方,桥面板两端布置有桥面板齿块23,桥面板齿块23布置于横隔板处顶板13的上方;桥面板槽口22主要是增加接触面积起连接作用的,桥面板齿块23在桥面板最外侧突出去的地方,这样两块桥面板一拼,浇筑后浇带的时候混凝土不至于流出去。Further, bridge deck notches 22 and bridge deck tooth blocks 23 are arranged along the wet joints on the bridge deck, and a plurality of bridge deck notches 22 are arranged at intervals along the transverse bridge direction on the bridge deck, and the bridge deck notches 22 are arranged correspondingly Above the top plate 12 at the corresponding web, bridge deck tooth blocks 23 are arranged at both ends of the bridge deck, and the bridge deck tooth blocks 23 are arranged above the top plate 13 at the diaphragm; the bridge deck notch 22 is mainly to increase the contact area and connect Functionally, the bridge deck tooth block 23 is on the outermost part of the bridge deck, so that when the two bridge decks are put together, the concrete will not flow out when pouring the belt after pouring.

进一步地,预制桥面板2内置有钢筋网,预制桥面板2内沿顺桥向还设置有预应力钢束预留孔道,预应力钢束预留孔道用于穿梭桥面板纵向预应力筋。Further, the prefabricated bridge deck 2 is built with reinforcement mesh, and the prefabricated bridge deck 2 is also provided with prestressed steel tendon reserved tunnels along the bridge direction, and the prestressed steel tendon reserved tunnels are used to shuttle the longitudinal prestressed tendons of the bridge deck.

进一步地,桥面板伸入湿接缝处设有环形钢筋,环形钢筋与湿接缝方向垂直,湿接缝两侧桥面板的环形钢筋交叉设置,环形钢筋内穿有湿接缝连接钢筋。Further, annular steel bars are provided where the bridge deck extends into the wet joint, the annular steel bar is perpendicular to the direction of the wet joint, and the annular steel bars on the bridge deck on both sides of the wet joint are arranged crosswise, and the wet joint connecting steel bar is penetrated inside the annular steel bar.

进一步地,桥面板内的钢筋网个数为两个,分别布置于桥面板的顶板和底板上,预应力钢束预留孔道设置于两个钢筋网之间,纵向预应力筋交叉穿于各桥面板的预应力钢束预留孔道内。Furthermore, there are two steel meshes in the bridge deck, which are respectively arranged on the top and bottom plates of the bridge deck. The prestressed steel beams of the bridge deck are reserved in the tunnel.

进一步地,湿接缝内预先设置钢筋网片,并在桥面板深入的环形钢筋内外设置湿接缝连接筋25,湿接缝以钢梁纵横向交错布置的顶板作为底模,直接浇筑混凝土。Further, pre-set reinforcement mesh sheets in the wet joints, and set wet joint connecting bars 25 inside and outside the deep annular steel bars of the bridge deck. The wet joints use the top plate with steel beams arranged vertically and horizontally as the bottom form, and directly pour concrete.

进一步地,根据桥梁受力状况,选择合理预应力钢束线形(预应力钢束即预应力筋)及数量,钢梁内的钢梁纵向预应力筋控制为正弯矩,桥面板内的桥面板纵向预应力筋控制为负弯矩,通过张拉节点与结构整体受力。Further, according to the stress condition of the bridge, choose a reasonable prestressed steel beam line shape (prestressed steel beam is the prestressed tendon) and quantity, and the longitudinal prestressed tendon of the steel girder in the steel girder is controlled to be a positive bending moment, and the bridge in the bridge deck The longitudinal prestressed tendon of the panel is controlled as a negative bending moment, and the force is exerted on the whole structure through the tension node.

本发明的工作原理:对于钢梁1,采用槽型截面,腹板11根据计算选择合适距离,保证桥面板受力合理。腹板11顶部设置一定宽度、沿顺桥向的顶板12。钢梁1沿桥梁跨径间隔一定距离设置普通横隔板14,在支座处设置支座横隔板15,在横隔板顶部同样设置一定宽度、沿横桥向的顶板13。支座横隔板15处根据桥梁实际支座位置安装支座16。在钢梁腹板处顶板12和横隔板处顶板13设置组合桥剪力连接件3,连接钢梁1和预制桥面板2。The working principle of the present invention is as follows: for the steel girder 1, the channel section is adopted, and the proper distance of the web 11 is selected according to the calculation, so as to ensure that the stress on the bridge deck is reasonable. A top plate 12 with a certain width and along the bridge direction is arranged on the top of the web 11 . The steel girder 1 is provided with ordinary diaphragms 14 at intervals along the span of the bridge, a support diaphragm 15 is arranged at the support, and a top plate 13 of a certain width along the direction of the transverse bridge is also arranged on the top of the diaphragm. The support 16 is installed at the support diaphragm 15 according to the actual support position of the bridge. The composite bridge shear connector 3 is arranged on the top plate 12 at the web of the steel girder and the top plate 13 at the diaphragm to connect the steel girder 1 and the prefabricated bridge deck 2 .

对于预制桥面板2,构造上设置桥面板槽口22、桥面板齿块23,沿桥纵横向长度均匀布置,在桥梁起止点处根据具体情况调整槽口22及齿块23,设置为直线,与桥梁边线保持一致。桥面板2根据桥梁整体尺寸,在板与板之间设置一定距离的桥面板湿接缝21,湿接缝21宽度需略小于钢梁腹板处顶板12和横隔板处顶板13尺寸,以便于放置桥面板2有支撑位置,同时保证钢梁顶板能作为湿接缝21的底模,防止漏浆。预制桥面板2内设置纵横向的双层桥面板钢筋网24,在湿接缝21处,提前架设好桥面板湿接缝钢筋26,同样设置为双层双向。桥面板2中伸入湿接缝处、与湿接缝方向垂直的钢筋设置为环形模式,如断面图及大样A所示,两侧桥面板的环形钢筋交叉设置,其中穿过桥面板湿接缝连接钢筋25,保证预制桥面板2的纵横向连接性能。桥面板2中可根据计算需要,设置桥面板纵向预应力筋预留孔道51,以便于后期进行桥面板纵向预应力筋5张拉。桥面板的槽口22,与桥面板湿接缝21中共同浇筑混凝土,齿块23可作为桥面边缘处变模,以避免额外的模板设置。后浇混凝土区域均布置了组合桥剪力连接件3,其数量根据桥梁整体和局部计算确定。混凝土浇筑后,通过剪力连接件3,将钢梁1和预制桥面板2结合为整体,共同受力。在这个过程中,桥面板湿接缝21及槽口22的混凝土浇筑,均无需额外设置模板。For the prefabricated bridge deck 2, the bridge deck notch 22 and the bridge deck tooth block 23 are arranged on the structure, and are evenly arranged along the vertical and horizontal length of the bridge. Consistent with the bridge edge. According to the overall size of the bridge deck 2, a bridge deck wet joint 21 is set at a certain distance between the plates. The width of the wet joint 21 needs to be slightly smaller than the size of the top plate 12 at the web of the steel beam and the top plate 13 at the diaphragm, so that There is a supporting position for placing the bridge deck 2, and at the same time, it is ensured that the steel girder top plate can be used as the bottom form of the wet joint 21 to prevent grout leakage. The prefabricated bridge deck 2 is provided with vertical and horizontal double-layer bridge deck reinforcement mesh 24, and at the wet joint 21, the bridge deck wet joint reinforcement 26 is erected in advance, and is also set as double-layer two-way. The steel bars protruding into the wet joints in the bridge deck 2 and perpendicular to the direction of the wet joints are set in a circular pattern, as shown in the cross-sectional view and sample A, the circular steel bars on both sides of the bridge deck are arranged crosswise, and the wet joints passing through the bridge deck The joints connect the steel bars 25 to ensure the vertical and horizontal connection performance of the prefabricated bridge deck 2 . In the bridge deck 2, according to calculation requirements, the reserved tunnel 51 for the longitudinal prestressed tendons of the bridge deck can be set, so as to facilitate the 5 tensioning of the longitudinal prestressed tendons of the bridge deck in the later stage. The notch 22 of the bridge deck is poured with concrete in the wet joint 21 of the bridge deck, and the tooth block 23 can be used as a variable mold at the edge of the bridge deck to avoid additional formwork settings. Composite bridge shear connectors 3 are arranged in the post-cast concrete area, and the number is determined according to the overall and local calculation of the bridge. After the concrete is poured, the steel girder 1 and the prefabricated bridge deck 2 are combined into a whole through the shear connector 3 to bear the force together. In this process, the concrete pouring of the bridge deck wet joint 21 and the notch 22 does not require additional formwork.

对于钢梁1,可在其横隔板14处设置预应力钢束张拉节点6,根据桥梁整体和局部计算分析,确定是否设置钢梁纵向预应力筋4,可沿腹板顺桥向布置,在张拉节点6处进行张拉,使钢梁1和钢梁纵向预应力筋4整体受力,底板能承受预压力,有效改善钢结构疲劳性能。For the steel girder 1, prestressed steel tendon tension nodes 6 can be set at the transverse diaphragm 14. According to the overall and local calculation and analysis of the bridge, it is determined whether to set the longitudinal prestressed tendons 4 of the steel girder, which can be arranged along the web along the bridge direction. , the tension is carried out at the tension node 6, so that the steel beam 1 and the longitudinal prestressed tendon 4 of the steel beam are stressed as a whole, the bottom plate can bear the preload, and the fatigue performance of the steel structure is effectively improved.

对于预制桥面板2,可在其湿接缝21处设置预应力钢束张拉节点6,根据桥梁整体和局部计算分析,确定是否在连续梁中间支座处设置桥面板纵向预应力筋5,可沿腹板顺桥向布置。如图2所示轴线C,假定为墩顶支座轴线,则可垂直于支座轴线通过桥面板纵向预应力筋预留孔道51,穿过顺桥向的桥面板纵向预应力筋5,在张拉节点6处进行张拉。可根据需要调整接缝宽度,或移至槽口位置进行张拉,保证张拉设备的工作空间。张拉完成后,进行湿接缝21和槽口22的混凝土浇筑。桥面板2和桥面板纵向预应力筋5整体受力后,桥面板能承受预压力,有效改善混凝土结构抗裂性能。此外,后浇筑的混凝土也可采用高性能混凝土,分析其抗裂性能能否满足结构需要,从而避免设置桥面板纵向预应力筋5。For the prefabricated bridge deck 2, prestressed steel tendon tension nodes 6 can be set at its wet joints 21, and according to the overall and local calculation and analysis of the bridge, it is determined whether to set the longitudinal prestressed tendons 5 of the bridge deck at the middle support of the continuous beam, It can be arranged along the web along the bridge direction. As shown in Figure 2, the axis C is assumed to be the axis of the pier top support, then it can pass through the reserved channel 51 of the longitudinal prestressed tendons of the bridge deck perpendicular to the support axis, and pass through the longitudinal prestressed tendons 5 of the bridge deck along the direction of the bridge. Stretching is carried out at the tension node 6. The seam width can be adjusted according to needs, or moved to the notch position for tensioning to ensure the working space of the tensioning equipment. After the tensioning is completed, the concrete pouring of the wet joint 21 and the notch 22 is performed. After the bridge deck 2 and the longitudinal prestressed tendons 5 of the bridge deck are stressed as a whole, the bridge deck can bear the preload and effectively improve the crack resistance of the concrete structure. In addition, high-performance concrete can also be used for the post-cast concrete, and whether its crack resistance can meet the structural needs is analyzed, so as to avoid setting the longitudinal prestressed tendons of the bridge deck 5 .

本申请能够使钢混结构有效结合成整体,共同受力,通过预应力筋改善混凝土预制桥面板2抗裂性能及钢梁1疲劳性能,此外,预制桥面板2能提高施工质量,加快施工进度。本申请相对于常规钢混组合桥,避免了后浇桥面板的模板、支架、钢筋绑扎和养护工序,无多余材料,且能大大提高工作效率,降低施工难度。相比于常规预制桥面板,利用钢梁腹板11、横隔板14、15上面的顶板13作为底模,设置后浇湿接缝21,加强预制桥面板2自身及与钢梁1之间的结合,整体性能好。另外,正弯矩区的钢结构1和钢梁纵向预应力筋4相结合,有效改善钢结构疲劳性能;负弯矩区的预制桥面板2和桥面板纵向预应力筋5相结合,大幅提高混凝土结构抗裂性能;整体结构材料利用率高,能降低材料用量指标;本申请施工便利,节省用材,绿色环保,有显著经济效益,能有效提高组合桥整体性和耐久性。本申请通过后浇带及剪力连接件,将预制桥面板和钢梁有效结合为整体,配合预应力钢束,提高结构安全性和耐久性。结构施工便利,效率高,能有效利用不同材料强度,整体性好,抗疲劳性优越。This application can effectively combine the steel-concrete structure into a whole, jointly bear the force, and improve the crack resistance performance of the concrete prefabricated bridge deck 2 and the fatigue performance of the steel beam 1 through the prestressed tendons. In addition, the prefabricated bridge deck 2 can improve the construction quality and speed up the construction progress . Compared with conventional steel-concrete composite bridges, this application avoids the formwork, support, steel bar binding and maintenance procedures of the post-cast bridge deck, has no redundant materials, can greatly improve work efficiency, and reduce construction difficulty. Compared with the conventional prefabricated bridge deck, the steel girder web 11 and the top plate 13 above the transverse diaphragm 14 and 15 are used as the bottom formwork, and the post-casting joints 21 are set to strengthen the prefabricated bridge deck 2 itself and the space between the steel girder 1 combination, the overall performance is good. In addition, the combination of the steel structure 1 in the positive bending moment area and the longitudinal prestressing tendons 4 of the steel beam can effectively improve the fatigue performance of the steel structure; the combination of the prefabricated bridge deck 2 and the longitudinal prestressing tendons 5 in the negative bending moment area can greatly Crack resistance of concrete structure; overall structural material utilization rate is high, which can reduce material consumption index; this application is convenient for construction, saves materials, is green and environmentally friendly, has significant economic benefits, and can effectively improve the integrity and durability of composite bridges. In this application, the prefabricated bridge deck and the steel girder are effectively combined into a whole through the post-casting belt and the shear connector, and the prestressed steel beam is used to improve the structural safety and durability. The structure is convenient for construction, high in efficiency, can effectively utilize the strength of different materials, has good integrity, and has excellent fatigue resistance.

以上的仅为本发明的较佳实施例而已,当然不能以此来限定本发明之权利范围,因此依本发明申请专利范围所作的等效变化,仍属本发明的保护范围。The above are only preferred embodiments of the present invention, which certainly cannot limit the scope of rights of the present invention. Therefore, equivalent changes made according to the patent scope of the present invention still belong to the protection scope of the present invention.

Claims (9)

1.一种钢混组合桥,其特征在于,包括钢梁和预制桥面板,预制桥面板铺设于钢梁上,相邻预制桥面板之间设有后浇湿接缝,预制桥面板通过剪力连接件与钢梁连接,预制桥面板和钢梁之间通过剪力连接件及各相邻预制桥面板之间的后浇湿接缝连接,钢梁内和预制桥面板内均穿设有纵向预应力筋。1. a steel-concrete composite bridge, is characterized in that, comprises steel girder and prefabricated bridge deck, and prefabricated bridge deck is laid on the steel beam, is provided with post-pouring wet seam between adjacent prefabricated bridge decks, and prefabricated bridge deck is passed through shearing The force connector is connected with the steel girder, and the prefabricated bridge deck and the steel girder are connected through the shear connector and the post-cast wet joint between adjacent prefabricated bridge decks. Longitudinal prestressed tendons. 2.根据权利要求1所述的钢混组合桥,其特征在于,钢梁的各腹板上端沿顺桥向布置有腹板处顶板,钢梁的各橫隔板上端沿橫桥向布置有横隔板处顶板,腹板处顶板和横隔板处顶板纵横交错布置,腹板处顶板和横隔板处顶板上均间隔布置有剪力连接件。2. The steel-concrete composite bridge according to claim 1, characterized in that, the top of each web of the steel girder is arranged with a top plate at the web along the direction of the bridge, and the top of each diaphragm of the steel girder is arranged with a top plate along the direction of the bridge. The roof at the diaphragm, the roof at the web and the roof at the diaphragm are arranged in a criss-cross pattern, and the roof at the web and the roof at the diaphragm are evenly spaced with shear connectors. 3.根据权利要求2所述的钢混组合桥,其特征在于,钢梁内的纵向预应力筋布置于钢梁内部下方,钢梁纵向预应力筋两侧结合横隔板设置张拉节点。3. The steel-concrete composite bridge according to claim 2, characterized in that the longitudinal prestressed tendons in the steel girder are arranged below the inside of the steel girder, and tension nodes are set on both sides of the longitudinal prestressed tendons of the steel girder combined with the diaphragm. 4.根据权利要求1所述的钢混组合桥,其特征在于,各桥面板湿接缝分别布置于相应的腹板处顶板和横隔板处顶板上。4. The steel-concrete composite bridge according to claim 1, characterized in that, the wet joints of each bridge deck are respectively arranged on the top plate at the corresponding web and the top plate at the diaphragm. 5.根据权利要求1所述的钢混组合桥,其特征在于,桥面板上沿湿接缝设有桥面板槽口和桥面板齿块。5. The steel-concrete composite bridge according to claim 1, characterized in that, the bridge deck is provided with a bridge deck notch and a bridge deck tooth block along the wet joint. 6.根据权利要求1所述的钢混组合桥,其特征在于,预制桥面板内置有钢筋网,预制桥面板内还设置有预应力钢束预留孔道,预应力钢束预留孔道用于穿梭桥面板纵向预应力筋。6. The steel-concrete composite bridge according to claim 1, characterized in that, the prefabricated bridge deck has built-in reinforcement mesh, and the prefabricated bridge deck is also provided with prestressed steel tendon reserved channels, and the prestressed steel tendon reserved channels are used for Longitudinal prestressed tendons of the shuttle bridge deck. 7.根据权利要求1所述的钢混组合桥,其特征在于,桥面板伸入湿接缝处设有环形钢筋,环形钢筋与湿接缝方向垂直,湿接缝两侧桥面板的环形钢筋交叉设置,环形钢筋内穿有湿接缝连接钢筋。7. The steel-concrete composite bridge according to claim 1, characterized in that, the bridge deck stretches into the wet joint and is provided with annular reinforcement, the annular reinforcement is perpendicular to the direction of the wet joint, and the annular reinforcement of the bridge deck on both sides of the wet joint Cross setting, with wet seam connection reinforcement pierced inside the ring reinforcement. 8.根据权利要求7所述的钢混组合桥,其特征在于,湿接缝内预先设置钢筋网片,并在桥面板的环形钢筋内外设置湿接缝连接钢筋,湿接缝以钢梁纵横向交错布置的顶板作为底模,浇筑混凝土。8. The steel-concrete composite bridge according to claim 7, characterized in that the wet joints are pre-arranged with steel mesh sheets, and the wet joints are connected to the steel bars inside and outside the annular steel bars of the bridge deck, and the wet joints are vertically and horizontally formed by steel beams. Concrete is poured to the staggered top slab as the bottom formwork. 9.根据权利要求1所述的钢混组合桥,其特征在于,钢梁内的钢梁纵向预应力筋控制为正弯矩,桥面板内的桥面板纵向预应力筋控制为负弯矩,通过张拉节点与结构整体受力。9. The steel-concrete composite bridge according to claim 1, characterized in that, the steel girder longitudinal prestressed tendon in the steel girder is controlled as a positive moment, and the bridge deck longitudinal prestressed tendon in the bridge deck is controlled as a negative moment, Through the tension joints and the overall force of the structure.
CN202310090182.5A 2023-02-09 2023-02-09 Steel-concrete combined bridge Pending CN116122147A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310090182.5A CN116122147A (en) 2023-02-09 2023-02-09 Steel-concrete combined bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310090182.5A CN116122147A (en) 2023-02-09 2023-02-09 Steel-concrete combined bridge

Publications (1)

Publication Number Publication Date
CN116122147A true CN116122147A (en) 2023-05-16

Family

ID=86300773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310090182.5A Pending CN116122147A (en) 2023-02-09 2023-02-09 Steel-concrete combined bridge

Country Status (1)

Country Link
CN (1) CN116122147A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117867977A (en) * 2023-12-29 2024-04-12 中交第二航务工程局有限公司 A method for connecting prefabricated bridge decks with steel-concrete composite beams

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005290706A (en) * 2004-03-31 2005-10-20 Chiyoda Engineering Consultants Co Ltd Prestress introduction method for steel bridge and prestress reinforcement structure for steel bridge
CN101644024A (en) * 2009-08-21 2010-02-10 重庆交通大学 Prestress steel purlin-concrete combined continuous rigid frame bridge and construction method thereof
KR20130090452A (en) * 2012-02-06 2013-08-14 삼표건설 주식회사 Construction method for continuous bridge using confined concrete
CN205711743U (en) * 2016-06-12 2016-11-23 温州市交通投资集团有限公司 A kind of steel concrete combined bridge deck of dry and wet seam
CN110468689A (en) * 2019-09-17 2019-11-19 中铁第四勘察设计院集团有限公司 Floorings and steel reinforced concrete combination beam
CN111206489A (en) * 2020-03-02 2020-05-29 甘肃省交通规划勘察设计院股份有限公司 An assembled corrugated web steel box-UHPC composite girder bridge and construction method
CN111472258A (en) * 2020-04-01 2020-07-31 武汉理工大学 Large-span suspension bridge GFRP rib precast slab combined beam bridge deck system and construction method thereof
CN217629396U (en) * 2022-03-02 2022-10-21 安徽省交通控股集团有限公司 UHPC-RC superposed wet joint structure and bridge thereof

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005290706A (en) * 2004-03-31 2005-10-20 Chiyoda Engineering Consultants Co Ltd Prestress introduction method for steel bridge and prestress reinforcement structure for steel bridge
CN101644024A (en) * 2009-08-21 2010-02-10 重庆交通大学 Prestress steel purlin-concrete combined continuous rigid frame bridge and construction method thereof
KR20130090452A (en) * 2012-02-06 2013-08-14 삼표건설 주식회사 Construction method for continuous bridge using confined concrete
CN205711743U (en) * 2016-06-12 2016-11-23 温州市交通投资集团有限公司 A kind of steel concrete combined bridge deck of dry and wet seam
CN110468689A (en) * 2019-09-17 2019-11-19 中铁第四勘察设计院集团有限公司 Floorings and steel reinforced concrete combination beam
CN111206489A (en) * 2020-03-02 2020-05-29 甘肃省交通规划勘察设计院股份有限公司 An assembled corrugated web steel box-UHPC composite girder bridge and construction method
CN111472258A (en) * 2020-04-01 2020-07-31 武汉理工大学 Large-span suspension bridge GFRP rib precast slab combined beam bridge deck system and construction method thereof
CN217629396U (en) * 2022-03-02 2022-10-21 安徽省交通控股集团有限公司 UHPC-RC superposed wet joint structure and bridge thereof

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
中南大学裘伯永等: "《桥梁工程》", 31 March 2005, 中国铁道出版社, pages: 46 *
刘殿忠: "《钢-轻骨料混凝土组合梁试验与分析》", 31 October 2016, 知识产权出版社, pages: 136 - 137 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117867977A (en) * 2023-12-29 2024-04-12 中交第二航务工程局有限公司 A method for connecting prefabricated bridge decks with steel-concrete composite beams

Similar Documents

Publication Publication Date Title
CN106284044B (en) A kind of novel steel-concrete combined bridge and its construction method
CN104294748B (en) A kind of hybrid beam cable-stayed bridge adapter section structure and construction method thereof
CN104389261B (en) Prefabricated ultra-high performance concrete π ellbeam unit, bridge structure and construction method thereof
CN112482221B (en) Longitudinal continuous structure and construction method of bridge deck in negative bending moment zone of simply supported steel-concrete composite beam
CN104294747B (en) A kind of double tower hybrid beam cable-stayed bridge system and construction method thereof
CN106436592B (en) A kind of bridge using Z bar plate connector spells wide construction and its construction method
CN204185755U (en) A kind of Wavelike steel webplate post-stressed concrete T beam
CN108677685A (en) A kind of ultra-high performance concrete-part girder steel combination bent cap and its construction method
CN204212042U (en) Prefabricated ultra-high performance concrete π shape bridge construction
CN104762871A (en) Prestressed concrete-steel tank beam bond beam continuous beam bridge
CN205474784U (en) Prefabricated T roof beam
CN105369729A (en) External prestressing corrugated steel web T-shaped beam and construction method
CN202416148U (en) Bridge structure of pre-stressed concrete hollow slabs
CN103541310A (en) Long-united bridge widening splicing structure and construction method thereof
CN103643625B (en) A kind of steel truss-concrete slab composite beam based on shear connections structure
CN112458877A (en) Assembled steel-concrete combined rigid frame bridge and construction method thereof
CN106677051B (en) A steel box-slab girder composite girder bridge suitable for mountainous conditions
CN110331649A (en) A kind of transverse joint system for mixing combination beam for precast body steel-
CN104088221A (en) T-shaped plate girder segment prefabricating unit based on steel truss and combined bridge deck slab
CN108951399A (en) A kind of Single-box multi-chamber box beam bridge and its construction method
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
CN112663486A (en) Steel-concrete combined beam structure with increased steel beam in hogging moment area and construction method
CN211735002U (en) Steel-concrete combined beam bridge capable of being installed quickly
CN106192726B (en) A kind of V-arrangement web beam structure and its construction method
CN103669193B (en) A kind of laterally assembled Wavelike steel webplate combination T beam and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination