CN116084674A - Building edge structure construction operation platform - Google Patents
Building edge structure construction operation platform Download PDFInfo
- Publication number
- CN116084674A CN116084674A CN202211675607.0A CN202211675607A CN116084674A CN 116084674 A CN116084674 A CN 116084674A CN 202211675607 A CN202211675607 A CN 202211675607A CN 116084674 A CN116084674 A CN 116084674A
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- construction
- fixed seat
- splint
- platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/18—Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/001—Safety or protective measures against falling down relating to scaffoldings
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/04—Means for fastening, supporting, or bracing scaffolds on or against building constructions
- E04G5/046—Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on walls
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Types And Forms Of Lifts (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本发明涉及建筑施工防护技术领域,具体涉及一种建筑临边结构施工操作平台。The invention relates to the technical field of building construction protection, in particular to a construction operation platform for building edge structures.
背景技术Background technique
建筑行业中的“五临边”指的是尚未安装栏杆的楼板周边、无外架防护的屋面周边、框架工程楼层周边、上下跑道及斜道的两侧边、卸料平台的侧边,现在房屋的楼板通常为落地窗形式,对于这种楼板需要进行安装临边结构柱。相关技术中,需要专门从楼下搭设脚手架进行临边结构柱的施工,而楼下专门搭设脚手架的工程较大,较为耗费人力物力,当前已有专利文件对此进行了改进。The "five sides" in the construction industry refer to the perimeter of the floor that has not been installed with railings, the perimeter of the roof without external frame protection, the perimeter of the frame engineering floor, the sides of the upper and lower runways and ramps, and the side of the unloading platform. The floor slab of the house is usually in the form of floor-to-ceiling windows. For this floor slab, it is necessary to install side structural columns. In the related technology, scaffolding needs to be erected specially from downstairs for the construction of the adjacent structural columns. However, the project of erecting scaffolding downstairs is relatively large and consumes manpower and material resources. Currently, existing patent documents have improved this.
如中国专利CN211949715U一种建筑临边结构施工防护架,其涉及建筑施工技术领域,具体为一种建筑临边结构柱施工防护架,包括垫板,所述垫板顶面一侧的边缘处固定连接有夹紧板,所述夹紧板一侧面的顶部固定连接有支撑杠,所述支撑杠的表面开设有滑槽,所述滑槽内壁的中心处转动连接有丝杠,所述丝杠的外表面螺纹连接有滑块。该建筑临边结构柱施工防护架,通过设置了第一连接管,第一连接管的内壁螺纹连接有第一螺纹顶杆,且垫板的顶面设置有第二连接管,第二连接管的内壁螺纹连接有第二螺纹顶杆,第二螺纹顶杆的一端转动连接有顶紧块,能够使第二连接管顶紧垫板,顶紧块顶紧房顶,使支撑杠更加稳定,通过顶紧块连接的第一螺纹顶杆与第二连接管可以拉住施工台,从而提高结构强度。Such as Chinese patent CN211949715U a kind of construction protection frame of building border structure, it relates to the technical field of building construction, is specifically a kind of construction protection frame of building border structure column, comprises backing plate, and the edge of one side of the top surface of the backing plate is fixed A clamping plate is connected, the top of one side of the clamping plate is fixedly connected with a support bar, the surface of the support bar is provided with a chute, the center of the inner wall of the chute is rotatably connected with a lead screw, and the lead screw The outer surface of the slider is threadedly connected with a slider. The construction protection frame of the structural column on the edge of the building is provided with a first connecting pipe, the inner wall of the first connecting pipe is threadedly connected with a first threaded ejector rod, and the top surface of the backing plate is provided with a second connecting pipe, and the second connecting pipe The inner wall of the inner wall is threadedly connected with a second threaded ejector rod, and one end of the second threaded ejector rod is rotatably connected with a jacking block, which can make the second connecting pipe press against the backing plate, and the jacking block press against the roof, making the support bar more stable. The first threaded ejector rod and the second connecting pipe connected by the jacking block can pull the construction platform, thereby improving the structural strength.
上述专利虽然通过增加螺纹顶杆将施工平台与楼板的地面与顶部进行连接固定,让工作人员可以更为安全的站在施工台的表面进行结构柱的施工,但是文件中的设备在实际使用中并不符合常理,具有明显的缺陷以及局限性,如在使用时由于楼层过高,搭建手脚架不便的情况下才会使用此设备,但该设备所有的结构都为一个整体,且体积过大,并且设备能够承受施工重量,那么在材质上必然也为金属制,在这种情况下,设备无法通过简单的人力进行灵活搬运,而一栋高层建筑楼层高,楼板数量也繁多,如果动用高空吊装设备则太过于繁琐且费时费力,因此在实际的使用中并没有太大的实用性,因此,有必要重新设计一种建筑临边结构施工操作平台来解决此类缺陷。Although the above-mentioned patent connects and fixes the construction platform and the ground and top of the floor by adding threaded ejector rods, so that the staff can stand on the surface of the construction platform more safely to carry out the construction of the structural column, but the equipment in the document is actually used It is not in line with common sense, and has obvious defects and limitations. For example, this equipment will only be used when the floor is too high and it is inconvenient to build scaffolding. However, all structures of the equipment are integrated and the volume is too large , and the equipment can withstand the construction weight, the material must also be made of metal. In this case, the equipment cannot be moved flexibly by simple manpower, and a high-rise building has high floors and a large number of floors. The hoisting equipment is too cumbersome and time-consuming, so it is not very practical in actual use. Therefore, it is necessary to redesign a building edge structure construction operation platform to solve such defects.
发明内容Contents of the invention
针对现有技术的不足,本发明提供了一种建筑临边结构施工操作平台,解决了当前建筑临边结构柱施工防护架,整体过于笨重且体积大,不易进行灵活搬运进行使用的问题。Aiming at the deficiencies of the prior art, the present invention provides a construction operation platform for a building-side structure, which solves the problem that the current building-side structure column construction protection frame is too bulky and bulky to be easily transported and used.
实现本发明目的的技术解决方案为:一种建筑临边结构施工操作平台,其包括:The technical solution to realize the object of the present invention is: a construction operation platform for building edge structures, which includes:
承重板,所述承重板的顶部两侧对称设有限位框,所述限位框内腔底部设有滑动槽,所述滑动槽内滑动安装有滑块,所述滑块的顶部固定连接有第一固定座,所述第一固定座的一侧且位于所述限位框的内部通过转动件转动连接有第二固定座,所述第一固定座与所述第二固定座开设有贯穿两侧的螺纹槽,所述限位框通过开设开口螺纹连接有与螺纹槽相配合的螺纹杆,所述螺纹杆一端延伸至所述螺纹槽的内部;A load-bearing plate, the top of the load-bearing plate is symmetrically provided with a limit frame on both sides, and the bottom of the inner cavity of the limit frame is provided with a slide groove, and a slider is slidably installed in the slide groove, and the top of the slide block is fixedly connected with a The first fixed seat, one side of the first fixed seat and the second fixed seat is rotatably connected to the inside of the limit frame through a rotating member, and the first fixed seat and the second fixed seat are opened with a penetrating Threaded grooves on both sides, the limit frame is threadedly connected with a threaded rod that matches the threaded groove through an opening, and one end of the threaded rod extends to the inside of the threaded groove;
施工台,所述施工台的一侧固定连接有第二夹板,与所述第二夹板配合使用的第一夹板通过电动伸缩杆移动安装于所述承重板靠近所述第二固定座的一侧,所述第二固定座与所述第二夹板远离所述施工台的一侧固定连接;A construction platform, one side of the construction platform is fixedly connected with a second splint, and the first splint used in conjunction with the second splint is moved and installed on the side of the load-bearing plate close to the second fixed seat through an electric telescopic rod , the second fixing seat is fixedly connected to the side of the second splint away from the construction platform;
竖板,所述竖板的顶部固定连接有驱动箱,所述驱动箱内腔固定有双轴电机,所述双轴电机的两个输出轴均固定连接有转动筒,两个所述转动筒的一端均贯穿所述驱动箱;所述转动筒的表面且位于驱动箱的外部固定连接有收卷筒,所述收卷筒的表面收卷有拉索,两个所述拉索的一端分别固定连接于所述施工台的两侧;两个所述转动筒远离所述驱动箱的一端均通过开设开口滑动连接有滑杆,所述滑杆的表面固定连接有抵压板。A vertical plate, the top of the vertical plate is fixedly connected with a drive box, and the inner cavity of the drive box is fixed with a double-axis motor, and the two output shafts of the double-axis motor are fixedly connected with a rotating cylinder, and the two rotating cylinders One end of both passes through the drive box; the surface of the rotating cylinder is fixedly connected to the outside of the drive box with a winding drum, and the surface of the winding drum is wound with a cable, and one end of the two cables is respectively It is fixedly connected to both sides of the construction platform; the ends of the two rotating cylinders away from the drive box are slidably connected to slide bars through openings, and the surfaces of the slide bars are fixedly connected to pressure plates.
作为本发明优选实施例,所述承重板的底部两侧对称安装有万向轮。As a preferred embodiment of the present invention, universal wheels are symmetrically installed on both sides of the bottom of the bearing plate.
作为本发明优选实施例,所述螺纹杆远离所述第二固定座的一端延伸出所述限位框并固定连接有转盘。As a preferred embodiment of the present invention, the end of the threaded rod away from the second fixing seat extends out of the limiting frame and is fixedly connected with a turntable.
作为本发明优选实施例,所述第二夹板呈L型,较长的板与所述施工台固定连接,较窄的板与所述第一夹板配合使用以夹持楼板。As a preferred embodiment of the present invention, the second clamping plate is L-shaped, the longer plate is fixedly connected to the construction platform, and the narrower plate is used in conjunction with the first clamping plate to clamp the floor slab.
作为本发明优选实施例,所述双轴电机的两个输出轴均通过联轴器固定连接有所述转动筒。As a preferred embodiment of the present invention, the two output shafts of the biaxial motor are fixedly connected to the rotating cylinder through a coupling.
由于采用上述技术方案,使得本发明具有以下有益效果:Owing to adopting above-mentioned technical scheme, make the present invention have following beneficial effect:
(1)该建筑临边结构施工操作平台,通过将设备整体都安装于承重板的顶部,并且承重板的底部安装有可以移动的万向轮,同时施工台通过第二固定座与第一固定座进行转动连接,再配合双轴电机以及拉索进行使用,这些结构的配合,能够在施工完成后将施工台进行拉伸翻转将其从悬空处翻转至承重板的顶部,然后能够利用万向轮的作用可以将设备整体进行灵活移动,从而可以使得工作人员可以极为方便的对数量繁多的临边结构进行施工,并且也不用使用大型机械进行频繁的吊运,降低了施工成本,满足于当前建筑领域的使用。(1) The construction operation platform of the building's edge structure is installed on the top of the load-bearing plate as a whole, and the bottom of the load-bearing plate is equipped with movable universal wheels. The base is rotated and connected, and then used with a biaxial motor and a cable. The cooperation of these structures can stretch and flip the construction platform from the suspension to the top of the load-bearing plate after the construction is completed, and then use the universal The function of the wheels can move the equipment as a whole flexibly, so that the staff can construct a large number of side structures very conveniently, and do not need to use large machinery for frequent lifting, which reduces the construction cost and satisfies the current requirements. Use in the field of construction.
(2)该建筑临边结构施工操作平台,通过在第一固定座的左侧使用转动件对第二固定座进行转动连接,并且第二固定座与第一固定座内部都开设有螺纹槽,当施工台翻转至悬空状态时,能够通过旋转转盘让螺纹杆将第二固定座拉动至限位框的内部从而使第二夹板配合第一夹板将楼板夹紧,在搭配抵压板与滑杆的作用,从而能够使得设备在安装后具有两组保险固定功能,增加了安全性,同时也可以适用于不同厚度的楼板,有效的提高了设备整体的实用性与功能性。(2) The construction operation platform of the building's border structure uses a rotating piece on the left side of the first fixed seat to rotate and connect the second fixed seat, and both the second fixed seat and the first fixed seat are provided with thread grooves inside, When the construction platform is overturned to the suspended state, the threaded rod can be used to pull the second fixed seat to the inside of the limit frame by rotating the turntable so that the second splint cooperates with the first splint to clamp the floor. Function, so that the equipment can have two sets of safety and fixing functions after installation, which increases safety, and can also be applied to floors of different thicknesses, effectively improving the overall practicability and functionality of the equipment.
附图说明Description of drawings
为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained based on these drawings without creative effort.
图1为本发明实施例提供的建筑临边结构施工操作平台的结构示意图。Fig. 1 is a schematic structural diagram of a construction operation platform for building edge structures provided by an embodiment of the present invention.
图2为本发明实施例提供的限位框结构的剖视图。Fig. 2 is a cross-sectional view of the limiting frame structure provided by the embodiment of the present invention.
图3为本发明实施例提供的驱动箱内部结构的俯视图。Fig. 3 is a top view of the internal structure of the driving box provided by the embodiment of the present invention.
图中标记的对应关系如下:1-楼板;2-承重板;3-限位框;4-滑动槽;5-滑块;6-第一固定座;7-第二固定座;8-螺纹槽;9-螺纹杆;10-转盘;11-第二夹板;12-施工台;13-竖板;14-驱动箱;15-双轴电机;16-转动筒;17-滑杆;18-抵压板;19-收卷筒;20-拉索;21-万向轮;22-电动伸缩杆;23-第一夹板。The corresponding relationship of marks in the figure is as follows: 1-floor; 2-load bearing plate; 3-limiting frame; 4-sliding groove; 5-slider; Groove; 9-thread rod; 10-turntable; 11-second splint; 12-construction platform; 13-vertical plate; 14-drive box; 15-two-axis motor; Pressing plate; 19-winding drum; 20-stay cable; 21-universal wheel; 22-electric telescopic rod; 23-the first splint.
具体实施方式Detailed ways
下面将结合本专利实施例中的附图,对本专利实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本专利一部分实施例,而不是全部的实施例。基于本专利中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本专利保护的范围。The technical solutions in the embodiments of the patent will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the patent. Apparently, the described embodiments are only some of the embodiments of the patent, not all of them. Based on the embodiments in this patent, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of this patent.
请参阅图1~3,本发明提供一种建筑临边结构施工操作平台,包括楼板1,楼板1的顶部设置有承重板2,承重板2底部的两侧均通过固定板固定连接有万向轮21,承重板2顶部的前部与后部均通过固定板固定连接有限位框3,限位框3内腔的底部开设有滑动槽4,滑动槽4的内部滑动安装有滑块5,滑块5的顶部固定连接有第一固定座6,第一固定座6的左侧且位于限位框3的内部通过转动件转动连接有第二固定座7,第一固定座6与第二固定座7的右侧开设有贯穿至左侧的螺纹槽8,限位框3右侧的前部与后部均通过开设开口螺纹连接有与螺纹槽8相配合使用的螺纹杆9,螺纹杆9的右端固定连接有转盘10,螺纹杆9的左端延伸至螺纹槽8的内部。Please refer to Figures 1 to 3. The present invention provides a construction operation platform for building edge structures, which includes a floor 1, a load-bearing
作为可选的实施例,为了能够将施工台12与楼板1进行固定,承重板2的左侧通过固定块固定连接有与楼板1相配合使用的电动伸缩杆22,电动伸缩杆22的底端固定连接有第一夹板23,第二固定座7的左侧通过固定板固定连接有与第一夹板23相配合使用的第二夹板11,第二夹板11的左侧通过固定块固定连接有施工台12。As an optional embodiment, in order to fix the
进一步的,为了能够将施工台12进行翻转便于移动,承重板2顶部的右侧通过固定块固定连接有竖板13,竖板13的顶部通过固定块固定连接有驱动箱14,驱动箱14内腔的底部固定连接有双轴电机15,双轴电机15为伺服电机,双轴电机15的两个输出轴均通过联轴器固定连接有转动筒16,两个转动筒16的一端贯穿驱动箱14并分别延伸至驱动箱14的前部与后部,转动筒16的表面且位于驱动箱14的外部固定连接有收卷筒19,收卷筒19的表面收卷有拉索20,拉索20为钢索,两个拉索20的一端分别通过固定块固定连接于施工台12的前部与后部。Further, in order to be able to turn over the
其中,为了配合电动伸缩杆22和第二夹板11进行使用增加稳定性,两个转动筒16远离驱动箱14的一端均通过开设开口滑动连接有滑杆17,滑杆17的表面固定连接有抵压板18。Among them, in order to cooperate with the electric
同时本说明书中未作详细描述的内容均属于本领域技术人员公知的现有技术。At the same time, the content not described in detail in this specification belongs to the prior art known to those skilled in the art.
使用时,通过万向轮21将承重板2推动至楼板1的顶部,同时使得竖板13位于楼板内的房间内,然后工作人员将滑杆17从转动筒16的内部拉出,使得抵压板18的一侧与房间楼板的两侧墙壁相抵,此时承重板2通过抵压板18与墙壁的接触而固定住不会再进行移动,随后启动双轴电机15,双轴电机15带动两个转动筒16进行转动,由于滑杆17和转动筒16为滑动连接所以不会受到旋转的影响,当转动筒16在旋转会带动收卷筒19同时转动,将拉索20延伸,当拉索20延伸后施工台12通过第二固定座7发生翻转,从而将施工台12翻转至楼板1的最左侧处于悬空状态,此时第二固定座7与第一固定座6相平行对接使得两个螺纹槽8连接住,此时工作人员旋转转盘10带动螺纹杆9转动,螺纹杆9的转动会拉动第一固定座6在滑动槽4的限位下向右移动,同时也拉动第二固定座7与施工台12一起向右移动,使得螺纹杆9旋转至第二固定座7内部的螺纹槽8内,直至将第二夹板11与楼板1的左侧夹持住,随后启动电动伸缩杆22将第一夹板23下压使得,第一夹板23与第二夹板11的配合将施工台12给完全固定住,此时工作人员进入施工台12的内部进行施工,当完成施工后反转转盘10将第二固定座7与施工台12向左推动,使得螺纹杆9退出第二固定座7内部的螺纹槽8让第二夹板11与楼板1分离,然后再次启动双轴电机15反转转动筒16,使得拉索20将施工台12拉动通过第二固定座7将反转离开楼板1的左侧将施工台12翻转至承重板2的顶部,此时工作人员拖动竖板13将楼板1拉回房间内然后收起滑杆17,此时将设备脱离移动至另一个施工点进行施工。During use, the load-
尽管已经示出和描述了本专利的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本专利的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本专利的范围由所附权利要求及其等同物限定。Although the embodiments of this patent have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of this patent. and modifications, the scope of this patent is defined by the appended claims and their equivalents.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211675607.0A CN116084674B (en) | 2022-12-26 | 2022-12-26 | Construction operation platform for building edge structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211675607.0A CN116084674B (en) | 2022-12-26 | 2022-12-26 | Construction operation platform for building edge structure |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN116084674A true CN116084674A (en) | 2023-05-09 |
| CN116084674B CN116084674B (en) | 2025-09-23 |
Family
ID=86209587
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211675607.0A Active CN116084674B (en) | 2022-12-26 | 2022-12-26 | Construction operation platform for building edge structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN116084674B (en) |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000320142A (en) * | 1999-05-11 | 2000-11-21 | Kuniyasu Ri | Device and method for reinforcement assembly in construction work |
| US20070262219A1 (en) * | 2006-05-11 | 2007-11-15 | Physical Systems, Inc. | Adjustable mounting bracket |
| WO2017018927A1 (en) * | 2015-07-27 | 2017-02-02 | Arbeit Sicher Pte Ltd | Construction platform apparatus and method of installation thereof |
| CN207513201U (en) * | 2017-08-28 | 2018-06-19 | 中国一冶集团有限公司 | A kind of roofing cornices installation mobile device |
| CN209025450U (en) * | 2018-10-25 | 2019-06-25 | 大同泰瑞集团建设有限公司 | A kind of automatic deploying and retracting formula discharging platform |
| CN211949715U (en) * | 2020-04-14 | 2020-11-17 | 内蒙古北方时代设计研究院股份有限公司 | Building faces limit structure post construction protection frame |
| CN111980389A (en) * | 2020-08-12 | 2020-11-24 | 中建八局第一建设有限公司 | A side-by-side operation platform |
| CN212773376U (en) * | 2020-06-28 | 2021-03-23 | 安徽三建工程有限公司 | An overhanging protection platform |
| CN217106065U (en) * | 2022-03-20 | 2022-08-02 | 中建新疆建工(集团)有限公司 | Building faces limit structure post construction protection frame |
| CN217871706U (en) * | 2022-06-29 | 2022-11-22 | 中建八局第四建设有限公司 | Steel construction faces limit protection frame |
-
2022
- 2022-12-26 CN CN202211675607.0A patent/CN116084674B/en active Active
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000320142A (en) * | 1999-05-11 | 2000-11-21 | Kuniyasu Ri | Device and method for reinforcement assembly in construction work |
| US20070262219A1 (en) * | 2006-05-11 | 2007-11-15 | Physical Systems, Inc. | Adjustable mounting bracket |
| WO2017018927A1 (en) * | 2015-07-27 | 2017-02-02 | Arbeit Sicher Pte Ltd | Construction platform apparatus and method of installation thereof |
| CN207513201U (en) * | 2017-08-28 | 2018-06-19 | 中国一冶集团有限公司 | A kind of roofing cornices installation mobile device |
| CN209025450U (en) * | 2018-10-25 | 2019-06-25 | 大同泰瑞集团建设有限公司 | A kind of automatic deploying and retracting formula discharging platform |
| CN211949715U (en) * | 2020-04-14 | 2020-11-17 | 内蒙古北方时代设计研究院股份有限公司 | Building faces limit structure post construction protection frame |
| CN212773376U (en) * | 2020-06-28 | 2021-03-23 | 安徽三建工程有限公司 | An overhanging protection platform |
| CN111980389A (en) * | 2020-08-12 | 2020-11-24 | 中建八局第一建设有限公司 | A side-by-side operation platform |
| CN217106065U (en) * | 2022-03-20 | 2022-08-02 | 中建新疆建工(集团)有限公司 | Building faces limit structure post construction protection frame |
| CN217871706U (en) * | 2022-06-29 | 2022-11-22 | 中建八局第四建设有限公司 | Steel construction faces limit protection frame |
Also Published As
| Publication number | Publication date |
|---|---|
| CN116084674B (en) | 2025-09-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103806644B (en) | For electrical lift shaft form hydraulic telescopic device and operation method thereof | |
| CN213683165U (en) | Quick whole formula elevartor shaft template operation platform that promotes | |
| CN206408952U (en) | A kind of construction adhesion type lifts discharging platform | |
| CN113511583B (en) | Multifunctional high-safety assembled building lifting clamp | |
| CN112112416A (en) | A hinged variable section elevator shaft mold | |
| CN219973882U (en) | A new type of stereotyped overall lifting elevator shaft operating platform | |
| CN104763447B (en) | Beret piece combined steel mold trolley | |
| CN213174803U (en) | A kind of concrete building formwork for civil engineering | |
| CN114941411B (en) | A BIM-based prefabricated low-carbon building structure and structural connection method | |
| CN112373548A (en) | ALC panel installation auxiliary device | |
| CN210798103U (en) | A prefabricated steel-concrete structure staircase | |
| CN209635745U (en) | Braking device for a monorail crane used in building construction | |
| CN116084674B (en) | Construction operation platform for building edge structure | |
| CN216707854U (en) | An automatic demoulding mechanism for concrete prefabricated parts | |
| CN116464488A (en) | A device, system and removal method for obliquely pushing and assisting removal of negative ring segments | |
| CN211774617U (en) | Pre-buried equipment is used in civil engineering | |
| CN210140383U (en) | Crane structure for bridge construction | |
| CN114704090B (en) | Lifting system for single-side formwork | |
| CN113215990A (en) | Construction device and method for quickly dismantling prefabricated bent cap bottom formwork | |
| CN221823375U (en) | Assembly template of scalable reentrant corner | |
| CN115822249A (en) | One-way template assembly suitable for concrete construction in plane narrow space | |
| CN220319167U (en) | Giant steel beam high-altitude butt joint auxiliary mechanism | |
| CN224186920U (en) | Steel structure assembling and connecting device | |
| CN221956787U (en) | A construction support frame | |
| CN217106057U (en) | Can have enough to meet need removal operation platform of encorbelmenting |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |