CN116084615A - Concrete Hollow Roof with Fire Protection, Shock Absorption, Heat Insulation and Assembly Properties - Google Patents
Concrete Hollow Roof with Fire Protection, Shock Absorption, Heat Insulation and Assembly Properties Download PDFInfo
- Publication number
- CN116084615A CN116084615A CN202310020386.1A CN202310020386A CN116084615A CN 116084615 A CN116084615 A CN 116084615A CN 202310020386 A CN202310020386 A CN 202310020386A CN 116084615 A CN116084615 A CN 116084615A
- Authority
- CN
- China
- Prior art keywords
- formwork
- assembly
- cavity
- cast
- prefabricated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 68
- 238000009413 insulation Methods 0.000 title claims abstract description 19
- 238000010521 absorption reaction Methods 0.000 title claims abstract description 16
- 230000035939 shock Effects 0.000 title claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 52
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 16
- 239000010959 steel Substances 0.000 claims abstract description 16
- RNFJDJUURJAICM-UHFFFAOYSA-N 2,2,4,4,6,6-hexaphenoxy-1,3,5-triaza-2$l^{5},4$l^{5},6$l^{5}-triphosphacyclohexa-1,3,5-triene Chemical compound N=1P(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP(OC=2C=CC=CC=2)(OC=2C=CC=CC=2)=NP=1(OC=1C=CC=CC=1)OC1=CC=CC=C1 RNFJDJUURJAICM-UHFFFAOYSA-N 0.000 claims abstract description 9
- 239000007788 liquid Substances 0.000 claims abstract description 8
- 239000003973 paint Substances 0.000 claims abstract description 5
- 238000009415 formwork Methods 0.000 claims description 35
- 238000010276 construction Methods 0.000 claims description 20
- 230000002787 reinforcement Effects 0.000 claims description 17
- 239000002699 waste material Substances 0.000 claims description 10
- 239000011248 coating agent Substances 0.000 claims description 6
- 238000000576 coating method Methods 0.000 claims description 6
- 238000009434 installation Methods 0.000 claims description 6
- 239000002023 wood Substances 0.000 claims description 6
- 239000007798 antifreeze agent Substances 0.000 claims description 3
- 238000005452 bending Methods 0.000 claims description 3
- 239000012757 flame retardant agent Substances 0.000 claims description 3
- 239000004033 plastic Substances 0.000 claims description 3
- 150000003839 salts Chemical class 0.000 claims description 3
- 239000012528 membrane Substances 0.000 claims 1
- 239000007787 solid Substances 0.000 claims 1
- 239000011150 reinforced concrete Substances 0.000 abstract description 7
- 230000008901 benefit Effects 0.000 abstract description 6
- 239000003063 flame retardant Substances 0.000 abstract description 6
- 239000003795 chemical substances by application Substances 0.000 abstract 1
- 239000000463 material Substances 0.000 description 10
- 230000000694 effects Effects 0.000 description 9
- 230000002528 anti-freeze Effects 0.000 description 7
- 230000007613 environmental effect Effects 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 2
- 238000001035 drying Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000000565 sealant Substances 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000036541 health Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007921 spray Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/20—Roofs consisting of self-supporting slabs, e.g. able to be loaded
- E04B7/22—Roofs consisting of self-supporting slabs, e.g. able to be loaded the slabs having insulating properties, e.g. laminated with layers of insulating material
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/43—Floor structures of extraordinary design; Features relating to the elastic stability; Floor structures specially designed for resting on columns only, e.g. mushroom floors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/36—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
- E04G11/38—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings for plane ceilings of concrete
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/108—Rainwater harvesting
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Building Environments (AREA)
Abstract
Description
技术领域technical field
本发明属于建筑工程领域和环保节能工程领域。从本发明的混凝土空心屋盖的应用及功能来分属于建筑工程领域。从本发明混凝土空心屋盖具有的保温隔热隔声良好的性能,可降低层高,采用废旧模板材料制作装配箱体侧板和顶板实现节约投资,消防减震一体化,用底板预制装配化的性质来分,又可属于环保节能工程领域。The invention belongs to the field of construction engineering and the field of environmental protection and energy saving engineering. According to the application and function of the concrete hollow roof of the present invention, it belongs to the field of construction engineering. The concrete hollow roof of the present invention has good performance of thermal insulation, heat insulation and sound insulation, which can reduce the floor height, use waste formwork materials to make the side panels and top panels of the assembly box to save investment, integrate fire protection and shock absorption, and use the bottom panel to prefabricate and assemble According to the nature, it can also belong to the field of environmental protection and energy saving engineering.
背景技术Background technique
混凝土空心楼盖是与本发明接近的现有技术,该楼盖体系具有保温隔热隔声效果好;减少混凝土用量并降低层高经济性能高;楼盖底部平整无需吊顶,采光效果及空调效果优于有梁楼盖体系。近年来该楼盖体系在大柱网、大开间、大空间的工业与民用建筑中得到应用。特别是在地下室顶板中采用混凝土空心楼盖,具有更大的经济效益和社会效益。Concrete hollow floor is an existing technology close to the present invention. The floor system has good heat insulation and sound insulation effects; reduces the amount of concrete and lowers the height of the floor and has high economic performance; Better than the beam floor system. In recent years, the floor system has been applied in industrial and civil buildings with large column nets, large bays, and large spaces. Especially the use of concrete hollow floors in the basement roof has greater economic and social benefits.
空心楼盖的形式主要有两大类:There are two main types of hollow floors:
(1)现浇混凝土空心楼盖,设计施工及应用依据为《现浇混凝土空心楼盖结构技术规程》CECS175-2004;(1) Cast-in-place concrete hollow floor, the design, construction and application are based on "Technical Regulations for Cast-in-place Concrete Hollow Floor Structure" CECS175-2004;
(2)装配与现浇结合的混凝土空心楼盖,设计施工及应用依据《装配箱混凝土空心楼盖结构技术规程》JGJ/T207一2010)。(2) Concrete hollow floors combined with assembly and cast-in-place, design, construction and application are based on "Technical Specifications for Concrete Hollow Floor Structures of Assembled Boxes" JGJ/T207-2010).
装配箱混凝土网梁(空心)楼盖技术与本发明最相似。网梁(空心)楼盖是箱形截面的混凝土密肋楼盖,由预制的“装配箱”与后浇混凝土肋梁结合成梁板合一的整体楼盖,具有底部平整、大空腔蜂巢构造及空间受力特性。装配箱是由预制的钢筋混凝土顶板、底板及问硬质材料制作的侧壁筒三个部件组装而成。顶板直接作为楼(屋)面结构层的称为明箱,顶板作为模板并在其上绑扎钢筋浇筑混凝土作为楼(屋)面结构层的称为暗箱。网梁(肋梁)是在相邻装配箱之间绑扎钢筋浇筑混凝土形成的钢筋混凝土梁。Assembling box concrete girder (hollow) floor technology is most similar to the present invention. The mesh beam (hollow) floor is a box-shaped concrete ribbed floor. The prefabricated "assembly box" and the post-cast concrete rib beam are combined to form a beam-slab integrated floor. It has a flat bottom, a large cavity honeycomb structure and space. Stress characteristics. The assembly box is assembled from three parts: a prefabricated reinforced concrete top plate, a bottom plate and a side wall tube made of hard materials. The top slab is directly used as the floor (roof) surface structure layer called the open box, and the top slab is used as a formwork and the reinforced concrete is bound on it as the floor (roof) surface structure layer is called the dark box. The mesh beam (rib beam) is a reinforced concrete beam formed by binding reinforced concrete between adjacent assembly boxes.
现有技术的缺点:Disadvantages of existing technology:
1.现有装配箱的不足或可改进之处:1. Insufficiency or improvement of the existing assembly box:
(1)装配箱的侧壁筒采用硬质材料工厂制作,由于工程结构尺寸规格繁多,实际应用时侧壁规格型号多而会混乱,从工厂至工地的运输及成品保护工作量大。(1) The side wall tube of the assembly box is made of hard materials in the factory. Due to the various sizes and specifications of the engineering structure, there are many specifications and models of the side wall in actual application and it will be confusing. The transportation from the factory to the construction site and the protection of the finished product are heavy workloads.
(2)装配箱中暗箱顶板仅作为模板经济性能差,一来作为混凝土构件工厂内生产、运输及成品保护需要费用,二来因混凝土顶板比木模板重100kg/㎡需加大楼板的结构承载能力而增加费用。装配箱明箱顶板与肋梁之间存在施工缝,起不到T型肋梁作用且用在屋盖时存在渗漏隐患。(2) The economic performance of the dark box roof in the assembly box is poor only as a formwork. Firstly, as a concrete component in the factory, production, transportation and product protection require costs. Second, because the concrete roof is 100kg/㎡ heavier than the wooden formwork, the structural load of the slab needs to be increased. capacity increases costs. There are construction joints between the top plate of the assembled box and the rib beam, which cannot play the role of the T-shaped rib beam and there is a hidden danger of leakage when used on the roof.
2.施工时需安装楼板支撑并需全部设置模板,该模板即是重复和浪费。若仅肋梁下设置模板,则该模板的存在使支撑体系复杂化且费工费时经济性能较差。2. During construction, it is necessary to install floor support and set all formwork, which is duplication and waste. If only the formwork is set under the rib beam, the existence of the formwork will complicate the support system and be time-consuming and labor-intensive, with poor economic performance.
3.装配箱砼楼盖的预埋管线设置于箱体内:3. The pre-embedded pipelines of the assembled box concrete floor are set in the box:
(1)硬质材料侧壁筒安装时需临时开槽口,开槽过程较复杂且需进行防漏浆处理。(1) Temporary slotting is required during installation of the hard material side wall tube. The slotting process is complicated and requires anti-leakage slurry treatment.
(2)使用期间无法进行管线检查。(2) Pipeline inspection cannot be performed during use.
4.室内消防管线的存在严重影响不吊顶大空间的外观效果。4. The existence of indoor fire pipelines seriously affects the appearance of large spaces without suspended ceilings.
5.装配箱内空腔闲置,末充分发挥空心楼盖体系的作用。5. The cavity in the assembly box is idle, and the function of the hollow floor system cannot be fully utilized.
发明内容Contents of the invention
发明目的:鉴于现浇混凝土空心楼盖有许多优点而得到推广运用,存在一些不足使应用范围受到限制,本发明的目的是提供一种具有消防、减震、隔热和装配化性能的混凝土空心屋盖。Purpose of the invention: In view of the fact that the cast-in-place concrete hollow floor has many advantages and has been popularized and used, there are some shortcomings that limit the scope of application. The purpose of the invention is to provide a concrete hollow floor with fire protection, shock absorption, heat insulation and assembly performance. roof.
本发明采用的技术方案为:一种具有消防、减震、隔热和装配化性能的混凝土空心屋盖,包括顶模、现浇混凝土楼面、侧模、网梁钢筋、波纹水管、预制底板钢筋、预制底板、现浇混凝土楼面钢筋网和底模板;The technical scheme adopted in the present invention is: a concrete hollow roof with fire-fighting, shock-absorbing, heat-insulating and assembling properties, including top formwork, cast-in-place concrete floor, side formwork, mesh girder reinforcement, corrugated water pipes, and prefabricated floor Steel bars, prefabricated slabs, cast-in-place concrete floor reinforcement mesh and slab formwork;
所述顶模、侧模和预制底板构成装配箱;所述预制底板为配置纵横向的预制底板钢筋的预制混凝土板,所述预制底板钢筋伸出与网梁钢筋绑扎在一起浇筑并共同受力;所述预制底板的下部放置底模板;所述顶模和侧模采用工地剩余的废旧模板在木工房内分别制作;所述顶模上面为现浇混凝土楼面,现浇混凝土楼面内设有现浇混凝土楼面钢筋网;The top form, the side form and the prefabricated bottom plate constitute an assembly box; the prefabricated bottom plate is a prefabricated concrete slab equipped with vertical and horizontal prefabricated bottom plate reinforcement bars, and the prefabricated bottom plate steel bars protrude out and are bound together with the mesh girder steel bars for pouring and joint stress The bottom formwork is placed on the bottom of the prefabricated bottom plate; the top formwork and side formwork are respectively made in the carpentry workshop using the waste formwork remaining on the construction site; There are cast-in-place concrete floor reinforcement mesh;
所述装配箱的空腔内部喷防水涂料,多个装配箱之间安装波纹水管控制空腔内液面均衡,所述侧模上开设有供安装波纹水管使用的孔洞,波纹水管在侧模安装施工时起到对侧模的稳固支撑作用,房屋使用期间为空腔间水的流动通道;The interior of the cavity of the assembly box is sprayed with waterproof paint, and corrugated water pipes are installed between multiple assembly boxes to control the liquid level in the cavity. It acts as a stable support for the side formwork during construction, and serves as a flow channel for water between the cavities during the use of the house;
所述混凝土空心屋盖设置有进出水口、雨水收集管及阀门,用来控制空腔内液面高度,所述装配箱的空腔内的储水中掺隔热阻燃防冻剂,有如下优点,1)冬季防冻,2)掺隔热阻燃防冻剂的水灭火效果比纯水高,3)掺隔热阻燃防冻剂的水有一定的粘性,对水的流动有一定的粘滞作用,其减震效果要比纯水更好。The concrete hollow roof is provided with a water inlet and outlet, a rainwater collecting pipe and a valve, which are used to control the liquid level in the cavity. The water stored in the cavity of the assembly box is mixed with heat-insulating, flame-retardant and antifreeze agent, which has the following advantages: 1) Antifreeze in winter, 2) The fire extinguishing effect of water mixed with heat-insulating and flame-retardant antifreeze is higher than that of pure water, 3) Water mixed with heat-insulating, flame-retardant and antifreeze has a certain viscosity and has a certain viscous effect on the flow of water. Its shock absorption effect is better than pure water.
作为优选,所述底模板中间部位放置两块小木块,底模板两侧上部各放置一块小木块,并在设置预制底板钢筋时,放置木块部位要预留出一小截钢筋,用于在整体浇筑时进行弯起。As a preference, two small pieces of wood are placed in the middle of the bottom formwork, and a small piece of wood is placed on the upper parts of both sides of the bottom formwork. Bending is carried out during overall pouring.
作为优选,所述现浇混凝土楼面中部要设置略宽于所述波纹水管长度的通长防水卷材,波纹水管两侧设置屋盖箱体肋板以起到固定作用。As a preference, the middle part of the cast-in-place concrete floor should be provided with a long waterproof coiled material slightly wider than the length of the corrugated water pipe, and roof box ribs should be provided on both sides of the corrugated water pipe to play a fixed role.
作为优选,所述顶模设置塑料定位垫块供安装现浇混凝土楼面钢筋网使用。As a preference, the top form is provided with plastic positioning pads for installing the cast-in-place concrete floor reinforcing mesh.
作为优选,所述防水涂料使用耐盐水性能强的ZS-711无机防腐涂料,干燥性能好,对混凝土空腔内壁及网格梁顶部进行喷涂。Preferably, the waterproof coating uses ZS-711 inorganic anti-corrosion coating with strong salt water resistance and good drying performance, and is sprayed on the inner wall of the concrete cavity and the top of the grid beam.
有益效果:本发明具有如下性能:Beneficial effect: the present invention has the following properties:
(1)优良的保温隔热和隔声性能。(1) Excellent thermal insulation and sound insulation performance.
(2)优良的使用性能。无梁屋盖实现降低层高、板底平整无需吊顶的目的,具有美观、采光及空调效果好的使用性能。(2) Excellent performance. The beamless roof achieves the purpose of reducing the floor height and flat bottom without the need for a suspended ceiling. It has beautiful appearance, good lighting and air-conditioning effects.
(3)优良的经济性能和环保性能。屋面不做保温层、少做防水层、不设消防水箱、箱体侧模和顶模采用废旧模板木工房内制作、雨水利用、屋盖无梁且减少消防管道而降低层高。推广运用后可节约大量投资和环保节能。(3) Excellent economic performance and environmental protection performance. There is no insulation layer on the roof, less waterproof layer, no fire water tank, the box side formwork and top formwork are made in the carpentry workshop with waste templates, rainwater is used, the roof has no beams, and the number of fire pipes is reduced to reduce the storey height. After popularization and application, a large amount of investment and environmental protection and energy saving can be saved.
4)优良的消防功能和减震功能4) Excellent fire protection function and shock absorption function
装配箱空腔内储水(掺入阻燃防冻剂),设置波纹管及进出水口等设施,保证了水的流动性和实现了消防与减震功能一体化的目的。Water is stored in the cavity of the assembly box (mixed with flame retardant antifreeze), and facilities such as bellows and water inlet and outlet are set to ensure the fluidity of water and realize the purpose of integrating fire protection and shock absorption functions.
本发明适用于面广量大的钢筋混凝土框架、剪力墙及筒体结构的屋盖,推广应用后可创造巨大的经济效益和社会效益。The invention is suitable for wide-area and large-scale reinforced concrete frames, shear walls and roofs of cylindrical structures, and can create huge economic and social benefits after popularization and application.
附图说明Description of drawings
图1是本发明混凝土空心屋盖结构示意图。Fig. 1 is a schematic diagram of the structure of the concrete hollow roof of the present invention.
图2是本发明混凝土空心屋盖的装配箱示意图。Fig. 2 is a schematic diagram of the assembly box of the concrete hollow roof of the present invention.
图3是本发明装配箱连接示意图。Fig. 3 is a schematic diagram of the connection of the assembly box of the present invention.
图4是本发明预制底板示意图。Fig. 4 is a schematic diagram of the prefabricated floor of the present invention.
具体实施方式Detailed ways
下面结合本发明附图和具体实施方式对整个实施例中的技术方案进行详细的叙述。The technical solutions in the entire embodiment will be described in detail below in conjunction with the drawings and specific implementation methods of the present invention.
如他1-4所示,一种具有消防、减震、隔热和装配化性能的混凝土空心屋盖,包括顶模1、现浇混凝土楼面2、侧模3、网梁钢筋4、波纹水管5、预制底板钢筋7、预制底板8、现浇混凝土楼面钢筋网9和底模板11;As shown in his 1-4, a concrete hollow roof with fire protection, shock absorption, heat insulation and assembly performance, including top form 1, cast-in-place concrete floor 2, side form 3, mesh girder reinforcement 4,
所述顶模1、侧模3和预制底板8构成装配箱;所述预制底板8为配置纵横向的预制底板钢筋7的预制混凝土板,所述预制底板钢筋7伸出与网梁钢筋4绑扎在一起浇筑并共同受力;所述预制底板8的下部放置底模板11;所述顶模1和侧模3采用工地剩余的废旧模板在木工房内分别制作;所述顶模1上面为现浇混凝土楼面2,现浇混凝土楼面2内设有现浇混凝土楼面钢筋网9;The top form 1, the side form 3 and the
所述装配箱的空腔内部喷防水涂料,多个装配箱之间安装波纹水管控制空腔内液面均衡,所述侧模上开设有供安装波纹水管5使用的孔洞,波纹水管5在侧模3安装施工时起到对侧模3的稳固支撑作用,房屋使用期间为空腔间水的流动通道;The interior of the cavity of the assembly box is sprayed with waterproof paint, and corrugated water pipes are installed between multiple assembly boxes to control the liquid level in the cavity. The mold 3 acts as a stable support for the side mold 3 during installation and construction, and serves as a flow channel for water between the cavities during the use of the house;
所述混凝土空心屋盖设置有进出水口、雨水收集管及阀门,用来控制空腔内液面高度,所述装配箱的空腔内的储水中掺隔热阻燃防冻剂,有如下优点,1)冬季防冻,2)掺隔热阻燃防冻剂的水灭火效果比纯水高,3)掺隔热阻燃防冻剂的水有一定的粘性,对水的流动有一定的粘滞作用,其减震效果要比纯水更好。The concrete hollow roof is provided with a water inlet and outlet, a rainwater collecting pipe and a valve, which are used to control the liquid level in the cavity. The water stored in the cavity of the assembly box is mixed with heat-insulating, flame-retardant and antifreeze agent, which has the following advantages: 1) Antifreeze in winter, 2) The fire extinguishing effect of water mixed with heat-insulating and flame-retardant antifreeze is higher than that of pure water, 3) Water mixed with heat-insulating, flame-retardant and antifreeze has a certain viscosity and has a certain viscous effect on the flow of water. Its shock absorption effect is better than pure water.
所述底模板11中间部位放置两块小木块10,底模板11两侧上部各放置一块小木块10,并在设置预制底板钢筋7时,放置木块部位要预留出一小截钢筋,用于在整体浇筑时进行弯起。所述现浇混凝土楼面2中部要设置略宽于所述波纹水管5长度的通长防水卷材,波纹水管5两侧设置屋盖箱体肋板6以起到固定作用。所述顶模1设置塑料定位垫块供安装现浇混凝土楼面钢筋网9使用。所述防水涂料使用耐盐水性能强的ZS-711无机防腐涂料,干燥性能好,对混凝土空腔内壁及网格梁顶部进行喷涂。Two small pieces of
实施例为在某旅游康养度假中心主楼(总建筑面积8300㎡)第六层(顶层)中部单元300平方大礼堂屋盖中的应用。大礼堂层高3.4m,屋盖原没计梁高0.7m,则楼层净高仅2.7m难以满足大礼堂楼层净高3.0m的要求。采用本发明一种具有消防、减震、隔热和装配化性能的混凝土空心屋盖(屋盖厚度0.35m)后楼层净高3.05m,满足了大礼堂的净高要求且板底平整不需装修吊顶。The embodiment is the application in the roof of the 300-square-meter auditorium in the middle unit of the sixth floor (top floor) of the main building of a tourism, health care and vacation center (total construction area of 8300 square meters). The floor height of the auditorium is 3.4m, and the girder height of the roof is 0.7m, so the floor height is only 2.7m, which cannot meet the requirement of 3.0m. After adopting a concrete hollow roof (roof thickness 0.35m) of the present invention with the performance of fire protection, shock absorption, heat insulation and assembly, the net floor height is 3.05m, which meets the net height requirements of the auditorium and the slab bottom is flat and does not require Decorate the ceiling.
实施例的箱体(包括预制混凝土底板、用废旧模板制作的箱体侧板和顶模板、通水波纹管、进出水口及雨水收集器)。The box body of the embodiment (comprising prefabricated concrete base plate, box body side plate and top formwork made with waste formwork, water bellows, water inlet and outlet and rainwater collector).
具有“四优”性能的混凝土空心屋盖实施例的制作方法:The production method of the embodiment of the concrete hollow roof with "four excellent" properties:
1.箱体制作1. Cabinet making
在本工程一楼地面现场预制混凝土底板,混凝土底板倒置制作以确保板底面平整光滑满足不需吊顶的要求。在工地现场木工房内采用废旧模板制作箱体侧板及顶模板。The concrete floor is prefabricated on the ground of the first floor of this project, and the concrete floor is made upside down to ensure that the bottom surface of the slab is flat and smooth to meet the requirement of no suspended ceiling. Use waste templates to make box side panels and top templates in the carpentry room on the construction site.
2.屋盖箱体安装及钢筋混凝土施工步骤2. Roof box installation and reinforced concrete construction steps
(1)先搭设屋盖施工支撑。(1) Set up the roof construction support first.
(2)对预制混凝土底板进行拼装(拼缝用密封胶进行密封),并对预制板端的钢筋弯起并伸入肋梁内,绑扎肋梁钢筋。(2) Assemble the prefabricated concrete bottom slab (sealing joints are sealed with sealant), bend the steel bars at the end of the precast slab and extend into the rib beam, and bind the rib beam steel bars.
(3)现埸将侧板装钉成侧壁筒后安装到预制混凝土底板上,并在侧板中部打孔并安装通水波纹管(波纹管两侧设置屋盖箱体肋板,用于固定波纹管位置,),箱体底板和侧板喷射防水涂料,波纹管与侧板连接拼缝用密封胶进行密封。(3) On site, nail the side panels into side wall tubes and install them on the precast concrete floor, and drill holes in the middle of the side panels and install water-through bellows (roof box ribs are set on both sides of the bellows for Fix the position of the bellows,), spray waterproof paint on the bottom and side panels of the box, and seal the joints between the bellows and the side panels with sealant.
(4)将预制底板两侧的钢筋弯起并伸入肋梁,绑扎肋梁钢筋,安装电线管、进出水口及雨水收集器。(4) Bend the steel bars on both sides of the prefabricated bottom plate and extend them into the rib beams, bind the rib beam steel bars, and install wire pipes, water inlets and outlets, and rainwater collectors.
(5)浇筑肋梁及顶板混凝土,养护后拆除屋盖施工支撑,并利用进水口注水。(5) Pouring rib beams and roof concrete, removing the roof construction support after curing, and using the water inlet to inject water.
本发明的箱体底板采用现埸预制混凝土底板;箱体侧板和顶扳利用现埸剩余的废旧模板在木工房内制作,可保证箱体的制作质量,节约箱体的材料费、运输费、成品保护费和废旧模板的处理费,经济性能及环保性能优。在顶板上配筋并与肋梁同时浇筑混凝土形成T形肋梁,提高肋梁的承载能力。The bottom plate of the box body of the present invention adopts the prefabricated concrete bottom plate on site; the side panels and top plates of the box body are made in the carpentry room by using the waste templates remaining on site, which can ensure the production quality of the box body and save the material cost and transportation cost of the box body , Finished product protection fee and waste formwork processing fee, excellent economic performance and environmental protection performance. Reinforcing the reinforcement on the top plate and pouring concrete together with the rib beam to form a T-shaped rib beam to improve the bearing capacity of the rib beam.
本发明采用将预制混凝土底板顶紧拼接兼做后浇混凝土肋梁底模,取消了原体系板底施工模板,节约了材料费和安装及拆除的人工费。In the present invention, the prefabricated concrete bottom slab is top-tightly spliced and used as the post-cast concrete rib beam bottom form, the original system slab bottom construction formwork is canceled, and the material cost and labor cost for installation and removal are saved.
本发明的管线预埋于顶板混凝土内并从肋梁底模拼接处伸出底板,克服了原体系施工过程复杂和管线使用期间的检查难题。The pipeline of the present invention is pre-embedded in the roof concrete and protrudes from the base plate at the joint of the rib-beam bottom formwork, which overcomes the complex construction process of the original system and the inspection problems during the use of the pipeline.
本发明的箱体内储有充足的消防用水可直供喷淋及消防使用,减少大量的消防管道材料费及安装人工费,实现大空间顶面光洁的美观效果。Sufficient fire-fighting water is stored in the box of the present invention, which can be directly used for spraying and fire-fighting, reduces a large amount of fire-fighting pipeline material costs and installation labor costs, and realizes the aesthetic effect of a smooth top surface in a large space.
本发明充分利用空心楼盖的箱体作为储水装置,利用连接波纹管作为流水通道并设置雨水收集器,实现了雨水收集、消防储水及减震阻尼器的多功能应用。是一项节材、节水、保温隔热及节能环保的屋盖新体系。The present invention fully utilizes the box body of the hollow floor as the water storage device, utilizes the connecting bellows as the flow channel and arranges the rainwater collector, and realizes the multifunctional application of rainwater collection, fire-fighting water storage and shock absorption damper. It is a new roof system that saves materials, water, heat insulation, energy saving and environmental protection.
应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明所述原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。It should be pointed out that those skilled in the art can make some improvements and modifications without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310020386.1A CN116084615A (en) | 2023-01-06 | 2023-01-06 | Concrete Hollow Roof with Fire Protection, Shock Absorption, Heat Insulation and Assembly Properties |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202310020386.1A CN116084615A (en) | 2023-01-06 | 2023-01-06 | Concrete Hollow Roof with Fire Protection, Shock Absorption, Heat Insulation and Assembly Properties |
Publications (1)
Publication Number | Publication Date |
---|---|
CN116084615A true CN116084615A (en) | 2023-05-09 |
Family
ID=86198708
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202310020386.1A Pending CN116084615A (en) | 2023-01-06 | 2023-01-06 | Concrete Hollow Roof with Fire Protection, Shock Absorption, Heat Insulation and Assembly Properties |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN116084615A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN119664037A (en) * | 2025-02-19 | 2025-03-21 | 合肥国瑞集成建筑科技有限公司 | Novel assembled building roof structure |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006152699A (en) * | 2004-11-30 | 2006-06-15 | Sekisui Plastics Co Ltd | In-situ hollow concrete slab structure and its construction method |
CN101581122A (en) * | 2009-06-04 | 2009-11-18 | 王本淼 | Cast-in-place hollow floor with hidden protecting fume exhaust ductwork |
CN105696739A (en) * | 2015-12-23 | 2016-06-22 | 王海崴 | Cast-in-situ cavity floor adopting steel net cages with ribs |
CN106013567A (en) * | 2016-06-08 | 2016-10-12 | 湖南标迪夫节能科技有限公司 | Fabricated stressed island reinforced concrete cavity floor system |
CN212957172U (en) * | 2020-06-30 | 2021-04-13 | 江苏智信达建筑科技有限公司 | Template box-type superstructure is exempted from to assembled |
-
2023
- 2023-01-06 CN CN202310020386.1A patent/CN116084615A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006152699A (en) * | 2004-11-30 | 2006-06-15 | Sekisui Plastics Co Ltd | In-situ hollow concrete slab structure and its construction method |
CN101581122A (en) * | 2009-06-04 | 2009-11-18 | 王本淼 | Cast-in-place hollow floor with hidden protecting fume exhaust ductwork |
CN105696739A (en) * | 2015-12-23 | 2016-06-22 | 王海崴 | Cast-in-situ cavity floor adopting steel net cages with ribs |
CN106013567A (en) * | 2016-06-08 | 2016-10-12 | 湖南标迪夫节能科技有限公司 | Fabricated stressed island reinforced concrete cavity floor system |
CN212957172U (en) * | 2020-06-30 | 2021-04-13 | 江苏智信达建筑科技有限公司 | Template box-type superstructure is exempted from to assembled |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN119664037A (en) * | 2025-02-19 | 2025-03-21 | 合肥国瑞集成建筑科技有限公司 | Novel assembled building roof structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2021253808A1 (en) | Building technique for low-carbon society in high-technology era | |
CN101265723B (en) | Architecture structure system assembled by composite building board and building method | |
US20190257094A1 (en) | Building based on large-space structure and freestanding external envelope as well as construction method | |
CN103821276B (en) | A kind of assembled, modular architectural system | |
WO2017076070A1 (en) | Integrated-assembly steel structure building | |
CN106522359B (en) | Fully-assembled village and town dwelling type composite wall structure system and construction method thereof | |
CN205444458U (en) | Integrated assembled steel construction building | |
CN211286074U (en) | Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall | |
CN105569260A (en) | Fabricated concrete composite wallboard structure | |
CN105863317A (en) | Energy-saving environmentally-friendly type distribution room based on quick construction technique | |
CN206418663U (en) | A kind of prefabricated combined wall board of novel fabricated H types | |
CN112031210A (en) | Composite heat-insulation outer wall structure of hollow wall and preparation method | |
CN116084615A (en) | Concrete Hollow Roof with Fire Protection, Shock Absorption, Heat Insulation and Assembly Properties | |
CN107975163B (en) | An assembled double-layer exterior wall panel and installation structure and horizontal and vertical waterproof structure | |
CN210621917U (en) | Assembled light steel house system | |
CN111962715A (en) | Hollow outer wall body structure and preparation method thereof | |
CN107165303A (en) | External thermal insulation formula and cross combined wall and the practice with lead pipe coarse sand energy-dissipating and shock-absorbing key | |
CN207419699U (en) | A kind of energy-saving and environment-friendly industrialization prefabricated buildings structure | |
CN215519271U (en) | Be used for GSY outer wall board height to stride movement joint department connection structure | |
CN204676927U (en) | Module intelligence anti-seismic heat-preservation one splicing structure house | |
CN210067146U (en) | Simple passive house with environmental protection, energy saving and safety | |
CN110029759B (en) | Environment-friendly, energy-saving and safe simple passive house | |
CN205369703U (en) | Assembled concrete composite wall panel structure | |
CN204676701U (en) | Module intelligence anti-seismic heat-preservation one package assembly house | |
CN113931487B (en) | Steel construction and evaporate and press aerated concrete slab assembled villa system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |