Prior art keywords
frame
fixing
load
fixed
bearing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202211698943.7A
Other languages
Chinese (zh)
Other versions
CN116044065B (en
Inventor
陈佳伟
吴玲怡
王萱
陈颖
马政
徐嘉程
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Mechanized Construction Group Co Ltd
Priority to CN202211698943.7A priority Critical patent/CN116044065B/en
Publication of CN116044065A publication Critical patent/CN116044065A/en
Application granted granted Critical
Publication of CN116044065B publication Critical patent/CN116044065B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The application discloses a supporting structure for curtain wall relates to the field of curtain wall, and comprises upright posts, wherein the upright posts are vertical, the upright posts are fixed on a building, two upright posts are arranged at intervals in parallel along the horizontal direction, a cross beam is arranged between the two upright posts, the cross beam is horizontal, fixing assemblies are respectively connected between two ends of the cross beam and the two upright posts, and the cross beam is uniformly arranged at intervals along the vertical direction; a temporary support frame is arranged between the two upright posts, the temporary support frame comprises an upright frame and a bearing layer frame, the upright frame is detachably fixed on a building, the bearing layer frame is arranged on the upright frame in a lifting manner, and a fastening part is fixed between the bearing layer frame and the upright frame; the middle part of the cross beam is erected on the bearing layer frames, and the bearing layer frames are in one-to-one correspondence with the cross beams. This application has the middle part of reducing longer crossbeam and down takes place to warp the condition, reduces the error of distance between two adjacent longer crossbeams, promotes the installation quality's of curtain effect.

Description

一种幕墙用支承结构及其安装工艺A support structure for curtain wall and its installation process

技术领域technical field

本申请涉及幕墙的领域,尤其是涉及一种幕墙用支承结构及其安装工艺。The present application relates to the field of curtain walls, in particular to a support structure for curtain walls and an installation process thereof.

背景技术Background technique

幕墙是建筑的外墙围护,不承重,像幕布一样挂上去,故又称为“帷幕墙”,主要由装饰面板和支承结构体系组成,是现代大型和高层建筑常用的带有装饰效果的轻质墙体。The curtain wall is the outer wall enclosure of the building. It is not load-bearing and hangs up like a curtain, so it is also called "curtain wall". It is mainly composed of decorative panels and supporting structure systems. It is commonly used in modern large and high-rise buildings with decorative effects. Lightweight walls.

相关技术中,一种幕墙用支承结构,其包括立柱和横梁。立柱呈竖直,立柱沿水平方向间隔设置有两根,且两根立柱均固定于建筑外墙上或两根立柱的下端均固定于建筑的地坪上。横梁呈水平,横梁位于两个立柱之间,横梁的两端分别抵接于两个立柱,横梁的两端均通过紧固件和角板固定于对应立柱上,紧固件一般为铆钉或螺栓,且横梁在立柱上沿竖直方向设置有多个。实际安装中,先将两个立柱固定于建筑外墙上或地坪上,然后将横梁置于两个立柱之间,并经铆钉和螺栓将角板的两个侧板分别钉死于立柱和横梁上。之后,可以将幕墙的装饰面板安装于相邻两个的横梁之间。In the related art, a supporting structure for a curtain wall includes columns and beams. The uprights are vertical, and two uprights are arranged at intervals along the horizontal direction, and the two uprights are fixed on the outer wall of the building or the lower ends of the two uprights are fixed on the floor of the building. The beam is horizontal, the beam is located between two uprights, the two ends of the beam are in contact with the two uprights respectively, and both ends of the beam are fixed on the corresponding uprights by fasteners and gussets, the fasteners are generally rivets or bolts , and a plurality of beams are arranged vertically on the column. In the actual installation, first fix the two columns on the outer wall of the building or on the floor, then place the beam between the two columns, and nail the two side panels of the corner plate to the columns and on the beam. Afterwards, the decorative panels of the curtain wall can be installed between two adjacent beams.

采用上述方案,对长度较大的横梁进行安装时,横梁的中部容易下挠,相邻两个横梁之间的距离相对更难控制且安装误差较大,将致使幕墙的安装质量较差,存在待改进之处。Using the above scheme, when installing a long beam, the middle part of the beam is easy to deflect, and the distance between two adjacent beams is relatively difficult to control and the installation error is relatively large, which will lead to poor installation quality of the curtain wall and exist room for improvement.

发明内容Contents of the invention

为了改善相关技术中对长度较大的横梁进行安装时,两个相邻横梁之间的距离难以控制,并致使安装误差较大、幕墙的安装质量较差的问题,本申请提供了一种幕墙用支承结构及其安装工艺。In order to improve the problems in the related art that the distance between two adjacent beams is difficult to control when installing long beams, which leads to large installation errors and poor installation quality of the curtain wall, this application provides a curtain wall Supporting structures and their installation techniques.

第一方面,本申请提供的一种幕墙用支承结构,采用如下的技术方案:In the first aspect, the application provides a supporting structure for a curtain wall, which adopts the following technical solution:

一种幕墙用支承结构,包括立柱,所述立柱呈竖直,所述立柱固定于建筑上,所述立柱沿水平方向平行间隔设置有两根,两所述立柱之间设置有横梁,所述横梁呈水平,所述横梁的两端分别与两个立柱之间均连接有固定组件,且所述横梁沿竖直方向均匀间隔设置有多个;A supporting structure for a curtain wall, comprising uprights, the uprights are vertical, the uprights are fixed on a building, two uprights are arranged at intervals in parallel along the horizontal direction, a crossbeam is arranged between the two uprights, the The crossbeam is horizontal, the two ends of the crossbeam are respectively connected to the two columns with fixed components, and the crossbeam is evenly spaced along the vertical direction to arrange a plurality of them;

两所述立柱之间设置有临时支撑架,所述临时支撑架包括立架和承载层架,所述立架可拆卸固定于建筑上,所述承载层架升降设置于立架上,所述承载层架与立架之间固定有紧固部件;A temporary support frame is arranged between the two columns, and the temporary support frame includes a stand and a load-bearing layer frame. Fastening parts are fixed between the bearing layer frame and the stand;

所述横梁中部架设于承载层架上,所述承载层架与横梁一一对应。The middle part of the beam is erected on the load-bearing frame, and the load-bearing frame corresponds to the beam one by one.

通过采用上述技术方案,实际安装中,先安装两个立柱;然后,在两个立柱之间安装立架,并从下向上依次安装承载层架;安装每层承载层架时,可以在立架上上下升降承载层架,对承载层架的高度进行调节,并由紧固部件将承载层架固定于立架上;同时,每安装一层承载层架,随同吊装对应层的横梁,由承载层架对横梁的中部进行支撑,且将横梁的两端通过对应固定组件固定于立柱上。当所有横梁安装完毕后,可以拆除临时支撑架。通过这种方式,减少较长横梁的中部下挠的情况发生,并有助于缩小两个相邻的较长横梁之间距离的误差,有助于提升幕墙的安装质量。By adopting the above-mentioned technical scheme, in the actual installation, two uprights are installed first; then, a stand is installed between the two uprights, and the load-bearing shelf is installed sequentially from bottom to top; when installing each load-bearing shelf, the stand can Lift the load-bearing frame up and down, adjust the height of the load-bearing frame, and fix the load-bearing frame on the stand by the fastening parts; The layer frame supports the middle part of the crossbeam, and fixes the two ends of the crossbeam on the column through corresponding fixing components. When all beams have been installed, the temporary support frame can be removed. In this way, the downward deflection of the middle part of the longer beam is reduced, and the error of the distance between two adjacent longer beams is reduced, which helps to improve the installation quality of the curtain wall.

优选的,所述固定组件包括固定架,所述固定架固定于立柱上,所述横梁靠近固定架的端部设有嵌槽,所述固定架嵌入嵌槽内,所述固定架的上下两侧分别与嵌槽的上下两侧壁之间预留间隙,且所述横梁的端部设置有用于升降横梁的调节件。Preferably, the fixed assembly includes a fixed frame, the fixed frame is fixed on the column, the end of the beam near the fixed frame is provided with a slot, the fixed frame is embedded in the slot, the upper and lower sides of the fixed frame A gap is reserved between the two sides and the upper and lower side walls of the embedding groove, and the end of the beam is provided with an adjusting piece for lifting the beam.

通过采用上述技术方案,当横梁置于承载层架上后,将固定架嵌入嵌槽内。当横梁水平度存在误差时,可以通过调节件抬升或下落横梁的一端,从而实现对横梁水平度的调节。By adopting the above-mentioned technical scheme, after the beam is placed on the load-bearing layer frame, the fixing frame is embedded in the embedded groove. When there is an error in the horizontality of the crossbeam, one end of the crossbeam can be lifted or dropped by the adjusting member, thereby realizing the adjustment of the levelness of the crossbeam.

优选的,所述调节件为垫片,所述垫片在固定架上侧与嵌槽上侧壁之间、在固定架下侧与嵌槽下侧壁之间各设置有若干个。Preferably, the adjusting member is a gasket, and several gaskets are provided between the upper side of the fixing frame and the upper side wall of the socket, and between the lower side of the fixing frame and the lower side wall of the socket.

通过采用上述技术方案,实际运用中,工作人员可以更换不同厚度的垫片,从而抬升或下落横梁,有助于保证对横梁水平度正常的调节。By adopting the above-mentioned technical solution, in actual application, the staff can replace gaskets of different thicknesses, thereby raising or lowering the beam, which helps to ensure the normal adjustment of the levelness of the beam.

优选的,所述横梁在固定架的一端从上向下开设有第一腰型孔,所述第一腰型孔的长度方向平行于横梁的长度方向,所述固定组件还包括固定螺栓和固定螺母,所述固定螺栓贯穿固定架和第一腰型孔,且所述固定螺母螺纹连接于固定螺栓的端部。Preferably, the beam is provided with a first waist hole from top to bottom at one end of the fixing frame, the length direction of the first waist hole is parallel to the length direction of the beam, and the fixing assembly also includes a fixing bolt and a fixing A nut, the fixing bolt passes through the fixing frame and the first waist hole, and the fixing nut is threadedly connected to the end of the fixing bolt.

通过采用上述技术方案,实际安装中,工作人员可以沿横梁长度方向调节横梁与固定架之间的相对位置,然后由固定螺栓和固定螺母配合锁紧固定横梁和固定架,有助于保证两个相邻横梁之间相对位置的正确性。By adopting the above technical scheme, in actual installation, the staff can adjust the relative position between the beam and the fixing frame along the length direction of the beam, and then use the fixing bolts and fixing nuts to lock and fix the beam and the fixing frame, which helps to ensure two Correctness of relative position between adjacent beams.

优选的,所述固定架上从上向下开设有第二腰型孔,所述第二腰型孔的长度方向垂直于横梁的长度方向,所述固定组件还包括固定螺栓和固定螺母,所述固定螺栓贯穿第二腰型孔和横梁,且所述固定螺母螺纹连接于固定螺栓的端部。Preferably, a second waist-shaped hole is opened from top to bottom on the fixing frame, and the length direction of the second waist-shaped hole is perpendicular to the length direction of the crossbeam. The fixing assembly also includes fixing bolts and fixing nuts. The fixing bolts pass through the second waist hole and the beam, and the fixing nuts are screwed to the ends of the fixing bolts.

通过采用上述技术方案,实际安装中,工作人员可以沿横梁宽度方向调节横梁与固定架之间的相对位置,然后由固定螺栓和固定螺母配合锁紧固定横梁和固定架,有助于保证两个相邻横梁之间相对位置的正确性。By adopting the above technical scheme, in actual installation, the staff can adjust the relative position between the beam and the fixing frame along the width direction of the beam, and then use the fixing bolts and fixing nuts to lock and fix the beam and the fixing frame, which helps to ensure two Correctness of relative position between adjacent beams.

优选的,两所述立柱上端之间固定有结构梁,所述结构梁和相邻的横梁之间、相邻的两个横梁之间、最下方的横梁下侧与建筑之间均竖直固定有拉杆。Preferably, a structural beam is fixed between the upper ends of the two columns, and vertically fixed between the structural beam and adjacent beams, between two adjacent beams, and between the lowermost beam and the building There is a pull rod.

通过采用上述技术方案,由拉杆上拉并支撑横梁,有助于保证横梁的稳定性。By adopting the above technical solution, the crossbeam is pulled up and supported by the pull rod, which helps to ensure the stability of the crossbeam.

优选的,所述横梁的上侧两侧均转动连接有螺纹套,所述横梁上下两侧相邻的所述拉杆的端部分别穿入对应螺纹套并与对应螺纹套螺纹连接。Preferably, both sides of the upper side of the crossbeam are rotatably connected with threaded sleeves, and the ends of the tie rods adjacent to the upper and lower sides of the crossbeam respectively penetrate into corresponding threaded sleeves and are threadedly connected with the corresponding threaded sleeves.

通过采用上述技术方案,由螺纹套和拉杆螺纹配合,方便对拉杆的安装,并有助于保证对横梁正常的调节作业。By adopting the above-mentioned technical scheme, the threaded sleeve and the pull rod are threadedly matched, which facilitates the installation of the pull rod and helps to ensure the normal adjustment operation of the beam.

第二方面,本申请提供了一种幕墙用支承结构的安装工艺,采用如下的技术方案:In the second aspect, the present application provides an installation process of a supporting structure for a curtain wall, which adopts the following technical scheme:

一种幕墙用支承结构的安装工艺,包括如下步骤,An installation process for a supporting structure for a curtain wall, comprising the following steps,

S1、将两个立柱固定于建筑上;S1. Fix the two columns on the building;

S2、在两个立柱之间安装立架,使得立架固定于建筑上;S2, installing a stand between the two columns, so that the stand is fixed on the building;

S3、安装承载层架和横梁;S3, install the load-carrying shelf and the beam;

S3.1、在立架上安装承载层架,调节承载层架的高度,并通过紧固部件将承载层架固定于立架上;然后,吊装横梁,将横梁的中部置于承载层架上,由承载层架对横梁的高度进行定位,再通过固定组件将横梁的两端分别固定在两个立柱上;S3.1. Install the load-bearing frame on the stand, adjust the height of the load-bearing frame, and fix the load-bearing frame on the stand through fastening parts; then, hoist the beam and place the middle of the beam on the load-bearing frame , the height of the beam is positioned by the load-bearing frame, and then the two ends of the beam are respectively fixed on the two columns through the fixing components;

S3.2、重复3.1步骤,从下向上对承载层架和横梁进行安装,直至完成对所有横梁的安装。S3.2. Repeat step 3.1 to install the load-carrying shelf and beams from bottom to top until all beams are installed.

S4、拆除承载层架和立架。S4. Remove the load-carrying shelf and stand.

通过采用上述技术方案,减少较长横梁的中部下挠的情况发生,并有助于缩小两个相邻的较长横梁之间距离的误差,有助于提升幕墙的安装质量。By adopting the above technical solution, the occurrence of deflection in the middle of the longer beams is reduced, and the error of the distance between two adjacent longer beams is reduced, which helps to improve the installation quality of the curtain wall.

优选的,在S1中,在两个立柱的上端安装有结构梁;Preferably, in S1, structural beams are installed on the upper ends of the two columns;

在S3.1步骤中,采用全站仪对承载层架的高度调节进行测量和定位;In step S3.1, a total station is used to measure and position the height adjustment of the load-bearing shelf;

并且,在横梁的下侧安装拉杆;And, install tie rods on the lower side of the beam;

S3.3、在最上方的横梁与结构梁之间安装拉杆。S3.3. Install tie rods between the uppermost beam and the structural beam.

通过采用上述技术方案,一方面,由全站仪对每个承载层架的高度进行定位,有助于保证承载层架和横梁高度的精度;另一方面,由拉杆上拉和支撑横梁,有助于保证横梁的稳定性和承载能力。By adopting the above technical scheme, on the one hand, the height of each load-bearing shelf is positioned by the total station, which helps to ensure the accuracy of the height of the load-bearing shelf and the beam; Helps ensure the stability and load-carrying capacity of the beam.

优选的,在S4中,从上向下逐层拆除承载层架,同时通过全站仪随着承载层架的拆除逐层对横梁进行测量,并对横梁进行调节矫正;Preferably, in S4, the load-bearing frame is removed layer by layer from top to bottom, and at the same time, the beam is measured layer by layer through the total station along with the removal of the load frame, and the beam is adjusted and corrected;

当横梁水平度存在误差时,取出固定架与嵌槽上下侧壁之间的垫片,并旋动对应的螺纹套,提升或下落横梁的一侧;然后,在固定架与嵌槽上下侧壁之间填充相应厚度的垫片。When there is an error in the horizontality of the beam, take out the gasket between the fixing frame and the upper and lower side walls of the slot, and turn the corresponding threaded sleeve to lift or drop one side of the beam; Spacers of corresponding thickness are filled in between.

通过采用上述技术方案,由全站仪对每个横梁进行测量,并可以根据测量情况对每个横梁进行调节和矫正,从而有助于进一步缩小两个相邻的较长横梁之间距离的误差,有助于提升幕墙的安装质量。By adopting the above-mentioned technical scheme, each beam is measured by the total station, and each beam can be adjusted and corrected according to the measurement situation, which helps to further reduce the distance error between two adjacent longer beams , help to improve the installation quality of the curtain wall.

综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:

1.通过升降设置于立架上的承载层架,并由紧固部件将承载层架固定于立架上,此时承载层架可以对横梁进行支撑和定位,从而有助于减少较长横梁的中部下挠的情况发生,并有助于缩小两个相邻的较长横梁之间距离的误差,有助于提升幕墙的安装质量;1. By lifting and lowering the load-bearing layer frame set on the stand, and fixing the load-bearing layer frame on the stand by the fastening parts, the load-bearing layer frame can support and position the beam at this time, thus helping to reduce the long beam The occurrence of deflection in the middle part of the curtain wall helps to reduce the error of the distance between two adjacent long beams, and helps to improve the installation quality of the curtain wall;

2.借助横梁与嵌槽之间的间隙、开设于横梁上的第一腰型孔以及开设于固定架上的第二腰型孔,从而实现对横梁的调节,有助于保证横梁安装的精度,并有助于进一步提升幕墙的安装质量。2. With the help of the gap between the beam and the slot, the first waist-shaped hole opened on the beam and the second waist-shaped hole opened on the fixing frame, the adjustment of the beam can be realized, which helps to ensure the accuracy of the installation of the beam , and help to further improve the installation quality of the curtain wall.

附图说明Description of drawings

图1为本实施例主要体现幕墙用支承结构整体结构的轴测示意图;Fig. 1 mainly embodies the axonometric schematic diagram of the overall structure of the supporting structure for the curtain wall in this embodiment;

图2为图1局部A的放大图,主要体现临时支撑架和拉杆的结构;Fig. 2 is an enlarged view of part A in Fig. 1, which mainly reflects the structure of the temporary support frame and tie rods;

图3为本实施例主要体现固定组件结构的局部爆炸示意图。Fig. 3 is a partial exploded schematic diagram mainly embodying the fixed component structure of this embodiment.

附图标记:1、立柱;2、结构梁;3、临时支撑架;31、立架;311、侧架;3111、立管;3112、横管;32、承载层架;321、承载管;33、可调扣件;4、横梁;41、嵌槽;42、第一腰型孔;5、固定组件;51、固定架;511、第二腰型孔;52、固定螺栓;53、固定螺母;6、垫片;7、拉杆;71、螺纹套;8、预埋件。Reference signs: 1. Upright column; 2. Structural beam; 3. Temporary support frame; 31. Vertical frame; 311. Side frame; 3111. Standpipe; 3112. Horizontal pipe; 33. Adjustable fastener; 4. Beam; 41. Embedding groove; 42. First waist hole; 5. Fixing component; 51. Fixing frame; 511. Second waist hole; 52. Fixing bolt; Nut; 6. Gasket; 7. Pull rod; 71. Thread sleeve; 8. Embedded parts.

具体实施方式Detailed ways

以下结合附图对本申请作进一步详细说明。The application will be described in further detail below in conjunction with the accompanying drawings.

本申请实施例公开了一种幕墙用支承结构及其安装工艺。The embodiment of the application discloses a supporting structure for a curtain wall and an installation process thereof.

参照图1和图2,幕墙用支承结构,包括立柱1和结构梁2,立柱1呈竖直,立柱1的下端与建筑的地坪固定,结构梁2呈水平,结构梁2的两端分别与两个立柱1的上端固定。两个立柱1之间设置有临时支撑架3,临时支撑架3包括立架31和承载层架32,立架31的下侧固定于建筑的地坪上,承载层架32升降设置在立架31上,且承载层架32和立架31之间固定有紧固部件。两个立柱1之间还设置有横梁4,横梁4呈水平,横梁4的中部架设于承载层架32上,横梁4的两端分别与两个立柱1之间均固定有固定组件5。并且,横梁4沿竖直方向均匀间隔设置有多个,固定组件5、承载层架32以及紧固部件三者均与横梁4对应设置。Referring to Figure 1 and Figure 2, the supporting structure for the curtain wall includes a column 1 and a structural beam 2, the column 1 is vertical, the lower end of the column 1 is fixed to the floor of the building, the structural beam 2 is horizontal, and the two ends of the structural beam 2 are respectively It is fixed with the upper ends of two columns 1. A temporary support frame 3 is arranged between the two columns 1. The temporary support frame 3 includes a stand 31 and a bearing layer frame 32. 31, and a fastening component is fixed between the carrying layer frame 32 and the stand 31. A crossbeam 4 is also arranged between the two columns 1. The crossbeam 4 is horizontal. The middle part of the beam 4 is erected on the load-bearing layer frame 32. Both ends of the beam 4 are respectively fixed with fixing components 5 between the two columns 1. In addition, a plurality of cross beams 4 are evenly spaced along the vertical direction, and the fixing assembly 5 , the carrying layer frame 32 and the fastening components are all arranged correspondingly to the cross beams 4 .

实际运用中,先在建筑的地坪上固定两个立柱1,并在两个立柱1的上端固定架51设结构梁2;然后,在两个立柱1之间安装立架31,并在立架31上安装承载层架32,此时,可以对承载层架32的高度进行调节,并通过紧固部件固定连接承载层架32与立架31;之后,吊装横梁4,使得横梁4的中部架设于承载层架32上,并由承载层架32对横梁4进行支撑和定位;最后,通过两组固定组件5分别将横梁4的两端固定于两个立柱1上。完成对所有横梁4的安装后,可以拆除临时支撑架3。In practical application, two columns 1 are first fixed on the floor of the building, and a structural beam 2 is arranged on the upper end fixing frame 51 of the two columns 1; then, a stand 31 is installed between the two columns 1, and a Install the bearing layer frame 32 on the frame 31, at this moment, the height of the bearing layer frame 32 can be adjusted, and the bearing layer frame 32 and the stand 31 are fixedly connected by fastening parts; It is erected on the load-bearing frame 32, and the beam 4 is supported and positioned by the load-bearing frame 32; finally, the two ends of the beam 4 are respectively fixed on the two columns 1 by two sets of fixing components 5. After completing the installation of all beams 4, the temporary support frame 3 can be dismantled.

具体而言,参见图1和图2,立架31包括两个侧架311,两个侧架311分别位于横梁4宽度方向的两侧。两个侧架311结构一致,每层承载层架32的结构均一致,现以其中一个侧架311和一层承载层架32为例进行阐述。Specifically, referring to FIG. 1 and FIG. 2 , the stand 31 includes two side frames 311 , and the two side frames 311 are respectively located on both sides of the beam 4 in the width direction. The two side frames 311 have the same structure, and the structure of each layer of the load-bearing frame 32 is the same. Now take one of the side frames 311 and one layer of the load-bearing frame 32 as an example to illustrate.

侧架311包括立管3111和横管3112,立管3111沿横梁4长度方向平行间隔设置有两个,横梁4位于两个立管3111之间,横管3112的两端分别通过脚手架扣件锁紧固定于两个立管3111上,且横管3112在立管3111上沿竖直方向均匀间隔设置有多个。并且,立管3111可以沿竖直方向设置多个,相邻两个立管3111之间通过脚手架扣件连接,从而保证侧架311具备足够的高度。The side frame 311 includes a standpipe 3111 and a horizontal pipe 3112. Two standpipes 3111 are arranged at intervals in parallel along the length direction of the crossbeam 4. The crossbeam 4 is located between the two standpipes 3111. The two ends of the crosspipe 3112 are respectively locked by scaffold fasteners. It is tightly fixed on the two standpipes 3111, and a plurality of horizontal pipes 3112 are evenly spaced along the vertical direction on the standpipes 3111. In addition, a plurality of standpipes 3111 can be arranged vertically, and two adjacent standpipes 3111 are connected by scaffold fasteners, so as to ensure that the side frame 311 has a sufficient height.

承载层架32包括两个沿横梁4长度方向间隔设置的承载管321,两个承载管321的轴线均沿横梁4的宽度方向设置。紧固部件为可调扣件33,每个承载管321的两端均分别通过可调扣件33与立架31沿横梁4宽度方向设置的两个立管3111固定连接。为提升对横梁4支撑的稳定性,立架31沿横梁4长度方向均匀间隔设置有三个。安装横梁4时,从下向上对承载层架32进行依次安装,横梁4从下向上依次随同承载层架32进行安装,即安装每层承载层架32后,随之安装对应层横梁4,减少上侧承载层架32对下侧横梁4安装的阻碍,从而有助于保证对横梁4安装的便捷性。The carrying layer frame 32 includes two carrying tubes 321 arranged at intervals along the length direction of the crossbeam 4 , and the axes of the two carrying pipes 321 are both arranged along the width direction of the crossbeam 4 . The fastening component is an adjustable fastener 33, and the two ends of each bearing tube 321 are fixedly connected to the two standpipes 3111 provided by the stand 31 along the width direction of the crossbeam 4 through the adjustable fastener 33 respectively. In order to improve the stability of supporting the beam 4 , three stands 31 are evenly spaced along the length direction of the beam 4 . When the beam 4 is installed, the load-bearing frame 32 is installed sequentially from bottom to top, and the beam 4 is installed with the load-bearing frame 32 successively from the bottom to the top. The upper bearing layer frame 32 hinders the installation of the lower crossbeam 4, thereby helping to ensure the convenience of the installation of the crossbeam 4.

参见图2和图3,每个固定组件5的结构均一致,现以其中一个固定组件5为例进行阐述。固定组件5包括固定架51,固定架51焊接固定于立柱1上。横梁4靠近固定架51的端部设有嵌槽41,固定架51嵌入嵌槽41,固定架51分别与嵌槽41的上下两侧壁之间均预留间隙。横梁4的端部还设有调节件,调节件为垫片6,垫片6在固定架51上侧与嵌槽41上侧壁之间、在固定架51与嵌槽41下侧壁之间各设置有若干个。实际安装中,先在固定架51与嵌槽41上下侧壁之间的两个间隙内安装相同厚度的垫片6,使得固定架51在嵌槽41内居中,再将固定架51焊接于立柱1上。当横梁4的水平度存在误差时,调节横梁4一端的高度,可以通过增加固定架51下侧的垫片6厚度,减小固定架51上侧的垫片6厚度,以提升横梁4一端的高度;也可以通过减小固定架51下侧的垫片6厚度,增加固定架51上侧的垫片6厚度,以降低横梁4一端的高度,从而实现对横梁4水平度的调节。Referring to FIG. 2 and FIG. 3 , the structures of each fixing component 5 are consistent, and one of the fixing components 5 is taken as an example for illustration. The fixing assembly 5 includes a fixing frame 51 , and the fixing frame 51 is welded and fixed on the column 1 . The crossbeam 4 is provided with a slot 41 near the end of the fixing bracket 51 , the fixing bracket 51 is inserted into the slot 41 , and there is a gap between the fixing bracket 51 and the upper and lower side walls of the slot 41 . The end of the crossbeam 4 is also provided with an adjustment piece, the adjustment piece is a gasket 6, and the gasket 6 is between the upper side of the fixing frame 51 and the upper side wall of the insertion groove 41, and between the fixing bracket 51 and the lower side wall of the insertion groove 41 There are several of each setting. In actual installation, first install gaskets 6 of the same thickness in the two gaps between the fixing frame 51 and the upper and lower side walls of the insertion groove 41, so that the fixing frame 51 is centered in the insertion groove 41, and then the fixing frame 51 is welded to the column 1 on. When there is an error in the levelness of the crossbeam 4, the height of one end of the crossbeam 4 can be adjusted, and the thickness of the gasket 6 on the lower side of the fixed mount 51 can be increased, and the thickness of the gasket 6 on the upper side of the fixed mount 51 can be reduced to enhance the height of the crossbeam 4 one end. Height; also can increase the thickness of gasket 6 on the upper side of the fixed mount 51 by reducing the gasket 6 thickness on the lower side of the fixed mount 51 to reduce the height of one end of the crossbeam 4, thereby realizing the adjustment of the horizontality of the crossbeam 4.

固定组件5还包括固定螺栓52和固定螺母53,每个横梁4的端部位置均从上向下开设有第一腰型孔42,第一腰型孔42的长度方向平行于横梁4的长度方向,固定架51上从上向下开设有第二腰型孔511,第二腰型孔511的长度方向平行于横梁4的宽度方向,固定螺栓52贯穿第一腰型孔42和第二腰型孔511,且固定螺母53螺纹连接于固定螺栓52的端部。实际运用中,可以沿第一腰型孔42和第二腰型孔511长度方向对横梁4的位置进行调节,并经固定螺栓52和固定螺母53配合锁紧固定架51和横梁4。The fixing assembly 5 also includes fixing bolts 52 and fixing nuts 53, and the end position of each beam 4 is provided with a first waist-shaped hole 42 from top to bottom, and the length direction of the first waist-shaped hole 42 is parallel to the length of the beam 4 direction, the fixing frame 51 is provided with a second waist hole 511 from top to bottom, the length direction of the second waist hole 511 is parallel to the width direction of the beam 4, and the fixing bolt 52 runs through the first waist hole 42 and the second waist hole. type hole 511 , and the fixing nut 53 is threadedly connected to the end of the fixing bolt 52 . In practice, the position of the beam 4 can be adjusted along the length direction of the first waist hole 42 and the second waist hole 511 , and the fixing frame 51 and the beam 4 can be locked by the fixing bolt 52 and the fixing nut 53 .

参见图1和图2,为了保证临时支撑架3拆除后横梁4的稳定性,最下方的横梁4下侧与建筑的地坪之间、相邻的两个横梁4之间、结构梁2和相邻的横梁4之间均竖直设置有拉杆7,所有的拉杆7轴线共线。建筑的地坪上预埋有预埋件8,预埋件8的上侧、横梁4的上下两侧均竖直设置有螺纹套71,预埋件8上的螺纹套71与预埋件8固定连接,横梁4上的螺纹套71均与对应横梁4转动连接。其中,在建筑地坪与最下方横梁4之间、两个相邻横梁4之间,每个拉杆7的两端分别穿入对应两个螺纹套71并与螺纹套71螺纹连接;在结构梁2和最上方的横梁4之间,对应拉杆7的上端与结构梁2固定,该拉杆7的下端穿入对应螺纹套71并与螺纹套71螺纹连接。并且,沿竖直方向共轴线的拉杆7为一组,拉杆7沿横梁4宽度方向设置有两组,两组拉杆7为一列,拉杆7沿横梁4长度方向均匀间隔设置有六列,且螺纹套71与拉杆7对应设置。Referring to Fig. 1 and Fig. 2, in order to ensure the stability of the crossbeam 4 after the temporary support frame 3 is removed, between the lower side of the bottom crossbeam 4 and the floor of the building, between two adjacent crossbeams 4, the structural beam 2 and There are tie rods 7 vertically arranged between the adjacent beams 4 , and the axes of all the tie rods 7 are collinear. Embedded parts 8 are pre-embedded on the floor of the building, and threaded sleeves 71 are vertically arranged on the upper side of the embedded parts 8 and the upper and lower sides of the beam 4. The threaded sleeves 71 on the embedded parts 8 and the embedded parts 8 Fixedly connected, the threaded sleeves 71 on the crossbeam 4 are all rotatably connected with the corresponding crossbeam 4 . Wherein, between the building floor and the lowermost crossbeam 4, and between two adjacent crossbeams 4, the two ends of each pull rod 7 respectively penetrate into two corresponding threaded sleeves 71 and are threadedly connected with the threaded sleeves 71; 2 and the uppermost beam 4, the upper end of the corresponding tie rod 7 is fixed to the structural beam 2, and the lower end of the tie rod 7 penetrates into the corresponding threaded sleeve 71 and is threadedly connected with the threaded sleeve 71. And, the tie rods 7 coaxial in the vertical direction form a group, the tie rods 7 are provided with two groups along the width direction of the beam 4, the two groups of tie rods 7 are a row, and the tie rods 7 are arranged in six rows at even intervals along the length direction of the crossbeam 4, and the threads The sleeve 71 is set corresponding to the pull rod 7 .

本申请实施例还公开了一种幕墙用支承结构的安装工艺,包括如下步骤,The embodiment of the present application also discloses an installation process of a supporting structure for a curtain wall, which includes the following steps,

S1、安装外框。将两个立柱1固定于建筑的地坪上,并在两个立柱1的上端之间固定安装结构梁2。S1. Install the outer frame. Fix the two columns 1 on the floor of the building, and fix and install the structural beam 2 between the upper ends of the two columns 1 .

S2、安装立架31。立架31在两个立柱1之间沿结构梁2长度方向均匀间隔设置有三个,并将每个侧架311的下侧均固定于建筑地坪上。本实施例中,可以将侧架311的下端埋入地坪;也可以在建筑地坪上对应立架31的位置预埋安装座,并将立架31固定于安装座上。S2, install the stand 31. Three uprights 31 are arranged at regular intervals along the length direction of the structural beam 2 between the two uprights 1 , and the lower side of each side frame 311 is fixed on the building floor. In this embodiment, the lower end of the side frame 311 can be embedded in the ground; or the mounting seat can be pre-embedded at the position corresponding to the stand 31 on the building floor, and the stand 31 can be fixed on the mounting seat.

S3、安装承载层架32和横梁4。S3. Install the bearing layer frame 32 and the beam 4.

S3.1、安装单层承载层架32和横梁4。在三个立架31上陆续安装单层承载层架32,由全站仪对承载层架32的承载管321的标高进行测量和定位,并由工作人员将承载管321移动至对应标高;经全站仪测量无误后,通过可调扣件33将承载层架32的两个承载管321均固定与立架31上;然后,通过吊机吊装横梁4,将横梁4的中部置于三个承载层架32上,由承载层架32对横梁4的高度进行定位并对横梁4进行支撑;随后,将两个固定架51安装于横梁4的两端,使得两个固定架51分别穿入横梁4两端的嵌槽41内,并在安装架与嵌槽41上下侧壁之间的两个间隙内填装相同厚度的垫片6;此时,工作人员可以移动横梁4和固定架51,使得两个固定架51分别与两个立柱1抵接,并对每个固定架51和对应立柱1之间进行焊接;最后,将固定螺栓52穿过第一腰型孔42和第二腰型孔511,此时可以沿第一腰型孔42和第二腰型孔511的长度方向对横梁4的位置进行调节,再将固定螺母53螺纹连接于固定螺栓52的端部,由固定螺栓52和固定螺母53配合对横梁4和固定架51之间进行固定。S3.1. Install the single-layer bearing frame 32 and the beam 4 . Single-layer load-carrying layer frames 32 are successively installed on the three vertical frames 31, and the elevation of the load-bearing tube 321 of the load-bearing layer frame 32 is measured and positioned by the total station, and the load-bearing tube 321 is moved to the corresponding elevation by the staff; After the measurement of the total station is correct, the two bearing tubes 321 of the bearing layer frame 32 are all fixed on the stand 31 by the adjustable fastener 33; On the bearing layer frame 32, the height of the beam 4 is positioned by the bearing layer frame 32 and the beam 4 is supported; then, two fixing frames 51 are installed on the two ends of the beam 4, so that the two fixing frames 51 respectively penetrate into the In the slots 41 at both ends of the beam 4, fill the spacers 6 of the same thickness in the two gaps between the mounting bracket and the upper and lower side walls of the slot 41; at this time, the staff can move the beam 4 and the fixed frame 51, Make the two fixing frames 51 abut against the two columns 1 respectively, and weld between each fixing frame 51 and the corresponding column 1; finally, pass the fixing bolts 52 through the first waist-shaped hole 42 and the second waist-shaped hole hole 511, now the position of the beam 4 can be adjusted along the length direction of the first waist-shaped hole 42 and the second waist-shaped hole 511, and then the fixing nut 53 is screwed to the end of the fixing bolt 52, and the fixing bolt 52 Cooperate with the fixing nut 53 to fix between the beam 4 and the fixing frame 51 .

完成对横梁4的固定后,在横梁4的下侧安装拉杆7,使得拉杆7的两端分别旋入两个螺纹套71内。After finishing fixing the crossbeam 4, a pull rod 7 is installed on the lower side of the crossbeam 4, so that the two ends of the pull rod 7 are screwed into two threaded sleeves 71 respectively.

需要指出的是,本实施例中的固定螺栓52贯穿每个垫片6,以减少垫片6脱落的情况发生。It should be pointed out that the fixing bolts 52 in this embodiment pass through each spacer 6 to reduce the occurrence of the spacer 6 falling off.

S3.2、重复3.1步骤,从下向上对承载层架32和横梁4进行安装,直至完成对所有横梁4的安装。S3.2. Repeat the step 3.1 to install the load-carrying shelf 32 and the crossbeams 4 from bottom to top until all the crossbeams 4 are installed.

其中,当立架31的立管3111高度不足时,可以通过脚手架扣件向上连接新的立管3111,并增加立架31的高度。Wherein, when the height of the riser 3111 of the stand 31 is insufficient, a new standpipe 3111 can be connected upwards through a scaffold fastener, and the height of the stand 31 can be increased.

S3.3、在最上方的横梁4与结构梁2之间安装拉杆7,并使得该拉杆7的上端与结构梁2固定,使得该拉杆7的下端螺纹连接于最上方横梁4上侧的螺纹套71。S3.3. Install a tie rod 7 between the uppermost beam 4 and the structural beam 2, and fix the upper end of the tie rod 7 to the structural beam 2, so that the lower end of the tie rod 7 is screwed to the thread on the upper side of the uppermost beam 4 Set 71.

S4、拆除承载层架32和立架31。S4. Remove the bearing layer frame 32 and the vertical frame 31.

从上向下逐层拆除承载层架32,同时通过全站仪随着承载层架32的拆除逐层对横梁4进行测量,即拆除一层承载层架32,随即对相应层横梁4进行测量,并对相应层横梁4进行调节矫正;Remove the bearing layer frame 32 layer by layer from top to bottom, and measure the crossbeam 4 layer by layer with the removal of the load layer frame 32 through the total station at the same time, that is, remove one layer of load-bearing layer frame 32, and then measure the corresponding layer beam 4 , and adjust and correct the beam 4 on the corresponding floor;

当横梁4水平度存在误差时,松开对应横梁4一端的固定螺栓52和固定螺母53,取出固定架51与嵌槽41上下侧壁之间的垫片6,并旋动对应横梁4上下两侧的螺纹套71,通过拉杆7提升或下落横梁4的一侧;然后,在固定架51与嵌槽41上下侧壁之间填充对应厚度的垫片6;当固定架51与嵌槽41上侧壁或下侧壁之间抵接时,可以仅在固定架51与嵌槽41的下侧壁或上侧壁之间填充对应厚度的垫片6。When there is an error in the levelness of the crossbeam 4, loosen the fixing bolt 52 and the fixing nut 53 at one end of the corresponding crossbeam 4, take out the spacer 6 between the fixing frame 51 and the upper and lower side walls of the embedded groove 41, and rotate the upper and lower sides of the corresponding crossbeam 4. The threaded sleeve 71 on the side lifts or drops one side of the crossbeam 4 through the pull rod 7; then, fill the spacer 6 of corresponding thickness between the fixed frame 51 and the upper and lower side walls of the slot 41; when the fixed frame 51 and the slot 41 When the sidewalls or the lower sidewalls are in contact with each other, only the gasket 6 of corresponding thickness can be filled between the fixing frame 51 and the lower sidewall or the upper sidewall of the socket 41 .

同时,可以再次沿第一腰型孔42和第二腰型孔511的长度方向对横梁4的位置进行调节。At the same time, the position of the beam 4 can be adjusted again along the length direction of the first waist hole 42 and the second waist hole 511 .

调节后,由固定螺栓52和固定螺母53配合对横梁4和固定架51之间进行固定。After adjustment, the beam 4 and the fixing frame 51 are fixed by the cooperation of the fixing bolt 52 and the fixing nut 53 .

承载层架32和立架31拆除完毕,所有横梁4矫正完毕,即完成对幕墙用支承结构的安装。After the load-carrying shelf 32 and the stand 31 have been dismantled, and all beams 4 have been rectified, the installation of the supporting structure for the curtain wall is completed.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.

Claims (11)

1.一种幕墙用支承结构,包括立柱(1),所述立柱(1)呈竖直,所述立柱(1)固定于建筑上,所述立柱(1)沿水平方向平行间隔设置有两根,两所述立柱(1)之间设置有横梁(4),所述横梁(4)呈水平,所述横梁(4)的两端分别与两个立柱(1)之间均连接有固定组件(5),且所述横梁(4)沿竖直方向均匀间隔设置有多个;1. A support structure for a curtain wall, comprising a column (1), the column (1) is vertical, the column (1) is fixed on the building, and the column (1) is provided with two parallel intervals along the horizontal direction root, a beam (4) is arranged between the two columns (1), the beam (4) is horizontal, and the two ends of the beam (4) are respectively connected to the two columns (1). component (5), and a plurality of beams (4) are evenly spaced along the vertical direction; 其特征在于:两所述立柱(1)之间设置有临时支撑架(3),所述临时支撑架(3)包括立架(31)和承载层架(32),所述立架(31)可拆卸固定于建筑上,所述承载层架(32)升降设置于立架(31)上,所述承载层架(32)与立架(31)之间固定有紧固部件;It is characterized in that: a temporary support frame (3) is arranged between the two columns (1), and the temporary support frame (3) includes a stand (31) and a load-bearing layer frame (32), and the stand (31 ) is detachably fixed on the building, the load-bearing frame (32) is lifted and set on the stand (31), and a fastening part is fixed between the load-bearing frame (32) and the stand (31); 所述横梁(4)中部架设于承载层架(32)上,所述承载层架(32)与横梁(4)一一对应。The middle part of the beam (4) is erected on the load-bearing frame (32), and the load-bearing frame (32) corresponds to the beam (4) one by one. 2.根据权利要求1所述的一种幕墙用支承结构,其特征在于:所述固定组件(5)包括固定架(51),所述固定架(51)固定于立柱(1)上,所述横梁(4)靠近固定架(51)的端部设有嵌槽(41),所述固定架(51)嵌入嵌槽(41)内,所述固定架(51)的上下两侧分别与嵌槽(41)的上下两侧壁之间预留间隙,且所述横梁(4)的端部设置有用于升降横梁(4)的调节件。2. A supporting structure for a curtain wall according to claim 1, characterized in that: the fixing assembly (5) includes a fixing frame (51), and the fixing frame (51) is fixed on the column (1), so that The end of the crossbeam (4) close to the fixed frame (51) is provided with a slot (41), the fixed frame (51) is embedded in the slot (41), and the upper and lower sides of the fixed frame (51) are respectively connected with A gap is reserved between the upper and lower side walls of the slot (41), and the end of the beam (4) is provided with an adjusting piece for lifting the beam (4). 3.根据权利要求2所述的一种幕墙用支承结构,其特征在于:所述调节件为垫片(6),所述垫片(6)在固定架(51)上侧与嵌槽(41)上侧壁之间、在固定架(51)下侧与嵌槽(41)下侧壁之间各设置有若干个。3. A supporting structure for a curtain wall according to claim 2, characterized in that: the adjusting member is a gasket (6), and the gasket (6) is on the upper side of the fixing frame (51) and the socket ( 41) Between the upper side walls, between the lower side of the fixing frame (51) and the lower side wall of the caulking groove (41), there are several pieces respectively. 4.根据权利要求2所述的一种幕墙用支承结构,其特征在于:所述横梁(4)在固定架(51)的一端从上向下开设有第一腰型孔(42),所述第一腰型孔(42)的长度方向平行于横梁(4)的长度方向,所述固定组件(5)还包括固定螺栓(52)和固定螺母(53),所述固定螺栓(52)贯穿固定架(51)和第一腰型孔(42),且所述固定螺母(53)螺纹连接于固定螺栓(52)的端部。4. A supporting structure for a curtain wall according to claim 2, characterized in that: the beam (4) is provided with a first waist-shaped hole (42) from top to bottom at one end of the fixing frame (51), so that The length direction of the first waist hole (42) is parallel to the length direction of the beam (4), the fixing assembly (5) also includes fixing bolts (52) and fixing nuts (53), the fixing bolts (52) The fixing frame (51) and the first waist hole (42) pass through, and the fixing nut (53) is threadedly connected to the end of the fixing bolt (52). 5.根据权利要求2所述的一种幕墙用支承结构,其特征在于:所述固定架(51)上从上向下开设有第二腰型孔(511),所述第二腰型孔(511)的长度方向垂直于横梁(4)的长度方向,所述固定组件(5)还包括固定螺栓(52)和固定螺母(53),所述固定螺栓(52)贯穿第二腰型孔(511)和横梁(4),且所述固定螺母(53)螺纹连接于固定螺栓(52)的端部。5. A supporting structure for a curtain wall according to claim 2, characterized in that: a second waist-shaped hole (511) is opened on the fixing frame (51) from top to bottom, and the second waist-shaped hole The length direction of (511) is perpendicular to the length direction of the beam (4), the fixing assembly (5) also includes fixing bolts (52) and fixing nuts (53), and the fixing bolts (52) pass through the second waist hole (511) and the beam (4), and the fixing nut (53) is threadedly connected to the end of the fixing bolt (52). 6.根据权利要求1所述的一种幕墙用支承结构,其特征在于:两所述立柱(1)上端之间固定有结构梁(2),所述结构梁(2)和相邻的横梁(4)之间、相邻的两个横梁(4)之间、最下方的横梁(4)下侧与建筑之间均竖直固定有拉杆(7)。6. A supporting structure for a curtain wall according to claim 1, characterized in that: a structural beam (2) is fixed between the upper ends of the two columns (1), and the structural beam (2) and the adjacent beam Between (4), between two adjacent beams (4), and between the lower side of the lowest beam (4) and the building, tie rods (7) are vertically fixed. 7.根据权利要求6所述的一种幕墙用支承结构,其特征在于:所述横梁(4)的上侧两侧均转动连接有螺纹套(71),所述横梁(4)上下两侧相邻的所述拉杆(7)的端部分别穿入对应螺纹套(71)并与对应螺纹套(71)螺纹连接。7. The supporting structure for a curtain wall according to claim 6, characterized in that: both sides of the upper side of the beam (4) are rotatably connected with threaded sleeves (71), and the upper and lower sides of the beam (4) are Ends of the adjacent pull rods (7) respectively penetrate into corresponding threaded sleeves (71) and are threadedly connected with the corresponding threaded sleeves (71). 8.一种幕墙用支承结构的安装工艺,其特征在于:包括如下步骤,8. An installation process for a curtain wall supporting structure, characterized in that: comprising the following steps, S1、将两个立柱(1)固定于建筑上;S1. Fix the two columns (1) on the building; S2、在两个立柱(1)之间安装立架(31),使得立架(31)固定于建筑上;S2. Install the stand (31) between the two columns (1), so that the stand (31) is fixed on the building; S3、安装承载层架(32)和横梁(4);S3, install the bearing shelf (32) and the beam (4); S3.1、在立架(31)上安装承载层架(32),调节承载层架(32)的高度,并通过紧固部件将承载层架(32)固定于立架(31)上;然后,吊装横梁(4),将横梁(4)的中部置于承载层架(32)上,由承载层架(32)对横梁(4)的高度进行定位,再通过固定组件(5)将横梁(4)的两端分别固定在两个立柱(1)上;S3.1. Install the load-bearing frame (32) on the stand (31), adjust the height of the load-bearing frame (32), and fix the load-bearing frame (32) on the stand (31) through fastening parts; Then, hoist the crossbeam (4), place the middle part of the crossbeam (4) on the load-bearing shelf (32), the height of the crossbeam (4) is positioned by the load-bearing shelf (32), and then the fixed component (5) will The two ends of the beam (4) are respectively fixed on the two columns (1); S3.2、重复3.1步骤,从下向上对承载层架(32)和横梁(4)进行安装,直至完成对所有横梁(4)的安装。S3.2. Repeat step 3.1 to install the load-carrying shelf (32) and beams (4) from bottom to top until all beams (4) are installed. 9.S4、拆除承载层架(32)和立架(31)。9.S4. Remove the bearing shelf (32) and stand (31). 10.根据权利要求8所述的一种幕墙用支承结构的安装工艺,其特征在于:在S1中,在两个立柱(1)的上端安装有结构梁(2);10. The installation process of a support structure for a curtain wall according to claim 8, characterized in that: in S1, a structural beam (2) is installed on the upper ends of the two columns (1); 在S3.1步骤中,采用全站仪对承载层架(32)的高度调节进行测量和定位;In step S3.1, a total station is used to measure and position the height adjustment of the load-bearing shelf (32); 并且,在横梁(4)的下侧安装拉杆(7);And, the tie rod (7) is installed on the lower side of the beam (4); S3.3、在最上方的横梁(4)与结构梁(2)之间安装拉杆(7)。S3.3. Install tie rods (7) between the uppermost beam (4) and the structural beam (2). 11.根据权利要求9所述的一种幕墙用支承结构的安装工艺,其特征在于:在S4中,从上向下逐层拆除承载层架(32),同时通过全站仪随着承载层架(32)的拆除逐层对横梁(4)进行测量,并对横梁(4)进行调节矫正;11. The installation process of a supporting structure for a curtain wall according to claim 9, characterized in that: in S4, the bearing layer frame (32) is removed layer by layer from top to bottom, and at the same time, the total station is used to follow the bearing layer The removal of the frame (32) measures the beam (4) layer by layer, and adjusts and corrects the beam (4); 当横梁(4)水平度存在误差时,取出固定架(51)与嵌槽(41)上下侧壁之间的垫片(6),并旋动对应的螺纹套(71),提升或下落横梁(4)的一侧;然后,在固定架(51)与嵌槽(41)上下侧壁之间填充对应厚度的垫片(6)。When there is an error in the levelness of the beam (4), take out the gasket (6) between the fixing frame (51) and the upper and lower side walls of the slot (41), and turn the corresponding threaded sleeve (71) to raise or lower the beam (4); then, fill the gasket (6) of corresponding thickness between the fixed frame (51) and the upper and lower side walls of the caulking groove (41).
CN202211698943.7A 2022-12-28 2022-12-28 A supporting structure for curtain wall and its installation process Active CN116044065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211698943.7A CN116044065B (en) 2022-12-28 2022-12-28 A supporting structure for curtain wall and its installation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211698943.7A CN116044065B (en) 2022-12-28 2022-12-28 A supporting structure for curtain wall and its installation process

Publications (2)

Publication Number Publication Date
CN116044065A true CN116044065A (en) 2023-05-02
CN116044065B CN116044065B (en) 2025-07-01

Family

ID=86130586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211698943.7A Active CN116044065B (en) 2022-12-28 2022-12-28 A supporting structure for curtain wall and its installation process

Country Status (1)

Country Link
CN (1) CN116044065B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117326202A (en) * 2023-11-17 2024-01-02 深圳市科泰新能源车用空调技术有限公司 packaging device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006008293A1 (en) * 2004-07-19 2006-01-26 Jacques Riguelle Load-bearing structure for buildings and method for construction of a load-bearing structure
JP2018017049A (en) * 2016-07-28 2018-02-01 不二サッシ株式会社 Curtain wall support device
KR102144434B1 (en) * 2019-10-11 2020-08-13 조한영 Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
CN213477332U (en) * 2020-09-30 2021-06-18 中建鼎元建设工程有限公司 Curtain wall framework mounting structure
CN114482349A (en) * 2022-01-12 2022-05-13 浙江精工钢结构集团有限公司 Construction method of straight-through double-pull-rod steel frame supported long-span glass curtain wall system
CN115522719A (en) * 2022-09-27 2022-12-27 广东韶钢工程技术有限公司 A kind of industrial plant curtain wall installation tool and using method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2006008293A1 (en) * 2004-07-19 2006-01-26 Jacques Riguelle Load-bearing structure for buildings and method for construction of a load-bearing structure
JP2018017049A (en) * 2016-07-28 2018-02-01 不二サッシ株式会社 Curtain wall support device
KR102144434B1 (en) * 2019-10-11 2020-08-13 조한영 Installation of temporary apparatus for curtain wall and temporary apparatus for curtain wall
CN213477332U (en) * 2020-09-30 2021-06-18 中建鼎元建设工程有限公司 Curtain wall framework mounting structure
CN114482349A (en) * 2022-01-12 2022-05-13 浙江精工钢结构集团有限公司 Construction method of straight-through double-pull-rod steel frame supported long-span glass curtain wall system
CN115522719A (en) * 2022-09-27 2022-12-27 广东韶钢工程技术有限公司 A kind of industrial plant curtain wall installation tool and using method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117326202A (en) * 2023-11-17 2024-01-02 深圳市科泰新能源车用空调技术有限公司 packaging device

Also Published As

Publication number Publication date
CN116044065B (en) 2025-07-01

Similar Documents

Publication Publication Date Title
CN108643594B (en) Manual correction device for cantilever steel beam and construction method thereof
CN112412036A (en) Net rack installation construction method and net rack lifting device
CN116044065A (en) Supporting structure for curtain wall and mounting process thereof
CN217205526U (en) Industrial and civil building wall reinforcing device
CN111335679A (en) A prefabricated heat-insulating steel bar processing plant and its construction method
CN209780275U (en) lifting device for large-span beam reinforcing steel bar
CN114934657B (en) Integral lifting construction method for main stage suspension structure of theater
CN219651601U (en) Steel structure package jacking device
CN219528094U (en) Novel assembled stone material curtain fossil fragments installation node
CN218756936U (en) Non-thrust arch bridge arch foot pre-embedding structure
CN214739603U (en) Super thick terrace dividing strip installation adjusting device
CN115522719A (en) A kind of industrial plant curtain wall installation tool and using method
CN109436990B (en) Elevator well adjusting device
CN213087514U (en) Prefabricated balcony erection bracing frame of plain type
CN207905333U (en) Saddle combines Construction of Supporting hoistable platform
CN111576834B (en) A fixed boiler maintenance platform and installation method
CN222541878U (en) A keel structure of external wall panel
CN2263161Y (en) Self-lifting scaffold
CN110905183B (en) A hanging basket suspension structure installation system on a portal structure and a construction method thereof
CN219173978U (en) Elevator attachment system for construction elevator to reach top of building
CN220868753U (en) Device for suspending scaffold
CN218861674U (en) Aluminum alloy scaffold
CN219060931U (en) Curved-surface net rack jacking system capable of avoiding horizontal deviation
CN118745807A (en) A kind of combined steel column with an embracing guide rail and convenient for installation and transportation based on an intelligent climbing frame and a method thereof
CN218437658U (en) Curtain wall unit interlayer connecting system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant