CN116025751A - A pilot-operated nitrogen blanketing valve - Google Patents

A pilot-operated nitrogen blanketing valve Download PDF

Info

Publication number
CN116025751A
CN116025751A CN202310013551.0A CN202310013551A CN116025751A CN 116025751 A CN116025751 A CN 116025751A CN 202310013551 A CN202310013551 A CN 202310013551A CN 116025751 A CN116025751 A CN 116025751A
Authority
CN
China
Prior art keywords
valve
pilot
core
pilot valve
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202310013551.0A
Other languages
Chinese (zh)
Inventor
龙海涛
张红莲
方士豪
李绍利
郁勇
吴翔
姚东升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Fushen Special Valve Co ltd
Original Assignee
Jiangsu Fushen Special Valve Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Fushen Special Valve Co ltd filed Critical Jiangsu Fushen Special Valve Co ltd
Priority to CN202310013551.0A priority Critical patent/CN116025751A/en
Publication of CN116025751A publication Critical patent/CN116025751A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Fluid-Driven Valves (AREA)

Abstract

本发明公开了一种先导式氮封阀,包括:通过螺栓连接的阀体与阀盖,阀体和阀盖内设置有主阀活塞,主阀活塞与阀盖内设置有主阀弹簧,阀盖顶端设置有连接筒,阀盖与连接筒之间通过O形圈密封及螺栓连接,阀盖与连接筒中间设置有一体成型的导阀阀芯,导阀阀芯槽内设置O形圈,导阀阀芯与阀盖间设有导阀弹簧,导阀阀芯上通过螺母并紧导阀膜片,导阀膜片大圈处压在阀盖与连接筒之间凹槽内。本发明导阀阀芯作无摩擦运动,形成上下对称的平衡力,提升了导阀弹簧及导阀阀芯上O形圈的使用寿命,减少了后期维修的次数,采用一体式的导阀阀芯设计,优化结构,减少加工工序,节约成本,整体结构优化,使用标准件,增加了互换性,结构简单,性能稳定。

Figure 202310013551

The invention discloses a pilot-operated nitrogen sealing valve, which comprises: a valve body and a valve cover connected by bolts, a main valve piston is arranged in the valve body and the valve cover, a main valve spring is arranged in the main valve piston and the valve cover, and the valve There is a connecting cylinder on the top of the cover, and the valve cover and the connecting cylinder are sealed and bolted by O-rings. There is an integrally formed pilot valve core in the middle of the valve cover and the connecting cylinder, and an O-ring is set in the groove of the pilot valve core. A pilot valve spring is arranged between the pilot valve spool and the bonnet, and the pilot valve spool is tightened with nuts to tighten the pilot valve diaphragm, and the large circle of the pilot valve diaphragm is pressed in the groove between the bonnet and the connecting cylinder. In the present invention, the pilot valve spool moves without friction, forming a symmetrical balance force up and down, improving the service life of the pilot valve spring and the O-ring on the pilot valve spool, reducing the number of later maintenance, and adopting an integrated pilot valve Core design, optimized structure, reduced processing procedures, cost savings, optimized overall structure, use of standard parts, increased interchangeability, simple structure, and stable performance.

Figure 202310013551

Description

一种先导式氮封阀A pilot-operated nitrogen sealing valve

技术领域technical field

本发明涉及气氮封阀技术领域,更具体地说,本发明涉及一种先导式氮封阀。The invention relates to the technical field of nitrogen sealing valves, and more specifically, the invention relates to a pilot-operated nitrogen sealing valve.

背景技术Background technique

当前市场上主要是自力式氮封阀,由于自力式氮封阀对入口压力有限制,常需要通过减压后才能给自力式氮封阀供气;自力式氮封阀流量与压力降成正比,即压力降大则流量大,压力降小流量小,不能实现瞬间快速补氮。除此之外,还有先导式氮封阀,可以解决自力式氮封阀的缺点,其通过膜片感应到储罐的压力,当储罐压力达到或低于储罐的设定压力值时,带动阀芯向上或向下运动,然后带动主阀活塞补氮或停止补氮。结构简单,工作灵敏,调节压力方便,补气迅速,售后方便。At present, the self-operated nitrogen sealing valve is mainly used in the market. Since the self-operated nitrogen sealing valve has restrictions on the inlet pressure, it is often necessary to decompress to supply gas to the self-operated nitrogen sealing valve; the flow rate of the self-operated nitrogen sealing valve is proportional to the pressure drop , that is, the flow rate is large when the pressure drop is large, and the flow rate is small when the pressure drop is small, and instant and rapid nitrogen supplementation cannot be realized. In addition, there is also a pilot-operated nitrogen sealing valve, which can solve the shortcomings of the self-operated nitrogen sealing valve. It senses the pressure of the storage tank through the diaphragm. When the pressure of the storage tank reaches or is lower than the set pressure value of the storage tank , to drive the valve core to move up or down, and then drive the main valve piston to replenish nitrogen or stop nitrogen replenishment. The structure is simple, the work is sensitive, the pressure is convenient to adjust, the gas is replenished quickly, and the after-sales service is convenient.

现有的先导式氮封阀往往结构复杂,加工精度高,配合要求也高,导阀阀芯使用分体式设计,其加工工艺复杂,配合精度要求高,且导阀阀芯在开启和关闭的过程中受到O形圈的摩擦力,对导阀弹簧工艺提出了更高的要求,报损的频率更快,并且导阀阀芯O形圈也更易损坏,后期售后更频繁。Existing pilot-operated nitrogen seal valves often have complex structures, high processing precision, and high matching requirements. The friction force of the O-ring during the process puts forward higher requirements for the pilot valve spring process, and the frequency of damage reports is faster, and the O-ring of the pilot valve core is also more easily damaged, and the after-sales service is more frequent.

因此,有必要提出一种先导式氮封阀,以至少部分地解决现有技术中存在的问题。Therefore, it is necessary to propose a pilot-operated nitrogen blanketing valve to at least partly solve the problems existing in the prior art.

发明内容Contents of the invention

在发明内容部分中引入了一系列简化形式的概念,这将在具体实施方式部分中进一步详细说明。本发明的发明内容部分并不意味着要试图限定出所要求保护的技术方案的关键特征和必要技术特征,更不意味着试图确定所要求保护的技术方案的保护范围。A series of concepts in simplified form are introduced in the Summary of the Invention, which will be further detailed in the Detailed Description. The summary of the invention in the present invention does not mean to limit the key features and essential technical features of the claimed technical solution, nor does it mean to try to determine the protection scope of the claimed technical solution.

为至少部分地解决上述问题,本发明提供了一种先导式氮封阀,包括:To at least partly solve the above problems, the present invention provides a pilot-operated nitrogen blanketing valve, comprising:

通过螺栓连接的阀体与阀盖,阀体和阀盖内设置有主阀活塞,主阀活塞与阀盖内设置有主阀弹簧,阀盖顶端设置有连接筒,阀盖与连接筒之间通过O形圈一密封及螺栓连接,阀盖与连接筒中间设置有一体成型的导阀阀芯,导阀阀芯槽内设置O形圈二,导阀阀芯与阀盖间设有导阀弹簧,导阀阀芯上通过螺母并紧导阀膜片,导阀膜片大圈处压在阀盖与连接筒之间凹槽内。The valve body and the bonnet are connected by bolts. The main valve piston is arranged in the valve body and the bonnet. The main valve spring is arranged in the main valve piston and the bonnet. Through O-ring seal and bolt connection, there is an integrally formed pilot valve spool between the valve cover and the connecting cylinder, O-ring 2 is set in the pilot valve spool groove, and a pilot valve is installed between the pilot valve spool and the bonnet The spring, the pilot valve spool passes the nut and tightens the pilot valve diaphragm, and the large circle of the pilot valve diaphragm is pressed in the groove between the valve cover and the connecting cylinder.

优选的是,连接筒顶端设置有膜盖,膜盖包括上膜盖和下膜盖,连接筒与下膜盖之间通过螺栓连接,下膜盖与上膜盖之间设有膜片,导阀阀芯顶在膜片中部,膜片把上膜盖和下膜盖围设形成的腔室分为上腔及下腔,下膜盖底端设有与储罐连接的管路,上膜盖顶端通过螺纹连接有防护盖,防护盖内设有调节螺栓,调节螺栓延伸至上膜盖内,且调节螺栓和膜片之间设有调节弹簧。Preferably, a membrane cover is provided at the top of the connecting cylinder, the membrane cover includes an upper membrane cover and a lower membrane cover, the connecting cylinder and the lower membrane cover are connected by bolts, and a diaphragm is arranged between the lower membrane cover and the upper membrane cover, and the guide The valve core is placed in the middle of the diaphragm, and the diaphragm divides the chamber formed by the upper diaphragm cover and the lower diaphragm cover into an upper chamber and a lower chamber. The top of the cover is connected with a protective cover through threads, and an adjusting bolt is arranged in the protective cover, and the adjusting bolt extends into the upper membrane cover, and an adjusting spring is arranged between the adjusting bolt and the diaphragm.

优选的是,主阀活塞把阀体、阀盖分为上中下三个腔室,主阀活塞与阀盖围设形成滑动空间,主阀活塞滑动设置于滑动空间内,阀体下腔室顶端设置有阀座,主阀活塞底端与阀座通过O形圈密封连接,主阀活塞上方的面积大于阀座的面积。Preferably, the main valve piston divides the valve body and the bonnet into three chambers, upper, middle and lower, the main valve piston and the bonnet form a sliding space, the main valve piston is slidably arranged in the sliding space, and the lower chamber of the valve body The top is provided with a valve seat, the bottom end of the main valve piston is sealed with the valve seat through an O-ring, and the area above the main valve piston is larger than the area of the valve seat.

优选的是,导阀阀芯包括从上至下依次连接的第一芯体、第二芯体和第三芯体,第一芯体、第二芯体和第三芯体的直径逐渐增大,第一芯体穿设下膜盖与膜片接触,阀盖与连接筒围设形成导阀腔,第二芯体和第三芯体设置于导阀腔内,第二芯体上开设有O形圈槽,O形圈二设置于O形圈槽内,第三芯体外侧设有螺纹,螺母螺接于第三芯体外侧,第三芯体靠近第二芯体的一端设置有挡块,导阀膜片小圈处压接于螺母和挡块之间。Preferably, the spool of the pilot valve includes a first core, a second core and a third core which are sequentially connected from top to bottom, and the diameters of the first core, the second core and the third core gradually increase , the first core body is pierced with the lower membrane cover to contact the diaphragm, the valve cover and the connecting cylinder are surrounded to form a pilot valve chamber, the second core body and the third core body are arranged in the pilot valve chamber, and the second core body is provided with O-ring groove, O-ring 2 is set in the O-ring groove, threads are provided on the outside of the third core body, nuts are screwed on the outside of the third core body, and the end of the third core body close to the second core body is provided with a stopper Block, the small ring of the pilot valve diaphragm is crimped between the nut and the block.

优选的是,第三芯体底端开设有阀芯凹槽,导阀弹簧设置于阀芯凹槽与阀盖之间,导阀阀芯上设置有T形气体通道,T形气体通道的水平段穿设第二芯体侧端设置,T形气体通道的竖直段与阀芯凹槽连通。Preferably, the bottom end of the third core is provided with a valve core groove, the pilot valve spring is arranged between the valve core groove and the valve cover, a T-shaped gas channel is arranged on the pilot valve core, and the level of the T-shaped gas channel is The section is set through the side end of the second core body, and the vertical section of the T-shaped gas channel communicates with the groove of the valve core.

优选的是,导阀腔包括从上至下依次设置的导阀腔一、导阀腔二和导阀腔三,导阀腔一和导阀腔二设置于连接筒内,导阀腔三设置于阀盖内,O形圈与导阀腔一和导阀腔二的连接拐角接触。Preferably, the pilot valve chamber includes pilot valve chamber 1, pilot valve chamber 2 and pilot valve chamber 3 arranged sequentially from top to bottom, pilot valve chamber 1 and pilot valve chamber 2 are arranged in the connecting cylinder, and pilot valve chamber 3 is arranged Inside the bonnet, the O-ring is in contact with the connecting corner of pilot chamber one and pilot chamber two.

优选的是,连接筒两侧分别连通开设有与导阀腔二连通的左出气孔和右进气孔,连接筒上还设置有进气部和出气部,进气部与右进气孔连通,出气部通过管路与阀体左出气孔连通,导阀腔二经过左出气孔通过气流通道与阀体的上腔室连通。Preferably, the two sides of the connecting cylinder are respectively connected with the left air outlet and the right air inlet connected with the pilot valve cavity two, and the connecting cylinder is also provided with an air inlet and an air outlet, and the air inlet communicates with the right air inlet , the air outlet part communicates with the left air outlet of the valve body through the pipeline, and the pilot valve chamber two passes through the left air outlet and communicates with the upper chamber of the valve body through the air flow channel.

优选的是,右进气孔直径是出气部直径0.25-0.1倍。Preferably, the diameter of the right air inlet is 0.25-0.1 times the diameter of the air outlet.

优选的是,导阀阀芯在连接筒内壁做上下无摩擦运动。Preferably, the spool of the pilot valve moves up and down on the inner wall of the connecting cylinder without friction.

优选的是,导阀膜片大圈连接有密封块,密封块的形状采用半圆形、圆形、三角形和锥形中的任意一种。Preferably, the large circle of the pilot valve diaphragm is connected with a sealing block, and the shape of the sealing block is any one of semicircle, circle, triangle and cone.

相比现有技术,本发明至少包括以下有益效果:Compared with the prior art, the present invention at least includes the following beneficial effects:

本发明提供的一种先导式氮封阀,导阀阀芯作无摩擦运动,形成上下对称的平衡力,提升了导阀弹簧及导阀阀芯上O形圈的使用寿命,减少了后期维修的次数,采用一体式的导阀阀芯设计,优化结构,减少加工工序,节约成本,整体结构优化,使用标准件,增加了互换性,结构简单,性能稳定。In the pilot-operated nitrogen sealing valve provided by the present invention, the pilot valve spool moves without friction, forming a symmetrical balance force up and down, which improves the service life of the pilot valve spring and the O-ring on the pilot valve spool, and reduces later maintenance The number of times, the integrated pilot valve core design is adopted, the structure is optimized, the processing steps are reduced, the cost is saved, the overall structure is optimized, the standard parts are used, the interchangeability is increased, the structure is simple, and the performance is stable.

本发明所述的一种先导式氮封阀,本发明的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本发明的研究和实践而为本领域的技术人员所理解。For a pilot-operated nitrogen blanketing valve according to the present invention, other advantages, objectives and features of the present invention will be partly embodied by the following description, and partly will be understood by those skilled in the art through the research and practice of the present invention.

附图说明Description of drawings

附图用来提供对本发明的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention, and constitute a part of the description, and are used together with the embodiments of the present invention to explain the present invention, and do not constitute a limitation to the present invention. In the attached picture:

图1为本发明一种先导式氮封阀的结构示意图;Fig. 1 is the structural representation of a kind of pilot type nitrogen blanketing valve of the present invention;

图2为本发明一种先导式氮封阀的连接筒处局部结构示意图;Fig. 2 is a schematic diagram of the partial structure of the connecting cylinder of a pilot-operated nitrogen blanketing valve of the present invention;

图3为本发明一种先导式氮封阀的连接筒处局部结构示意图;Fig. 3 is a schematic diagram of the partial structure of the connection cylinder of a pilot-operated nitrogen blanketing valve of the present invention;

图4为本发明一种先导式氮封阀中导阀阀芯的结构示意图;Fig. 4 is a schematic structural view of the pilot valve spool in a pilot-operated nitrogen blanketing valve of the present invention;

图5为本发明一种先导式氮封阀中导阀膜片的结构示意图。Fig. 5 is a structural schematic diagram of a pilot valve diaphragm in a pilot-operated nitrogen blanketing valve of the present invention.

图中:1.阀体;2.主阀活塞;3.阀盖;4.主阀弹簧;5.O形圈一;6.连接筒;7.导阀弹簧;8.导阀阀芯;9.导阀膜片;10.螺母;11.O形圈二;12.下膜盖;13.膜片;14.上膜盖;15.调节弹簧;16.防护盖;17.调节螺栓;18.上腔;19.下腔;20.管路;21.阀座;22.出气部;23.进气部;24.导阀腔一;25.导阀腔二;26.导阀腔三;61.左出气孔;62.右进气孔;63.气流通道;81.第一芯体;82.第二芯体;83.第三芯体;84.O形圈槽;85.挡块;86.阀芯凹槽;87.T形气体通道;91.密封块。In the figure: 1. Valve body; 2. Main valve piston; 3. Bonnet; 4. Main valve spring; 5. O-ring 1; 6. Connecting cylinder; 7. Pilot valve spring; 9. Pilot valve diaphragm; 10. Nut; 11. O-ring two; 12. Lower diaphragm cover; 13. Diaphragm; 14. Upper diaphragm cover; 15. Adjusting spring; 16. Protective cover; 17. Adjusting bolt; 18. Upper chamber; 19. Lower chamber; 20. Pipeline; 21. Valve seat; 22. Outlet part; 23. Intake part; 24. Pilot valve chamber one; 25. Pilot valve chamber two; 26. Pilot valve chamber Three; 61. Left air outlet; 62. Right air inlet; 63. Air flow channel; 81. First core; 82. Second core; 83. Third core; 84. O-ring groove; 85. Block; 86. Spool groove; 87. T-shaped gas channel; 91. Sealing block.

具体实施方式Detailed ways

下面结合附图以及实施例对本发明做进一步的详细说明,以令本领域技术人员参照说明书文字能够据以实施。The present invention will be described in further detail below in conjunction with the accompanying drawings and embodiments, so that those skilled in the art can implement it with reference to the description.

应当理解,本文所使用的诸如“具有”、“包含”以及“包括”术语并不排除一个或多个其它元件或其组合的存在或添加。It should be understood that terms such as "having", "comprising" and "including" used herein do not exclude the presence or addition of one or more other elements or combinations thereof.

如图1-5所示,本发明提供了一种先导式氮封阀,包括:As shown in Figures 1-5, the present invention provides a pilot-operated nitrogen blanketing valve, including:

通过螺栓连接的阀体1与阀盖3,阀体1和阀盖3内设置有主阀活塞2,主阀活塞2与阀盖3内设置有主阀弹簧4,阀盖3顶端设置有连接筒6,阀盖3与连接筒6之间通过O形圈一5密封及螺栓连接,阀盖3与连接筒6中间设置有一体成型的导阀阀芯8,导阀阀芯8槽内设置O形圈二11,导阀阀芯8与阀盖3间设有导阀弹簧7,导阀阀芯8上通过螺母10并紧导阀膜片9,导阀膜片9大圈处压在阀盖3与连接筒6之间凹槽内。The valve body 1 and the bonnet 3 are connected by bolts, the main valve piston 2 is arranged in the valve body 1 and the bonnet 3, the main valve spring 4 is arranged in the main valve piston 2 and the bonnet 3, and the top of the bonnet 3 is provided with a connection Cylinder 6, the valve cover 3 and the connecting cylinder 6 are sealed and bolted by O-ring-5, and there is an integrally formed pilot valve core 8 in the middle of the valve cover 3 and the connecting cylinder 6, and the pilot valve core 8 is set in the groove O-ring two 11, a pilot valve spring 7 is provided between the pilot valve spool 8 and the valve cover 3, the pilot valve spool 8 passes through the nut 10 and tightens the pilot valve diaphragm 9, and the large circle of the pilot valve diaphragm 9 is pressed on In the groove between the valve cover 3 and the connecting cylinder 6.

上述技术方案的工作原理和有益效果为:The working principle and beneficial effects of the above-mentioned technical scheme are:

导阀阀芯8采用一体式加工,解决了加工工艺复杂、成本增加、配合要求更高的问题,导阀膜片9采用一体式夹布工艺,解决了传统氮封阀O形圈工作中产生的摩擦力及长期工作后摩擦力增大导致导阀弹簧7塑性变形,并且O形圈在长期使用后更易损坏造成售后间隔时间短的问题。Pilot valve spool 8 adopts integrated processing, which solves the problems of complicated processing technology, increased cost, and higher coordination requirements. Pilot valve diaphragm 9 adopts integrated fabric clamping process, which solves the problem of The friction force and the increase of friction force after long-term work lead to plastic deformation of the pilot valve spring 7, and the O-ring is more likely to be damaged after long-term use, resulting in the problem of short after-sales intervals.

在一个实施例中,连接筒6顶端设置有膜盖,膜盖包括上膜盖14和下膜盖12,连接筒6与下膜盖12之间通过螺栓连接,下膜盖12与上膜盖14之间设有膜片13,导阀阀芯8顶在膜片13中部,膜片13把上膜盖14和下膜盖12围设形成的腔室分为上腔18及下腔19,下膜盖14底端设有与储罐连接的管路20,上膜盖14顶端通过螺纹连接有防护盖16,防护盖16内设有调节螺栓17,调节螺栓17延伸至上膜盖14内,且调节螺栓17和膜片13之间设有调节弹簧15。In one embodiment, a membrane cover is provided at the top of the connecting cylinder 6, and the membrane cover includes an upper membrane cover 14 and a lower membrane cover 12, and the connecting cylinder 6 and the lower membrane cover 12 are connected by bolts, and the lower membrane cover 12 and the upper membrane cover Diaphragm 13 is arranged between 14, pilot valve spool 8 tops in the middle of diaphragm 13, and diaphragm 13 divides the cavity formed by upper membrane cover 14 and lower membrane cover 12 into upper cavity 18 and lower cavity 19, The bottom end of the lower membrane cover 14 is provided with a pipeline 20 connected to the storage tank, and the top end of the upper membrane cover 14 is threadedly connected with a protective cover 16. The protective cover 16 is provided with an adjusting bolt 17, and the adjusting bolt 17 extends into the upper membrane cover 14. Moreover, an adjusting spring 15 is provided between the adjusting bolt 17 and the diaphragm 13 .

上述技术方案的工作原理和有益效果为:The working principle and beneficial effects of the above-mentioned technical scheme are:

上腔18与下腔19被膜片13分割,作用在膜片13上互为一对平衡力,管路20与储罐连接,当管路20感应到储罐内压力下降时,下腔19内的压力减低,调节弹簧15带动膜片13向下,带动导阀阀芯8向下移动,使O形圈二11与连接筒6内壁分离,将O形圈二11打开,此时导阀打开,使氮封阀能够根据储罐内压力的大小调节导阀的通断,为导阀阀芯8上下移动提供动力,通过转动调节螺栓17能够改变膜片13上方受到的压力,以此来设置储罐的设定压力,操作简单,动作灵敏。The upper chamber 18 and the lower chamber 19 are divided by the diaphragm 13, acting on the diaphragm 13 as a pair of balanced forces, the pipeline 20 is connected to the storage tank, when the pipeline 20 senses the pressure drop in the storage tank, the lower chamber 19 The pressure inside decreases, the adjustment spring 15 drives the diaphragm 13 downward, drives the pilot valve spool 8 to move downward, separates the O-ring 2 11 from the inner wall of the connecting cylinder 6, opens the O-ring 2 11, and at this time the pilot valve Open, so that the nitrogen blanketing valve can adjust the on-off of the pilot valve according to the pressure in the storage tank, and provide power for the pilot valve spool 8 to move up and down. By turning the adjusting bolt 17, the pressure on the top of the diaphragm 13 can be changed, so as to Set the set pressure of the storage tank, the operation is simple and the action is sensitive.

在一个实施例中,主阀活塞2把阀体1、阀盖3分为上中下三个腔室,主阀活塞2与阀盖3围设形成滑动空间,主阀活塞2滑动设置于滑动空间内,阀体1下腔室顶端设置有阀座21,主阀活塞2底端与阀座21通过O形圈密封连接,主阀活塞2上方的面积大于阀座21的面积。In one embodiment, the main valve piston 2 divides the valve body 1 and the valve cover 3 into upper, middle and lower chambers. The main valve piston 2 and the valve cover 3 are surrounded to form a sliding space, and the main valve piston 2 is slidably arranged on the sliding In the space, a valve seat 21 is arranged on the top of the lower chamber of the valve body 1, and the bottom end of the main valve piston 2 is sealed with the valve seat 21 through an O-ring. The area above the main valve piston 2 is larger than the area of the valve seat 21.

上述技术方案的工作原理和有益效果为:The working principle and beneficial effects of the above-mentioned technical scheme are:

主阀活塞2用于控制阀体1通道的通断,当上下的两个腔室内受到压力相同时,主阀活塞2牢牢压在阀座21上,将阀体1的通道阻隔,当上腔室受到的压力远远小于下腔室的压力时,作用在阀座21处的力打开阀体1通道,使阀体1连通。The main valve piston 2 is used to control the opening and closing of the channel of the valve body 1. When the pressure in the upper and lower chambers is the same, the main valve piston 2 firmly presses on the valve seat 21 to block the channel of the valve body 1. When the pressure of the chamber is much lower than the pressure of the lower chamber, the force acting on the valve seat 21 opens the channel of the valve body 1 to make the valve body 1 communicate.

在一个实施例中,导阀阀芯8包括从上至下依次连接的第一芯体81、第二芯体82和第三芯体83,第一芯体81、第二芯体82和第三芯体83的直径逐渐增大,第一芯体81穿设下膜盖12与膜片13接触,阀盖3与连接筒6围设形成导阀腔,第二芯体82和第三芯体83设置于导阀腔内,第二芯体82上开设有O形圈槽84,O形圈二11设置于O形圈槽84内,第三芯体83外侧设有螺纹,螺母10螺接于第三芯体83外侧,第三芯体83靠近第二芯体82的一端设置有挡块85,导阀膜片9小圈处压接于螺母10和挡块85之间。In one embodiment, the pilot valve spool 8 includes a first core 81, a second core 82 and a third core 83 connected sequentially from top to bottom, the first core 81, the second core 82 and the third core The diameter of the three cores 83 gradually increases, the first core 81 is pierced with the lower membrane cover 12 to contact the diaphragm 13, the valve cover 3 and the connecting cylinder 6 are surrounded to form a guide valve cavity, the second core 82 and the third core The body 83 is set in the pilot valve chamber, the second core body 82 is provided with an O-ring groove 84, the O-ring 211 is set in the O-ring groove 84, the outside of the third core body 83 is provided with threads, and the nut 10 is threaded. Connected to the outside of the third core 83 , the end of the third core 83 close to the second core 82 is provided with a stopper 85 , and the small circle of the pilot valve diaphragm 9 is crimped between the nut 10 and the stopper 85 .

上述技术方案的工作原理和有益效果为:The working principle and beneficial effects of the above-mentioned technical scheme are:

导阀阀芯8采包括一体成型的第一芯体81、第二芯体82和第三芯体83,O形圈二11具有弹性,使用时将O形圈二11卡接于O形圈槽84内,将导阀膜片9小圈套设在第三芯体83上,并靠近挡块85,然后在第三芯体83上拧上螺母10,螺母10转动并靠近挡块85,将导阀膜片9夹设在螺母10和挡块85之间,对导阀膜片9进行固定。导阀阀芯8采用一体式设计,有效实现了O形圈二11和导阀膜片9的同时固定,优化了导阀阀芯8结构,避免采用分体结构时连接易松动,连接精度不高的问题,减少氮封阀加工工序,节约成本。Pilot valve core 8 includes integrally formed first core body 81, second core body 82 and third core body 83. O-ring 211 is elastic, and O-ring 211 is clamped to O-ring during use. In the groove 84, set the pilot valve diaphragm 9 small ring on the third core 83, and close to the stopper 85, then screw the nut 10 on the third core 83, the nut 10 rotates and close to the stopper 85, the The pilot valve diaphragm 9 is sandwiched between the nut 10 and the block 85 to fix the pilot valve diaphragm 9 . The pilot valve spool 8 adopts an integrated design, which effectively realizes the simultaneous fixation of the O-ring 2 11 and the pilot valve diaphragm 9, optimizes the structure of the pilot valve spool 8, and avoids easy loosening of the connection when the split structure is adopted, and the connection accuracy is not good High problem, reduce nitrogen sealing valve processing procedure, save cost.

在一个实施例中,第三芯体83底端开设有阀芯凹槽86,导阀弹簧7设置于阀芯凹槽86与阀盖3之间,导阀阀芯8上设置有T形气体通道87,T形气体通道87的水平段穿设第二芯体82侧端设置,T形气体通道87的竖直段与阀芯凹槽86连通。In one embodiment, the bottom end of the third core 83 is provided with a valve core groove 86, the pilot valve spring 7 is arranged between the valve core groove 86 and the valve cover 3, and the pilot valve core 8 is provided with a T-shaped gas spring. Channel 87 , the horizontal section of the T-shaped gas channel 87 is provided through the side end of the second core 82 , and the vertical section of the T-shaped gas channel 87 communicates with the valve core groove 86 .

在一个实施例中,导阀腔包括从上至下依次设置的导阀腔一24、导阀腔二25和导阀腔三26,导阀腔一24和导阀腔二25设置于连接筒6内,导阀腔三26设置于阀盖3内,O形圈二11与导阀腔一24和导阀腔二25的连接拐角接触。In one embodiment, the pilot valve cavity includes a pilot valve cavity 1 24, a pilot valve cavity 2 25 and a pilot valve cavity 3 26 arranged in sequence from top to bottom, and the pilot valve cavity 1 24 and the pilot valve cavity 2 25 are arranged in the connecting cylinder 6, the pilot valve chamber three 26 is arranged in the valve cover 3, and the O-ring two 11 is in contact with the connecting corner of the pilot valve chamber one 24 and the pilot valve chamber two 25.

在一个实施例中,连接筒6两侧分别连通开设有与导阀腔二25连通的左出气孔61和右进气孔62,连接筒6上还设置有进气部23和出气部22,进气部23与右进气孔62连通,出气部22通过管路与阀体1左出气口连通,导阀腔二25经过左出气孔61通过气流通道63与阀体1的上腔室连通。In one embodiment, the two sides of the connecting cylinder 6 are respectively communicated with a left air outlet hole 61 and a right air inlet hole 62 communicating with the pilot valve chamber 2 25, and the connecting cylinder 6 is also provided with an air inlet portion 23 and an air outlet portion 22, The air intake part 23 communicates with the right air intake hole 62, the air outlet part 22 communicates with the left air outlet of the valve body 1 through a pipeline, and the pilot valve chamber 2 25 communicates with the upper chamber of the valve body 1 through the left air outlet hole 61 and the air flow channel 63 .

在一个实施例中,右进气孔62直径小于出气部22直径,且右进气孔62直径是出气部22直径0.25-0.1倍。In one embodiment, the diameter of the right air inlet hole 62 is smaller than that of the air outlet portion 22 , and the diameter of the right air inlet hole 62 is 0.25-0.1 times the diameter of the air outlet portion 22 .

在一个实施例中,导阀阀芯8在连接筒6内壁做上下无摩擦运动。In one embodiment, the pilot valve spool 8 moves up and down on the inner wall of the connecting cylinder 6 without friction.

在一个实施例中,导阀膜片9大圈连接有密封块91,密封块91的形状采用半圆形、圆形、三角形和锥形中的任意一种。In one embodiment, the large ring of the pilot valve diaphragm 9 is connected with a sealing block 91, and the shape of the sealing block 91 is any one of semicircle, circle, triangle and cone.

在一个实施例中,导阀阀芯8为加工件,O形圈二11、导阀膜片9以及螺母10为标准件,结构更简单,简化了加工工艺,降低了成本。In one embodiment, the pilot valve core 8 is a processed part, and the O-ring 2 11, the pilot valve diaphragm 9 and the nut 10 are standard parts, which has a simpler structure, simplifies the processing technology, and reduces the cost.

上述技术方案的工作原理为:The working principle of the above-mentioned technical scheme is:

本发明提供一种先导式氮封阀:The invention provides a pilot-operated nitrogen sealing valve:

主阀打开过程为:当管路20感应到储罐内压力下降时,调节弹簧15带动膜片13向下,带动导阀阀芯8向下移动,使O形圈二11与连接筒6内壁分离,将O形圈二11打开,此时将导阀腔一24打开,此时导阀打开,气体进入阀体1右进气口和进气部23,从进气部23进入到出气部22和左出气孔61,因为右进气孔62直径是出气部22直径的0.25-0.1倍,在导阀打开瞬间,气体大部分从出气部22走掉,此时导阀失压,此时阀体1上腔室受到的压力远远大于阀体1下腔室受到的压力,虽然主阀活塞2上方的面积大于阀座21的面积,但是作用在阀座21处的力依旧可以打开阀体1通道,使阀体1连通,主阀打开。The opening process of the main valve is: when the pipeline 20 senses the pressure drop in the storage tank, the adjustment spring 15 drives the diaphragm 13 downward, drives the pilot valve core 8 to move downward, and makes the O-ring 2 11 and the inner wall of the connecting cylinder 6 Separate, open the O-ring 2 11, at this time open the pilot valve cavity 1 24, at this time the pilot valve is opened, the gas enters the right air inlet of the valve body 1 and the air inlet 23, and enters the air outlet from the air inlet 23 22 and the left air outlet 61, because the diameter of the right air inlet 62 is 0.25-0.1 times of the diameter of the air outlet 22, when the pilot valve is opened, most of the gas will go away from the air outlet 22, and the pilot valve loses pressure at this time. The pressure on the upper chamber of the valve body 1 is much greater than the pressure on the lower chamber of the valve body 1. Although the area above the main valve piston 2 is larger than the area of the valve seat 21, the force acting on the valve seat 21 can still open the valve. The body 1 channel connects the valve body 1, and the main valve opens.

主阀关闭过程为:当管路20感应到储罐内压力上升至设定压力时,导阀阀芯8带动膜片13向上,使O形圈二11与连接筒6内壁接触,将O形圈二11关闭,此时将导阀腔一24关闭,此时导阀关闭,气体进入阀体1右进气口和进气部23,从进气部23进入左出气孔61,气体同时作用在主阀活塞2上方和阀座21上面,因为主阀活塞2面积大于阀体1的上阀座21面积,主阀活塞2牢牢压在阀座21上,将阀体1的通道阻隔,主阀关闭。The closing process of the main valve is: when the pipeline 20 senses that the pressure in the storage tank rises to the set pressure, the pilot valve spool 8 drives the diaphragm 13 upward, so that the O-ring 2 11 contacts the inner wall of the connecting cylinder 6, and the O-ring Circle 2 11 is closed, at this time, the pilot valve cavity 1 24 is closed, and the pilot valve is closed at this time, the gas enters the right air inlet of the valve body 1 and the air inlet 23, and enters the left air outlet 61 from the air inlet 23, and the gas acts simultaneously On the top of the main valve piston 2 and the valve seat 21, because the area of the main valve piston 2 is larger than the area of the upper valve seat 21 of the valve body 1, the main valve piston 2 is firmly pressed on the valve seat 21, blocking the passage of the valve body 1, The main valve is closed.

上述技术方案的技术效果为:The technical effect of above-mentioned technical scheme is:

本发明提供一种先导式氮封阀,导阀阀芯8作无摩擦运动,形成上下对称的平衡力,提升了导阀弹簧7及导阀阀芯8上O形圈二11的使用寿命,减少了后期维修的次数,采用一体式的导阀阀芯设计,优化结构,减少加工工序,节约成本,整体结构优化,使用标准件,增加了互换性,结构简单,性能稳定。The present invention provides a pilot-operated nitrogen seal valve. The pilot valve core 8 moves without friction to form an up-and-down symmetrical balance force, which improves the service life of the pilot valve spring 7 and the O-ring 211 on the pilot valve core 8. The number of post-maintenance is reduced, the integrated pilot valve core design is adopted, the structure is optimized, the processing procedure is reduced, the cost is saved, the overall structure is optimized, the standard parts are used, the interchangeability is increased, the structure is simple, and the performance is stable.

在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”“内”、“外”、“顺时针”、“逆时针”、“轴向”、“径向”、“周向”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " Back", "Left", "Right", "Vertical", "Horizontal", "Top", "Bottom", "Inner", "Outer", "Clockwise", "Counterclockwise", "Axial", The orientation or positional relationship indicated by "radial", "circumferential", etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying the referred device or element Must be in a particular orientation, be constructed in a particular orientation, and operate in a particular orientation, and therefore should not be construed as limiting the invention.

在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接或彼此可通讯;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系,除非另有明确的限定。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise clearly specified and limited, terms such as "installation", "connection", "connection" and "fixation" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection , or integrated; can be mechanically connected, can also be electrically connected or can communicate with each other; can be directly connected, can also be indirectly connected through an intermediary, can be the internal communication of two components or the interaction relationship between two components, Unless expressly defined otherwise. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.

尽管本发明的实施方案已公开如上,但其并不仅仅限于说明书和实施方式中所列运用,它完全可以被适用于各种适合本发明的领域,对于熟悉本领域的人员而言,可容易地实现另外的修改,因此在不背离权利要求及等同范围所限定的一般概念下,本发明并不限于特定的细节与这里示出与描述的图例。Although the embodiment of the present invention has been disclosed as above, it is not limited to the use listed in the specification and implementation, it can be applied to various fields suitable for the present invention, and it can be easily understood by those skilled in the art Therefore, the invention is not limited to the specific details and examples shown and described herein without departing from the general concept defined by the claims and their equivalents.

Claims (10)

1. A pilot-operated nitrogen seal valve, comprising:
valve body (1) and valve gap (3) through bolted connection are provided with main valve piston (2) in valve body (1) and valve gap (3), be provided with main valve spring (4) in main valve piston (2) and valve gap (3), valve gap (3) top is provided with connecting cylinder (6), seal and bolted connection through O shape circle one (5) between valve gap (3) and connecting cylinder (6), be provided with integrated into one piece's pilot valve case (8) in the middle of valve gap (3) and connecting cylinder (6), pilot valve case (8) inslot sets up O shape circle two (11), be equipped with pilot valve spring (7) between pilot valve case (8) and valve gap (3), through nut (10) and tight pilot valve diaphragm (9) on pilot valve case (8), pilot valve diaphragm (9) major circle department is pressed in the recess between valve gap (3) and connecting cylinder (6).
2. The pilot-operated nitrogen seal valve according to claim 1, characterized in that the top end of the connecting cylinder (6) is provided with a membrane cover, the membrane cover comprises an upper membrane cover (14) and a lower membrane cover (12), the connecting cylinder (6) is connected with the lower membrane cover (12) through bolts, a membrane (13) is arranged between the lower membrane cover (12) and the upper membrane cover (14), the pilot valve core (8) is propped against the middle part of the membrane (13), the membrane (13) divides a cavity formed by encircling the upper membrane cover (14) and the lower membrane cover (12) into an upper cavity (18) and a lower cavity (19), a pipeline (20) connected with a storage tank is arranged at the bottom end of the lower membrane cover (14), a protective cover (16) is arranged at the top end of the upper membrane cover (14) through threads, an adjusting bolt (17) is arranged in the protective cover (16), and an adjusting spring (15) is arranged between the adjusting bolt (17) and the membrane (13).
3. The pilot-operated nitrogen seal valve according to claim 1, wherein the main valve piston (2) divides the valve body (1) and the valve cover (3) into an upper chamber, a middle chamber, a lower chamber, a sliding space is formed by surrounding the main valve piston (2) and the valve cover (3), the main valve piston (2) is arranged in the sliding space in a sliding mode, the top end of the lower chamber of the valve body (1) is provided with the valve seat (21), the bottom end of the main valve piston (2) is in sealing connection with the valve seat (21) through an O-shaped ring, and the area above the main valve piston (2) is larger than the area of the valve seat (21).
4. A pilot-operated nitrogen seal valve according to claim 3, characterized in that the pilot-operated valve core (8) comprises a first core (81), a second core (82) and a third core (83) which are sequentially connected from top to bottom, the diameters of the first core (81), the second core (82) and the third core (83) are gradually increased, the first core (81) is penetrated by a lower membrane cover (12) and is contacted with a membrane (13), a valve cover (3) and a connecting cylinder (6) are surrounded to form a pilot-operated valve cavity, the second core (82) and the third core (83) are arranged in the pilot-operated valve cavity, an O-ring groove (84) is formed in the second core (82), an O-ring second (11) is arranged in the O-ring groove (84), threads are arranged on the outer side of the third core (83), a stop block (85) is arranged at one end of the third core (83) close to the second core (82), and a pilot-operated valve (9) is arranged between the small membrane (10) and the stop block (85).
5. The pilot-operated nitrogen seal valve according to claim 4, wherein a valve core groove (86) is formed in the bottom end of the third core body (83), the pilot valve spring (7) is arranged between the valve core groove (86) and the valve cover (3), a T-shaped gas channel (87) is arranged on the pilot valve core (8), the horizontal section of the T-shaped gas channel (87) penetrates through the side end of the second core body (82) to be arranged, and the vertical section of the T-shaped gas channel (87) is communicated with the valve core groove (86).
6. The pilot-operated nitrogen seal valve according to claim 4, wherein the pilot valve cavity comprises a pilot valve cavity I (24), a pilot valve cavity II (25) and a pilot valve cavity III (26) which are sequentially arranged from top to bottom, the pilot valve cavity I (24) and the pilot valve cavity II (25) are arranged in the connecting cylinder (6), the pilot valve cavity III (26) is arranged in the valve cover (3), and the O-shaped ring II (11) is in contact with the connecting corner of the pilot valve cavity I (24) and the pilot valve cavity II (25).
7. The pilot-operated nitrogen seal valve according to claim 6, wherein a left air outlet hole (61) and a right air inlet hole (62) which are communicated with the pilot valve cavity II (25) are respectively communicated with two sides of the connecting cylinder (6), an air inlet part (23) and an air outlet part (22) are further arranged on the connecting cylinder (6), the air inlet part (23) is communicated with the right air inlet hole (62), the air outlet part (22) is communicated with the left air outlet of the valve body (1) through a pipeline, and the pilot valve cavity II (25) is communicated with the upper chamber of the valve body (1) through an air flow channel (63) through the left air outlet hole (61).
8. A pilot operated nitrogen shut-off valve as set forth in claim 7 wherein the right inlet orifice (62) has a diameter of 0.25-0.1 times the diameter of the outlet orifice (22).
9. A pilot-operated nitrogen-sealed valve according to claim 1, characterized in that the pilot valve core (8) does a friction-free movement up and down on the inner wall of the connecting cylinder (6).
10. The pilot-operated nitrogen seal valve according to claim 1, wherein the large circle of the pilot valve diaphragm (9) is connected with a sealing block (91), and the sealing block (91) is in any one of a semicircular shape, a circular shape, a triangular shape and a conical shape.
CN202310013551.0A 2023-01-05 2023-01-05 A pilot-operated nitrogen blanketing valve Pending CN116025751A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202310013551.0A CN116025751A (en) 2023-01-05 2023-01-05 A pilot-operated nitrogen blanketing valve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202310013551.0A CN116025751A (en) 2023-01-05 2023-01-05 A pilot-operated nitrogen blanketing valve

Publications (1)

Publication Number Publication Date
CN116025751A true CN116025751A (en) 2023-04-28

Family

ID=86070991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202310013551.0A Pending CN116025751A (en) 2023-01-05 2023-01-05 A pilot-operated nitrogen blanketing valve

Country Status (1)

Country Link
CN (1) CN116025751A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117052543A (en) * 2023-08-29 2023-11-14 东风商用车有限公司 An oil and gas balance valve assembly

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001124229A (en) * 1999-10-29 2001-05-11 Pacific Ind Co Ltd solenoid valve
CN205383307U (en) * 2016-01-04 2016-07-13 恒丰赛特实业(上海)有限公司 A a nitrogen valve for $facing storage tank provide nitrogen seal gaseous
JP2019023505A (en) * 2017-07-25 2019-02-14 フシマン株式会社 Pilot type pressure reducer
CN109667968A (en) * 2018-12-29 2019-04-23 捷锐企业(上海)有限公司 The pressure reducing valve of balanced type valve core structure
CN211117827U (en) * 2019-11-26 2020-07-28 浙江博益特电器科技有限公司 Self-sealing pressure reducing valve
CN119146240A (en) * 2024-08-08 2024-12-17 武汉大学 Diaphragm valve

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001124229A (en) * 1999-10-29 2001-05-11 Pacific Ind Co Ltd solenoid valve
CN205383307U (en) * 2016-01-04 2016-07-13 恒丰赛特实业(上海)有限公司 A a nitrogen valve for $facing storage tank provide nitrogen seal gaseous
JP2019023505A (en) * 2017-07-25 2019-02-14 フシマン株式会社 Pilot type pressure reducer
CN109667968A (en) * 2018-12-29 2019-04-23 捷锐企业(上海)有限公司 The pressure reducing valve of balanced type valve core structure
CN211117827U (en) * 2019-11-26 2020-07-28 浙江博益特电器科技有限公司 Self-sealing pressure reducing valve
CN119146240A (en) * 2024-08-08 2024-12-17 武汉大学 Diaphragm valve

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117052543A (en) * 2023-08-29 2023-11-14 东风商用车有限公司 An oil and gas balance valve assembly

Similar Documents

Publication Publication Date Title
CN105673900A (en) Air reducing valve used for ships
CN205190864U (en) Cartridge formula air throttle
CN2806923Y (en) Series connection air-resistance pilot type ultra-high pneumatic proportional pressure-reducing valve
CN205534440U (en) High -pressure gas valve that reduces pressure
CN204961948U (en) Diaphragm type liquid air -vent valve
CN111503334B (en) A bottled liquefied petroleum gas pressure regulator
CN109707878A (en) A kind of check valve and unidirectional variable pressure valve based on response diaphragm
CN216692331U (en) Pilot-operated pressure reducer
CN213117618U (en) Pressure regulating valve device with nitrogen seal
CN201582462U (en) Constant pressure reducing valve
CN205534441U (en) There is not gas of leakage relief pressure valve
CN216200662U (en) Piston type hydraulic pressure reducing valve
CN105715838B (en) Elongate rod relief valve
CN223648698U (en) A pilot-operated solenoid valve
CN211820851U (en) An economical throttle valve
CN202691198U (en) Gas pressure reducing valve
CN222910778U (en) A balanced pneumatic single-seat regulating valve
CN210266053U (en) Miniature pressure reducing valve
CN217381776U (en) Pressure reducing valve with gas flow regulating function
CN201779320U (en) Novel gas reducing valve
CN222102863U (en) A two-stage adjustable pilot
CN208900256U (en) Check valve type vehicle fuel pressure regulator
CN207864689U (en) A kind of threeway pneumatic diaphragm control valve
CN208204122U (en) A kind of gas pressure reducer
CN214888945U (en) Convenient sealed governing valve of dismantling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20230428

RJ01 Rejection of invention patent application after publication