CN115988801A - A device and method for cascading test boxes - Google Patents
A device and method for cascading test boxes Download PDFInfo
- Publication number
- CN115988801A CN115988801A CN202211693581.2A CN202211693581A CN115988801A CN 115988801 A CN115988801 A CN 115988801A CN 202211693581 A CN202211693581 A CN 202211693581A CN 115988801 A CN115988801 A CN 115988801A
- Authority
- CN
- China
- Prior art keywords
- frame
- sliding block
- hole
- clamping
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)
Abstract
Description
技术领域technical field
本发明涉及测试箱级联技术领域,具体为一种测试箱级联的装置和方法。The invention relates to the technical field of cascading test boxes, in particular to a device and method for cascading test boxes.
背景技术Background technique
测试箱是指用于对电子设备进行检测的仪器,而级联可以定义为两台或两台以上的交换机通过一定的方式相互连接,根据需要,多台交换机可以以多种方式进行级联。通过级联使多台测试箱可以进行连接使用。A test box refers to an instrument used to test electronic equipment, and cascading can be defined as two or more switches connected to each other in a certain way. According to needs, multiple switches can be cascaded in various ways. Through cascading, multiple test boxes can be connected and used.
现有技术中,所使用的测试箱在使用过程中,计算机的接头直接插接在测试箱的端口上,无法对接头进行有效的固定,从而使得在使用过程中接头容易发生脱落,从而使得测试中断的情况,其次现有的测试箱在使用过程中,散热效果较差,使得箱内的温度较高,从而影响测试箱的正常运行,并且在ATE测试中,由于测试通道数的需求,通常需要多个测试箱级联来满足测试端口数的需求,级联时需要确保通信信号的带宽和同步信号同步性能,因此需要发明出一种测试箱级联的装置和方法来解决上述问题。In the prior art, during the use of the test box used, the connector of the computer is directly plugged into the port of the test box, and the connector cannot be effectively fixed, so that the connector is easy to fall off during use, so that the test In the case of interruption, secondly, the heat dissipation effect of the existing test box is poor during use, which makes the temperature inside the box higher, thus affecting the normal operation of the test box, and in the ATE test, due to the demand for the number of test channels, usually Multiple test boxes need to be cascaded to meet the number of test ports. When cascading, it is necessary to ensure the bandwidth of the communication signal and the synchronization performance of the synchronization signal. Therefore, it is necessary to invent a device and method for cascading test boxes to solve the above problems.
发明内容Contents of the invention
本发明的目的在于提供一种测试箱级联的装置和方法,以解决上述背景技术中提出的问题。The object of the present invention is to provide a device and method for cascading test boxes to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本发明提供如下技术方案:一种测试箱级联的装置和方法,包括外壳体,所述外壳体的底部固定安装有支撑脚,所述外壳体的正面设置有柜门,所述外壳体的内部固定安装有测试机,所述外壳体的背部设置有接头固定机构,所述外壳体的底部与柜门的正面设置有散热通风机构。In order to achieve the above object, the present invention provides the following technical solutions: a device and method for cascading test boxes, including an outer casing, the bottom of the outer casing is fixedly equipped with support feet, and the front of the outer casing is provided with a cabinet door, A testing machine is fixedly installed inside the outer casing, a joint fixing mechanism is provided on the back of the outer casing, and a heat dissipation and ventilation mechanism is arranged on the bottom of the outer casing and the front of the cabinet door.
所述接头固定机构包括接头组件、固定组件与卡接组件,所述接头组件设置在外壳体背端的内部,所述卡接组件设置在固定组件的内部。The joint fixing mechanism includes a joint assembly, a fixing assembly and a clamping assembly, the joint assembly is arranged inside the back end of the outer casing, and the clamping assembly is arranged inside the fixing assembly.
优选的,所述接头组件包括信号端口,所述信号端口设置在外壳体的背部,所述信号端口与测试机之间固定安装有数据线,所述信号端口的内部插接有接头体,便于使接头体与测试机进行连接。Preferably, the connector assembly includes a signal port, the signal port is arranged on the back of the outer casing, a data line is fixedly installed between the signal port and the testing machine, and a connector body is plugged into the signal port, which facilitates Connect the connector body to the tester.
优选的,所述固定组件包括固定框,所述固定框固定安装在外壳体的背部,所述固定框的外侧设置有端盖,所述端盖与固定框之间设置有第一螺栓,所述端盖与第一螺栓的对应位置处开设有通孔,所述固定框与第一螺栓的对应位置处开设有螺纹孔,且所述第一螺栓穿过通孔螺纹安装在螺纹孔中,便于使固定框固定安装。Preferably, the fixing assembly includes a fixing frame, the fixing frame is fixedly installed on the back of the outer casing, an end cover is arranged outside the fixing frame, and a first bolt is arranged between the end cover and the fixing frame, so that A through hole is opened at the corresponding position of the end cover and the first bolt, a threaded hole is opened at the corresponding position of the fixed frame and the first bolt, and the first bolt is threaded through the through hole and installed in the threaded hole, It is convenient to make the fixed frame fixed and installed.
优选的,所述卡接组件包括滑动块,所述滑动块滑动安装在固定框的内部,所述滑动块的内侧固定安装有连接杆,所述固定框的内部固定安装有限位杆,所述滑动块的外侧固定安装有拉动杆,所述拉动杆远离滑动块的一端螺纹安装有螺帽,所述端盖与滑动块之间固定安装有复位弹簧,所述连接杆远离滑动块的一端固定安装有卡接块,便于对接头体进行限位固定。Preferably, the clamping assembly includes a sliding block, the sliding block is slidably installed inside the fixed frame, the inner side of the sliding block is fixedly installed with a connecting rod, the inside of the fixed frame is fixedly installed with a limit rod, the The outer side of the sliding block is fixedly equipped with a pulling rod, and the end of the pulling rod away from the sliding block is threaded with a nut, and a return spring is fixedly installed between the end cover and the sliding block, and the connecting rod is fixed at one end far away from the sliding block. A clamping block is installed, which is convenient for limiting and fixing the joint body.
优选的,所述滑动块与限位杆的对应位置处开设有通孔,且所述限位杆穿过通孔,所述固定框的内侧与连接杆的对应位置处开设有通孔,且所述连接杆穿过通孔,所述端盖与拉动杆的对应位置处开设有通孔,且所述拉动杆穿过通孔,便于使滑动块限位滑动。Preferably, a through hole is opened at the corresponding position of the sliding block and the limit rod, and the limit rod passes through the through hole, and a through hole is opened at the corresponding position of the inner side of the fixed frame and the connecting rod, and The connecting rod passes through the through hole, and a through hole is opened at the corresponding position of the end cover and the pulling rod, and the pulling rod passes through the through hole, so that the sliding block can be limited and slid.
优选的,所述接头体与卡接块的对应位置处开设有卡接槽,且所述卡接块插接在卡接槽的内部,所述卡接块的外形结构为梯形结构,便于使卡接块固定接头体。Preferably, a snap-in slot is provided at the corresponding position of the joint body and the snap-in block, and the snap-in block is inserted into the interior of the snap-in slot, and the shape structure of the snap-in block is a trapezoidal structure, which is convenient for use The clamping block fixes the connector body.
优选的,所述散热通风机构包括排气管,所述排气管固定安装在外壳体的顶部,所述排气管的内部固定安装有安装架,所述安装架的内部固定安装有电机,所述电机的输出端固定安装有散热扇,所述柜门的内部开设有进气孔,所述柜门的正面固定安装有安装框,所述安装框的内部插接有连接框,所述连接框的内部固定安装有过滤网,所述连接框与安装框之间设置有第二螺栓,所述安装框与第二螺栓的对应位置处开设有通孔,且所述连接框与第二螺栓的对应位置处开设有螺纹孔,且所述第二螺栓穿过通孔螺纹安装在螺纹孔中,便于对设备内部进行散热通风。Preferably, the heat dissipation and ventilation mechanism includes an exhaust pipe, the exhaust pipe is fixedly installed on the top of the outer shell, the inside of the exhaust pipe is fixedly installed with a mounting frame, and the inside of the mounting frame is fixedly installed with a motor, The output end of the motor is fixedly installed with a cooling fan, the inside of the cabinet door is provided with an air intake hole, the front of the cabinet door is fixedly installed with a mounting frame, and a connecting frame is plugged into the inside of the mounting frame. A filter screen is fixedly installed inside the connection frame, a second bolt is arranged between the connection frame and the installation frame, a through hole is opened at the corresponding position of the installation frame and the second bolt, and the connection frame is connected to the second bolt. Corresponding positions of the bolts are provided with threaded holes, and the second bolts are threaded through the through holes and installed in the threaded holes, which is convenient for heat dissipation and ventilation inside the device.
优选的,所述测试机的内部设置有PCle交换模块、同步信号产生模块、同步信号路由模块、测试功能模块,所述PCle交换模块与测试功能模块之间信号连接,所述测试功能模块与同步信号路由模块之间信号连接,所述同步信号路由模块与同步信号产生模块之间信号连接。Preferably, the interior of the test machine is provided with a PCle switching module, a synchronous signal generation module, a synchronous signal routing module, and a test function module. The signal routing modules are connected to each other, and the synchronous signal routing module is connected to the synchronous signal generating module.
一种测试箱级联装置使用方法,包括以下步骤:A method for using a test box cascade device, comprising the following steps:
S1、通过螺帽向外侧拉动拉动杆,使拉动杆通过滑动块向外侧拉动连接杆,连接杆带动卡接块向外侧移动,并使滑动块压缩复位弹簧,再将计算机的接头体插入到信号端口中,随后松开螺帽,通过复位弹簧的弹力使滑动块带动卡接块插入到接头体的卡接槽中,使接头体固定在信号端口中。S1. Pull the pull rod outward through the nut, so that the pull rod pulls the connecting rod outward through the sliding block, the connecting rod drives the clamping block to move outward, and makes the sliding block compress the return spring, and then insert the connector body of the computer into the signal Afterwards, the nut is loosened, and the sliding block is driven by the elastic force of the return spring to insert the locking block into the locking groove of the connector body, so that the connector body is fixed in the signal port.
S2、通过安装架上的电机驱动散热扇进行转动,使散热扇将外壳体内部的热空气排出,同时通过连接框上的过滤网将外部空气过滤后,吸入到外壳体的内部,通过将第二螺栓取出,使连接框与安装框进行分离,从而对连接框上的过滤网进行清洁。S2. Drive the heat dissipation fan to rotate through the motor on the mounting frame, so that the heat dissipation fan discharges the hot air inside the outer casing, and at the same time filters the external air through the filter on the connection frame, and sucks it into the inside of the outer casing. Take out the two bolts to separate the connection frame from the installation frame, so as to clean the filter screen on the connection frame.
S3、通过将一组PCIe信号输入到PCIe交换模块中,输出N+1组PCIe信号,其中N≥2,输出的N+1组PCIe信号分别连接N个测试功能模块,通过同步信号产生模块,产生系统同步所需的触发信号和时钟信号,同步信号分别发送给同步信号路由模块,通过将一组同步信号输入到同步信号路由模块中,输出N组同步信号。S3, by inputting a group of PCIe signals into the PCIe switch module, outputting N+1 groups of PCIe signals, wherein N≥2, the outputted N+1 groups of PCIe signals are respectively connected to N test function modules, and the synchronous signal generation module, The trigger signal and clock signal required for system synchronization are generated, and the synchronization signals are sent to the synchronization signal routing module respectively. By inputting a group of synchronization signals into the synchronization signal routing module, N groups of synchronization signals are output.
与现有技术相比,本发明提供了一种测试箱级联的装置和方法,具备以下有益效果:Compared with the prior art, the present invention provides a device and method for cascading test boxes, which have the following beneficial effects:
1、该测试箱级联的装置和方法,通过螺帽向外侧拉动拉动杆,使拉动杆通过滑动块向外侧拉动连接杆,连接杆带动卡接块向外侧移动,并使滑动块压缩复位弹簧,再将计算机的接头体插入到信号端口中,随后松开螺帽,通过复位弹簧的弹力使滑动块带动卡接块插入到接头体的卡接槽中,使接头体固定在信号端口中,从而防止在使用过程中接头体发生脱落的情况。1. The device and method of cascading the test box, pull the pull rod outward through the nut, so that the pull rod pulls the connecting rod outward through the sliding block, and the connecting rod drives the clamping block to move outward, and makes the sliding block compress the return spring , and then insert the connector body of the computer into the signal port, then loosen the nut, and through the elastic force of the return spring, the sliding block drives the clamping block to be inserted into the clamping groove of the connector body, so that the connector body is fixed in the signal port, Thereby preventing the joint body from falling off during use.
2、该测试箱级联的装置和方法,通过安装架上的电机驱动散热扇进行转动,使散热扇将外壳体内部的热空气排出,同时通过连接框上的过滤网将外部空气过滤后,吸入到外壳体的内部,通过将第二螺栓取出,使连接框与安装框进行分离,从而对连接框上的过滤网进行清洁,从而达到了便于对设备进行快速散热的效果。2. The cascading device and method of the test box drives the heat dissipation fan to rotate through the motor on the mounting frame, so that the heat dissipation fan discharges the hot air inside the outer casing, and at the same time filters the external air through the filter on the connection frame. It is sucked into the inside of the outer shell, and the connection frame is separated from the installation frame by taking out the second bolt, so as to clean the filter screen on the connection frame, thereby achieving the effect of facilitating rapid heat dissipation of the equipment.
3、该测试箱级联的装置和方法,通过将一组PCIe信号输入到PCIe交换模块中,输出N+1(N≥2)组PCIe信号,输出的N+1组PCIe信号分别连接N个测试功能模块,通过同步信号产生模块,产生系统同步所需的触发信号和时钟信号,同步信号分别发送给同步信号路由模块,通过将一组同步信号输入到同步信号路由模块中,输出N组同步信号,从而达到了通过通信信号和同步信号的扩展,提高测试机的测试接口数量。3. The device and method for cascading the test box, by inputting a group of PCIe signals into the PCIe switch module, outputting N+1 (N≥2) groups of PCIe signals, and the output N+1 groups of PCIe signals are respectively connected to N The test function module, through the synchronization signal generation module, generates the trigger signal and clock signal required for system synchronization, and sends the synchronization signal to the synchronization signal routing module respectively, and outputs N groups of synchronization signals by inputting a group of synchronization signals into the synchronization signal routing module Signals, so as to achieve the expansion of communication signals and synchronization signals, and increase the number of test interfaces of the test machine.
附图说明Description of drawings
为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图:In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without paying creative labor:
图1为本发明正面结构示意图;Fig. 1 is the schematic view of the front structure of the present invention;
图2为本发明左视结构剖视示意图;Fig. 2 is a schematic cross-sectional view of the left view structure of the present invention;
图3为本发明局部结构剖视示意图;Fig. 3 is a schematic cross-sectional view of a local structure of the present invention;
图4为本发明图3中A处结构放大示意图;Fig. 4 is the enlarged schematic view of the structure at A in Fig. 3 of the present invention;
图5为本发明排气管及所连机构剖视示意图;Fig. 5 is a schematic cross-sectional view of the exhaust pipe of the present invention and the connected mechanism;
图6为本发明图2中B处结构放大示意图;Fig. 6 is the enlarged schematic view of the structure at B in Fig. 2 of the present invention;
图7为本发明测试机内部模块示意图;Fig. 7 is a schematic diagram of the internal modules of the testing machine of the present invention;
图8为本发明级联连接示意图。Fig. 8 is a schematic diagram of the cascade connection of the present invention.
图中:1、外壳体;2、支撑脚;3、柜门;4、测试机;41、PCle交换模块;42、同步信号产生模块;43、同步信号路由模块;44、测试功能模块;5、接头固定机构;51、接头组件;511、信号端口;512、数据线;513、接头体;52、固定组件;521、固定框;522、端盖;523、第一螺栓;53、卡接组件;531、滑动块;532、连接杆;533、限位杆;534、拉动杆;535、复位弹簧;536、螺帽;537、卡接块;6、散热通风机构;61、排气管;62、安装架;63、电机;64、散热扇;65、进气孔;66、安装框;67、连接框;68、过滤网;69、第二螺栓。In the figure: 1. Outer shell; 2. Supporting feet; 3. Cabinet door; 4. Testing machine; 41. PCle switch module; 42. Synchronization signal generation module; 43. Synchronization signal routing module; 44. Test function module; 5 , joint fixing mechanism; 51, joint assembly; 511, signal port; 512, data line; 513, joint body; 52, fixed assembly; 521, fixed frame; 522, end cover; Component; 531, sliding block; 532, connecting rod; 533, limit rod; 534, pulling rod; 535, return spring; 536, nut; ; 62, mounting frame; 63, motor; 64, cooling fan; 65, air intake hole; 66, installation frame; 67, connection frame; 68, filter screen; 69, second bolt.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
在本发明中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本发明中的具体含义。In the present invention, unless otherwise clearly specified and limited, terms such as "installation", "connection", "connection" and "fixation" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection , or integrated; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components or the interaction relationship between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention according to specific situations.
实施例一:Embodiment one:
请参阅图1-8,本发明提供一种技术方案:一种测试箱级联的装置和方法,包括外壳体1,外壳体1的底部固定安装有支撑脚2,外壳体1的正面设置有柜门3,外壳体1的内部固定安装有测试机4,外壳体1的背部设置有接头固定机构5,外壳体1的底部与柜门3的正面设置有散热通风机构6。Please refer to Figures 1-8, the present invention provides a technical solution: a device and method for cascading test boxes, including an
接头固定机构5包括接头组件51、固定组件52与卡接组件53,接头组件51设置在外壳体1背端的内部,卡接组件53设置在固定组件52的内部。The
进一步的,接头组件51包括信号端口511,信号端口511设置在外壳体1的背部,信号端口511与测试机4之间固定安装有数据线512,信号端口511的内部插接有接头体513,便于使接头体513与测试机4进行连接。Further, the
进一步的,固定组件52包括固定框521,固定框521固定安装在外壳体1的背部,固定框521的外侧设置有端盖522,端盖522与固定框521之间设置有第一螺栓523,端盖522与第一螺栓523的对应位置处开设有通孔,固定框521与第一螺栓523的对应位置处开设有螺纹孔,且第一螺栓523穿过通孔螺纹安装在螺纹孔中,便于使固定框521固定安装。Further, the fixing
进一步的,卡接组件53包括滑动块531,滑动块531滑动安装在固定框521的内部,滑动块531的内侧固定安装有连接杆532,固定框521的内部固定安装有限位杆533,滑动块531的外侧固定安装有拉动杆534,拉动杆534远离滑动块531的一端螺纹安装有螺帽536,端盖522与滑动块531之间固定安装有复位弹簧535,连接杆532远离滑动块531的一端固定安装有卡接块537,便于对接头体513进行限位固定。Further, the clamping
进一步的,滑动块531与限位杆533的对应位置处开设有通孔,且限位杆533穿过通孔,固定框521的内侧与连接杆532的对应位置处开设有通孔,且连接杆532穿过通孔,端盖522与拉动杆534的对应位置处开设有通孔,且拉动杆534穿过通孔,便于使滑动块531限位滑动。Further, a through hole is opened at the corresponding position of the sliding
进一步的,接头体513与卡接块537的对应位置处开设有卡接槽,且卡接块537插接在卡接槽的内部,卡接块537的外形结构为梯形结构,便于使卡接块537固定接头体513。Further, the corresponding position of the
实施例二:Embodiment two:
请参阅图2、图5与图6,并结合实施例一,进一步得到,散热通风机构6包括排气管61,排气管61固定安装在外壳体1的顶部,排气管61的内部固定安装有安装架62,安装架62的内部固定安装有电机63,电机63的输出端固定安装有散热扇64,柜门3的内部开设有进气孔65,柜门3的正面固定安装有安装框66,安装框66的内部插接有连接框67,连接框67的内部固定安装有过滤网68,连接框67与安装框66之间设置有第二螺栓69,安装框66与第二螺栓69的对应位置处开设有通孔,且连接框67与第二螺栓69的对应位置处开设有螺纹孔,且第二螺栓69穿过通孔螺纹安装在螺纹孔中,便于对设备内部进行散热通风。Please refer to Fig. 2, Fig. 5 and Fig. 6, and in combination with
进一步的,测试机4的内部设置有PCle交换模块41、同步信号产生模块42、同步信号路由模块43、测试功能模块44,PCle交换模块41与测试功能模块44之间信号连接,测试功能模块44与同步信号路由模块43之间信号连接,同步信号路由模块43与同步信号产生模块42之间信号连接。Further, the interior of the
实施例三:Embodiment three:
请参阅图7与8,并结合实施例一与实施例二,进一步得到,一种测试箱级联装置使用方法,包括以下步骤:Please refer to Figures 7 and 8, and in combination with
S1、通过螺帽536向外侧拉动拉动杆534,使拉动杆534通过滑动块531向外侧拉动连接杆532,连接杆532带动卡接块537向外侧移动,并使滑动块531压缩复位弹簧535,再将计算机的接头体513插入到信号端口511中,随后松开螺帽536,通过复位弹簧535的弹力使滑动块531带动卡接块537插入到接头体513的卡接槽中,使接头体513固定在信号端口511中。S1. Pull the
S2、通过安装架62上的电机63驱动散热扇64进行转动,使散热扇64将外壳体1内部的热空气排出,同时通过连接框67上的过滤网68将外部空气过滤后,吸入到外壳体1的内部,通过将第二螺栓69取出,使连接框67与安装框66进行分离,从而对连接框67上的过滤网68进行清洁。S2. Drive the
S3、通过将一组PCIe信号输入到PCIe交换模块中,输出N+1(N≥2)组PCIe信号,输出的N+1组PCIe信号分别连接N个测试功能模块44,通过同步信号产生模块42,产生系统同步所需的触发信号和时钟信号,同步信号分别发送给同步信号路由模块43,通过将一组同步信号输入到同步信号路由模块43中,输出N组同步信号。S3, by inputting a group of PCIe signals into the PCIe switch module, output N+1 (N≥2) group PCIe signals, the output N+1 group PCIe signals are respectively connected to N
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个......”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is a relationship between these entities or operations. There is no such actual relationship or order between them. Furthermore, the term "comprises", "comprises" or any other variation thereof is intended to cover a non-exclusive inclusion such that a process, method, article, or apparatus comprising a set of elements includes not only those elements, but also includes elements not expressly listed. other elements of or also include elements inherent in such a process, method, article, or device. Without further limitations, an element defined by the phrase "comprising a ..." does not exclude the presence of additional identical elements in the process, method, article or apparatus comprising said element.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211693581.2A CN115988801A (en) | 2022-12-28 | 2022-12-28 | A device and method for cascading test boxes |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211693581.2A CN115988801A (en) | 2022-12-28 | 2022-12-28 | A device and method for cascading test boxes |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115988801A true CN115988801A (en) | 2023-04-18 |
Family
ID=85975491
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211693581.2A Pending CN115988801A (en) | 2022-12-28 | 2022-12-28 | A device and method for cascading test boxes |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115988801A (en) |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN208536895U (en) * | 2018-08-07 | 2019-02-22 | 苏州普强电子科技有限公司 | A kind of spraying detection device |
| CN208779246U (en) * | 2018-09-13 | 2019-04-23 | 天津立恒实业有限公司 | A kind of warning light box of flight alarm signal simulator |
| CN210608121U (en) * | 2019-11-25 | 2020-05-22 | 郑州联开电气设备有限公司 | Ventilation structure of power distribution cabinet |
| CN211238934U (en) * | 2019-08-29 | 2020-08-11 | 广东东伟电控科技有限公司 | Power distribution cabinet with good dust removal and heat dissipation effects |
| CN215581999U (en) * | 2021-04-21 | 2022-01-18 | 余志生 | Electrical cabinet for electrical engineering |
| CN114415779A (en) * | 2021-12-17 | 2022-04-29 | 苏州华兴源创科技股份有限公司 | Case trigger signal control method and case control system |
| CN217662222U (en) * | 2022-03-23 | 2022-10-28 | 成都爱迪空调制造有限公司 | Industrial air conditioner filter equipment easy to maintain |
-
2022
- 2022-12-28 CN CN202211693581.2A patent/CN115988801A/en active Pending
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN208536895U (en) * | 2018-08-07 | 2019-02-22 | 苏州普强电子科技有限公司 | A kind of spraying detection device |
| CN208779246U (en) * | 2018-09-13 | 2019-04-23 | 天津立恒实业有限公司 | A kind of warning light box of flight alarm signal simulator |
| CN211238934U (en) * | 2019-08-29 | 2020-08-11 | 广东东伟电控科技有限公司 | Power distribution cabinet with good dust removal and heat dissipation effects |
| CN210608121U (en) * | 2019-11-25 | 2020-05-22 | 郑州联开电气设备有限公司 | Ventilation structure of power distribution cabinet |
| CN215581999U (en) * | 2021-04-21 | 2022-01-18 | 余志生 | Electrical cabinet for electrical engineering |
| CN114415779A (en) * | 2021-12-17 | 2022-04-29 | 苏州华兴源创科技股份有限公司 | Case trigger signal control method and case control system |
| CN217662222U (en) * | 2022-03-23 | 2022-10-28 | 成都爱迪空调制造有限公司 | Industrial air conditioner filter equipment easy to maintain |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US9678546B2 (en) | Enclosure with multiple heat dissipating surfaces | |
| US6750562B2 (en) | Fan control module for a system unit | |
| US6331933B1 (en) | Power sub-frame for a system unit | |
| US8184437B2 (en) | Modular test systems for severe environments | |
| CN101090626A (en) | Dust-proof electric cabinet | |
| CN101763151B (en) | Multi-screen processor case with composite framework | |
| US6542997B1 (en) | Powering computer systems | |
| CN115988801A (en) | A device and method for cascading test boxes | |
| US6452794B1 (en) | Grounding computer systems | |
| CN206611686U (en) | A kind of server cabinet with drawer type cabinet | |
| CN213092225U (en) | A dust-proof mechanism for an output interface of a data processing terminal | |
| CN217640122U (en) | Computer workstation | |
| CN221650507U (en) | Integrated electrical test adapter set | |
| CN221409556U (en) | A mixed-pressure high-frequency multilayer circuit board | |
| CN216389926U (en) | Dustproof high-efficient radiating many interfaces net gape communication connector | |
| CN118283229B (en) | Explosion-proof anti-interference monitor for mine | |
| CN222029546U (en) | Novel multilayer formula block terminal | |
| CN220252515U (en) | Combined chassis shell | |
| CN118487128A (en) | A high voltage switch cabinet | |
| CN215121591U (en) | Encoder signal processing circuit fixing device | |
| CN218183743U (en) | A digital relay protection intelligent terminal | |
| CN224163802U (en) | A frequency converter transformer tester | |
| CN213817562U (en) | Simple boost frequency converter | |
| CN218272415U (en) | Integrated grid line line loss fine management equipment | |
| CN214044503U (en) | A system transmission control cabinet for network information |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230418 |