CN115949223A - A distribution frame for distribution line construction and using method thereof - Google Patents
A distribution frame for distribution line construction and using method thereof Download PDFInfo
- Publication number
- CN115949223A CN115949223A CN202211478883.8A CN202211478883A CN115949223A CN 115949223 A CN115949223 A CN 115949223A CN 202211478883 A CN202211478883 A CN 202211478883A CN 115949223 A CN115949223 A CN 115949223A
- Authority
- CN
- China
- Prior art keywords
- frame
- limiting
- distribution
- fixedly connected
- ring
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Handcart (AREA)
- Patch Boards (AREA)
Abstract
Description
技术领域technical field
本发明属于电力施工设备技术领域,具体为一种配电线路施工用配电架及其使用方法。The invention belongs to the technical field of electric power construction equipment, in particular to a power distribution frame for power distribution line construction and a use method thereof.
背景技术Background technique
电力工程,即与电能的生产、输送、分配有关的工程,广义上还包括把电作为动力和能源在多种领域中应用的工程;同时可理解到送变电业扩工程。Electric power engineering, that is, engineering related to the production, transmission, and distribution of electric energy, also includes engineering in a broad sense that uses electricity as power and energy in various fields; at the same time, it can be understood as power transmission and transformation industry expansion projects.
现有电力施工过程中,通常需要施工人员佩戴较重维修工具攀爬电线杆,而较重的维护工具为施工人员的操作带来较多不便,从而会影响整体施工效率,同时由于较重的维护工具会较为快速损耗施工人员体力,进而容易导致维护人员在施工过程中存在因体力不支而发生意外危险的安全隐患。In the existing electric power construction process, construction personnel are usually required to wear heavy maintenance tools to climb the utility poles, and the heavy maintenance tools bring more inconvenience to the operation of the construction personnel, which will affect the overall construction efficiency. The maintenance tools will quickly consume the physical strength of the construction personnel, which will easily lead to the safety hazards of accidental dangers caused by the lack of physical strength of the maintenance personnel during the construction process.
发明内容Contents of the invention
本发明的目的在于:提供一种能够提供电力施工人员进行电力设备安装设置时的临时支撑位置,方便施工人员进行电力设备或施工工具的放置,有效减缓施工人员的体力损耗和有效提高实际施工效率,同时有效提高施工人员施工安全性的一种配电线路施工用配电架及其使用方法。The purpose of the present invention is to provide a temporary support position for electric power construction personnel to install and set up electric power equipment, facilitate construction personnel to place electric equipment or construction tools, effectively slow down the physical loss of construction personnel and effectively improve actual construction efficiency , and at the same time effectively improve the construction safety of construction workers, a distribution frame for distribution line construction and a method of use thereof.
本发明采用的技术方案如下:一种配电线路施工用配电架,包括:The technical scheme adopted in the present invention is as follows: a power distribution frame for power distribution line construction, comprising:
限位机构,所述限位机构包括支撑架、定位部件和限位部件,所述定位部件和限位部件均设置于支撑架上,所述支撑架一侧外表面开设有安装槽,所述安装槽一侧内表壁转动连接有调节管,所述调节管外表面转动套设有第一连动齿圈,所述调节管外表面套设有第二连动齿圈,所述调节管顶部开设有放置槽,所述放置槽内部滑动嵌设有限位条,所述支撑架另一侧外表面固定连接有限位块,所述限位块一侧外表面滑动贯穿有推杆;以及A limit mechanism, the limit mechanism includes a support frame, a positioning component and a limit component, the positioning component and the limit component are both arranged on the support frame, an installation groove is opened on the outer surface of one side of the support frame, and the The inner surface wall on one side of the installation groove is rotatably connected with an adjustment tube, the outer surface of the adjustment tube is rotatably provided with a first interlocking ring gear, the outer surface of the adjustment tube is overlaid with a second interlocking ring gear, the adjustment tube A placement slot is opened on the top, and a limit bar is slidably embedded inside the placement slot, the outer surface of the other side of the support frame is fixedly connected with a limit block, and a push rod slides through the outer surface of one side of the limit block; and
载物机构,所述载物机构包括连动部件、载物部件、连接框和连接板,所述连接板顶部开设有连动槽和两个移动槽,所述连接板通过螺栓和支撑架固定连接,所述连接框固定连接于连接板一侧外表面,所述连动部件和载物部件均设置于连接板上。The object-carrying mechanism, the object-carrying mechanism includes a linkage part, an object-carrying part, a connection frame and a connection plate, the top of the connection plate is provided with a linkage groove and two moving grooves, and the connection plate is fixed by a bolt and a support frame connection, the connection frame is fixedly connected to the outer surface of one side of the connection plate, and the linkage part and the loading part are both arranged on the connection plate.
其中,所述定位部件包括移动架,所述移动架滑动套设于限位块外表面,所述移动架两侧内表壁之间固定连接有防滑垫,所述防滑垫一侧外表面开设有梯形贯穿口,所述梯形贯穿口内部插设有推板。Wherein, the positioning part includes a moving frame, and the moving frame is slidingly sleeved on the outer surface of the limit block, and an anti-slip pad is fixedly connected between the inner surface walls on both sides of the moving frame, and the outer surface of one side of the anti-slip pad is opened There is a trapezoidal through opening, and a push plate is inserted inside the trapezoidal through opening.
其中,所述限位部件包括支撑管,所述支撑管固定连接于支撑架两侧内表壁之间,且支撑管两端均延伸至支撑架外部,所述支撑管顶部开设有移动口,所述支撑管两侧内表壁之间转动连接有双向螺纹杆,所述双向螺纹杆外表面螺纹连接有两组移动圈,每组所述移动圈共设置有两个,每个所述移动圈顶部均通过移动口延伸至支撑管外部,所述支撑管外表面滑动套设有四个移动环,每个所述移动环内表壁和对应移动圈顶部均固定连接,四个所述移动环共分为两组,其中一组两个所述移动环外表面均转动连接有第一限位轮,另一组两个所述移动环外表面均转动连接有第二限位轮。Wherein, the limiting part includes a support tube, the support tube is fixedly connected between the inner surface walls on both sides of the support frame, and both ends of the support tube extend to the outside of the support frame, and the top of the support tube is provided with a moving port. Two-way threaded rods are rotatably connected between the inner and outer walls on both sides of the support tube, and two sets of moving rings are threaded on the outer surface of the two-way threaded rods. There are two moving rings in each group, and each moving ring The tops of the rings all extend to the outside of the support tube through the moving openings. The outer surface of the support tube is slidingly sleeved with four moving rings. The inner surface wall of each moving ring is fixedly connected to the top of the corresponding moving ring. The four moving rings The rings are divided into two groups. In one group, the outer surfaces of the two moving rings are both rotatably connected to the first limiting wheel, and in the other group, the outer surfaces of the two moving rings are both rotatably connected to the second limiting wheel.
其中,所述限位条底部等距开设有多个限位槽,每个所述限位槽内部均插设有限位弹簧,每个所述限位弹簧底部和放置槽内部底面贴合。Wherein, the bottom of the limiting bar is equidistantly provided with a plurality of limiting grooves, and a limiting spring is inserted inside each limiting groove, and the bottom of each limiting spring is attached to the inner bottom surface of the placement groove.
其中,所述第一连动齿圈内表壁开设有限位口,所述限位条顶端延伸至限位口内部。Wherein, a limiting opening is opened on the inner surface wall of the first interlocking ring gear, and the top end of the limiting strip extends to the inside of the limiting opening.
其中,所述支撑架一侧外表面固定连接有安装片,所述安装片顶部固定连接有驱动电机,所述驱动电机的输出端套设有驱动齿轮,所述驱动齿轮和第一连动齿圈啮合,所述支撑架顶部固定连接有安装环。Wherein, the outer surface of one side of the support frame is fixedly connected with a mounting piece, and the top of the mounting piece is fixedly connected with a driving motor, and the output end of the driving motor is provided with a driving gear, and the driving gear and the first linkage gear The ring is engaged, and the top of the support frame is fixedly connected with a mounting ring.
其中,所述推杆一端转动连接有顶帽,所述推杆另一端延伸至调节管内部,且推杆和调节管螺纹连接。Wherein, one end of the push rod is rotatably connected with a top cap, the other end of the push rod extends to the inside of the adjustment pipe, and the push rod is screwed to the adjustment pipe.
其中,所述载物部件包括两个压块,两个所述压块分别滑动嵌设于对应移动内部,每个所述移动槽内部均滑动设置有放置弹簧,两个所述压块顶部之间固定连接有载物板,所述载物板底部固定连接有两个夹板,所述载物板外表面等距开设有多个防护槽。Wherein, the loading part includes two pressure blocks, and the two pressure blocks are slidably embedded in the corresponding moving interiors, and each of the moving grooves is slidably provided with a placement spring, and the top of the two pressure blocks A loading board is fixedly connected between them, and two splints are fixedly connected to the bottom of the loading board, and a plurality of protective grooves are equally spaced on the outer surface of the loading board.
其中,所述连动部件包括压条和安装框,所述压条滑动嵌设于连动槽内部,所述压条底部固定连接有抵条,所述抵条底部滑动贯穿连动槽内部底面,且抵条底部延伸至安装框内部,所述安装框固定连接于连接板底部,所述安装框一侧外表面固定连接有复位框,所述复位框内部底面固定连接有两个滑杆,每个所述滑杆外表面均滑动套设有复位弹簧,两个所述滑杆外表面之间滑动套设有复位片,所述安装框一侧外表面开设有复位口,所述安装框内部滑动嵌设有齿条,所述齿条底端滑动贯穿安装槽,所述齿条和第二连动齿圈啮合,所述齿条一侧外表面通过复位口和复位片固定连接。Wherein, the linkage part includes a bead and a mounting frame, the bead is slidably embedded in the interlocking groove, the bottom of the bead is fixedly connected with a resisting bar, the bottom of the belaying bar slides through the inner bottom surface of the interlocking groove, and The bottom of the bar extends to the inside of the installation frame, and the installation frame is fixedly connected to the bottom of the connecting plate. The outer surface of one side of the installation frame is fixedly connected with a reset frame, and the inner bottom surface of the reset frame is fixedly connected with two slide bars. The outer surfaces of the sliding rods are all slidingly sleeved with reset springs, and the sliding sleeves between the outer surfaces of the two sliding rods are provided with reset pieces. A rack is provided, the bottom end of the rack slides through the installation groove, the rack engages with the second interlocking ring gear, and the outer surface of one side of the rack is fixedly connected to the reset plate through the reset port.
一种配电线路施工用配电架的使用方法,包括以下步骤:A method for using a power distribution frame for power distribution line construction, comprising the following steps:
S1、准备调节:通过连接框配合现有螺栓能够稳固进行两个载物机构的有效连接,进而使两个设备能够滑动套设于电线杆本体外表面,通过旋转双向螺纹杆,使双向螺纹杆能够移动调节移动圈的使用位置,进而使移动圈通过移动环移动调节第一限位轮和第二限位轮的使用位置,从而使第一限位轮和第二限位轮能够紧贴电线杆本体外表面,进而限制设备的位置移动方向,再通过现有绳索连接安装环,进而令施工人员优先攀爬至指定施工位置,从而使施工人员能够通过现有绳索能够将拼接好的设备沿电线杆本体向上提升;S1. Preparation and adjustment: The two-way threaded rod can be stably and effectively connected through the connection frame and the existing bolts, so that the two devices can be slid on the outer surface of the utility pole body, and the two-way threaded rod can be rotated by rotating the two-way threaded rod. Can move and adjust the use position of the moving ring, and then make the moving ring move through the moving ring to adjust the use position of the first limit wheel and the second limit wheel, so that the first limit wheel and the second limit wheel can be close to the wire The outer surface of the rod body, thereby restricting the position and movement direction of the equipment, and then connecting the installation ring through the existing rope, so that the construction personnel can climb to the designated construction position first, so that the construction personnel can use the existing rope to move the spliced equipment along the The utility pole body is lifted upwards;
S2、使用调节:当载物板接触使用人员足部时,通过现有无线控制设备,控制启动驱动电机,使驱动电机能够通过驱动齿轮带动第一连动齿圈进行旋转,进而使第一连动齿圈能够通过限位口和限位条能够有效带动调节管进行旋转,从而使旋转的调节管能够移动调节推杆使用位置,进而使推杆能够通过顶帽推动防滑垫逐渐完全贴合电线杆本体外表面;当防滑垫一侧与电线杆本体外表面完全接触时,防滑垫将阻碍推杆继续移动,进而使调节管跟随第一连动齿圈旋转受到阻碍,进而使限位条压缩限位弹簧移动至放置槽内部,进而使调节管能够脱离第一连动齿圈的带动,进而当施工人员踩压载物板时,使载物板能够挤压压条,进而使压条能够通过抵条挤压移动齿条,并使齿条逐渐下移与第二连动齿圈啮合,进而使下移的齿条能够通过第二连动齿圈能够带动调节管继续进行旋转,进而使推杆能够继续挤压防滑垫,从而使防滑垫能够紧密贴合电线杆本体外表面,进而使设备能够稳固设置于电线杆本体外表面。S2. Use adjustment: when the loading plate touches the foot of the user, the existing wireless control equipment is used to control and start the drive motor, so that the drive motor can drive the first linkage ring gear to rotate through the drive gear, and then the first linkage The movable ring gear can effectively drive the adjustment tube to rotate through the limit port and the limit bar, so that the rotating adjustment tube can move and adjust the use position of the push rod, so that the push rod can push the anti-skid pad through the top cap to gradually and completely fit the wire The outer surface of the rod body; when one side of the anti-slip pad is in full contact with the outer surface of the utility pole body, the anti-slip pad will prevent the push rod from continuing to move, thereby hindering the rotation of the adjustment tube following the first interlocking ring gear, thereby compressing the limit bar The limit spring moves to the inside of the placement groove, so that the adjusting tube can be separated from the drive of the first interlocking ring gear, and then when the construction personnel step on the ballast plate, the object plate can squeeze the bead, and then the bead can pass through the resisting The bar squeezes and moves the rack, and makes the rack gradually move down to mesh with the second interlocking ring gear, so that the down moving rack can drive the adjustment tube to continue to rotate through the second interlocking ring gear, thereby making the push rod The anti-slip pad can be continuously squeezed, so that the anti-slip pad can be closely attached to the outer surface of the utility pole body, so that the equipment can be stably arranged on the outer surface of the utility pole body.
综上所述,由于采用了上述技术方案,本发明的有益效果是:In summary, owing to adopting above-mentioned technical scheme, the beneficial effect of the present invention is:
在使用本发明提供的配电架时,能够为施工人员提供有效的支撑位置,方便施工人员进行较多施工工具和电力施工工具的放置,同时可有效节省施工人员的体力,进而能够有效提高实际施工效率和施工安全性。When using the power distribution rack provided by the present invention, it can provide effective support positions for construction personnel, facilitate the construction personnel to place more construction tools and electric construction tools, and at the same time effectively save the physical strength of construction personnel, thereby effectively improving the actual Construction efficiency and construction safety.
附图说明Description of drawings
图1为本发明所述配电架在使用时的正视立体图;Fig. 1 is a front perspective view of the power distribution frame of the present invention when in use;
图2为本发明所述配电架的正视立体图;Fig. 2 is the front perspective view of the power distribution frame of the present invention;
图3为本发明所述配电架的后视立体图;Fig. 3 is a rear perspective view of the power distribution frame of the present invention;
图4为本发明所述配电架的仰视立体图;Fig. 4 is a bottom perspective view of the distribution frame of the present invention;
图5为本发明所述配电架的正视剖视立体图;Fig. 5 is a front sectional perspective view of the distribution frame of the present invention;
图6为本发明所述限位机构的正视立体图;Fig. 6 is a front perspective view of the limiting mechanism of the present invention;
图7为本发明所述限位机构的正视剖视展开立体图;Fig. 7 is a front view, a sectional expanded perspective view of the position-limiting mechanism of the present invention;
图8为本发明图6中的A部分放大图;Figure 8 is an enlarged view of part A in Figure 6 of the present invention;
图9为本发明图6中的B部分放大图;Fig. 9 is an enlarged view of part B in Fig. 6 of the present invention;
图10为本发明所述载物机构的正视剖视展开立体图;Fig. 10 is a front sectional and expanded perspective view of the loading mechanism of the present invention;
图11为本发明图10中的C部分放大图;Fig. 11 is an enlarged view of part C in Fig. 10 of the present invention;
图12为本发明所述载物机构的仰视剖视展开立体图;Fig. 12 is a bottom-view, sectioned and expanded perspective view of the loading mechanism of the present invention;
图13为本发明图12中的D部分放大图。Fig. 13 is an enlarged view of part D in Fig. 12 of the present invention.
图中标记:1、限位机构;101、支撑架;102、限位块;103、调节管;104、限位条;105、限位弹簧;106、第一连动齿圈;107、推杆;108、驱动电机;109、驱动齿轮;110、移动架;111、防滑垫;112、推板;113、支撑管;114、双向螺纹杆;115、移动圈;116、移动环;117、第一限位轮;118、第二限位轮;119、安装环;2、载物机构;201、连接框;202、连接板;203、放置弹簧;204、压块;205、载物板;206、夹板;207、压条;208、抵条;209、安装框;210、齿条;211、复位片;212、复位框;213、滑杆;214、复位弹簧;3、电线杆本体。Marks in the figure: 1, limit mechanism; 101, support frame; 102, limit block; 103, regulating tube; 104, limit bar; 105, limit spring; 106, first interlocking ring gear; 107, push Rod; 108, drive motor; 109, drive gear; 110, mobile frame; 111, anti-slip mat; 112, push plate; 113, support tube; 114, two-way threaded rod; 118, the second spacer wheel; 119, mounting ring; 2, loading mechanism; 201, connecting frame; 202, connecting plate; 203, placing spring; 204, briquetting block; 205,
具体实施方式Detailed ways
为了使本发明的目的、技术方案及优点更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅用以解释本发明,并不用于限定本发明。In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.
实施例Example
参照图1-图13:一种配电线路施工用配电架,包括:限位机构1和载物机构2,其中,所述限位机构1包括支撑架101、定位部件和限位部件,支撑架101的设立方提供设备其他功能部件设置的安装基础,同时能够有效进行设备安装支撑设置,定位部件和限位部件均设置于支撑架101上,支撑架101一侧外表面开设有安装槽,安装槽的设立方便进行调节管103的安装设置,安装槽一侧内表壁转动连接有调节管103,调节管103的设立能够有效移动调节推杆107的使用位置,调节管103外表面转动套设有第一连动齿圈106,通过第一连动齿圈106的设立配合驱动齿轮109使驱动电机108能够有效带动调节管103进行旋转,调节管103外表面套设有第二连动齿圈,第二连动齿圈的设立使齿条210能够有效带动调节管103进行旋转,调节管103顶部开设有放置槽,放置槽的设立方便进行限位条104的安装设置,放置槽内部滑动嵌设有限位条104,限位条104的设立配合限位口使调节管103和第一连动齿圈106能够同步旋转,支撑架101另一侧外表面固定连接有限位块102,限位块102的设立方便进行推杆107的安装设置,限位块102一侧外表面滑动贯穿有推杆107,推杆107的设立能够有效进行防滑垫111的位置移动调节;Referring to Figures 1-13: a power distribution frame for distribution line construction, including: a
所述载物机构2包括连动部件、载物部件、连接框201和连接板202,通过连接框201的设立使两个载物机构2能够稳固连接,连接板202的设立方便进行设备其他功能部件的安装设置,连接板202顶部开设有连动槽和两个移动槽,连动槽的设立方便进行压条207的安装设置,移动槽的设立方便进行压块204的安装设置,连接板202通过螺栓和支撑架101固定连接,连接框201固定连接于连接板202一侧外表面,连动部件和载物部件均设置于连接板202上。The
参照图3-图13:定位部件包括移动架110,移动架110的设立方便进行防滑垫111的安装设置,移动架110滑动套设于限位块102外表面,移动架110两侧内表壁之间固定连接有防滑垫111,防滑垫111的设立使设备能够稳固设置于电线杆本体3外表面,防滑垫111一侧外表面开设有梯形贯穿口,通过这种结构的设立使推杆107能够有效调节防滑垫111和电线杆本体3外表面的贴合状态,梯形贯穿口内部插设有推板112,限位部件包括支撑管113,支撑管113的设立方便进行设备其他功能部件的安装设置,支撑管113固定连接于支撑架101两侧内表壁之间,且支撑管113两端均延伸至支撑架101外部,支撑管113顶部开设有移动口,移动口的设立使移动圈115能够正常进行使用位置的移动调节,支撑管113两侧内表壁之间转动连接有双向螺纹杆114,双向螺纹杆114的设立能够有效移动调节移动圈115的使用位置,双向螺纹杆114外表面螺纹连接有两组移动圈115,移动圈115的设立使双向螺纹杆114能够有效移动调节移动环116,每组移动圈115共设置有两个,每个移动圈115顶部均通过移动口延伸至支撑管113外部,支撑管113外表面滑动套设有四个移动环116,移动环116的设立能够有效移动调节第一限位轮117和第二限位轮118的使用位置,每个移动环116内表壁和对应移动圈115顶部均固定连接,四个移动环116共分为两组,其中一组两个移动环116外表面均转动连接有第一限位轮117,第一限位轮117的设立配合第二限位轮118使设备能够保持有限的移动方向,进而使设备能够稳固设置,另一组两个移动环116外表面均转动连接有第二限位轮118,限位条104底部等距开设有多个限位槽,限位槽的设立方便进行限位弹簧105的安装设置,每个限位槽内部均插设有限位弹簧105,限位弹簧105的设立能够有效进行限位条104的支撑限制,每个限位弹簧105底部和放置槽内部底面贴合,第一连动齿圈106内表壁开设有限位口,限位条104顶端延伸至限位口内部,支撑架101一侧外表面固定连接有安装片,安装片的设立方便进行驱动电机108的安装设置,安装片顶部固定连接有驱动电机108,驱动电机108的设立提供第一连动齿圈106旋转所需动力,驱动电机108的输出端套设有驱动齿轮109,驱动齿轮109和第一连动齿圈106啮合,支撑架101顶部固定连接有安装环119,安装环119的设立进行现有绳索的连接,推杆107一端转动连接有顶帽,推杆107另一端延伸至调节管103内部,且推杆107和调节管103螺纹连接,载物部件包括两个压块204,压块204的设立方便进行载物板205的安装设置,两个压块204分别滑动嵌设于对应移动内部,每个移动槽内部均滑动设置有放置弹簧203,放置弹簧203的设立能够有效进行压块204的支撑限制,两个压块204顶部之间固定连接有载物板205,载物板205的设立能够有效进行施工人员的承载,载物板205底部固定连接有两个夹板206,夹板206的设立能够有效限制载物板205的位置移动,载物板205外表面等距开设有多个防护槽,防护槽的设立当施工人员意外掉落时能够有效进行安全绳的位置限制,连动部件包括压条207和安装框209,压条207的设立配合抵条208使载物板205能够带动齿条210进行位置移动,压条207滑动嵌设于连动槽内部,压条207底部固定连接有抵条208,抵条208底部滑动贯穿连动槽内部底面,且抵条208底部延伸至安装框209内部,安装框209固定连接于连接板202底部,安装框209一侧外表面固定连接有复位框212,复位框212的设立方便进行设备其他功能部件的安装设置,复位框212内部底面固定连接有两个滑杆213,滑杆213的设立方便进行复位弹簧214的安装设置,每个滑杆213外表面均滑动套设有复位弹簧214,复位弹簧214的设立能够有效进行复位片211的有效支撑,两个滑杆213外表面之间滑动套设有复位片211,复位片211的设立使复位弹簧214能够有效进行齿条210的有效支撑,安装框209一侧外表面开设有复位口,复位口的设立使复位片211能够正常进行位置移动,安装框209内部滑动嵌设有齿条210,齿条210底端滑动贯穿安装槽,齿条210和第二连动齿圈啮合,齿条210一侧外表面通过复位口和复位片211固定连接。Referring to Fig. 3-Fig. 13: the positioning component includes a
以下对本发明实施例提供的一种配电线路施工用配电架的使用方法进行详细说明,其使用方法包括以下步骤:The following is a detailed description of the method of using a power distribution frame for distribution line construction provided by the embodiment of the present invention. The method of use includes the following steps:
步骤一、准备调节:通过连接框201配合现有螺栓能够稳固进行两个载物机构2的有效连接,进而使两个设备能够有效滑动套设于电线杆本体3外表面,通过旋转双向螺纹杆114,使双向螺纹杆114能够有效移动调节移动圈115的使用位置,进而使移动圈115能够通过移动环116有效移动调节第一限位轮117和第二限位轮118的使用位置,从而使第一限位轮117和第二限位轮118能够紧贴电线杆本体3外表面,同时能够有效限制设备的位置移动方向,再通过现有绳索连接安装环119,从而令施工人员优先攀爬至指定施工位置,进而使施工人员能够通过现有绳索能够有效将拼接好的设备沿电线杆本体3向上提升;
步骤二、使用调节:当载物板205接触使用人员足部时,可通过现有无线控制设备,控制启动驱动电机108,进而使驱动电机108能够通过驱动齿轮109有效带动第一连动齿圈106进行旋转,进而使第一连动齿圈106通过限位口和限位条104能够有效带动调节管103进行旋转,从而使旋转的调节管103能够有效移动调节推杆107使用位置,进而使推杆107能够通过顶帽有效推动防滑垫111逐渐完全贴合电线杆本体3外表面;当防滑垫111一侧与电线杆本体3外表面完全接触时,防滑垫111将阻碍推杆107继续移动,进而使调节管103跟随第一连动齿圈106旋转受到阻碍,使限位条104压缩限位弹簧105移动至放置槽内部,进而使调节管103能够脱离第一连动齿圈106的带动,进而当施工人员踩压载物板205时,使载物板205能够有效挤压压条207,进而使压条207能够通过抵条208有效挤压移动齿条210,并使齿条210逐渐下移与第二连动齿圈啮合,进而使下移的齿条210能够通过第二连动齿圈能够带动调节管103继续进行旋转,进而使推杆107能够继续挤压防滑垫111,从而使防滑垫111能够紧密贴合电线杆本体3外表面,进而使设备能够稳固设置于电线杆本体3外表面,进而使设备能够有效为施工人员提供有效的支撑位置,有效节省施工人员的体力,同时方便进行较多施工工具和电力施工工具的放置,进而能够有效提高实际施工效率和施工安全性。Step 2, use adjustment: when the loading plate 205 touches the foot of the user, the existing wireless control equipment can be used to control and start the driving motor 108, so that the driving motor 108 can effectively drive the first interlocking ring gear through the driving gear 109 106 to rotate, so that the first interlocking ring gear 106 can effectively drive the adjustment tube 103 to rotate through the limit opening and the limit bar 104, so that the rotating adjustment tube 103 can effectively move the adjustment push rod 107 to use position, and then make The push rod 107 can effectively push the anti-skid pad 111 to gradually and completely fit the outer surface of the utility pole body 3 through the top cap; , so that the adjustment tube 103 is hindered from following the rotation of the first interlocking ring gear 106, so that the limit bar 104 compresses the limit spring 105 and moves to the inside of the placement groove, so that the adjustment tube 103 can be separated from the drive of the first interlocking ring gear 106 , and then when the construction personnel step on the ballast plate 205, the load plate 205 can effectively squeeze the bead 207, and then the bead 207 can effectively squeeze the moving rack 210 through the contact bar 208, and the rack 210 will gradually move down Mesh with the second interlocking ring gear, so that the downwardly moving rack 210 can drive the adjustment tube 103 to continue to rotate through the second interlocking ring gear, so that the push rod 107 can continue to squeeze the anti-skid pad 111, so that the anti-skid The pad 111 can closely fit the outer surface of the utility pole body 3, so that the equipment can be firmly arranged on the outer surface of the utility pole body 3, and then the equipment can effectively provide an effective support position for the construction personnel, effectively saving the physical strength of the construction personnel, and convenient The placement of more construction tools and electric construction tools can effectively improve the actual construction efficiency and construction safety.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present invention should be included in the protection of the present invention. within range.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211478883.8A CN115949223B (en) | 2022-11-24 | 2022-11-24 | A distribution rack for distribution line construction and use method thereof |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211478883.8A CN115949223B (en) | 2022-11-24 | 2022-11-24 | A distribution rack for distribution line construction and use method thereof |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN115949223A true CN115949223A (en) | 2023-04-11 |
| CN115949223B CN115949223B (en) | 2025-04-22 |
Family
ID=87296236
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211478883.8A Active CN115949223B (en) | 2022-11-24 | 2022-11-24 | A distribution rack for distribution line construction and use method thereof |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115949223B (en) |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2652929A1 (en) * | 2008-02-11 | 2009-08-11 | Watercare Services Limited | Access apparatus |
| JP2019019446A (en) * | 2017-07-11 | 2019-02-07 | 積水ハウス株式会社 | Runner construction auxiliary tool and runner construction method using the same |
| CN209692241U (en) * | 2019-04-03 | 2019-11-26 | 中联天盛(北京)电力工程有限公司 | A kind of power construction leading truck |
| JP2021032071A (en) * | 2019-08-16 | 2021-03-01 | 方小剛 | Lifting ladder for indoor building construction |
| CN215167849U (en) * | 2021-05-27 | 2021-12-14 | 中国建筑第八工程局有限公司 | Double-limb beam string cable clamp installation operation platform |
| CN114412156A (en) * | 2022-02-08 | 2022-04-29 | 杨荣珺 | Tower column construction internal climbing frame and construction method thereof |
| CN114753612A (en) * | 2022-05-26 | 2022-07-15 | 联旺工程建设有限公司 | A kind of building exterior climbing construction operation platform and installation method |
-
2022
- 2022-11-24 CN CN202211478883.8A patent/CN115949223B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CA2652929A1 (en) * | 2008-02-11 | 2009-08-11 | Watercare Services Limited | Access apparatus |
| JP2019019446A (en) * | 2017-07-11 | 2019-02-07 | 積水ハウス株式会社 | Runner construction auxiliary tool and runner construction method using the same |
| CN209692241U (en) * | 2019-04-03 | 2019-11-26 | 中联天盛(北京)电力工程有限公司 | A kind of power construction leading truck |
| JP2021032071A (en) * | 2019-08-16 | 2021-03-01 | 方小剛 | Lifting ladder for indoor building construction |
| CN215167849U (en) * | 2021-05-27 | 2021-12-14 | 中国建筑第八工程局有限公司 | Double-limb beam string cable clamp installation operation platform |
| CN114412156A (en) * | 2022-02-08 | 2022-04-29 | 杨荣珺 | Tower column construction internal climbing frame and construction method thereof |
| CN114753612A (en) * | 2022-05-26 | 2022-07-15 | 联旺工程建设有限公司 | A kind of building exterior climbing construction operation platform and installation method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN115949223B (en) | 2025-04-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203438167U (en) | Movable cement paste cup detacher | |
| CN210825312U (en) | Hydraulic lifting type insulating platform for distribution line live-wire work | |
| CN211191948U (en) | Gravity casting device is used in bicycle rim production | |
| CN115949223A (en) | A distribution frame for distribution line construction and using method thereof | |
| CN214055239U (en) | Novel electromechanical maintenance support device | |
| CN211396532U (en) | A lift bench for engineering fitment is decorated | |
| CN204088978U (en) | A kind of adjustable dedicated hydraulic moving lifting car | |
| CN112814351A (en) | Lifting construction equipment hanging point device | |
| CN217018323U (en) | Automatic control separation structure in stamping die | |
| CN213073699U (en) | An environmental protection landscape flower platform based on environmental improvement | |
| CN210413384U (en) | Anti-pinch assembling device for vehicle hydraulic lifting cylinder | |
| CN213231280U (en) | Lifting device with protection effect for decoration construction | |
| CN211338604U (en) | Hoisting accessory of power equipment maintenance usefulness | |
| CN201515156U (en) | Switch cabinet wiring vehicle | |
| CN218495838U (en) | Electric drill rod replacing device of calcium carbide furnace | |
| CN209920179U (en) | Building material apron culvert apron drawing of patterns equipment | |
| CN221340701U (en) | A lifting device for installing building power equipment | |
| CN216447757U (en) | Installation device convenient to server equipment | |
| CN219281773U (en) | Safety hydraulic device for mining | |
| CN208378303U (en) | A kind of telescoping mechanism recreational vehicle electric jack stand easy to disassemble | |
| CN218140473U (en) | Copper foil coating device | |
| CN214719912U (en) | LED stamping die convenient to change mould | |
| CN110917582A (en) | Single climbing device used during transformer maintenance | |
| CN219053518U (en) | Single hydraulic prop disassembling machine | |
| CN212499125U (en) | Scrap iron compression equipment of numerical control machining center |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20251230 Address after: 221000 No. 20 Jiefang North Road, Jiangsu, Xuzhou Patentee after: STATE GRID XUZHOU POWER SUPPLY COMPANY Country or region after: China Patentee after: State Grid Jiangsu comprehensive energy service Co.,Ltd. Address before: 221000 No. 20 Jiefang North Road, Jiangsu, Xuzhou Patentee before: STATE GRID XUZHOU POWER SUPPLY COMPANY Country or region before: China |
|
| TR01 | Transfer of patent right |