CN115928583A - On-site temporary assembly and erection method of multi-segment steel box girder of cable-stayed bridge spanning multi-storey highway - Google Patents
On-site temporary assembly and erection method of multi-segment steel box girder of cable-stayed bridge spanning multi-storey highway Download PDFInfo
- Publication number
- CN115928583A CN115928583A CN202211541569.XA CN202211541569A CN115928583A CN 115928583 A CN115928583 A CN 115928583A CN 202211541569 A CN202211541569 A CN 202211541569A CN 115928583 A CN115928583 A CN 115928583A
- Authority
- CN
- China
- Prior art keywords
- longitudinal
- guide rail
- support
- steel box
- assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本申请涉及斜拉桥施工的领域,尤其是涉及一种跨多层公路斜拉桥钢箱梁多节段现场临时拼装架设工法。The application relates to the field of construction of cable-stayed bridges, in particular to a multi-segment on-site temporary assembly and erection method for steel box girders of cable-stayed bridges spanning multi-storey highways.
背景技术Background technique
悬臂拼装法是斜拉桥钢箱梁架设方法的其中一种,先将梁段运输到桥位处,然后利用桥面吊机垂直起吊架设就位,或是通过运梁小车将钢箱梁节段运至桥墩处的提升站,通过提升站将钢箱梁节段吊至桥面。The cantilever assembly method is one of the erection methods of the steel box girder of the cable-stayed bridge. First, the beam section is transported to the bridge position, and then the bridge deck crane is used to vertically lift the erection into place, or the steel box girder section is lifted by the beam transport trolley. The section is transported to the lifting station at the pier, and the steel box girder section is hoisted to the bridge deck through the lifting station.
当在需要跨越既有道路桥梁、山区、河流等建设场地有限的地方修建钢梁斜拉桥时,尤其是在已经运行的高速公路处,运梁小车难以在狭小的搬运体积庞大的钢箱梁节段,且悬臂拼装法实施,钢箱梁节段也难以在桥面实现转运中,因此仍有改进空间。When a steel girder cable-stayed bridge needs to be built in places with limited construction sites such as crossing existing roads, bridges, mountains, and rivers, especially on highways that have already been in operation, it is difficult for beam-carrying trolleys to carry bulky steel box girders in a narrow space segment, and the implementation of the cantilever assembly method, the steel box girder segment is also difficult to achieve transfer on the bridge deck, so there is still room for improvement.
发明内容Contents of the invention
为了便于实现钢箱梁转运和拼装,本申请提供一种跨多层公路斜拉桥钢箱梁多节段现场临时拼装架设工法。In order to facilitate the transfer and assembly of steel box girders, the present application provides a multi-segment on-site temporary assembly and erection method for steel box girders of cable-stayed bridges spanning multi-storey highways.
本申请提供的一种跨多层公路斜拉桥钢箱梁多节段现场临时拼装架设工法采用如下的技术方案:The multi-segment steel box girder multi-segment on-site temporary assembly and erection method of a multi-layer highway cable-stayed bridge provided by this application adopts the following technical scheme:
一种跨多层公路斜拉桥钢箱梁多节段现场临时拼装架设工法,包括以下步骤:A multi-segment steel box girder multi-segment on-site temporary assembly and erection method for a cable-stayed bridge spanning multi-storey highways, comprising the following steps:
S1: 施工准备:将钢箱梁的标准节段分为三块组合模块进行制作,并在预拼场进行预拼;S1: Construction preparation: divide the standard section of the steel box girder into three combined modules for fabrication, and pre-assemble in the pre-assembly field;
S2: 支架搭设:在主塔墩旁搭建纵向支架,纵向支架沿桥向延伸,且纵向支架的支撑面位于公路上方,在纵向支架一侧搭建横向支架,横向支架的支撑面与纵向支架的支撑面衔接;S2: Bracket erection: build a longitudinal bracket next to the main tower pier, the longitudinal bracket extends along the bridge direction, and the supporting surface of the longitudinal bracket is located above the road, and a horizontal bracket is built on the side of the longitudinal bracket, the supporting surface of the horizontal bracket and the support of the longitudinal bracket face connection;
S3: 钢混结合段施工:在纵向支架上完成主塔两侧的钢混结合段施工;S3: Construction of the steel-concrete joint section: complete the construction of the steel-concrete joint section on both sides of the main tower on the longitudinal support;
S4:提升站施工:在横向支架处搭建提升站,提升站用于将组合模块提升至横向支架上;S4: Lifting station construction: build a lifting station at the horizontal support, and the lifting station is used to lift the combined module to the horizontal support;
S5:起始段施工:利用提升站将组焊模块逐一提升至横向支架的移动平台,所述移动平台包括若干竖向千斤顶以及若干纵向千斤顶,所述竖向千斤顶分别用于竖向顶推并调整三块组焊模块的高度,所述纵向千斤顶用于纵向顶推并调整三块组焊模块的纵向位置,通过竖向千斤顶和纵向千斤顶对三块组焊模块进行对齐调整,以拼装焊接成钢箱梁标准节段,接着将标准节段横移至纵向支架支撑面,然后纵移至纵向支架远离主塔的一端位置处,按照以上步骤完成若干个标准节段的组装和转移,然后在纵向支架上将钢混结合段以及多个标准节段拼装焊接成整体,以完成主塔一侧的起始段施工。S5: Construction of the initial section: use the lifting station to lift the assembly welding modules one by one to the mobile platform of the horizontal support. Adjust the height of the three assembly welding modules, the longitudinal jack is used for vertically pushing and adjusting the longitudinal positions of the three assembly welding modules, the alignment adjustment of the three assembly welding modules is carried out through the vertical jack and the longitudinal jack, and the assembled and welded Steel box girder standard section, then move the standard section horizontally to the support surface of the longitudinal support, and then move vertically to the end of the longitudinal support away from the main tower, complete the assembly and transfer of several standard sections according to the above steps, and then The steel-concrete combined section and multiple standard sections are assembled and welded into a whole on the longitudinal support to complete the construction of the initial section on one side of the main tower.
通过采用上述技术方案,将钢箱梁标准节段分为三块组焊模块,目的是便于在狭小的地段进行刚箱梁的转运,并且减轻节段起吊重量以及便于在横向支架上横移,达到在施工场地狭小、周边地形复杂的区域完成钢箱梁拼接步骤的目的,通过移动平台的竖向千斤顶和纵向千斤顶对三块组焊模块进行对齐调整,有利于提高钢箱梁标准节段的拼装效率,并在移动平台的作用下实现钢箱梁的转移。By adopting the above technical scheme, the standard section of the steel box girder is divided into three welding modules, the purpose is to facilitate the transfer of the steel box girder in a narrow area, reduce the lifting weight of the section and facilitate the lateral movement on the horizontal support. To achieve the purpose of completing the steel box girder splicing steps in areas with narrow construction sites and complex surrounding terrains, the alignment and adjustment of the three assembly welding modules through the vertical jack and longitudinal jack of the mobile platform is conducive to improving the standard section of the steel box girder. Assembling efficiency, and realize the transfer of steel box girder under the action of the mobile platform.
优选的,在所述S5中,在横向支架上安装横向导轨,横向导轨横向延伸至纵向支架上,并在纵向支架上安装纵向导轨,纵向导轨与横向导轨衔接,且纵向导轨沿桥向延伸,在标准节段移动过程中,先沿横向导轨横移至纵向支架上,然后沿纵向导轨纵移至纵向支架端部。Preferably, in said S5, a transverse guide rail is installed on the transverse support, the transverse guide rail extends laterally to the longitudinal support, and a longitudinal guide rail is installed on the longitudinal support, the longitudinal guide rail is connected with the transverse guide rail, and the longitudinal guide rail extends along the bridge direction, During standard segmental movement, first move laterally along the transverse guide rails to the longitudinal support, and then longitudinally move along the longitudinal guide rails to the end of the longitudinal support.
通过采用上述技术方案,设计横纵导轨,以便标准节段精准落位,有利于标准节段拼装。By adopting the above technical scheme, the horizontal and vertical guide rails are designed so that the standard segments can be positioned accurately, which is conducive to the assembly of the standard segments.
优选的,所述移动平台还包括连接杆,沿横向导轨分布的若干竖向千斤顶通过连接杆相连。Preferably, the mobile platform further includes a connecting rod, and several vertical jacks distributed along the transverse guide rail are connected through the connecting rod.
通过采用上述技术方案,以便实现若干竖向千斤顶整体移动,便于将标准节段整体移动至纵向支架上。By adopting the above technical solution, the overall movement of several vertical jacks can be realized, which facilitates the overall movement of the standard segment to the longitudinal support.
优选的,所述横向导轨和纵向导轨上表面均设置有凹槽,横向导轨的凹槽和纵向导轨的凹槽相连通,所述竖向千斤顶底部设置有滑块,所述滑块与凹槽滑动连接。Preferably, grooves are provided on the upper surfaces of the transverse guide rail and the longitudinal guide rail, the grooves of the transverse guide rail and the grooves of the longitudinal guide rail are connected, and a slider is provided at the bottom of the vertical jack, and the slider and the groove Swipe to connect.
通过采用上述技术方案,以便实现标准节段的稳定滑动,且便于滑块顺利从横向导轨的凹槽滑动至纵向导轨上的凹槽,有利于提高移动的流畅性。By adopting the above technical solution, the stable sliding of the standard segment can be realized, and the slider can be smoothly slid from the groove of the horizontal guide rail to the groove of the longitudinal guide rail, which is beneficial to improve the fluency of movement.
优选的,所述连接杆两端分别设置有斜向千斤顶,所述斜向千斤顶用于将侧部的组焊模块往中间的组焊模块方向顶推。Preferably, the two ends of the connecting rod are respectively provided with oblique jacks, and the oblique jacks are used to push the welding assembly module at the side toward the welding assembly module in the middle.
通过采用上述技术方案,以便提高三块组焊模块的对接效率。By adopting the above-mentioned technical scheme, the butt joint efficiency of the three welding modules can be improved.
优选的,所述横向导轨共有两条,两条所述横向导轨并排分布,将组组焊模块吊放至移动平台时,组焊模块架设在两条横向导轨中的若干竖向千斤顶上。Preferably, there are two transverse guide rails, and the two transverse guide rails are distributed side by side. When the welding assembly module is hoisted to the mobile platform, the welding assembly module is erected on several vertical jacks in the two transverse guide rails.
通过采用上述技术方案,以提高组焊模块在移动平就位时的稳定性。By adopting the above-mentioned technical scheme, the stability of the assembly and welding module when it is moved and placed in place is improved.
优选的, 同一条横向导轨上的若干竖向千斤顶通过一条连接杆连接,两条连接杆之间连接有横杆。Preferably, several vertical jacks on the same horizontal guide rail are connected by a connecting rod, and a cross bar is connected between the two connecting rods.
通过采用上述技术方案,从而实现两条横向导轨上的若干竖向千斤顶的整体性,有利于实现所有竖向千斤顶的整体移动。By adopting the above technical solution, the integrity of several vertical jacks on the two transverse guide rails is realized, which is beneficial to realize the integral movement of all vertical jacks.
附图说明Description of drawings
图1是本申请实施例一种跨多层公路斜拉桥钢箱梁多节段现场临时拼装架设工法中的整体结构示意图。Figure 1 is a schematic diagram of the overall structure of a multi-segment on-site temporary assembly and erection method of a multi-segment steel box girder of a cable-stayed bridge spanning multi-storey highways according to an embodiment of the present application.
图2是本申请实施例一种跨多层公路斜拉桥钢箱梁多节段现场临时拼装架设工法中移动平台的整体结构示意图。Fig. 2 is a schematic diagram of the overall structure of the mobile platform in the on-site temporary assembly and erection method of a multi-segment steel box girder of a cable-stayed bridge spanning multi-storey highways according to an embodiment of the present application.
图3本申请实施例一种跨多层公路斜拉桥钢箱梁多节段现场临时拼装架设工法中竖向千斤顶与横向导轨以及纵向导轨凹槽间的连接关系示意图。Fig. 3 is a schematic diagram of the connection relationship between the vertical jack, the transverse guide rail and the groove of the longitudinal guide rail in the on-site temporary assembly and erection method of multi-segment steel box girder of a multi-layer highway cable-stayed bridge according to an embodiment of the present application.
附图标记说明:1、主塔;2、提升站;3、纵向支架;4、横向支架;5、横向导轨;6、纵向导轨;7、高速公路;8、标准节段;81、组焊模块;9、移动平台;91、竖向千斤顶;911、滑块;92、纵向千斤顶;93、斜向千斤顶;94、连接杆;95、安装板;96、横杆;10、凹槽。Explanation of reference signs: 1. main tower; 2. lifting station; 3. longitudinal support; 4. transverse support; 5. transverse guide rail; 6. longitudinal guide rail; 7. expressway; 8. standard segment; Module; 9, mobile platform; 91, vertical jack; 911, slide block; 92, longitudinal jack; 93, oblique jack; 94, connecting rod; 95, mounting plate; 96, cross bar; 10, groove.
具体实施方式Detailed ways
以下结合附图1-3对本申请作进一步详细说明。The present application will be described in further detail below in conjunction with accompanying drawings 1-3.
本申请实施例公开一种跨多层公路斜拉桥钢箱梁多节段现场临时拼装架设工法。包括以下步骤:The embodiment of the present application discloses a multi-segment on-site temporary assembly and erection construction method of a steel box girder of a cable-stayed bridge spanning multi-storey highways. Include the following steps:
S1: 施工准备:将钢箱梁的标准节段8分为三块组合模块进行制作,并在预拼场进行预拼。S1: Construction preparation: The
S2: 支架搭设:在主塔1墩旁搭建纵向支架3,纵向支架3沿桥向延伸,且纵向支架3的支撑面位于公路上方,在纵向支架3一侧搭建横向支架4,横向支架4的支撑面与纵向支架3的支撑面衔接。S2: Bracket erection: Build a
S3: 钢混结合段施工:在纵向支架3上完成主塔1两侧的钢混结合段施工。S3: Construction of the steel-concrete joint section: complete the construction of the steel-concrete joint section on both sides of the main tower 1 on the
S4:提升站2施工:在横向支架4处搭建提升站2,提升站2用于将组合模块提升至横向支架4上。S4: Construction of the lifting station 2: the
S5:起始段施工:起始段施工的目的是为拼装龙门吊和架桥机提供平台。在起吊组焊模块81之前,在横向支架4上安装横向导轨5,横向导轨5横向延伸至纵向支架3上,并在纵向支架3上安装纵向导轨6,纵向导轨6与横向导轨5衔接,且纵向导轨6沿桥向延伸。并且,横向导轨5和纵向导轨6上表面均设置有凹槽10,横向导轨5的凹槽10和纵向导轨6的凹槽10相连通,以供移动平台9滑动。S5: Initial section construction: The purpose of initial section construction is to provide a platform for assembling gantry cranes and bridge erecting machines. Before lifting the
然后将移动平台9安装至横向滑轨处。具体的,移动平台9包括若干竖向千斤顶91、若干纵向千斤顶92、两个斜向千斤顶93以及两根连接杆94。竖向千斤顶91分别用于竖向顶推并调整三块组焊模块81的高度,纵向千斤顶92用于纵向顶推并调整三块组焊模块81的纵向位置,斜向千斤顶93用于将侧部的组焊模块81往中间的组焊模块81方向顶推。Then the mobile platform 9 is installed to the transverse slide rail. Specifically, the mobile platform 9 includes several
在本实施例中,横向导轨5共有两条,两条所述横向导轨5并排分布,两根连接杆94与两根横向导轨5一一对应,同一条横向导轨5上的若干竖向千斤顶91通过一条连接杆94连接,并且在两条连接杆94之间连接有横杆96。实现两条横向导轨5上的若干竖向千斤顶91的整体性,有利于实现所有竖向千斤顶91的整体移动。In this embodiment, there are two
若干纵向千斤顶92分两列分别安装在连接杆94侧部的安装板95上,使得两列纵向千斤顶92相对设置,以便左右调节组焊模块81的位置。另外,两个斜向千斤顶93分别设置在连接杆94两端位置,并且倾斜朝上设置,以在顶推组焊模块81时,能够垂直于侧部组焊模块81的斜侧面。Some
另外,为提高移动平台9的滑动稳定性,在竖向千斤顶91底部设置有滑块911,滑块911与凹槽10滑动连接。由于横向导轨5的凹槽10和纵向导轨6的凹槽10相连通,所以,滑块911能够顺利从横向导轨5的凹槽10滑动至纵向导轨6上的凹槽10,有利于提高移动的流畅性。In addition, in order to improve the sliding stability of the mobile platform 9 , a
吊放组焊模块81时,利用提升站2将组焊模块81逐一提升至横向支架4的移动平台9,组焊模块81架设在两条横向导轨5中的若干竖向千斤顶91上。然后通过竖向千斤顶91、纵向千斤顶92以及斜向千斤顶93对三块组焊模块81进行对齐调整,竖向千斤顶91将组焊模块81顶离纵向支架3支撑面,以便操作人员拼装焊接成钢箱梁标准节段8,在标准节段8移动过程中,先沿横向导轨5横移至纵向支架3上,然后沿纵向导轨6纵移至纵向支架3远离主塔1的一端位置处。按照以上步骤完成若干个标准节段8的组装和转移,然后在纵向支架3上将钢混结合段以及多个标准节段8拼装焊接成整体,以完成主塔1一侧的起始段施工。When the
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。All of the above are preferred embodiments of the application, and are not intended to limit the protection scope of the application. Therefore, all equivalent changes made according to the structure, shape, and principle of the application should be covered by the protection scope of the application. Inside.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211541569.XA CN115928583A (en) | 2022-12-02 | 2022-12-02 | On-site temporary assembly and erection method of multi-segment steel box girder of cable-stayed bridge spanning multi-storey highway |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211541569.XA CN115928583A (en) | 2022-12-02 | 2022-12-02 | On-site temporary assembly and erection method of multi-segment steel box girder of cable-stayed bridge spanning multi-storey highway |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115928583A true CN115928583A (en) | 2023-04-07 |
Family
ID=86655487
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211541569.XA Pending CN115928583A (en) | 2022-12-02 | 2022-12-02 | On-site temporary assembly and erection method of multi-segment steel box girder of cable-stayed bridge spanning multi-storey highway |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115928583A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117026838A (en) * | 2023-08-02 | 2023-11-10 | 山东高速建设管理集团有限公司 | Large-span steel box girder hoisting construction device and method based on three-dimensional laser scanning |
| CN118166673A (en) * | 2023-10-23 | 2024-06-11 | 安徽省公路桥梁工程有限公司 | A construction method for segmented traction sliding splicing of wide steel box beams |
Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2791167Y (en) * | 2004-11-19 | 2006-06-28 | 刘文瑞 | Vehicle-carrying tray four-direction moving grooved rail network of multi-layered garage |
| CN102182147A (en) * | 2011-03-31 | 2011-09-14 | 中铁港航局集团第二工程有限公司 | Steel box girder erection method |
| CN203625777U (en) * | 2013-11-04 | 2014-06-04 | 中铁四局集团第二工程有限公司 | Adjustable wheeltrack type beam transporting vehicle on beams |
| CN204000614U (en) * | 2014-04-10 | 2014-12-10 | 宏润建设集团股份有限公司 | The three-dimensional shift unit building a bridge |
| CN105696469A (en) * | 2015-11-16 | 2016-06-22 | 中铁四局集团有限公司 | A Construction Method for Pushing and Installing Steel Box Girder with Long-span and Two-way Longitudinal Slope of Extra-Large Bridge |
| CN211498524U (en) * | 2019-12-03 | 2020-09-15 | 山东省公路桥梁建设有限公司 | Module walking type multi-point pushing equipment for bridge pushing |
| CN111719437A (en) * | 2020-07-22 | 2020-09-29 | 中交二公局第二工程有限公司 | A construction system and method for vertical and horizontal movement of overweight and ultra-wide steel box girder |
| CN113403955A (en) * | 2021-06-30 | 2021-09-17 | 保利长大工程有限公司 | Three-dimensional transport trolley suitable for adjustment of space attitude of segment box girder |
| CN214301312U (en) * | 2021-01-13 | 2021-09-28 | 龙建路桥股份有限公司 | Multi-box-chamber steel box girder multidirectional accurate positioning auxiliary adjusting device |
| CN215518416U (en) * | 2021-09-07 | 2022-01-14 | 中交一公局第二工程有限公司 | An adjustable sliding device for UHPC steel-concrete composite beam |
-
2022
- 2022-12-02 CN CN202211541569.XA patent/CN115928583A/en active Pending
Patent Citations (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2791167Y (en) * | 2004-11-19 | 2006-06-28 | 刘文瑞 | Vehicle-carrying tray four-direction moving grooved rail network of multi-layered garage |
| CN102182147A (en) * | 2011-03-31 | 2011-09-14 | 中铁港航局集团第二工程有限公司 | Steel box girder erection method |
| CN203625777U (en) * | 2013-11-04 | 2014-06-04 | 中铁四局集团第二工程有限公司 | Adjustable wheeltrack type beam transporting vehicle on beams |
| CN204000614U (en) * | 2014-04-10 | 2014-12-10 | 宏润建设集团股份有限公司 | The three-dimensional shift unit building a bridge |
| CN105696469A (en) * | 2015-11-16 | 2016-06-22 | 中铁四局集团有限公司 | A Construction Method for Pushing and Installing Steel Box Girder with Long-span and Two-way Longitudinal Slope of Extra-Large Bridge |
| CN211498524U (en) * | 2019-12-03 | 2020-09-15 | 山东省公路桥梁建设有限公司 | Module walking type multi-point pushing equipment for bridge pushing |
| CN111719437A (en) * | 2020-07-22 | 2020-09-29 | 中交二公局第二工程有限公司 | A construction system and method for vertical and horizontal movement of overweight and ultra-wide steel box girder |
| CN214301312U (en) * | 2021-01-13 | 2021-09-28 | 龙建路桥股份有限公司 | Multi-box-chamber steel box girder multidirectional accurate positioning auxiliary adjusting device |
| CN113403955A (en) * | 2021-06-30 | 2021-09-17 | 保利长大工程有限公司 | Three-dimensional transport trolley suitable for adjustment of space attitude of segment box girder |
| CN215518416U (en) * | 2021-09-07 | 2022-01-14 | 中交一公局第二工程有限公司 | An adjustable sliding device for UHPC steel-concrete composite beam |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117026838A (en) * | 2023-08-02 | 2023-11-10 | 山东高速建设管理集团有限公司 | Large-span steel box girder hoisting construction device and method based on three-dimensional laser scanning |
| CN118166673A (en) * | 2023-10-23 | 2024-06-11 | 安徽省公路桥梁工程有限公司 | A construction method for segmented traction sliding splicing of wide steel box beams |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101603288B (en) | Three-truss main girder structure of highway and railway bi-purpose cable-stayed bridge and installation method thereof | |
| CN102373671B (en) | Construction method of steel truss flexible arch bridge with vault push | |
| CN115977407B (en) | Prestressed large-span truss string slipping construction system and construction method thereof | |
| CN114134796B (en) | Non-stress manufacturing method for oversized section of steel truss bridge | |
| CN111139749A (en) | A construction method of a large-span top-supported continuous steel truss girder cantilever frame | |
| CN113846563A (en) | Construction method for side span and auxiliary span steel truss girder erection of large-span cable-stayed bridge | |
| CN216640288U (en) | Tower-passing sliding platform for steel box girder of cable-stayed bridge | |
| CN219793684U (en) | Long-distance pushing steel box girder crossing existing highway girder falling guide device | |
| CN116892172B (en) | Method for erecting sections of public rail co-construction multi-span continuous steel truss bridge | |
| CN114032791A (en) | A construction method for integral jacking of large-span steel truss bridges | |
| CN102154988A (en) | Arch-after-girder construction method of large-span steel box tacked arch bridge | |
| CN111676816B (en) | Steel truss girder and frame pier steel beam construction method | |
| CN114263114A (en) | Construction system and construction method of large-section steel box girder | |
| CN108867316A (en) | Construction technology of walking-type jacking for long-span steel box girder of single-tower self-anchored suspension bridge | |
| CN115961549A (en) | Rear-feeding beam type erection construction method for large-tonnage whole-section steel beam of cable-stayed bridge | |
| CN110093862A (en) | Vertically and horizontally assembled three working face Bridge Erectors and bent cap can be achieved without sidewalk section assembling engineering method | |
| CN115262414A (en) | Trestle-free steel girder sliding track construction and installation structure and construction method | |
| CN113123238A (en) | Transverse moving erection method for wide-section steel truss girder | |
| CN101324054B (en) | Construction Method of Pushing into Place for Temporary Piers of Segmental Beams of Bridges | |
| CN222435958U (en) | Temporary support frame used in the top-pushing of the existing station building expansion | |
| CN113774813A (en) | Traction deviation rectifying equipment convenient for installing large-section steel truss box girder | |
| CN111648246B (en) | Construction method for building medium and large steel truss girder | |
| CN116163213B (en) | A translational aerial temporary work platform and its method for the integral assembly of bridge steel structure segments. | |
| CN114319079B (en) | Double-deck steel bridge girder falling structure and girder falling method for highway bridge and railway bridge | |
| CN110804958A (en) | A method for changing the frame of a whole-hole beam |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20230407 |
|
| RJ01 | Rejection of invention patent application after publication |