CN115911906A - A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines - Google Patents
A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines Download PDFInfo
- Publication number
- CN115911906A CN115911906A CN202211451443.3A CN202211451443A CN115911906A CN 115911906 A CN115911906 A CN 115911906A CN 202211451443 A CN202211451443 A CN 202211451443A CN 115911906 A CN115911906 A CN 115911906A
- Authority
- CN
- China
- Prior art keywords
- grounding
- hook
- rod
- magnetic suction
- suction block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
Description
技术领域technical field
本发明涉及一种高压输电线路检修前使用的高压线路接地机构,特别涉及一种便于登高携带,并能实现可靠接地的高压输电线路的接地棒及其挂接方法。The invention relates to a high-voltage line grounding mechanism used before the maintenance of a high-voltage transmission line, in particular to a grounding rod for a high-voltage transmission line that is easy to carry when climbing a height and can realize reliable grounding and a connecting method thereof.
背景技术Background technique
在对高压输电线路进行运维检修前,运维人员必须预先在输电铁塔的靠近变电站一侧的三相输电线路的每相线路上,挂接一个接地线,将三相输电线路与铁塔电连接在一起,实现输电线路的接地短接,以保证运维检修人员塔上操作的安全;现有的高压线路接地棒为一体式的接地棒,即在长杆状绝缘棒的顶端,固定设置有一个金属接地挂钩,在接地挂钩上连接有接地铜线,整个接地棒的重量约有十斤左右,长度约有数米长,金属接地挂钩为U形形状,在U形口中设置有带弹性的夹持导线的卡簧,U形挂钩钩接在导线上后,通过卡簧将导线与钩体固定连接为一体;现场操作步骤如下:首先,操作人员携带长杆状接地棒,攀登到铁塔的某一相输电线路在铁塔上对应的接地点处,然后,将绝缘棒上的与接地挂钩连接的接地铜线的下端,连接在铁搭上对应的接地点上,最后,手持绝缘棒,将绝缘棒端头的接地挂钩,靠近该相输电线路,并将U形钩体钩接在输电线路上,从而完成该相输电线路的接地短接工作;由于铁塔上的输电线路为三相交流电,挂线人员挂接完该相线路后,需要从塔上下到地面,再携带第二根绝缘棒登塔作业,需要重复登塔三次,才能完成三相输电线路的地线的挂接工作;如何降低接地线挂接工作的劳动强度,并提高现场的挂接工作效率,是现场需要解决的一个问题;另外,由于输电铁塔的塔型不同,一些铁塔上相应线路的接地点处于被挂接输电线路的下方,而有些铁塔上相应的接地点是处于被挂接输电线路的上方;当被挂接线路是处于线路上方时,塔上操作人员通过向上举升绝缘棒后,将绝缘棒顶端的金属挂钩正向挂接在线路上,即将U形金属挂钩开口向下,挂接在线路上,金属挂钩靠自重,悬垂在线路上,基本能实现挂钩与导线的可靠电连接;但是,当挂接线路是处于操作点下方时,操作人员只能将接地挂钩的U形开口向上,反向挂接在输电线路上,这时,金属挂钩的自重会成为挂钩与导线脱离的隐患,同时,U形口向上的反向挂接方式,也容易造成接地挂钩与输电导线电连接的不可靠,甚至出现挂钩脱落的现象,导致输电线接地失败,严重威胁到了现场操作人员的生命安全。Before operating and maintaining the high-voltage transmission line, the operation and maintenance personnel must pre-attach a grounding wire to each phase of the three-phase transmission line on the side of the transmission tower close to the substation to electrically connect the three-phase transmission line to the iron tower Together, the grounding short circuit of the transmission line is realized to ensure the safety of operation and maintenance personnel operating on the tower; A metal grounding hook is connected with a grounding copper wire. The weight of the whole grounding rod is about ten kilograms, and the length is about several meters. The metal grounding hook is U-shaped, and there is an elastic clip in the U-shaped mouth After the U-shaped hook is hooked on the wire, the wire and the hook body are fixed and connected as a whole through the clip spring; the on-site operation steps are as follows: First, the operator carries a long rod-shaped grounding rod and climbs to a certain part of the iron tower. The one-phase power transmission line is at the corresponding grounding point on the iron tower. Then, connect the lower end of the grounding copper wire connected to the grounding hook on the insulating rod to the corresponding grounding point on the iron strap. Finally, hold the insulating rod and place the insulation The grounding hook at the end of the rod is close to the phase transmission line, and the U-shaped hook body is hooked on the transmission line, thereby completing the grounding and shorting work of the phase transmission line; since the transmission line on the iron tower is a three-phase AC, the hook After hooking up the phase line, the line personnel need to go up and down from the tower to the ground, and then carry the second insulating rod to climb the tower. It is necessary to repeat the tower three times to complete the hooking work of the ground wire of the three-phase transmission line; how to reduce the The labor intensity of the grounding wire hooking work and improving the efficiency of the on-site hooking work are a problem that needs to be solved on the site; in addition, due to the different tower types of the transmission towers, the grounding points of the corresponding lines on some towers are located in the connected transmission line. The corresponding grounding point on some iron towers is above the connected transmission line; when the connected line is above the line, the operator on the tower lifts the insulating rod upwards and puts the metal on the top of the insulating rod The hook is hung on the line in the forward direction, that is, the opening of the U-shaped metal hook is downward, and it is hung on the line. When the operating point is below, the operator can only connect the U-shaped opening of the grounding hook upwards to the power transmission line in reverse. The reverse hooking method also easily causes unreliable electrical connection between the grounding hook and the transmission wire, and even the phenomenon that the hook falls off, resulting in the failure of the grounding of the transmission line, which seriously threatens the life safety of the on-site operators.
发明内容Contents of the invention
本发明提供了一种实现高压输电线路可靠接地的组合式伸缩接地棒,解决了如何实现地线可靠挂接和如何降低地线挂接劳动强度的技术问题。The invention provides a combined telescopic ground rod for realizing reliable grounding of high-voltage transmission lines, and solves the technical problems of how to realize reliable connection of ground wires and how to reduce the labor intensity of connection of ground wires.
本发明是通过以下技术方案解决以上技术问题的:The present invention solves the above technical problems through the following technical solutions:
本发明的总体构思:将地线挂接棒设计为分体组合结构形式,即将金属挂钩与绝缘棒分离成两件,现场只需要一名操作人员,携带三个挂钩和一根绝缘棒登塔,在塔上将绝缘棒与金属挂钩组合在一起后,进行接地线的挂接,完成一相输电线路的地线挂接后,将挂接在线路上的金属挂钩与绝缘棒分离;再将第二个金属挂钩与绝缘棒组合在一起,进行第二相输电线路的接地挂接工作,即实现了一人一次登塔后,即可完成三相线路的全部地线的挂接工作;并将接地挂钩与绝缘棒的连接设计为磁吸式,以方便操作人员在铁塔高处进行挂钩与绝缘棒的组装与拆卸;在金属挂钩的底端和顶端分别设置磁铁块,使绝缘棒即可在挂钩的下端与金属挂钩组合,也可在挂钩的顶端与金属挂钩组合在一起,从而解决了操作人员不论在输电线路的上方或处于输电线路的下方,均可实现将金属挂钩正向挂接在输电线路上的操作难题。The general idea of the present invention: design the ground wire hooking rod as a split combination structure, that is, separate the metal hook and the insulating rod into two pieces, and only one operator is needed on site to carry three hooks and one insulating rod to climb the tower After the insulating rod and the metal hook are combined together on the tower, the grounding wire is connected. After the ground wire connection of the one-phase transmission line is completed, the metal hook connected to the line is separated from the insulating rod; Two metal hooks and insulating rods are combined to carry out the ground connection work of the second-phase transmission line, that is, after one person climbs the tower at one time, the connection work of all the ground wires of the three-phase line can be completed; and the ground connection The connection between the hook and the insulating rod is designed as a magnetic suction type, which is convenient for the operator to assemble and disassemble the hook and the insulating rod at the height of the iron tower; set magnet blocks at the bottom and top of the metal hook respectively, so that the insulating rod can be placed on the hook The lower end of the hook can be combined with the metal hook, and it can also be combined with the metal hook at the top of the hook, thus solving the problem that whether the operator is above or below the transmission line, the metal hook can be positively connected to the transmission line. Operational problems on the line.
一种实现高压输电线路可靠接地的组合式伸缩接地棒,包括金属接地挂钩、可伸缩的环氧树脂绝缘操作杆和接地铜线,在金属接地挂钩的U形钩体内,设置有八字形弹性卡舌,在八字形弹性卡舌的顶端与U形钩体之间,设置有输电线路卡接凹槽,在U形钩体的顶端外侧面上,固定设置有挂钩顶端永磁磁性吸块,在挂钩顶端永磁磁性吸块的顶端面右侧,固定设置有上端水平圆环脱扣,在U形钩体的右下端,固定设置有挂钩底端永磁磁性吸块,在挂钩底端永磁磁性吸块的下底面右侧,固定设置有下端水平圆环脱扣;在环氧树脂绝缘操作杆的顶端面上,固定设置有绝缘杆上端永磁磁性吸块,在绝缘杆上端永磁磁性吸块的顶端面右侧,固定设置有连接柱;环氧树脂绝缘操作杆的上端,是通过绝缘杆上端永磁磁性吸块与挂钩底端永磁磁性吸块的吸附,与U形钩体的右下端连接在一起的,并且,连接柱插接在下端水平圆环脱扣中。A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines, including a metal grounding hook, a retractable epoxy resin insulated operating rod and a grounding copper wire, and a figure-eight elastic clip is arranged in the U-shaped hook body of the metal grounding hook The tongue, between the top of the eight-shaped elastic tongue and the U-shaped hook body, is provided with a transmission line clamping groove, and on the outer surface of the top end of the U-shaped hook body, a permanent magnetic suction block at the top of the hook is fixedly arranged. On the right side of the top surface of the permanent magnetic suction block at the top of the hook, there is a fixed upper horizontal ring release, and at the lower right end of the U-shaped hook body, there is a permanent magnetic suction block at the bottom end of the hook, and a permanent magnetic suction block at the bottom end of the hook. On the right side of the lower bottom surface of the magnetic suction block, there is a fixed lower end horizontal ring tripping; on the top surface of the epoxy resin insulating operating rod, there is a permanent magnet magnetic suction block at the upper end of the insulating rod, and a permanent magnetic magnetic suction block at the upper end of the insulating rod. The right side of the top surface of the suction block is fixed with a connecting column; the upper end of the epoxy resin insulated operating rod is absorbed by the permanent magnetic suction block at the upper end of the insulating rod and the permanent magnetic suction block at the bottom of the hook, and is connected with the U-shaped hook body. The lower right ends of the two are connected together, and the connecting column is plugged into the horizontal ring release at the lower end.
在U形钩体的右下端外侧面上,设置有接地铜线连接螺栓,在接地铜线连接螺栓上,连接有接地铜线。On the outer surface of the lower right end of the U-shaped hook body, a grounding copper wire connecting bolt is arranged, and a grounding copper wire is connected to the grounding copper wire connecting bolt.
在八字形弹性卡舌与U形钩体内侧面之间,有卡舌弹性支撑杆。Between the eight-shaped elastic tab and the inner side of the U-shaped hook, there is an elastic support bar for the tab.
在环氧树脂绝缘操作杆的中部,设置有伸缩节;在环氧树脂绝缘操作杆的下端,设置有绝缘手柄护套。In the middle of the epoxy resin insulated operating rod, a telescopic joint is arranged; in the lower end of the epoxy resin insulated operating rod, an insulating handle sheath is arranged.
一种实现高压输电线路可靠接地的组合式伸缩接地棒,包括金属接地挂钩、可伸缩的环氧树脂绝缘操作杆和接地铜线,在金属接地挂钩的U形钩体内,设置有八字形弹性卡舌,在八字形弹性卡舌的顶端与U形钩体之间,设置有输电线路卡接凹槽,在U形钩体的顶端外侧面上,固定设置有挂钩顶端永磁磁性吸块,在挂钩顶端永磁磁性吸块的顶端面右侧,固定设置有上端水平圆环脱扣,在U形钩体的右下端,固定设置有挂钩底端永磁磁性吸块,在挂钩底端永磁磁性吸块的下底面右侧,固定设置有下端水平圆环脱扣;在环氧树脂绝缘操作杆的顶端面上,固定设置有绝缘杆上端永磁磁性吸块,在绝缘杆上端永磁磁性吸块的顶端面右侧,固定设置有连接柱;环氧树脂绝缘操作杆的上端,是通过绝缘杆上端永磁磁性吸块与挂钩顶端永磁磁性吸块的吸附,与U形钩体顶端连接在一起的,并且,连接柱插接在上端水平圆环脱扣中。A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines, including a metal grounding hook, a retractable epoxy resin insulated operating rod and a grounding copper wire, and a figure-eight elastic clip is arranged in the U-shaped hook body of the metal grounding hook The tongue, between the top of the eight-shaped elastic tongue and the U-shaped hook body, is provided with a transmission line clamping groove, and on the outer surface of the top end of the U-shaped hook body, a permanent magnetic suction block at the top of the hook is fixedly arranged. On the right side of the top surface of the permanent magnetic suction block at the top of the hook, there is a fixed upper horizontal ring release, and at the lower right end of the U-shaped hook body, there is a permanent magnetic suction block at the bottom end of the hook, and a permanent magnetic suction block at the bottom end of the hook. On the right side of the lower bottom surface of the magnetic suction block, there is a fixed lower end horizontal ring tripping; on the top surface of the epoxy resin insulating operating rod, there is a permanent magnet magnetic suction block at the upper end of the insulating rod, and a permanent magnetic magnetic suction block at the upper end of the insulating rod. The right side of the top surface of the suction block is fixed with a connecting column; the upper end of the epoxy resin insulated operating rod is absorbed by the permanent magnet magnetic suction block at the upper end of the insulating rod and the permanent magnetic magnetic suction block at the top of the hook, and is connected to the top of the U-shaped hook body. connected together, and the connecting column is plugged into the upper horizontal ring release.
一种将高压输电线路可靠接地的组合式接地棒的挂接方法,包括金属接地挂钩、可伸缩的环氧树脂绝缘操作杆、接地铜线、输电铁塔、变电站和挂接地线塔上操作点;在输电铁塔与变电站之间,分别连接有上方输电线路和下方输电线路,上方输电线路设置在挂接地线塔上操作点的上方,下方输电线路设置在挂接地线塔上操作点的下方;在金属接地挂钩的U形钩体内,设置有八字形弹性卡舌,在八字形弹性卡舌的顶端与U形钩体之间,设置有输电线路卡接凹槽,在U形钩体的顶端外侧面上,固定设置有挂钩顶端永磁磁性吸块,在挂钩顶端永磁磁性吸块的顶端面右侧,固定设置有上端水平圆环脱扣,在U形钩体的右下端,固定设置有挂钩底端永磁磁性吸块,在挂钩底端永磁磁性吸块的下底面右侧,固定设置有下端水平圆环脱扣;在环氧树脂绝缘操作杆的顶端面上,固定设置有绝缘杆上端永磁磁性吸块,在绝缘杆上端永磁磁性吸块的顶端面右侧,固定设置有连接柱;其特征在于以下步骤:A method for connecting a combined grounding rod for reliable grounding of a high-voltage transmission line, comprising a metal grounding hook, a retractable epoxy resin insulated operating rod, a grounding copper wire, a power transmission tower, a substation, and an operating point on the grounding tower; Between the transmission tower and the substation, the upper transmission line and the lower transmission line are respectively connected. The upper transmission line is set above the operating point on the grounding tower, and the lower transmission line is set below the operating point on the grounding tower; The U-shaped hook body of the metal grounding hook is provided with a figure-eight elastic tab, between the top of the figure-eight elastic tab and the U-shaped hook body, a transmission line clamping groove is arranged, and outside the top of the U-shaped hook body On the side, a permanent magnetic suction block at the top of the hook is fixedly installed. On the right side of the top surface of the permanent magnetic magnetic suction block at the top of the hook, there is a fixed upper horizontal ring release. At the lower right end of the U-shaped hook body, a fixed The permanent magnetic suction block at the bottom of the hook is fixed with a lower horizontal ring trip on the right side of the bottom surface of the permanent magnetic suction block at the bottom of the hook; on the top surface of the epoxy resin insulated operating rod, there is a fixed insulation The permanent magnetic suction block at the upper end of the rod is fixed with a connecting column on the right side of the top surface of the permanent magnetic suction block at the upper end of the insulating rod; it is characterized by the following steps:
第一步、在挂接地线塔上操作点处,将第一个金属接地挂钩与环氧树脂绝缘操作杆组合在一起,即,将环氧树脂绝缘操作杆的上端的绝缘杆上端永磁磁性吸块与第一个金属接地挂钩上的挂钩底端永磁磁性吸块吸附在一起,得到组合在一起的接地线挂接的组合式接地棒;The first step is to combine the first metal grounding hook with the epoxy resin insulating operating rod at the operating point on the hanging grounding tower, that is, the upper end of the insulating rod at the upper end of the epoxy resin insulating operating rod is permanently magnetized The suction block is adsorbed together with the permanent magnetic suction block at the bottom of the hook on the first metal grounding hook to obtain a combined grounding rod connected by the combined grounding wire;
第二步、通过向上举升组合式接地棒,将U形钩体钩接在上方输电线路上,并使上方输电线路卡接在输电线路卡接凹槽中;The second step is to hook the U-shaped hook body to the upper transmission line by lifting the combined grounding rod upward, and make the upper transmission line clamped in the transmission line clamping groove;
第三步、旋转环氧树脂绝缘操作杆,环氧树脂绝缘操作杆上的连接柱以下端水平圆环脱扣为支点,克服挂钩底端永磁磁性吸块与绝缘杆上端永磁磁性吸块之间的磁吸力,使环氧树脂绝缘操作杆与第一个金属接地挂钩脱离,完成上方输电线路的接地线的挂接操作;The third step is to rotate the epoxy resin insulated operating rod. The connecting column on the epoxy resin insulated operating rod is used as the fulcrum for the horizontal ring release at the lower end to overcome the permanent magnetic suction block at the bottom of the hook and the permanent magnetic suction block at the upper end of the insulating rod. The magnetic attraction force between them makes the epoxy resin insulated operating rod disengage from the first metal grounding hook, and completes the hooking operation of the grounding wire of the upper transmission line;
第四步、将环氧树脂绝缘操作杆收回,在挂接地线塔上操作点处,将第二个金属接地挂钩与环氧树脂绝缘操作杆组合在一起,即,将环氧树脂绝缘操作杆的上端的绝缘杆上端永磁磁性吸块与第二个金属接地挂钩上的挂钩顶端永磁磁性吸块吸附在一起,得到将金属接地挂钩反向连接在环氧树脂绝缘操作杆顶端的组合式接地棒;Step 4: Take back the epoxy resin insulating operating rod, and combine the second metal grounding hook with the epoxy resin insulating operating rod at the operating point on the grounding tower, that is, put the epoxy resin insulating operating rod The upper end of the insulating rod upper permanent magnetic suction block is adsorbed together with the permanent magnetic magnetic suction block on the top of the hook on the second metal grounding hook, and a combination of reversely connecting the metal grounding hook to the top of the epoxy resin insulating operating rod is obtained. Ground rod;
第四步、通过向下伸出新组合在一起的组合式接地棒,将第二个金属接地挂钩上的U形钩体,压接在下方输电线路上,并使下方输电线路卡接在输电线路卡接凹槽中,实现了第二个金属接地挂钩,以U形口向下形式,在下方输电线路上的正向挂接;The fourth step is to stretch out the newly assembled combined grounding rod downwards, crimp the U-shaped hook body on the second metal grounding hook to the lower transmission line, and make the lower transmission line clamped on the transmission line. In the line clamping groove, the second metal grounding hook is realized, which is positively connected to the lower transmission line in the form of a U-shaped mouth downward;
第五步、旋转环氧树脂绝缘操作杆,环氧树脂绝缘操作杆上的连接柱以上端水平圆环脱扣为支点,克服挂钩顶端永磁磁性吸块与绝缘杆上端永磁磁性吸块之间的磁吸力,使旋转环氧树脂绝缘操作杆与第二个金属接地挂钩脱离,从而完成下方输电线路的接地线的挂接操作。Step 5: Rotate the epoxy resin insulated operating rod. The connecting column on the epoxy resin insulated operating rod takes the horizontal ring release at the upper end as the fulcrum to overcome the gap between the permanent magnetic suction block at the top of the hook and the permanent magnetic suction block at the upper end of the insulating rod. The magnetic attraction force between them makes the rotating epoxy resin insulated operating rod disengage from the second metal grounding hook, thereby completing the hooking operation of the grounding wire of the transmission line below.
在U形钩体的右下端外侧面上,设置有接地铜线连接螺栓,接地铜线的上端连接在接地铜线连接螺栓上,在将金属接地挂钩挂接在输电线路上前,必须先将与金属接地挂钩连接的接地铜线的下端连接在输电铁塔上的接地点上。On the outer surface of the lower right end of the U-shaped hook body, there is a grounding copper wire connecting bolt. The upper end of the grounding copper wire is connected to the grounding copper wire connecting bolt. The lower end of the grounding copper wire connected to the metal grounding hook is connected to the grounding point on the transmission tower.
本发明采用环氧树脂绝缘操作杆与金属接地挂钩的分体式设计,减少登塔作业人员携带接地棒的数量,省时省力;在塔上的挂地线操作点处,根据预挂接接地的输电线路是处于操作点上方或下方的情况,将操作杆与金属接地挂钩或正向组合连接或反向组合连接在一起,实现了始终将金属接地挂钩U形口向下,可靠地正向地挂接在输电线路上的目的,实现了接地线的可靠接地,减少高空作业时间,大大提高了工作效率,并保证了高空作业人员的安全。The present invention adopts the split design of the epoxy resin insulated operating rod and the metal grounding hook, which reduces the number of grounding rods carried by the operators who climb the tower, saving time and effort; When the power transmission line is above or below the operating point, the operating rod and the metal grounding hook are connected together in a positive or reverse combination, so that the U-shaped mouth of the metal grounding hook is always downward, and the positive grounding is reliable. The purpose of hooking on the power transmission line is to realize the reliable grounding of the grounding wire, reduce the time of high-altitude operations, greatly improve work efficiency, and ensure the safety of high-altitude workers.
附图说明Description of drawings
图1是本发明的环氧树脂绝缘操作杆2与金属接地挂钩1正向组合连接时的结构示意图;Fig. 1 is the structure diagram when the epoxy resin insulated
图2是本发明的金属接地挂钩1的结构示意图;Fig. 2 is a schematic structural view of the
图3是本发明的环氧树脂绝缘操作杆2的结构示意图;Fig. 3 is the structural representation of the epoxy resin insulating
图4是本发明的环氧树脂绝缘操作杆2旋转脱离金属接地挂钩1时的结构示意图;Fig. 4 is a structural schematic view of the epoxy resin insulated
图5是本发明的环氧树脂绝缘操作杆2与金属接地挂钩1反向组合连接时的结构示意图;Fig. 5 is a schematic structural view of the epoxy resin insulated
图6是在挂接地线塔上操作点8处向上挂接接地线时工作示意图;Fig. 6 is a schematic diagram of the work when the ground wire is hooked up at the
图7是在挂接地线塔上操作点8处向下挂接接地线时工作示意图。Fig. 7 is a schematic diagram of work when the ground wire is connected downward at the
具体实施方式Detailed ways
下面结合附图对本发明进行详细说明:The present invention is described in detail below in conjunction with accompanying drawing:
一种实现高压输电线路可靠接地的组合式伸缩接地棒,包括金属接地挂钩1、可伸缩的环氧树脂绝缘操作杆2和接地铜线3,在金属接地挂钩1的U形钩体101内,设置有八字形弹性卡舌102,在八字形弹性卡舌102的顶端与U形钩体101之间,设置有输电线路卡接凹槽109,在U形钩体101的顶端外侧面上,固定设置有挂钩顶端永磁磁性吸块108,在挂钩顶端永磁磁性吸块108的顶端面右侧,固定设置有上端水平圆环脱扣104,在U形钩体101的右下端,固定设置有挂钩底端永磁磁性吸块103,在挂钩底端永磁磁性吸块103的下底面右侧,固定设置有下端水平圆环脱扣107;在环氧树脂绝缘操作杆2的顶端面上,固定设置有绝缘杆上端永磁磁性吸块201,在绝缘杆上端永磁磁性吸块201的顶端面右侧,固定设置有连接柱203;环氧树脂绝缘操作杆2的上端,是通过绝缘杆上端永磁磁性吸块201与挂钩底端永磁磁性吸块103的吸附,与U形钩体101的右下端连接在一起的,并且,连接柱203插接在下端水平圆环脱扣107中;由于将环氧树脂绝缘操作杆2与金属接地挂钩1设计成分体式,现场操作人员可将三个金属接地挂钩放入到一个包中,并只需携带一根环氧树脂绝缘操作杆2登上铁塔,完成三相输电线路的接地挂接工作,作业人员登上铁塔后,再依次分别将所携带的三个金属接地挂钩与环氧树脂绝缘操作杆2组合,分别对三相输电线路进行地线挂接工作。A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines, including a
在U形钩体101的右下端外侧面上,设置有接地铜线连接螺栓106,在接地铜线连接螺栓106上,连接有接地铜线3;当将U形钩体101挂接到输电线路上后,输电线路被卡接在输电线路卡接凹槽109中,实现了输电线路与金属接地挂钩1的电连接,金属接地挂钩1又通过接地铜线连接螺栓106上连接的接地铜线3,与铁塔电连接在一起,实现输电线路与大地的连接,从而实现输电线路的接地。On the outer surface of the lower right end of the
在八字形弹性卡舌102与U形钩体101内侧面之间,有卡舌弹性支撑杆105,以实现八字形弹性卡舌102对进入到输电线路卡接凹槽109中的输电线路的可靠连接,同时也起到防止金属接地挂钩1与输电线路脱离。Between the eight-shaped
在环氧树脂绝缘操作杆2的中部,设置有伸缩节202,环氧树脂绝缘操作杆2通过该伸缩节202,实现伸长或缩短;在环氧树脂绝缘操作杆2的下端,设置有绝缘手柄护套204,以方便操作人员手握操作。In the middle of the epoxy resin insulating
一种实现高压输电线路可靠接地的组合式伸缩接地棒,包括金属接地挂钩1、可伸缩的环氧树脂绝缘操作杆2和接地铜线3,在金属接地挂钩1的U形钩体101内,设置有八字形弹性卡舌102,在八字形弹性卡舌102的顶端与U形钩体101之间,设置有输电线路卡接凹槽109,在U形钩体101的顶端外侧面上,固定设置有挂钩顶端永磁磁性吸块108,在挂钩顶端永磁磁性吸块108的顶端面右侧,固定设置有上端水平圆环脱扣104,在U形钩体101的右下端,固定设置有挂钩底端永磁磁性吸块103,在挂钩底端永磁磁性吸块103的下底面右侧,固定设置有下端水平圆环脱扣107;在环氧树脂绝缘操作杆2的顶端面上,固定设置有绝缘杆上端永磁磁性吸块201,在绝缘杆上端永磁磁性吸块201的顶端面右侧,固定设置有连接柱203;环氧树脂绝缘操作杆2的上端,是通过绝缘杆上端永磁磁性吸块201与挂钩顶端永磁磁性吸块108的吸附,与U形钩体101顶端连接在一起的,并且,连接柱203插接在上端水平圆环脱扣104中;当挂接线路处在挂接地线塔上操作点8的下方时,采用将金属接地挂钩1与环氧树脂绝缘操作杆2倒向反接的连接方式,以保证向下伸出操作杆后,能顺利地将金属接地挂钩1的U形口向下,正向挂接在输电线路上,这时金属接地挂钩1仅靠自重也能保证与输电线路可靠电连接在一起。A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines, including a metal grounding hook 1, a telescopic epoxy resin insulated operating rod 2 and a grounding copper wire 3, inside the U-shaped hook body 101 of the metal grounding hook 1, A figure-eight elastic tab 102 is provided, and between the top of the figure-eight elastic tab 102 and the U-shaped hook body 101, a power transmission line clamping groove 109 is arranged, and on the outer surface of the top end of the U-shaped hook body 101, a fixed A hook top permanent magnet magnetic suction block 108 is provided, on the right side of the top surface of the hook top permanent magnetic magnetic suction block 108, an upper horizontal circular ring release 104 is fixedly arranged, and at the lower right end of the U-shaped hook body 101, a The permanent magnetic suction block 103 at the bottom end of the hook is fixedly provided with a lower horizontal circular ring release 107 on the right side of the lower bottom surface of the permanent magnetic magnetic suction block 103 at the bottom end of the hook; The permanent magnetic suction block 201 at the upper end of the insulating rod is fixedly arranged, and on the right side of the top surface of the permanent magnetic magnetic suction block 201 at the upper end of the insulating rod, a connecting column 203 is fixedly arranged; The adsorption of the upper permanent magnet magnetic suction block 201 and the permanent magnetic magnetic suction block 108 at the top of the hook is connected with the top of the U-shaped hook body 101, and the connecting column 203 is plugged into the upper horizontal ring trip 104; When the connection line is below the operation point 8 on the grounding tower, the metal grounding hook 1 and the epoxy resin insulated operating rod 2 are connected in reverse to ensure that the operating rod can be extended smoothly. Ground the U-shaped opening of the
一种将高压输电线路可靠接地的组合式接地棒的挂接方法,包括金属接地挂钩1、可伸缩的环氧树脂绝缘操作杆2、接地铜线3、输电铁塔4、变电站5和挂接地线塔上操作点8;在输电铁塔4与变电站5之间,分别连接有上方输电线路6和下方输电线路7,上方输电线路6设置在挂接地线塔上操作点8的上方,下方输电线路7设置在挂接地线塔上操作点8的下方;在金属接地挂钩1的U形钩体101内,设置有八字形弹性卡舌102,在八字形弹性卡舌102的顶端与U形钩体101之间,设置有输电线路卡接凹槽109,在U形钩体101的顶端外侧面上,固定设置有挂钩顶端永磁磁性吸块108,在挂钩顶端永磁磁性吸块108的顶端面右侧,固定设置有上端水平圆环脱扣104,在U形钩体101的右下端,固定设置有挂钩底端永磁磁性吸块103,在挂钩底端永磁磁性吸块103的下底面右侧,固定设置有下端水平圆环脱扣107;在环氧树脂绝缘操作杆2的顶端面上,固定设置有绝缘杆上端永磁磁性吸块201,在绝缘杆上端永磁磁性吸块201的顶端面右侧,固定设置有连接柱203;其特征在于以下步骤:A method for connecting a combined grounding rod for reliable grounding of a high-voltage transmission line, comprising a metal grounding hook 1, a retractable epoxy resin insulated operating rod 2, a grounding copper wire 3, a transmission tower 4, a substation 5 and a grounding wire The operation point 8 on the tower; between the transmission tower 4 and the substation 5, the upper transmission line 6 and the lower transmission line 7 are connected respectively, the upper transmission line 6 is set above the operation point 8 on the tower with the grounding line, and the lower transmission line 7 Set below the operating point 8 on the grounding tower; in the U-shaped hook body 101 of the metal grounding hook 1, a figure-eight elastic tab 102 is arranged, and the top of the figure-eight elastic tab 102 is connected to the U-shaped hook body 101 Between, be provided with transmission line clamping groove 109, on the top outer surface of U-shaped hook body 101, be fixedly provided with hook top permanent magnet magnetic suction piece 108, on the top surface of hook top permanent magnet magnetic suction piece 108 right On the side, the upper horizontal circular ring release 104 is fixedly arranged, and at the lower right end of the U-shaped hook body 101, a permanent magnetic suction block 103 at the bottom end of the hook is fixedly arranged, and a permanent magnetic suction block 103 at the bottom end of the hook is fixedly arranged on the lower bottom surface of the permanent magnetic suction block 103 at the bottom right side, fixedly provided with a lower end horizontal ring trip 107; on the top surface of the epoxy resin insulating operating rod 2, a permanent magnetic suction block 201 at the upper end of the insulating rod is fixedly provided, and a permanent magnetic magnetic suction block 201 at the upper end of the insulating rod On the right side of the top surface, a connecting column 203 is fixedly arranged; it is characterized by the following steps:
第一步、在挂接地线塔上操作点8处,将第一个金属接地挂钩1与环氧树脂绝缘操作杆2组合在一起,即,将环氧树脂绝缘操作杆2的上端的绝缘杆上端永磁磁性吸块201与第一个金属接地挂钩1上的挂钩底端永磁磁性吸块103吸附在一起,得到组合在一起的接地线挂接的组合式接地棒;The first step is to combine the first
第二步、通过向上举升组合式接地棒,将U形钩体101钩接在上方输电线路6上,并使上方输电线路6卡接在输电线路卡接凹槽109中;The second step is to hook the
第三步、旋转环氧树脂绝缘操作杆2,环氧树脂绝缘操作杆2上的连接柱203以下端水平圆环脱扣107为支点,克服挂钩底端永磁磁性吸块103与绝缘杆上端永磁磁性吸块201之间的磁吸力,使环氧树脂绝缘操作杆2与第一个金属接地挂钩1脱离,完成上方输电线路6的接地线的挂接操作;The third step is to rotate the epoxy resin insulated
第四步、将环氧树脂绝缘操作杆2收回,在挂接地线塔上操作点8处,将第二个金属接地挂钩与环氧树脂绝缘操作杆2组合在一起,即,将环氧树脂绝缘操作杆2的上端的绝缘杆上端永磁磁性吸块201与第二个金属接地挂钩上的挂钩顶端永磁磁性吸块108吸附在一起,得到将金属接地挂钩1反向连接在环氧树脂绝缘操作杆2顶端的组合式接地棒;The fourth step is to retract the epoxy resin insulating
第四步、通过向下伸出新组合在一起的组合式接地棒,将第二个金属接地挂钩上的U形钩体101,压接在下方输电线路7上,并使下方输电线路7卡接在输电线路卡接凹槽109中,实现了第二个金属接地挂钩,以U形口向下形式,在下方输电线路7上的正向挂接;The fourth step is to stretch out the newly assembled combined grounding rod downwards, crimp the
第五步、旋转环氧树脂绝缘操作杆2,环氧树脂绝缘操作杆2上的连接柱203以上端水平圆环脱扣104为支点,克服挂钩顶端永磁磁性吸块108与绝缘杆上端永磁磁性吸块201之间的磁吸力,使旋转环氧树脂绝缘操作杆2与第二个金属接地挂钩脱离,从而完成下方输电线路7的接地线的挂接操作。The fifth step, rotate the epoxy resin insulating
在U形钩体101的右下端外侧面上,设置有接地铜线连接螺栓106,接地铜线3的上端连接在接地铜线连接螺栓106上,在将金属接地挂钩1挂接在输电线路上前,必须先将与金属接地挂钩1连接的接地铜线3的下端连接在输电铁塔4上的接地点上。On the outer surface of the lower right end of the
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211451443.3A CN115911906A (en) | 2022-11-20 | 2022-11-20 | A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202211451443.3A CN115911906A (en) | 2022-11-20 | 2022-11-20 | A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN115911906A true CN115911906A (en) | 2023-04-04 |
Family
ID=86472178
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202211451443.3A Pending CN115911906A (en) | 2022-11-20 | 2022-11-20 | A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN115911906A (en) |
Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN204012601U (en) * | 2014-05-25 | 2014-12-10 | 国家电网公司 | The rotatable card line apparatus of transmission line short-circuit grounding wire insulating rod |
| CN206947572U (en) * | 2017-06-16 | 2018-01-30 | 国家电网公司 | A kind of overhead transmission line uses earthing clamp component temporarily |
| CN217641823U (en) * | 2022-04-28 | 2022-10-21 | 国网新疆电力有限公司喀什供电公司 | Self-adaptive multifunctional grounding wire hook |
-
2022
- 2022-11-20 CN CN202211451443.3A patent/CN115911906A/en active Pending
Patent Citations (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN204012601U (en) * | 2014-05-25 | 2014-12-10 | 国家电网公司 | The rotatable card line apparatus of transmission line short-circuit grounding wire insulating rod |
| CN206947572U (en) * | 2017-06-16 | 2018-01-30 | 国家电网公司 | A kind of overhead transmission line uses earthing clamp component temporarily |
| CN217641823U (en) * | 2022-04-28 | 2022-10-21 | 国网新疆电力有限公司喀什供电公司 | Self-adaptive multifunctional grounding wire hook |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102623923B (en) | Lifting type rail insulation operation platform | |
| CN103176000A (en) | Telescopic high altitude test wire connector | |
| CN101277002A (en) | Construction Method of Concrete Pole for 10kV Double Circuit Distribution Line | |
| CN201345512Y (en) | 220KV double-circuit overhead tower-sharing circuit high-voltage strong-electric-field special tool | |
| CN204552245U (en) | A kind of extra-high voltage direct-current tangent tower of wire vertical arrangement | |
| CN115911906A (en) | A combined telescopic grounding rod for reliable grounding of high-voltage transmission lines | |
| CN115911905A (en) | Mounting method of combined grounding rods for reliable grounding of high-voltage transmission lines | |
| CN203932808U (en) | Replacing insulator under electrified wire lifting device | |
| CN103500966B (en) | 66kv disconnecting switch is to pipe bus charged disconnecting lead-in wire method | |
| CN202611568U (en) | Insulation trestle ladder | |
| CN104158123A (en) | Overhead line phase sequence plate hot-line assembly and disassembly method and assembling device | |
| CN203242965U (en) | Sag adjuster | |
| CN207847235U (en) | No ground pole DC transmission line line pole tower | |
| CN216774076U (en) | Electrified mounting system of 10 kilovolt distribution lines post switch | |
| CN202949163U (en) | Maintenance platform for tubular busbar post insulator | |
| CN210779826U (en) | Special gallows of multi-loop vertical arrangement wire equipotential operation special guidance ground wire | |
| CN205882560U (en) | Special circulation cord rack device of distribution live working earth potential | |
| CN102891451B (en) | A kind of tubular busbar post insulator overhaul platform | |
| CN211150812U (en) | Novel grounding wire device | |
| CN202423958U (en) | Extra-high voltage movable inspection earthing switch device | |
| CN204941333U (en) | Electric power pylon high-altitude cat ladder suspension arrangement | |
| CN204590751U (en) | Double loop abnormity terminal steel pipe pole | |
| CN206947826U (en) | A kind of safety belt support bar | |
| CN216055844U (en) | Safe portable interim power consumption control box | |
| CN115832933A (en) | Locking method capable of realizing safe hanging and dismounting of grounding wire on high-voltage transmission line |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination |