CN115900669A - Centering devices for shipbuilding - Google Patents

Centering devices for shipbuilding Download PDF

Info

Publication number
CN115900669A
CN115900669A CN202211315682.6A CN202211315682A CN115900669A CN 115900669 A CN115900669 A CN 115900669A CN 202211315682 A CN202211315682 A CN 202211315682A CN 115900669 A CN115900669 A CN 115900669A
Authority
CN
China
Prior art keywords
wire
centering device
steel
racks
hammer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202211315682.6A
Other languages
Chinese (zh)
Inventor
杨凡
黄翔宇
吉祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN202211315682.6A priority Critical patent/CN115900669A/en
Publication of CN115900669A publication Critical patent/CN115900669A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a centering device for ship construction, which comprises: the two wire racks are oppositely arranged, each wire rack can be detachably fixed on the construction surface of the centering area, and the opposite inclined surfaces of the two wire racks are sequentially provided with a first mounting position, a second mounting position and a third mounting position at intervals along the inclined direction; the first mounting position of each wire frame can be rotatably connected with one thread fine adjustment rod, and each thread fine adjustment rod is provided with a guide ring convenient for a steel wire to penetrate through; the second mounting position of each wire rack is provided with one limiting storage disk for winding a steel wire, and each limiting storage disk is detachably connected with a limiting piece for matching with the wire rack to limit the rotation of the limiting storage disk; the third mounting position of each wire frame is provided with a fixing piece which can be connected and fixed with the free end of the steel wire; and the plumb bob component is arranged between the two wire frames through the steel wire frames so as to be capable of centering.

Description

用于船舶建造的对中装置Centering devices for shipbuilding

技术领域technical field

本发明涉及船舶建造技术领域,尤其涉及一种用于船舶建造的对中装置。The invention relates to the technical field of shipbuilding, in particular to a centering device for shipbuilding.

背景技术Background technique

船舶建造过程中,分段制作、分段总组、搭载等使用线锤进行对中频率较高。在分段胎架阶段,需在分段轮廓外设置四个中心线、肋骨检验线的线架,通常采用角钢拼接结构,一般高3-4m,用于安装对准地样线的钢丝线,采用线锤对准。在分段总组、搭载阶段,通常采用短角钢延伸分段中心线、肋检线,然后线锤,需将角钢焊接在分段上,需焊接及后续去除打磨,使用不方便,装拆浪费材料、人力,此外,钢丝线收纳和布置也不方便。In the process of ship construction, the frequency of centering with wire hammers is relatively high for segmental fabrication, segmental general assembly, and loading. In the stage of segmented tire frame, it is necessary to set four wire racks for the center line and rib inspection line outside the segmented outline, usually using angle steel splicing structure, generally 3-4m high, for installing steel wires aligned with ground sample lines, Align with a wire hammer. In the stage of segment assembly and loading, short angle steel is usually used to extend the segment centerline and rib inspection line, and then the line hammer needs to weld the angle steel to the segment, which requires welding and subsequent removal and grinding, which is inconvenient to use and wasteful in assembly and disassembly Materials, manpower, and in addition, the storage and arrangement of steel wires are inconvenient.

发明内容Contents of the invention

本发明的目的在于提供一种用于船舶建造的对中装置,用以解决现有技术中对中时操作繁琐、耗费人力及时间等难题。The object of the present invention is to provide a centering device for shipbuilding, which can solve the problems of cumbersome centering operation, labor-intensive and time-consuming problems in the prior art.

本发明的上述目的可采用下列技术方案来实现:Above-mentioned purpose of the present invention can adopt following technical scheme to realize:

本发明提供了一种用于船舶建造的对中装置,包括:The invention provides a centering device for shipbuilding, comprising:

两个线架,相对设置,每个所述线架均能可拆卸固定在对中区域的施工面上,两个所述线架相对的面为倾斜面,在所述倾斜面上沿其倾斜方向依次间隔设置有第一安装位、第二安装位和第三安装位;Two wire frames are arranged opposite to each other, and each of the wire frames can be detachably fixed on the construction surface of the centering area. The opposite surface of the two wire frames is an inclined surface, and the inclined surface is inclined along it The direction is provided with a first installation position, a second installation position and a third installation position at intervals in sequence;

两个螺纹微调杆,每个所述线架的所述第一安装位上均可转动连接有一个所述螺纹微调杆,每个所述螺纹微调杆上均设置有一个便于钢丝线穿设的导引环;Two threaded fine-tuning rods, one threaded fine-tuning rod can be rotatably connected to the first installation position of each of the wire racks, and each threaded fine-tuning rod is provided with a threaded fine-tuning rod that facilitates the threading of steel wires. guide ring;

两个限位收纳盘,每个所述线架的所述第二安装位上均安装有一个所述限位收纳盘以能在其上缠绕钢丝线,每个所述限位收纳盘上均可拆卸连接有限位件以能配合所述线架限制所述限位收纳盘的转动;Two limit storage discs, one limit storage disc is installed on the second installation position of each of the wire racks so that steel wire can be wound thereon, each limit storage disc has a The limiting part is detachably connected so as to cooperate with the wire frame to limit the rotation of the limiting storage disc;

两个固定件,每个所述线架的所述第三安装位上均设置有一个所述固定件以能与钢丝线的自由端连接固定;Two fixing parts, one fixing part is provided on the third installation position of each wire rack so as to be connected and fixed with the free end of the steel wire;

线锤组件,通过钢丝线架设在两个所述线架之间以能进行对中。The wire hammer assembly is erected between the two wire racks through steel wires for centering.

优选的,其中,每个所述线架的底部均具有一端开敞的收容腔以便于施工面板插入并固定,且两个所述收容腔的开敞口相对设置;和/或Preferably, wherein, the bottom of each wire frame has a receiving cavity with an open end to facilitate the insertion and fixing of the construction panel, and the openings of the two receiving cavities are oppositely arranged; and/or

每个所述线架上还设置有磁吸件以能将所述线架与施工面连接为一体。Each of the wire racks is also provided with a magnetic attraction to connect the wire racks with the construction surface as a whole.

优选的,其中,每个所述线架上还可拆卸连接有多个锁定件以能插入所述收容腔中将施工面板锁牢。Preferably, a plurality of locking pieces can be detachably connected to each of the wire racks so as to be able to be inserted into the accommodating cavity to securely lock the construction panel.

优选的,其中,所述螺纹微调杆的自由端形成有手柄以能调整所述导引环的位置。Preferably, wherein, the free end of the thread fine-tuning rod is formed with a handle for adjusting the position of the guide ring.

优选的,其中,所述限位收纳盘沿其周向设置有中间凹槽以便于缠绕钢丝线。Preferably, wherein, the limit storage plate is provided with an intermediate groove along its circumference to facilitate winding of the steel wire.

优选的,其中,所述限位收纳盘上设置有多个贯穿孔以便于所述限位件穿设并配合所述线架进行限位。Preferably, a plurality of through holes are provided on the limiting storage tray to facilitate the passing of the limiting member and cooperate with the wire frame to limit the position.

优选的,其中,所述中间凹槽的槽深不小于40毫米。Preferably, wherein, the groove depth of the middle groove is not less than 40 mm.

优选的,其中,每个所述限位收纳盘通过中心旋转轴转动连接在所述线架上,且所述中心旋转轴的末端形成有手柄。Preferably, each of the limiting storage trays is rotatably connected to the wire rack through a central rotating shaft, and a handle is formed at the end of the central rotating shaft.

优选的,其中,所述线锤组件包括:Preferably, wherein the wire hammer assembly includes:

线锤;wire hammer;

吊扣,可滑动设置在钢丝线上;Hanging buckle, which can be slidably set on the steel wire;

夹扣,两端通过粉线分别与所述线锤和所述吊扣连接,且所述夹扣能与粉线配合调整所述线锤的距地高度。The two ends of the clip are respectively connected to the wire hammer and the hanging buckle through a powder wire, and the clip can cooperate with the powder wire to adjust the height of the wire hammer from the ground.

优选的,其中,所述吊扣采用钢质圆柱弯制而成,所述吊扣呈平行四边形设置,且所述平行四边形的尖角角度为10度;和/或Preferably, wherein, the hanging buckle is made of a steel cylinder bent, the hanging buckle is arranged in a parallelogram, and the sharp angle of the parallelogram is 10 degrees; and/or

所述夹扣采用钢质圆柱弯制而成,所述夹扣包括中心重合的圆环和十字状结构,所述圆环的直径小于所述十字状结构的尺寸,且所述十字状结构的每个自由端均具有10毫米长的折弯部。The buckle is made of a bent steel cylinder, and the buckle includes a ring and a cross-shaped structure whose centers overlap, the diameter of the ring is smaller than the size of the cross-shaped structure, and the cross-shaped structure Each free end has a 10 mm long bend.

本发明至少具有以下特点及优点:The present invention has at least the following characteristics and advantages:

本发明的用于船舶建造的对中装置,设置线盘用于收纳钢丝线,采用吊线锤对准、左右微调架螺杆调节钢丝线对准情况,结构采用门架形式,设置磁吸装置和螺栓夹具,夹具适用于分段合拢口,磁吸装置适用于部分壁板垂直度检测或无自由边位置。线盘设置限位装置,线架另一端设置拉紧装置,使得钢丝线拉紧固定。线锤粉线上口设置扣式连接便于线锤沿着钢丝线滑动,线锤粉线中部设置夹扣,便于线锤高低伸缩时粉线长短调节。The centering device for shipbuilding of the present invention is provided with a wire reel for receiving steel wires, using a hanging hammer for alignment, left and right fine-tuning frame screws to adjust the alignment of the steel wires, the structure adopts the form of a door frame, and a magnetic suction device and bolts are provided Fixture, the fixture is suitable for segmental closure, and the magnetic suction device is suitable for the verticality detection of some wall panels or the position without free edge. The wire reel is equipped with a limit device, and the other end of the wire frame is equipped with a tensioning device, so that the steel wire is tightened and fixed. There is a buckle connection at the mouth of the powder line of the hammer to facilitate the sliding of the hammer along the steel wire, and a clip is set in the middle of the powder line of the hammer to facilitate the adjustment of the length of the powder line when the hammer is stretched.

附图说明Description of drawings

为了更清楚地说明本发明实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the drawings in the following description are only some embodiments of the present invention. For those skilled in the art, other drawings can also be obtained based on these drawings without creative effort.

图1为本发明用于船舶建造的对中装置的立体图;Fig. 1 is the perspective view of the centering device that the present invention is used for ship building;

图2为本发明限位收纳盘的结构示意图;Fig. 2 is a structural schematic diagram of the limit storage tray of the present invention;

图3为本发明螺纹微调杆的结构示意图;Fig. 3 is the structural schematic diagram of thread fine-tuning rod of the present invention;

图4为本发明吊扣的结构示意图;Fig. 4 is a structural schematic diagram of the suspension buckle of the present invention;

图5为本发明夹扣的结构示意图。Fig. 5 is a structural schematic diagram of the clip of the present invention.

附图标记与说明:Reference signs and description:

1、线架;11、第一安装位;12、第二安装位;13、第三安装位;14、收容腔;15、磁吸件;16、锁定件;2、螺纹微调杆;21、导引环;3、限位收纳盘;31、限位件;32、中间凹槽;33、贯穿孔;34、中心旋转轴;4、固定件;5、线锤组件;51、线锤;52、吊扣;53、夹扣;6、钢丝线。1. Wire stand; 11. First installation position; 12. Second installation position; 13. Third installation position; 14. Storage cavity; 15. Magnetic attraction piece; 16. Locking piece; Guide ring; 3. Limit storage tray; 31. Limit piece; 32. Middle groove; 33. Through hole; 34. Central rotating shaft; 4. Fixing piece; 5. Wire hammer assembly; 51. Wire hammer; 52, hanging buckle; 53, clip buckle; 6, steel wire.

具体实施方式Detailed ways

下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,下文所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the embodiments described below are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

本发明提供了一种用于船舶建造的对中装置,请参见图1至图5,包括两个线架1、两个螺纹微调杆2、两个限位收纳盘3、两个固定件4和线锤组件5。The present invention provides a centering device for shipbuilding, please refer to Fig. 1 to Fig. 5, which includes two wire racks 1, two thread fine-tuning rods 2, two limit storage discs 3, and two fixing parts 4 and wire hammer assembly 5.

具体的,两个线架1相对设置,每个线架1均能可拆卸固定在对中区域的施工面上,两个线架1相对的面为倾斜面,在倾斜面上沿其倾斜方向依次间隔设置有第一安装位11、第二安装位12和第三安装位13;每个线架1的第一安装位11上均可转动连接有一个螺纹微调杆2,每个螺纹微调杆2上均设置有一个便于钢丝线6穿设的导引环21;每个线架1的第二安装位12上均安装有一个限位收纳盘3以能在其上缠绕钢丝线6,每个限位收纳盘3上均可拆卸连接有限位件31以能配合线架1限制限位收纳盘3的转动;每个线架1的第三安装位13上均设置有一个固定件4以能与钢丝线6的自由端连接固定;线锤组件5通过钢丝线6架1设在两个线架1之间以能进行对中。Specifically, two wire frames 1 are arranged opposite to each other, and each wire frame 1 can be detachably fixed on the construction surface of the centering area. The first installation position 11, the second installation position 12 and the third installation position 13 are arranged at intervals in sequence; a threaded fine-tuning rod 2 is rotatably connected to the first installation position 11 of each wire rack 1, and each threaded fine-tuning rod 2 are all provided with a guide ring 21 that is convenient for the steel wire 6 to pass through; on the second installation position 12 of each wire rack 1, a limit storage disc 3 is installed so that the steel wire 6 can be wound thereon, and each Each limit storage tray 3 can be detachably connected with a limit member 31 to be able to cooperate with the wire rack 1 to limit the rotation of the limit storage disc 3; the third installation position 13 of each wire rack 1 is provided with a fixing piece 4 for It can be connected and fixed with the free end of the steel wire 6; the wire hammer assembly 5 is installed between the two wire racks 1 through the steel wire 6 to be centered.

在一些实施例中,请参见图1,每个线架1的底部均具有一端开敞的收容腔14以便于施工面板插入并固定,且两个收容腔14的开敞口相对设置;在另一些实施例中,请参见图1,每个线架1上还设置有磁吸件15以能将线架1与施工面连接为一体。在一些实施例中,每个线架1的底部均具有一端开敞的收容腔14以便于施工面板插入并固定,且两个收容腔14的开敞口相对设置,且每个线架1上还设置有磁吸件15以能将线架1与施工面连接为一体。In some embodiments, referring to Fig. 1, the bottom of each wire rack 1 has a receiving chamber 14 with an open end so that the construction panel can be inserted and fixed, and the openings of the two receiving chambers 14 are oppositely arranged; In some embodiments, please refer to FIG. 1 , each wire frame 1 is also provided with a magnetic attraction 15 to connect the wire frame 1 with the construction surface as a whole. In some embodiments, the bottom of each wire frame 1 has a receiving chamber 14 with an open end so that the construction panel can be inserted and fixed, and the openings of the two receiving chambers 14 are oppositely arranged, and each wire rack 1 has A magnetic attraction 15 is also provided to connect the wire frame 1 with the construction surface as a whole.

进一步的,请参见图1,每个线架1上还可拆卸连接有多个锁定件16以能插入收容腔14中将施工面板锁牢。Further, referring to FIG. 1 , each wire frame 1 is detachably connected with a plurality of locking pieces 16 so as to be inserted into the receiving cavity 14 to lock the construction panel firmly.

在一些实施例中,请参见图3,螺纹微调杆2的自由端形成有手柄以能调整导引环21的位置。In some embodiments, please refer to FIG. 3 , the free end of the threaded fine adjustment rod 2 is formed with a handle for adjusting the position of the guide ring 21 .

在一些实施例中,请参见图2,限位收纳盘3沿其周向设置有中间凹槽32以便于缠绕钢丝线6。进一步的,请参见图1和图2,限位收纳盘3上设置有多个贯穿孔33以便于限位件31穿设并配合线架1进行限位。更进一步的,中间凹槽32的槽深不小于40毫米。在另一些实施例中,请参见图1和图2,每个限位收纳盘3通过中心旋转轴34转动连接在线架1上,且中心旋转轴34的末端形成有手柄。In some embodiments, please refer to FIG. 2 , the limit storage tray 3 is provided with a middle groove 32 along its circumference to facilitate the winding of the steel wire 6 . Further, please refer to FIG. 1 and FIG. 2 , a plurality of through holes 33 are provided on the limiting storage tray 3 to facilitate the passing of the limiting member 31 and cooperate with the wire frame 1 for limiting. Furthermore, the groove depth of the middle groove 32 is not less than 40mm. In other embodiments, please refer to FIG. 1 and FIG. 2 , each limit storage tray 3 is rotatably connected to the wire rack 1 through a central rotating shaft 34 , and a handle is formed at the end of the central rotating shaft 34 .

在一些实施例中,请参见图1、图4和图5,线锤组件5包括线锤51、吊扣52和夹扣53。具体的,吊扣52可滑动设置在钢丝线6上;夹扣53两端通过粉线分别与线锤51和吊扣52连接,且夹扣53能与粉线配合调整线锤51的距地高度。In some embodiments, referring to FIG. 1 , FIG. 4 and FIG. 5 , the wire hammer assembly 5 includes a wire hammer 51 , a hanging buckle 52 and a clamping buckle 53 . Specifically, the hanging buckle 52 is slidably arranged on the steel wire 6; the two ends of the clip 53 are respectively connected to the wire hammer 51 and the hanging buckle 52 through the powder wire, and the clip 53 can cooperate with the powder wire to adjust the height of the wire hammer 51 from the ground.

在一些实施例中,请参见图4,吊扣52采用钢质圆柱弯制而成,吊扣52呈平行四边形设置,且平行四边形的尖角角度为10度;在另一些实施例中,请参见图图5,夹扣53采用钢质圆柱弯制而成,夹扣53包括中心重合的圆环和十字状结构,圆环的直径小于十字状结构的尺寸,且十字状结构的每个自由端均具有10毫米长的折弯部。In some embodiments, please refer to Fig. 4, the hanging buckle 52 is made of a steel cylinder bent, the hanging buckle 52 is arranged in a parallelogram, and the angle of the sharp angle of the parallelogram is 10 degrees; in other embodiments, please refer to Fig. Fig. 5, buckle 53 adopts steel cylinder to bend, and buckle 53 comprises the circular ring and cross-shaped structure that the center overlaps, and the diameter of circular ring is smaller than the size of cross-shaped structure, and each free end of cross-shaped structure is Has a 10 mm long bend.

本发明至少具有以下特点及优点:The present invention has at least the following characteristics and advantages:

(1)携带使用更便携,收纳钢丝线6,使用更便携。(1) It is more portable to carry and use, and the storage of steel wire 6 makes it more portable to use.

(2)粉线调节更方便,夹扣53调节线锤51粉线长短,使用更方便。(2) It is more convenient to adjust the pink thread, and the clip 53 can adjust the length of the pink thread of the hammer 51, which is more convenient to use.

(3)减少装焊打磨,工效高,无需装焊,夹持即可用,降本增效明显。(3) Reduce welding and grinding, high work efficiency, no need to install and weld, it can be used after clamping, and the cost reduction and efficiency increase are obvious.

(4)线锤51调用更简单,线锤51粉线扣式连接,线锤51移动更简单。(4) The call of the wire hammer 51 is simpler, the wire hammer 51 is connected with a powder wire buckle, and the wire hammer 51 is moved more simply.

(5)对准更快捷,螺纹微调钢丝线6,钢丝线6对准更快捷。(5) Alignment is faster, and the thread fine-tuning steel wire 6 makes the alignment of the steel wire 6 faster.

下面以一个具体实施例来对本发明做进一步的介绍与说明,请参见图1至图5:The present invention will be further introduced and illustrated with a specific embodiment below, please refer to Fig. 1 to Fig. 5:

本发明主要包括具有磁吸及夹具的线架1、限位收纳盘3、钢丝线6、螺纹微调杆2、线锤51的吊扣52、线锤51的粉线夹扣53,具体如下:The present invention mainly includes a wire rack 1 with magnetic attraction and clamps, a limit storage tray 3, a steel wire 6, a thread fine-tuning rod 2, a hook 52 of a wire hammer 51, and a wire clip 53 of a wire hammer 51, specifically as follows:

线架1主要是采用直径20mm圆钢管制作而成,长300mm宽200mm高200mm,整体呈三角体形状,底部设置有夹具盘(即收容腔14)内径20mm管套,夹具盘管4个12mm通孔,通孔一侧安装M10螺母,并配长50mmM10的螺栓(即锁定件16),螺栓顶部装焊长50mm宽4mm高25mm的扁铁条用于手动调节螺栓。在夹具盘管边安装磁吸装置(即磁吸件15)。中部设置安装杆(即中心旋转轴34)用于安装限位收纳盘3,顶部设置M20双螺母,用于安装钢丝线6螺纹微调杆2。线架1尾部安装M10螺母,配长50mmM10螺栓,螺栓顶部装焊长50mm宽4mm高25mm的扁铁条用于手动调节螺栓,在扁铁条顶部装焊钩座(即固定件4)用于收紧钢丝线6。Wire frame 1 is mainly made of round steel pipe with a diameter of 20mm, 300mm in length, 200mm in width and 200mm in height. M10 nuts are installed on one side of the through hole, and a 50mm long M10 bolt (that is, the locking piece 16) is installed. A flat iron bar with a length of 50mm, a width of 4mm, and a height of 25mm is welded on the top of the bolt for manual adjustment of the bolt. A magnetic attraction device (that is, a magnetic attraction part 15) is installed on the clamp coil side. The middle part is provided with an installation rod (ie, the central rotating shaft 34) for installing the limit storage tray 3, and the top is provided with M20 double nuts for installing the steel wire 6 thread fine-tuning rod 2. M10 nuts are installed at the end of the wire frame 1, and M10 bolts with a length of 50 mm are installed. A flat iron bar with a length of 50 mm, a width of 4 mm, and a height of 25 mm is welded on the top of the bolts for manual adjustment of the bolts. Tighten the steel wire 6.

限位收纳盘3主要采用直径120mm宽40mm,内径80mm的凹槽轮,凹槽轮中部设置直径18mm的长60mm的轴套,轴套边缘设置直径5mm的通孔,转轴及手柄与凹槽轮轴套采用M5螺栓连接。凹槽轮距圆心30mm处设置4个22mm通孔,采用直径18mm长220mm圆管进行限位。The limit storage tray 3 mainly adopts a grooved wheel with a diameter of 120mm, a width of 40mm, and an inner diameter of 80mm. A bushing with a diameter of 18mm and a length of 60mm is set in the middle of the grooved wheel, and a through hole with a diameter of 5mm is set on the edge of the bushing. The sleeve is connected with M5 bolts. Four 22mm through holes are set at the center of the groove wheel base 30mm, and a circular tube with a diameter of 18mm and a length of 220mm is used for limiting.

钢丝线6螺纹微调杆2主要采用长400mm的M20螺栓和长100mm宽100mm的曲臂手柄,螺栓中部设置M20螺母,螺母上设置钢丝线6圆环(即导引环21)用于悬挂钢丝线6。Steel wire 6 thread fine-tuning lever 2 mainly adopts M20 bolts with a length of 400mm and a crank handle with a length of 100mm and a width of 100mm. M20 nuts are arranged in the middle of the bolts, and 6 rings (ie, guide rings 21) of steel wires are arranged on the nuts for hanging the steel wires. 6.

线锤51吊扣52主要采用直径1mm钢质圆柱弯制而成,锥高100mm,呈平行四边形,平行四边形长20mm,尖角角度10度。The wire hammer 51 and the buckle 52 are mainly bent from a steel cylinder with a diameter of 1 mm. The cone height is 100 mm, and it is a parallelogram. The length of the parallelogram is 20 mm, and the sharp angle is 10 degrees.

线锤51粉线夹扣53主要采用直径1mm钢质圆柱弯制而成,呈圆环十字状,中部圆环直径30mm,十字长60mm,十字尾部折弯长10mm。The wire hammer 51 and the powder wire clip 53 are mainly made of steel cylinders with a diameter of 1 mm, which are in the shape of a circular ring cross, with a diameter of the middle ring of 30 mm, a length of the cross of 60 mm, and a bending length of 10 mm at the end of the cross.

本发明的使用方法如下:The using method of the present invention is as follows:

1、前后架设磁吸及夹具线架1,上紧固定夹具螺栓或打开磁吸装置吸附;1. Set up the magnetic suction and clamp wire frame 1 front and rear, tighten the fixing clamp bolts or open the magnetic suction device for adsorption;

2、牵引钢丝线6架1到螺纹微调杆2上,限位收纳盘3,钢丝线6钩在另一个线架1尾部的螺栓钩上,并锁紧螺栓;2. Pull the steel wire 6 frame 1 to the thread fine-tuning rod 2, limit the storage plate 3, hook the steel wire 6 on the bolt hook at the tail of another wire frame 1, and lock the bolt;

3、左右调节微调杆,使得钢丝线6对准地面的地样线。3. Adjust the fine-tuning lever left and right, so that the steel wire 6 is aligned with the ground sample line.

4、拆卸时,只需要松开螺栓即可拆除。4. When disassembling, you only need to loosen the bolts to disassemble.

本发明的用于船舶建造的对中装置,设置线盘用于收纳钢丝线6,采用吊线锤51对准、左右微调架螺杆调节钢丝线6对准情况,结构采用门架形式,设置磁吸装置和螺栓夹具,夹具适用于分段合拢口,磁吸装置适用于部分壁板垂直度检测或无自由边位置。线盘设置限位装置,线架1另一端设置拉紧装置,使得钢丝线6拉紧固定。线锤51粉线上口设置扣式连接便于线锤51沿着钢丝线6滑动,线锤51粉线中部设置夹扣53,便于线锤51高低伸缩时粉线长短调节。The centering device for shipbuilding of the present invention is provided with a wire reel for receiving the steel wire 6, using a hanging hammer 51 for alignment, left and right fine-tuning frame screws to adjust the alignment of the steel wire 6, the structure adopts the form of a door frame, and a magnetic attraction is provided. Device and bolt fixture, the fixture is suitable for segmental closing openings, and the magnetic suction device is suitable for the verticality detection of some wall panels or positions without free edges. The wire reel is provided with a limiting device, and the other end of the wire frame 1 is provided with a tensioning device, so that the steel wire 6 is tensioned and fixed. Wire hammer 51 powder line mouth is provided with buckle type connection and is convenient to wire hammer 51 to slide along steel wire 6, and clamp 53 is set in the middle part of wire hammer 51 powder line, and powder line length is adjusted when being convenient to wire hammer 51 height and contraction.

以上,仅是本发明的较佳实施例而已,并非对本发明做任何形式上的限制,虽然本发明已以较佳实施例揭露如上,然而并非用以限定本发明,任何熟悉本专业的技术人员,在不脱离本发明技术方案范围内,当可利用上述揭示的技术内容做出些许更动或修饰为等同变化的等效实施例,但凡是未脱离本发明技术方案的内容,依据本发明的技术实质对以上实施例所做的任何简单修改、等同变化与修饰,均仍属于本发明技术方案的范围内。The above are only preferred embodiments of the present invention, and do not limit the present invention in any form. Although the present invention has been disclosed as above with preferred embodiments, it is not intended to limit the present invention. Anyone familiar with this field , without departing from the scope of the technical solution of the present invention, when the technical content disclosed above can be used to make some changes or modifications to equivalent embodiments with equivalent changes, but as long as the content of the technical solution of the present invention is not departed from, according to the technical content of the present invention Technical Essence Any simple modifications, equivalent changes and modifications made to the above embodiments still fall within the scope of the technical solution of the present invention.

Claims (10)

1.一种用于船舶建造的对中装置,其特征在于,包括:1. A centering device for shipbuilding, characterized in that it comprises: 两个线架,相对设置,每个所述线架均能可拆卸固定在对中区域的施工面上,两个所述线架相对的面为倾斜面,在所述倾斜面上沿其倾斜方向依次间隔设置有第一安装位、第二安装位和第三安装位;Two wire frames are arranged opposite to each other, and each of the wire frames can be detachably fixed on the construction surface of the centering area. The opposite surface of the two wire frames is an inclined surface, and the inclined surface is inclined along it The direction is provided with a first installation position, a second installation position and a third installation position at intervals in sequence; 两个螺纹微调杆,每个所述线架的所述第一安装位上均可转动连接有一个所述螺纹微调杆,每个所述螺纹微调杆上均设置有一个便于钢丝线穿设的导引环;Two threaded fine-tuning rods, one threaded fine-tuning rod can be rotatably connected to the first installation position of each of the wire racks, and each threaded fine-tuning rod is provided with a threaded fine-tuning rod that facilitates the threading of steel wires. guide ring; 两个限位收纳盘,每个所述线架的所述第二安装位上均安装有一个所述限位收纳盘以能在其上缠绕钢丝线,每个所述限位收纳盘上均可拆卸连接有限位件以能配合所述线架限制所述限位收纳盘的转动;Two limit storage discs, one limit storage disc is installed on the second installation position of each of the wire racks so that steel wire can be wound thereon, each limit storage disc has a The limiting part is detachably connected so as to cooperate with the wire frame to limit the rotation of the limiting storage disc; 两个固定件,每个所述线架的所述第三安装位上均设置有一个所述固定件以能与钢丝线的自由端连接固定;Two fixing parts, one fixing part is provided on the third installation position of each wire rack so as to be connected and fixed with the free end of the steel wire; 线锤组件,通过钢丝线架设在两个所述线架之间以能进行对中。The wire hammer assembly is erected between the two wire racks through steel wires for centering. 2.根据权利要求1所述的用于船舶建造的对中装置,其特征在于,2. The centering device for shipbuilding according to claim 1, characterized in that, 每个所述线架的底部均具有一端开敞的收容腔以便于施工面板插入并固定,且两个所述收容腔的开敞口相对设置;和/或The bottom of each of the wire racks has a receiving cavity with an open end to facilitate the insertion and fixing of the construction panel, and the openings of the two receiving cavities are oppositely arranged; and/or 每个所述线架上还设置有磁吸件以能将所述线架与施工面连接为一体。Each of the wire racks is also provided with a magnetic attraction to connect the wire racks with the construction surface as a whole. 3.根据权利要求2所述的用于船舶建造的对中装置,其特征在于,每个所述线架上还可拆卸连接有多个锁定件以能插入所述收容腔中将施工面板锁牢。3. The centering device for shipbuilding according to claim 2, characterized in that, each of the wire racks is detachably connected with a plurality of locking pieces that can be inserted into the accommodation cavity to lock the construction panel prison. 4.根据权利要求3所述的用于船舶建造的对中装置,其特征在于,所述螺纹微调杆的自由端形成有手柄以能调整所述导引环的位置。4. The centering device for ship building according to claim 3, characterized in that, the free end of the threaded fine adjustment rod is formed with a handle so as to be able to adjust the position of the guide ring. 5.根据权利要求4所述的用于船舶建造的对中装置,其特征在于,所述限位收纳盘沿其周向设置有中间凹槽以便于缠绕钢丝线。5 . The centering device for shipbuilding according to claim 4 , characterized in that, the limit storage plate is provided with a middle groove along its circumference to facilitate the winding of steel wires. 6 . 6.根据权利要求5所述的用于船舶建造的对中装置,其特征在于,所述限位收纳盘上设置有多个贯穿孔以便于所述限位件穿设并配合所述线架进行限位。6. The centering device for shipbuilding according to claim 5, characterized in that, a plurality of through holes are provided on the limiting storage plate to facilitate the passing of the limiting member and cooperate with the wire stand Carry out limit. 7.根据权利要求6所述的用于船舶建造的对中装置,其特征在于,所述中间凹槽的槽深不小于40毫米。7. The centering device for shipbuilding according to claim 6, characterized in that, the depth of the middle groove is not less than 40 mm. 8.根据权利要求6所述的用于船舶建造的对中装置,其特征在于,每个所述限位收纳盘通过中心旋转轴转动连接在所述线架上,且所述中心旋转轴的末端形成有手柄。8. The centering device for shipbuilding according to claim 6, characterized in that, each of the limit storage discs is connected to the wire stand through a central rotating shaft in rotation, and the central rotating shaft Ends formed with handles. 9.根据权利要求1至8中任一项所述的用于船舶建造的对中装置,其特征在于,所述线锤组件包括:9. The centering device for shipbuilding according to any one of claims 1 to 8, wherein the hammer assembly comprises: 线锤;wire hammer; 吊扣,可滑动设置在钢丝线上;Hanging buckle, which can be slidably set on the steel wire; 夹扣,两端通过粉线分别与所述线锤和所述吊扣连接,且所述夹扣能与粉线配合调整所述线锤的距地高度。The two ends of the clip are respectively connected to the wire hammer and the hanging buckle through a powder wire, and the clip can cooperate with the powder wire to adjust the height of the wire hammer from the ground. 10.根据权利要求9所述的用于船舶建造的对中装置,其特征在于,10. The centering device for shipbuilding according to claim 9, characterized in that, 所述吊扣采用钢质圆柱弯制而成,所述吊扣呈平行四边形设置,且所述平行四边形的尖角角度为10度;和/或The hanging buckle is made of a steel cylinder bent, the hanging buckle is arranged in a parallelogram, and the sharp angle of the parallelogram is 10 degrees; and/or 所述夹扣采用钢质圆柱弯制而成,所述夹扣包括中心重合的圆环和十字状结构,所述圆环的直径小于所述十字状结构的尺寸,且所述十字状结构的每个自由端均具有10毫米长的折弯部。The clip is made of bent steel cylinder, and the clip includes a circular ring and a cross-shaped structure whose centers overlap, the diameter of the circular ring is smaller than the size of the cross-shaped structure, and the cross-shaped structure Each free end has a 10 mm long bend.
CN202211315682.6A 2022-10-26 2022-10-26 Centering devices for shipbuilding Pending CN115900669A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202211315682.6A CN115900669A (en) 2022-10-26 2022-10-26 Centering devices for shipbuilding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202211315682.6A CN115900669A (en) 2022-10-26 2022-10-26 Centering devices for shipbuilding

Publications (1)

Publication Number Publication Date
CN115900669A true CN115900669A (en) 2023-04-04

Family

ID=86476879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202211315682.6A Pending CN115900669A (en) 2022-10-26 2022-10-26 Centering devices for shipbuilding

Country Status (1)

Country Link
CN (1) CN115900669A (en)

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3348315A (en) * 1964-03-07 1967-10-24 Fontguyon Marie Pierre Poit De Device for the stable determination of the vertical above a given point
JPH0511018U (en) * 1991-02-20 1993-02-12 三井造船株式会社 Down swing height adjustment jig
JPH07159173A (en) * 1993-12-07 1995-06-23 Nikon Corp Marking pointer
US5473819A (en) * 1994-04-11 1995-12-12 Byers; Gary L. Plumb bob string holder
JP2005201643A (en) * 2004-01-13 2005-07-28 Shimada Chiaki Plumb bob for leveling string
CN205907689U (en) * 2016-08-04 2017-01-25 四川永强机械施工股份有限公司 Complete simple and easy centering device of reversing chassis
CN106767350A (en) * 2017-01-20 2017-05-31 江南造船(集团)有限责任公司 For the steel wire centralising device and its centering method of marine shafting equipment
CN207019684U (en) * 2017-07-28 2018-02-16 中国二十冶集团有限公司 Adjustable messenger wire
CN208026282U (en) * 2018-04-07 2018-10-30 李晓艳 Architectural engineering line fall device
CN210400382U (en) * 2019-07-25 2020-04-24 浙江二十冶建设有限公司 Central line measuring and adjusting device
CN112208722A (en) * 2020-10-23 2021-01-12 中船黄埔文冲船舶有限公司 Auxiliary segmented positioning device for slipway and using method thereof
CN112444237A (en) * 2020-09-28 2021-03-05 中国三冶集团有限公司 Method for measuring equipment installation center line
CN213090758U (en) * 2020-09-10 2021-04-30 中国建筑第二工程局有限公司 Auxiliary alignment device for building engineering paying-off
CN113044177A (en) * 2021-04-22 2021-06-29 中船黄埔文冲船舶有限公司 Ship section construction precision control method
CN113048961A (en) * 2021-05-07 2021-06-29 中建四局第三建设有限公司 Measuring tool for independent foundation positioning and using method
CN213579352U (en) * 2020-10-10 2021-06-29 中国华冶科工集团有限公司 Mine underground lofting device
CN214870528U (en) * 2021-04-23 2021-11-26 中船澄西扬州船舶有限公司 Stay wire tool for mounting deck piping system bracket
CN115077428A (en) * 2022-06-07 2022-09-20 中船黄埔文冲船舶有限公司 Centering measurement method for ship construction

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3348315A (en) * 1964-03-07 1967-10-24 Fontguyon Marie Pierre Poit De Device for the stable determination of the vertical above a given point
JPH0511018U (en) * 1991-02-20 1993-02-12 三井造船株式会社 Down swing height adjustment jig
JPH07159173A (en) * 1993-12-07 1995-06-23 Nikon Corp Marking pointer
US5473819A (en) * 1994-04-11 1995-12-12 Byers; Gary L. Plumb bob string holder
JP2005201643A (en) * 2004-01-13 2005-07-28 Shimada Chiaki Plumb bob for leveling string
CN205907689U (en) * 2016-08-04 2017-01-25 四川永强机械施工股份有限公司 Complete simple and easy centering device of reversing chassis
CN106767350A (en) * 2017-01-20 2017-05-31 江南造船(集团)有限责任公司 For the steel wire centralising device and its centering method of marine shafting equipment
CN207019684U (en) * 2017-07-28 2018-02-16 中国二十冶集团有限公司 Adjustable messenger wire
CN208026282U (en) * 2018-04-07 2018-10-30 李晓艳 Architectural engineering line fall device
CN210400382U (en) * 2019-07-25 2020-04-24 浙江二十冶建设有限公司 Central line measuring and adjusting device
CN213090758U (en) * 2020-09-10 2021-04-30 中国建筑第二工程局有限公司 Auxiliary alignment device for building engineering paying-off
CN112444237A (en) * 2020-09-28 2021-03-05 中国三冶集团有限公司 Method for measuring equipment installation center line
CN213579352U (en) * 2020-10-10 2021-06-29 中国华冶科工集团有限公司 Mine underground lofting device
CN112208722A (en) * 2020-10-23 2021-01-12 中船黄埔文冲船舶有限公司 Auxiliary segmented positioning device for slipway and using method thereof
CN113044177A (en) * 2021-04-22 2021-06-29 中船黄埔文冲船舶有限公司 Ship section construction precision control method
CN214870528U (en) * 2021-04-23 2021-11-26 中船澄西扬州船舶有限公司 Stay wire tool for mounting deck piping system bracket
CN113048961A (en) * 2021-05-07 2021-06-29 中建四局第三建设有限公司 Measuring tool for independent foundation positioning and using method
CN115077428A (en) * 2022-06-07 2022-09-20 中船黄埔文冲船舶有限公司 Centering measurement method for ship construction

Similar Documents

Publication Publication Date Title
CN110056186A (en) A kind of building template Simple clamp and its construction method
CN115900669A (en) Centering devices for shipbuilding
CN212371554U (en) Pipeline assembly device suitable for multiple pipe diameters
CN211257737U (en) Scaffold frame for building engineering convenient to build
CN115750919A (en) Pipeline structure for testing straight industrial water meter and installation method
CN211991634U (en) A kind of installation auxiliary device for water pipe flange
CN110039466B (en) Clamp for gear box
CN117001581B (en) Method and device for replacing locating plate clamp for intelligent assembly of domain controller
CN215329398U (en) A drop frame device that can be quickly disassembled and assembled for the pouring of cover beams
CN211951701U (en) An easy-to-install tubular support and hanger
CN117306514A (en) A kind of anchor rod body installation device
CN113321117A (en) High-efficient wheel hub stone tongs
CN220527585U (en) Pipeline bracket for building
CN206519907U (en) Special fixture of deep-well pump dismouting
CN217143625U (en) A anchor clamps hydraulic tong for pipeline bus structure installation
CN115355388B (en) Pipe Nozzle Anti-deformation Support Device and Operation Method
CN109296217B (en) A kind of reinforcing component of wooden pillar and its use method
CN115306026B (en) A connection structure of assembled steel structure columns
CN221894539U (en) A large steel pipe vertical lifting device
CN222818774U (en) U-shaped clamp for fixing H-shaped steel
CN222791748U (en) A kind of auxiliary device for pipe installation
CN219885487U (en) Balance beam structure
CN216912758U (en) Spacing fine-tuning of pipeline is to device
CN216612137U (en) A transition plate for a single crystal furnace that is easy to receive
CN223122740U (en) Ceramic filter tube flexural strength testing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication